VALIYATHURA GODOWN PROJECT-III
Administrative Sanction No. GO (Rt.) No.216/2017/ F&CSD dtd.28.06.2017
Estimated cost Rs. 3.9 crores.
PMC M/s. HPL
Area
24,993.80sqft
Present Status The Construction work completed .
Godown inaugurated on 11/09/2020.
OUTSIDE VIEW
INSIDE VIEW