(1 )
(2 )
CERTIFICATE
It is certified that the proposed IWMP-I project comprising five micro-watersheds of
district Sant Ravidas Naga, Uttar Pradesh has been selected for its sustainable development on
watershed basis under Integrated Watershed Management Programme. The land is physically
available for proposed interventions and is not overlapping with any other schemes. It will be
developed as per Common Guidelines for Watershed Development Project-2008, GOI, New Delhi.
The significant results will be achieved through proposed interventions on soil and water
conservation, ground water recharge, availability of drinking and irrigation water, agricultural
production systems, livestock, fodder availability, livelihoods of asset-less, capacity building, etc.
The proposed Detailed Project Report of IWMP-I for financial year 2009-10 is approved for its
implementation.
Bhoomi Sanrakshan Adhikari Department of Land Development & Water Resources,
Sant Ravidas Naga, Uttar Pradesh
(3 )
TABLE OF CONTENTS
CHAPTER No. DESCRIPTIONS PAGE NO.
EXECUTIVE SUMMARY 04
1. INTRODUCTION AND BACKGROUND 09
2. GENERAL DESCRIPTION OF PROJECT AREA 17
3. BASELINE SURVEY 30
4. INSTITUTIONAL BUILDING AND PROJECT MANAGEMENT 52
5. MANAGEMENT / ACTION PLAN 74
6. LIVELIHOOD ACTIVITIES 79
7. CAPACITY BUILDING PLAN 108
8. PHASING OF PROGRAMME AND BUDGETING 112
9. CONSOLIDATION / WITHDRAWAL STRATEGY 121
10. EXPECTED OUTCOME 124
11. COST NORMS & DESIGN OF STRUCTURE PROPOSED 128
12 MAPS 134
12. Annexure-1 & 2 146
13. ABBRIVIATIONS/REFERENCES 153
(4 )
EXECUTIVE SUMMARY
The Indo-gangetic plains of U.P. have undergone stress for natural resources, which are witnessing
degradation at an alarming rate. The watershed approach has conventionally aimed at treating degraded
lands with low cost and locally accessed technologies such as in-situ soil and moisture conservation
measures, afforestation etc. and through a participatory approach that seeks to secure close involvement
of the user communities.
All the micro watersheds of IWMP-I (2009-10) are located in Bhadhohi Block (except some part
mainly of 2B3A3a3c and 2B3A3a2c of MWS, which falls under Aurai Block) of SANT RAVIDAS NAGAR
District of Uttar Pradesh. The extent of the Project area is 25o17’59.651”N to 25o23’52.977”N Latitude and
82o31’40.821” E to 82o31’40.821”E Longitude. The project consist of six (6) micro watershed clusters. The
total geographical area of the project is 7059 ha, Out of which 5082 ha has been proposed for the
treatment. The total outlay of the project is R. 609.84 lakh under Integrated Watershed Management
Programme. The project implementation agency (PIA) is Bhoomi Sanrakshan Adhikari, Deptt. of Land
Development and Water Resources, Sant Ravidas Naga, U.P.
The project area falls in agro – climatic zone of Eastern Plain (ACZ-VIII). The elevation of the project
area is 75 msl to 89 msl. The Soil texture of the project is fine silty calcareous to fine Loamy.
(5 )
Major Rabi crops of the watershed area are Wheat, Pea, Gram, Mustered, etc. and in Khrif season
Paddy, Maize, Urd, and Moong.
The productivity of these crops is lower than the national standard. The pre – dominant tree species
are mainly Neem, Sheesham, Mango and guava.
A detailed baseline survey was undertaken which involved household census survey, Bio-physical
survey and Village level data collection from Talati – cum mantri. Household census survey includes a
detailed questionnaire which has been filled by visiting each and every household in the village. This gave
in the details of the demographic profile of the village, the literacy percentage, SC/ST population, number
of BPL household, cattle population and net consumption rate in the village, average milk production of
the cattle and various schemes running and their benefits.
The Institutional arrangement, Watershed Committtee (WC), Self Help Group, User Group, was
constituted for active participation and co operation for community development.
The Action plans like livelihood, Production system and Treatment area development plan were
prepared according to need of the project area.
--------------------------------------------------------------------------------------------------------------
(6 )
Table-0.1: Project at a Glance IWMP-Ist (Sant Ravidas Nagar (Bhadohi)
Sr.
No.
Particulars IWMP - I Total
1 Name of the State Uttar Pradesh
2 Name of the project I.W.M.P. -I St. Ravidas Nagar
3 Name of the District St. Ravidas Nagar
4 Names of the Blocks Bhadohi, & Aurai
5 Names of Gram Panchayats Total number of Gram panchayat in
the project area are -
48
6 Names & Census Code of Villages covered Total number of revenue Villages in
the project area are -
87
7 Four major reasons for selection of watershed 1. Population are poor 80% to 50%
2. Rain fed area more than 90%
3.% of small and Marginal
farmer>80%
4. Land with moderate production
8 Name, Address & Phone No. of the PIA(s) Satish Chandra Srivastava
Bhoomi Sanrakshan Adikhari,
DPAP- I, Uttar Mohal, Near Chandi
Hotel, Rabatsganj, Sonabhadra
Ph. : 0544-223389
9 Rain fed Area 4600.ha
10 Area of the Project (ha.) 7059ha
11 Area proposed to be treated (ha.) 5082 ha
12 Financial Year of sanction 2009-2010
13 Project duration from ----- to … 2009-2010 to 2013-2014
14 Project Cost (Rs. in Lakhs) 609.84
15 Date of Sanction of state authority
(7 )
Table-0.2: IWMP - I (2009-2010) DISTRICT SANT RAVIDASNAGAR
YEAR WISE PHASING OF IWMP WORKS (COMPONENTS - WISE)
District : Sant Ravidasnagar Starting Year : 2009-2010 Area : ha, Amount : In Lacs
S. No. Particulars
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy.
1 Administrative Cost -
10% 3.05 - 9.15 - 16.47 - 16.47 - 15.86 - 60.98 -
2 Monitoring - 1% - - 1.22 - 1.22 - 1.22 - 2.44 - 6.10 -
3 Evaluation - 1% - - 1.83 - 1.07 - 1.07 - 2.13 - 6.10 -
4 Entry Point Activity - 4% 24.39 - - - - - - - 24.39 -
5 Institution & Capacity
Building - 5% 3.05 - 15.25 - 4.57 - 4.57 - 3.05 - 30.49 -
6 DPR - 1% 6.10 - - - - - - - - - 6.10 -
7 Watershed Development
work - 56% - - 45.74 680.48 99.71 1483.94 97.57 1451.93 98.49 1465.65 341.51 5082
8 Livelihood Activity - 9% - - 6.10 - 15.25 - 15.25 - 18.30 - 54.89 -
9 Production System &
Micro Enterprise - 10% - - 6.10 - 15.25 - 15.25 - 24.39 - 60.98 -
10 Consolidation - 3% - - - - - - - - 18.30 - 18.30 -
Total 36.59 85.38 680.48 153.53 1483.94 151.39 1451.93 182.95 1465.65 609.84 5082
(8 )
Table-0.3: Budget for Various Components (I.W.M.P. - I, Sant Ravidas Nagar)
(9 )
CHAPTER – 1
INTRODUCTION AND BACKGROUND
(10 )
The project area is very well known for its Carpet viewing speciality all over the world. The
watershed is a cluster of six (6) micro watersheds. There are 48 Gram Panchayat and 87 Revenue villages
in the project area.
The watershed is proposed to be taken by Bhoomi Sanrakshan Adhikari, Department of Land
Development & Water Resources, Sant Ravidas Nagar for IWMP programme, starting from 2009-10. It is
proposed to be completed by 2013-14.
The Status of Integrated Watershed Management Programme as approved by Steering Committee,
Govt. of India for Sant Ravidas Nagar district, Uttar Pradesh is given in Table Nos. 1.1, 1.2 and 1.3.
Table 1.1: Status of watershed programme District- Sant Ravidas
Nagar
Details No. Area (Lac ha.)
1 2 3
Total Micro watersheds in the district 92 101500
Workable Micro Watersheds 71 78138
Micro Watersheds already treated by DLWR & other agencies 9 9500
Balance Micro Watersheds (MWS) for treatment (Before start of IWMP in distt.)
62 68638
(11 )
Table 1.2: Approved plan (PPRs) by Steering Committee (SC)/Gov. of India,
Year Project/Phase
IWMP……..
MWS Area
(ha)
Project
Cost
Rs. lakh
Name of
PIA
S.C.
Meeting
Date
1 2 4 5 6 7 8
2009-10 IWMP I 6 5082 609.84 BSA, DPAP, Sant Ravidas Nagar
16-03-2010
Table 1.3: Details of IWMP for which this DPR is Prepared
Watershed project
IWMP -I of SANT RAVIDAS
NAGAR… (Bhadohi)…….
Micro Watersheds (MWS) detail Micro
watersheds
code
Treatable
Area (ha.)
Name of Watershed in
which MWS is falling (River / Nala name)
IWMP -I of
SANT RAVIDAS
NAGAR
(Bhadohi), 2009-10
Dhaskari/2B3A3a2b 2B3A3a2b 629.21
Morwa river watershed Dattipur/2B3A3a2c 2B3A3a2c 794.64
Kanehri/2B3A3a2a 2B3A3a2a 1009.39
ChakharibanshBhatankala/2B3A3a3a 2B3A3a3a 830.90
Musilatpur/2B3A3a3b 2B3A3a3b 528.73
Jangala/2B3A3a3c 2B3A3a3c 1289.13
Total 5082.00
(12 )
Table 1.4: Weightage of the project
Project name Project Type Weightage
IWMP Sant Ravidas
Nagar Ist
IWMP-I i ii iii iv v vi vii viii ix x xi xii xiii xiv
7.5 10 5 10 0 0 10 7.5 10 15 10 15 0 100
(13 )
Table 1.5: Criteria and Weightage for selection of watershed
Criteria Maximum Score Ranges & Scores
Poverty index (% of poor to population)
10
Above 80 % (10)
80 to 50 % (7.5)
50 to 20 % (5)
Below 20 % (2.5)
% of SC/ ST population 10 More than 40 % (10) 20 to 40 % (5) Less than 20 % (3)
Actual wages
5
Actual wages are significantly lower than minimum wages
(5)
Actual wages are equal to or higher than minimum
wages (0)
% of small and marginal farmers
10 More than 80 % (10) 50 to 80 % (5) Less than 50 % (3)
Ground water status 5 Over exploited (5) Critical (3) Sub critical (2) Safe (0)
Moisture index/ DPAP/ DDP Block
15
-66.7 & below (15) DDP Block
-33.3 to -66.6 (10) DPAP Block
0 to -33.2 (0) Non DPAP/ DDP Block
Area under rain-fed agriculture
15 More than 90 % (15)
80 to 90 % (10) 70 to 80% (5) Above 70 % (Reject)
Drinking water 10 No source (10) Problematic village (7.5) Partially covered (5) Fully covered (0)
Degraded land 15 High – above 20 % (15) Medium – 10 to 20 % (10) Low- less than 10 % of TGA (5)
Productivity potential of the land
15 Lands with low production & where productivity can be
significantly enhanced with reasonable efforts (15)
Lands with moderate production & where productivity can be
enhanced with reasonable efforts (10)
Lands with high production & where productivity can be marginally enhanced with
reasonable efforts (5)
Contiguity to another watershed that has
already been developed/ treated
10
Contiguous to previously treated watershed & contiguity within the
micro watersheds in the project (10)
Contiguity within the micro watersheds in the
project but non contiguous to previously
treated watershed (5)
Neither contiguous to previously treated watershed
nor contiguity within the micro watersheds in the
project (0)
Cluster approach in the plains (more than one
contiguous micro-watersheds in the project)
15 Above 6 micro-watersheds in cluster (15)
4 to 6 micro watersheds in cluster (10)
2 to 4 micro watersheds in cluster (5)
Cluster approach in the hills (more than one contiguous micro-
watersheds in the project)
15 Above 5 micro-watersheds in cluster (15)
3 to 5 micro watersheds in cluster (10)
2 to 3 micro watersheds in cluster (5)
150 150 90 41 2.5
(14 )
Table 1.6: Strength, weakness, opportunity and threat (SWOT) analysis is a
useful decision support tool, A SWOT analysis of the watershed is presented in Table below. SWOT analysis of the watershed
Strengths (S)
i. Cooperative work culture in traditional
activities
ii. Close ethic ties
iii. Road at the top as well as outlet of
the watershed
iv. Hard working
v. Resource pool of crop genetics
diversity
vi. Awareness of farmers about watershed
management programme
vii. Well established CPR maintaining and
sharing system
viii. Good productivity of soil
ix. Social outlook of the community
towards land less.
Weakness (W)
i. Poor water management
ii. Resource poor farmers
iii. Out migration of youth
iv. Low and erratic rainfall
v. Fragile geography
vi. Fragmented land holding
vii. Heavy infestation of wild animals
viii. Problem of fuel and fodder
Opportunities (O)
i. Wide range of annual and perennial
crops
ii. Scope of regular employment
opportunities to check out migration
iii. Strengthening of existing irrigation
system
iv. Conducive climate for rainfed crop
diversification
v. Good scope for Agro forestry and dry
land horticulture
vi. Potential for collective action and
management of CPR
Threats (T)
i. Prone to adverse climate like Flood
ii. High market risk
iii. Social conflicts owing to PRI and
WSM polices and local politics
iv. Weak coordination among line
departments
v. Lack of expertise of implementing
agency in different aspects of WSM
(15 )
Table 1.7: WATERSHED INFORMATION
Name Of the Project No. of water
sheds to be
treated
Watershed Code Watershed
regime/type/order
IWMP-I, St. Ravidas Nagar
6
2B3A3a2b
2B3A3a2c 2B3A3a2a
2B3A3a3a 2B3A3a3b
2B3A3a3c
Micro Watershed
The watershed falls under the semi arid region of Tropical climate. The average annual rain fall is
864.60 mm. Most of the rainfall (about 90 %) is received during July to September. The intensity of
Rainfall is moderate to high. The Temperature ranges from as high as 44.6°c in the month of May –
June to as low as 3.3°c in December - January.
(16 )
Table 1.8: STATUS OF PREVIOUS WATERSHED PROGRAMMES AND OTHER
DEVELOPMENTAL PROJECTS /SCHEMES RUNNING IN THE VILLAGES:
These villages of the project area being very backward therefore have been on top priority for a
number of developmental projects. These programmes are Swarnajayanti Gram Swarojgar Yojana
(SGSY) and Indira Awas Yojana (IAY). Integrated Watershed Management Programme in other
areas of the district is under operation in the department of Agriculture. DPAP Programme is also
running in the project area.
The basic information regarding project area are given as under-
Table 1.9: Details of ongoing Development Programme
Sr.
No.
Name of Programme Impleme-
nting agency
Objectives of the
programme
Year of
Commencement
Villages
covered
Project
Cost
1 Swarnajayanti Gram
Swarojgar Yojana (SGSY)
DRDA Formulation of groups
for weaker section of
the BC/SC
On going All the villages
of the project
area
-
2 Indira Awas Yojana (IAY) DRDA Provide low cast
houses to the weaker
section SC/ST
On going All the villages
of the project
area
-
3 Drought Prone Area
Programme (DPAP)
B.S.A DOLR To improvement of
environmental
condition of the
watershed
1995 on words - -
(17 )
CHAPTER – 2
General Description of the Project Area
(18 )
2.1: Location:- The micro-watershed of IWMP-I, Sant Ravidasnagar, is located in Bhadohi and Aurai blocks of Sant
Ravidas Nagar district. It is about 16 km. from district Headquarter on the Jaunpur -Mirzapur road. The
details of the location are given below:
Table 2.1: Micro-watershed wise details of location, Gram Panchayat, Villages and
Geographical area
Project- IWMP- I District- SANT RAVIDAS NAGAR (Bhadohi)
S.No. MWS code with name
Longitude Latitude Name of Block
Name of Gram Panchayat
Name of Village AREA(ha.) Details of important /approach road with
distance km
1 Kanehri/ 2B3A3a2a 82°34'13E to
82°36'20E
25°21'19N to
25°23'47N
Bhadohi Hirday Patti Hirday Patti 7.555
Ahara 2.471
Bhagtanpur Z.Sarohi 34.329
Dhaskari 95.731
Bhagwati Daspur Bhagwati Daspur 75.332
Chak Fakir 2.709
Kom Kom 5.458
Bhalla Bhalla 80.626
Bhagwanpur/Kanehri 74.901
Badhuna Chak Bhawnigir 0.146
Palahiya Chak Bisram 13.360
Basantpur 38.105
Daribpur Daribpur 141.931
Dubha 45.544
Chak Sanath Chak Sanath 148.445
Dattipur Dattipur 2.857
Awashanpur Giriya 74.226
Sharbat Khani Gondapar 40.876
(19 )
2 Dhaskari/ 2B3A3a2b
82°34'13E to
82°36'20E
25°21'19N t0
25°23'47N
Bhadohi Hirday Patti Hirday Patti 15.965
Ahara 31.267
Dhaskari 52.521
Gopal Patti 4.54
Chaubepur Chaubepur 51.092
Harirampur 27.242
Prajapatipur 22.504
Ahamadpur Phulwaria Jallapur 32.311
Pureshyam 16.263
Mahboobpur Jamunipur Badfarosh 11.371
Raghopur Raghopur 128.03
Kansraipur 103.928
Dulandaspur Manikpur 12.795
Ramraipur Ramraipur 111.007
Saroi Saroi 45.792
Rajpura Rajpura 0.684
3 Dattipur/ 2B3A3a2c 82°34'20E to
82°36'17E
25°18'17N to
25°21'40N
Bhadohi Bharatpur Bharatpur 11.246
Bishapur Bishapur 168.702
Hirday Patti Bisunpur 30.353
Badhauna Bhawanigir 31.215
Badhauna 135.73
Bhagwatidaspur Chak Fakir 2.442
Bhagwatidaspur 6.91
Bhalla Dattipur 183.796
Bhalla 7.872
Dulamdaspur Dulamdaspur 23.604
Manikpur 34.255
Hirday Patti Hirday Patti 116.799
Ahara 3.173
Bhagwanpur Z Saroi 2.701
Ismaila Ismaila 0.346
Khetalpur Khetalpur 40.493
Pure Uchit Pure Uchit 0.645
Rampur Lohara Rampur Lohara 3.499
Uchetha Sabalpur 29.815
Saroi Saroi 2.159
Tarapur Baswapatti 26.38
Bhagwanpur Bhagwanpur 32.597
Aurai Bejavan Bejavan 134.451
(20 )
4 Chakharibansh Bhatanka l /2B3A3a3a
82°32'4E to
82°34'23E
25°20'24N to 25°23'6N
Bhadohi Badi Badi 0.27
Chaubepur Bankat Z Saroi 31.324
Prajapatipur 47.82
Udhawa Mafi Bampurwa 0.284
Udhawa Mafi 80.915
Jhingurpur Chak Haribans Bhatan Kala 63.295
Puremudhia Chak Holman 67.376
Puremudhia 72.274
Dulamdaspur Dulamdaspur 40.378
Chaubepur Harirampur 28.885
Hariyawana Hariyawana 32.364
Sultanpur 0.187
Ismaila Ismaila 8.576
Mishirpur 39.053
Pachwal 41.051
Rampur Jai Rampur Khas 42.11
Jai Rampur Sir 15.92
Raghopur Kansraipur 11.527
Rajpura Rajpura 21.067
Rampur Z Saroi Rampur Z Saroi 83.305
Saroi Saroi 97.759
Khemaipur Khemaipur 28.402
5 Musilatpur/2B3A3a3b 82°31'57E to
82°34'18E
25°20'30N to
25°23'52N
Bhadohi Udhawa Mafi Udhawa Mafi 23.014
Banpurwa 76.789
Chak Purahi 19.113
Jhingurpur Chak Haribans Bhatan Kala 8.77
Chak Dharni 10.362
Hariyawan Hariyawan 278.672
Kushahara 13.763
Sultanpur 85.733
Khemaipur Khemaipur 42.347
Rajpura Rajpura 9.772
Rampur Z Saroi Rampur Z Saroi 12.47
Gangapur Saraiya 34.387
(21 )
6 Jangala /2B3A3a3c 82°31'39E to
82°34'56E
25°18'3N to 25°20'58N
Bhadohi Badi Badi 163.041
Mullupur Chak Haibans Passian Kala 25.435
Mullupur 127.483
Dulamdaspur Dulamdaspur 0.027
Ismaila Ismaila 87.808
Mishrpur 18.989
Pachwal 16.611
Jangla Jangla 203.623
Katehara 54.362
Rajaipur Z Sayar 7.215
Khetalpur Khetalpur 65.922
Khemaipur Khemaipur 23.225
Lila Dharpur Lila Dharpur 163.722
Marchwar Marchwar 82.877
Poore Uchit Poore Uchit 5.179
Rauri Rauri 12.292
Uchetha Sabalpur 23.334
Aurai Ugapur Ugapur 3.285
Jagadhari Daraundha 59.63
Bejavan Bejavan 146.632
Sarouli Jaddupur N Sayar 34.382
(22 )
WS location maps: - Map showing- U.P. in India, District in U.P., Watershed
in District and Block
(23 )
2.2: Area and Land use
Exiting land use/land cover information is prerequisite of any future planning activities. Therefore at
attempt has been made to prepare detail land use map using large scale satellite data. The details of
exiting land use categories are given below:
Table 2.2: Area under major land uses
Project- IWMP- I District- Sant Ravidas Nagar S. No.
Name of micro
watershed with Code
Name of village Cultivated rainfed
area
Cultivated
irrigated area
Uncultivated wasteland/ fallow
Pvt. Agri. Land Forest Land
Community land
Others Total area (ha)
Temp. Perma-nent
Gen SC ST OBC Total (Habitat Road etc.)
