Bridge 6
Cable Stayed Bridge 6
Extradosed Bridge 10
Concrete Box Girder Bridge 14
Precast Segmental Construction 14
Balanced Cantilever Method 20
Incremental Launching Method 24
Movable Scaffolding System 28
Containment Structure 32
Building 36
Special Structure 38
Damper 40
Heavy Lifting 42
VSL Korea is one of the 35 worldwide subsidiaries of VSL International, which is a world-leading group in the field of engineering and construction based on post-tensioning and other state-of-the-art engineering technologies. VSL Korea has much reputable experience in the area of prestressed concrete structures such as over 200 concrete box girder bridges, over 20 cable bridges, over 20 containment structures (tanks for LNG, LPG, silo and nuclear power), buildings and heavy lifting structures, since its establishment in Korea in 1982. Recently, the company has constructed some of the most prestigious and complex concrete structures; Seonyu footbridge, Busan-Geoje fixed link project (immersed tunnel and 3 pylon cable stayed bridge), Handuri bridge and Mokpo bridge.
Post-tensioningVSL’s pioneering technology is based on the principle of post-tensioning where the prestress is permanently introduced into the structure after the concrete has hardened. This is achieved by the stressing of suitably arranged, high strength prestressing tendons. VSL’s post-tensioning is proven to be more economical than other systems, especially when fast construction cycles are envisaged. This technology leads less material handling on site and labor force reducing which induce minimization of the site congestion. To make it better, the post-tensioning works by VSL Korea aim at “the best quality and service” through the technical tie-up with VSL International’s highly specialized team.
Global Network Over the past three decades after the company establishment, VSL Korea has grown into a nationwide engineering and construction company in collaboration with VSL International. It is proven that its clients have been greatly benefited from not only continuing development of special construction methods but information exchange taking place within the VSL network. Thanks to the technical support from VSL International as a licensor of VSL Korea for the full range of works from project planning and design to engineering, construction and other on-site activities, VSL Korea has been able to provide clients with innovative practical designs and construction solutions whenever it is demanded.
One-stop Service VSL Korea’s technological expertise has come to perfection through the accumulated construction works of up-to-date prestressed concrete structures. The construction experience by the company extends from bridges (concrete box girder bridges in ways of precast segmental method, balanced cantilever method, incremental launching method, movable scaffolding system and cable stayed / extradosed bridges) and containment structures (tanks for LNG, LPG, silo and nuclear power) to heavy lifting, damper installation, special structures (immersed tunnel and wind power plant) and post-tensioning in buildings.
As a general contractor, to provide “One-stop Service” with clients is the essence of VSL Korea.
VSL Korea As a partner for general construction
�
�
Company Profile
Company Name VSL Korea Co., Ltd. (VSL Korea)
Incorporation Date Aug. 10, 1982
Corporate Form Joint-stock Corp.
Sales Turnover (FY 2011) €M117.73 (≒\M176,594)
No. of Employees (FY 2011) 216 persons
The above VSL Korea Employees designate only head office staffs/engineers and site engineers except for workers-on-site (laborers & supervisors).
Company in Brief
No. of Employees
Organization
VSL International Vice President
CEO
Planning &
Finance
Administration &
AccountingMarketing Construction R&D QA/QC
President
Head office 66
Job site 150
Workers-on-siteKorean 542
Foreigner 533
Total 1,291
�
Company History
Achievement & Activities Year
OrganizationChange
Establishment of VSL Korea Co., Ltd. (VSL Korea) in Seoul Establishment of Shinwoo Ind. as a VSL Korea’s subsidiary in Eumseong area for workshopMerger of Shinwoo Ind. into VSL Korea (Eumseong factory)Enlargement & remodeling of Eumseong factory (land size: 17,155m2 → 35,113m2) Movement into new company-owned building built by VSL Korea(Shinnuri) → (Gross floor area: 13,096m2, 10 stories above ground/ 4 stories below ground)
•••••
19821994200220102013
LicenseAcquisition
For reinforced concrete worksFor maintenance management / Certification of ISO/KS A 9001 IQ NET 9001For scaffolding and demolition works
•••
198319972006
AwardAcquisition
The 1st Korea grand prix for construction (Special construction part, KFCIS)Award for construction from the President of Korea (MOPAS)Award for construction from Ministry of Land. Transport & Marine Affairs Award for best partner of the year [Korea Expressway (2002), Daelim Ind.(1990), Samsung C&T(1994), Hyundai Devt. (2000), Dongbu E&C(2002), SK E&C(2004), Hyundai E&C(2004), GS E&C(2006), Daewoo E&C(2011) etc.]
