+ All Categories
Home > Documents > (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data...

(1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data...

Date post: 07-Apr-2018
Category:
Upload: phamkhanh
View: 223 times
Download: 3 times
Share this document with a friend
156
(1 )
Transcript
Page 1: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(1 )

Page 2: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(2 )

CERTIFICATE

It is certified that the proposed IWMP-I project comprising five micro-watersheds of

district Sant Ravidas Naga, Uttar Pradesh has been selected for its sustainable development on

watershed basis under Integrated Watershed Management Programme. The land is physically

available for proposed interventions and is not overlapping with any other schemes. It will be

developed as per Common Guidelines for Watershed Development Project-2008, GOI, New Delhi.

The significant results will be achieved through proposed interventions on soil and water

conservation, ground water recharge, availability of drinking and irrigation water, agricultural

production systems, livestock, fodder availability, livelihoods of asset-less, capacity building, etc.

The proposed Detailed Project Report of IWMP-I for financial year 2009-10 is approved for its

implementation.

Bhoomi Sanrakshan Adhikari Department of Land Development & Water Resources,

Sant Ravidas Naga, Uttar Pradesh

Page 3: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(3 )

TABLE OF CONTENTS

CHAPTER No. DESCRIPTIONS PAGE NO.

EXECUTIVE SUMMARY 04

1. INTRODUCTION AND BACKGROUND 09

2. GENERAL DESCRIPTION OF PROJECT AREA 17

3. BASELINE SURVEY 30

4. INSTITUTIONAL BUILDING AND PROJECT MANAGEMENT 52

5. MANAGEMENT / ACTION PLAN 74

6. LIVELIHOOD ACTIVITIES 79

7. CAPACITY BUILDING PLAN 108

8. PHASING OF PROGRAMME AND BUDGETING 112

9. CONSOLIDATION / WITHDRAWAL STRATEGY 121

10. EXPECTED OUTCOME 124

11. COST NORMS & DESIGN OF STRUCTURE PROPOSED 128

12 MAPS 134

12. Annexure-1 & 2 146

13. ABBRIVIATIONS/REFERENCES 153

Page 4: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(4 )

EXECUTIVE SUMMARY

The Indo-gangetic plains of U.P. have undergone stress for natural resources, which are witnessing

degradation at an alarming rate. The watershed approach has conventionally aimed at treating degraded

lands with low cost and locally accessed technologies such as in-situ soil and moisture conservation

measures, afforestation etc. and through a participatory approach that seeks to secure close involvement

of the user communities.

All the micro watersheds of IWMP-I (2009-10) are located in Bhadhohi Block (except some part

mainly of 2B3A3a3c and 2B3A3a2c of MWS, which falls under Aurai Block) of SANT RAVIDAS NAGAR

District of Uttar Pradesh. The extent of the Project area is 25o17’59.651”N to 25o23’52.977”N Latitude and

82o31’40.821” E to 82o31’40.821”E Longitude. The project consist of six (6) micro watershed clusters. The

total geographical area of the project is 7059 ha, Out of which 5082 ha has been proposed for the

treatment. The total outlay of the project is R. 609.84 lakh under Integrated Watershed Management

Programme. The project implementation agency (PIA) is Bhoomi Sanrakshan Adhikari, Deptt. of Land

Development and Water Resources, Sant Ravidas Naga, U.P.

The project area falls in agro – climatic zone of Eastern Plain (ACZ-VIII). The elevation of the project

area is 75 msl to 89 msl. The Soil texture of the project is fine silty calcareous to fine Loamy.

Page 5: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(5 )

Major Rabi crops of the watershed area are Wheat, Pea, Gram, Mustered, etc. and in Khrif season

Paddy, Maize, Urd, and Moong.

The productivity of these crops is lower than the national standard. The pre – dominant tree species

are mainly Neem, Sheesham, Mango and guava.

A detailed baseline survey was undertaken which involved household census survey, Bio-physical

survey and Village level data collection from Talati – cum mantri. Household census survey includes a

detailed questionnaire which has been filled by visiting each and every household in the village. This gave

in the details of the demographic profile of the village, the literacy percentage, SC/ST population, number

of BPL household, cattle population and net consumption rate in the village, average milk production of

the cattle and various schemes running and their benefits.

The Institutional arrangement, Watershed Committtee (WC), Self Help Group, User Group, was

constituted for active participation and co operation for community development.

The Action plans like livelihood, Production system and Treatment area development plan were

prepared according to need of the project area.

--------------------------------------------------------------------------------------------------------------

Page 6: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(6 )

Table-0.1: Project at a Glance IWMP-Ist (Sant Ravidas Nagar (Bhadohi)

Sr.

No.

Particulars IWMP - I Total

1 Name of the State Uttar Pradesh

2 Name of the project I.W.M.P. -I St. Ravidas Nagar

3 Name of the District St. Ravidas Nagar

4 Names of the Blocks Bhadohi, & Aurai

5 Names of Gram Panchayats Total number of Gram panchayat in

the project area are -

48

6 Names & Census Code of Villages covered Total number of revenue Villages in

the project area are -

87

7 Four major reasons for selection of watershed 1. Population are poor 80% to 50%

2. Rain fed area more than 90%

3.% of small and Marginal

farmer>80%

4. Land with moderate production

8 Name, Address & Phone No. of the PIA(s) Satish Chandra Srivastava

Bhoomi Sanrakshan Adikhari,

DPAP- I, Uttar Mohal, Near Chandi

Hotel, Rabatsganj, Sonabhadra

Ph. : 0544-223389

9 Rain fed Area 4600.ha

10 Area of the Project (ha.) 7059ha

11 Area proposed to be treated (ha.) 5082 ha

12 Financial Year of sanction 2009-2010

13 Project duration from ----- to … 2009-2010 to 2013-2014

14 Project Cost (Rs. in Lakhs) 609.84

15 Date of Sanction of state authority

Page 7: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(7 )

Table-0.2: IWMP - I (2009-2010) DISTRICT SANT RAVIDASNAGAR

YEAR WISE PHASING OF IWMP WORKS (COMPONENTS - WISE)

District : Sant Ravidasnagar Starting Year : 2009-2010 Area : ha, Amount : In Lacs

S. No. Particulars

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy.