(Geogra-phical)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Dhaskari/ 2B3A3a2b
Hirday Patti 91.77 19.5 2.34 3.41 42.91 24.52 0.00 55.17 122.61 0.00 0.81 23.06 145.67
Chaubepur 89.21 16.96 6.51 2.97 41.72 23.84 0.00 53.64 119.19 0.00 0.79 22.41 141.60
Ahamadpur Phulwaria
45.57 9.68 3.15 1.69 21.36 12.21 0.00 27.46 61.03 0.00 0.4 11.30 72.33
Mahboobpur 9.37 2.32 0.75 0.41 4.38 2.50 0.00 5.63 12.52 0.00 0.08 2.35 14.87
Raghopur 209.9 44.6 17.5 7.81 98.15 56.09 0.00 126.19 280.43 0.00 1.85 52.74 333.17
Dulandaspur 9.8 2.08 0.68 0.36 4.59 2.62 0.00 5.90 13.10 0.00 0.09 2.46 15.56
Ramraipur 108.21 20.99 6.82 3.67 50.60 28.91 0.00 65.06 144.57 0.00 0.95 27.19 171.76
Saroi 44.79 9.52 3.09 1.67 21.07 12.04 0.00 27.09 60.19 0.00 0.4 11.25 71.44
SUB TOTAL 608.62 125.65 40.84 21.99 284.77 162.73 0.00 366.14 813.64 0.00 5.37 152.76 966.40
2 Kanehri/ 2B3A3a2a
Hirday Patti 90.03 22.51 16.82 9.05 52.05 26.02 0.00 52.05 130.12 0.00 0.87 8.39 138.51
Bhagwati Daspur 73.04 18.26 13.64 7.35 42.22 21.11 0.00 42.22 105.56 0.00 0.7 6.81 112.37
Kom 5.46 1.63 1.22 0.66 3.56 1.78 0.00 3.56 8.89 0.00 0.05 0.51 9.40
Bhalla 116.1 29.03 21.69 11.68 67.13 33.56 0.00 67.13 167.82 0.00 1.12 10.80 178.62
Daribpur 149.54 37.39 27.93 15.04 86.45 43.22 0.00 86.45 216.12 0.00 1.44 13.94 230.06
Chak Sanath 112.2 28.05 20.96 11.28 64.87 32.43 0.00 64.87 162.17 0.00 1.08 10.45 172.62
Dattipur 2.86 1.00 0.75 0.40 2.01 1.01 0.00 2.01 5.03 0.00 0.03 0.27 5.30
Awashanpur 69.23 17.31 12.93 6.96 40.02 20.01 0.00 40.02 100.06 0.00 0.67 6.45 106.51
(24 )
Sharbat Khani 40.88 10.22 7.64 4.11 23.63 11.82 0.00 23.63 59.08 0.00 0.39 3.81 62.89
Palahiya 51.46 12.87 9.61 5.18 29.75 14.87 0.00 29.75 74.37 0.00 0.5 4.80 79.17
SUB TOTAL 710.8 178.25 133.19 71.71 411.69 205.84 0.00 411.69 1029.22 0.00 6.84 66.23 1095.45
3 Dattipur/2B3A3a2c
Bharatpur 11.03 2.27 1.02 0.55 6.85 3.81 0.00 4.57 15.23 0.00 0.13 0.73 15.96
Bishapur 165.39 26.43 15.93 6.42 97.03 53.91 0.00 64.69 215.62 0.00 2 10.94 226.56
Hirday Patti 150.03 22.38 10.1 5.44 88.02 48.90 0.00 58.68 195.59 0.00 1.82 9.93 205.52
Badhauna 163.68 23.74 12.7 5.77 96.03 53.35 0.00 64.02 213.39 0.00 1.98 10.83 224.22
Bhagwati Daspur 9.17 1.50 0.68 0.36 5.38 2.99 0.00 3.59 11.95 0.00 0.11 0.61 12.56
Bhalla 168.50 34.67 15.65 8.43 98.85 54.92 0.00 65.90 219.67 0.00 2.04 11.15 230.82
Dulamdaspur 56.73 11.67 5.27 2.84 33.28 18.49 0.00 22.19 73.96 0.00 0.69 3.75 77.71
Ismaila 1.84 0.38 0.17 0.09 1.08 0.60 0.00 0.72 2.40 0.00 0.02 0.12 2.52
Khetalpur 39.70 8.17 3.69 1.99 23.29 12.94 0.00 15.53 51.75 0.00 0.48 2.63 54.38
Pure Uchit 0.87 0.42 0.19 0.1 0.51 0.28 0.00 0.34 1.13 0.00 0.01 0.06 1.19
Rampur Lohara 3.43 0.71 0.32 0.17 2.01 1.12 0.00 1.34 4.47 0.00 0.04 0.23 4.7
Uchetha 29.24 6.02 2.72 1.46 17.15 9.53 0.00 11.43 38.11 0.00 0.35 1.94 40.05
Saroi 2.62 0.54 0.24 0.13 1.54 0.86 0.00 1.03 3.42 0.00 0.03 0.17 3.59
Tarapur 25.86 5.32 2.4 1.29 15.17 8.43 0.00 10.11 33.71 0.00 0.31 1.71 35.42
Bhagwanpur 31.96 6.58 2.97 1.6 18.75 10.42 0.00 12.50 41.66 0.00 0.39 2.12 43.78
Bejavan 131.81 27.12 12.24 6.59 77.33 42.96 0.00 51.55 171.84 0.00 1.6 8.72 180.56
SUB TOTAL 991.86 152.50 86.29 43.23 582.26 323.48 0.00 388.17 1293.90 0.00 12.01 65.64 1359.54
4 Chakharibansh Bhatankal/ 2B3A3a3a
Badi 0.19 0.04 0.02 0.01 0.09 0.05 0.00 0.12 0.27 0.00 0 0.04 0.31
Chaubepur 52.29 11.01 5.15 2.77 25.90 14.80 0.00 33.30 73.99 0.00 1.07 10.35 84.34
Udhawa Mafi 42.26 8.90 4.16 2.24 20.93 11.96 0.00 26.91 59.79 0.00 0.86 8.37 68.16
Jhingurpur 43.66 9.19 4.3 2.31 21.62 12.35 0.00 27.80 61.77 0.00 0.89 8.65 70.42
Puremudhia 96.31 20.28 9.48 5.11 45.94 26.25 0.00 59.07 131.27 0.00 1.97 19.07 150.34
Dulamdaspur 27.85 5.86 2.74 1.48 13.79 7.88 0.00 17.73 39.41 0.00 0.57 5.51 44.92
Chaubepur 19.92 4.19 1.96 1.06 9.87 5.64 0.00 12.69 28.19 0.00 0.41 3.94 32.13
Hariyawana 22.45 4.73 2.21 1.19 11.12 6.35 0.00 14.29 31.76 0.00 0.46 4.45 36.21
Ismaila 61.16 12.88 6.02 3.24 30.29 17.31 0.00 38.94 86.54 0.00 1.25 12.11 98.65
Rampur 40.02 8.43 3.94 2.12 19.82 11.33 0.00 25.48 56.63 0.00 0.82 7.92 64.55
Raghopur 7.95 1.67 0.78 0.42 3.94 2.25 0.00 5.06 11.25 0.00 0.16 1.57 12.82
Rajpura 14.53 3.06 1.43 0.77 7.20 4.11 0.00 9.25 20.56 0.00 0.3 2.88 23.44
Rampur Z Saroi 57.46 12.10 5.66 3.05 28.47 16.27 0.00 36.61 81.35 0.00 1.17 11.33 92.68
(25 )
Saroi 67.42 14.06 6.57 3.54 32.59 18.62 0.00 41.90 93.12 0.00 1.38 13.35 106.47
Khemaipur 19.59 4.10 1.92 1.03 9.70 5.54 0.00 12.47 27.72 0.00 0.4 3.88 31.60
SUB TOTAL 573.01 120.50 56.34 30.34 281.27 160.72 0.00 361.63 803.62 0.00 11.71 113.42 917.04
5 Musilatpur/ 2B3A3a3b
Udhawa Mafi 100.59 24.98 18.39 6.67 68.43 34.22 0.00 68.43 171.08 0.00 4.56 34.21 205.29
Jhingurpur 17.8 4.42 2.19 1.18 12.11 6.05 0.00 12.11 30.27 0.00 0.81 6.06 36.33
Hariyawan 279.89 69.88 39.68 18.67 190.40 95.20 0.00 190.40 476.00 0.00 12.7 95.2 571.2
Khemaipur 39.4 9.78 4.85 2.61 29.46 14.73 0.00 29.46 73.64 0.00 1.79 13.4 87.04
Rajpura 9.09 2.26 1.12 0.6 6.18 3.09 0.00 6.18 15.46 0.00 0.41 3.09 18.55
Rampur Z Saroi 11.6 2.88 1.43 0.77 7.88 3.94 0.00 7.88 19.71 0.00 0.53 3.95 23.66
Gangapur 31.99 7.94 3.94 2.12 21.76 10.88 0.00 21.76 54.41 0.00 1.45 10.88 65.29
SUB TOTAL 490.36 122.14 71.6 32.62 336.23 168.11 0.00 336.23 840.57 0.00 22.25 166.79 1007.36
6 Jangala/ 2B3A3a3c
Badi 145.43 29.93 10.06 2.39 68.40 39.09 0.00 87.95 195.44 0.00 1.3 12.55 207.99
Mullupur 145.35 29.92 10.05 2.39 66.27 37.87 0.00 85.20 189.34 0.00 1.3 12.54 201.88
Dulamdaspur 0.03 0.01 0 0 0.01 0.01 0.00 0.02 0.04 0.00 0 0 0.04
Ismaila 117.30 24.14 8.11 1.93 53.48 30.56 0.00 68.76 152.80 0.00 1.05 10.12 162.92
Jangla 233.09 47.97 19.12 3.84 106.27 60.72 0.00 136.63 303.62 0.00 2.09 20.11 323.73
Khetalpur 57.03 11.74 3.94 0.94 26.00 14.86 0.00 33.43 74.29 0.00 0.51 4.92 79.21
Khemaipur 22.08 4.54 1.53 0.36 10.07 5.75 0.00 12.94 28.76 0.00 0.2 1.91 30.67
Lila Dharpur 155.62 32.03 10.76 2.56 70.95 40.54 0.00 91.22 202.70 0.00 1.39 13.43 216.13
Marchwar 78.78 16.21 5.45 1.3 35.92 20.52 0.00 46.18 102.62 0.00 0.71 6.8 109.42
Poore Uchit 4.92 1.01 0.34 0.08 2.25 1.28 0.00 2.89 6.42 0.00 0.04 0.42 6.84
Rauri 11.68 2.40 0.81 0.19 5.32 3.04 0.00 6.84 15.21 0.00 0.1 1.01 16.22
Uchetha 22.18 4.56 1.53 0.36 11.99 6.85 0.00 15.42 34.27 0.00 0.2 1.86 36.13
Ugapur 3.13 0.64 0.22 0.05 1.42 0.81 0.00 1.83 4.07 0.00 0.03 0.27 4.34
Jagadhari 56.68 11.67 3.92 0.93 25.84 14.77 0.00 33.22 73.83 0.00 0.51 4.89 78.72
Bejavan 139.37 28.69 15.64 2.3 63.54 36.31 0.00 81.70 181.55 0.00 1.25 12.03 193.58
Sarouli 32.68 6.73 2.26 0.54 14.90 8.51 0.00 19.16 42.57 0.00 0.29 2.82 45.39
SUB TOTAL 1225.35 252.19 93.74 20.16 562.64 321.51 0.00 723.39 1607.53 0.00 10.97 105.68 1713.21
GRAND TOTAL 4600.00 951.00 482.00 220.05 2458.85 1342.39 0.00 2587.24 6388.26 0.00 69.15 670.74 7059.00
(26 )
2.3 Physiography:-
The project area is situated in Eastern plan zone which is almost flat terrain. The elevation ranges
from 75 Mean Sea Level to 89 Mean Sea Level. The details of individual MWS are given below:
Table 2.3: Micro-watershed wise elevation range and relief
Project- IWMP- I District- Sant Ravidas Nagar
S. No. Name of MWS & code Minimum Maximum Releif
1 2 3 4 5
1 Dhaskari/2B3A3a2b 76 89 13
2 Kanehri/2B3A3a2a 75 89 14
3 Dattipur/2B3A3a2c 77 89 12
4 Chakharibansh Bhatankala/2B3A3a3a 78 89 11
5 Musilatpur/2B3A3a3b 78 89 11
6 Jangala/2B3A3a3c 80 89 09
(27 )
2.4 Slope
An attempt has been made to prepare the slope map of the study area using SRTM elevation model.
The details of micro watershed wise slope range are given below:
Table 2.4: Slope classes in the MWS IWMP-I
Sl. No.
Name of MWS & code
Slope range wise area (ha)
0-05% 0.5-
1.0% 1-3% 3-5%
>5% Others
Undulating Terraced Specify
1 2 3 4 5 6 7 8 9
1 Dhaskari/2B3A3a2b 101.29 133.69 657.443 70.344 3.634
2 Kanehri/2B3A3a2a 96.947 161.202 731.725 98.871 6.71
3 Dattipur/2B3A3a2c 82.507 161.935 943.207 160.67 11.221
4
Chakharibansh
Bhatankala
/2B3A3a3a
42.079 93.048 616.337 152.38 13.191
5 Musilatpur/2B3A3a3b 73.689 100.91 666.395 157.97 8.392
6 Jangala/2B3A3a3c 122..800 220.825 1197.61 179 9.417
(28 )
2.5 Climate:-
The watershed lies in the sub tropical climate. The average annual rainfall is less than 864.60mm.
Most of the annual rain fall (about 90%) is received during the rainy season (July to September)
accompanied with high intensity storm. The temperature in the area rarely goes up to 44°c during
summer and reaches 4.1°c in winter.
The year may be divided into four seasons. The cold season from mid November to February is
followed by the summer season from March to mid June. The period from mid June to the end of
September is the south-west monsoon season and the October and the first half of November constitute
the post-monsoon season.
TEMPERATURE
The data of St. Ravidas Nagar raingauge centre may be taken as representative of the
meteorological conditions in the district. From mid November there is a rapid fall in temperature. January
is the coldest month with the mean daily maximum temperature at 22.8º C and the mean daily minimum
temperature at 9.3º C. In association with cold waves in the wake of the western disturbances passing
eastwards in the winter season, temperature tends to go down to a degree or two above the freezing
point. Day temperature begins to rise rapidly after February. May is the hottest with mean daily maximum
temperature at 38.4 C and the mean daily minimum at 25.1º C. With the advent of the monsoon by about
the middle of June there is appreciable drop in the day temperature, however, the nights continue to be
warm. In September there is a slight increase again in the day temperature but the night temperature
decreases after September. With the withdrawal of monsoon by the beginning of October it decreases
progressively.
(29 )
HUMIDITY
During the monsoon and the post monsoon seasons the relative humidity are high ranging between
70 and 85 per cent. In the winter months humidity decreases and in summer the air is comparatively
drier.
Table 2.5: Average monthly rainfall and Temperature of the last five years:-
Project- IWMP I District- Sant Ravidas Nagar
Month Year/Rainfall in mm.
2004 2005 2006 2007 2008 Average
January 0.0 0.0 0.0 0.0 3.0
864.6 mm annual
rainfall of the last 5
years.
February 0.0 3.0 0.0 0.0 0.0
March 0.0 16.0 5.0 2.0 1.0
April 26.0 0.0 0.0 0.0 0.0
May 16.0 0.0 10.0 12.0 2.0
June 32.0 121.8 133.3 66.0 682.6
July 319.0 177.0 179.3 272.5 692
August 246.0 156.3 142.0 124.0 409.0
September 32.0 179.0 60.0 105.0 12.0
October 11.0 11.0 15.0 43.0 6.0
November 0.0 0.0 0.0 0.0 0.0
December 0.0 0.0 0.0 0.0 0.0
(30 )
CHAPTER – 3
BASELINE SURVEY
(31 )
SOCIO-ECONOMIC CONDITION OF THE PROJECT
In the proposed watershed management plan of proper blending of bio- engineering measures will
be applied. Based on the results of studies conducted in this region, it is estimated that more than 50
% of the watershed area will be treated and consequently the soil loss and runoff from the area is
expected to be reduced by 40 % and 65 % respectively. The proposed land use plan will improve the
land utilization index and crop diversification index significantly as compared to the existing one. It will
help in maintaining ecosystem integrity on sustained basis along with improving the livelihood security of
the farming community.
ECONOMIC ANALYSIS
Economic analysis of the project is carried out by taking direct benefits and costs, considering 30
year project life at 10% discount rate. For the purpose of economic analysis, whole watershed
development plan is divided into four sectors namely agriculture (rainfed and irrigated), pure horticulture,
agro-horticulture and silvi pastoral (Silvi-Pastoral + sericulture). Net present value (NPV), Benefit Cost
Ratio (BCR), Payback Period (PBR) and internal rate of return (IRR) criteria is employed to judge the
economic efficiency of each enterprise, sector and project as a whole.
(32 )
DEMOGRAPHIC INFORMATION
HUMAN AND LIVESTOCK POPULATION
Human Population
The total population of the study area is about 49565, there are total number of 96 villages of the
project area with average family size of 6 persons.
Table 3.1: Demographic Features in the project area
S. No. Name of Micro Watershed Name of village Total Population Population of SC/ST
Total Male Female Total Male Female
1 2 3 4 5 6 7 8 9
1
Dhaskari/2B3A3a2b,
Kanehri/2B3A3a2a,
Dattipur/2B3A3a2c,
Chakharibansh Bhatankala/2B3A3a3a,
Musilatpur/2B3A3a3b,
Jangala/2B3A3a3c
Pure shyam 44 39 26 83 11 0
2 Jallapur 190 158 118 348 40 10
3 Rewra paraspur 407 323 242 730 109 11
4 Kom 255 252 197 507 65 36
5 Ramraipur 631 588 472 1219 157 36
6 Rampur-z-saroi 864 786 568 1650 194 49
7 Jairampur sir 64 56 47 120 15 2
8 Jairampur khas 167 145 112 312 38 7
9 Hariyawan 2785 2408 2156 5193 718 244
10 Sultanpur 390 354 317 744 106 0
11 Kushahra 0 0 0 0 0 0
12 Hirday patti 780 645 447 1425 149 61
13 Ahara 160 148 78 308 23 0
14 Bisunpur 100 93 53 193 18 0
15 Bhagtanpur-z-saroi 321 268 191 589 67 16
16 Dhaskari 403 392 292 795 101 13
(33 )
17 Rampur Dhaskari 107 102 63 209 22 19
18 Gopal patti 0 0 0 0 0 0
19 Raghopur 883 710 548 1593 184 47
20 Kansraipur 649 588 391 1237 137 5
21 Dulamdaspur 1163 1121 742 2284 248 4
22 Manikpur 463 397 339 860 111 2
23 Chaubeypur(Sudhist) 371 355 237 726 80 2
24 Pajapatipur 489 428 341 917 116 62
25 Banket-z-saroi 220 210 111 430 40 0
26 Harirampur 635 418 374 1053 125 11
27 Saroi 1544 1294 945 2838 313 147
28 Udhwa mafi 1102 915 711 2017 236 54
29 Chakphurahi 123 115 51 238 27 0
30 Banpurwa 196 190 129 386 42 0
31 Jhigurpur chakvijay 1000 967 677 1967 226 17
32 Chakdharani 0 0 0 0 0 0
33 Chakharibanshbhatan 580 550 446 1130 177 42
34 Khemaipur 1766 1584 1208 3350 415 113
35 Mullupur 617 571 440 1188 150 51
36 Chakharibanshpasiankala 428 390 369 818 122 114
37 Chakharibanshpasiankhurd 161 160 157 321 55 55
38 Puremudhiya 535 461 214 996 74 9
39 Chak Holeman 415 370 279 785 92 4
40 Jangala 486 466 347 952 117 9
41 Rajpura 496 444 362 940 120 0
42 Katehra 83 78 63 161 20 0
43 Liladharpur 883 824 681 1707 229 46
(34 )
44 Bankat-z-Lilapur 0 0 0 0 0 0
45 Badi 1028 922 772 1950 217 11
46 Ismaila 448 392 263 840 90 26
47 Pachwal 226 219 144 445 35 0
48 Missirpur 401 346 243 747 81 33
49 Uchetha 880 863 554 1743 186 51
50 Sabalpur 168 139 89 307 29 0
51 Bisapur 726 628 557 1354 180 28
52 Badhauna 3900 3823 621 7723 208 41
53 Chakbhawanigiri 86 63 57 149 23 3
54 Khetalpur 624 600 491 1224 132 29
55 Bijla 547 536 368 1083 123 6
56 Arjunpur 74 70 49 144 13 0
57 Bhalla 789 780 679 1569 210 2
58 Dattipur 390 373 214 763 72 0
59 Taalkudawa 0 0 0 0 0 0
60 Kanehri 208 164 147 372 51 8
61 Gonda kanehri 0 0 0 0 0 0
62 Daribpur 379 369 261 748 104 52
63 Suwajag 219 208 194 427 57 4
64 Bhagwatidaspur 389 320 289 709 145 23
65 Chak fakirmafi 0 0 0 0 0 0
66 Tarapur 563 515 493 1078 143 71
67 Baswa patti 196 170 114 366 38 24
68 Jawasanpur 304 280 243 584 85 2
69 Bagahi 276 218 188 494 67 4
70 Giriya 356 345 243 701 75 4
(35 )
71 Jogipur 492 481 367 973 106 21
72 Bhagwanpur kunehri 395 364 253 759 85 45
73 Basantpur 318 257 214 575 84 42
74 Chaksanath 81 62 59 143 19 9
75 Chak bisram 140 135 113 275 39 0
76 Musilatpur 4117 3770 1878 7887 972 51
77 Bejawan 1075 966 746 2041 204 66
78 Rampur lohara 0 0 0 0 0 0
79 Bharatpur 745 650 537 1395 117 47
80 Poore uchit 649 449 387 1098 140 41
81 Sarauli or Ramauli 653 601 587 1254 146 36
82 Jaddupur N.shayar 312 259 213 571 89 2
83 Ugapur 1799 1615 1247 3414 221 41
84 Rauri 61 58 39 119 9 7
85 Pipar gaon 1526 742 639 2268 183 19
86 Daraudha 601 557 476 1158 142 135
87 Jagdhari 468 397 316 865 119 1
Total 49565 44069 30885 93634 10328 2283
(36 )
Table 3.2: Details of seasonal migration from Project area: Pre-project status *
Project- IWMP I District- Sant Ravidas Nagar
Sl.
No.
Names of
Watershed
Name of
village
No. of
persons
migrating
No. of days
per year of
migration
Major
reason(s) for
migrating
Distance of
destination of
migration
from the
village (km)
Occupation
during
migration
Income
from such
occupation
(Rs. in
lakh)
1 2 3 4 5 6 7 8
1 Dhaskari/
2B3A3a2b
Total no of
village (87) 378 175
Unemployment
Poverty 15 to 350 km Labour
2 Kanehri/
2B3A3a2a
3 Dattipur/
2B3A3a2c
4 Chakharibansh
Bhatanka l/
2B3A3a3a
5 Musilatpur/
2B3A3a3b
6 Jangala/
2B3A3a3c
6 Total of Project
(37 )
Table 3.3: Soil Texture:-
Project- IWMP I District- Sant Ravidas Nagar
Sl. No. Area in different Soil Group (ha)
Light textured soil
(sand, loamy sand)
Medium textured
soil (Sandy loam, loam, silt loam)
Heavy textured soil
(Clayey)
Others specify
………..
1 Fine Silty:- 869.66
2 Loamy 6205.77
Total 7075.43
Table 3.4: Details of land holding pattern in the project areas *
Project- IWMP I District - Sant Ravidas Nagar
S. No. Name of Villages Land holding classification
Marginal Small Others Landless Total
1 Pure shyam 3 5 2 0 10
2 Jallapur 0 0 0 0 0
3 Rewra paraspur 4 7 2 1 14
4 Kom 29 61 12 17 119
5 Ramraipur 51 86 19 12 168
6 Rampur-z-saroi 11 19 5 4 39
7 Jairampur sir 3 8 4 0 15
(38 )
8 Jairampur khas 12 24 7 2 45
9 Hariyawan 37 68 31 4 140
10 Sultanpur 27 58 27 3 115
11 Kushahra 0 0 0 0 0
12 Hirday patti 21 37 15 2 75
13 Ahara 3 7 5 0 15
14 Bisunpur 8 19 7 1 35
15 Bhagtanpur-z-saroi 12 21 8 4 45
16 Dhaskari 23 44 17 1 85
17 Rampur Dhaskari 9 17 7 2 35
18 Gopal patti 0 0 0 0 0
19 Raghopur 39 62 16 3 120
20 Kansraipur 33 48 9 5 95
21 Dulamdaspur 27 41 15 1 84
22 Manikpur 7 15 5 1 28
23 Chaubeypur(Sudhist) 48 83 26 6 163
24 Pajapatipur 10 19 9 0 38
25 Banket-z-saroi 11 17 5 1 34
26 Harirampur 20 36 15 1 72
27 Saroi 24 53 17 2 96
28 Udhwa mafi 51 97 41 6 195
29 Chakphurahi 0 0 0 0 0
30 Banpurwa 2 5 2 0 9
31 Jhigurpur chakvijay 26 54 25 3 108
32 Chakdharani 0 0 0 0 0
33 Chakharibanshbhatan 25 48 21 3 97
34 Khemaipur 37 76 31 2 146
35 Mullupur 31 65 26 4 126
36 Chakharibanshpasiankala 40 61 22 2 125
37 Chakharibanshpasiankhurd 12 23 9 1 45
38 Puremudhiya 46 62 17 3 128
(39 )
39 Chak Holeman 11 25 9 0 45
40 Jangala 44 93 35 13 185
41 Rajpura 19 39 10 0 78
42 Katehra 0 0 0 0 0
43 Liladharpur 31 75 14 6 126
44 Bankat-z-Lilapur 0 0 0 0 0
45 Badi 27 53 25 3 108
46 Ismaila 18 37 19 1 75
47 Pachwal 9 19 7 3 38
48 Missirpur 5 9 3 1 18
49 Uchetha 41 82 31 8 162
50 Sabalpur 0 0 0 0 0
51 Bisapur 32 69 25 2 128
52 Badhauna 29 63 15 1 118
53 Chakbhawanigiri 2 6 2 0 10
54 Khetalpur 37 53 12 3 105
55 Bijla 42 80 29 9 160
56 Arjunpur 5 8 3 2 18
57 Bhalla 30 61 17 4 112
58 Dattipur 46 92 37 3 178
59 Taalkudawa 0 0 0 0 0
60 Kanehri 11 17 2 2 32
61 Gonda kanehri 0 0 0 0 0
62 Daribpur 57 109 30 11 207
63 Suwajag 17 31 12 0 60
64 Bhagwatidaspur 19 37 5 2 63
65 Chak fakirmafi 0 0 0 0 0
66 Tarapur 48 99 34 9 190
67 Baswa patti 0 0 0 0 0
68 Jawasanpur 27 58 17 4 106
69 Bagahi 16 38 6 0 60
(40 )
70 Giriya 7 14 1 0 22
71 Jogipur 30 73 19 3 125
72 Bhagwanpur kunehri 23 44 17 1 85
73 Basantpur 16 29 9 2 56
74 Chaksanath 4 8 1 1 14
75 Chak bisram 11 23 4 2 40
76 Musilatpur 108 304 52 19 566
77 Bejawan 115 256 63 16 450
78 Rampur lohara 3 9 1 0 13
79 Bharatpur 14 23 9 1 47
80 Poore uchit 6 17 3 0 26
81 Sarauli or Ramauli 29 53 11 1 94
82 Jaddupur N.shayar 17 28 0 1 46
83 Ugapur 105 212 47 9 373
84 Rauri 13 19 5 2 39
85 Pipar gaon 126 243 41 12 422
86 Daraudha 20 39 12 2 73
87 Jagdhari 15 41 6 3 65
Total 2027 4034 1179 259 7602
(41 )
Table 3.5: Major Crops, their Productivity and Production
IWMP-I District-Sant Ravidas Nagar
S.