••••
199920002006
Performance &Construction
Yeongdong 1 bridge (1st post-tensioning)Seohae bridge (3.26km long precast segmental construction)Pyeongtaek LNG project (post-tensioning & construction)Sinchon bridge (Balanced cantilever method with 170m long span)Busan-Geoje immersed tunnel (2nd fabrication in Asia)Unam bridge (1st reference of VSL SSI saddle system in the world)Mokpo bridge (cable stayed bridge with 3ways of stay cable and 500m long span)Geumwang #1,2 bridge (double-T MSS overhead erection)Honam high speed railway #3-4 (full span precast method)
•••••••••
198319992008200820102011201220122013
Business Area
Bridge Construction
Cable Stayed BridgeExtradosed Bridge Concrete Box Girder Bridge - Precast Segmental Construction - Balanced Cantilever Method - Incremental Launching Method - Movable Scaffolding System
•••
Containment Structure LNG TankSilo
••
Building More than 120 building Post-tensioning references•
Special structure Immersed TunnelDuctal Structure
••
Damper & Heavy LiftingGensui DamperFriction DamperHeavy Lifting
•••
Construction Equipment
Formwork SystemMSS Launching GirderForm TravellerLaunching System
••••
� �� �
Work Scope
Deck
Deck
Pylon
Cable
Formwork
Rebar & Concreting
Form Traveller / Lifting Frame (Design / Supply)
Post-tensioning
Pre-cast slab (Fabrication / Installation)
Geometry Control
Supply
Installation
Damper Installation
Post-tensioning
Rebar & Concreting
Cable Stayed Bridge
VSL SSI 2000 Stay Cable System VSL Automatic Monostrand Stressing System(AMS)
� �� �
Bridge
Busan - Geoje Fixed Link Project
Project Period : 2008 – 2010 Main Contractor : Daewoo E&C Method : Cable Stayed Bridge Main Span : L= 230m Work Scope : Cable, Damper
•••••
Mokpo Bridge
Project Period : 2008 – 2012Main Contractor : GS E&CMethod : Cable Stayed BridgeMain Span : L= 500mWork Scope : Pylon, Cable, Damper
•••••
Yeosu Bridge
Project Period : 2008 – 2012Main Contractor : GS E&CMethod : Cable Stayed BridgeMain Span : L= 430mWork Scope : Pylon, Cable, Damper
•••••
2nd Dolsan Bridge
Project Period : 2006 – 2012Main Contractor : Daelim IndustrialMethod : Cable Stayed BridgeMain Span : L= 230mWork Scope : Pylon, Deck, Cable,
Geometry Control
•••••
� �� �
Cable Stayed Bridge Bridge
Project Period : 2008 – 2010Main Contractor : Hanwha E&CMethod : Cable Stayed BridgeMain Span : L= 120mWork Scope : Cable
•••••
Hanbit Bridge
Handol Bridge (Dolsan-Hwatae)
Project Period : 2010 – 2013Main Contractor : Hanjin Heavy Industries &
ConstructionMethod : Cable Stayed BridgeMain Span : L= 500mWork Scope : Cable, Damper,
Geometry Control
••
•••
Gongchon Bridge
Project Period : 2008 – 2012Main Contractor : Hyundai E&CMethod : Cable Stayed BridgeMain Span : L= 170mWork Scope : Cable, Damper,
Geometry Control
•••••
Project Period : 2009 – 2012Main Contractor : Daelim IndustrialMethod : Cable Stayed BridgeMain Span : L= 200mWork Scope : Pylon, Deck, Cable, Damper
•••••
Handuri Bridge (2nd Geumgang)
� �� �
Cable Stayed Bridge Bridge
YearProjectName
DeckType
MainSpan(m)
Length(m)
Cable (tons)
Work Scope
Cable Deck Pylon DamperGeometry
Control
2006-20122nd Dolsan Bridge
ConcreteEdge Girder
230 464 350 ●●
FormTraveller
● ●
2008-2010Busan- Geoje Fixed Link Project
Composite 230 676 570 ● ●
2008-2010 Hanbit Bridge Composite 120 420 81 ●
2009-2013Nakdonggang Bridge
ConcreteBox
150 595 343 ●●
FormTraveller
● ●
2008-2012 Mokpo Bridge Steel Box 500 900 1340 ● ● ●
2008-2012 Yeosu Bridge Composite 430 760 985 ● ● ●
2008-2012Gongchon Bridge
Composite 170 300.5 400 ● ● ●
2009-2012 Handuri Bridge Composite 200 340 494 ● ● ● ●
2010-2013 Handol Bridge Composite 500 1020 1198 ● ● ●
2010-2013Gyeongnam CityProject
Composite+
ConcreteBox
200 347.5 447 ● ● ● ● ●
2011-2013 Gyodong Bridge Concrete
Edge Girder
165 310 113●
PWS
●LiftingFrame
● ●
2011-2014 Saryang BridgeConcrete
Box280 530 520
●PWS
●Form
Traveller● ●
References
Project Period : 2010 – 2013Main Contractor : Doosan E&CMethod : Cable Stayed BridgeMain Span : L= 200mWork Scope : Pylon, Deck, Cable, Damper,
Geometry Control
•••••
Gyeongnam City Project
10 1110 11
Extradosed Bridge
VSL SSI Saddle section, with the “V” shaped strand hole compared to circular guide void
VSL SSI Saddle design with cable connection
Work Scope
Pylon
Deck
Cable
Formwork
Rebar & Concreting
Saddle (Design / Supply)
Form Traveller / Falsework
Rebar & Concreting
Post-tensioning
Camber Control
Supply
Installation
Post-tensioning
10 1110 11
Project Period : 2006 – 2011Main Contractor : Ssangyong E&CMethod : Extradosed BridgeMain Span : L= 130mWork Scope : Cable, Deck, Pylon,
Camber Control, Form Traveller
•••••
Unam Bridge
Unnam Bridge