1 Administrative Cost -

10% 3.05 - 9.15 - 16.47 - 16.47 - 15.86 - 60.98 -

2 Monitoring - 1% - - 1.22 - 1.22 - 1.22 - 2.44 - 6.10 -

3 Evaluation - 1% - - 1.83 - 1.07 - 1.07 - 2.13 - 6.10 -

4 Entry Point Activity - 4% 24.39 - - - - - - - 24.39 -

5 Institution & Capacity

Building - 5% 3.05 - 15.25 - 4.57 - 4.57 - 3.05 - 30.49 -

6 DPR - 1% 6.10 - - - - - - - - - 6.10 -

7 Watershed Development

work - 56% - - 45.74 680.48 99.71 1483.94 97.57 1451.93 98.49 1465.65 341.51 5082

8 Livelihood Activity - 9% - - 6.10 - 15.25 - 15.25 - 18.30 - 54.89 -

9 Production System &

Micro Enterprise - 10% - - 6.10 - 15.25 - 15.25 - 24.39 - 60.98 -

10 Consolidation - 3% - - - - - - - - 18.30 - 18.30 -

Total 36.59 85.38 680.48 153.53 1483.94 151.39 1451.93 182.95 1465.65 609.84 5082

Page 8: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(8 )

Table-0.3: Budget for Various Components (I.W.M.P. - I, Sant Ravidas Nagar)

Page 9: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(9 )

CHAPTER – 1

INTRODUCTION AND BACKGROUND

Page 10: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(10 )

The project area is very well known for its Carpet viewing speciality all over the world. The

watershed is a cluster of six (6) micro watersheds. There are 48 Gram Panchayat and 87 Revenue villages

in the project area.

The watershed is proposed to be taken by Bhoomi Sanrakshan Adhikari, Department of Land

Development & Water Resources, Sant Ravidas Nagar for IWMP programme, starting from 2009-10. It is

proposed to be completed by 2013-14.

The Status of Integrated Watershed Management Programme as approved by Steering Committee,

Govt. of India for Sant Ravidas Nagar district, Uttar Pradesh is given in Table Nos. 1.1, 1.2 and 1.3.

Table 1.1: Status of watershed programme District- Sant Ravidas

Nagar

Details No. Area (Lac ha.)

1 2 3

Total Micro watersheds in the district 92 101500

Workable Micro Watersheds 71 78138

Micro Watersheds already treated by DLWR & other agencies 9 9500

Balance Micro Watersheds (MWS) for treatment (Before start of IWMP in distt.)

62 68638

Page 11: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(11 )

Table 1.2: Approved plan (PPRs) by Steering Committee (SC)/Gov. of India,

Year Project/Phase

IWMP……..

MWS Area

(ha)

Project

Cost

Rs. lakh

Name of

PIA

S.C.

Meeting

Date

1 2 4 5 6 7 8

2009-10 IWMP I 6 5082 609.84 BSA, DPAP, Sant Ravidas Nagar

16-03-2010

Table 1.3: Details of IWMP for which this DPR is Prepared

Watershed project

IWMP -I of SANT RAVIDAS

NAGAR… (Bhadohi)…….

Micro Watersheds (MWS) detail Micro

watersheds

code

Treatable

Area (ha.)

Name of Watershed in

which MWS is falling (River / Nala name)

IWMP -I of

SANT RAVIDAS

NAGAR

(Bhadohi), 2009-10

Dhaskari/2B3A3a2b 2B3A3a2b 629.21

Morwa river watershed Dattipur/2B3A3a2c 2B3A3a2c 794.64

Kanehri/2B3A3a2a 2B3A3a2a 1009.39

ChakharibanshBhatankala/2B3A3a3a 2B3A3a3a 830.90

Musilatpur/2B3A3a3b 2B3A3a3b 528.73

Jangala/2B3A3a3c 2B3A3a3c 1289.13

Total 5082.00

Page 12: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(12 )

Table 1.4: Weightage of the project

Project name Project Type Weightage

IWMP Sant Ravidas

Nagar Ist

IWMP-I i ii iii iv v vi vii viii ix x xi xii xiii xiv

7.5 10 5 10 0 0 10 7.5 10 15 10 15 0 100

Page 13: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(13 )

Table 1.5: Criteria and Weightage for selection of watershed

Criteria Maximum Score Ranges & Scores

Poverty index (% of poor to population)

10

Above 80 % (10)

80 to 50 % (7.5)

50 to 20 % (5)

Below 20 % (2.5)

% of SC/ ST population 10 More than 40 % (10) 20 to 40 % (5) Less than 20 % (3)

Actual wages

5

Actual wages are significantly lower than minimum wages

(5)

Actual wages are equal to or higher than minimum

wages (0)

% of small and marginal farmers

10 More than 80 % (10) 50 to 80 % (5) Less than 50 % (3)

Ground water status 5 Over exploited (5) Critical (3) Sub critical (2) Safe (0)

Moisture index/ DPAP/ DDP Block

15

-66.7 & below (15) DDP Block

-33.3 to -66.6 (10) DPAP Block

0 to -33.2 (0) Non DPAP/ DDP Block

Area under rain-fed agriculture

15 More than 90 % (15)

80 to 90 % (10) 70 to 80% (5) Above 70 % (Reject)

Drinking water 10 No source (10) Problematic village (7.5) Partially covered (5) Fully covered (0)

Degraded land 15 High – above 20 % (15) Medium – 10 to 20 % (10) Low- less than 10 % of TGA (5)

Productivity potential of the land

15 Lands with low production & where productivity can be

significantly enhanced with reasonable efforts (15)