No. Crop.
Area (ha) Productivity
(q/ha)
Production (q)
Grain/Main product Fodder/Fuel/other Product
Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed
A Kharif
1 Paddy 325.20 2022.20 0.00 8.00 0.00 16177.60 0.00 24266.40
2 Maize 0.00 175.60 0.00 4.7 0.00 258.13 0.00 387.20
3 Arhar 222.30 536.40 0.00 7.87 0.00 4221.47 0.00 6332.20
4 Urd/Mung 0.00 241.30 0.00 5.08 0.00 1225.80 0.00 1225.80
5 vegetables (Cropwise) 11.50 0.00 0.00 220.40 0.00 12518.72 0.00 12518.72
6 Fodder 20.20 56.80 0.00 0.00 0.00 0.00 0.00 0.00
.. Other, specify 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 579.20 3032.30 242.82 34401.72 44730.32
B Rabi
1 Wheat 284.54 2235.12 25.00 18.00 7113.50 40232.16 1890.00 60348.24
2 Barley 54.50 127.60 0.00 10.47 0.00 1335.97 0.00 2003.96
3 Masoor 0.00 173.50 0.00 4.80 0.00 832.80 0.00 1041.00
4 Gram 33.00 335.60 0.00 6.56 0.00 2201.54 0.00 2751.92
5 Pea 0.00 7.50 0.00 10.43 0.00 78.23 0.00 78.23
6 Mustard 0.00 496.30 0.00 4.26 0.00 2114.24 0.00 3171.36
7 Potato 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 vegetables (Cropwise) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 Fodder 0.00 12.70 0.00 0.00 0.00 0.00 0.00 0.00
.. Other, specify 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 372.04 3388.32 25.00 54.52 7113.50 46794.93 1890.00 69394.70
C Zaid
Cultivable Area 5551.24 Cropping Intensity 132.80
(42 )
Summary
It was found that the productivity of wheat, Gram, Jowar, Arhar and Masoor are mainly
grown in the project area. Overall cropping intensity of the project area is 132.80%.
Horticulture Status
There is no systematic agroforestry and orchard in the project area, however scattered trees
are found in the study area. The details are given below:
Table 3.6: Project- IWMP I District - Sant Ravidas Nagar
S.
N.
Name of micro
watershed with code
Name of Important horticultural crop
Whole Fruit Crop Scattered Fruit Crop
Name Area
ha
Productivity
q/ha
Production
q
No. Productivity
q/No
Production
q
1 2 4 5 6 7 8
1 Dhaskari/2B3A3a2b
Nil
Nil
Nil
Nil
42
2.5
45
2 Kanehri/2B3A3a2a
Nil
Nil
Nil
Nil
42
2.8
45
3 Dattipur/2B3A3a2c Nil Nil Nil Nil
33
2.7
36
4 Chakharibansh
Bhatankala /2B3A3a3a
Nil
Nil
Nil
Nil
35
2.6
38
5 Musilatpur/2B3A3a3b
Nil
Nil
Nil
Nil
26
2.3
29
6 Jangala/2B3A3a3c
Nil
Nil
Nil
Nil
52
2.5
55
Total of project
(43 )
Livestock Population
There are Desi cows and bufflows are mostly found in the project area. The details of
livestock population are given below:
Table 3.7: Livestock Population in IWMP-I, Sant Ravidas Nagar
All Figure in No.
S. No. Name of Village livestock Resolution
Buffaloes Cows Bullocks Goat Other Total
1. Pure shyam 11 9 2 4 - 26
2. Jallapur 32 21 3 21 12 89
3. Rewra paraspur 71 56 26 48 11 212
4. Kom 47 33 11 25 19 135
5. Ramraipur 119 89 23 74 12 317
6. Rampur-z-saroi 125 98 24 73 42 362
7. Jairampur sir 13 11 3 7 4 38
8. Jairampur khas 29 34 5 12 7 87
9. Hariyawan 538 497 94 229 68 1426
10. Sultanpur 67 78 17 48 7 217
11. Kushahra 0 0 0 0 0 0
12. Hirday patti 101 117 14 54 11 297
13. Ahara 14 11 4 9 3 41
14. Bisunpur 9 14 6 2 1 32
15. Bhagtanpur-z-saroi 37 53 11 28 10 139
16. Dhaskari 69 57 14 49 18 207
17. Rampur Dhaskari 16 19 3 8 3 49
18. Gopal patti 0 0 0 0 0 0
(44 )
19. Raghopur 114 99 23 69 19 324
20. Kansraipur 96 104 21 54 12 287
21. Dulamdaspur 169 144 33 86 26 458
22. Manikpur 87 74 19 51 7 238
23. Chaubeypur(Sudhist) 59 45 13 41 9 167
24. Pajapatipur 94 88 26 26 4 238
25. Banket-z-saroi 33 21 7 19 6 86
26. Harirampur 91 59 15 79 13 257
27. Saroi 229 186 31 168 15 629
28. Udhwa mafi 143 162 18 128 12 463
29. Chakphurahi 23 16 6 9 3 57
30. Banpurwa 37 26 9 13 4 89
31. Jhigurpur chakvijay 197 143 26 53 13 432
32. Chakdharani 0 0 0 0 0 0
33. Chakharibanshbhatan 109 111 23 61 23 327
34. Khemaipur 286 243 46 208 32 815
35. Mullupur 93 64 29 81 17 284
36. Chakharibanshpasiankala 83 78 27 33 7 228
37. Chakharibanshpasiankhurd 42 36 13 18 4 113
38. Puremudhiya 53 47 12 12 3 127
39. Chak Holeman 66 53 10 48 9 186
40. Jangala 79 84 19 41 11 234
41. Rajpura 86 69 18 57 18 248
42. Katehra 17 14 3 11 4 49
43. Liladharpur 179 163 37 92 16 487
44. Bankat-z-Lilapur 0 0 0 0 0 0
45. Badi 159 163 41 57 12 432
(45 )
46. Ismaila 72 53 11 43 7 186
47. Pachwal 26 22 7 21 3 79
48. Missirpur 57 64 9 23 3 156
49. Uchetha 127 115 18 88 13 361
50. Sabalpur 24 21 5 8 1 59
51. Bisapur 117 102 22 94 7 342
52. Badhauna 151 133 27 89 11 411
53. Chakbhawanigiri 13 12 4 7 2 38
54. Khetalpur 86 79 22 72 8 267
55. Bijla 72 67 26 65 19 249
56. Arjunpur 11 8 3 4 1 27
57. Bhalla 121 125 43 97 11 397
58. Dattipur 49 43 11 35 3 141
59. Taalkudawa 0 0 0 0 0 0
60. Kanehri 36 38 13 19 3 109
61. Gonda kanehri 0 0 0 0 0 0
62. Daribpur 74 61 24 39 5 203
63. Suwajag 34 29 11 36 4 114
64. Bhagwatidaspur 103 89 32 57 6 287
65. Chak fakirmafi 0 0 0 0 0 0
66. Tarapur 97 104 31 45 9 286
67. Baswa patti 27 23 8 19 2 79
68. Jawasanpur 72 67 8 21 3 171
69. Bagahi 48 51 19 13 5 136
70. Giriya 42 39 23 42 3 149
71. Jogipur 84 71 31 29 2 217
72. Bhagwanpur kunehri 63 56 27 26 5 177
(46 )
73. Basantpur 46 41 21 49 4 161
74. Chaksanath 13 11 3 5 1 33
75. Chak bisram 27 22 17 7 2 75
76. Musilatpur 673 587 229 401 38 1928
77. Bejawan 123 148 37 93 12 413
78. Rampur lohara 0 0 0 0 0 0
79. Bharatpur 82 65 27 48 11 233
80. Poore uchit 103 95 33 42 12 285
81. Sarauli or Ramauli 84 91 29 84 8 296
82. Jaddupur N.shayar 67 62 19 23 2 173
83. Ugapur 153 146 32 96 8 435
84. Rauri 8 5 3 5 1 22
85. Pipar gaon 113 96 26 112 11 358
86. Daraudha 93 85 29 68 4 279
87. Jagdhari 76 55 24 57 3 215
TOTAL 7189 6470 1749 4288 780 20476
(47 )
Irrigation Status
Table 3.8: Details of Irrigation Status
Project- IWMP I District - Sant Ravidas Nagar
S.No. Name & Micro Watershed with
code
Gross Cultivated Area Net Cultivated
Area
Gross Irrigated Area Net Irrigated
Area
Rainfed Area
Kharif Rabi Zaid Total Kharif Rabi Zaid Total
1 2 3 4 5 6 7 8 9 10 11 12 13
1 Dhaskari/2B3A3a2b 475.5 542.1 12 1029.62 734.27 75.32 82.2 157.52 125.65 608.62
2 Kanehri/2B3A3a2a 723.1 624.2 32 1379.33 889.05 124.5 142.2 266.72 178.25 710.80
3 Dattipur/2B3A3a2c 580.2 614.2 20 1214.4 892.94 85.3 96.3 181.6 152.5 991.86
4 Chakharibansh Bhatankala /2B3A3a3a
524.4 560.3 5 1089.71 693.51 78.2 92.5 170.7 120.5 573.01
5 Musilatpur/2B3A3a3b 523.6 580.1 16 1119.7 612.50 65.2 84.2 149.4 122.14 490.36
6 Jangala/2B3A3a3c 1023 990.3 40 2053.35 1477.54 135.2 148.6 283.8 252.2 1225.35
Total for Project 3850 3911 125 7886 5551 563.7 646 1210 951.24 4600.00
(48 )
Ground Water Status
Table 3.9: Details of Ground Water Status
Project- IWMP I District - Sant Ravidas Nagar
S.
No.
Name & Code of
Micro watershed
Depth of Ground Water Table
(Below Ground level) in Meter
No. of Observation well Remarks
Before
Monsoon(M)
After Monsoon(M)
1 2 4 5 6 7
1 Dhaskari/2B3A3a2b 16-17 14-15 15 The observation has been
taken from open well of
the Villages of the project
area.
2 Kanehri/2B3A3a2a 15-16.5 14-15 11
3 Dattipur/2B3A3a2c 16-18 14-15 8
4 Chakharibansh
Bhatankala /2B3A3a3a 15-17 14-15 12
5 Musilatpur/2B3A3a3b 16-18 14-15 16
6 Jangala/2B3A3a3c 16-18 14-15 14
(Source:PPR)
(49 )
Details of infrastructure in the project areas*
Project- IWMP I District - Sant Ravidas Nagar
S
N
Name of
Micro
Watershed
Name of
villages Parameters Status
1 2 3 4 5
1 Dhaskari/
2B3A3a2b
As per list
(i)
Name of villages connected to the main road by an all-
weather road
All the Village of the project
area have been connected by
Pakka road.
2 Kanehri/
2B3A3a2a
-do- (ii) Village's Name provided with electricity All villages have been
electrified
3 Dattipur/
2B3A3a2c
-do- (iii) No. of households without access to drinking water About 80% Household having
facility of drinking water.
4 Chakharibans
h Bhatankala
/2B3A3a3a
-do-
(iv) No. of educational institutions :
Primary(P)/ Secondary(S)/ Higher Secondary(HS)/
vocational institution(VI)
(P)
51
(S)
36
(HS)
6
(VI)
5 Musilatpur/
2B3A3a3b
-do- (v) Names of villages with access to Primary Health Centre There are 15 PHC in the
project area.
6 Jangala/
2B3A3a3c
-do- (vi) Names of villages with access to Veterinary Dispensary There are 8 V.D. in the project
area.
(vii) Names of villages with access to Post Office There are 2Post Office in the
project area.
(viii) Names of villages with access to Banks There are 5 Banks in the
project area.
(ix) Names of villages with access to Markets/ mandis -
(x) Names of villages with access to Agro-industries -
(xi) Total quantity of surplus milk deficit -
(xii) No. of milk collection centres
(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
(U) (S) (PA) (O)
(xiii) Name of villages with access to Anganwadi Centre There are 9 Anganwadi centre
the project area.
(xiv) Any other facilities with names of villages (please specify) -
(50 )
(51 )
(52 )
CHAPTER - 4
INSTITUTION BUILDING &
PROJECT MANAGEMENT
(53 )
Project Implementing Agency: The Project Implementing Agency (PIA) for IWMP- I, Sant Ravidas
Nagar is BSA, Bhoomi Sanrakshan Unit, Land Development and Water Resources Department, District
Sant Ravidas Nagar, Uttar Pradesh. The project implementing agency was selected by State Level Nodal
Agency (SLNA) for Integrated Watershed Management Program (IWMP) in Sant Ravidas Nagar district.
The PIA was given responsibility to develop the micro-watershed by District Watershed Development Unit
(DWDU) and State Level Nodal Agency (SLNA) considering its vast experiences in handling land and water
management issues in the region. The PIA has well experienced trained and sufficient staff to handle the
watershed management programme efficiently.
The PIA will put dedicated Watershed Development team and will provide necessary technical
guidance to the Gram Panchayat for preparation of Development Plans for the Watershed Projects through
Participatory Rural Appraisal exercise. PIA will also undertake a) Community Organization, b) Trainings
for the village communities, c) supervise Watershed development Activities, d) inspect & authenticate
project accounts, e) monitor & review the overall project implementation, f) set up institutional
arrangements for post project operations and g) maintenance and further development of the assets
created during the project period.
(54 )
Table 4.1: Details of Project Implementing Agency (PIA)
Project- IWMP I District - Sant Ravidas Nagar
S. No. Particulars of PIA
1 2 3
(i) Date of selection of PIA 23-6-2010
(ii) Type of organization# Govt.
(iii) Name of organization Bhoomi Sanrakshan Unit, Land Development and Water Resources
Department, District Sant Ravidas Nagar, Bhadohi
(iv) Designation & Address BSA, Bhoomi Sanrakshan Unit, Land Development and Water Resources Department, District Sant Ravidas Nagar, Bhadohi
(v) Telephone 05444-223389
(vi) Fax -
(vii) E-mail Govt.
(55 )
Table 4.2: Details of Staff at PIA
S.
No. Name Designation Qualification
M/F Field of
Experience &
Period(Year)
1 2 3 4
1 Sri Satish Chandra Srivastava Bhoomi Sanrakshan Adhikari Intermediate, Engg. Diploma. M 22
2 “ Jagdish Prasad Junior Engineer Intermediate, Engg. Diploma. M 22
3 “ Santosh Kumar Srivastava Accountant M.Com M 20
4 “ Rajeev Lochan Accountant M.Com M 18
5 “ Lalta Prasad Draftsman B.A,Diploma in Draughtsman M 19
6 “Suresh Kumar Tracer Intermediate M 20
7 “ Kamal Bajpayee Senior clerk B.A. M 22
8 “ Shamsher Singh Junior clerk B.A. M 20
9 “ Mohan Lal Gupta A.S.C.I. B.Sc (Ag) M 23
10 “ Harish Prasad Srivastava A.S.C.I. B.Sc (Ag) M 21
11 “ Sunder Lal Bajpayee Seech Paryavechhak Intermediate M 19
12 “Raj Kumar Shukla Seenchpal Intermediate M 18
13 “Shiv Murat Seenchpal Intermediate M 20
14 “Ram Kedar Seenchpal Intermediate M 20
15 “Rama pati Shukla Seenchpal Intermediate M 21
16 “Ram Swaroop Yadav Seenchpal Intermediate M 20
17 “Iftekhar Hussain Rizvi Seechpal Intermediate M 20
18 “Ganga ram Munshi B.A. M 4
Note:- Details of all the persons working in BSA Unit is to be incorporated
(56 )
The Watershed Development Team (WDT):
It is an integral part of the PIA. WDT will assist gram Sabha in a) constitution of Watershed
Committee and its functioning, b) organize and strengthening User groups, Self Help Groups, c)
conducting participatory baseline survey, d) training and Capacity Building, e) preparing detailed resource
development plan including Soil & Water Conservation, f) undertake engineering surveys, g) prepare
engineering drawings and cost estimate for structure to be built.
Table 4.3: Details of Watershed Development Team (WDT) in the project area
Project- IWMP I PIA-BSA, LDWR District - Sant Ravidas Nagar
1 2 3 4 5 6 7 8
S. N.
Name of WDT member
M/F# Age Qualification / Experience
Description of professional
training
Role/ Function##
Date of appointment of
WDT member
1
Mr R.A.Verma M 30 B.Sc.(Ag) Agriculture Watershed
Management
March,2011
2 Mr Sumant
Shukla
M 28 Intermediate Diploma (Ag.) Water
Management
“
3 Mr Shalendra
Singh
M 60 B.Sc.(Ag) Agriculture Soil
Conservation
“
4 Smt Parbati Yadav
F 28 B.A. Social work Social Mobilization
”
(57 )
Watershed Committees:
Watershed committees are being formed in all villages. Each committee would consist of at least of 10
members. Their representation will be as under:
Minimum of 50% members from SHGs and UGs, SCs, women and landless
One member from Watershed Development Team, especially women member (subject matter
specialist in Social Science).
Watershed Committees would nominate one of their members as Watershed Secretary to perform the
following duties:
1. Convening meetings of Watershed Committee, Gram Sabha.
2. Maintaining all records and proceedings of the meetings.
3. Follow up action on all decisions taken in the meetings.
4. Ensuring people’s participation.
Watershed Secretary will be imparted training in maintaining the accounts as well other activities related
to Project.
(58 )
Details of Watershed Committee (WC)
Name of Micro watershed- Dhaskari Name of Project:- IWMP I District- Sant Ravidas Nagar
1 2 3 4
5 6 7 8 9 10 11 12 13 14 15 16 17
Sl.
No.
Name of
Gram
Sabha/ GP
Date of
Constitution/
Registration
as a Society
(dd/mm/
yyyy)
Name of
Members
Designation M/F SC ST SF MF LF Land-
less
UG SHG GP Any
other
Educa-
tional
qualifi-
cation
Function(s)
assigned#
1 Dhaskari 15.9.2010 Ram Morat President M √ √
Ravi
Shanker
Yadav
Secretary M √
Ram Kedar
Yadav Member M
Inter
Girja Devi Member F
Satya
Narayan
Member M
Mul
Chandra
Yadav
Member
M
Nagesh
Mishra
Member M
Mangaru Member M
Ramdhani Member M
Sheshdhar
Yadav
Member M
Mohan Lal
Yadav
Member M
Note: WC to be constituted for each GP included in the MWS
(59 )
Name of Micro watershed- Kanehri Name of Project:- IWMP I, District- Sant Ravidas Nagar
1 2 3 4
5 6 7 8 9 10 11 12 13 14 15 16 17
Sl.
No.
Name of
Gram
Sabha/ GP
Date of
Constitution/
Registration
as a Society
(dd/mm/
yyyy)
Name of
Members
Designation M/F SC ST SF MF LF Land-
less
UG SHG GP Any
other
Educa-
tional
qualifi-
cation
Function(s)
assigned#
2 Kanehri 16.9.2010 Phoolpatti
Devi President F √ √
Raj Nath Secretary M √ √
Harish
Prasad
Srivastava
(ASCI)
Member M
B.Sc.
Ag.
Jaynath
Yadav
Member M √
Baliram
Yadav
Member M √
Panna Lal Member M √
Jiledar
Upadhya
Member M √
Usha Devi Member F √
Asha Devi Member F √
Krishna
Kumar
Member M √
Chandrika Member M √
(60 )
Name of Micro watershed- Dattipur Name of Project:- IWMP I District- Sant Ravidas Nagar
1 2 3 4
5 6 7 8 9 10 11 12 13 14 15 16 17
Sl.
No.
Name of
Gram
Sabha/ GP
Date of
Constitution/
Registration
as a Society
(dd/mm/
yyyy)
Name of
Members
Designation M/F SC ST SF MF LF Land-
less
UG SHG GP Any
other
Educa-
tional
qualifi-
cation
Function(s)
assigned#
3 Dattipur 17.9.2010 Raj Kr.
Singh President M
Dharmendra
Kr. Singh Secretary M
R K Shukla
(seechpal) Member M
Inter
Radha Devi Member F
Ranno Devi Member F
Namvar
Singh
Member M
H N Singh Member M
R S Yadav Member M
Mangal
Singh
Member M
H L Yadav Member M
A K Singh Member M
(61 )
Name of Micro watershed- Chakharibansh Bhatankal Name of Project:- IWMP I
District- Sant Ravidas Nagar
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Sl. No.
Name of Gram Sabha/ GP
Date of Constitution/
Registration as a Society (dd/mm/
yyyy)
Name of Members
Designation M/F SC ST SF MF LF Land-less
UG SHG GP Any other
Educa-tional qualifi-cation
Function(s) assigned#
4 Chakhari-bansh Bhatankal
18.9.2010 Amrit lal President M
Sharwan
Kr. Maurya
Secretary M
Shivmurat
Chaursiya
(seechpal)
Member M
MA
Sarth lal Member M
Mahesh Member M
Nazir Member M
Santosh Member M
Sanjay Member M
Hargen Member M
Basantu Member M
Ranno Devi
Member F
(62 )
Name of Micro watershed- Musilatpur
Name of Project:- IWMP I District-Sant Ravidas Nagar
1 2 3 4
5 6 7 8 9 10 11 12 13 14 15 16 17
Sl.
No.
Name of
Gram
Sabha/ GP
Date of
Constitution/
Registration
as a Society
(dd/mm/
yyyy)
Name of
Members
Designation M/F SC ST SF MF LF Land-
less
UG SHG GP Any
other
Educa-
tional
qualifi-
cation
Function(s)
assigned#
5 Musilatpur 19.9.2010 Gopal
Prajapati President M
Ram
Bahadur Secretary M
S L Bajpai
(Seech Pr.) Member M
Inter
K K Bind Member M
M L Bind Member M
Mohan
Prajati
Member M
Chhannu
Lal
Member M
Angina Devi Member M
A K
Kanojiya
Member M
Lalji Gaud Member M
S N
Prajapati
Member M
(63 )
Name of Micro watershed- Jangala
Name of Project:-IWMP I District- Sant Ravidas Nagar
1 2 3 4
5 6 7 8 9 10 11 12 13 14 15 16 17
Sl.
No.
Name of
Gram
Sabha/ GP
Date of
Constitution/
Registration
as a Society
(dd/mm/
yyyy)
Name of
Members
Designation M/F SC ST SF MF LF Land-
less
UG SHG GP Any
other
Educa-
tional
qualifi-
cation
Function(s)
assigned#
6 Jangala 20.9.2010 Keshav
Prashad President M
Brijesh
kumar Secretary M
M L Gupta
(ASCI) Member M
BSc
(Ag)
Prem
Shanker
Member M
Dinesh
Chandra
Member M
Sabhajeet Member M
Harish
Chandra
Member M
Satmi Devi Member F
Hriday
Narayan
Member M
Ram Murat Member M
Pandhari
Pal
Member M
(64 )
Formation of Self Help Groups:
The formation of SHGs in all watershed villages is underway. It is proposed to form at least 2 SHGs
in each village. Each SHG will consist of 12/15 members. The members would be mainly from landless,
SCs and women, small and marginal farmers. Few groups exclusively of unemployed youth have also been
identified. These groups will be homogeneous having common goal for increasing their income by
establishing micro enterprise. Under the Project, each SHGs would be given a revolving fund of
Rs.20000/25000 each after 6 months from the date of formation (subject to qualifying the 1st grading and
meeting the laid down norms). After having discussions with the village community The SHGs may opt any
of the Income Generating Activities from the list given below.
1. Bakery Products 2. Soap & Detergent making 3 Cutting and Tailoring 4 Embroidery 5. Fisheries 6.
Mushroom cultivation 7 Household wiring, Motor winding 8.Plumbing 9 Carpentry 10.Bee keeping 11.
Pickles, sauces, jam, jelly etc. 12.Two wheelers repairing 13.Animal husbandry 14.Backyard poultry 15.
Vermi compost & Carpet Viewing
However, decision for adopting Economic Activities would rest with respective SHGs. Accordingly;
these SHGs would be imparted trainings in the IGAs they opt for. Preliminary survey reveals reasonable
potentials for the above mentioned Economic Activities and these could prove to be beneficial to poor
people residing in selected Watershed villages.
(65 )
Details of Self Help Groups (SHGs) in the project area
Project- IWMP I District - Sant Ravidas Nagar
1 2 3 4 5 6 7 8
S.
N.