Project Period : 2006 – 2012Main Contractor : Hyundai E&CMethod : Extradosed BridgeMain Span : L= 155mWork Scope : Cable, Deck, Pylon,
Camber Control, Form Traveller
•••••
Project Period : 2006 – 2009Main Contractor : Doosan E&CMethod : Extradosed BridgeMain Span : L= 140mWork Scope : Cable, Deck, Pylon,
Camber Control, Form Traveller
•••••
Aam Bridge
Bridge
Noksan Bridge
Project Period : 2003 – 2005Main Contractor : Daewoo E&CMethod : Extradosed BridgeMain Span : L= 70mWork Scope : Cable, Deck, Pylon,
Camber Control, Form Traveller
•••••
12 1�12 1�
Extradosed Bridge
Gyeongan Bridge
Project Period : 2010 – 2012Main Contractor : Hyundai E&CMethod : Extradosed BridgeMain Span : L= 130mWork Scope : Cable
•••••
Pyeongtaek Bridge
Project Period : 2007 – 2010Main Contractor : Haedong ConstructionMethod : Extradosed BridgeMain Span : L= 200mWork Scope : Cable, Deck, Pylon,
Camber Control, Form Traveller
•••••
Haeinji Bridge
Project Period : 2011 – 2014Main Contractor : SK E&CMethod : Extradosed BridgeMain Span : L= 160mWork Scope : Deck, Pylon, Camber Control,
Form Traveller
•••••
Project Period : 2010 – 2011Main Contractor : GS E&CMethod : Extradosed BridgeMain Span : L= 145mWork Scope : Cable, Deck, Pylon,
Camber Control, Form Traveller
•••••
Sicheon Bridge
12 1�12 1�
References
YearProjectName
DeckType
MainSpan(m)
Length(m)
Cable (tons)
Work ScopeSaddleTypeCable Deck Pylon
CamberControl
2003-2005 Noksan BridgeConcrete
Box70 140 102 ●
●Form
Traveller● ● Double
Pipe
2002-20092nd Pyeongyeo Bridge
ConcreteBox
120 250 80 ●●
FormTraveller
● ● Double Pipe
2006-2009 Aam BridgeConcrete
Box140 308 87 ●
●Form
Traveller● ●
2006-2011 Unam BridgeConcrete
Box130 670 214 ●
●Form
Traveller● ● SSI
Saddle
2007-2010 Haeinji BridgeConcrete & Steel
Box200 360 123 ●
●Form
Traveller● ● Double
Pipe
2006-2012 Unnam BridgeConcrete
Box155 325 94 ●
●Form
Traveller● ● Double
Pipe
2010-2011 Sicheon BridgeConcrete
Box145 305 143 ●
●Form
Traveller● ● SSI
Saddle
2010-2012GyeonganBridge
ConcreteBox
130 270 121 ● SSI Saddle
2010-2012Honam High Speed Railway #2-3
ConcreteBox
80 180 24 ●●
FormTraveller
● ● SSI Saddle
2011-2014Pyeongtaek Bridge
Concrete Box
160 1160 595●
FormTraveller
● ●
2011-2015 Yaro BridgeConcrete
Box190 760 165 ●
●Form
Traveller● ● Double
Pipe
Yaro Bridge
Project Period : 2011 – 2015Main Contractor : SK E&CMethod : Extradosed BridgeMain Span : L= 190mWork Scope : Cable, Deck, Pylon,
Camber Control, Form Traveller
•••••
Bridge
1� 1�1� 1�
Precast Segmental Construction
Work Scope
1+NN1-N
Delivery of Precast Span along Completed Deckby Launching Carrier
Direction of Erection
Rear TrailerFront Trailer
Rear Fixed Leg
Rear Mobile Support
Front Lifting FrameRear Lifting Frame
Lifting Winches
Launching Carrier
3+N2+N
Front Mobile Support
Front Fixed Leg
Support Beam
FULL SPAN PRECAST METHOD
Mould Installation / Operation
Rebar & Concreting
Pre-tensioning / Post-tensioning
Geometry Control
Launching Equipment (Supply / Operation)
Post-tensioning
Camber Control
Casting Yard
Deck
1� 1�1� 1�
1+NN1-N
Delivery of Precast Span along Completed Deckby Launching Carrier
Direction of Erection
Rear TrailerFront Trailer
Rear Fixed Leg
Rear Mobile Support
Front Lifting FrameRear Lifting Frame
Lifting Winches
Launching Carrier
3+N2+N
Front Mobile Support
Front Fixed Leg
Support Beam
Bridge
Honam High Speed Railway # 3-4
Project Period : 2010 – 2013Main Contractor : Hyundai Development CompanyMethod : Full Span Precast MethodTypical span : L= 35m & L= 30mNumber of Span : 179 spansWork Scope : Mould Installation / Operation,
Rebar & Concreting, Pre-tensioning, Geometry Control, Special Trolly (Supply / Operation)
••••••
1� 1�1� 1�
Precast Segmental Construction
BALANCED CANTILEVER ERECTION
Bukbu Expressway #2
Project Period : 1994 – 1998Main Contractor : Samsung C&TMethod : Balanced Cantilever ErectionTypical span : L= 50m Work Scope : Rebar & Concreting, Geometry Control, Launching Gantry, Post-tensioning
•••••
Front Upper Cross BeamMain Truss
Rear Lower Cross Beam Front Lower Cross Beam
Rear Upper Cross Beam
Direction of Erection
Rear Support Leg
Segment Delivery on Completed Deckor at Ground Level
Stitching Beam
Closure Stitch Formwork
Front Support Leg
Pier Bracket
N+1N-1 N
Stressing Platform
1� 1�1� 1�
Bridge
2nd Sangpyeong Bridge
Project Period : 2003 – 2007Main Contractor : Samwhan CorporationMethod : Precast Beam ErectionTypical span : L= 36m + 14m = 50mWork Scope : Rebar & Concreting, Geometry Control, Launching Gantry, Post-tensioning
•••••
PRECAST BEAM ERECTION
Front Upper Cross Beamin Lifting Position
Support Tower
Rear Upper Cross Beamin Lifting Position
Direction of Erection
Rear Lower Cross BeamFront Lower Cross Beam
