+ All Categories
Home > Documents > 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · '[email protected]' 'Nadia Hetzel'...

03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · '[email protected]' 'Nadia Hetzel'...

Date post: 09-Jun-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
24
: +27 12 000 2562 : +27 73 232 4312 : +27 86 465 2526 : [email protected] 323 Lynnwood Rd Menlo Park Pretoria PO Box 65384 Erasmusrand 0165 Pretoria 03 December 2019 ATTENTION: STAKEHOLDER Dear Sir/Madam EXTENSION OF DRAFT REPORT REVIEW PERIOD: APPLICATION FOR AMENDMENT OF AN EXEMPTION FOR ASH DISPOSAL FACILITY AT THE ESKOM KENDAL POWER STATION IN MPUMLANGA PROVINCE. DEA REF NO. 14/12/16/3/3/3/63AM1 A communication was sent on 01 November 2019, informing you of the availability of the draft Amendment Motivation Report for public review. The review period was from 01 November 2019 to 30 November 2019. We have received a complaint from an Interested and Affected Party (I&AP) that the review period was unacceptable since the 30 November 2019 fell on a Saturday, and that it should have instead ended on the following Monday, which is the 2 December 2019. In response to the complaint, we wish to inform you that the review period has been extended to Wednesday, 11 December 2019. We encourage you to review the draft Amendment Motivation Report and accompanying specialists’ studies and submit comments on or before 11 December 2019 at 17:00. Copies of the draft Amendment Motivation Report are available as stipulated below: Hard Copy Venue Websites We Transfer Sharing Kendal Power Station main gate from 8am to 4pm Kuhle Premium Fuels Station from 8am to 7pm Zomhlaba Resources Mine main gate from 8am to 4pm http://www.greengoldgroup.co.za/Downloads.aspx Send sharing request by email to [email protected] Comments may be send via Email: [email protected]; Post: PO Box 65384, Erasmusrand, 0165; Fax: +27 86 465 2526; Hand: First Floor Block 1, Eulophia Corner, General Van Reyneveld St , Persequor Park, Brummeria, Pretoria. Yours sincerely, Basetsana Motha For Green Gold Group (Pty) Ltd
Transcript
Page 1: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

: +27 12 000 2562

: +27 73 232 4312

: +27 86 465 2526

: [email protected]

323 Lynnwood Rd Menlo Park Pretoria

PO Box 65384 Erasmusrand 0165 Pretoria

03 December 2019

ATTENTION: STAKEHOLDER

Dear Sir/Madam

EXTENSION OF DRAFT REPORT REVIEW PERIOD: APPLICATION FOR AMENDMENT OF AN EXEMPTION FOR

ASH DISPOSAL FACILITY AT THE ESKOM KENDAL POWER STATION IN MPUMLANGA PROVINCE. DEA REF NO.

14/12/16/3/3/3/63AM1

A communication was sent on 01 November 2019, informing you of the availability of the draft Amendment Motivation

Report for public review. The review period was from 01 November 2019 to 30 November 2019. We have received a

complaint from an Interested and Affected Party (I&AP) that the review period was unacceptable since the 30 November

2019 fell on a Saturday, and that it should have instead ended on the following Monday, which is the 2 December 2019.

In response to the complaint, we wish to inform you that the review period has been extended to Wednesday, 11 December

2019. We encourage you to review the draft Amendment Motivation Report and accompanying specialists’ studies and

submit comments on or before 11 December 2019 at 17:00. Copies of the draft Amendment Motivation Report are

available as stipulated below:

Hard Copy Venue Websites We Transfer Sharing

Kendal Power Station main gate from 8am to 4pm Kuhle Premium Fuels Station from 8am to 7pm Zomhlaba Resources Mine main gate from 8am to 4pm

http://www.greengoldgroup.co.za/Downloads.aspx

Send sharing request by email to [email protected]

Comments may be send via Email: [email protected]; Post: PO Box 65384, Erasmusrand, 0165; Fax: +27 86

465 2526; Hand: First Floor Block 1, Eulophia Corner, General Van Reyneveld St , Persequor Park, Brummeria,

Pretoria.

