+ All Categories
Home > Documents > CONTENT...VIVA BUSINESS PARK Site Area Business Park - 1,315,085 sq ft Construction Cost (SGD) est...

CONTENT...VIVA BUSINESS PARK Site Area Business Park - 1,315,085 sq ft Construction Cost (SGD) est...

Date post: 14-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
16
Transcript
Page 1: CONTENT...VIVA BUSINESS PARK Site Area Business Park - 1,315,085 sq ft Construction Cost (SGD) est 21 Million Location Singapore Client The Trust Company (Asia ) Limited …
Page 2: CONTENT...VIVA BUSINESS PARK Site Area Business Park - 1,315,085 sq ft Construction Cost (SGD) est 21 Million Location Singapore Client The Trust Company (Asia ) Limited …

CONTENT

About UsOur Key PersonnelResidentialMixed DevelopmentHotel & Resort Instituitional & HospitalIndustrialCoastal EngineeringReclamationTransportation & TunnelingPrecast EngineeringERSS Projects

12 - 56 - 1011 - 1213 - 1415 - 1617 - 18192021 - 2223 - 2425 - 27

ABOUT US

CONTACT US

No.2 Kallang Avenue #08-21 CT Hub Singapore 339407T: +65 63482501 | F: +65 63486873W: www.kcl.com.sg

General Enquiries : [email protected] : [email protected]

1

Page 3: CONTENT...VIVA BUSINESS PARK Site Area Business Park - 1,315,085 sq ft Construction Cost (SGD) est 21 Million Location Singapore Client The Trust Company (Asia ) Limited …

MR. CUI ZHE DIRECTOR

OUR KEY PERSONNELOUR KEY PERSONNEL

MR. KANG JIANHAN DIRECTOR

32

Mr. Cui Zhe is the Founding Director for KCL Consultants Pte Ltd since 2011. Graduated in 1997 with Bachelor Degree in Civil Engineering, Mr. Cui has been conferred with Master of Engineering in 2003 (Civil) and Master of Science (Geotechnical Engineering) in 2013. He has over 20 years of experience in civil and structural design.

He has worked on a diverse range of projects, covering residential, retail, office, hotel, mixed development, industrial and institutional projects. His track records include landmark developments such as The Clift @ McCallum Street, Park Hotel Clarke Quay, Twenty Anson Building, River Isles @ Punggol Central, Lakeville @ Boon Lay Way, Signature at Yishun and Victoria Park Villas.

Mr. Cui is a registered Professional Engineer in Singapore

Mr. Kang Jianhan is the Founding Director of KCL Consultants Pte. Ltd since 2011. He has developed his expertise in the area of precast design and construction advisory, seismic design, façade design, complex structures ranging from high rise residential and commercial buildings to long-span structures, and floating concrete structures.

His track record included conceptual design and design advisory of a super-highrise luxury condominium, The Sail@Marina Bay, 73m span precast Aircraft Maintenance Hangar in Guam. Special precast façade such as NUS-Yale campus, Sengkang General Hospital, Draycott Park and etc. He also expertise in design, develop and construction of prefabricated bathroom unit (PBU) and prefabricated prefinished volumetric construction (PPVC) structures.

He was elected as a member of Institution of Structural Engineers (IStructE) and Institution of Engineers Singapore (IES) since 2008. He has been the committee member of IES/IStructE Joint Committee Singapore since 2009.

Mr. Kang is a registered Professional Engineer in Singapore, Chartered Engineer in UK.

MR. CHEN YUEFENGMANAGING DIRECTOR

MR. LEE YEE SENG EXECUTIVE DIRECTOR

Mr. Chen Yuefeng is the Founder and Managing Director of KCL Consultants Pte Ltd. founded in 2011. Graduated in 1996 with First Class Honor Bachelor Degree in Civil Engineering, Mr. Chen has been conferred with Master of Engineering in 1999 (Structural Engineering) and Master of Science (Geotechnical Engineering) in 2013. He has more than 20 years engineering experiences in structural dynamics, super high-rise building design, large span structure and Earth Retaining Structure System (ERSS) for deep basement excavation. He is also a pioneer in the design of Prefabricated Prefinished Volumetric Construction (PPVC).