Rear Support Leg
Beam Delivery at Ground Level
Main Truss
Front Support Leg
N+1NN-1N-2
1� 1�1� 1�
Precast Segmental Construction
SPAN BY SPAN ERECTION
Mokpo Bridge
Project Period : 2008 – 2012Main Contractor : GS E&CMethod : Span by Span Erection Typical span : L= 60m Work Scope : Rebar & Concreting, Geometry Control, Launching Gantry, Post-tensioning
•••••
Main Truss
Direction of Erection
Rear Lower Cross Beam
Rear Support Leg
Segment Delivery atGround Level
Hanger Beams
Winch Upper Cross Beam
Front Lower Cross Beam
Front Support Leg
N+1NN-1N-2
1� 1�1� 1�
References
Year Project NameConstruction
MethodDeckType
TypicalSpan(m)
Length(m)
Work Scope
Post-tensioning
LaunchingGantry
GeometryControl
Rebar &Concreting
1994 - 1998 Bukbu Expressway #2BalancedCantilever Erection
ConcreteBox
5050
13005300
● ● ● ●
1993 - 1997Jeongreungcheonbyoun #1
BalancedCantilever Erection
ConcreteBox
50 1800 ● ● ● ●
1993 - 1997Busan Port–Elevated Roadway
Span bySpan
Erection
ConcreteBox
50 2000 ● ● ● ●
1995 - 1999 Seohae Bridge #2Span by
Span Erection
ConcreteBox
60 2760 ● ● ● ●
2003 - 2007 2nd Sangpyeong Bridge Precast Beam
ErectionU-Girder 50 785 ● ● ● ●
2008 - 2012 Mokpo BridgeSpan by
Span Erection
ConcreteBox
6060
10801080
● ● ● ●
2010 - 2012Urban Maglev Test Line Project
Precast Beam
Erection
ConcreteBox
30 5980 ● ● ● ●
2010 - 2013Honam High Speed Railway #3-4
Full Span Precast Method
ConcreteBox
3035
3905810
● ● ● ●
Bridge
Busan Port-Elevated Roadway
Project Period : 1993 – 1997Main Contractor : Daelim IndustrialMethod : Span by Span ErectionTypical span : L= 50mWork Scope : Rebar & Concreting, Geometry
Control, Launching Gantry, Post-tensioning
•••••
Seohae Bridge #2
Project Period : 1995 – 1999Main Contractor : GS E&CMethod : Span by Span ErectionTypical span : L= 60mWork Scope : Rebar & Concreting, Geometry
Control, Launching Gantry, Post-tensioning
•••••
20 2120 21
Balanced Cantilever Method
Work Scope
Front Transverse TrussAnchoring Jack
Rail Beam
Main Frame
Lower Rear Transverse Beam
End Span Falsework
Form Traveller
Lower Front Transverse Beam
Outer Roller Beam
Form Traveller
N+2N+1N
Bridge Abutment
Temporary Support
End span constructed using Form Traveller
Stitching Beam
Closure Stitch Formwork
Formwork
Rebar & Concreting
Form Traveller / Falsework
Rebar & Concreting
Post-tensioning
Camber Control
Pier
Deck
20 2120 21
Front Transverse TrussAnchoring Jack
Rail Beam
Main Frame
Lower Rear Transverse Beam
End Span Falsework
Form Traveller
Lower Front Transverse Beam
Outer Roller Beam
Form Traveller
N+2N+1N
Bridge Abutment
Temporary Support
End span constructed using Form Traveller
Stitching Beam
Closure Stitch Formwork
Bridge
Sindanyang Bridge
Project Period : 1996 – 2001Main Contractor : Dongbu CorporationMethod : Balanced Cantilever MethodMain Span : L= 115mWork Scope : Post-tensioning, Form Traveller,
Rebar & Concreting, Camber Control
•••••
Jido-saok Bridge
Project Period : 2001 – 2005Main Contractor : Kumho E&CMethod : Balanced Cantilever MethodMain Span : L= 120mWork Scope : Post-tensioning, Form Traveller,
Rebar & Concreting, Camber Control
•••••
Palgeum-amtae Bridge
Project Period : 2000 – 2004Main Contractor : Daelim IndustrialMethod : Balanced Cantilever MethodMain Span : L= 140mWork Scope : Post-tensioning, Form Traveller,
Rebar & Concreting, Camber Control
•••••
22 2�22 2�
Balanced Cantilever Method
Gyeongin ARA Waterway #3 – Hwankyeong Bridge
Project Period : 2010 – 2011Main Contractor : GS E&CMethod : Balanced Cantilever MethodMain Span : L= 165mWork Scope : Post-tensioning, Form Traveller,
Rebar & Concreting, Camber Control
•••••
Bukhanggang Bridge – Railway Bridge
Namyangju Bridge
Project Period : 2005 – 2008Main Contractor : Hyundai Development CompanyMethod : Balanced Cantilever MethodMain Span : L= 125mWork Scope : Post-tensioning, Form Traveller,
Rebar & Concreting, Camber Control
•••••
Project Period : 2003 – 2008Main Contractor : Samsung C&TMethod : Balanced Cantilever MethodMain Span : L= 80mWork Scope : Post-tensioning, Form Traveller,
Rebar & Concreting, Camber Control
•••••
Sinchon Bridge
Project Period : 2002 – 2008Main Contractor : GS E&CMethod : Balanced Cantilever MethodMain Span : L=170mWork Scope : Post-tensioning, Form Traveller,
Rebar & Concreting, Camber control
•••••
22 2�22 2�
References
Year Project NameMainSpan(m)
Length(m)
Work Scope
Post-tensioning
Form Traveller
CamberControl
Rebar &Concreting
1990 - 1992 Gahwacheon Bridge 120 240 ● ● ● ●
1993 - 1996 Bigeum-Docho Bridge 128 812 ● ● ● ●
1993 - 1996 Anyangdong Bridge 160 530 ● ● ● ●
1993 - 1996 Jaeun-Amtae Bridge 105 675 ● ● ● ●
1993 - 1995 Narodo Bridge 160 350 ● ● ● ●