Lands with moderate production & where productivity can be

enhanced with reasonable efforts (10)

Lands with high production & where productivity can be marginally enhanced with

reasonable efforts (5)

Contiguity to another watershed that has

already been developed/ treated

10

Contiguous to previously treated watershed & contiguity within the

micro watersheds in the project (10)

Contiguity within the micro watersheds in the

project but non contiguous to previously

treated watershed (5)

Neither contiguous to previously treated watershed

nor contiguity within the micro watersheds in the

project (0)

Cluster approach in the plains (more than one

contiguous micro-watersheds in the project)

15 Above 6 micro-watersheds in cluster (15)

4 to 6 micro watersheds in cluster (10)

2 to 4 micro watersheds in cluster (5)

Cluster approach in the hills (more than one contiguous micro-

watersheds in the project)

15 Above 5 micro-watersheds in cluster (15)

3 to 5 micro watersheds in cluster (10)

2 to 3 micro watersheds in cluster (5)

150 150 90 41 2.5

Page 14: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(14 )

Table 1.6: Strength, weakness, opportunity and threat (SWOT) analysis is a

useful decision support tool, A SWOT analysis of the watershed is presented in Table below. SWOT analysis of the watershed

Strengths (S)

i. Cooperative work culture in traditional

activities

ii. Close ethic ties

iii. Road at the top as well as outlet of

the watershed

iv. Hard working

v. Resource pool of crop genetics

diversity

vi. Awareness of farmers about watershed

management programme

vii. Well established CPR maintaining and

sharing system

viii. Good productivity of soil

ix. Social outlook of the community

towards land less.

Weakness (W)

i. Poor water management

ii. Resource poor farmers

iii. Out migration of youth

iv. Low and erratic rainfall

v. Fragile geography

vi. Fragmented land holding

vii. Heavy infestation of wild animals

viii. Problem of fuel and fodder

Opportunities (O)

i. Wide range of annual and perennial

crops

ii. Scope of regular employment

opportunities to check out migration

iii. Strengthening of existing irrigation

system

iv. Conducive climate for rainfed crop

diversification

v. Good scope for Agro forestry and dry

land horticulture

vi. Potential for collective action and

management of CPR

Threats (T)

i. Prone to adverse climate like Flood

ii. High market risk

iii. Social conflicts owing to PRI and

WSM polices and local politics

iv. Weak coordination among line

departments

v. Lack of expertise of implementing

agency in different aspects of WSM

Page 15: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(15 )

Table 1.7: WATERSHED INFORMATION

Name Of the Project No. of water

sheds to be

treated

Watershed Code Watershed

regime/type/order

IWMP-I, St. Ravidas Nagar

6

2B3A3a2b

2B3A3a2c 2B3A3a2a

2B3A3a3a 2B3A3a3b

2B3A3a3c

Micro Watershed

The watershed falls under the semi arid region of Tropical climate. The average annual rain fall is

864.60 mm. Most of the rainfall (about 90 %) is received during July to September. The intensity of

Rainfall is moderate to high. The Temperature ranges from as high as 44.6°c in the month of May –

June to as low as 3.3°c in December - January.

Page 16: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(16 )

Table 1.8: STATUS OF PREVIOUS WATERSHED PROGRAMMES AND OTHER

DEVELOPMENTAL PROJECTS /SCHEMES RUNNING IN THE VILLAGES:

These villages of the project area being very backward therefore have been on top priority for a

number of developmental projects. These programmes are Swarnajayanti Gram Swarojgar Yojana

(SGSY) and Indira Awas Yojana (IAY). Integrated Watershed Management Programme in other

areas of the district is under operation in the department of Agriculture. DPAP Programme is also

running in the project area.

The basic information regarding project area are given as under-

Table 1.9: Details of ongoing Development Programme

Sr.

No.

Name of Programme Impleme-

nting agency

Objectives of the

programme

Year of

Commencement

Villages

covered

Project

Cost

1 Swarnajayanti Gram

Swarojgar Yojana (SGSY)

DRDA Formulation of groups

for weaker section of

the BC/SC

On going All the villages

of the project

area

-

2 Indira Awas Yojana (IAY) DRDA Provide low cast

houses to the weaker

section SC/ST

On going All the villages

of the project

area

-

3 Drought Prone Area

Programme (DPAP)

B.S.A DOLR To improvement of

environmental

condition of the

watershed

1995 on words - -

Page 17: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(17 )

CHAPTER – 2

General Description of the Project Area

Page 18: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(18 )

2.1: Location:- The micro-watershed of IWMP-I, Sant Ravidasnagar, is located in Bhadohi and Aurai blocks of Sant

Ravidas Nagar district. It is about 16 km. from district Headquarter on the Jaunpur -Mirzapur road. The

details of the location are given below:

Table 2.1: Micro-watershed wise details of location, Gram Panchayat, Villages and

Geographical area

Project- IWMP- I District- SANT RAVIDAS NAGAR (Bhadohi)

S.No. MWS code with name

Longitude Latitude Name of Block

Name of Gram Panchayat

Name of Village AREA(ha.) Details of important /approach road with

distance km

1 Kanehri/ 2B3A3a2a 82°34'13E to

82°36'20E

25°21'19N to

25°23'47N

Bhadohi Hirday Patti Hirday Patti 7.555

Ahara 2.471

Bhagtanpur Z.Sarohi 34.329

Dhaskari 95.731

Bhagwati Daspur Bhagwati Daspur 75.332

Chak Fakir 2.709

Kom Kom 5.458

Bhalla Bhalla 80.626

Bhagwanpur/Kanehri 74.901

Badhuna Chak Bhawnigir 0.146

Palahiya Chak Bisram 13.360

Basantpur 38.105

Daribpur Daribpur 141.931

Dubha 45.544

Chak Sanath Chak Sanath 148.445

Dattipur Dattipur 2.857

Awashanpur Giriya 74.226

Sharbat Khani Gondapar 40.876

Page 19: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(19 )

