Traffic Evolution

From 1952 to 1996 travel in UK trebled from 218 billion to 719 billion passenger km.

• 1980’s – ‘predict and provide’ era. • 1990’s – unprecedented growth in traffic.• 1998 Integrated Transport White Paper and 2000

Transport Act – introduces LTPs. • LTP1 (2001-06) and LTP2 (2006-11) influenced

the amount of funding received by HCC • LTP2 was target driven

www.hertsdirect.org

Local Transport Plan 2011-2031 (LTP3)

http://www.hertsdirect.org

www.hertsdirect.org

Recent Government strategy• LTP3 Guidance already moving towards less

prescriptive approach• Delivering a Sustainable Transport System (challenge

driven)• Proposed – Localism Bill 2010 – 2011 abolition of

Regional Spatial Strategies and Regional Transport Strategy

• Government requires local authorities to continue to produce LTPs

• Local Transport White Paper Jan 2011 placed emphasis on sustainable transport and economic development

www.hertsdirect.org

Why do we need an LTP?

• Statutory obligation

• To provide a strategic framework for transport in the County

• To help formulate Urban Transport Plans

• To justify/prioritise limited funding – capital & revenue

• To inform the planning process

• To inform other HCC Plans

www.hertsdirect.org

How we developed Herts LTP3July 2009

Received DfT guidance on producing LTP3

Nov-Dec 2009Initial workshops held with Stakeholders on LTP3 challenges and issues

Jan 2010Report with stakeholder comments considered by Highways and Transport Panel

Jan-Sept 2010LTP3 draft developed taking consultation comments into consideration

22nd Sept-1st Dec 2010 (10 weeks)Full public consultation on provisional LTP3 and SEA report

Feb 2011Highways and Transport Panel consider all consultation comments and agree Final LTP3

March 2011Full Council agree final LTP3

31 March 2011LTP3 and associated documents published

www.hertsdirect.org

PresentThe following LTP3 documents were all

published on www.hertsdirect.org on 1 April 2011:

• Vol 1 Strategy • Vol 2 Policies –Vol 3 Implementation Plan,

2 year programme as well as major schemes, and other projects

• Daughter documents • Volume 3 – Implementation Plan

www.hertsdirect.org

LTP3 Daughter Documents• Bus & Intalink Strategies (published 4 July 2011)• Cycling Strategy• Intelligent Transport Systems Strategy• Inter-Urban Routes Strategy (under development)• Rail Strategy• Right of Way Improvement Plan• Road Safety Plan • Rural Strategy • Smarter Modes of Travel Strategy for Schools &Colleges

(SMoTS) • Speed Management Strategy (to be refreshed)• TAMP (to be updated)• Urban Transport Plans (ongoing programme)• Walking Strategy

www.hertsdirect.org

Our LTP3 Vision

“To provide a safe, efficient and resilient transport system that serves the needs of business and residents across Hertfordshire and minimises its impact on the environment.”

www.hertsdirect.org

Hertfordshire’s IssuesThe key transport issues in Herts LTP3

remain mostly the same as those in the LTP2: - Tackling peak-time congestion- Maintaining roads- Reducing casualties- Supporting economic growth- Maintaining access to key services.

With one addition:- Reducing transport’s contribution to greenhouse gas emissions

www.hertsdirect.org

The Five Goals• Support economic development and

planned dwelling growth• Improve transport opportunities for all and

achieve behavioural change in mode choice• Enhance quality of life, health and the

natural, built and historic environment for all Hertfordshire residents

• Improve the safety and security of residents and other road users

• Reduce transport’s contribution to greenhouse gas emissions and improve its resilience.

www.hertsdirect.org

Our Approach

• Making best use of the existing network – ITS, small scale improvements.

• Promoting and supporting sustainable travel.

www.hertsdirect.org

Funding

• HCC Revenue and Capital funding

• Section 106 form developer contributions

• Successful bids to Central Government or Europe

• Other 3rd party funding such as: District or Borough Councils, Sustrans, Network Rail, Rail Operators

www.hertsdirect.org

Scheme identification

The strategies and daughter documents of the LTP in particular the Urban transport Plans (UTPs) are used to identify local transport needs to promote the objectives of LTP 3There are 3 UTPs in the District

www.hertsdirect.org

Significant new infrastructure will be necessary during the plan period and is essential for passenger transport improvements.

www.hertsdirect.org

Other Opportunities for St Albans

www.hertsdirect.org

January 2011Local Sustainable Transport Fund:£560m in total for England excl.

London.

www.hertsdirect.org

Successful HCC Key Component bid provides funding of £1.99m for 2011/12 only (plus match funding) to be spent by 31st March 2012

HCC Proposal for an additional £10.755m (for 2012/13 – 2014/15) submitted in June

Short-listed by DfT on 3rd August for the large component

Only Large Project bid in the East of England to be on the DfT’s Large Project Shortlist

One of only 14 Large Project Bids in England to be on the

Large Project shortlist

A full business case will need to be submitted bid to DfT by 20th December 2011

Approved Large Project bids announced in June 2012

The Bid

www.hertsdirect.org

What does it mean for St Albans ?

www.hertsdirect.org

• Many bus shelters have electronic information screens using scheduled departure information these will go live

• Committed to a programme of RTI (Real Time Information) displays throughout the county using a Vehicle Location software.

• First tranche of locations has been determined, mainly in areas operated by bus companies Uno, Centrebus & Arriva

• Many signs will be pole mounted

Electronic Information

www.hertsdirect.org

• AVL/RTPI – Objectives

– Provide reliable real-time information to passengers through a variety of systems and communications media

– Provide a voice and data communications platform– Enable bus priority at traffic signals– Provide a vehicle location and control system– Be compatible with AVL/RTPI systems operating in

other counties and with other transport providers– Enhance passenger security– Provide information to drivers to aid timekeeping

www.hertsdirect.org

Electric Car Charging points

www.hertsdirect.org

School and Business Travel Planning

Consultant support:Toolkit

Marketing campaignWebsite

Network travel plans

www.hertsdirect.org

• Enhanced Support

– Consultation & audits

– Website

– Action Days

– Walk to School weeks and incentive schemes

– ‘Tailored initiatives’

– Including Bike it Officer dedicated to the LSTF area

Schools

www.hertsdirect.org

Cycling• Improvements to signing of Nickey Line cycle

route between Hemel Hempstead and Harpenden / St Albans

• 74 additional covered cycle spaces at the City Station on top of the current 552 provided building on FCCs national Cycle Rail Award – best Station.

www.hertsdirect.org

The provision of a North South Route through the park linking the King Harry area to the City centre and to the Abbey Station

The Green Ring

The Green Ring is a proposed continuous walking and cycling route that encircles the city centre, rather like a city wall, which will take about an hour to cycle and is seldom more than 20 minutes walk from the city centre

www.hertsdirect.org

The Green Ring builds on existing routes where available such as the Alban Way, links existing green spaces including Verulamium Park, and Bernards Heath and seeks to develop the potential of opportunities such as Everlasting Lane.

www.hertsdirect.org

• It will involve promoting a step change in healthy local transport provision, encouraged by significant investment in off-road routes and cyclist priority junctions at key nodes.

www.hertsdirect.org