Yours sincerely,

Basetsana Motha

For Green Gold Group (Pty) Ltd

Page 2: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

1

[email protected]

From: [email protected]

Sent: Tuesday, December 3, 2019 8:53 PM

To: '[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; 'fanniem@legal-

aid.co.za'; '[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; 'Nadia Hetzel'; '[email protected]'

Cc: '[email protected]'

Subject: EXTENSION OF DRAFT REPORT REVIEW PERIOD: APPLICATION FOR AMENDMENT OF

AN EXEMPTION FOR ASH DISPOSAL FACILITY AT THE ESKOM KENDAL POWER

STATION IN MPUMLANGA PROVINCE. DEA REF NO. 14/12/16/3/3/3/63AM1

Attachments: Kendal ADF -Extension of Public Review Period- 2019 12 03.pdf

TrackingTracking: Recipient Read

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

Page 3: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

2

Recipient Read

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'Nadia Hetzel'

'[email protected]'

'[email protected]'

Hennie Pienaar Read: 12/5/2019 3:45 PM

[email protected] Read: 12/9/2019 7:59 PM

Dear Stakeholder

Please be informed that the review period for the draft Amendment Motivation Report has been extended to 11

December 2019.

Kindly see the attached letter for more information.

Regards,

Basetsana Motha

Page 4: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

1

[email protected]

From: [email protected]

Sent: Tuesday, December 3, 2019 8:53 PM

To: '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'

Cc: '[email protected]'

Subject: EXTENSION OF DRAFT REPORT REVIEW PERIOD: APPLICATION FOR AMENDMENT OF

AN EXEMPTION FOR ASH DISPOSAL FACILITY AT THE ESKOM KENDAL POWER

STATION IN MPUMLANGA PROVINCE. DEA REF NO. 14/12/16/3/3/3/63AM1

Attachments: Kendal ADF -Extension of Public Review Period- 2019 12 03.pdf

TrackingTracking: Recipient Read

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

Page 5: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

2

Recipient Read

'[email protected]'

[email protected] Read: 12/9/2019 7:59 PM

Dear Stakeholder

Please be informed that the review period for the draft Amendment Motivation Report has been extended to 11

December 2019.

Kindly see the attached letter for more information.

Regards,

Basetsana Motha

Page 6: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

1

[email protected]

From: [email protected]

Sent: Tuesday, December 3, 2019 8:53 PM

To: '[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]'; 'vvuurej2

@telkom.co.za'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]'

Cc: '[email protected]'

Subject: EXTENSION OF DRAFT REPORT REVIEW PERIOD: APPLICATION FOR AMENDMENT OF

AN EXEMPTION FOR ASH DISPOSAL FACILITY AT THE ESKOM KENDAL POWER

STATION IN MPUMLANGA PROVINCE. DEA REF NO. 14/12/16/3/3/3/63AM1

Attachments: Kendal ADF -Extension of Public Review Period- 2019 12 03.pdf

Flag Status: Flagged

TrackingTracking: Recipient Read

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

Page 7: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

2

Recipient Read

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

John Byrne \ Fairacres Products (Pty) Ltd Read: 12/3/2019 10:08 PM

Stefan Vermaak Read: 12/4/2019 6:49 AM

[email protected] Read: 12/9/2019 7:59 PM

Dear Stakeholder

Please be informed that the review period for the draft Amendment Motivation Report has been extended to 11

December 2019.

Kindly see the attached letter for more information.

Regards,

Basetsana Motha

Page 8: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

1

[email protected]

From: [email protected]

Sent: Tuesday, December 3, 2019 8:53 PM

To: '[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'

Cc: '[email protected]'

Subject: EXTENSION OF DRAFT REPORT REVIEW PERIOD: APPLICATION FOR AMENDMENT OF

AN EXEMPTION FOR ASH DISPOSAL FACILITY AT THE ESKOM KENDAL POWER

STATION IN MPUMLANGA PROVINCE. DEA REF NO. 14/12/16/3/3/3/63AM1

Attachments: Kendal ADF -Extension of Public Review Period- 2019 12 03.pdf

TrackingTracking: Recipient Read

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

Bobby Peek Read: 12/4/2019 8:04 AM

[email protected] Read: 12/9/2019 7:59 PM

Page 9: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

2

Dear Stakeholder

Please be informed that the review period for the draft Amendment Motivation Report has been extended to 11

December 2019.