2 Dhaskari/ 2B3A3a2b

82°34'13E to

82°36'20E

25°21'19N t0

25°23'47N

Bhadohi Hirday Patti Hirday Patti 15.965

Ahara 31.267

Dhaskari 52.521

Gopal Patti 4.54

Chaubepur Chaubepur 51.092

Harirampur 27.242

Prajapatipur 22.504

Ahamadpur Phulwaria Jallapur 32.311

Pureshyam 16.263

Mahboobpur Jamunipur Badfarosh 11.371

Raghopur Raghopur 128.03

Kansraipur 103.928

Dulandaspur Manikpur 12.795

Ramraipur Ramraipur 111.007

Saroi Saroi 45.792

Rajpura Rajpura 0.684

3 Dattipur/ 2B3A3a2c 82°34'20E to

82°36'17E

25°18'17N to

25°21'40N

Bhadohi Bharatpur Bharatpur 11.246

Bishapur Bishapur 168.702

Hirday Patti Bisunpur 30.353

Badhauna Bhawanigir 31.215

Badhauna 135.73

Bhagwatidaspur Chak Fakir 2.442

Bhagwatidaspur 6.91

Bhalla Dattipur 183.796

Bhalla 7.872

Dulamdaspur Dulamdaspur 23.604

Manikpur 34.255

Hirday Patti Hirday Patti 116.799

Ahara 3.173

Bhagwanpur Z Saroi 2.701

Ismaila Ismaila 0.346

Khetalpur Khetalpur 40.493

Pure Uchit Pure Uchit 0.645

Rampur Lohara Rampur Lohara 3.499

Uchetha Sabalpur 29.815

Saroi Saroi 2.159

Tarapur Baswapatti 26.38

Bhagwanpur Bhagwanpur 32.597

Aurai Bejavan Bejavan 134.451

Page 20: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(20 )

4 Chakharibansh Bhatanka l /2B3A3a3a

82°32'4E to

82°34'23E

25°20'24N to 25°23'6N

Bhadohi Badi Badi 0.27

Chaubepur Bankat Z Saroi 31.324

Prajapatipur 47.82

Udhawa Mafi Bampurwa 0.284

Udhawa Mafi 80.915

Jhingurpur Chak Haribans Bhatan Kala 63.295

Puremudhia Chak Holman 67.376

Puremudhia 72.274

Dulamdaspur Dulamdaspur 40.378

Chaubepur Harirampur 28.885

Hariyawana Hariyawana 32.364

Sultanpur 0.187

Ismaila Ismaila 8.576

Mishirpur 39.053

Pachwal 41.051

Rampur Jai Rampur Khas 42.11

Jai Rampur Sir 15.92

Raghopur Kansraipur 11.527

Rajpura Rajpura 21.067

Rampur Z Saroi Rampur Z Saroi 83.305

Saroi Saroi 97.759

Khemaipur Khemaipur 28.402

5 Musilatpur/2B3A3a3b 82°31'57E to

82°34'18E

25°20'30N to

25°23'52N

Bhadohi Udhawa Mafi Udhawa Mafi 23.014

Banpurwa 76.789

Chak Purahi 19.113

Jhingurpur Chak Haribans Bhatan Kala 8.77

Chak Dharni 10.362

Hariyawan Hariyawan 278.672

Kushahara 13.763

Sultanpur 85.733

Khemaipur Khemaipur 42.347

Rajpura Rajpura 9.772

Rampur Z Saroi Rampur Z Saroi 12.47

Gangapur Saraiya 34.387

Page 21: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(21 )

6 Jangala /2B3A3a3c 82°31'39E to

82°34'56E

25°18'3N to 25°20'58N

Bhadohi Badi Badi 163.041

Mullupur Chak Haibans Passian Kala 25.435

Mullupur 127.483

Dulamdaspur Dulamdaspur 0.027

Ismaila Ismaila 87.808

Mishrpur 18.989

Pachwal 16.611

Jangla Jangla 203.623

Katehara 54.362

Rajaipur Z Sayar 7.215

Khetalpur Khetalpur 65.922

Khemaipur Khemaipur 23.225

Lila Dharpur Lila Dharpur 163.722

Marchwar Marchwar 82.877

Poore Uchit Poore Uchit 5.179

Rauri Rauri 12.292

Uchetha Sabalpur 23.334

Aurai Ugapur Ugapur 3.285

Jagadhari Daraundha 59.63

Bejavan Bejavan 146.632

Sarouli Jaddupur N Sayar 34.382

Page 22: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(22 )

WS location maps: - Map showing- U.P. in India, District in U.P., Watershed

in District and Block

Page 23: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(23 )

2.2: Area and Land use

Exiting land use/land cover information is prerequisite of any future planning activities. Therefore at

attempt has been made to prepare detail land use map using large scale satellite data. The details of

exiting land use categories are given below:

Table 2.2: Area under major land uses

Project- IWMP- I District- Sant Ravidas Nagar S. No.

Name of micro

watershed with Code

Name of village Cultivated rainfed

area

Cultivated

irrigated area

Uncultivated wasteland/ fallow

Pvt. Agri. Land Forest Land

Community land

Others Total area (ha)

Temp. Perma-nent

Gen SC ST OBC Total (Habitat Road etc.)