Mr.Chen has involved in a lot of landmark developments such as the Altez (62-storeys Condominium), J Gateway (39-storeys Condominium), Woods Square (an integrated office development with retail, F&B, and childcare centre @ Woodland MRT Station), Village Hotel Sentosa and Outpost Hotel Sentosa, Global India International School Singapore, Indira Gandhi Memorial Hospital @ Maldives, MRT Mandai Depot ERSS design, North Point ERSS design @ Yishun MRT station, and so on.

Mr. Chen is a registered Professional Engineer in Singapore, Chartered Engineer in UK.

Mr. Lee Yee Seng is the Founding and Executive Director of KCL Consultants Pte Ltd. Graduated in 2004 from National University of Singapore in Civil Engineering, Mr Lee has been conferred with Master of Science (Civil) in 2007. He has more than 14 years engineering experiences in steel structures, deep foundations, high-rise building design, large span roof structures and Earth Retaining Structure System (ERSS) for deep basement excavation.

Mr.Lee has been involved in a broad spectrum of projects ranging from retail, overseas resort, residential, office, institutional to large-scale commercial mixed development. His track records include landmark developments such as The Scala @ Lorong Chuan, Parc Riveria @ West Coast Vale, The Topiary EC @ Fernvale Road, Star of Kovan and Pullman Maamuttaa Resorts, Maldives. Yee Seng is also the Term Consultant for National University of Singapore.

Mr.Lee is a registered Professional Engineer in Singapore and Malaysia, Chartered Engineer in UK.

Page 4: CONTENT...VIVA BUSINESS PARK Site Area Business Park - 1,315,085 sq ft Construction Cost (SGD) est 21 Million Location Singapore Client The Trust Company (Asia ) Limited …

54

OUR KEY PERSONNEL

MR. NG PENG BOONSENIOR GEOTECHNICAL ADVISOR

Mr. Ng Peng Boon joined KCL Consultants Pte Ltd in 2014 served as Senior Geotechnical Advisor. He has more than 40 years of diversified and extensive geotechnical engineering project experience.

Mr. Ng has been involved in a wide range of consulting projects in the areas of Foundation Design, Deep Excavations, Tunnelling Underground Works, off –shore structures, Reclamation and associated Structural Design. His was involved in MRT Down Town Line 3B, Pasir Panjang Terminal Phases 3 & 4 and Raft Foundation for Maple Tree Tower 3.

Mr. Ng is the registered PE(Civil), PE(Geo) and AC(Geo) in Singapore, and Fellow of Institution of Engineers , Singapore.

DR. TIAN HAITECHNICAL DIRECTOR (GEO)

Dr. Tian Hai joined KCL Consultants Pte Ltd since 2013 as Technical Director (Geo). Dr. Tian received his Ph.D. from National University Singapore in 2003. He also holds Bachelor & Master Degree in Civil Engineering from Tsinghua University, China. He has more than 20 years of geotechnical engineering project design and research experience.

Dr. Tian has been involved in thousands of Foundation, Deep Excavation, Soil Improvement projects design and checking, which include deep excavation design for City Square Mall, Clarke Quay Central, Northpoint City, Mandai Depot and so on.

Page 5: CONTENT...VIVA BUSINESS PARK Site Area Business Park - 1,315,085 sq ft Construction Cost (SGD) est 21 Million Location Singapore Client The Trust Company (Asia ) Limited …

RESIDENTIALPORTFOLIO

BELLEWATERS No. of Units : 651 residential unitsConstruction Cost (SGD) : est 178 MillionClient : Qingjian Realty (Anchorvale) Pte LtdCompletion Schedule : 4th Quater 2017

SOL ACRES EC No. of Units : 1328 residential unitsConstruction Cost (SGD) : est 276 MillionClient : MCL Land (Brighton) Pte LtdCompletion Schedule : 1st Quarter 2018