1996 - 1999 3rd Sangdae / Hoengseong Bridge 115 705 ● ● ● ●
1996 - 2001 Sindanyang Bridge 115 455 ● ● ● ●
1998 - 2001 1st Seongsan Bridge 120 275 ● ● ● ●
1997 - 2001 Dueum Bridge 115 660 ● ● ● ●
1998 - 2001 2nd/ 3rd Seongsan Bridge 120 395 ● ● ● ●
1998 - 1999 Sinmae Bridge 80 660 ● ● ● ●
1998 - 2000 Neukdo Bridge 160 340 ● ● ● ●
1998 - 2000 Seohae Bridge #2 165 500 ● ● ● ●
1998 - 2001 Guryangcheon Bridge 100 750 ● ● ● ●
1998 - 2002 4th Geumgang Bridge 110 450 ● ● ● ●
2000 - 2002 2nd Ganghwa Bridge 120 1000 ● ● ● ●
2000 - 2002 Gangdong Bridge 125 1126 ● ● ● ●
2000 - 2004 Palgeum-Amtae Bridge 140 600 ● ● ● ●
2000 - 2002 Dohwa-Jijuk Bridge 120 440 ● ● ● ●
2001 - 2005 Jido-Saok Bridge 120 660 ● ● ● ●
2001 - 2005 Gojeong Bridge 120 1320 ● ● ● ●
2001 - 2004 1st Sanseong-U Bridge 130 550 ● ● ● ●
2001 - 2004 Namdeacheon Bridge 110 690 ● ● ● ●
2002 - 2008 Sinchon Bridge 170 1060 ● ● ● ●
2003 - 2008 Bukhangang Bridge 80 660 ● ● ● ●
2005 - 2008 Namyangju Bridge 125 1530 ● ● ● ●
2005 - 2009 Jeokseong Bridge 100 418 ● ● ● ●
2006 - 2010 Deokpo Bridge 110 620 ● ● ● ●
2008 - 2012 Yongchu Bridge 160 520 ● ● ● ●
2010 - 2011 Gyeongin ARA Waterway #3 165 375 ● ● ● ●
2010 - 2012 Gyeongin ARA Waterway #5 147 330 ● ● ● ●
2009 - 2012 Gyeongin ARA Waterway #6 170 390 ● ● ● ●
2010 - 2015 Pyeongchang -Jungsun #3 150 510 ● ● ● ●
Bridge
2� 2�2� 2�
Incremental Launching Method
Work Scope
Launching Nose
Casting Bed
Vertical Reaction Beams
Scaffolding for Access
Pulling Jack
Direction of Launch
to 1stMonolithic or Stressed Connection
Segment
Launching Bearings
Lateral Restraint
3+N2+N1+NN(A)(B)
(A)
(A)
TYPICAL CONSTRUCTION SEQUENCE
Cast segment (A),install launching nose,install pulling units
Pull segment (A) forwardusing pulling jacks attachedto reaction beam
Construct segment (B),repeat stage and forremaining segments
Formwork
Rebar & Concreting
Post-tensioning
Nose (Design / Supply)
Rebar & Concreting
Post-tensioning
Launching
Casting yard
Deck
2� 2�2� 2�
Bridge
2nd Nodong Bridge
Project Period : 2000 – 2001Main Contractor : Hyundai Development CompanyLength : L = 40+11@50+40 = 630mWork Scope : Post-tensioning, Nose,
Rebar & Concreting, Formwork
••••
Mankyunggang Bridge
Project Period : 1999 – 2001Main Contractor : Samsung C&TLength : L = 40+16@50+40 = 880mWork Scope : Post-tensioning, Nose,
Rebar & Concreting, Formwork
••••
Ilsun Bridge
Project Period : 2003 – 2005Main Contractor : Hyundai E&CLength : L = 50+10@60+50+2@50 = 800mWork Scope : Post-tensioning, Nose,
Rebar & Concreting, Formwork Deck : Corrugated Steel Webs
••••
•
Launching Nose
Casting Bed
Vertical Reaction Beams
Scaffolding for Access
Pulling Jack
Direction of Launch
to 1stMonolithic or Stressed Connection
Segment
Launching Bearings
Lateral Restraint
3+N2+N1+NN(A)(B)
(A)
(A)
TYPICAL CONSTRUCTION SEQUENCE
Cast segment (A),install launching nose,install pulling units
Pull segment (A) forwardusing pulling jacks attachedto reaction beam
Construct segment (B),repeat stage and forremaining segments
2� 2�2� 2�
Incremental Launching Method
Gwangjeongcheon Bridge
Project Period : 2005 – 2009Main Contractor : Onbit E&CLength : L = 40+10@50+40 = 580mWork Scope : Post-tensioning, Nose,
Rebar & Concreting, Formwork
••••
Sanmal Bridge
Tongcheon Bridge
Project Period : 2004 – 2009Main Contractor : GS E&CLength : L = 40+10@55+40 = 630mWork Scope : Post-tensioning, Nose,
Rebar & Concreting, Formwork
••••
Saedeul Bridge
Project Period : 2004 – 2009Main Contractor : GS E&CLength : L = 47.5+13@55+47.5 = 810mWork Scope : Post-tensioning, Nose,
Rebar & Concreting, Formwork
••••
Project Period : 2005 – 2009Main Contractor : Dongbu CorporationLength : L = 13@60 = 780mWork Scope : Post-tensioning, Nose,
Rebar & Concreting, Formwork
••••
2� 2�2� 2�
References
Year Project NameTypicalSpan(m)
Length(m)
Work Scope
Post-tensioning
NoseRebar &
Concreting
1990-1992 Namji Bridge 50 600 ● ● ●
1990-1992 Baekun Bridge 50 250 ● ●
1990-1992 Uiwang Bridge 50 300 ● ●
1991-1993 Gunja Bridge 50 420 ● ● ●
1992-1994 Sumgang Bridge 50 350 ● ● ●
1992-1994 Gangchon Bridge 50 530 ● ● ●
1996-1998 6th Kyunghogang Bridge 50 630 ● ● ●
1996-1998 Hwasan Bridge 50 530 ● ● ●
1998-1999 Kyunggang Bridge 50 650 ● ● ●
1998-1999 Namhangang Bridge 50 540 ● ● ●
1999-2000 Daegwan Bridge 48 560 ● ● ●
1996-1999 4th Wonchang Bridge 50 330 ● ● ●
1998-1999 Jangpyeong Bridge 50 370 ● ● ●
1998-2001 Jamdu Bridge 50 550 ● ● ●
1998-2001 Yongpo Bridge 50 380 ● ● ●
1998-2001 2nd Wichon Bridge 50 330 ● ● ●
2000-2001 2nd Nodong Bridge 50 630 ● ● ●
2000-2001 2nd Wangsan Bridge 50 300 ● ● ●
2000-2001 1st Banjung Bridge 50 280 ● ● ●
1999-2001 Mankyunggang Bridge 50 880 ● ● ●
