°Ñ¦Ò
REFERENCE No. A/NE-TK/647 ø DRAWING A-1
( SOURCE : APPLICANT'S SUBMISSION PLAN)
(¨Ó·½ : ¥Ó½Ð¤
( SOURCE : APPLICANT'S SUBMISSION PLAN)
(¨Ó·½ : ¥Ó½Ð¤
³W¹
DEPARTMENT
PLANNING
°Ñ¦Ò
REFERENCE No. PLAN¹
A-1
LOCATION PLAN¦ì¸
0100 100 200 300METRES
¦SCALE 1 : 7 500 ¤ñ¨
METRES
¦
APPLICATION SITE
¥Ó½Ð
¥Ó½ÐAPPLICATION SITE
SCALE 1 : 50 000 ¤ñ¨Ò¤
nÄ KEY PLAN
A/NE-TK/647
¤À°Ïp¹º¤jºõ¹Ï½s¸¹S
©Ò®Ú¾Úªº¸ê®Æ¬°©ó2015¦~
¥»ºKn¹Ï©ó2018¦~7¤
No. S/NE-TK/19 APPROVED ON 27.10.2015
BASED ON OUTLINE ZONING PLAN
EXTRACT PLAN PREPARED ON 27.7.2018
·s¬É¤j®H²îÆW¥¬¤ß±Æ§ø¤V¶q¬ù¥÷
Á{®ÉÅS¤Ñ¶Jª«¡]«Ø¿v
PO SAM PAI VILLAGE, SHUEN WAN, TAI PO, NEW TERRITORIES
LOT 637 S.A IN D.D.23,
FOR A PERIOD OF 3 YEARS
TEMPORARY OPEN STORAGE (CONSTRUCTION EQUIPMENT)
ˆ
18.5
20.2 C
H
F
ˆ
ˆ
ˆ
ˆ ˆˆˆ
ˆ
ˆ
ˆ
ˆ
ˆ
ˆ
ˆˆ
ˆˆ
ˆ
ˆˆ
ˆ
ˆ
ˆ
ˆ
ˆ
ˆˆ
ˆ
H
H
H
H
H
H
SHR
TS
TS
TS
TS
TS
7A
6H
6D
6B
20
6E
18
10
20
24
10
22
FP
道路
道路
Road
Road
11.6
8.5
23.1
14.4
14.2
9.6
19.7
16.5
18.4
13.4
17.8
19.3
17.1
16.5
19.8
22.7
29.5
13.2
11.0
14.1
8.5
10.7
11.8
19.6
10.5
21.4
10.0
22.7
ET
L
E
E
L
106
C
C
C
C
C
F
FF
ˆ
ˆˆ
ˆ
ˆ
ˆ ˆ
ˆ
ˆˆ
ˆ
ˆ
ˆ
ˆˆ
ˆˆ
ˆ
ˆ
ˆˆ
ˆ ˆ
ˆˆ
ˆˆ
ˆ
ˆ
ˆˆ
ˆ
ˆ
ˆ
ˆˆ
ˆ
ˆ ˆ ˆ
ˆ
ˆ
ˆ
ˆ
ˆ
ˆ
ˆˆ ˆ
ˆ ˆˆ
ˆ
ˆ
ˆ
ˆˆˆ ˆ
ˆ
ˆ
ˆ
ˆ
ˆ
ˆ
ˆ
ˆ
ˆ
ˆ
ˆ ˆ
ˆˆ
ˆ
ˆˆ
ˆˆ
ˆ
ˆ
ˆ
ˆ
ˆ
ˆ
ˆ
ˆˆˆ
ˆ
ˆˆ
ˆ
ˆ
ˆ
ˆ
ˆ
ˆ
ˆˆ
ˆ
ˆ
ˆ
] ]
] ]
]
] ]
] ] ]
] ] ] ] ]
] ] ] ] ]
] ] ] ]
] ] ]
] ] ]
] ]
HH
H
H
H
H
H
HH
H H
H
H
HH
HH
H
H
H
H
H
H
H
H
HH
H
H
HH
HH
H
H
H
H
H
H
H
H
R
R
R
R
R
R
R
TS
TS
TS
TS
TS
TS
TS
TS
TSZ
TS
TS
TS
TS
81A
83A
82
1C
92
81B
101
75
A
106
81C
73
4
3
1D
1
85
86
90
7
81
76
76
A75
1B
83
74
84
4
6
20
6
20
HW
M
CUL
PO
CUL
CUL
單車
徑
FP
FP
FP
Cycling
Track
FP
FP
Cycling
Track
FP
布心排
犁壁山新村
LAI PEK SHAN SAN TSUEN
PO SAM PAI
泥路
道路
道路
泥路
路泥
泥路
Road
Track
Track
Track
Track
Road
WIP
Dec 2017
6.0
9.2
15.0
6.1
5.7
16.7
6.5
11.0
7.1
12.3
6.6
9.2
9.8
9.6
16.4
12.8
6.3
10.8
12.1
8.4
7.6
10.6
5.8
11.0
15.1
6.8
15.7
14.0
11.5
10.3
6.4
15.1
8.1
8.0
10.3
6.3
9.3
7.5
10.9
7.5
9.0
6.0
8.5
7.0
6.1
11.8
5.6
15.9
6.8
8.4
8.8