Name of
MWS
Names of
villages
Total no. of Constituted/registered
SHGs No. of members
No. of SC/ST in each
category
No. of BPL in each
category Date of formation of SHGs With
only
Men
With only
Women
With both
Total Categories M F Total M F Total M F Total
1 Dhaskari/
2B3A3a2b
(87
Villages, As per list )
3 3 2 8 (i) Landless 12-9-2010
(ii) SF
(iii) MF
(iv) LF
2 Kanehri/
2B3A3a2a
3 2 - 5 (i) Landless 14-9-2010
(ii) SF
(iii) MF
(iv) LF
3 Dattipur/
2B3A3a2c
2 3 - 5 (i) Landless 14-9-2010
(ii) SF
(iii) MF
(iv) LF
4 Chakharibansh
Bhatanka l/
2B3A3a3a
3 2 - 5 (i) Landless
(ii) SF
(iii) MF
(iv) LF
5 Musilatpur/
2B3A3a3b
1 2 1 4 (i) Landless
(ii) SF
(iii) MF
(iv) LF
6 Jangala/
2B3A3a3c
1 2 2 5 (i) Landless
(ii) SF
(iii) MF
(iv) LF
Total of Project Total 12 13 3 28
(M – Male, F – Female)
(66 )
Details of Formation of Self Help Groups
Project- IWMP I District- Sant Ravidas Nagar
S. No.
Name of micro watershed
Name of village
Name of group
Date of constitution
Name of Adhyaksh
Name of Sachiv
Total No. of Members Name of Bank and Address
Account No. & Date
Up to date Saving Rs.
Group activities Wo-men Sc/St Other Total
1 2 3 4 5 6 7 8 9 10 11 12 13
1 Dhaskari/2B3A3a2b
Rampur Dhaskari
Maa Durga SHG
15.9.10
Shakuntala Devi
Sangeeta 11 3 8 11 K G S G
Bank 2023199 3300 G M S
Rampur Dhaskari
Shivam SGH
Amrawati Devi
Shayam Kumari
11 2 9 11 -do- 2023200 3300 G K
Raghopur D B R A
SHG Urmila Devi Savita Devi 11 4 7 11 -do- 2023242 3300 PO.
GopalPatti G P SHG Ratana Devi Fulwanti 11 1 10 11 -do- 2023201 3300 Diary
Dhaskari J H SHG Samudra
Devi Usha Ddevi 11 3 8 11 -do- 2023202 3300 Tailoring
Raghopur J M K SHG
Sonpatti Hirawati 11 2 9 11 -do- 2023243 3300 Kaleen Ferry
Dhaskari M V SGH
Mmohara Devi
Chirauji 11 3 3 11 -do- 2023198 3300 G K
2 Kanehri/2B3A3a2a Giriya Amit SHG
16.9.10 Jaynath Raj narayan - 2 9 11 G M S
3 Dattipur/2B3A3a2c
Uchetha J M V SGH
17.9.10
Ashok Kumar
Pankaj Kumar
- 2 10 12 - - - Diary
Uchetha O Sai SGH
Mangla Prasad
Pankaj Kumar
- 3 7 10 - - - Tailoring
Uchetha M V D SGH
Namvar Singh
shivam - 2 8 10 - - - G K
Uchetha S S SHG Dhamraj Ranvijay - 1 9 10 - - - G M S
Uchetha J M D SGH
Mahendra Kr.
Samar Bahadur
- 3 8 11 - - - Diary
Uchetha O G SGH
Dharmendra Raj kumar - 2 8 10 - - - G K
Saroi Baudh SGH
Suraymani Akhilesh - 1 9 10 - - - G M S
Saroi M L SGH Prem
Shanker Akhilesh - 2 8 10 - - - Tailoring
4 Chakharibansh
Bhatanka l/2B3A3a3a
Udhawa mafi J H SGH 18.9.10 Mahesh Kr. Pawan kr. - 3 6 11 - - - Kaleen Ferry
5 Musilatpur/2B3A3a3b Musilatpur J M V SHG
19.9.10 Sunita Manju 8 3 - 11 - - - Diary
6 Jangala/2B3A3a3c Rajaipur
Durga SGH
20.9.10 Sona Devi Urmila Devi 11 3 8 11 - - -
Kaleen Ferry -
Rajaipur M S SGH
Sushama Devi
Jadawati Devi
12 2 10 12 - - - Tailoring
(67 )
S. No. Name of Project & Code (M.W.S.) Name of S.H.G. Occupation of S.H.G. Name of Chairman & No. Members
1 2 3 4 5 6
1 Dhaskari 2B3A3a2b
1.Maa Parvati ,S.H.G.
Making of woolen Balls Smt Parvati Devi
“ Smt.Arti Devi “ Smt Shiv Kumari “ Smt Niranjana “ Smt Rajkumari “ Smt.Savitri Devi “ Smt Chohgari “ Smt.Shubhwanti “ Smt Geeta Devi “ Smt Dulari “ Smt Devraji
2.Sri Ganeshji,S.H.G.
Animal Husbandry Shri Ram ashray “ Shri Samarjeet yadav “ Shri Devi Charan “ Shri Haridas yadav “ Shri Abhimanyu “ Shri Bhagelu ram “ Shri Ram dayal “ Shri Dharmendra Kumar “ Shri Bhag Chandra pal “ Shri Nand dhari “ Shri Vishram yadav
2 Dattipur 2B3A3a2c
1. Jai Maa Durge S.H.G.
Kaleen Ferry Shri Shobnath “ Shri Kamla Shanker “ Shri Devi Prasad “ Shri Ram Garib “ Shri Bechu Lal “ Shri Piyare “ Shri Ram Khelawan “ Shri Chauharja “ Shri Algu “ Shri Kailash Nath “ Shri Dunagar
2. AmbikaS.H.G.
Bangle work Smt Seetabi “ Smt Kabootri devi “ Smt Kamla “ Smt Girja devi “ Smt Sona devi “ Smt Mola devi “ Smt Matavi “ Smt Mukundi “ Smt Prabhawati
(68 )
“ Smt Dukhni “ Smt Saraswati devi
3 Kanehri 2B3A3a2a
1. Shankar S.H.G.
Diary Shri Lalman “ Shri Sushil “ Shri Rama Shanker “ Shri Ashok “ Shri Suresh “ Shri Shiv ram “ Shri Ramesh “ Shri Sukhraj “ Shri Nind Raj “ Shri Ram lal gupta “ Shri Awadh Narayan
2.Mateshwari S.H.G.
Tailoring Smt Gaura devi “ Smt Mewa devi “ Smt Lal Mani “ Smt Chandra kala “ Smt Seeta devi “ Smt Adalati “ Smt Chamli devi “ Smt Durgawati “ Smt Nirmala devi “ Smt Vidya devi “ Smt Phoolwanti
4 Chakharibansh bhatankala 2B3A3a3a
1.Bholenath S.H.G.
Goat Farming Shri Bimlesh “ Shri Rashid “ Shri Trilochan “ Shri Sarvesh kuar “ Shri Pramod “ Shri Satish “ Shri Anand “ Shri Raju kumar “ Shri Kamlesh “ Shri Sharafat ali “ Shri Munshi
2.Jwala devi S.H.G.
Packing Smt Moti rani “ Smt Manju devi “ Smt Nirmala “ Smt Motana devi “ Smt Lalti “ Smt Indu devi “ Smt Malti “ Smt Shakuntala “ Smt Dharma devi “ Smt Sunita “ Smt Savitri devi
5 Musilatpur 2B3A3a3b 1. Jai Maa Vindhavasini devi Kaleen Ferry Shri Ram Lochan
(69 )
S.H.G. “ Shri Dukhi “ Shri Lal Mani “ Shri Budhi Ram “ Shri Shalik ram “ Shri Ram sewak “ Shri Nanhku “ Shri Jagganath “ Shri Barkhu “ Shri Ram Sumer “ Shri Lurkhur
2.Dayawanti S.H.G.
Tailoring Smt Rajeshwari Devi “ Smt Mamta “ Smt Dulari “ Smt Babni devi “ Smt Panna devi “ Smt Phoolwanti “ Smt Shubhwati devi “ Smt Savitri devi “ Smt Phooldeyi “ Smt Shushila “ Smt Jhoora devi
6 Jangala 2B3A3a3c
1. Jai Ambe S.H.G.
Dari ferry Shri Anil “ Shri Sant lal “ Shri Nand lal “ Shri Brij lal “ Shri Nirahu kumar “ Shri Doodh nath “ Shri Budhi ram patel “ Shri Ram soorat “ Shri Mithai lal “ Shri Radhey patel “ Shri Preetam
2.Begum Hazrat S.H.G.
Making wollen balls Smt Asma Biwi “ Smt Isha “ Smt Munninisha “ Smt Panna devi “ Smt Hafizam “ Smt Anati “ Smt Prabhawati devi “ Smt Jahida Begum “ Smt Kitabun “ Smt Shahjahan “ Smt Antarib
(70 )
User groups:
The members of User groups would be those persons who would directly derive benefits from Watershed
Activities. Resource use agreements are being worked out. The User groups will be responsible for the
operation and maintenance of all the assets created under the Project. Formation of User groups is under
process in all the villages covered under the Project. The members of User Groups would be imparted
training by PIA for effectively managing the assets created.
Details of Formation of User Groups (UGs)
Project- IWMP I District - Sant Ravidas Nagar
S. No.
Name of micro watershed
Name of village Name of group
Date of constitutio
n
Name of Adhyaksh
Name of Sachiv/
Treasurer
Total No. of Members Name of Bank and
Address
Account No. & Date
Up to date
Saving
Group Activeties
Status of User
Agreement Women Sc/St Other Total
1 2 3 4
5 6 7 8 9 10
1 Dhaskari/2B3A
3a2b
1- RampurDhaskari
15.9.10
Kali Charan Prem
Chandra - 3 7 10
2- Dhaskari Hind Lal Shiya Ram
4 6 10
3- RampurDhaskari Ram Kumar Sheshman
3 8 11
4- Raghopur Ram Murat Vijay
Shanker 2 13 15
5- Dhaskari Ram Sumer Rajpat
3 7 10
6- Dhaskari Dev Saran Raj Narain
2 8 10
2 Kanehri/2B3A3
a2a
1-Giriya
16.9. 10
Baliram Radhe
Shayam 1 10 11
2-Giriya Krishan Kr. Ramjatan
4 11 15
3-Bighi R S
Chauhan K S Chauhan
3 11 14
(71 )
3 Dattipur/2B3A3
a2c Uchtha
17.9. 10
N V Singh Sangeeta
singh 2 3 7 12
Hindraj Singh
Nagendra Singh
3 11 14
M P Yadav Kunta Devi 2 2 7 11
S L Gautam Lakshamdhar
i 2 2 10 14
4 Chakharibansh Bhatankal/2B3
A3a3a Udhawa Mafi
18.9. 10
Bansi Lal Amrit Lal
2 13 15
Hori Ram Ram
Khelawan 5 10 15
Bechu Lal Panna Lal
4 10 14
Lal Bahadur Tilak Dhari
4 12 16
Ram Lal Hansh Raj
3 12 15
Vimla Devi Gulab
Chandra 11
11
5 Musilatpur/2B3
A3a3b Munshi Bhawanpur
19.9. 10
Raj Bahadur Raj Narayan
2 10 12
Shyam
Narayan Mokadam
5 7 12
6 Jangala/2B3A3
a3c
1-Jangala
20.9. 10
H N Saroj J L Saroj
3 8 11
2-Rajaipur H Chandra Rakesh Kumar
5 7 12
Sabhajeet Ashok Kumar
4 10 14
S Chandra
Shyam Mohan
5 6 11
R Lolarakh
Chandra Shekhar
2 8 10
(72 )
Details of Fund flow of Watershed Committee Accounts (Amount in Rs.)
Name of Project IWMP I District - Sant Ravidas Nagar
S.
No.
Name of
MWS
with code
Name of
watershed
committee
(WC)
Opening Balance
Deposit Withdrawal
Interest accrued
Closing balance
DRDA/ ZP
cheque No./date
Amount
/ Date of
deposit in WC Account
Total amount
available in WC Account
Amount withdrawn
by Cash/ Cheque
Date of with-
drawal
Purpose
of with-drawal
1 2 3 4 5 6 7 8 9 10 11 12
1 Dhaskari/
2B3A3a2b Dhaskari 0.00 513864.00 513864.00 - - - - 513864.00
2 Kanehri/
2B3A3a2a Kanehri 0.00 422721.00 422721.00 - - - - 422721.00
3 Dattipur/
2B3A3a2c Dattipur 0.00 954405.00 954405.00 - - - - 954405.00
4
Chakharibansh Bhatankal/
2B3A3a3a
Chakharibansh Bhatankal
0.00 468369.00 468369.00 - - - - 468369.00
5 Musilatpur/
2B3A3a3b Musilatpur 0.00 1047582.00 1047582.00 - - - - 1047582.00
6 Jangala/
2B3A3a3c Jangala 0.00 1166859.00 1166859.00 - - - - 1166859.00
Total for Project
0.00 4573800.0 4573800.0 4573800.0
(73 )
Details of Convergence of IWMP with other Schemes*
Project IWMP - I District - Sant Ravidas Nagar
S.
No.
Name of Micro
Watershed
Names of
Departments
with Schemes
converging with
IWMP
Fund made available to IWMP due to
convergence (Rs. in lakh)
Was this fund included in Rs.12,000/
15,000 per ha.
Name of activity/task/structure
undertaken with converged funds
Reference no. of
activity/ task/
structure in DPR@
Level at which decision for convergence was taken$
Yes No
(a) Structures
(b) livelihoods
(c ) Any other (pl. specify)#
1 2 3 4 5 6 7 8 9 10
1 Dhaskari MNREGA 3.40 Structures
2 Kanehri MNREGA 4.29 Structures
3 Dattipur MNREGA 5.45 Structures
4 Chakharibansh
Bhatankal MNREGA 4.49 Structures
5 Musilatpur MNREGA 2.86 Structures
6 Jangala MNREGA 6.96 Structures
Total for project 27.44
(74 )
CHAPTER – 5
MANAGEMENT / ACTION PLAN
(75 )
ENTRY POINT ACTIVITY (EPA)
EPA activities are taken up under watershed projects to newly build or repair the already existing
structures with the consultation of village community at the beginning of the project; generally, certain
important works which are in urgent demand of the local community are taken up. A group Discussion was
conducted with watershed Development Committee regarding the EPA activity, It was conveyed to the WC
that an amount of 24.39 Lakhs was allotted for EPA activity, which was 4 per cent of total allocated
budget. The villagers discussed various activities which they fell is important but after a brief discussion it
was conveyed to them that only those activities can be taken, which revive the common natural
resources. It was also taken into priority that there should be an instrument of convergence which will
result in sustainability of activities.
In total 27 EPA activities were executed in the project area with an budget of Rs. 24.39 Lacs.
Photographs of Entry Point Activities done in the project are given below:
(76 )
(77 )
(78 )
Table 5.1: Entry point activities (EPA)
S.No. Name of The Project
Amount
Earmarked for
EPA
Entry Point Acitivies
Estimated
Cost (Rs. in
Lakh)
1 Dhaskari/ 2B3A3a2b
24.39
Repair of Well, Construction of Chabutara. 3.02
2 Kanehri/
2B3A3a2a
Well Platform & Chabutara Construction
3.81
3 Dattipur/ 2B3A3a2c
Well Platform & Chabutara Construction 4.85
4 Chakharibansh Bhatanka l/
2B3A3a3a
Well Platform & Chabutara Construction 3.99
5 Musilatpur/ 2B3A3a3b
Well Platform & Chabutara Construction 2.54
6 Jangala/
2B3A3a3c
Well Platform & Chabutara Construction 6.19
Total 24.39
(79 )
Details of Livelihood Activities in the project area
During discussions with the village communities by our Livelihood experts, several activities were
discussed with them. The main objectives of these discussions were:
Assure one livelihood option to poor families
Assured livelihood for at least 300 days in a year
At least one daily job per family SCs/BPL/ very poor families.
Form SHGs would be imparted skill training on identified Economic Activities nd it is proposed to impart
them trainings. It is proposed to lend revolving fund of Rs. 25000/- to each SHG/individuals formed in the
watershed villages. Since the members from SHGs/landless are very poor, they do not have resources to
start micro enterprises. It is envisaged that they should be assisted and given loan of this amount in the
shape of Revolving Fund Assistane (RFA) so that they do not get trpped by money lenders. Funds thus
given on loan are recoverable from SHGs/individuals in easy instalments. It is also proposed to impart skill
training to atleast 10 unemployed youth from each village and give them trainings of their choice so that
they establish some small enterprises. It is further proposed to give them interest free loan of Rs. 12000/-
each as Revolving Fund Assistane (RFA) to meet their urgent needs of funds for establishing micro
enterprises. Such funds recovered could either be back to SHGs/ individuals so some other SHGs/
individuals depending upon assessment of their respective needs. It is proposed to form 2 SHGs in each
village and identify at least 10 youths in each village for imparting training and giving Revolving Fund.
Activities that is likely to be taken up by SHGs/ individuals
Cutting & Tailoring
(80 )
Household wiring, motor winding
Carpentry
Bee keeping
Pickles, sauces, jam, jelly, etc.
Two wheelers repairing
Animal husbandry/ Dairy
Goat Rearing.
General store shops, etc.
Table 5.2 : Details of Livelihood activities in the project area (LIVELIHOOD ACTION PLAN-LAP)
YEARWISE FINANCIAL BREAK UP OF LIVELIHOOD ACTIVITIES IWMP-I,
DISTRICT- SANT RAVIDAS NAGAR
Amount in Lacs
S. No. Micro
watershed
Project
Area
Proposed
Amount
Livelihood Activities 9% of the Total project Cost
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
1 Dhaskari 629.21 6.80 0.00 0.76 1.89 1.89 2.27 6.80
2 Kanehari 794.64 8.58 0.00 0.95 2.38 2.38 2.86 8.58
3 Dattipur 1009.39 10.90 0.00 1.21 3.03 3.03 3.63 10.90
4 Chak Harivansh Bhatan kala
830.90 8.97 0.00 1.00 2.49 2.49 2.99 8.97
5 Musilatpur 528.73 5.71 0.00 0.63 1.59 1.59 1.90 5.71
6 Jangala 1289.13 13.92 0.00 1.55 3.87 3.87 4.64 13.92
Total 5082.00 54.89 0.00 6.10 15.25 15.25 18.30 54.89
(81 )
GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF LIVELIHOOD ACTIVITIES IWMP-I,
DISTRICT- SANT RAVIDAS NAGAR
CODE- 2B3A3a2b
Amount in Lacs
S. No. Gram
Panchayat
Project
Area
Proposed
Amount
Livelihood Activities 9% of the Total project Cost
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL 1 Hirday Patti 94.77 1.02 0.00 0.11 0.28 0.28 0.34 1.02
2 Chaubepur 91.21 0.99 0.00 0.11 0.27 0.27 0.33 0.99
3 Ahamadpur Phulwaria
48.57 0.52 0.00 0.06 0.15 0.15 0.17 0.52
4 Mahboobpur 11.37 0.12 0.00 0.01 0.03 0.03 0.04 0.12
5 Raghopur 213.00 2.30 0.00 0.26 0.64 0.64 0.77 2.30
6 Dulandaspur 12.80 0.14 0.00 0.02 0.04 0.04 0.05 0.14
7 Ramraipur 111.01 1.20 0.00 0.13 0.33 0.33 0.40 1.20
8 Saroi 45.79 0.49 0.00 0.05 0.14 0.14 0.16 0.49
9 Rajpura 0.68 0.01 0.00 0.00 0.00 0.00 0.00 0.01
Total 629.21 6.80 0.00 0.76 1.89 1.89 2.27 6.80
GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF LIVELIHOOD ACTIVITIES IWMP-I,
DISTRICT- SANT RAVIDAS NAGAR
CODE- 2B3A3a3b
Amount in Lacs
S. No. Gram
Panchayat
Project
Area
Proposed
Amount
Livelihood Activities 9% of the Total project Cost
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
1 Udhawa Mafi 108.13 1.17 0.00 0.13 0.32 0.32 0.39 1.17
2 Jhingurpur 19.13 0.21 0.00 0.02 0.06 0.06 0.07 0.21
3 Hariyawan 302.50 3.27 0.00 0.36 0.91 0.91 1.09 3.27
4 Khemaipur 42.35 0.46 0.00 0.05 0.13 0.13 0.15 0.46
5 Rajpura 9.77 0.11 0.00 0.01 0.03 0.03 0.04 0.11
6 Rampur Z Saroi 12.47 0.13 0.00 0.01 0.04 0.04 0.04 0.13
7 Gangapur 34.39 0.37 0.00 0.04 0.10 0.10 0.12 0.37
Total 528.73 5.71 0.00 0.63 1.59 1.59 1.90 5.71
(82 )
GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF LIVELIHOOD ACTIVITIES IWMP-I,
DISTRICT- SANT RAVIDAS NAGAR
CODE- 2B3A3a2a
Amount in Lacs
S. No. Gram
Panchayat
Project
Area
Proposed
Amount
Livelihood Activities 9% of the Total project Cost
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
1 Hirday Patti 100.03 1.08 0.00 0.12 0.30 0.30 0.36 1.08
2 Bhagwati Daspur 78.04 0.84 0.00 0.09 0.23 0.23 0.28 0.84
3 Kom 5.46 0.06 0.00 0.01 0.02 0.02 0.02 0.06
4 Bhalla 136.00 1.47 0.00 0.16 0.41 0.41 0.49 1.47
5 Badhauna 0.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 Daribpur 177.54 1.92 0.00 0.21 0.53 0.53 0.64 1.92
7 Chak Sanath 128.00 1.38 0.00 0.15 0.38 0.38 0.46 1.38
8 Dattipur 2.86 0.03 0.00 0.00 0.01 0.01 0.01 0.03
9 Awashanpur 74.23 0.80 0.00 0.09 0.22 0.22 0.27 0.80
10 Sharbat Khani 40.88 0.44 0.00 0.05 0.12 0.12 0.15 0.44
11 Palahiya 51.46 0.56 0.00 0.06 0.15 0.15 0.19 0.56
Total 794.64 8.58 0.00 0.95 2.38 2.38 2.86 8.58
(83 )
GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF LIVELIHOOD ACTIVITIES IWMP-I,
DISTRICT- SANT RAVIDAS NAGAR
CODE- 2B3A3a2c
Amount in Lacs
S. No. Gram
Panchayat
Project
Area
Proposed
Amount
Livelihood Activities 9% of the Total project Cost
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
1 Bharatpur 11.25 0.12 0.00 0.01 0.03 0.03 0.04 0.12
2 Bishapur 168.70 1.82 0.00 0.20 0.51 0.51 0.61 1.82
3 Hirday Patti 153.03 1.65 0.00 0.18 0.46 0.46 0.55 1.65
4 Badhauna 166.95 1.80 0.00 0.20 0.50 0.50 0.60 1.80
5 Bhagwati Daspur 9.35 0.10 0.00 0.01 0.03 0.03 0.03 0.10
6 Bhalla 171.87 1.86 0.00 0.21 0.52 0.52 0.62 1.86
7 Dulamdaspur 57.86 0.62 0.00 0.07 0.17 0.17 0.21 0.62
8 Ismaila 0.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 Khetalpur 40.49 0.44 0.00 0.05 0.12 0.12 0.15 0.44
10 Pure Uchit 0.65 0.01 0.00 0.00 0.00 0.00 0.00 0.01
11 Rampur Lohara 3.50 0.04 0.00 0.00 0.01 0.01 0.01 0.04
12 Uchetha 29.82 0.32 0.00 0.04 0.09 0.09 0.11 0.32
13 Saroi 2.16 0.02 0.00 0.00 0.01 0.01 0.01 0.02
14 Tarapur 26.38 0.28 0.00 0.03 0.08 0.08 0.09 0.28
15 Bhagwanpur 32.60 0.35 0.00 0.04 0.10 0.10 0.12 0.35
16 Bejavan 134.45 1.45 0.00 0.16 0.40 0.40 0.48 1.45
Total 1009.39 10.90 0.00 1.21 3.03 3.03 3.63 10.90
(84 )
GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF LIVELIHOOD ACTIVITIES IWMP-I,
DISTRICT- SANT RAVIDAS NAGAR
CODE- 2B3A3a3a
Amount in Lacs
S. No. Gram
Panchayat
Project
Area
Proposed
Amount
Livelihood Activities 9% of the Total project Cost
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
1 Badi 0.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Chaubepur 75.82 0.82 0.00 0.09 0.23 0.23 0.27 0.82
3 Udhawa Mafi 61.28 0.66 0.00 0.07 0.18 0.18 0.22 0.66
4 Jhingurpur 63.30 0.68 0.00 0.08 0.19 0.19 0.23 0.68
5 Puremudhia 139.65 1.51 0.00 0.17 0.42 0.42 0.50 1.51
6 Dulamdaspur 40.38 0.44 0.00 0.05 0.12 0.12 0.15 0.44
7 Chaubepur 28.89 0.31 0.00 0.03 0.09 0.09 0.10 0.31
8 Hariyawana 32.55 0.35 0.00 0.04 0.10 0.10 0.12 0.35
9 Ismaila 88.68 0.96 0.00 0.11 0.27 0.27 0.32 0.96
10 Rampur 58.03 0.63 0.00 0.07 0.17 0.17 0.21 0.63
11 Raghopur 11.53 0.12 0.00 0.01 0.03 0.03 0.04 0.12
12 Rajpura 21.07 0.23 0.00 0.03 0.06 0.06 0.08 0.23
13 Rampur Z Saroi 83.31 0.90 0.00 0.10 0.25 0.25 0.30 0.90
14 Saroi 97.76 1.06 0.00 0.12 0.29 0.29 0.35 1.06
15 Khemaipur 28.40 0.31 0.00 0.03 0.09 0.09 0.10 0.31
Total 830.90 8.97 0.00 1.00 2.49 2.49 2.99 8.97
(85 )
GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF LIVELIHOOD ACTIVITIES IWMP-I,
DISTRICT- SANT RAVIDAS NAGAR
CODE- 2B3A3a3c
Amount in Lacs
S. No. Gram
Panchayat
Project
Area
Proposed
Amount
Livelihood Activities 9% of the Total project Cost
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
1 Badi 153.00 1.65 0.00 0.18 0.46 0.46 0.55 1.65
2 Mullupur 152.92 1.65 0.00 0.18 0.46 0.46 0.55 1.65
3 Dulamdaspur 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Ismaila 123.41 1.33 0.00 0.15 0.37 0.37 0.44 1.33
5 Jangla 245.22 2.65 0.00 0.29 0.74 0.74 0.88 2.65
6 Khetalpur 60.00 0.65 0.00 0.07 0.18 0.18 0.22 0.65
7 Khemaipur 23.23 0.25 0.00 0.03 0.07 0.07 0.08 0.25
8 Lila Dharpur 163.72 1.77 0.00 0.20 0.49 0.49 0.59 1.77
9 Marchwar 82.88 0.90 0.00 0.10 0.25 0.25 0.30 0.90
10 Poore Uchit 5.18 0.06 0.00 0.01 0.02 0.02 0.02 0.06
11 Rauri 12.29 0.13 0.00 0.01 0.04 0.04 0.04 0.13
12 Uchetha 23.33 0.25 0.00 0.03 0.07 0.07 0.08 0.25
13 Ugapur 3.29 0.04 0.00 0.00 0.01 0.01 0.01 0.04
14 Jagadhari 59.63 0.64 0.00 0.07 0.18 0.18 0.21 0.64
15 Bejavan 146.63 1.58 0.00 0.18 0.44 0.44 0.53 1.58
16 Sarouli 34.38 0.37 0.00 0.04 0.10 0.10 0.12 0.37
Total 1289.13 13.92 0.00 1.55 3.87 3.87 4.64 13.92
(86 )