1999-2001 Yeongokcheon Bridge 50 330 ● ● ●
2001-2004 Namdaecheon Bridge 50 350 ● ● ●
2002-2004 1st Dopyeong Bridge 50 380 ● ● ●
2001-2004 Gangdong Bridge 50 530 ● ● ●
2001-2004 Geumsi Bridge 50 830 ● ● ●
2003-2005 Ilsun Bridge 60 800 ● ● ●
2002-2005 Hoeya Bridge 50 940 ● ● ●
2003-2006 Gosancheon Bridge 50 450 ● ● ●
2002-2008 Cheongnam Bridge 50 1010 ● ● ●
2005-2009 Yongsucheon Bridge 50 750 ● ● ●
2005-2009 Sanmal Bridge 60 780 ● ● ●
2004-2009 Saedeul Bridge 55 810 ● ● ●
2004-2009 Tongcheon Bridge 55 630 ● ● ●
2004-2009 1st Balsan Bridge 55 535 ● ● ●
2005-2009 Gwangjeongcheon Bridge 50 580 ● ● ●
2010-2013 Baekjeon Bridge 68 728 ● ● ●
Bridge
2� 2�2� 2�
Movable Scaffolding System
Work Scope
UNDERSLUNG ERECTION
Truss Girder
Lifting & Moving Unit
Main Box Girder
Outer Form
Pier Bracket
N N+1 N+2N N+1 N+2
Rear Cross Beam Outer Form
Suspension Beam
Nose Girder Main Girder
Support Bracket
Nose Girder
Formwork
Rebar & Concreting
MSS (Design / Supply / Operation)
Rebar & Concreting
Post-tensioning
Launching
Camber Control
Pier
Deck
2� 2�2� 2�
Bridge
1st Seosang Bridge
Project Period : 2005 – 2013Main Contractor : Dongbu CorporationTypical Span : L = 50mWork Scope : Post-tensioning, MSS,
Rebar & Concreting, Camber Control
••••
Gochang-Jangsung #3 (1st Anpyeong)
Project Period : 2004 – 2008Main Contractor : Samwhan CorporationTypical Span : L = 50mWork Scope : Post-tensioning, MSS,
Rebar & Concreting, Camber Control
••••
Mokpo-jangheung #3 (Baekyang)
Project Period : 2003 – 2011Main Contractor : Dongbu CorporationTypical Span : L = 50mWork Scope : Post-tensioning, MSS,
Rebar & Concreting, Camber Control
••••
OVERHEAD ERECTION
Truss Girder
Lifting & Moving Unit
Main Box Girder
Outer Form
Pier Bracket
N N+1 N+2N N+1 N+2
Rear Cross Beam Outer Form
Suspension Beam
Nose Girder Main Girder
Support Bracket
Nose Girder
�0 �1�0 �1
Movable Scaffolding System
Incheon Bridge #3
Project Period : 2006 – 2009Main Contractor : Hyundai E&CTypical Span : L = 60mWork Scope : Post-tensioning, MSS,
Rebar & Concreting, Camber Control
••••
Seomjingang Bridge
Project Period : 2007 – 2012Main Contractor : Hyundai Development CompanyTypical Span : L = 50mWork Scope : Post-tensioning, MSS,
Rebar & Concreting, Camber Control
••••
1st Giheung Bridge
Project Period : 2007 – 2009Main Contractor : Samsung C&TTypical Span : L = 60mWork Scope : Post-tensioning, MSS,
Rebar & Concreting, Camber Control
••••
Yeosu Industrial Complex #4
Project Period : 2009 – 2012Main Contractor : POSCO E&CTypical Span : L = 60mWork Scope : Post-tensioning, MSS,
Rebar & Concreting, Camber Control
••••
�0 �1�0 �1
References
Year Project NameTypicalSpan(m)
Length(m)
Work Scope
Post-tensioning
MSSRebar &
Concreting
1989 - 1993 Noryang Bridge 50 1350 ● ●
1994 - 1999 Seoul-Busan High Speed Railway #5-14040
1920880
● ● ●
1995 - 1999 Seoul-Busan High Speed Railway #4-1 25 75 ● ● ●
1995 - 1999 Seoul-Busan High Speed Railway #4-2 40 3600 ● ● ●
1995 - 1999 Geumgang Bridge 50 1600 ● ● ●
1995 - 2001 Seoul-Busan High Speed Railway #5-3 40 3200 ● ●
1997 - 1999 Seoul-Busan High Speed Railway #5-24040
22801540
● ●
1997 - 2000 Jeokmun Bridge 50 1000 ● ● ●
1998 - 1998 Seoul-Busan High Speed Railway #4-3 40 560 ● ● ●
1998 - 2001 Seoul-Busan High Speed Railway #7-3 25 1050 ● ● ●
1999 - 2003 Seoul-Busan High Speed Railway #2-1404040
1160600
1160● ● ●
2000 - 2004 2nd Gakseo Bridge 60 930 ● ● ●
2003 - 2007 Seoul-Busan High Speed Railway #10-4
25254025
175900480350
● ● ●
2003 - 2011 Mokpo-Jangheung #3 50 200 ● ● ●
2003 – 2008 Seoul-Busan High Speed Railway #10-54025
36351795
● ● ●
2003 - 2006 Gwangcheon Bridge 50 800 ● ● ●
2004 - 2008Gochang-Jangsung #3(Daeduk / 1st Anpyeong Bridge)
5050
630530
● ● ●
2004 - 2010 Seoul-Busan High Speed Railway #14-1 40 2983 ● ● ●
2005 - 2008 Heesung Bridge 50 490 ● ● ●
2005 - 2010 Seongdongcheon Bridge 50 580 ● ● ●
2005 - 2013 1st Seosang Bridge 50 1850 ● ● ●
2006 - 2009 Incheon Bridge #3 60 1437 ● ● ●
2007 - 2012Sunchang-Unam #2(Seomjingang / Galdamcheon Bridge)
5050
550390
● ● ●
2007 - 2009 1st Giheung Bridge 60 410 ● ● ●
2009 - 2012 Yeosu Industrial Complex #2 55 440 ● ● ●
2009 - 2012Eumseong-Chungju #2(1st and 2nd Geumwang Bridge)
5040
490240
● ● ●
2009 - 2012 Yeosu Industrial Complex #4 60 1075 ● ● ●
2010 - 2013 Jeokseong-Jeongok #1 60 810 ● ● ●
Bridge
�2
LNG Tank & Silo
Work Scope
Compliant withinternational standardsPost-tensioning systemscompliant with ETAG* 013requirements and havebeen tested undercryogenic conditions
Versatility5 different types of anchorages to suitvarying project requirements
Extensive experienceVSL is recognised as an internationalleader in LNG and LPG tank construction.