8.5 5.9
8.3
10.6
5.1
6.2
9.7
11.7
9.6
6.5
11.5
13.5
12.8
8.6
5.6
6.4
6.2
11.7
9.3
14.5
12.1
14.9
10.4
6.4
8.9
5.7
16.1
15.6
16.5
6.1
26.0
6.1
5.9
8.2
9.1
15.7
5.7
10.0
7.3
14.3
9.8
7.0
8.3
5.2
6.5
6.4
7.1
9.6
15.6
9.1
6.3
15.3
H
E
L
L
L
E
H
L
L
E
H
L
L
LL
E
L
E
E
E
ET
L
H
E
L
L
ET
E
L
L
L
L
E
L
E
E
E
L
°Ñ¦Ò
REFERENCE No. ¹ PLAN
A-2
³W¹
DEPARTMENT
PLANNING
SITE PLAN¥
25 0 25 50
SCALE 1 : 1 500¦
METRES METRES
¦
¤ñ¨
A/NE-TK/647
3-SE-17C¡B17D¡B22A¤Î
©Ò®Ú¾Úªº¸ê®Æ¬
¥»ºKn¹Ï©ó2018¦~7¤
3-SE-17C, 17D, 22A & 22B
BASED ON SURVEY SHEETS No.
EXTRACT PLAN PREPARED ON 31.7.2018
SSSI
D.D.23
V
AGR
V
CPA
¹Ï LEGEND
VILLAGE TYPE DEVELOPMENTV
¶m§ø¦
¥Ó½Ð (¬É½u¥u§@
PURPOSE ONLY)
(BOUNDARY FOR IDENTIFICATION
¹AAGR
VACªÅ
VACANT
TEMPORARY STRUCTURE
Á{®ÉºTS
S/R¶J
STORAGE
M/U¯î
UNUSED LAND
DOMDOMESTIC STRUCTURE
¦í¥Îº
A/F¥ð¯Ñ
FALLOW AGRICULTURAL LAND
A/C
±`¯Ñ
ACTIVE AGRICULTURAL LAND
1¹ê¦a·Ó¤ù
VIEWING POINT OF SITE PHOTO
APPLICATION SITE
AGRICULTURE
TS
M/U
S/R
A/F
M/UVAC
°±ªy
of VehiclesParking M/U
M/U
A/C
DOM
VAC
A/F A/F
M/U
A/F
A/F
2
13
637 S.A
TIN
G K
OK R
OA
DA/F
¥Å¨
LAI PEK SHAN SAN TSUEN
²p¾À¤
(1)
2018¦~7¤ë20¤é°É´ú
survey conducted by the Planning Department on 20.7.2018
Land uses shown on this plan are in accordance with the land use
µùÄNote :
ªÅ¸m
Vacant Land
A/F
A/F
A/F
A/F
A/F
ÅS¤Ñ¦s©ñ
Construction MaterialsOpen Storage of
ÅS¤Ñ¦s©ñ
Construction MaterialsOpen Storage of
DOM
DOM
M/U
A/F
A/F
A/FDOM
M/U
M/U
Containers
°±ªy
of VehiclesParking
°±ªy
of VehiclesParking
Containers
³fÂ
³fÂ
³fÂ
Containers
S/R
VAC
WIP
A/F
PO SAM PAI VILLAGE, SHUEN WAN, TAI PO, NEW TERRITORIES
LOT 637 S.A IN D.D.23,
FOR A PERIOD OF 3 YEARS
TEMPORARY OPEN STORAGE (CONSTRUCTION EQUIPMENT)
·s¬É¤j®H²îÆW¥¬¤ß±Æ§ø¤V¶q¬ù¥÷
Á{®ÉÅS¤Ñ¶Jª«¡]«Ø¿v
°õ¦æºÞ¨î
(°õ¦æºÞ¨î
ENFORCEMENT CASE No.
(Enforcement Notice)
E/NE-TK/124
®ü©¤«
COASTAL PROTECTION AREA
¨ã¯S®í¬ì¾
INTEREST
SITE OF SPECIAL SCIENTIFIC SSSI
CPA
ªe
STREAM COURSE
³W¹
DEPARTMENT
PLANNING
REFERENCE No.