(Geogra-phical)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 Dhaskari/ 2B3A3a2b

Hirday Patti 91.77 19.5 2.34 3.41 42.91 24.52 0.00 55.17 122.61 0.00 0.81 23.06 145.67

Chaubepur 89.21 16.96 6.51 2.97 41.72 23.84 0.00 53.64 119.19 0.00 0.79 22.41 141.60

Ahamadpur Phulwaria

45.57 9.68 3.15 1.69 21.36 12.21 0.00 27.46 61.03 0.00 0.4 11.30 72.33

Mahboobpur 9.37 2.32 0.75 0.41 4.38 2.50 0.00 5.63 12.52 0.00 0.08 2.35 14.87

Raghopur 209.9 44.6 17.5 7.81 98.15 56.09 0.00 126.19 280.43 0.00 1.85 52.74 333.17

Dulandaspur 9.8 2.08 0.68 0.36 4.59 2.62 0.00 5.90 13.10 0.00 0.09 2.46 15.56

Ramraipur 108.21 20.99 6.82 3.67 50.60 28.91 0.00 65.06 144.57 0.00 0.95 27.19 171.76

Saroi 44.79 9.52 3.09 1.67 21.07 12.04 0.00 27.09 60.19 0.00 0.4 11.25 71.44

SUB TOTAL 608.62 125.65 40.84 21.99 284.77 162.73 0.00 366.14 813.64 0.00 5.37 152.76 966.40

2 Kanehri/ 2B3A3a2a

Hirday Patti 90.03 22.51 16.82 9.05 52.05 26.02 0.00 52.05 130.12 0.00 0.87 8.39 138.51

Bhagwati Daspur 73.04 18.26 13.64 7.35 42.22 21.11 0.00 42.22 105.56 0.00 0.7 6.81 112.37

Kom 5.46 1.63 1.22 0.66 3.56 1.78 0.00 3.56 8.89 0.00 0.05 0.51 9.40

Bhalla 116.1 29.03 21.69 11.68 67.13 33.56 0.00 67.13 167.82 0.00 1.12 10.80 178.62

Daribpur 149.54 37.39 27.93 15.04 86.45 43.22 0.00 86.45 216.12 0.00 1.44 13.94 230.06

Chak Sanath 112.2 28.05 20.96 11.28 64.87 32.43 0.00 64.87 162.17 0.00 1.08 10.45 172.62

Dattipur 2.86 1.00 0.75 0.40 2.01 1.01 0.00 2.01 5.03 0.00 0.03 0.27 5.30

Awashanpur 69.23 17.31 12.93 6.96 40.02 20.01 0.00 40.02 100.06 0.00 0.67 6.45 106.51

Page 24: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(24 )

Sharbat Khani 40.88 10.22 7.64 4.11 23.63 11.82 0.00 23.63 59.08 0.00 0.39 3.81 62.89

Palahiya 51.46 12.87 9.61 5.18 29.75 14.87 0.00 29.75 74.37 0.00 0.5 4.80 79.17

SUB TOTAL 710.8 178.25 133.19 71.71 411.69 205.84 0.00 411.69 1029.22 0.00 6.84 66.23 1095.45

3 Dattipur/2B3A3a2c

Bharatpur 11.03 2.27 1.02 0.55 6.85 3.81 0.00 4.57 15.23 0.00 0.13 0.73 15.96

Bishapur 165.39 26.43 15.93 6.42 97.03 53.91 0.00 64.69 215.62 0.00 2 10.94 226.56

Hirday Patti 150.03 22.38 10.1 5.44 88.02 48.90 0.00 58.68 195.59 0.00 1.82 9.93 205.52

Badhauna 163.68 23.74 12.7 5.77 96.03 53.35 0.00 64.02 213.39 0.00 1.98 10.83 224.22

Bhagwati Daspur 9.17 1.50 0.68 0.36 5.38 2.99 0.00 3.59 11.95 0.00 0.11 0.61 12.56

Bhalla 168.50 34.67 15.65 8.43 98.85 54.92 0.00 65.90 219.67 0.00 2.04 11.15 230.82

Dulamdaspur 56.73 11.67 5.27 2.84 33.28 18.49 0.00 22.19 73.96 0.00 0.69 3.75 77.71

Ismaila 1.84 0.38 0.17 0.09 1.08 0.60 0.00 0.72 2.40 0.00 0.02 0.12 2.52

Khetalpur 39.70 8.17 3.69 1.99 23.29 12.94 0.00 15.53 51.75 0.00 0.48 2.63 54.38

Pure Uchit 0.87 0.42 0.19 0.1 0.51 0.28 0.00 0.34 1.13 0.00 0.01 0.06 1.19

Rampur Lohara 3.43 0.71 0.32 0.17 2.01 1.12 0.00 1.34 4.47 0.00 0.04 0.23 4.7

Uchetha 29.24 6.02 2.72 1.46 17.15 9.53 0.00 11.43 38.11 0.00 0.35 1.94 40.05

Saroi 2.62 0.54 0.24 0.13 1.54 0.86 0.00 1.03 3.42 0.00 0.03 0.17 3.59

Tarapur 25.86 5.32 2.4 1.29 15.17 8.43 0.00 10.11 33.71 0.00 0.31 1.71 35.42

Bhagwanpur 31.96 6.58 2.97 1.6 18.75 10.42 0.00 12.50 41.66 0.00 0.39 2.12 43.78

Bejavan 131.81 27.12 12.24 6.59 77.33 42.96 0.00 51.55 171.84 0.00 1.6 8.72 180.56

SUB TOTAL 991.86 152.50 86.29 43.23 582.26 323.48 0.00 388.17 1293.90 0.00 12.01 65.64 1359.54

4 Chakharibansh Bhatankal/ 2B3A3a3a

Badi 0.19 0.04 0.02 0.01 0.09 0.05 0.00 0.12 0.27 0.00 0 0.04 0.31

Chaubepur 52.29 11.01 5.15 2.77 25.90 14.80 0.00 33.30 73.99 0.00 1.07 10.35 84.34

Udhawa Mafi 42.26 8.90 4.16 2.24 20.93 11.96 0.00 26.91 59.79 0.00 0.86 8.37 68.16

Jhingurpur 43.66 9.19 4.3 2.31 21.62 12.35 0.00 27.80 61.77 0.00 0.89 8.65 70.42

Puremudhia 96.31 20.28 9.48 5.11 45.94 26.25 0.00 59.07 131.27 0.00 1.97 19.07 150.34