THE VISIONAIRE ECNo. of Units : 632 residential unitsConstruction Cost (SGD) : est 173 MillionClient : Qingjian Realty

(Sembawang) Pte LtdCompletion Schedule : 3rd Quarter 2018

THE TOPIARYNo. of Units : 700 residential unitsConstruction Cost (SGD) : est 170 MillionClient : Peak Living Pte LtdCompletion Schedule : 3rd Quarter 2017

6

PORTFOLIORESIDENTIAL

SIGNATURE AT YISHUNNo. of Units : 525 residential unitsConstruction Cost (SGD) : est 135 MillionClient : Gee-I Investments Pte LtdCompletion Schedule : 3rd Quarter 2017

WATERBAYNo. of Units : 383 residential unitsConstruction Cost (SGD) : est 101 MillionClient : Qingjian Realty (Edgefield Plains) Pte Ltd Completion Schedule 1st Quarter 2016

ECOPOLITANNo. of Units : 512 residential unitsConstruction Cost (SGD) : est 133 MillionClient : Qingjian Realty (Punggol Way) Pte LtdCompletion Schedule : 4th Quarter 2016

7

Page 6: CONTENT...VIVA BUSINESS PARK Site Area Business Park - 1,315,085 sq ft Construction Cost (SGD) est 21 Million Location Singapore Client The Trust Company (Asia ) Limited …

RESIDENTIALPORTFOLIO

GRANDEUR PARK RESIDENCESNo. of Units : 720 residential unitsConstruction Cost (SGD) : est 140 MillionClient : CEL-Changi Pte LtdCompletion Schedule : 1st Quarter 2021

RIVER ISLES No. of Units : 610 residential unitsConstruction Cost (SGD) : est 147 MillionClient : Qingjian Realty (Punggol Central) Pte LtdCompletion Schedule : 1st Quarter 2016

MARTIN MODERNNo. of Units : 450 residential unitsConstruction Cost (SGD) : est 161 MillionClient : Martin Modern Pte LtdCompletion Schedule : 2nd Quarter 2022

LAKE GRANDE No. of Units : 710 residential unitsConstruction Cost (SGD) : est 160 MillionClient : MCL Land (Vantage) Pte LtdCompletion Schedule : 1st Quarter 2020

8

PORTFOLIORESIDENTIAL

LAKEVILLENo. of Units : 696 residential unitsConstruction Cost (SGD) : est 190 MillionClient : MCL Land (Prestige) Pte LtdCompletion Schedule : 1st Quarter 2018

J GATEWAYNo. of Units : 738 residential unitsConstruction Cost (SGD) : est 162 MillionClient : MCL Land (Gateway) LtdCompletion Schedule : 4th Quarter 2016

PARC RIVIERANo. of Units : 752 residential unitsConstruction Cost (SGD) : est 156.8 MillionClient : EL DevelopmentCompletion Schedule : 3rd Quarter 2020

VICTORIA PARK VILLASNo. of Units : 109 residential unitsConstruction Cost (SGD) : est 188 MillionClient : Athens Residential

Development Pte LtdCompletion Schedule : 2nd Quarter 2018

9

Page 7: CONTENT...VIVA BUSINESS PARK Site Area Business Park - 1,315,085 sq ft Construction Cost (SGD) est 21 Million Location Singapore Client The Trust Company (Asia ) Limited …

RESIDENTIALPORTFOLIO

LA PYI WUN SERVICE APARTMENT @ MYANMARNo. of Units : 112 residential unitsConstruction Cost (USD) : est 10 MillionClient : La Pyi Wun Co., Ltd.Completion Schedule : 4th Quarter 2019

AXIS RESIDENCES @ CAMBODIANo. of Units : 566 residential unitsConstruction Cost (USD) : est 30 MillionClient : Spring CJW Development Pte LtdCompletion Schedule : 4th Quarter 2018

THE SKYLINE @ CAMBODIANo. of Units : 792 residential unitsConstruction Cost (USD) : est 70 MillionClient : SGPD Corporation CO. LtdCompletion Schedule : 4th Quarter 2018