DETAILS OF LIVELIHOOD ACTIVITIES AT GLANCE UNDER IWMP-I,
DISTRICT-SANT RAVIDAS NAGAR
S. No.
Gram Panchayat
General Merchant Shop Goat Keeping Poultry
20
09
-10
20
10
-11
20
11
-12
20
12
-13
20
13
-14
Tota
l
20
09
-10
20
10
-11
20
11
-12
20
12
-13
20
13
-14
Tota
l
20
09
-10
20
10
-11
20
11
-12
20
12
-13
20
13
-14
Tota
l
1 Dhaskari 2 2 1 2 7 1 2 1 1 5 1 1 1 1 4
2 Kanehari 1 1 2 1 5 1 1 1 1 4 1 2 1 1 5
3 Dattipur 1 1 2 2 6 1 2 1 1 5 2 1 1 1 5
4 Chak Harivansh
Bhatan kala 1 2 1 1 5 1 2 1 2 6 1 1 1 2 5
5 Musilatpur 1 1 2 2 6 1 2 1 1 5 1 1 1 1 4
6 Jangala 2 1 1 1 5 2 1 1 1 5 2 2 1 1 6
Total 0 8 8 9 9 34 0 7 10 6 7 30 0 8 8 6 7 29
S. No.
Gram Panchayat
Diary Tailoring Pottery Carpet Weaving
20
09
-10
20
10
-11
20
11
-12
20
12
-13
20
13
-14
Tota
l
20
09
-10
20
10
-11
20
11
-12
20
12
-13
20
13
-14
Tota
l
20
09
-10
20
10
-11
20
11
-12
20
12
-13
20
13
-14
Tota
l
20
09
-10
20
10
-11
20
11
-12
20
12
-13
20
13
-14
Tota
l
1 Dhaskari 1 1 1 1 4 1 2 1 1 5 1 1 1 1 4 1 2 1 1 5
2 Kanehari 1 2 1 1 5 1 1 1 1 4 1 2 2 1 6 1 2 2 1 6
3 Dattipur 1 1 2 1 5 1 2 1 2 6 1 1 1 2 5 1 1 1 2 5
4 Chak Harivansh
Bhatan kala 1 1 1 2 5 1 1 1 1 4 1 2 2 1 6 1 2 1 1 5
5 Musilatpur 1 2 1 1 5 1 2 1 2 6 2 2 1 2 7 1 2 1 2 6
6 Jangala 1 1 1 1 4 1 1 1 1 4 2 1 1 1 5 1 1 2 1 5
Total 0 6 8 7 7 28 0 6 9 6 8 29 0 8 9 8 8 33 0 6 10 8 8 32 Approx cost:- General Merchant Shop @ Rs. 25000/- Goat Keeping @ Rs. 25000/- Poultry @ Rs. 25000/- Diary @ Rs. 25000/- Tailoring @ Rs. 20000/-
Pottery @ Rs. 15000/- Carpet Weaving @ Rs. 25000/-
(87 )
Total allocation of fund in this activity is Rs. 54.89 lacs. Out off which Rs. 49.00 lacs have been
allocated in different activity as required in the project area. 10% of the fund would be proposed later on.
(88 )
FARM PRODUCTION SYSTEM (10%)
Camps (Demo) for Farm Production System:
IWMP-Ist SANT RAVIDAS NAGAR
Type Seed Demonstration Details
Rabi Season
Wheat Sorghum
1. Variety K 8027 , NW-1012, 1076, HDR-77, Raj -107
2. Sowing Time: 15 November to 25 December
3- Seed rate – 100 -125 Kg/ hectare
4- Requirement of fertilizers / ha N- 125 Kg , P- 70 -75 Kg, K-70-
75 Kg
5. FYM: 60 Ou.
6. Flowering Period: 80 to 85 days.
7. Crop Duration: 120-145 days.
8. Harvesting time : April to May
9. Yield: Irrigated: 50-60 Q/ha
Un-irrigated: 30-35 Q/ha
Note- Hence demonstration cost of wheat /ha is Rs 13000.00 and
the Total cost increases @ 10 % for next year
1. Variety: CSH-16, 9, 14, CSB-13, 15
2. Requirement of Seed /ha - 15 kg
3. Sowing Time - 15 th July to 15 th August
4. Requirement of fertilizers/ha N- 60.0 Kg , P- 40.00Kg, K- 40.00 Kg
5. Fertilizers requirement / ha N- 80.0 Kg , P- 50Kg, K- 40 Kg FYM: 50q
6. Flowering Period: 80-85 days.
7. Crop Duration: 120 to 130 days.
8. Harvesting time : 25 September to 5 October
9. Yield: Grain: 18-20 q/ha Dry Fodder: 200-250q/ha
Note- Hence demonstration cost of SORGHUM /ha is Rs 6500.00 and the Total cost increases @ 10 % for next year.
Kharif Season
Arahar Maize
1. Variety -Long Durtion: Malviya -13 NA -1, NA-2 Short Duration: UPAS-120, ICPL-151, 8801 2- Seed rate /ha – 20 Kg 3. Sowing Time: June-July 4- Fertilizers requirement / ha N- 20.0 Kg , P- 50Kg, K- 40 Kg 4. FYM: 50 Q 5. Flowering Period: Long Duration:160 to 175 days. Short Duration: 110-120 days 6. Crop Duration: Long Duration: 270-280 days. Short Duration: 130-140 days 7. Harvesting time : Long Duration: March To April, Short Duration:
1. Variety: Hybrid: Ganga-2, 11,Shaktiman, Dakkan-7, Prakash, Sartaj
2. Sankul: Tarun, Naveen, Kanchan, Sweta, Prabhat, Gaurav
3. Requirement of Seed /ha - 15 kg I
3. Sowing Time - 15 th July to 15 th August
4. Requirement of fertilizers / ha N- 60.0 Kg , P- 40.00Kg, K- 40.00 Kg
5. Fertilizers requirement / ha N- 80.0 Kg , P- 50Kg, K- 40 Kg
FYM: 50 Q
6. Flowering Period: 80-85 days.
7. Crop Duration: 120 to 130 days.
(89 )
November to December 8. Yield : Long Duration: 18-20 Q/ha Short Duration: 20-25 Q/ha Note- Hence demonstration cost of Arahar /ha is Rs 10000.00 and the Total cost increases @ 10 % for next year.
8. Harvesting time : 25 September to 5 October
9. Yield: Grain: 18-20 Q/ha
Dry Fodder: 200-250 Q/ha
Note- Hence demonstration cost of SORGHUM /ha is Rs 6500.00 and the Total cost cost
increases @ 10 % for next year.
Seed
Distribution of high yield verity seed of Arhar, Wheat and maize, etc.
Animal Husbandry
Organize of health camp animals, and feed for animals.
Agriculture Toolkit
Distribution of agriculture toolkit to the individual.
YEARWISE FINANCIAL BREAK UP OF PRODUCTION & MICRO ENTERPRISES, IWMP-I,
DISTRICT- SANT RAVIDAS NAGAR
Amount in Lacs
S. No. Micro
watershed
Project
Area
Proposed
Amount
Production System & Microenterprises 10% of the Total
Project Cost WDF
2009-
10 2010-11 2011-12 2012-13 2013-14 TOTAL
1 Dhaskari 629.21 7.55 0.00 0.76 1.89 1.89 3.02 7.55 0.76
2 Kanehari 794.64 9.54 0.00 0.95 2.38 2.38 3.81 9.54 0.95
3 Dattipur 1009.39 12.11 0.00 1.21 3.03 3.03 4.85 12.11 1.21
4 Chak
Harivansh Bhatan kala
830.90 9.97 0.00 1.00 2.49 2.49 3.99 9.97 1.00
5 Musilatpur 528.73 6.34 0.00 0.63 1.59 1.59 2.54 6.34 0.63
6 Jangala 1289.13 15.47 0.00 1.55 3.87 3.87 6.19 15.47 1.55
Total 5082 60.98 0.00 6.10 15.25 15.25 24.39 60.98 6.10
(90 )
GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF PRODUCTION & MICRO ENTERPRISES, IWMP-I,
DISTRICT- SANT RAVIDAS NAGAR
CODE- 2B3A3a2b Amount in Lacs
S. No. GRAM
PANCHAYAT
Project
Area
Proposed
Amount
Production System & Microenterprises 10% of the Total Project Cost
WDF 2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
1 Hirday Patti 94.77 1.14 0.00 0.11 0.28 0.28 0.45 1.14 0.11
2 Chaubepur 91.21 1.09 0.00 0.11 0.27 0.27 0.44 1.09 0.11
3 Ahamadpur Phulwaria
48.57 0.58 0.00 0.06 0.15 0.15 0.23 0.58 0.06
4 Mahboobpur 11.37 0.14 0.00 0.01 0.03 0.03 0.05 0.14 0.01
5 Raghopur 213.00 2.56 0.00 0.26 0.64 0.64 1.02 2.56 0.26
6 Dulandaspur 12.80 0.15 0.00 0.02 0.04 0.04 0.06 0.15 0.02
7 Ramraipur 111.01 1.33 0.00 0.13 0.33 0.33 0.53 1.33 0.13
8 Saroi 45.79 0.55 0.00 0.05 0.14 0.14 0.22 0.55 0.05
9 Rajpura 0.68 0.01 0.00 0.00 0.00 0.00 0.00 0.01 0.00
Total 629.21 7.55 0.00 0.76 1.89 1.89 3.02 7.55 0.76
GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF PRODUCTION & MICRO ENTERPRISES, IWMP-I,
DISTRICT- SANT RAVIDAS NAGAR
CODE- 2B3A3a2a Amount in Lacs
S.
No.
GRAM
PANCHAYAT
Project
Area
Proposed
Amount
Production System & Microenterprises 10% of the Total Project
Cost WDF
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
1 Hirday Patti 100.03 1.20 0.00 0.12 0.30 0.30 0.48 1.20 0.12
2 Bhagwati Daspur 78.04 0.94 0.00 0.09 0.23 0.23 0.37 0.94 0.09
3 Kom 5.46 0.07 0.00 0.01 0.02 0.02 0.03 0.07 0.01
4 Bhalla 136.00 1.63 0.00 0.16 0.41 0.41 0.65 1.63 0.16
5 Badhauna 0.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 Daribpur 177.54 2.13 0.00 0.21 0.53 0.53 0.85 2.13 0.21
7 Chak Sanath 128.00 1.54 0.00 0.15 0.38 0.38 0.61 1.54 0.15
8 Dattipur 2.86 0.03 0.00 0.00 0.01 0.01 0.01 0.03 0.00
9 Awashanpur 74.23 0.89 0.00 0.09 0.22 0.22 0.36 0.89 0.09
10 Sharbat Khani 40.88 0.49 0.00 0.05 0.12 0.12 0.20 0.49 0.05
11 Palahiya 51.46 0.62 0.00 0.06 0.15 0.15 0.25 0.62 0.06
Total 794.64 9.54 0.00 0.95 2.38 2.38 3.81 9.54 0.95
(91 )
GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF PRODUCTION & MICRO ENTERPRISES, IWMP-I,
DISTRICT- SANT RAVIDAS NAGAR
CODE- 2B3A3a2c Amount in Lacs
S.
No.
GRAM
PANCHAYAT
Project
Area
Proposed
Amount
Production System & Microenterprises 10% of the Total Project
Cost WDF
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
1 Bharatpur 11.25 0.13 0.00 0.01 0.03 0.03 0.05 0.13 0.01
2 Bishapur 168.70 2.02 0.00 0.20 0.51 0.51 0.81 2.02 0.20
3 Hirday Patti 153.03 1.84 0.00 0.18 0.46 0.46 0.73 1.84 0.18
4 Badhauna 166.95 2.00 0.00 0.20 0.50 0.50 0.80 2.00 0.20
5 Bhagwati Daspur 9.35 0.11 0.00 0.01 0.03 0.03 0.04 0.11 0.01
6 Bhalla 171.87 2.06 0.00 0.21 0.52 0.52 0.82 2.06 0.21
7 Dulamdaspur 57.86 0.69 0.00 0.07 0.17 0.17 0.28 0.69 0.07
8 Ismaila 0.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 Khetalpur 40.49 0.49 0.00 0.05 0.12 0.12 0.19 0.49 0.05
10 Pure Uchit 0.65 0.01 0.00 0.00 0.00 0.00 0.00 0.01 0.00
11 Rampur Lohara 3.50 0.04 0.00 0.00 0.01 0.01 0.02 0.04 0.00
12 Uchetha 29.82 0.36 0.00 0.04 0.09 0.09 0.14 0.36 0.04
13 Saroi 2.16 0.03 0.00 0.00 0.01 0.01 0.01 0.03 0.00
14 Tarapur 26.38 0.32 0.00 0.03 0.08 0.08 0.13 0.32 0.03
15 Bhagwanpur 32.60 0.39 0.00 0.04 0.10 0.10 0.16 0.39 0.04
16 Bejavan 134.45 1.61 0.00 0.16 0.40 0.40 0.65 1.61 0.16
Total 1009.39 12.11 0.00 1.21 3.03 3.03 4.85 12.11 1.21
(92 )
GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF PRODUCTION & MICRO ENTERPRISES, IWMP-I,
DISTRICT- SANT RAVIDAS NAGAR
CODE- 2B3A3a3a Amount in Lacs
S.
No.
GRAM
PANCHAYAT
Project
Area
Proposed
Amount
Production System & Microenterprises 10% of the Total Project
Cost WDF
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
1 Badi 0.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Chaubepur 75.82 0.91 0.00 0.09 0.23 0.23 0.36 0.91 0.09
3 Udhawa Mafi 61.28 0.74 0.00 0.07 0.18 0.18 0.29 0.74 0.07
4 Jhingurpur 63.30 0.76 0.00 0.08 0.19 0.19 0.30 0.76 0.08
5 Puremudhia 139.65 1.68 0.00 0.17 0.42 0.42 0.67 1.68 0.17
6 Dulamdaspur 40.38 0.48 0.00 0.05 0.12 0.12 0.19 0.48 0.05
7 Chaubepur 28.89 0.35 0.00 0.03 0.09 0.09 0.14 0.35 0.03
8 Hariyawana 32.55 0.39 0.00 0.04 0.10 0.10 0.16 0.39 0.04
9 Ismaila 88.68 1.06 0.00 0.11 0.27 0.27 0.43 1.06 0.11
10 Rampur 58.03 0.70 0.00 0.07 0.17 0.17 0.28 0.70 0.07
11 Raghopur 11.53 0.14 0.00 0.01 0.03 0.03 0.06 0.14 0.01
12 Rajpura 21.07 0.25 0.00 0.03 0.06 0.06 0.10 0.25 0.03
13 Rampur Z Saroi 83.31 1.00 0.00 0.10 0.25 0.25 0.40 1.00 0.10
14 Saroi 97.76 1.17 0.00 0.12 0.29 0.29 0.47 1.17 0.12
15 Khemaipur 28.40 0.34 0.00 0.03 0.09 0.09 0.14 0.34 0.03
Total 830.90 9.97 0.00 1.00 2.49 2.49 3.99 9.97 1.00
(93 )
GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF PRODUCTION & MICRO ENTERPRISES, IWMP-I,
DISTRICT- SANT RAVIDAS NAGAR
CODE- 2B3A3a3b Amount in Lacs
S.
No.
GRAM
PANCHAYAT
Project
Area
Proposed
Amount
Production System & Microenterprises 10% of the Total Project
Cost WDF
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
1 Udhawa Mafi 108.13 1.30 0.00 0.13 0.32 0.32 0.52 1.30 0.13
2 Jhingurpur 19.13 0.23 0.00 0.02 0.06 0.06 0.09 0.23 0.02
3 Hariyawan 302.50 3.63 0.00 0.36 0.91 0.91 1.45 3.63 0.36
4 Khemaipur 42.35 0.51 0.00 0.05 0.13 0.13 0.20 0.51 0.05
5 Rajpura 9.77 0.12 0.00 0.01 0.03 0.03 0.05 0.12 0.01
6 Rampur Z Saroi 12.47 0.15 0.00 0.01 0.04 0.04 0.06 0.15 0.01
7 Gangapur 34.39 0.41 0.00 0.04 0.10 0.10 0.17 0.41 0.04
Total 528.73 6.34 0.00 0.63 1.59 1.59 2.54 6.34 0.63
(94 )
GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF PRODUCTION & MICRO ENTERPRISES, IWMP-I,
DISTRICT- SANT RAVIDAS NAGAR
CODE- 2B3A3a3c Amount in Lacs
S.
No.
GRAM
PANCHAYAT
Project
Area
Proposed
Amount
Production System & Microenterprises 10% of the Total Project
Cost WDF
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
1 Badi 153.00 1.84 0.00 0.18 0.46 0.46 0.73 1.84 0.18
2 Mullupur 152.92 1.84 0.00 0.18 0.46 0.46 0.73 1.84 0.18
3 Dulamdaspur 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Ismaila 123.41 1.48 0.00 0.15 0.37 0.37 0.59 1.48 0.15
5 Jangla 245.22 2.94 0.00 0.29 0.74 0.74 1.18 2.94 0.29
6 Khetalpur 60.00 0.72 0.00 0.07 0.18 0.18 0.29 0.72 0.07
7 Khemaipur 23.23 0.28 0.00 0.03 0.07 0.07 0.11 0.28 0.03
8 Lila Dharpur 163.72 1.96 0.00 0.20 0.49 0.49 0.79 1.96 0.20
9 Marchwar 82.88 0.99 0.00 0.10 0.25 0.25 0.40 0.99 0.10
10 Poore Uchit 5.18 0.06 0.00 0.01 0.02 0.02 0.02 0.06 0.01
11 Rauri 12.29 0.15 0.00 0.01 0.04 0.04 0.06 0.15 0.01
12 Uchetha 23.33 0.28 0.00 0.03 0.07 0.07 0.11 0.28 0.03
13 Ugapur 3.29 0.04 0.00 0.00 0.01 0.01 0.02 0.04 0.00
14 Jagadhari 59.63 0.72 0.00 0.07 0.18 0.18 0.29 0.72 0.07
15 Bejavan 146.63 1.76 0.00 0.18 0.44 0.44 0.70 1.76 0.18
16 Sarouli 34.38 0.41 0.00 0.04 0.10 0.10 0.17 0.41 0.04
Total 1289.13 15.47 0.00 1.55 3.87 3.87 6.19 15.47 1.55
The activity has already been shown in the respective map.
(95 )
DETAILS OF PRODUCTION SYSTEM & MICRO ENTERPRISES ACTIVITIES AT GLANCE UNDER IWMP-I, DISTRICT-SANT RAVIDAS NAGAR
S. No.
Gram Panchayat
CROP DEMOSTRATION ANIMAL HUSBANDRY HORTICULTURE NURSURY SEED DISTRIBUTION
2009
-10
2010
-11
2011
-12
2012
-13
2013
-14
Tot
al
2009
-10
2010
-11
2011
-12
2012
-13
2013
-14
Tot
al
2009
-10
2010
-11
2011
-12
2012
-13
2013
-14
Tot
al
2009
-10
2010
-11
2011
-12
2012
-13
2013
-14
Tot
al
2009
-10
2010
-11
2011
-12
2012
-13
2013
-14
Tot
al
1 Ramraipur 0 1
1 0
1 1 0 1
1 0
1
1 0
1 1
2 Bharatpur 0
1
1 0
1
1 0
1
1 0
1
1 0
1
1
3 Bishapur 0
1
1 0 1
1 0
1 1 0
1 1 0 1
1
4 Ugapur 0 1
1 0
1
1 0 1
1 0 1
1 0
1
1
5 Jagadhari 0
1
1 0
1
1 0
1
1 0
1
1 0
1 1
6 Bejavan 0
1 1 0 1
1 0
1
1 0 1
1 0
1
1
7 Sarouli 0 1
1 0
1
1 0
1 1 0
1
1 0 1
1
8 Rauri 0
1
1 0
1 1 0 1
1 0
1 1 0
1
1
9 Lila Dharpur 0
1 1 0 1
1 0
1
1 0
1
1 0
1 1
10 Marchwar 0 1
1 0
1
1 0
1
1 0 1
1 0
1
1
11 Tarapur 0
1
1 0
1
1 0
1 1 0
1
1 0 1
1
12 Bhagwanpur 0
1 1 0
1 1 0
1
1 0
1 1 0
1
1
13 Bejavan 0 1
1 0 1
1 0 1
1 0
1
1 0
1
1
14 Rampur Lohara
0
1
1 0
1 1 0
1
1 0 1
1 0
1 1
15 Mahboobpur 0
1
1 0
1
1 0
1
1 0
1
1 0
1
1
16 Ahamadpur Phulwaria
0
1 1 0
1
1 0
1 1 0
1 1 0 1
1
17 Hirday Patti 0 1
1 0 1
1 0 1
1 0
1
1 0
1
1
18 Badhauna 0
1
1 0
1 1 0
1
1 0 1
1 0
1 1
19 Bhagwati Daspur
0
1
1 0
1
1 0
1
1 0
1
1 0
1
1
20 Bhalla 0
1 1 0
1
1 0
1 1 0 1
1 0
1
1
21 Palahiya 0 1
1 0 1
1 0 1
1 0
1
1 0 1
1
22 Daribpur 0
1
1 0
1 1 0
1
1 0 1
1 0
1
1
23 Chak Sanath 0
1
1 0
1
1 0
1
1 0 1
1 0
1 1
24 Chaubepur 0 1
1 0 1
1 0
1
1 0
1 1 0
1
1
25 Dulamdaspur 0
1
1 0
1
1 0
1 1 0 1
1 0
1
1
(96 )
26 Udhawa Mafi 0
1 1 0
1
1 0 1
1 0
1
1 0 1
1
27 Hariyawan 0 1
1 0
1 1 0
1
1 0
1
1 0
1
1
28 Ismaila 0
1
1 0 1
1 0
1 1 0
1 1 0
1 1
29 Jhingurpur 0
1 1 0
1
1 0
1
1 0 1
1 0
1
1
30 Raghopur 0 1
1 0
1
1 0 1
1 0
1
1 0
1
1
31 Saroi 0
1
1 0
1 1 0
1
1 0
1
1 0
1
1
32 Rampur Z
Saroi 0
1 1 0
1
1 0
1
1 0
1 1 0 1
1
33 Puremudhia 0 1
1 0 1
1 0
1
1 0 1
1 0
1 1
34 Mullupur 0
1
1 0
1
1 0
1 1 0
1
1 0
1
1
35 Jangla 0
1 1 0
1 1 0
1
1 0 1
1 0
1
1
36 Rampur 0 1
1 0
1
1 0
1
1 0
1
1 0 1
1
37 Kom 0
1
1 0 1
1 0 1
1 0
1 1 0
1 1
38 Dattipur 0
1 1 0
1
1 0
1
1 0
1
1 0
1
1
39 Awashanpur 0
1
1 0
1
1 0
1 1 0 1
1 0
1
1
40 Poore Uchit 0 1
1 0
1 1 0 1
1 0
1
1 0
1
1
41 Uchetha 0
1
1 0 1
1 0
1
1 0
1 1 0 1
1
42 Hariyawana 0
1
1 0
1 1 0
1
1 0
1
1 0
1 1
43 Khemaipur 0
1 1 0
1
1 0
1 1 0 1
1 0
1
1
44 Rajpura 0 1
1 0
1
1 0 1
1 0
1
1 0
1
1
45 Sharbat Khani 0
1
1 0 1
1 0
1
1 0
1 1 0 1
1
46 Gangapur 0
1
1 0
1
1 0
1 1 0 1
1 0
1 1
47 Badi 0
1 1 0
1
1 0
1
1 0
1
1 0
1
1
48 Khetalpur 0 1
1 0 1
1 0 1
1 0
1
1 0
1
1
Total 0 15 14 7 12 48 0 13 13 11 11 48 0 12 13 12 11 48 0 15 12 11 10 48 0 10 16 11 11 48
Approx cost of crop demonstration is No. 1. Wheat – 13000.00 per ha., 2. Surghum - 6500.00 per ha., Arhar – 10000.00 per ha.,
Paddy – 13000.00 per ha and Maize – 6500.00 per ha. Seed distribution Rs. 20000.00 per GP, Animal husbandary – 20000.00 per GP,
Horticulature – 15000.00 per GP and Nursery – 22000.00 per GP.