Dulamdaspur 27.85 5.86 2.74 1.48 13.79 7.88 0.00 17.73 39.41 0.00 0.57 5.51 44.92

Chaubepur 19.92 4.19 1.96 1.06 9.87 5.64 0.00 12.69 28.19 0.00 0.41 3.94 32.13

Hariyawana 22.45 4.73 2.21 1.19 11.12 6.35 0.00 14.29 31.76 0.00 0.46 4.45 36.21

Ismaila 61.16 12.88 6.02 3.24 30.29 17.31 0.00 38.94 86.54 0.00 1.25 12.11 98.65

Rampur 40.02 8.43 3.94 2.12 19.82 11.33 0.00 25.48 56.63 0.00 0.82 7.92 64.55

Raghopur 7.95 1.67 0.78 0.42 3.94 2.25 0.00 5.06 11.25 0.00 0.16 1.57 12.82

Rajpura 14.53 3.06 1.43 0.77 7.20 4.11 0.00 9.25 20.56 0.00 0.3 2.88 23.44

Rampur Z Saroi 57.46 12.10 5.66 3.05 28.47 16.27 0.00 36.61 81.35 0.00 1.17 11.33 92.68

Page 25: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(25 )

Saroi 67.42 14.06 6.57 3.54 32.59 18.62 0.00 41.90 93.12 0.00 1.38 13.35 106.47

Khemaipur 19.59 4.10 1.92 1.03 9.70 5.54 0.00 12.47 27.72 0.00 0.4 3.88 31.60

SUB TOTAL 573.01 120.50 56.34 30.34 281.27 160.72 0.00 361.63 803.62 0.00 11.71 113.42 917.04

5 Musilatpur/ 2B3A3a3b

Udhawa Mafi 100.59 24.98 18.39 6.67 68.43 34.22 0.00 68.43 171.08 0.00 4.56 34.21 205.29

Jhingurpur 17.8 4.42 2.19 1.18 12.11 6.05 0.00 12.11 30.27 0.00 0.81 6.06 36.33

Hariyawan 279.89 69.88 39.68 18.67 190.40 95.20 0.00 190.40 476.00 0.00 12.7 95.2 571.2

Khemaipur 39.4 9.78 4.85 2.61 29.46 14.73 0.00 29.46 73.64 0.00 1.79 13.4 87.04

Rajpura 9.09 2.26 1.12 0.6 6.18 3.09 0.00 6.18 15.46 0.00 0.41 3.09 18.55

Rampur Z Saroi 11.6 2.88 1.43 0.77 7.88 3.94 0.00 7.88 19.71 0.00 0.53 3.95 23.66

Gangapur 31.99 7.94 3.94 2.12 21.76 10.88 0.00 21.76 54.41 0.00 1.45 10.88 65.29

SUB TOTAL 490.36 122.14 71.6 32.62 336.23 168.11 0.00 336.23 840.57 0.00 22.25 166.79 1007.36

6 Jangala/ 2B3A3a3c

Badi 145.43 29.93 10.06 2.39 68.40 39.09 0.00 87.95 195.44 0.00 1.3 12.55 207.99

Mullupur 145.35 29.92 10.05 2.39 66.27 37.87 0.00 85.20 189.34 0.00 1.3 12.54 201.88

Dulamdaspur 0.03 0.01 0 0 0.01 0.01 0.00 0.02 0.04 0.00 0 0 0.04

Ismaila 117.30 24.14 8.11 1.93 53.48 30.56 0.00 68.76 152.80 0.00 1.05 10.12 162.92

Jangla 233.09 47.97 19.12 3.84 106.27 60.72 0.00 136.63 303.62 0.00 2.09 20.11 323.73

Khetalpur 57.03 11.74 3.94 0.94 26.00 14.86 0.00 33.43 74.29 0.00 0.51 4.92 79.21

Khemaipur 22.08 4.54 1.53 0.36 10.07 5.75 0.00 12.94 28.76 0.00 0.2 1.91 30.67

Lila Dharpur 155.62 32.03 10.76 2.56 70.95 40.54 0.00 91.22 202.70 0.00 1.39 13.43 216.13

Marchwar 78.78 16.21 5.45 1.3 35.92 20.52 0.00 46.18 102.62 0.00 0.71 6.8 109.42

Poore Uchit 4.92 1.01 0.34 0.08 2.25 1.28 0.00 2.89 6.42 0.00 0.04 0.42 6.84

Rauri 11.68 2.40 0.81 0.19 5.32 3.04 0.00 6.84 15.21 0.00 0.1 1.01 16.22

Uchetha 22.18 4.56 1.53 0.36 11.99 6.85 0.00 15.42 34.27 0.00 0.2 1.86 36.13

Ugapur 3.13 0.64 0.22 0.05 1.42 0.81 0.00 1.83 4.07 0.00 0.03 0.27 4.34

Jagadhari 56.68 11.67 3.92 0.93 25.84 14.77 0.00 33.22 73.83 0.00 0.51 4.89 78.72

Bejavan 139.37 28.69 15.64 2.3 63.54 36.31 0.00 81.70 181.55 0.00 1.25 12.03 193.58

Sarouli 32.68 6.73 2.26 0.54 14.90 8.51 0.00 19.16 42.57 0.00 0.29 2.82 45.39

SUB TOTAL 1225.35 252.19 93.74 20.16 562.64 321.51 0.00 723.39 1607.53 0.00 10.97 105.68 1713.21

GRAND TOTAL 4600.00 951.00 482.00 220.05 2458.85 1342.39 0.00 2587.24 6388.26 0.00 69.15 670.74 7059.00

Page 26: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(26 )

2.3 Physiography:-

The project area is situated in Eastern plan zone which is almost flat terrain. The elevation ranges

from 75 Mean Sea Level to 89 Mean Sea Level. The details of individual MWS are given below:

Table 2.3: Micro-watershed wise elevation range and relief

Project- IWMP- I District- Sant Ravidas Nagar

S. No. Name of MWS & code Minimum Maximum Releif

1 2 3 4 5

1 Dhaskari/2B3A3a2b 76 89 13

2 Kanehri/2B3A3a2a 75 89 14

3 Dattipur/2B3A3a2c 77 89 12

4 Chakharibansh Bhatankala/2B3A3a3a 78 89 11

5 Musilatpur/2B3A3a3b 78 89 11

6 Jangala/2B3A3a3c 80 89 09

Page 27: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(27 )

2.4 Slope

An attempt has been made to prepare the slope map of the study area using SRTM elevation model.