Improved force distributionwith VSL’s PT PLUS ducts
Exhanced efficiency
Allows vertical tendons without therequirement for a stressing gallery
Unique AF Anchorage
Greater tendon corrosionprotection
*ETAG:European Technical Approval Guideline
Full encapsulation
Formwork
Rebar & Concreting
Post-tensioning
Outer Tank Structures
��
Containment Structure
Gwangyang LNG Tank #3
Completion : 2010Main Contractor : POSCO E&CSize : H = 52.5m, B = 84.1mWork Scope : Formwork, Post-tensioning,
Rebar & Concreting
••••
Pyeongtaek LNG Tank #18
Completion : 2010Main Contractor : Hanyang CorporationSize : H = 53.7m, B = 87.9mWork Scope : Formwork, Post-tensioning
••••
Pyeongtaek LNG Tank #11~14
Completion : 2008Main Contractor : Samsung C&TSize : H = 53.2m, B = 90.4mWork Scope : Formwork, Rebar & Concreting
••••
Dongyang Cement SILO
Completion : 1994 Main Contractor : Dongyang CementSize : H = 55m, B = 16mWork Scope : Repair & Strengthening
••••
��
LNG Tank & Silo
Singapore SLNG Tank #1~3
Completion : 2013Main Contractor : Samsung C&TSize : H = 49.45m, B = 86.6mWork Scope : Post-tensioning,
Rebar & Concreting
••••
Gwangyang LNG Tank #4
Completion : 2013Main Contractor : POSCO E&CSize : H = 52.2m, B = 84.1mWork Scope : Formwork, Post-tensioning,
Rebar & Concreting
••••
Tongyoung LNG Tank #17
Completion : 2012Main Contractor : Keangnam EnterprisesSize : H = 47.3m, B = 85.4mWork Scope : Formwork, Post-tensioning,
Rebar & Concreting
••••
Pyeongtaek LNG Tank #22
Completion : 2012Main Contractor : Samsung C&TSize : H = 53.7m, B = 87.9mWork Scope : Formwork, Post-tensioning,
Rebar & Concreting
••••
��
References
Year Project Name
Work Scope
FormworkRebar &
ConcretingPost-
tensioningRepair &
Strengthening
1991 Ssangyong SILO ●
1995 Dongyang Cement Samcheok SILO ●
1995 Dongyang Incheon SILO ●
1996 Pohang SILO ●
1996 Bukpyeong 1st, 2nd SILO ●
1996 Yeosu Plant SILO ●
1996 Pyeongtaek LNG Tank #308 ●
1996 Pyeongtaek LNG Tank #309 ●
1996 Pyeongtaek LNG Tank #310 ●
1996 Pyeongtaek LNG Tank #706 ●
1996 Pyeongtaek LNG Tank #707 ●
2002 KOGAS Membrane PILOT Tank ●
2002 Inchon LNG Receiving Terminal #213 ●
2002 Inchon LNG Receiving Terminal #214 ●
2004 Inchon LNG Receiving Terminal #217 ●
2004 Inchon LNG Receiving Terminal #218 ●
2008 Pyeongtaek LNG Tank #11~14 ● ●
2010 Pyeongtaek LNG Tank #15, #17 ● ● ●
2010 Pyeongtaek LNG Tank #16 ●
2010 Pyeongtaek LNG Tank #18 ● ●
2010 Gwangyang LNG Tank #3 ● ● ●
2012 Pyeongtaek LNG Tank #22 ● ● ●
2012 Tongyoung LNG Tank #17 ● ● ●
2013 Singapore SLNG Tank #1~3 ● ●
2013 Gwangyang LNG Tank #4 ● ● ●
2013 Samcheok LNG Tank #3 ● ● ●
Containment Structure
��
Building
Daejeon Gao District (2005), Hyundai Development Company, PT Flat Plate Slab (Unbonded) / Span: 7.6m / THK.210mm
Yongamdong Cathedral (2001), Hankun Construction, PT Beam(Unbonded) / Span: 14.0m / THK. 700mm
Ourhome Yangsan Food Processing Center (2004), GS E&C, PT Flat Slab (Unbonded) / Span: 10.2m / THK.350mm
Nongshim Noksan Plant (2006), Samsung ENG., PT Foundation(Bonded) / Span: 13.0m
VSL-DM Building (2013), Shinnuri, PT Beam(Unbonded) / Span: 18.0m / THK. 900mm
��
Building
References
Year Project NamePT
System
1996 Heungkuk Life Building Unbonded
1997 Incheon Munhak Stadium Bonded
1997 Cheonan Campus Multi-Purpose Hall Unbonded
1997 Iljin SPO-WORLD Bonded
1998 Samdong Beomchang Cold Plaza Unbonded
1999 Kookmin University 6th Building Extension Unbonded
1999 International Youth Center Unbonded
1999 Daejeon junggyeong College Classroom Unbonded
2000 Banpo-cheon Parking Lot Bonded
2001 Yongamdong Cathedral Unbonded
2001 Nonhyeondong Neighborhood Facilities Unbonded
2001 Pyeongchang Art Exhibition Unbonded
2001Samsung Heavy Industries Changwon TEST BED
Bonded
2002 COMSEL KOREA Nonhyundong Building Unbonded
2002 Ansan Youth Center Unbonded
2002 Suwon City Social Welfare Center Unbonded
2003 Kookmin University 7th Building Bonded
2003 Law Firm Tower Unbonded
2004 Ourhome Yangsan Food Processing Center Unbonded
2005 Daejeon Gao District Unbonded
2006 Nongshim Noksan Plant Bonded
2006 Ourhome in Yongin Unbonded
2007 Songdo New City Convention Center Bonded
2007 International School in New Songdo City Unbonded
2008 Boutique Monaco Unbonded
2008 Dongnam District Shopping Mall Ga-Block Unbonded
2008 Ourhome Ahnsan Plant Unbonded
2009 Inje Univ. Haeundae Paik Hospital Unbonded
2009 Kyeongju Cultural Arts Center Unbonded
2010 Green Technology Laboratory Unbonded
2011Senior Leader’s Quarters, U.S. Army G. Humphreys
Unbonded
2012 Taekwondo Park Unbonded
2012Marine Product Export Process Performance Enhancement Complex
Unbonded
2012 Samsung Electronics R5 Project Unbonded
Year Project NamePT
System
1983 Dongil Corporation Building Unbonded
1985 Gimpo Airport New Building Bonded
1986 Hanbat Library Unbonded
1988 Kunkook University Sangheo Library Unbonded
1988 Mokdong Ice Rink Bonded
