Page 1: ...• Reduces cost (disposal facility gate fee ≈$15 / m3) • Reduces risk of production limits due to disposal availability • Reduce Water Intake Requirements

www.alfalaval.com

Page 2: ...• Reduces cost (disposal facility gate fee ≈$15 / m3) • Reduces risk of production limits due to disposal availability • Reduce Water Intake Requirements

www.alfalaval.com

AlfaFlashNext Generation ZLD Technology

EnviroTech 2019

Calgary, Alberta

Patrick Horner

Global Technology Waste Evaporation and ZLD

Slide 2dksophr / 2019-04-16

Page 3: ...• Reduces cost (disposal facility gate fee ≈$15 / m3) • Reduces risk of production limits due to disposal availability • Reduce Water Intake Requirements

www.alfalaval.com© Alfa Laval

Why Minimize (Waste = Cost + Risk)

• Reduce Waste Transporation

• Reduces cost (trucking ≈ $3 / m3 / hr)

• Reduces risk of release (environmental liability)

• Reduces risk of transporation accidents (safety)

• Reduce Waste Disposal

• Reduces cost (disposal facility gate fee ≈ $15 / m3)

• Reduces risk of production limits due to disposal availability

• Reduce Water Intake Requirements

• Reduces cost (sourcing and transporation)

• Reduces risk of production limits due to water availability

• Convert Waste to Value Products or Energy (emerging trend)

Slide 3

dksophr / 2019-04-16

Page 4: ...• Reduces cost (disposal facility gate fee ≈$15 / m3) • Reduces risk of production limits due to disposal availability • Reduce Water Intake Requirements

www.alfalaval.com© Alfa Laval

What is AlfaFlash

Slide 4

dksophr / 2019-04-16

Confidential

• Forced circulation evaporator with a

specialized plate and frame heat

exchanger

• For NaCl based brines can operate with up

to 50wt% TS (Total Solids):

• 30wt% TDS (Dissolved Solids)

• 20wt% TSS (Suspended Solids)

• Coupled with dewatering equipment can

achieve up to 85wt% TS discharge.

Page 5: ...• Reduces cost (disposal facility gate fee ≈$15 / m3) • Reduces risk of production limits due to disposal availability • Reduce Water Intake Requirements

www.alfalaval.com© Alfa Laval

What is ZLD?

Reducing industrial wastewater quantity and maximize recycling as

much as technically AND economically practical.

Slide 5

dksophr / 2019-04-16

Source:

Wikipedia

Page 6: ...• Reduces cost (disposal facility gate fee ≈$15 / m3) • Reduces risk of production limits due to disposal availability • Reduce Water Intake Requirements

www.alfalaval.com© Alfa Laval Slide 6

dksophr / 2019-04-16

Confidential

Page 7: ...• Reduces cost (disposal facility gate fee ≈$15 / m3) • Reduces risk of production limits due to disposal availability • Reduce Water Intake Requirements

www.alfalaval.com

Minimum vs Zero Liquid Discharge

© Alfa Laval

www.alfalaval.com

Slide 7

MLD• Liquid Effluent

• < 40 wt% Total Solids

• Evaporator Only

ZLD• Solid Effluent

• < 85 wt% Total Solids

• Evaporator + Solids Dewatering

Page 8: ...• Reduces cost (disposal facility gate fee ≈$15 / m3) • Reduces risk of production limits due to disposal availability • Reduce Water Intake Requirements

www.alfalaval.com© Alfa Laval © Alfa Laval

PRE-TREATMENT

- Oil Removal

- TSS Removal

- Softening (Ca, SiO2)

PRE-

CONCENTRATION

- Organics

- Divalent Ions

- TDS

EVAPORATION

CONDENSATE POLISHING

- Ammonia Removal

- TDS Removal

- VOC Removal

DEWATERING

www.alfalaval.com

ZLD Toolbelt

Page 9: ...• Reduces cost (disposal facility gate fee ≈$15 / m3) • Reduces risk of production limits due to disposal availability • Reduce Water Intake Requirements

www.alfalaval.com

Shale Gas

© Alfa Laval

www.alfalaval.com

Slide 9

CONVENTIONAL ZLD

Page 10: ...• Reduces cost (disposal facility gate fee ≈$15 / m3) • Reduces risk of production limits due to disposal availability • Reduce Water Intake Requirements

www.alfalaval.com

SAGD (OTSG)

© Alfa Laval

www.alfalaval.com

Slide 10

CONVENTIONAL ZLD

80 to 85% Recovery >95% Recovery

Page 11: ...• Reduces cost (disposal facility gate fee ≈$15 / m3) • Reduces risk of production limits due to disposal availability • Reduce Water Intake Requirements

www.alfalaval.com

Municiple Wastewater Treatment

© Alfa Laval

www.alfalaval.com

Slide 11

CONVENTIONAL ZLD

Page 12: ...• Reduces cost (disposal facility gate fee ≈$15 / m3) • Reduces risk of production limits due to disposal availability • Reduce Water Intake Requirements

www.alfalaval.com

ZLD Evaporator Cost Feasibility

© Alfa Laval

www.alfalaval.com

Slide 12

Page 13: ...• Reduces cost (disposal facility gate fee ≈$15 / m3) • Reduces risk of production limits due to disposal availability • Reduce Water Intake Requirements

www.alfalaval.com


Recommended