The details of micro watershed wise slope range are given below:

Table 2.4: Slope classes in the MWS IWMP-I

Sl. No.

Name of MWS & code

Slope range wise area (ha)

0-05% 0.5-

1.0% 1-3% 3-5%

>5% Others

Undulating Terraced Specify

1 2 3 4 5 6 7 8 9

1 Dhaskari/2B3A3a2b 101.29 133.69 657.443 70.344 3.634

2 Kanehri/2B3A3a2a 96.947 161.202 731.725 98.871 6.71

3 Dattipur/2B3A3a2c 82.507 161.935 943.207 160.67 11.221

4

Chakharibansh

Bhatankala

/2B3A3a3a

42.079 93.048 616.337 152.38 13.191

5 Musilatpur/2B3A3a3b 73.689 100.91 666.395 157.97 8.392

6 Jangala/2B3A3a3c 122..800 220.825 1197.61 179 9.417

Page 28: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(28 )

2.5 Climate:-

The watershed lies in the sub tropical climate. The average annual rainfall is less than 864.60mm.

Most of the annual rain fall (about 90%) is received during the rainy season (July to September)

accompanied with high intensity storm. The temperature in the area rarely goes up to 44°c during

summer and reaches 4.1°c in winter.

The year may be divided into four seasons. The cold season from mid November to February is

followed by the summer season from March to mid June. The period from mid June to the end of

September is the south-west monsoon season and the October and the first half of November constitute

the post-monsoon season.

TEMPERATURE

The data of St. Ravidas Nagar raingauge centre may be taken as representative of the

meteorological conditions in the district. From mid November there is a rapid fall in temperature. January

is the coldest month with the mean daily maximum temperature at 22.8º C and the mean daily minimum

temperature at 9.3º C. In association with cold waves in the wake of the western disturbances passing

eastwards in the winter season, temperature tends to go down to a degree or two above the freezing

point. Day temperature begins to rise rapidly after February. May is the hottest with mean daily maximum

temperature at 38.4 C and the mean daily minimum at 25.1º C. With the advent of the monsoon by about

the middle of June there is appreciable drop in the day temperature, however, the nights continue to be

warm. In September there is a slight increase again in the day temperature but the night temperature

decreases after September. With the withdrawal of monsoon by the beginning of October it decreases

progressively.

Page 29: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(29 )

HUMIDITY

During the monsoon and the post monsoon seasons the relative humidity are high ranging between

70 and 85 per cent. In the winter months humidity decreases and in summer the air is comparatively

drier.

Table 2.5: Average monthly rainfall and Temperature of the last five years:-

Project- IWMP I District- Sant Ravidas Nagar

Month Year/Rainfall in mm.

2004 2005 2006 2007 2008 Average

January 0.0 0.0 0.0 0.0 3.0

864.6 mm annual

rainfall of the last 5

years.

February 0.0 3.0 0.0 0.0 0.0

March 0.0 16.0 5.0 2.0 1.0

April 26.0 0.0 0.0 0.0 0.0

May 16.0 0.0 10.0 12.0 2.0

June 32.0 121.8 133.3 66.0 682.6

July 319.0 177.0 179.3 272.5 692

August 246.0 156.3 142.0 124.0 409.0

September 32.0 179.0 60.0 105.0 12.0

October 11.0 11.0 15.0 43.0 6.0

November 0.0 0.0 0.0 0.0 0.0

December 0.0 0.0 0.0 0.0 0.0

Page 30: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(30 )

CHAPTER – 3

BASELINE SURVEY

Page 31: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(31 )

SOCIO-ECONOMIC CONDITION OF THE PROJECT

In the proposed watershed management plan of proper blending of bio- engineering measures will

be applied. Based on the results of studies conducted in this region, it is estimated that more than 50

% of the watershed area will be treated and consequently the soil loss and runoff from the area is

expected to be reduced by 40 % and 65 % respectively. The proposed land use plan will improve the

land utilization index and crop diversification index significantly as compared to the existing one. It will

help in maintaining ecosystem integrity on sustained basis along with improving the livelihood security of

the farming community.

ECONOMIC ANALYSIS

Economic analysis of the project is carried out by taking direct benefits and costs, considering 30

year project life at 10% discount rate. For the purpose of economic analysis, whole watershed

development plan is divided into four sectors namely agriculture (rainfed and irrigated), pure horticulture,

agro-horticulture and silvi pastoral (Silvi-Pastoral + sericulture). Net present value (NPV), Benefit Cost

Ratio (BCR), Payback Period (PBR) and internal rate of return (IRR) criteria is employed to judge the

economic efficiency of each enterprise, sector and project as a whole.

Page 32: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(32 )

DEMOGRAPHIC INFORMATION

HUMAN AND LIVESTOCK POPULATION

Human Population

The total population of the study area is about 49565, there are total number of 96 villages of the

project area with average family size of 6 persons.