10

PORTFOLIOMIXED DEVELOPMENT

STAR OF KOVANNo. of Units : 46 retail shops,

395 residential unitsConstruction Cost (SGD) : est 91 MillionLocation : SingaporeClient : Kovan Treasure Pte LtdCompletion Schedule : 2020

THE CORAL BOULEVARDNo. of Units : Retail shops,

549 residential unitsConstruction Cost (USD) : est 150 MillionLocation : Maldives, MaleClient : Chang Hua Construction Pte LtdCompletion Schedule : 2020

THE GATEWAYNo. of Units : 572 residential units

299 OfficesConstruction Cost (USD) : est 96 MillionLocation : Cambodia, Phnom PenhClient : TA Corporation LtdCompletion Schedule : 2019

11

Page 8: CONTENT...VIVA BUSINESS PARK Site Area Business Park - 1,315,085 sq ft Construction Cost (SGD) est 21 Million Location Singapore Client The Trust Company (Asia ) Limited …

MIXED DEVELOPMENTPORTFOLIO

183 LONGHAUSNo. of Units : 10 Commercial units &

40 Residential unitsConstruction Cost (SGD) : est 17 MillionLocation : SingaporeClient : TEE Ventures Pte LtdCompletion Schedule : 4th Quarter 2018

VIVA BUSINESS PARK Site Area : Business Park - 1,315,085 sq ftConstruction Cost (SGD) : est 21 MillionLocation : SingaporeClient : The Trust Company (Asia ) LimitedCompletion Schedule : 2nd Quarter 2016

TRIO@ SAM LEONG ROAD No. of Units : 28 Retail Shops &

15 RestaurantsConstruction Cost (SGD) : est 18 MillionLocation : SingaporeClient : TEE Ventures Pte Ltd Limited Completion Schedule : 3rd Quarter 2017

12

PORTFOLIOHOTEL & RESORT

SENTOSA OUTPOST VILLAGE HOTELNo. of Units : 850 guests roomsConstruction Cost (SGD) : est 230 MillionLocation : SingaporeClient : Fontaine Investment Pte LtdCompletion Schedule : 4th Quarter 2018

PULLMAN MALDIVES MAAMUTAA RESORTNo. of Units : 120 villaConstruction Cost (USD) : est 60 MillionLocation : MaldivesClient : Pristine Islands Investment Pte LtdCompletion Schedule : 1st Quarter 2019

GRAND PARK KODHIPPARU RESORT(STRUCTURAL DUE DILLIGENCE) No. of Units : 120 villaConstruction Cost (USD) : est 30 MillionLocation : MaldivesClient : CEL Development Pte Ltd Completion Schedule : 4th Quarter 2017

13

Page 9: CONTENT...VIVA BUSINESS PARK Site Area Business Park - 1,315,085 sq ft Construction Cost (SGD) est 21 Million Location Singapore Client The Trust Company (Asia ) Limited …

HOTEL & RESORTPORTFOLIO

HURUELHI ISLAND RESORTNo. of Units / Site Area : 128 villasConstruction Cost (USD) : est 80 MillionLocation : MaldivesClient : Chang Hua Construction Pte LtdCompletion Schedule : 4th Quarter 2019

VIIA RESIDENCES & HOTELNo. of Units / Site Area : 252-room hotel & 326 units of residencesConstruction Cost (RM) : est 279 MillionLocation : Malaysia (Kuala Lumpur)Client : China Construction Development (M) Sdn BhdCompletion Schedule : Under Development

14

PORTFOLIOINSTITUTIONAL & HOSPITAL

RAFFLES HOSPITALGFAConstruction Cost (SGD) : est 107 MillionType : Design & Build

(Top-down design & substructure)Client : Keong Hong Construction Pte Ltd Completion Schedule : 1st Quarter 2018

DATA STORAGE INSTITUTE GFA : N/AConstruction Cost (SGD) : est 21 MillionType : A&AClient : NUSCompletion Schedule : 1st Quarter 2018