Kindly see the attached letter for more information.

Regards,

Basetsana Motha

Page 10: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

1

[email protected]

From: [email protected]

Sent: Tuesday, December 3, 2019 8:53 PM

To: '[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'

Cc: '[email protected]'

Subject: EXTENSION OF DRAFT REPORT REVIEW PERIOD: APPLICATION FOR AMENDMENT OF

AN EXEMPTION FOR ASH DISPOSAL FACILITY AT THE ESKOM KENDAL POWER

STATION IN MPUMLANGA PROVINCE. DEA REF NO. 14/12/16/3/3/3/63AM1

Attachments: Kendal ADF -Extension of Public Review Period- 2019 12 03.pdf

Flag Status: Flagged

TrackingTracking: Recipient Read

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

Page 11: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

2

Recipient Read

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

Benjamin mtshali Read: 12/4/2019 10:30 AM

mtshali benjamin Read: 12/4/2019 1:25 PM

Marianna Nieuwoudt Read: 12/9/2019 5:49 PM

[email protected] Read: 12/9/2019 7:59 PM

Dear Stakeholder

Please be informed that the review period for the draft Amendment Motivation Report has been extended to 11

December 2019.

Kindly see the attached letter for more information.

Regards,

Page 12: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

3

Basetsana Motha

Page 13: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

1

[email protected]

From: [email protected]

Sent: Tuesday, December 3, 2019 8:53 PM

To: '[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; 'za'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'

Cc: '[email protected]'

Subject: EXTENSION OF DRAFT REPORT REVIEW PERIOD: APPLICATION FOR AMENDMENT OF

AN EXEMPTION FOR ASH DISPOSAL FACILITY AT THE ESKOM KENDAL POWER

STATION IN MPUMLANGA PROVINCE. DEA REF NO. 14/12/16/3/3/3/63AM1

Attachments: Kendal ADF -Extension of Public Review Period- 2019 12 03.pdf

Flag Status: Flagged

TrackingTracking: Recipient Read

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

Page 15: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

3

Recipient Read

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

Tshepo Shakwane Read: 12/3/2019 9:24 PM

[email protected] Read: 12/3/2019 10:17 PM

Steve Nicholls Read: 12/3/2019 10:37 PM

Britz Andre Read: 12/4/2019 5:43 AM

Hannes Read: 12/4/2019 7:12 AM

A Muller Read: 12/4/2019 8:40 AM

Angela Andrews Read: 12/4/2019 10:06 AM

Putter Hans - Colonel Deleted: 12/5/2019 9:01 AM

Dear Stakeholder

Please be informed that the review period for the draft Amendment Motivation Report has been extended to 11

December 2019.

Kindly see the attached letter for more information.

Regards,

Basetsana Motha

Page 16: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

4

Page 17: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

1

[email protected]

From: [email protected]

Sent: Tuesday, December 3, 2019 8:53 PM

To: '[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]'; 'health2

@webmail.co.za'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; 'mattpretorius686

@gmail.com'; '[email protected]'; '[email protected]'

Cc: '[email protected]'

Subject: EXTENSION OF DRAFT REPORT REVIEW PERIOD: APPLICATION FOR AMENDMENT OF

AN EXEMPTION FOR ASH DISPOSAL FACILITY AT THE ESKOM KENDAL POWER

STATION IN MPUMLANGA PROVINCE. DEA REF NO. 14/12/16/3/3/3/63AM1

Attachments: Kendal ADF -Extension of Public Review Period- 2019 12 03.pdf

Flag Status: Flagged

TrackingTracking: Recipient Read

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

Page 18: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

2

Recipient Read

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

[email protected] Read: 12/3/2019 8:59 PM

Martin Creamer Read: 12/3/2019 9:53 PM

Marco Alexandre Read: 12/4/2019 6:10 AM

Dear Stakeholder

Please be informed that the review period for the draft Amendment Motivation Report has been extended to 11

December 2019.

Kindly see the attached letter for more information.