(97 )
GRAM PANCHAYAT WISE PRODUCTION SYSTEM AND MICRO ENTERPRISE ACITIVITY
Overall fund in the activities is Rs. 60.98 lac.
The above action plan has been prepared according to the need and resources available in the
project area. Individual activity fund distribution has been made the details would be given beneficiary
wise in the project file. Demonstration of crop, animal husbandry camp distribution of seed and plantation
of fruit trees are the essential requirement of the project area. Therefore the above plan has been
constituted according to the aforesaid activity and the funds were allocated as per the norms.
(98 )
MAJOR PROBLEMS OF THE WATERSHEDS
Moisture stress-Drought conditions
Erosion hazard
Excess runoff .
Land degradation
Low fertility of soil
Ground water depletion/Low ground water table, poor quality of groundwater
Low cropping intensity
Lack of technical knowledge
Lack of irrigation facilities
Low productivity of crops
Low availability of drinking water for human as well as animals
Overgrazing
Poor vegetative cover
Poor/low productive breeds of miltch animals
Lower milk production
Lack of feed & fodder availability
Non availability of wood/fuel
Lack of proper market facilities
Lack of educational, transportation, medical & health care facilities
Low wages
Small land holdings
Low income of the households
Lack of employment opportunity.
Migration from the project area.
An annual action plan for the entire activity of the project according to availability of budget has
been proposed for the annual schedule from 2009-10 to 2013-14.The details given below.
(99 )
ANNUAL ACTION PLAN OF IWMP-Ist, SANT RAVIDAS NAGAR
S. No. Gram Panchayat Area Watershed
Development Work Livelihood Activities
Production System & Micro Enterprises
Total Remarks
1 2 3 4 5 6 7 8
1 Ramraipur 111 7.46 1.20 1.33 9.99
2 Bharatpur 11 0.76 0.12 0.13 1.01
3 Bishapur 169 11.34 1.82 2.02 15.18
4 Ugapur 3 0.22 0.04 0.04 0.30
5 Jagadhari 60 4.01 0.64 0.72 5.37
6 Bejavan 147 9.85 1.58 1.76 13.20
7 Sarouli 34 2.31 0.37 0.41 3.09
8 Rauri 12 0.83 0.13 0.15 1.11
9 Lila Dharpur 164 11.00 1.77 1.96 14.73
10 Marchwar 83 5.57 0.90 0.99 7.46
11 Tarapur 26 1.77 0.28 0.32 2.37
12 Bhagwanpur 33 2.19 0.35 0.39 2.93
13 Bejavan 134 9.04 1.45 1.61 12.10
14 Rampur Lohara 3 0.24 0.04 0.04 0.31
15 Mahboobpur 11 0.76 0.12 0.14 1.02
16 Ahamadpur Phulwaria 49 3.29 0.53 0.59 4.41
17 Hirday Patti 348 23.39 3.76 4.18 31.32
18 Badhauna 167 11.22 1.80 2.00 15.03
19 Bhagwati Daspur 87 5.85 0.94 1.04 7.83
20 Bhalla 308 20.70 3.33 3.70 27.72
21 Palahiya 51 3.43 0.55 0.61 4.59
22 Daribpur 178 11.96 1.92 2.14 16.02
23 Chak Sanath 128 8.60 1.38 1.54 11.52
24 Chaubepur 196 13.17 2.12 2.35 17.64
25 Dulamdaspur 111 7.46 1.20 1.33 9.99
26 Udhawa Mafi 169 11.36 1.83 2.03 15.21
(100 )
27 Hariyawan 302 20.29 3.26 3.62 27.18
28 Ismaila 212 14.25 2.29 2.54 19.08
29 Jhingurpur 82 5.51 0.89 0.98 7.38
30 Raghopur 225 15.12 2.43 2.70 20.25
31 Saroi 146 9.81 1.58 1.75 13.14
32 Rampur Z Saroi 96 6.45 1.04 1.15 8.64
33 Puremudhia 140 9.41 1.51 1.68 12.60
34 Mullupur 153 10.28 1.65 1.84 13.77
35 Jangla 245 16.46 2.65 2.94 22.05
36 Rampur 58 3.90 0.63 0.70 5.22
37 Kom 5 0.34 0.05 0.06 0.45
38 Dattipur 4 0.27 0.04 0.05 0.36
39 Awashanpur 74 4.97 0.80 0.89 6.66
40 Poore Uchit 6 0.40 0.06 0.07 0.54
41 Uchetha 53 3.56 0.57 0.64 4.77
42 Hariyawana 33 2.22 0.36 0.40 2.97
43 Khemaipur 94 6.32 1.02 1.13 8.46
44 Rajpura 32 2.15 0.35 0.38 2.88
45 Sharbat Khani 41 2.76 0.44 0.49 3.69
46 Gangapur 34 2.28 0.37 0.41 3.06
47 Badi 153 10.28 1.65 1.84 13.77
48 Khetalpur 100 6.72 1.08 1.20 9.00
Total 5082 341.52 54.89 60.98 457.38
(101 )
Financial Break up of Watershed Development Works Fin. : in Lacs
For Project Proposed 2009-10
Activity Target as AAP Actual Achievment
2009-10 2010-11 2011-12 2012-13 2013-14 Total 2010-11 2011-12 Justification
Land Development Afforestation 0.00 2.28 4.10 3.93 4.92 15.23
Horticulture 0.00 0.93 1.67 1.61 2.00 6.22
Agriculture
Pasture
SMC Staggered trenching
Contour Bonding 0.00 16.03 28.74 27.57 34.52 106.86
Bench terracing
Others FB/MB/PFB 0.00 12.22 21.93 21.01 26.32 81.48
Veg. & Engg. Structures Earthen Checks 0.00 6.33 11.35 10.90 13.63 42.21
Brushwood Checks
Gully Plugs 0.00 2.23 4.00 3.84 4.81 14.89
Loose Boulders 0.00 0.55 0.98 0.95 1.18 3.65
Gabion Structures
Others
WHS Farm Ponds 0.00 0.84 1.51 1.44 1.81 5.60
Check dams/Tanks 0.00 5.01 8.97 8.63 10.79 33.40
Nallah Bunds 0.00 1.17 2.11 2.02 2.53 7.82
Percolation Tanks 0.00 1.02 1.83 1.77 2.21 6.83
Ground Water Recharge Structures 0.00 1.02 1.83 1.77 2.21 6.83
Others WHB/SB 0.00 1.57 2.81 2.71 3.39 10.48
Sub Total 0.00 51.2 91.83 88.15 110.32 341.5
Livelihood on-Farm activities 0.00 1.65 6.59 4.94 3.29 16.47
off-Farm activities 0.00 3.84 15.37 11.53 7.68 38.42
Sub Total 0.00 5.49 21.96 16.47 10.97 54.89
Production System Production System 0.00 5.11 20.45 21.91 13.51 60.98
Total 0.00 61.80 134.25 126.52 134.81 457.38
(102 )
Financial Break up of Watershed Development Works Fin. : in Lacs
MWS Code- 2B3A3a2b MWS Name- Dhaskari
Activity Target as AAP Actual Achievment
2009-10 2010-11 2011-12 2012-13 2013-14 Total 2010-11 2011-12 Justification
Land Development Afforestation 0.00 0.26 0.46 0.44 0.55 1.71
Horticulture 0.00 0.10 0.19 0.18 0.23 0.70
Agriculture
Pasture
SMC Staggered trenching
Contour Bonding 0.00 1.80 3.23 3.10 3.88 12.01
Bench terracing
Others FB/MB/PFB 0.00 1.37 2.46 2.36 2.96 9.15
Veg. & Engg. Structures Earthen Checks 0.00 0.71 1.28 1.22 1.53 4.74
Brushwood Checks
Gully Plugs 0.00 0.25 0.45 0.43 0.54 1.67
Loose Boulders 0.00 0.06 0.11 0.11 0.13 0.41
Gabion Structures
Others
WHS Farm Ponds 0.00 0.09 0.17 0.16 0.20 0.63
Check dams/Tanks 0.00 0.56 1.01 0.97 1.21 3.75
Nallah Bunds 0.00 0.13 0.24 0.23 0.28 0.88
Percolation Tanks 0.00 0.11 0.21 0.20 0.25 0.77
Ground Water Recharge Structures 0.00 0.11 0.21 0.20 0.25 0.77
Others WHB/SB 0.00 0.18 0.32 0.30 0.38 1.18
Sub-Total 0.00 5.73 10.34 9.9 12.39 38.37
Livelihood on-Farm activities 0.00 0.18 0.74 0.55 0.37 1.85
off-Farm activities 0.00 0.43 1.73 1.29 0.86 4.32
Sub-Total 0 0.61 2.47 1.84 1.23 6.17
Production System Production System 0.00 0.57 2.30 2.46 1.52 6.85
Total 0.00 6.94 15.08 14.21 15.15 51.39
(103 )
Financial Break up of Watershed Development Works Fin. : in Lacs
MWS Code- 2B3A3a2c MWS Name- Dattipur
Activity Target as AAP Actual Achievment
2009-10 2010-11 2011-12 2012-13 2013-14 Total 2010-11 2011-12 Justification
Land Development Afforestation 0.00 0.48 0.86 0.82 1.03 3.18
Horticulture 0.00 0.19 0.35 0.34 0.42 1.30
Agriculture
Pasture
SMC Staggered trenching
Contour Bonding 0.00 3.34 6.00 5.75 7.20 22.30
Bench terracing
Others FB/MB/PFB 0.00 2.55 4.58 4.39 5.49 17.00
Veg. & Engg. Structures Earthen Checks 0.00 1.32 2.37 2.27 2.84 8.81
Brushwood Checks
Gully Plugs 0.00 0.47 0.83 0.80 1.00 3.11
Loose Boulders 0.00 0.11 0.20 0.20 0.25 0.76
Gabion Structures
Others
WHS Farm Ponds 0.00 0.18 0.32 0.30 0.38 1.17
Check dams/Tanks 0.00 1.05 1.87 1.80 2.25 6.97
Nallah Bunds 0.00 0.24 0.44 0.42 0.53 1.63
Percolation Tanks 0.00 0.21 0.38 0.37 0.46 1.43
Ground Water Recharge Structures 0.00 0.21 0.38 0.37 0.46 1.43
Others WHB/SB 0.00 0.33 0.59 0.57 0.71 2.19
Sub-Total 0.00 10.68 19.17 18.4 23.02 71.28
Livelihood on-Farm activities 0.00 0.34 1.37 1.03 0.69 3.44
off-Farm activities 0.00 0.80 3.21 2.41 1.60 8.02
Sub-Total 0 1.14 4.58 3.44 2.29 11.46
Production System Production System 0.00 1.07 4.27 4.57 2.82 12.73
Total 0.00 12.90 28.01 26.40 28.13 95.44
(104 )
Financial Break up of Watershed Development Works Fin. : in Lacs
MWS Code- 2B3A3a2a MWS Name- Kanehri
Activity Target as AAP Actual Achievment
2009-10 2010-11 2011-12 2012-13 2013-14 Total 2010-11 2011-12 Justification
Land Development Afforestation 0.00 0.21 0.38 0.36 0.46 1.41
Horticulture 0.00 0.09 0.15 0.15 0.19 0.57
Agriculture
Pasture
SMC Staggered trenching
Contour Bonding 0.00 1.48 2.66 2.55 3.19 9.88
Bench terracing
Others FB/MB/PFB 0.00 1.13 2.03 1.94 2.43 7.53
Veg. & Engg. Structures Earthen Checks 0.00 0.58 1.05 1.01 1.26 3.90
Brushwood Checks
Gully Plugs 0.00 0.21 0.37 0.36 0.44 1.38
Loose Boulders 0.00 0.05 0.09 0.09 0.11 0.34
Gabion Structures
Others
WHS Farm Ponds 0.00 0.08 0.14 0.13 0.17 0.52
Check dams/Tanks 0.00 0.46 0.83 0.80 1.00 3.09
Nallah Bunds 0.00 0.11 0.19 0.19 0.23 0.72
Percolation Tanks 0.00 0.09 0.17 0.16 0.20 0.63
Ground Water Recharge Structures 0.00 0.09 0.17 0.16 0.20 0.63
Others WHB/SB 0.00 0.15 0.26 0.25 0.31 0.97
Sub-Total 0.00 4.73 8.49 8.15 10.19 31.57
Livelihood on-Farm activities 0.00 0.15 0.61 0.46 0.30 1.52
off-Farm activities 0.00 0.36 1.42 1.07 0.71 3.55
Sub-Total 0.00 0.51 2.03 1.53 1.01 5.07
Production System Production System 0.00 0.47 1.89 2.03 1.25 5.64
Total 0.00 5.71 12.41 11.69 12.46 42.27
(105 )
Financial Break up of Watershed Development Works Fin. : in Lacs
MWS Code- 2B3A3a3a MWS Name- Chakharibansh Bhatankala
Activity Target as AAP Actual Achievment
2009-10 2010-11 2011-12 2012-13 2013-14 Total 2010-11 2011-12 Justification
Land Development Afforestation 0.00 0.23 0.42 0.40 0.50 1.56
Horticulture 0.00 0.10 0.17 0.16 0.21 0.64
Agriculture
Pasture
SMC Staggered trenching
Contour Bonding 0.00 1.64 2.94 2.82 3.53 10.94
Bench terracing
Others FB/MB/PFB 0.00 1.25 2.25 2.15 2.70 8.34
Veg. & Engg. Structures Earthen Checks 0.00 0.65 1.16 1.12 1.40 4.32
Brushwood Checks
Gully Plugs 0.00 0.23 0.41 0.39 0.49 1.52
Loose Boulders 0.00 0.06 0.10 0.10 0.12 0.37
Gabion Structures
Others
WHS Farm Ponds 0.00 0.09 0.16 0.15 0.19 0.57
Check dams/Tanks 0.00 0.51 0.92 0.88 1.10 3.42
Nallah Bunds 0.00 0.12 0.22 0.21 0.26 0.80
Percolation Tanks 0.00 0.10 0.19 0.18 0.23 0.70
Ground Water Recharge Structures 0.00 0.10 0.19 0.18 0.23 0.70
Others WHB/SB 0.00 0.16 0.29 0.28 0.35 1.07
Sub-Total 0.00 5.24 9.42 9.02 11.31 34.95
Livelihood on-Farm activities 0.00 0.17 0.67 0.51 0.34 1.69
off-Farm activities 0.00 0.39 1.57 1.18 0.79 3.93
Sub-Total 0 0.56 2.24 1.69 1.13 5.62
Production System Production System 0.00 0.52 2.09 2.24 1.38 6.24
Total 0.00 6.33 13.75 12.96 13.81 46.84
(106 )
Financial Break up of Watershed Development Works Fin. : in Lacs
MWS Code- 2B3A3a3b MWS Name- Musilatpur
Activity Target as AAP Actual Achievment
2009-10 2010-11 2011-12 2012-13 2013-14 Total 2010-11 2011-12 Justification
Land Development Afforestation 0.00 0.52 0.94 0.90 1.13 3.49
Horticulture 0.00 0.21 0.38 0.37 0.46 1.42
Agriculture
Pasture
SMC Staggered trenching
Contour Bonding 0.00 3.67 6.58 6.31 7.91 24.47
Bench terracing
Others FB/MB/PFB 0.00 2.80 5.02 4.81 6.03 18.66
Veg. & Engg. Structures Earthen Checks 0.00 1.45 2.60 2.50 3.12 9.67
Brushwood Checks
Gully Plugs 0.00 0.51 0.92 0.88 1.10 3.41
Loose Boulders 0.00 0.13 0.22 0.22 0.27 0.84
Gabion Structures
Others
WHS Farm Ponds 0.00 0.19 0.35 0.33 0.41 1.28
Check dams/Tanks 0.00 1.15 2.05 1.98 2.47 7.65
Nallah Bunds 0.00 0.27 0.48 0.46 0.58 1.79
Percolation Tanks 0.00 0.23 0.42 0.40 0.51 1.56
Ground Water Recharge Structures 0.00 0.23 0.42 0.40 0.51 1.56
Others WHB/SB 0.00 0.36 0.64 0.62 0.78 2.40
Sub-Total 0.00 11.72 21.02 20.18 25.28 78.2
Livelihood on-Farm activities 0.00 0.38 1.51 1.13 0.75 3.77
off-Farm activities 0.00 0.88 3.52 2.64 1.76 8.80
Sub-Total 0.00 1.26 5.03 3.77 2.51 12.57
Production System Production System 0.00 1.17 4.68 5.02 3.10 13.97
Total 0.00 14.16 30.75 28.98 30.88 104.76
(107 )
Financial Break up of Watershed Development Works Fin. : in Lacs
MWS Code- 2B3A3a3c MWS Name- Jangala
Activity Target as AAP Actual Achievment
2009-10 2010-11 2011-12 2012-13 2013-14 Total 2010-11 2011-12 Justification
Land Development Afforestation 0.00 0.58 1.05 1.00 1.26 3.89
Horticulture 0.00 0.24 0.43 0.41 0.51 1.59
Agriculture
Pasture
SMC Staggered trenching
Contour Bonding 0.00 4.09 7.33 7.03 8.81 27.26
Bench terracing
Others FB/MB/PFB 0.00 3.12 5.59 5.36 6.71 20.79
Veg. & Engg. Structures Earthen Checks 0.00 1.61 2.90 2.78 3.48 10.77
Brushwood Checks
Gully Plugs 0.00 0.57 1.02 0.98 1.23 3.80
Loose Boulders 0.00 0.14 0.25 0.24 0.30 0.93
Gabion Structures
Others
WHS Farm Ponds 0.00 0.21 0.39 0.37 0.46 1.43
Check dams/Tanks 0.00 1.28 2.29 2.20 2.75 8.52
Nallah Bunds 0.00 0.30 0.54 0.51 0.65 2.00
Percolation Tanks 0.00 0.26 0.47 0.45 0.56 1.74
Ground Water Recharge Structures 0.00 0.26 0.47 0.45 0.56 1.74
Others WHB/SB 0.00 0.40 0.72 0.69 0.86 2.67
Sub-Total 0.00 13.06 23.45 22.47 28.14 87.13
Livelihood on-Farm activities 0.00 0.42 1.68 1.26 0.84 4.20
off-Farm activities 0.00 0.98 3.92 2.94 1.96 9.80
Sub-Total 0 1.4 5.6 4.2 2.8 14
Production System Production System 0.00 1.30 5.22 5.59 3.45 15.56
Total 0.00 15.77 34.25 32.28 34.39 116.69
(108 )
CHAPTER – 6
CAPACITY BUILDING PLAN
(109 )
The total amount in this activity is Rs 30.49 Lacs have been allocated. According to distribution of fund in
different level, a comprehensive detail action plan has been prepared for proper execution of human
resource development in the project activities.
YEARWISE FINANCIAL BREAK UP OF INST. & CAP. BULDG. PROGRAMME OF IWMP-I, DISTRICT- SANT RAVIDAS NAGAR
PIA LAVEL
S. No. Micro watershed Project Area Proposed Amount
Institutional & Capacity Building 5% of the Total Project
2009-10 2010-11 2011-12 2012-13 Total
1 Dhaskari 629.21 2.87 1.04 0.69 0.87 0.26 2.87
2 Kanehari 794.64 3.62 1.32 0.88 1.10 0.33 3.62
3 Dattipur 1009.39 4.60 1.67 1.11 1.39 0.42 4.60
4 Chak Harivansh Bhatan
kala 830.9 3.79 1.38 0.92 1.15 0.35 3.79
5 Musilatpur 528.73 2.41 0.88 0.58 0.73 0.22 2.41
6 Jangala 1289.13 5.88 2.13 1.42 1.78 0.54 5.88
Sub Total 5082 23.17 8.42 5.61 7.01 2.13 23.17
WCDC LEVEL
1 Dhaskari 629.21 0.68 0.23 0.15 0.19 0.11 0.68
2 Kanehari 794.64 0.86 0.29 0.19 0.24 0.14 0.86
3 Dattipur 1009.39 1.09 0.36 0.24 0.30 0.18 1.09
4 Chak Harivansh Bhatan
kala 830.9 0.90 0.30 0.20 0.25 0.15 0.90
5 Musilatpur 528.73 0.57 0.19 0.13 0.16 0.10 0.57
6 Jangala 1289.13 1.39 0.46 0.31 0.39 0.23 1.39
Sub Total 5082 5.49 1.83 1.22 1.52 0.91 5.49
SLNA LEVEL
1 Dhaskari 629.21 0.23 0.09 0.06 0.08 0.00 0.23
2 Kanehari 794.64 0.29 0.11 0.08 0.10 0.00 0.29
3 Dattipur 1009.39 0.36 0.15 0.10 0.12 0.00 0.36
4 Chak Harivansh Bhatan
kala 830.9 0.30 0.12 0.08 0.10 0.00 0.30
5 Musilatpur 528.73 0.19 0.08 0.05 0.06 0.00 0.19
6 Jangala 1289.13 0.46 0.19 0.12 0.15 0.00 0.46
Sub Total 5082 1.83 0.73 0.49 0.61 0.00 1.83
Total 5082 30.49 10.98 7.32 9.15 3.05 30.49
(110 )
Year-wise bifurcation of capacity building activities IWMP -I, Sant Ravidas Nagar
First Year Second Year
S. No. Level Total no of
person
No of person to be trained
No of training to
be conduct
Training day
Total Cost No of
person to be trained
No of training to
be conduct
Training day
Total Cost
1 SLNA 0.73
2 WCDC 14 0 0 0 0 14 3 3 1.83
3 PIA 11 0 0 0 0 11 4 3 1.68
4 WDT 4 0 0 0 0 4 12 2 0.84
5 SHG 96 0 0 0 0 500 1 2 2.1
6 UG 120 0 0 0 0 400 1 2 2.95
7 WC 48 0 0 0 0 350 1 1 0.84
TOTAL 0 10.98
Third Year Fourth Year Fifth Year
No of person to
be trained
No of training
to be conduct
Training day
Total Cost
No of person to
be trained
No of training
to be conduct
Training day
Total Cost
No of person to
be trained
No of training
to be conduct
Training day
Total Cost
0.49 0.61 0
14 2 3 1.22 14 2 4 1.52 0 0 0 0.91
11 3 4 1.12 11 2 4 1.4 11 2 4 0.43
4 4 4 0.56 4 3 6 0.7 4 2 6 0.21
250 1 3 1.4 150 1 3 1.75 50 1 1 0.53
400 1 2 1.96 300 1 2 2.45 75 1 1 0.75
175 1 1 0.56 100 1 2 0.7 85 2 1 0.21
7.32 9.15 3.05
(111 )
List of identified training institutes for capacity building
Project IWMP - I District - Sant Ravidas Nagar
Sr.
No.
Name of the
Training
Institute
Full Address
with contact
no, website
Designation
of the Head
of Institute
Type of
Institute
Area(s) of
specialization
No. of
training
assigned
No. of
persons
to be
trained
Allocation
to be
made to
the
institute
1 2 3 4 5 6 7 8 9
1 Hind Swaraj
Trust(Ralegan
Sidhdhi)
Ahmadnagar
Ahmadnagar.
Maharashra
Kendra
Adhyash
Training Rural
Development
1 1 Rs:-15000
2 SIRD Director Director Training Rural
Development
4 5
3 CSWCRT(Agra) Director Director Training Conservation
of Soil
&Water
1 10 Rs:-22356
(112 )
CHAPTER -7
PHASING OF PROGRAMME
& BUDGETING
(113 )
FINANCIAL BREAKUP OF VARIOUS COMPONENT IN TERMS OF % OF IWMP-I,
DISTRICT-SANT RAVIDASNAGAR
Amount in Lacs
S.