HWA CHONG ALUMIGFA : 14306.4m²Construction Cost (SGD) : est 35 MillionType : C&S Consultant Client : Hwa Chong International School Completion Schedule : 2nd Quarter 2016

UNIVERSITY CULTURAL CENTREGFA : N/AConstruction Cost (SGD) : est 20 MillionType : A&AClient : NUSCompletion Schedule : 3rd Quarter 2018

15

Page 10: CONTENT...VIVA BUSINESS PARK Site Area Business Park - 1,315,085 sq ft Construction Cost (SGD) est 21 Million Location Singapore Client The Trust Company (Asia ) Limited …

INSTITUTIONAL & HOSPITALPORTFOLIOINDIRA GANDHI MEMORIAL HOSPITAL @ MALE, MALDIVESGFA : 30921m²Construction Cost (USD) : est 140 MillionType : Design & BuildClient : Chang Hua Construction Pte Ltd Completion Schedule : 3rd Quarter 2018

SCIENCE CANTEEN (FRONTIER) GFA : N/AConstruction Cost (SGD) : est 17 MillionType : A&AClient : NUSCompletion Schedule : 4th Quarter 2017

SKOOL4KIDZ @ SENGKANG RIVERSIDE PARKGFA : 4959.67m²Construction Cost (SGD) : est 7.8 Million Type : C&S Consultant Client : Skool4Kidz Pte LtdCompletion Schedule : 1st Quarter 2018

INSTITUTE OF MATERIALRESEARCH & ENGINEERINGGFA : N/A Construction Cost (SGD) : est 17.9 MillionType : A&AClient : NUSCompletion Schedule : 4th Quarter 2017

GLOBAL INDIAN INTERNATIONAL SCHOOLGFA : 32,086.51m²Construction Cost (SGD) : est 62 MillionType : C&S Consultant Client : Global Indian International School Pte LtdCompletion Schedule : 2nd Quarter 2018

16

PORTFOLIOINDUSTRIAL

THE INDEXGFA : 42976.87m²Construction Cost (SGD) : est 80 Million Client : Grow-Tech Properties Pte LtdCompletion Schedule : 3rd Quarter 2015

TUAS SOUTH STREET 11GFA : 14784.0m²Construction Cost (SGD) : est 14.8 Million Client : Tiong Aik Construction Pte LtdCompletion Schedule : 4th Quarter 2016

153 GUL CIRCLE GFA : 12366.2m²Construction Cost (SGD) : est 12 MillionClient : Sanwah Construction Pte LtdCompletion Schedule : 3rd Quarter 2017

TUAS SOUTH STREET 11GFA : 14745.53m²Construction Cost (SGD) : est 14 millionClient : Ho Lee GroupCompletion Schedule : 2nd Quarter 2017

17

Page 11: CONTENT...VIVA BUSINESS PARK Site Area Business Park - 1,315,085 sq ft Construction Cost (SGD) est 21 Million Location Singapore Client The Trust Company (Asia ) Limited …

INDUSTRIALPORTFOLIO

NORDCOM 2 @ GAMBASGFA : 92975m²Construction Cost (SGD) : est 72 MillionClient : Grow-Tech Properties Pte LtdCompletion Schedule : 2nd Quarter 2018

NORDCOM 1 @ GAMBASGFA : 38887m²Construction Cost (SGD) : est 39.6 MillionClient : Grow-Tech Properties Pte LtdCompletion Schedule : 4th Quarter 2017

SENOKO WAYGFA : 12002.08m²Construction Cost (SGD) : est 8 MillionClient : Sanwah Construction Pte LtdCompletion Schedule : 2nd Quarter 2018

18

PORTFOLIOCOASTAL ENGINEERING

PROPOSED ADDITION OF WASTEWATER TREATMENT PLANT OFF LOTS 814C, 46V 815M AND 816W MK34 AT SEMAKAU LANDFILL (SOUTHERN ISLAND PLANNING AREA)Project Type : Coastal EngineeringClient : MENCAST MARINE PTE LTDCompletion Schedule : 2016