°Ñ¦Ò¹ PLAN
¯èÄá AERIAL PHOTO
½s¸¹E03220
©ó2018¦~1¤ë3¤é©ç±
©Ò®Ú¾Úªº¸ê®
¥»ºKn¹Ï©ó2018¦~7¤
LANDS DEPARTMENT
TAKEN ON 3.1.2018 BY
BASED ON AERIAL PHOTO No. E032206C
EXTRACT PLAN PREPARED ON 27.7.2018
A/NE-TK/647
AGR
V
V
SSSI
¹Ï LEGEND
APPLICATION SITE
¥Ó½Ð (¬É½u¥u§@
PURPOSE ONLY)
(BOUNDARY FOR IDENTIFICATION
¥¬¤
PO SAM PAI
¥Å¨
TIN
G K
OK R
OA
D
CPA
A-3a
·s¬É¤j®H²îÆW¥¬¤ß±Æ§ø¤V¶q¬ù¥÷
Á{®ÉÅS¤Ñ¶Jª«¡]«Ø¿v
PO SAM PAI VILLAGE, SHUEN WAN, TAI PO, NEW TERRITORIES
LOT 637 S.A IN D.D.23,
FOR A PERIOD OF 3 YEARS
TEMPORARY OPEN STORAGE (CONSTRUCTION EQUIPMENT)
³W¹
DEPARTMENT
PLANNING
REFERENCE No.
°Ñ¦Ò¹ PLAN
¯èÄá AERIAL PHOTO
½s¸¹E02063
©ó2017¦~4¤ë5¤é©ç±
©Ò®Ú¾Úªº¸ê®
¥»ºKn¹Ï©ó2018¦~7¤
LANDS DEPARTMENT
TAKEN ON 5.4.2017 BY
BASED ON AERIAL PHOTO No. E020631C
EXTRACT PLAN PREPARED ON 27.7.2018
A/NE-TK/647
AGR
V
V
SSSI
¹Ï LEGEND
APPLICATION SITE
¥Ó½Ð (¬É½u¥u§@
PURPOSE ONLY)
(BOUNDARY FOR IDENTIFICATION
¥¬¤
PO SAM PAI
¥Å¨
TIN
G K
OK R
OA
D
CPA
A-3b
·s¬É¤j®H²îÆW¥¬¤ß±Æ§ø¤V¶q¬ù¥÷
Á{®ÉÅS¤Ñ¶Jª«¡]«Ø¿v
PO SAM PAI VILLAGE, SHUEN WAN, TAI PO, NEW TERRITORIES
LOT 637 S.A IN D.D.23,
FOR A PERIOD OF 3 YEARS
TEMPORARY OPEN STORAGE (CONSTRUCTION EQUIPMENT)
°Ñ¦Ò
REFERENCE No.
A/NE-TK/647
¹ PLAN
A-4a
¹ê¦a SITE PHOTO
1
³W¹
DEPARTMENT
PLANNING
APPLICATION SITE¥Ó½Ð
ªº¹ê¦
ªº¸ê®Æ¬°Äá©ó201
¥»¹Ï©ó2018¦~7¤ë27¤é
SITE PHOTO TAKEN ON 3.7.2018
PLAN PREPARED ON 27.7.2018 BASED ON
·s¬É¤j®H²îÆW¥¬¤ß±Æ§ø¤V¶q¬ù¥÷
Á{®ÉÅS¤Ñ¶Jª«¡]«Ø¿v
PO SAM PAI VILLAGE, SHUEN WAN, TAI PO, NEW TERRITORIES
LOT 637 S.A IN D.D.23,
FOR A PERIOD OF 3 YEARS
TEMPORARY OPEN STORAGE (CONSTRUCTION EQUIPMENT)
°Ñ¦Ò
REFERENCE No.
A/NE-TK/647
¹ PLAN
A-4b
2
³W¹
DEPARTMENT
PLANNING
3
¹ê¦a SITE PHOTOS
ªº¹ê¦
ªº¸ê®Æ¬°Äá©ó201
¥»¹Ï©ó2018¦~7¤ë27¤é
SITE PHOTOS TAKEN ON 3.7.2018
PLAN PREPARED ON 27.7.2018 BASED ON
·s¬É¤j®H²îÆW¥¬¤ß±Æ§ø¤V¶q¬ù¥÷
Á{®ÉÅS¤Ñ¶Jª«¡]«Ø¿v
PO SAM PAI VILLAGE, SHUEN WAN, TAI PO, NEW TERRITORIES
LOT 637 S.A IN D.D.23,
FOR A PERIOD OF 3 YEARS
TEMPORARY OPEN STORAGE (CONSTRUCTION EQUIPMENT)
¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð
APPLICATION SITE
¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð¥Ó½Ð
APPLICATION SITE