No.
Micro
Watershed P
ro
ject
Area
Pro
po
sed
Am
ou
nt
Ad
min
istr
ati
ve 1
0%
EP
A 4
%
In
sti
tuti
on
an
d C
B 5
%
DP
R 1
%
Wate
rsh
ed
develo
pm
en
t
wo
rk
56
%
Liv
elih
oo
d f
or
Asset
less
9%
Pro
du
cti
on
syste
m a
nd
Mic
ro
en
terp
ris
es 1
0%
Mo
nit
orin
g 1
%
Evalu
ati
on
1%
Co
nso
lid
ati
on
3%
To
tal
10
0%
1 Dhaskari 629.21 75.51 7.55 3.02 3.78 0.76 42.28 6.80 7.55 0.76 0.76 2.27 75.51
2 Kanehari 794.64 95.36 9.54 3.81 4.77 0.95 53.40 8.58 9.54 0.95 0.95 2.86 95.36
3 Dattipur 1009.39
121.13 12.11 4.85 6.06 1.21 67.83 10.90 12.11 1.21 1.21 3.63 121.13
4
Chak
Harivansh
Bhatan kala
830.90 99.71 9.97 3.99 4.99 1.00 55.84 8.97 9.97 1.00 1.00 2.99 99.71
5 Musilatpur 528.73 63.45 6.34 2.54 3.17 0.63 35.53 5.71 6.34 0.63 0.63 1.90 63.45
6 Jangala 1289.13 154.70 15.47 6.19 7.73 1.55 86.63 13.92 15.47 1.55 1.55 4.64 154.70
Total 5082.00 609.84 60.98 24.39 30.49 6.10 341.51 54.89 60.98 6.10 6.10 18.30 609.84
(114 )
YEARWISE PHYSICAL AND FINANCIAL BREAK UP OF WORK COMPONENT OF IWMP-I, DISTRICT-SANT RAVIDAS NAGAR
Amount in Lacs, Phy. in ha.
Watershed Development Works 56% of the Project Cost
S.
No.
Micro
Watershed
Project
Area
Propose
d
Amount
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.
1 Dhaskari 629.21 42.28 0.00 0.00 84.25 5.66 183.73 12.35 179.77 12.08 181.46 12.19 629.21 42.28
2 Kanehari 794.64 53.40 0.00 0.00 106.40 7.15 232.03 15.59 227.03 15.26 229.17 15.40 794.64 53.40
3 Dattipur 1009.39 67.83 0.00 0.00 135.16 9.08 294.74 19.80 288.38 19.38 291.11 19.56 1009.39 67.83
4
Chak
Harivansh
Bhatan
kala
830.90 55.84 0.00 0.00 111.26 7.48 242.62 16.30 237.39 15.95 239.63 16.10 830.90 55.84
5 Musilatpur 528.73 35.53 0.00 0.00 70.80 4.76 154.39 10.37 151.06 10.15 152.49 10.25 528.73 35.53
6 Jangala 1289.13 86.63 0.00 0.00 172.61 11.60 376.43 25.29 368.30 24.75 371.79 24.98 1289.13 86.63
Total 5082 341.51 0.00 0.00 680.48 45.74 1483.94 99.71 1451.93 97.57 1465.65 98.49 5082.00 341.51
(115 )
GRAM PANCHAYAT WISE PHYSICAL AND FINANCIAL BREAK UP OF WORK
COMPONENT OF IWMP-I, DISTRICT- SANT RAVIDAS NAGAR
Code- 2B3A3a2b
S.
No.
Gram
Panchayat
Project
Area
Proposed
Amount
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy
(ha,) Fin.
1 Hirday Patti 94.77
6.37 0.00 0.00 12.69 0.85 27.67 1.86 27.08 1.82 27.33 1.84 94.77 6.37
2 Chaubepur 91.21
6.13 0.00 0.00 12.21 0.82 26.63 1.79 26.06 1.75 26.30 1.77 91.21 6.13
3 Ahamadpur
Phulwaria 48.57
3.26 0.00 0.00 6.50 0.44 14.18 0.95 13.88 0.93 14.01 0.94 48.57 3.26
4 Mahboobpur 11.37
0.76 0.00 0.00 1.52 0.10 3.32 0.22 3.25 0.22 3.28 0.22 11.37 0.76
5 Raghopur 213
14.31 0.00 0.00 28.52 1.92 62.20 4.18 60.85 4.09 61.43 4.13 213.00 14.31
6 Dulandaspur 12.8
0.86 0.00 0.00 1.71 0.12 3.74 0.25 3.66 0.25 3.69 0.25 12.80 0.86
7 Ramraipur 111.01
7.46 0.00 0.00 14.86 1.00 32.41 2.18 31.72 2.13 32.02 2.15 111.01 7.46
8 Saroi 45.79
3.08 0.00 0.00 6.13 0.41 13.37 0.90 13.08 0.88 13.21 0.89 45.79 3.08
9 Rajpura 0.68
0.05 0.00 0.00 0.09 0.01 0.20 0.01 0.19 0.01 0.20 0.01 0.68 0.05
Total 629.2
42.28 0.00 0.00 84.25 5.66 183.73 12.34 179.76 12.08 181.46 12.19 629.20 42.28
(116 )
GRAM PANCHAYAT WISE PHYSICAL AND FINANCIAL BREAK UP OF WORK
COMPONENT OF IWMP-I, DISTRICT- Sant Ravidas Nagar
Code- 2B3A3a2a
S.
No.
Gram
Panchayat
Project
Area
Proposed
Amount
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy
(ha,) Fin.
1 Hirday Patti 100.03 6.72 0.00 0.00 13.39 0.90 29.21 1.96 28.58 1.92 28.85 1.94 100.03 6.72
2 Bhagwati Daspur 78.04 5.24 0.00 0.00 10.45 0.70 22.79 1.53 22.30 1.50 22.51 1.51 78.04 5.24
3 Kom 5.46 0.37 0.00 0.00 0.73 0.05 1.59 0.11 1.56 0.10 1.57 0.11 5.46 0.37
4 Bhalla 136 9.14 0.00 0.00 18.21 1.22 39.71 2.67 38.86 2.61 39.22 2.64 136.00 9.14
5 Badhauna 0.15 0.01 0.00 0.00 0.02 0.00 0.04 0.00 0.04 0.00 0.04 0.00 0.15 0.01
6 Daribpur 177.54 11.93 0.00 0.00 23.77 1.60 51.84 3.48 50.72 3.41 51.20 3.44 177.54 11.93
7 Chak Sanath 128 8.60 0.00 0.00 17.14 1.15 37.38 2.51 36.57 2.46 36.92 2.48 128.00 8.60
8 Dattipur 2.86 0.19 0.00 0.00 0.38 0.03 0.84 0.06 0.82 0.05 0.82 0.06 2.86 0.19
9 Awashanpur 74.23 4.99 0.00 0.00 9.94 0.67 21.68 1.46 21.21 1.43 21.41 1.44 74.23 4.99
10 Sharbat Khani 40.88 2.75 0.00 0.00 5.47 0.37 11.94 0.80 11.68 0.78 11.79 0.79 40.88 2.75
11 Palahiya 51.46 3.46 0.00 0.00 6.89 0.46 15.03 1.01 14.70 0.99 14.84 1.00 51.46 3.46
Total 794.64 53.40 0.00 0.00 106.40 7.15 232.04 15.59 227.03 15.26 229.18 15.40 794.65 53.40
(117 )
GRAM PANCHAYAT WISE PHYSICAL AND FINANCIAL BREAK UP OF WORK
COMPONENT OF IWMP-I, DISTRICT- Sant Ravidas Nagar
Code- 2B3A3a2c
S.
No.
Gram
Panchayat
Project
Area
Proposed
Amount
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy
(ha,) Fin.
1 Bharatpur 11.25 0.76 0.00 0.00 1.51 0.10 3.29 0.22 3.21 0.22 3.24 0.22 11.25 0.76
2 Bishapur 168.7 11.34 0.00 0.00 22.59 1.52 49.26 3.31 48.20 3.24 48.65 3.27 168.70 11.34
3 Hirday Patti 153.03 10.28 0.00 0.00 20.49 1.38 44.68 3.00 43.72 2.94 44.13 2.97 153.03 10.28
4 Badhauna 166.95 11.22 0.00 0.00 22.35 1.50 48.75 3.28 47.70 3.21 48.15 3.24 166.95 11.22
5 Bhagwati Daspur 9.35 0.63 0.00 0.00 1.25 0.08 2.73 0.18 2.67 0.18 2.70 0.18 9.35 0.63
6 Bhalla 171.87 11.55 0.00 0.00 23.01 1.55 50.19 3.37 49.10 3.30 49.57 3.33 171.87 11.55
7 Dulamdaspur 57.86 3.89 0.00 0.00 7.75 0.52 16.90 1.14 16.53 1.11 16.69 1.12 57.86 3.89
8 Ismaila 0.35 0.02 0.00 0.00 0.05 0.00 0.10 0.01 0.10 0.01 0.10 0.01 0.35 0.02
9 Khetalpur 40.49 2.72 0.00 0.00 5.42 0.36 11.82 0.79 11.57 0.78 11.68 0.78 40.49 2.72
10 Pure Uchit 0.65 0.04 0.00 0.00 0.09 0.01 0.19 0.01 0.19 0.01 0.19 0.01 0.65 0.04
11 Rampur Lohara 3.5 0.24 0.00 0.00 0.47 0.03 1.02 0.07 1.00 0.07 1.01 0.07 3.50 0.24
12 Uchetha 29.82 2.00 0.00 0.00 3.99 0.27 8.71 0.59 8.52 0.57 8.60 0.58 29.82 2.00
13 Saroi 2.16 0.15 0.00 0.00 0.29 0.02 0.63 0.04 0.62 0.04 0.62 0.04 2.16 0.15
14 Tarapur 26.38 1.77 0.00 0.00 3.53 0.24 7.70 0.52 7.54 0.51 7.61 0.51 26.38 1.77
15 Bhagwanpur 32.6 2.19 0.00 0.00 4.37 0.29 9.52 0.64 9.31 0.63 9.40 0.63 32.60 2.19
16 Bejavan 134.45 9.04 0.00 0.00 18.00 1.21 39.26 2.64 1.61 2.58 0.16 2.61 16.13 9.04
Total 1009.39 67.83 0.00 0.00 135.16 9.08 294.75 19.80 251.59 19.38 252.50 19.56 891.09 67.83
(118 )
GRAM PANCHAYAT WISE PHYSICAL AND FINANCIAL BREAK UP OF WORK
COMPONENT OF IWMP-I, DISTRICT- Sant Ravidas Nagar
Code- 2B3A3a3a
S.
No.
Gram
Panchayat
Project
Area
Proposed
Amount
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy
(ha,) Fin.
1 Badi 0.27 0.02 0.00 0.00 0.04 0.00 0.08 0.01 0.08 0.01 0.08 0.01 0.27 0.02
2 Chaubepur 75.82 5.10 0.00 0.00 10.15 0.68 22.14 1.49 21.66 1.46 21.87 1.47 75.82 5.10
3 Udhawa Mafi 61.28 4.12 0.00 0.00 8.21 0.55 17.89 1.20 17.51 1.18 17.67 1.19 61.28 4.12
4 Jhingurpur 63.3 4.25 0.00 0.00 8.48 0.57 18.48 1.24 18.08 1.22 18.26 1.23 63.30 4.25
5 Puremudhia 139.65 9.38 0.00 0.00 18.70 1.26 40.78 2.74 39.90 2.68 40.28 2.71 139.65 9.38
6 Dulamdaspur 40.38 2.71 0.00 0.00 5.41 0.36 11.79 0.79 11.54 0.78 11.65 0.78 40.38 2.71
7 Chaubepur 28.89 1.94 0.00 0.00 3.87 0.26 8.44 0.57 8.25 0.55 8.33 0.56 28.89 1.94
8 Hariyawana 32.55 2.19 0.00 0.00 4.36 0.29 9.50 0.64 9.30 0.62 9.39 0.63 32.55 2.19
9 Ismaila 88.68 5.96 0.00 0.00 11.87 0.80 25.89 1.74 25.34 1.70 25.58 1.72 88.68 5.96
10 Rampur 58.03 3.90 0.00 0.00 7.77 0.52 16.94 1.14 16.58 1.11 16.74 1.12 58.03 3.90
11 Raghopur 11.53 0.77 0.00 0.00 1.54 0.10 3.37 0.23 3.29 0.22 3.33 0.22 11.53 0.77
12 Rajpura 21.07 1.42 0.00 0.00 2.82 0.19 6.15 0.41 6.02 0.40 6.08 0.41 21.07 1.42
13 Rampur Z Saroi 83.31 5.60 0.00 0.00 11.16 0.75 24.33 1.63 23.80 1.60 24.03 1.61 83.31 5.60
14 Saroi 97.76 6.57 0.00 0.00 13.09 0.88 28.55 1.92 27.93 1.88 28.19 1.89 97.76 6.57
15 Khemaipur 28.4 1.91 0.00 0.00 3.80 0.26 8.29 0.56 8.11 0.55 8.19 0.55 28.40 1.91
Total 830.92 55.84 0.00 0.00 111.26 7.48 242.63 16.30 237.39 15.95 239.64 16.10 830.92 55.84
(119 )
GRAM PANCHAYAT WISE PHYSICAL AND FINANCIAL BREAK UP OF WORK
COMPONENT OF IWMP-I, DISTRICT- Sant Ravidas Nagar
Code- 2B3A3a3b
S.
No.
Gram
Panchayat
Project
Area
Proposed
Amount
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy
(ha,) Fin.
1 Udhawa Mafi 108.13 7.27 0.00 0.00 14.48 0.97 31.57 2.12 30.89 2.08 31.18 2.10 108.13 7.27
2 Jhingurpur 19.13 1.29 0.00 0.00 2.56 0.17 5.59 0.38 5.47 0.37 5.52 0.37 19.13 1.29
3 Hariyawan 302.5 20.33 0.00 0.00 40.50 2.72 88.33 5.94 86.42 5.81 87.24 5.86 302.50 20.33
4 Khemaipur 42.35 2.85 0.00 0.00 5.67 0.38 12.37 0.83 12.10 0.81 12.21 0.82 42.35 2.85
5 Rajpura 9.77 0.66 0.00 0.00 1.31 0.09 2.85 0.19 2.79 0.19 2.82 0.19 9.77 0.66
6 Rampur Z Saroi 12.47 0.84 0.00 0.00 1.67 0.11 3.64 0.24 3.56 0.24 3.60 0.24 12.47 0.84
7 Gangapur 34.39 2.31 0.00 0.00 4.60 0.31 10.04 0.67 9.83 0.66 9.92 0.67 34.39 2.31
Total 528.73 35.53 0.00 0.00 70.80 4.76 154.39 10.37 151.06 10.15 152.49 10.25 528.74 35.53
(120 )
GRAM PANCHAYAT WISE PHYSICAL AND FINANCIAL BREAK UP OF WORK
COMPONENT OF IWMP-I, DISTRICT- Sant Ravidas Nagar
Code- 2B3A3a3c
S.
No.
Gram
Panchayat
Project
Area
Proposed
Amount
2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL
Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy
(ha,) Fin.
1 Badi 153 10.28 0.00 0.00 20.49 1.38 44.68 3.00 43.71 2.94 44.13 2.97 153.00 10.28
2 Mullupur 152.92 10.28 0.00 0.00 20.48 1.38 44.65 3.00 43.69 2.94 44.10 2.96 152.92 10.28
3 Dulamdaspur 0.03 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.01 0.00 0.01 0.00 0.03 0.00
4 Ismaila 123.41 8.29 0.00 0.00 16.52 1.11 36.04 2.42 35.26 2.37 35.59 2.39 123.41 8.29
5 Jangla 245.22 16.48 0.00 0.00 32.83 2.21 71.60 4.81 70.06 4.71 70.72 4.75 245.22 16.48
6 Khetalpur 60 4.03 0.00 0.00 8.03 0.54 17.52 1.18 17.14 1.15 17.30 1.16 60.00 4.03
7 Khemaipur 23.23 1.56 0.00 0.00 3.11 0.21 6.78 0.46 6.64 0.45 6.70 0.45 23.23 1.56
8 Lila Dharpur 163.72 11.00 0.00 0.00 21.92 1.47 47.81 3.21 46.77 3.14 47.22 3.17 163.72 11.00
9 Marchwar 82.88 5.57 0.00 0.00 11.10 0.75 24.20 1.63 23.68 1.59 23.90 1.61 82.88 5.57
10 Poore Uchit 5.18 0.35 0.00 0.00 0.69 0.05 1.51 0.10 1.48 0.10 1.49 0.10 5.18 0.35
11 Rauri 12.29 0.83 0.00 0.00 1.65 0.11 3.59 0.24 3.51 0.24 3.54 0.24 12.29 0.83
12 Uchetha 23.33 1.57 0.00 0.00 3.12 0.21 6.81 0.46 6.67 0.45 6.73 0.45 23.33 1.57
13 Ugapur 3.29 0.22 0.00 0.00 0.44 0.03 0.96 0.06 0.94 0.06 0.95 0.06 3.29 0.22
14 Jagadhari 59.63 4.01 0.00 0.00 7.98 0.54 17.41 1.17 17.04 1.14 17.20 1.16 59.63 4.01
15 Bejavan 146.63 9.85 0.00 0.00 19.63 1.32 42.82 2.88 41.89 2.82 42.29 2.84 146.63 9.85
16 Sarouli 34.38 2.31 0.00 0.00 4.60 0.31 10.04 0.67 0.41 0.66 0.04 0.67 4.13 2.31
Total 1289.14 86.63 0.00 0.00 172.62 11.60 376.43 25.29 358.90 24.75 361.91 24.98 1258.89 86.63
(121 )
CHAPTER – 8
CONSOLIDATION/WITHDRAWAL
STRATEGY
(122 )
WATERSHED DEVELOPMENT FUND
The major source of financial assistance after post implementation period is Watershed Development
Fund. The contribution of it will come mainly from the fund generated.
USER CHARGES
Various user groups will be formed in village. These user groups will collect user according to the
designated rules formed during the formation of user group. These funds will be transferred to the WDF
funds as per these formulated rules. The secretary of watershed committee (WC) shall maintain the
records.
SUSTAINABILITY AND ENVIRONMENT SECURITY
In the proposed watershed management plan of I.W.M.P.-I, Sant Ravidas Nagar watershed, proper
blending of bio-engineering measures will be applied on 60% of the total watershed area. Based on the
results of studies conducted in this region, it is estimated that more 50% of the watershed area will be
treated and consequently the soil loss and runoff from the area is expected to be reduced by 70% and
65% respectively. The proposed land use plan will improve the land utilization index and crop
diversification index significantly as compared to the existing one. It will help in maintaining ecosystem
integrity on sustained basis along with improving the livelihood security of the farming community.
(123 )
ECONOMIC ANALYSIS
Economic analysis of the project was carried by taking direct benefits and costs considering 25 year
project life at 10 per cent discount rate. For this purpose of economic analysis, whole watershed
development plan was divided into three sectors namely,
Agriculture, horticulture and forest/fuel wood plantation. Net present value (NPV), Benefit cost ratio (BC)
ratio criteria were employed to judge the economic efficiency of each enterprise and sector.
AGRICULTURE
In rain-fed agriculture the development cost can be recovered within one year as the present rain-
fed agriculture is being done on well maintained field, therefore, does not require much investment.
(124 )
CHAPTER -9
EXPECTED OUTCOME
(125 )
ABTRACT OF OUTCOMES
The overall assessment of the project certain parameters have been evaluated on the present and
future basis. As mentioned in the above the food grain production according to the expenditure has been
analyzed after the completion of the project.
Ratio of Cost and Profit
S. No. Name of Cereal Area in ha Production /Ha in q Invest Cost/ ha Rate/q Net profit/ha Total Net profit
1 Paddy 2022.00 16.77 4000.00 1000.00 12770.00 25820940.00
2 Arhar 536.40 7.87 2300.00 4500.00 33115.00 17762886.00
3 Urd/Mung 241.30 5.08 3300.00 800.00 764.00 184353.20
4 Wheat 2235.12 28.20 4200.00 1000.00 24000.00 53642880.00
5 Mustard 496.30 4.26 2600.00 2000.00 5920.00 2938096.00
Total 5531.12 100349155.20
Status After Work
S. No. Name of Cereal Area in ha Production /Ha in q Invest Cost/ ha Rate/q Net profit/ha Total Net profit
1 Paddy 2100.00 20.00 4000.00 1000.00 16000.00 33600000.00
2 Arhar 540.00 8.00 2300.00 4500.00 33700.00 18198000.00
3 Urd/Mung 250.00 7.50 3600.00 800.00 2400.00 600000.00
4 Wheat 2300.00 22.00 4200.00 1000.00 17800.00 40940000.00
5 Mustard 500.00 12.00 2600.00 2000.00 21400.00 10700000.00
Total 5690.00 104038000.00
(126 )
Bhoomi Sanrakshan after the treatment of Land 104038000.00
Bhoomi Sanrakshan before the treatment of Land 100349155.20
Net Profit 3688844.80
Ratio of cost and profit 1.04
The above ratio clearly indicated that the conservation of land is extremely profitable.
(127 )
SUMMARY OF EXPECTED /ESTIMATED OUTCOMES OF IWMP-I, SANT RAVIDAS NAGAR (2009-2010)
S.
No.
Name of
the
District
Item Unit of
Measurement Pre-project Status
Expected Post-
project Status
1 2 3 4 5 6
1.
Sant
Ravidas
Nagar
Status of water table Meter 16.00-17.00 14.00-15.00
2. Grand water structure repaired/ rejuvenated - - -
3. Quality of drinking water Good Good Good
4. Availability of drinking water Meter 10months 12 Months
5. Increase in irrigation potential
6. Change in cropping/land use pattern - Single Crop Double Cropping
7. Area under agriculture crop ha 3666.00 3800.00
8. i- Area under single crop ha 1180 1652
9. ii- Area under double crop ha 1914 2400
10. iii- Area under multiple crop ha - 50
11. iv-Cropping Intensity % 132.80 155.00
12. Increase in area under vegetation ha 175 250
13. Increase in area under horticulture ha 165 300
14. Increase in area under fuel & fodder ha 3.50 9.0
15. Increase in milk production % 3 4
16. No. of SHGs No. 16 25
17. Increase in no. of livelihoods No. - 54
18. Migration No. 260 150
19. SHG Federation formed No. - -
20. Credit Linkage with banks - - -
(128 )
Chapter-10
COST NORMS & DESIGN OF STRUCTURE
PROPOSED
(129 )
DRAWING OF C.B., P.B., AND M.B. (Not to Scale)
(C.B., Cross-Section – 1.085 m2) (S.B., Cross-Section – 1.845m2)
(Field Bund, Cross-Section – 0.50 m2) (S.B. /P.B. /M.B., Cross-Section – 3.445 m2)
(All dimensions in Metre)
0.50
2.60
0.70
0.70
0.90
1.30 0.50
0.50 0.70
3.40
1.50 4.60
(130 )
DRAWING OF EARTHEN CHEKDAM / GULLY PLUG
(Not to Scale)
(C.D. /G.P., Cross-Section – 11.97 m2) (C.D. /G.P., Cross-Section – 17.50 m2)
(W.H.B., Cross-Section – 22.00 m2)
(All dimensions in Metre)
2.50 2.10
1.50 2.00
9.90 12.00
2.50
13.50
2.75
(131 )
DESIGN OF CONTOUR BUND Type of Soil -Loam,Sandy Loam Rain fall -24 hr in cm -25 cm Field Stop -1% Vertical Interval (VI) = [s/3+2] x 0.3 = [1/3+2] x 0.3 = 0.70 m Horizontal Interval (HI) = 100 x V.I/s = 100 x 0.7/1
Height of bund h = Re=maximum rainfall in cm
=
=
= 0.59 Say 0.60 m Free board =15% of height minimum -10 cm Height = 0.60 + 0.10 = 0.70 m Taking top width of bund 0.50 m and side slope 1.5:1 Then base of Bund = 0.50 + (1.50 d) x 2 = 2.60 m Cross-Section of bund = (0.50 + 2.60) x 0.70 / 2 = 1 .085 m2 Length of bund = 100 s / V.I. = 100 x 1 / 0.70 =142.85 m/ha Say 150 m/ha Earth work/ha = 150x1.085 = 162.75 cum Cost Rs. / ha = 162.75 x 39.16 = 6373.29 Say 6375.00
(132 )
TYPICAL SECTION OF P.B., M.B
Top width = 0.70 m
Side slope = 1.5:1
Height = 1.30 m
Bottom = 4.60 m
Cross section = (0.70+4.60)x1.30/2
= 3.445 m2
Cost/ meter = Rs. 142.oo
TYPICAL SECTION OF EARTHEN CHECK DAM / GULLY PLUG
Top width = 1.50 m
Side slope = 2:1
Height = 2.10m
Bottom Width = 9.90 m
Cross section = (1.50 + 9.90) x 2.10 / 2
= 11.97 m2
Cost per meter = Rs. 551.45
(133 )
TYPICAL SECTION OF CHECK DAM / GULLY PLUG
Top width = 2.00m
Side slope = 2:1
Height = 2.50 m
Bottom Width = 12.00 m
Cross Section = (2.00 + 12.00) x 2.50 / 2
= 17.50 m2
Cost /meter = Rs. 839.12
TYPICAL SECTION OF W.H.B
Top width = 2.50 m
Side slope = 2:1
Height = 2.75 m
Bottom Width = 13.50 m
Cross section = (2.50 + 13.50) x 2.75 / 2
= 22.00 m2
Per meter cost = Rs. 1085.92
(134 )
CHAPTER -11
MAPS
(135 )
MAPS
An attempt has been to map the surface details of the project area, as per the instruction of the
common Guide lines-2008, All the thematic maps of the study area have been prepared through using
remote sensing and geographical information system(G.I.S.) technique, following the fundamental norms
of the National Map Policy-2006. The details of the thematic maps have been given below.