1989 Ulsan National Investment Building Unbonded
1990 Youngdeungpo National Investment Building Unbonded
1991 Korea Credit Distribution Unbonded
1990 Busan National Investment Building Unbonded
1992Incheon Cultural Center Main Building & Parking Lot
Bonded
1992 Sanbon SPOREX Bonded
1992 Mapo Hyosung Building Unbonded
1992 The Constitutional Court Unbonded
1992 Yeongdong Department Annex Bonded
1992 Hankook Paper Onsan Factory Bonded
1993 Nation Pension Gyeongnam Branch Bonded
1992 Daejeon EXPO Bonded
1993 Samsung Aerospace Sacheon Airport Bonded
1994 Changwon Jinro Beer Plant Bonded
1993 National Pension Management Corporation Bonded
1994 Sanbon Cathedral Bonded
1994 Dongguk University of the Arts Unbonded
1994 2nd Onsan Factory Bonded
1995 Samsung Changwon Plant Bonded
1995 Bundang Korea Gas Corporation Bonded
1995 Gyeonggi Physical Education High School Bonded
1995 Hyundai Motor Shihwa Plant Bonded
1995 Daewoo Heavy Industry Building Unbonded
1995 Daewoo TEST BED Bonded
1995 Green Cross Shingal Plant Bonded
1995 Samsung Construction R&D Center Bonded
1995 Small Business Training Institute Bonded
1996 Hyundai R&D Center Bonded
1996 Mokdong Reconstruction Bonded
1996 Daeseung Plaza Unbonded
�� ���� ��
Immersed Tunnel Special Structure
Segment
Element
Immersed Tunnel in Busan-Geoje Fixed Link Project
Project period : 2005 - 2010Main Contractor : Daewoo E&CLength : L = 3.24km
•••
Quantity : 18 No.(3.24km) Length : 180m (8 x 22.5m Segments)Weight : approximately 54,000t
•••
Width : 26.46m, Length : 22.50m, Height : 9.97mOne elements is composed with 8 segments.
••
�� ���� ��
Ductal Special Structure
Seonyu Footbridge
Project Period : 2001 - 2002 Main Contractor : Dongyang E&CSize : L = 120mWork Scope : Ductal, Post-tensioning,
Rebar & Concreting
••••
160
100
4300
1300
30
6-12 Tendon
Sheathedand
greased monostands
6-9 Tendon
410
Cross Section
�0
Damper
Work Scope
Yeosu Bridge
Completion : 2012Main Contractor : GS E&CFriction Damper : 64 Nos. Gensui Damper : 72 Nos.
••••
Incheon Bridge
Completion : 2009Main Contractor : Samsung C&TFriction Damper : 192 Nos. Gensui Damper : 16 Nos.
••••
Busan – Geoje Fixed Link Project
Completion : 2009Main Contractor : Daewoo E&CFriction Damper : 56 Nos. Gensui Damper : 60 Nos.
••••
Installation
In-situ Performance Test
Damper
�1
Year Project Name Deck Type
Main Span (m)
No. of Stays
Longest Stay (m)
Biggest Stay
Friction Dampers
Gensui Dampers
2009 Incheon Bridge Composite 800 208 416 PWS 7-301 192 16
2010 Busan-Geoje Fixed Link Project Composite 230 116 124 SSI 6-55 56 60
2010 2nd Jindo Bridge Steel box 345 60 175 PWS 7-151 16 -
2012 Mokpo Bridge Steel box 500 120 227 SSI 6-73 120 -
2012 Yeosu Bridge Composite 430 136 236 SSI 6-61 64 72
2012 1st Gongchon Bridge Composite 170 38 190 SSI 6-85 8 30
2012 Handuri Bridge Composite 200 50 175 SSI 6-109 2 -
2013 Gyeongnam City Project Composite 200 58 204 SSI 6-61 14 32
2014 Handol Bridge Composite 500 128 274 SSI 6-43 56 72
Mokpo Bridge
Completion : 2012Main Contractor : GS E&CFriction Damper : 120 Nos.
•••
VSL Friction Damper VSL Gensui Damper
References
�2
Heavy Lifting
�2
Sangam Nurikum Square IT
Completion : 2007Main Contractor : Samsung C&T Size : Lifting Weight 660 ton
Level 40mWork Scope : Installation
•••
•
2nd Dolsan Bridge
Completion : 2008Main Contractor : Daelim IndustrialSize : Lifting Weight 550 ton
Level 30mWork Scope : Installation
•••
•
Jongno Building Top Structure
Completion : 1998Main Contractor : Samsung C&TSize : Lifting Weight 3,400 ton
Level 132mWork Scope : Installation
•••
•
HEAD OFFICE
PLANNING & FINANCE
MANAGEMENT
ADMINISTRATION & ACCOUNTING
qa@vslkorea.co.kr
rnd@vslkorea.co.kr
market@vslkorea.co.kr
plan@vslkorea.co.kr
manager@vslkorea.co.kr
admin@vslkorea.co.kr
construction@vslkorea.co.kr
MARKETING & SALES
CONSTRUCTION
R & D
QA & QC
The information set forth in this brochure including technical and engineering data is presented for general information only. While every effort has been made to insure its accuracy, this information should not be used or relied upon for any specific application without independent professional examination and verification of its accuracy, suitability and applicability. Anyone using this material assumes any and all liability resulting from such use. VSL Korea disclaims any and all express or implied warranties of merchantability fitness for any general or particular purpose or freedom from infringement of any patent, trademark or copyright in regard to the information or products contained or referred to herein. Nothing herein contained shall be construed as granting a license, express or implied under any patents.
VSL KOREA10th FI., VSL-DM Bldg.,502 Sangil-Dong, Gangdong-Gu, Seoul, KOREATel +82 2 553 8200 Fax +82 2 553 8255www.vslkorea.co.kr
Copyright 2012, VSL Korea Co., Ltd.Printed in Korea - patented.