FLOATING PASSENGER JETTY AT CHANGI SITE OFFICE FOR CONSTRUCTION AND MANAGEMENT OF STAGING GROUND &IN-FILLING WORKS AT TANAH MERAH (PHASE 2)Project Type : Coastal EngineeringClient : HYUNDAI ENGINEERING & CONSTRUCTIONCompletion Schedule : 2017

TENDER DESIGN FOR TUAS TERMINAL RECLAMATION WHARF CONSTRUCTION AND DREDGING PHASE 3 SINGAPOREProject Type : Coastal EngineeringClient : TOA CORPORATIONCompletion Schedule : 2018

TUAS WEST FINGER 2, SINGAPOREProject Type : Coastal EngineeringClient : MARITIME AND PORT AUTHORITY OF SINGAPORECompletion Schedule : 2017

19

Page 12: CONTENT...VIVA BUSINESS PARK Site Area Business Park - 1,315,085 sq ft Construction Cost (SGD) est 21 Million Location Singapore Client The Trust Company (Asia ) Limited …

RECLAMATIONPORTFOLIO

TEKONG ISLAND RECLAMATION WORKSProject Type : ReclamationConstruction Cost (SGD) : est >1 Billions Client : HYUNDAI ENGINEERING & CONSTRUCTIONCompletion Schedule : On-going

CONSTRUCTION OF LAND RECLAMATION AT CHANGI EASTProject Type : ReclamationConstruction Cost (SGD) : est 300 Millions Client : HYUNDAI ENGINEERING & CONSTRUCTIONCompletion Schedule : On-going

20

PORTFOLIOTRANSPORTATION & TUNNELING

T222 - CONSTRUCTION OF OUTRAM PARK STATIONProject Type : MRT TransportationConstruction Cost (SGD) : est > 300 Millions Client : Daelim Industrial Co Ltd Completion Schedule : On-going

DTL T201 PROPOSED NEW ERECTION OF 2 STOREY TRAIN DEPOT AND BUS DEPOT AT MANDAI ROADProject Type : MRT TransportationConstruction Cost (SGD) : est 250 Millions Client : Jurong Primewide Pte LtdCompletion Schedule : Year 2017

LTA-CONTRACT H1008 - ADVANCE EFFLUENT OUTFALL PIPE AND WATER PIPE DIVERSIONProject Type : AC GeoConstruction Cost (SGD) : est > 150 Millions Client : LTACompletion Schedule : On-going

PROPOSED NEW ERECTION OF DOWNTOWN LINEUNDERGROUND MASS RAPID TRANSIT STATION, C939Project Type : MRT TransportationConstruction Cost (SGD) : est > 300 Millions Client : Sato-Koygo (S) Pte LtdCompletion Schedule : Year 2016

21

Page 13: CONTENT...VIVA BUSINESS PARK Site Area Business Park - 1,315,085 sq ft Construction Cost (SGD) est 21 Million Location Singapore Client The Trust Company (Asia ) Limited …

TRANSPORTATION & TUNNELINGPORTFOLIO

DEEP TUNNEL SEWARAGE SYSTEM PHASE 2,DTSS T9, T10 & T11Project Type : AC GeoConstruction Cost (SGD) : est > 300 Millions Client : PUBCompletion Schedule : On-going

PROPOSED SEWERS IN WOODLANDS ROAD AREAProject Type : AC GeoConstruction Cost (SGD) : est > 100 Millions Client : PUBCompletion Schedule : Year 2016

PROPOSED ERECTION OF BUSINESS PARKDEVELOPMENT AT MEDIA CIRCLE AT ONE NORTH Project Type : AC GeoConstruction Cost (SGD) : est > 100 Millions Client : MediaCorpCompletion Schedule : On-going

PROPOSED LAND PREPARATION WORKS ALONG NORTH COAST DRIVE & ATTAP VALLEY ROAD Project Type : AC GeoConstruction Cost (SGD) : est > 100 Millions Client : JTCCompletion Schedule : Year 2017