1- Project Map
2- Contour Map
3- LCC Map
4- Land use/ Land cover Map
5- Gram Panchayat Boundary Map
6- Soil Erosion Map
7- Slope Map
8- Crop Demonstration Map
9- Action Plan Maps
10- Action Plan Maps- 2B3A3a3a
These maps were interpreted from the high resolution satellite dada freely available on internet.
(136 )
(137 )
(138 )
(139 )
(140 )
(141 )
(142 )
(143 )
(144 )
(145 )
(146 )
Annexure-1
Cost estimate of watershed work, IWMP-Ist Sant Ravidas Nagar
MWS code - 2B3A3a3a
CONTOUR BUND S. No. ACTIVITY LENGTH (M) KHASRA NO C S E W RATE AMOUNT AREA VILL. NAME
1 CB - 1 574.52 1159 (0.45+1.65)/2*0.60=0.63 361.95 39.20 14188 5.54
Hariyawan 2 CB - 2 440.56 1143 “ “ 277.55 39.20 10880 4.25
3 CB - 3 878.48 1100, P, 1104, 1100, 1098, 1076 “ “ 553.44 39.20 21695 8.47
4 CB - 8 802.68 7, 10, 5, 52, 53, 51, 37, 55 “ “ 505.69 39.20 19823 7.74 Misirpur
5 CB - 10 1085.88 275, 276, 266, 263, 260, 269, 265, 267 “ “ 684.10 39.20 26817 10.48
Chak Harbans Bhatan Kala
6 CB - 13 451.3 792, 797, 802, 809, 803, 794, 792, 795, 796, 798, 284 “ “ 284.32 39.20 11145 4.35
7 CB - 7 405.88 249, 249, 260, 283 “ “ 255.70 39.20 10024 3.92
8 CB - 9 409.32 334, 219, 330, 335, 336 “ “ 257.87 39.20 10109 3.95
9 CB - 10 1085.88 229, 262, 261, 243, 255, P, 246, 229, 243, 244 “ “ 684.10 39.20 26817 10.48
10 CB - 11 367.28 311, 317, 307, 312 “ “ 231.39 39.20 9070 3.54
11 CB - 12 390.28 P, 163, 161 “ “ 245.88 39.20 9638 3.76
12 CB - 14 291.08 P, 227, 210 “ “ 183.38 39.20 7189 2.81
13 CB - 15 292.68 198, P “ “ 184.39 39.20 7228 2.82
14 CB - 16 289.78 201, 206, P “ “ 182.56 39.20 7156 2.80
15 CB - 17 217.72 250, 253, 254, P “ “ 137.16 39.20 5377 2.10
16 CB - 18 246.88 195, 190, P “ “ 155.53 39.20 6097 2.38
17 CB - 19 272.9 P, 195, 196 “ “ 171.93 39.20 6740 2.63
18 CB - 20 307.7 P, 197, 198 “ “ 193.85 39.20 7599 2.97
19 CB - 21 494.44 P, 172, 167, 168, 169 “ “ 311.50 39.20 12211 4.77
20 CB - 1 574.52
“ “ 361.95 39.20 14188 5.54 Rampur Z.Saroi
21 CB - 4 371.72 168 “ “ 234.18 39.20 9180 3.59
22 CB - 5 324.76 169, 168, 152, 155, 154, 156 “ “ 204.60 39.20 8020 3.13
23 CB - 6 782.38 121, 116, 117, 135, 147, 140, 139, 149, 148, 78, 120, 338, 148 “ “ 492.90 39.20 19322 7.55
24 CB - 10 1085.88
“ “ 684.10 39.20 26817 10.48
(147 )
MARGINAL BUND
S. No. ACTIVITY LENGTH (M) KHASRA NO C S E W RATE AMOUNT AREA VILL NAME
1 MB - 11 722.62 86, 85, 87 (0.60+3.60)/2*1.00=2.10 1517.50 39.20 59486 13.52 Ismaila
2 MB - 12 657.42 67, 68, 59, 58, 51, 26, 25, 21, 22, 23, 18, 13, “ “ 1380.58 39.20 54119 12.30 Pachwal
3 MB - 15 1375.22 129, 127, 125, 126, 135 “ “ 2887.96 39.20 113208 25.73
Chak Holman
4 MB - 16 587.6 29, 21, 17, 24, 23 “ “ 1233.96 39.20 48371 10.99
5 MB - 17 461.84 45, 77, 76, 72, 73, 249, “ “ 969.86 39.20 38019 8.64
6 MB - 18 280.1 391, 396, 394, 403 “ “ 588.21 39.20 23058 5.24
7 MB - 19 223.4 386, 391, 390, 381, “ “ 469.14 39.20 18390 4.18
8 MB - 15 1375.22 22, 32, 4, 9, 86, 89, 77, 6, 84, 5, 69, P, 85, 76, 74, 32, 10, 76 “ “ 2887.96 39.20 113208 25.73
Pure Mudiya
9 MB - 20 614.94 105, 90, 64, 65, 79, 103, 66, 92, P, 60, 61, 62, 58, 57, 53 “ “ 1291.37 39.20 50622 11.50
10 MB - 1 562.48 121, 108, 123, 128, 156, 155 “ “ 1181.21 39.20 46303 10.52
Rampur Z.Saroi
11 MB - 2 625.56 168, 172, 186, 188 “ “ 1313.68 39.20 51496 11.70
12 MB - 3 205.48 168, 151, 153 “ “ 431.51 39.20 16915 3.84
13 MB - 4 616.98 168, 93, 106, 108, 107, 141, 137 “ “ 1295.66 39.20 50790 11.54
14 MB - 5 459.2 224, 194, 168, 199, 195, 209, “ “ 964.32 39.20 37801 8.59
15 MB - 6 542.54 243, 342, 340, 244, 241, 248, 168 “ “ 1139.33 39.20 44662 10.15
16 MB - 7 542.36 482, 459, 458, 451, 418 “ “ 1138.96 39.20 44647 10.15
17 MB - 8 634.88 149, 151, 135, 134, 132, 128, 126, 113 “ “ 1333.25 39.20 52263 11.88
Saroi 18 MB - 9 406.02 159, 151, 152, 134, 155 “ “ 852.64 39.20 33424 7.60
19 MB - 10 261.14 248, 246, 266, 249 “ “ 548.39 39.20 21497 4.89
20 MB - 13 792.04 64, 68, 66, 72, 73, 74, 96 “ “ 1663.28 39.20 65201 14.82
Ubhwa Mafi
21 MB - 14 480.48 77/554, 64, 83, 72, 82 “ “ 1009.01 39.20 39553 8.99
(148 )
PERIFERAL BUND
S.No. Activity LENGTH (M) KHASRA NO C S E W RATE AMOUNT AREA Village Name
1 PB - 7 785.1 171, 172 (1.00+4.00)/2*1.00=2.50 1962.75 39.20 76940 17.49
Duladaspur 2 PB - 9 753.88 177, 178, 204, 202, P, 182, 183, 213 “ “ 1884.70 39.20 73880 16.79
3 PB - 11 547.04 225, 234, 221, P, 224, 220, 213, “ “ 1367.60 39.20 53610 12.18
4 PB - 12 384.92 224 “ “ 962.30 39.20 37722 8.57
5 PB - 10 1048.32 84, 22, 118, 83, 71, 70, 69, 75, 66, 60, 65, 59, 58, 50, 47, 49, 1, 83, 82, 80, 48 “ “ 2620.80 39.20 102735 23.35
Ismaila 6 PB - 13 388.84 16, 17, 12, 13, 123, 15, 16, 21, 22, 19, 6 “ “ 972.10 39.20 38106 8.66
7 PB - 14 628.06 6, P, 8, 2 “ “ 1570.15 39.20 61550 13.99
8 PB - 14 628.06 122, 121, 118, 116, 126, 118 “ “ 1570.15 39.20 61550 13.99
9 PB - 25 1322.24 110, 111, 109, 126, 100, 108, 103, 101, 107, 106 “ “ 3305.60 39.20 129580 29.45 Jhingurpur
10 PB - 3 188.4 780, 782, 786 “ “ 471.00 39.20 18463 4.20 Khemaipur
11 PB - 25 1322.24 272 “ “ 3305.60 39.20 129580 29.45
12 PB - 18 319.5 418, 417, 415, 421, 403 “ “ 798.75 39.20 31311 7.12
Pure Mudiya
13 PB - 19 744.06 401, 402, 403, 383, 384, 378, 380 “ “ 1860.15 39.20 72918 16.57
14 PB - 20 198.18 295, 290 “ “ 495.45 39.20 19422 4.41
15 PB - 21 2257.44 297, 295, 252, 60, 287, 258, 286, 288, 255, 256, 254, 252, 55, “ “ 5643.60 39.20 221229 50.28
16 PB - 22 1709.18 23, 14, 111, 55, 110, 5, 4, 3, 16, 15, 2, 31, 34, 22, “ “ 4272.95 39.20 167500 38.07
17 PB - 15 664.9 4 “ “ 1662.25 39.20 65160 14.81
18 PB - 17 966.18 39, 36, 34 P, 4, 27, 41, 47 “ “ 2415.45 39.20 94686 21.52
19 PB - 23 361.1 71, 73, 69, 70 “ “ 902.75 39.20 35388 8.04
20 PB - 1 701.26 102, 94 “ “ 1753.15 39.20 68723 15.62
Rampur Z.Saroi
21 PB - 2 321.26 108, 112, 104, 105, 94 “ “ 803.15 39.20 31483 7.16
22 PB - 3 1241.16 155, 156, 160, 178, 177, 175, 181, 160, 209 “ “ 3102.90 39.20 121634 27.64
23 PB - 5 426.84 221, 218, 202, 204, 224 “ “ 1067.10 39.20 41830 9.51
24 PB - 15 664.9 67, 66, 57, 59, 56 “ “ 1662.25 39.20 65160 14.81
25 PB - 22 1709.18 209, 418 “ “ 4272.95 39.20 167500 38.07
26 PB - 6 492.46 113, 65, 57, 58, 56, 60, 55, 53, 52, 54 “ “ 1231.15 39.20 48261 10.97
Saroi 27 PB - 7 785.1 246, 249, 260, 265, 264, 262, P, 263, 259 “ “ 1962.75 39.20 76940 17.49
28 PB - 8 640.78 241, 209, 246, 244, 247, 242, 244, 243, 278, 248 “ “ 1601.95 39.20 62796 14.27
29 PB - 16 1191.06 44 “ “ 2977.65 39.20 116724 26.53
Ubhwa Mafi 30 PB - 17 664.9 83, 64, 84, 90, 91, 93, 87 “ “ 1662.25 39.20 65160 14.81
31 PB - 16 1191.06 44, 51, 49, 41, 50, 53, 57, 59, 58, “ “ 2977.65 39.20 116724 26.53
(149 )
GULLY PLUG
S. No. Activity LENGTH (M) KHASRA NO C S E W RATE AMOUNT AREA Village Name
GP GP - 1 155.4 13 (2.50+10.00)/2*2.50=15.63 2428.90 120.00 291468 24.29 Ismaila
GP GP - A 155.4 418, 421 (2.50+10.00)/2*2.50=15.63 2428.90 120.00 291468 24.29 Chak Holman
Earth Work
4387564 830.90
Brick Work
1196084
Total
5583648
Gram panchayat wise break up of Watershed Development
Activities in the Micro Watershed to be included in Detail Project Report (DPR)
MWS code - 2B3A3a3a
CONTOUR BUND
S. No. ACTIVITY LENGTH (M) KHASRA NO C S E W RATE AMOUNT AREA Gram Panchayat
1 CB - 1 574.52 1159 (0.45+1.65)/2*0.60=0.63 361.95 39.20 14188 5.54
Hariyawan 2 CB - 2 440.56 1143 “ “ 277.55 39.20 10880 4.25
3 CB - 3 878.48 1100, P, 1104, 1100, 1098, 1076 “ “ 553.44 39.20 21695 8.47
4 CB - 8 802.68 7, 10, 5, 52, 53, 51, 37, 55 “ “ 505.69 39.20 19823 7.74 Ismaila
5 CB - 10 1085.88 275, 276, 266, 263, 260, 269, 265, 267 “ “ 684.10 39.20 26817 10.48 Jhingurpur
6 CB - 13 451.3 792, 797, 802, 809, 803, 794, 792, 795, 796, 798, 284 “ “ 284.32 39.20 11145 4.35 Khemaipur
7 CB - 7 405.88 249, 249, 260, 283 “ “ 255.70 39.20 10024 3.92
Pure Mudiya
8 CB - 9 409.32 334, 219, 330, 335, 336 “ “ 257.87 39.20 10109 3.95
9 CB - 10 1085.88 229, 262, 261, 243, 255, P, 246, 229, 243, 244 “ “ 684.10 39.20 26817 10.48
10 CB - 11 367.28 311, 317, 307, 312 “ “ 231.39 39.20 9070 3.54
11 CB - 12 390.28 P, 163, 161 “ “ 245.88 39.20 9638 3.76
12 CB - 14 291.08 P, 227, 210 “ “ 183.38 39.20 7189 2.81
13 CB - 15 292.68 198, P “ “ 184.39 39.20 7228 2.82
14 CB - 16 289.78 201, 206, P “ “ 182.56 39.20 7156 2.80
15 CB - 17 217.72 250, 253, 254, P “ “ 137.16 39.20 5377 2.10
16 CB - 18 246.88 195, 190, P “ “ 155.53 39.20 6097 2.38
(150 )
17 CB - 19 272.9 P, 195, 196 “ “ 171.93 39.20 6740 2.63
18 CB - 20 307.7 P, 197, 198 “ “ 193.85 39.20 7599 2.97
19 CB - 21 494.44 P, 172, 167, 168, 169 “ “ 311.50 39.20 12211 4.77
20 CB - 1 574.52
“ “ 361.95 39.20 14188 5.54 Rampur Z.Saroi
21 CB - 4 371.72 168 “ “ 234.18 39.20 9180 3.59
22 CB - 5 324.76 169, 168, 152, 155, 154, 156 “ “ 204.60 39.20 8020 3.13 Saroi
23 CB - 6 782.38 121, 116, 117, 135, 147, 140, 139, 149, 148, 78, 120, 338, 148 “ “ 492.90 39.20 19322 7.55
24 CB - 10 1085.88
“ “ 684.10 39.20 26817 10.48 Ubhwa Mafi
MARGINAL BUND
S. No. ACTIVITY LENGTH (M) KHASRA NO C S E W RATE AMOUNT AREA Gram Panchayat
1 MB - 11 722.62 86, 85, 87 (0.60+3.60)/2*1.00=2.10 1517.50 39.20 59486 13.52 Ismaila
2 MB - 12 657.42 67, 68, 59, 58, 51, 26, 25, 21, 22, 23, 18, 13, “ “ 1380.58 39.20 54119 12.30
3 MB - 15 1375.22 129, 127, 125, 126, 135 “ “ 2887.96 39.20 113208 25.73
Pure Mudiya
4 MB - 16 587.6 29, 21, 17, 24, 23 “ “ 1233.96 39.20 48371 10.99
5 MB - 17 461.84 45, 77, 76, 72, 73, 249, “ “ 969.86 39.20 38019 8.64
6 MB - 18 280.1 391, 396, 394, 403 “ “ 588.21 39.20 23058 5.24
7 MB - 19 223.4 386, 391, 390, 381, “ “ 469.14 39.20 18390 4.18
8 MB - 15 1375.22 22, 32, 4, 9, 86, 89, 77, 6, 84, 5, 69, P, 85, 76, 74, 32, 10, 76 “ “ 2887.96 39.20 113208 25.73
9 MB - 20 614.94 105, 90, 64, 65, 79, 103, 66, 92, P, 60, 61, 62, 58, 57, 53 “ “ 1291.37 39.20 50622 11.50
10 MB - 1 562.48 121, 108, 123, 128, 156, 155 “ “ 1181.21 39.20 46303 10.52
Rampur Z.Saroi
11 MB - 2 625.56 168, 172, 186, 188 “ “ 1313.68 39.20 51496 11.70
12 MB - 3 205.48 168, 151, 153 “ “ 431.51 39.20 16915 3.84
13 MB - 4 616.98 168, 93, 106, 108, 107, 141, 137 “ “ 1295.66 39.20 50790 11.54
14 MB - 5 459.2 224, 194, 168, 199, 195, 209, “ “ 964.32 39.20 37801 8.59
15 MB - 6 542.54 243, 342, 340, 244, 241, 248, 168 “ “ 1139.33 39.20 44662 10.15
16 MB - 7 542.36 482, 459, 458, 451, 418 “ “ 1138.96 39.20 44647 10.15
17 MB - 8 634.88 149, 151, 135, 134, 132, 128, 126, 113 “ “ 1333.25 39.20 52263 11.88
Saroi 18 MB - 9 406.02 159, 151, 152, 134, 155 “ “ 852.64 39.20 33424 7.60
19 MB - 10 261.14 248, 246, 266, 249 “ “ 548.39 39.20 21497 4.89
20 MB - 13 792.04 64, 68, 66, 72, 73, 74, 96 “ “ 1663.28 39.20 65201 14.82 Ubhwa Mafi
21 MB - 14 480.48 77/554, 64, 83, 72, 82 “ “ 1009.01 39.20 39553 8.99
(151 )
PERIFERAL BUND
S. No.
Activity LENGTH (M) KHASRA NO C S E W RATE AMOUNT AREA Gram
Panchayat
1 PB - 7 785.1 171, 172 (1.00+4.00)/2*
1.00=2.50 1962.75 39.20 76940 17.49
Duladaspur 2 PB - 9 753.88 177, 178, 204, 202, P, 182, 183, 213 “ “ 1884.70 39.20 73880 16.79
3 PB - 11 547.04 225, 234, 221, P, 224, 220, 213, “ “ 1367.60 39.20 53610 12.18
4 PB - 12 384.92 224 “ “ 962.30 39.20 37722 8.57
5 PB - 10 1048.32 84, 22, 118, 83, 71, 70, 69, 75, 66, 60, 65, 59, 58, 50, 47, 49, 1, 83, 82, 80,
79, 48 “ “
2620.80 39.20 102735 23.35
Ismaila 6 PB - 13 388.84 16, 17, 12, 13, 123, 15, 16, 21, 22, 19, 6 “ “ 972.10 39.20 38106 8.66
7 PB - 14 628.06 6, P, 8, 2 “ “ 1570.15 39.20 61550 13.99
8 PB - 14 628.06 122, 121, 118, 116, 126, 118 “ “ 1570.15 39.20 61550 13.99
9 PB - 25 1322.24 110, 111, 109, 126, 100, 108, 103, 101, 107, 106 “ “ 3305.60 39.20 129580 29.45 Jhingurpur
10 PB - 3 188.4 780, 782, 786 “ “ 471.00 39.20 18463 4.20 Khemaipur
11 PB - 25 1322.24 272 “ “ 3305.60 39.20 129580 29.45
12 PB - 18 319.5 418, 417, 415, 421, 403 “ “ 798.75 39.20 31311 7.12
Pure Mudiya
13 PB - 19 744.06 401, 402, 403, 383, 384, 378, 380 “ “ 1860.15 39.20 72918 16.57
14 PB - 20 198.18 295, 290 “ “ 495.45 39.20 19422 4.41
15 PB - 21 2257.44 297, 295, 252, 60, 287, 258, 286, 288, 255, 256, 254, 252, 55, 67, 66, 57,
59, 56 “ “
5643.60 39.20 221229 50.28
16 PB - 22 1709.18 23, 14, 111, 55, 110, 5, 4, 3, 16, 15, 2, 31, 34, 22, “ “ 4272.95 39.20 167500 38.07
17 PB - 15 664.9 4 “ “ 1662.25 39.20 65160 14.81
18 PB - 17 966.18 39, 36, 34 P, 4, 27, 41, 47 “ “ 2415.45 39.20 94686 21.52
19 PB - 23 361.1 71, 73, 69, 70 “ “ 902.75 39.20 35388 8.04
20 PB - 1 701.26 102, 94 “ “ 1753.15 39.20 68723 15.62
Rampur Z.Saroi
21 PB - 2 321.26 108, 112, 104, 105, 94 “ “ 803.15 39.20 31483 7.16
22 PB - 3 1241.16 155, 156, 160, 178, 177, 175, 181, 160, 209 “ “ 3102.90 39.20 121634 27.64
23 PB - 5 426.84 221, 218, 202, 204, 224 “ “ 1067.10 39.20 41830 9.51
24 PB - 15 664.9
“ “ 1662.25 39.20 65160 14.81
25 PB - 22 1709.18 209, 418 “ “ 4272.95 39.20 167500 38.07
26 PB - 6 492.46 113, 65, 57, 58, 56, 60, 55, 53, 52, 54 “ “ 1231.15 39.20 48261 10.97
Saroi 27 PB - 7 785.1 246, 249, 260, 265, 264, 262, P, 263, 259 “ “ 1962.75 39.20 76940 17.49
28 PB - 8 640.78 241, 209, 246, 244, 247, 242, 244, 243, 278, 248 “ “ 1601.95 39.20 62796 14.27
(152 )
29 PB - 16 1191.06 44 “ “ 2977.65 39.20 116724 26.53
Ubhwa Mafi 30 PB - 17 664.9 83, 64, 84, 90, 91, 93, 87 “ “ 1662.25 39.20 65160 14.81
31 PB - 16 1191.06 44, 51, 49, 41, 50, 53, 57, 59, 58, “ “ 2977.65 39.20 116724 26.53
GULLY PLUG
S. No. Activity LENGTH (M) KHASRA NO C S E W RATE AMOUNT AREA Gram Panchayat
GP GP - 1 155.4 13 (2.50+10.00)/2*2.50=15.63
2428.90 120.00 291468 24.29 Ismaila
GP GP - A 155.4 418, 421 (2.50+10.00)/2*2.50=15.63
2428.90 120.00 291468 24.29 Pure Mudiya
Earth Work
4387564 830.90
Brick Work
1196084
Total
5583648
153
CHAPTER -12
ABBRIVIATIONS/
REFERENCES
154
LIST OF ABBRIVIATIONS/REFERENCES
DOLR Department of Land Resources
IWMP Integrated Watershed Management Programme
SLNA State Level Nodal Agency
CGL Common Guidelines
PIA Project Implementing Agency
BSA Bhoomi Sangrakshan Adhikari
WDT Watershed Development Team
WC Watershed Committee
UC User Group
SHG Self Help Group
CB Contour Bund
MB Marginal Bund
PFB Peripheral Bund
REFERENCES
Common Guideline of watershed development-2008.
Jila Sankhikiya Patrika
Census 2001
www.raebareli.nic.in
155
Preparation of DPR
Detail Project Report of Integrated Watershed Management Programme IWMP-I had been prepared through base line/
bench Mark survey for physiography climate, soil, land use, vegetation, and hydrology and socio economic data analysis. PRA
have been exercised to collect primary data, secondary data have been collected from Revenue, Statistics department, Statistical
Magazine of the district Snat Ravidas Nagar, Topo sheet (1 : 50000) survey of India- Deheradoon and technical & specific input
for preparation and drafting of detail project report.
S. NO. Name Designation
1 2 3
1 Sri Satish Chandra Srivastava Bhoomi Sanrakshan Adhikari
2 Sri Jagdish Prasad Junior Engineer
3 Sri Santosh Kumar Srivastava Accountant
4 Sri Rajeev Lochan Accountant
5 Sri Lalta Prasad Draftsman
6 Sri Suresh Kumar Tracer
7 Sri Mohan Lal Gupta A.S.C.I.
8 Sri Harish Prasad Srivastava A.S.C.I.
9 Sri A. K. Srivastava M.D. Kalyani Geospatial, Lucknow
10 Dr. A. K. Kulshestra Consultant
11 Sri Dipendra Kumar Sharma Statistical Analyst
12 Ku. Sulochna Pareekh GIS Analyst
13 Ku. Sunita GIS Analyst
14 Sri Uday Bhan Singh Planning Expert
15 Sri Rahul Sharma Cad expert
16
Ku Manju Lata Land use Expert
17 Ku Sunita Kothari Hydrologist