Regards,

Basetsana Motha

Page 19: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

1

[email protected]

From: [email protected]

Sent: Tuesday, December 3, 2019 8:53 PM

To: '[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'

Cc: '[email protected]'

Subject: EXTENSION OF DRAFT REPORT REVIEW PERIOD: APPLICATION FOR AMENDMENT OF

AN EXEMPTION FOR ASH DISPOSAL FACILITY AT THE ESKOM KENDAL POWER

STATION IN MPUMLANGA PROVINCE. DEA REF NO. 14/12/16/3/3/3/63AM1

Attachments: Kendal ADF -Extension of Public Review Period- 2019 12 03.pdf

Flag Status: Flagged

TrackingTracking: Recipient Read

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

Page 20: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

2

Recipient Read

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

[email protected] Read: 12/3/2019 8:59 PM

Trischka Honiball Read: 12/4/2019 7:45 AM

Rudie Briel Read: 12/4/2019 8:44 AM

Dear Stakeholder

Please be informed that the review period for the draft Amendment Motivation Report has been extended to 11

December 2019.

Kindly see the attached letter for more information.

Regards,

Basetsana Motha

Page 21: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

1

[email protected]

From: [email protected]

Sent: Tuesday, December 3, 2019 8:53 PM

To: '[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]';

'[email protected]'; '[email protected]'; '[email protected]'

Cc: '[email protected]'

Subject: EXTENSION OF DRAFT REPORT REVIEW PERIOD: APPLICATION FOR AMENDMENT OF

AN EXEMPTION FOR ASH DISPOSAL FACILITY AT THE ESKOM KENDAL POWER

STATION IN MPUMLANGA PROVINCE. DEA REF NO. 14/12/16/3/3/3/63AM1

Attachments: Kendal ADF -Extension of Public Review Period- 2019 12 03.pdf

Flag Status: Flagged

TrackingTracking: Recipient Read

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

Page 22: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

2

Recipient Read

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

[email protected] Read: 12/3/2019 8:55 PM

Priscilla Gallant Read: 12/4/2019 7:24 AM

Dear Stakeholder

Please be informed that the review period for the draft Amendment Motivation Report has been extended to 11

December 2019.

Kindly see the attached letter for more information.

Regards,

Basetsana Motha

Page 23: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

1

[email protected]

From: [email protected]

Sent: Tuesday, December 3, 2019 8:53 PM

To: '[email protected]'; '[email protected]'; 'vusimavuso88

@gmail.com'; '[email protected]'; '[email protected]'; 'Lerato

Mautjana'; 'Calvin Netshaulu'; 'Thabile Mzobe'; '[email protected]';

'[email protected]'; '[email protected]';

'[email protected]'; 'Klaas Mahlangu'; '[email protected]';

'Emmy Molepo'; 'Marike Landman'

Cc: '[email protected]'

Subject: EXTENSION OF DRAFT REPORT REVIEW PERIOD: APPLICATION FOR AMENDMENT OF

AN EXEMPTION FOR ASH DISPOSAL FACILITY AT THE ESKOM KENDAL POWER

STATION IN MPUMLANGA PROVINCE. DEA REF NO. 14/12/16/3/3/3/63AM1

Attachments: Kendal ADF -Extension of Public Review Period- 2019 12 03.pdf

Flag Status: Flagged

TrackingTracking: Recipient Read

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'Lerato Mautjana'

'Calvin Netshaulu'

'Thabile Mzobe'

'[email protected]'

'[email protected]'

'[email protected]'

'[email protected]'

'Klaas Mahlangu'

'[email protected]'

'Emmy Molepo'

'Marike Landman'

'[email protected]'

[email protected] Read: 12/3/2019 8:59 PM

Calvin Netshaulu Read: 12/4/2019 11:24 AM

Dear Stakeholder

Please be informed that the review period for the draft Amendment Motivation Report has been extended to 11

December 2019.

Kindly see the attached letter for more information.

Page 24: 03 December 2019 Dear Sir/Madam EXTENSION OF DRAFT … · 'kendals@afgri.co.za' 'Nadia Hetzel' 'Priscillap@hsginc.co.za' 'eias@greengoldgroup.co.za' Hennie Pienaar Read: 12/5/2019

2

Regards,

Basetsana Motha


Recommended