PROPOSED RESIDENTIAL DEVELOPMENT 3BLOCKS -40 STOREY BUILDINGS AT STIRLING ROADProject Type : AC GeoConstruction Cost (SGD) : est > 100 Millions Client : P & TCompletion Schedule : On-going

22

PORTFOLIOPRECAST ENGINEERING

NTUC FAIRPRICE Location : Benoi RoadType of Precast : Columns, Beams,

Heavy Industrial Precast

ST THOMAS WALK Location : St Thomas WalkType of Precast : Walls, Beams, Slabs, Bay Windows

OXLEY TOWERLocation : Robinson RoadType of Precast : Prestressed Floor Slab

Precast column fabrication Precast column storage

PC 12m tall column erection Cobiax system

BUCKLEY CLASSIQUELocation : Buckley RoadType of Precast : Wall on Site

Precast Elements

23

Page 14: CONTENT...VIVA BUSINESS PARK Site Area Business Park - 1,315,085 sq ft Construction Cost (SGD) est 21 Million Location Singapore Client The Trust Company (Asia ) Limited …

PRECAST ENGINEERINGPORTFOLIO

NUS YALE COLLEGE CAMPUSLocation : Dover RoadType of Precast : Architectural Façade, Hollow Core Slab

NUS Yale University Campus Precast Façade Design and Construction Site Shoring

Precast Façade

Precast Mould Fabrication

SENGKANG HOSPITALLocation : Sengkang East WayType of Precast : Precast Design and Submission

for Façade and Staircase

24

PORTFOLIOERSS PROJECT

25

OXLEY TOWER Location : 138 Robinson RoadExcavation Depth : > 8.0m Project Challenge : Semi top-down excavation works beside existing

MRT East West Line and future MRT Thomson Line,in soft marine clay area

NORTHSHORE (HDB WATERFRONT 1 & 2)Location : Punggol Northshore DriveExcavation Depth : > 8.0m Project Challenge : Semi top-down excavation works beside sea, in

sand area with intermediate soft marine clay layer

RAFFLES HOSPITAL EXTENSION Location : North Bridge RoadExcavation Depth : > 8.0m Project Challenge : Full top-down excavation design for 2 basement

carpark in marine clay beside Bugis MRT tunnel

Page 15: CONTENT...VIVA BUSINESS PARK Site Area Business Park - 1,315,085 sq ft Construction Cost (SGD) est 21 Million Location Singapore Client The Trust Company (Asia ) Limited …

ERSS PROJECTPORTFOLIO

GRANDEUR PARK RESIDENCES Location : Bedok South Ave 3 Excavation Depth : > 8.0m Project Challenge : Slope cutting and stabilization works beside landed

houses along Jalan Limau Kasturi

STAR OF KOVAN Location : Upper Serangoon Rd Excavation Depth : > 8.0m Project Challenge : Partial top-down excavation design for river 2 basement carpark

beside Kovan MRT

KALLANG RIVERSIDE Location : Kallang RoadExcavation Depth : > 8.0m Project Challenge : Partial top-down excavation design for 2 basement carpark in peaty soil

beside Kallang River

26

PORTFOLIOERSS PROJECT

TRIO Location : Sam Leong RdExcavation Depth : > 8.0m Project Challenge : Partial top-down excavation design for 2 basement carpark

in peaty soil densely built by old surrounded by shop houses

NORTHPARK CITY Location : Yishun Central/1/Yishun Avenue 2Excavation Depth : > 8.0m Project Challenge : Deep excavation beside major road, including the excavation

works for underpass connecting the new development andexisting MRT station

SPAZIOLocation : Upper Serangoon RdExcavation Depth : > 8.0m Project Challenge : Semi top-down excavation works beside existing MRT North

East Line

27

Page 16: CONTENT...VIVA BUSINESS PARK Site Area Business Park - 1,315,085 sq ft Construction Cost (SGD) est 21 Million Location Singapore Client The Trust Company (Asia ) Limited …

Recommended