Table 3.1: Demographic Features in the project area

S. No. Name of Micro Watershed Name of village Total Population Population of SC/ST

Total Male Female Total Male Female

1 2 3 4 5 6 7 8 9

1

Dhaskari/2B3A3a2b,

Kanehri/2B3A3a2a,

Dattipur/2B3A3a2c,

Chakharibansh Bhatankala/2B3A3a3a,

Musilatpur/2B3A3a3b,

Jangala/2B3A3a3c

Pure shyam 44 39 26 83 11 0

2 Jallapur 190 158 118 348 40 10

3 Rewra paraspur 407 323 242 730 109 11

4 Kom 255 252 197 507 65 36

5 Ramraipur 631 588 472 1219 157 36

6 Rampur-z-saroi 864 786 568 1650 194 49

7 Jairampur sir 64 56 47 120 15 2

8 Jairampur khas 167 145 112 312 38 7

9 Hariyawan 2785 2408 2156 5193 718 244

10 Sultanpur 390 354 317 744 106 0

11 Kushahra 0 0 0 0 0 0

12 Hirday patti 780 645 447 1425 149 61

13 Ahara 160 148 78 308 23 0

14 Bisunpur 100 93 53 193 18 0

15 Bhagtanpur-z-saroi 321 268 191 589 67 16

16 Dhaskari 403 392 292 795 101 13

Page 33: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(33 )

17 Rampur Dhaskari 107 102 63 209 22 19

18 Gopal patti 0 0 0 0 0 0

19 Raghopur 883 710 548 1593 184 47

20 Kansraipur 649 588 391 1237 137 5

21 Dulamdaspur 1163 1121 742 2284 248 4

22 Manikpur 463 397 339 860 111 2

23 Chaubeypur(Sudhist) 371 355 237 726 80 2

24 Pajapatipur 489 428 341 917 116 62

25 Banket-z-saroi 220 210 111 430 40 0

26 Harirampur 635 418 374 1053 125 11

27 Saroi 1544 1294 945 2838 313 147

28 Udhwa mafi 1102 915 711 2017 236 54

29 Chakphurahi 123 115 51 238 27 0

30 Banpurwa 196 190 129 386 42 0

31 Jhigurpur chakvijay 1000 967 677 1967 226 17

32 Chakdharani 0 0 0 0 0 0

33 Chakharibanshbhatan 580 550 446 1130 177 42

34 Khemaipur 1766 1584 1208 3350 415 113

35 Mullupur 617 571 440 1188 150 51

36 Chakharibanshpasiankala 428 390 369 818 122 114

37 Chakharibanshpasiankhurd 161 160 157 321 55 55

38 Puremudhiya 535 461 214 996 74 9

39 Chak Holeman 415 370 279 785 92 4

40 Jangala 486 466 347 952 117 9

41 Rajpura 496 444 362 940 120 0

42 Katehra 83 78 63 161 20 0

43 Liladharpur 883 824 681 1707 229 46

Page 34: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(34 )

44 Bankat-z-Lilapur 0 0 0 0 0 0

45 Badi 1028 922 772 1950 217 11

46 Ismaila 448 392 263 840 90 26

47 Pachwal 226 219 144 445 35 0

48 Missirpur 401 346 243 747 81 33

49 Uchetha 880 863 554 1743 186 51

50 Sabalpur 168 139 89 307 29 0

51 Bisapur 726 628 557 1354 180 28

52 Badhauna 3900 3823 621 7723 208 41

53 Chakbhawanigiri 86 63 57 149 23 3

54 Khetalpur 624 600 491 1224 132 29

55 Bijla 547 536 368 1083 123 6

56 Arjunpur 74 70 49 144 13 0

57 Bhalla 789 780 679 1569 210 2

58 Dattipur 390 373 214 763 72 0

59 Taalkudawa 0 0 0 0 0 0

60 Kanehri 208 164 147 372 51 8

61 Gonda kanehri 0 0 0 0 0 0

62 Daribpur 379 369 261 748 104 52

63 Suwajag 219 208 194 427 57 4

64 Bhagwatidaspur 389 320 289 709 145 23

65 Chak fakirmafi 0 0 0 0 0 0

66 Tarapur 563 515 493 1078 143 71

67 Baswa patti 196 170 114 366 38 24

68 Jawasanpur 304 280 243 584 85 2

69 Bagahi 276 218 188 494 67 4

70 Giriya 356 345 243 701 75 4

Page 35: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(35 )

71 Jogipur 492 481 367 973 106 21

72 Bhagwanpur kunehri 395 364 253 759 85 45

73 Basantpur 318 257 214 575 84 42

74 Chaksanath 81 62 59 143 19 9

75 Chak bisram 140 135 113 275 39 0

76 Musilatpur 4117 3770 1878 7887 972 51

77 Bejawan 1075 966 746 2041 204 66

78 Rampur lohara 0 0 0 0 0 0

79 Bharatpur 745 650 537 1395 117 47

80 Poore uchit 649 449 387 1098 140 41

81 Sarauli or Ramauli 653 601 587 1254 146 36

82 Jaddupur N.shayar 312 259 213 571 89 2

83 Ugapur 1799 1615 1247 3414 221 41

84 Rauri 61 58 39 119 9 7

85 Pipar gaon 1526 742 639 2268 183 19

86 Daraudha 601 557 476 1158 142 135

87 Jagdhari 468 397 316 865 119 1

Total 49565 44069 30885 93634 10328 2283

Page 36: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(36 )

Table 3.2: Details of seasonal migration from Project area: Pre-project status *

Project- IWMP I District- Sant Ravidas Nagar

Sl.

No.

Names of

Watershed

Name of

village

No. of

persons

migrating

No. of days

per year of

migration

Major

reason(s) for

migrating

Distance of

destination of

migration

from the

village (km)

Occupation

during

migration

Income

from such

occupation

(Rs. in

lakh)

1 2 3 4 5 6 7 8

1 Dhaskari/

2B3A3a2b

Total no of

village (87) 378 175

Unemployment

Poverty 15 to 350 km Labour

2 Kanehri/

2B3A3a2a

3 Dattipur/

2B3A3a2c

4 Chakharibansh

Bhatanka l/

2B3A3a3a

5 Musilatpur/

2B3A3a3b

6 Jangala/

2B3A3a3c

6 Total of Project

Page 37: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(37 )

Table 3.3: Soil Texture:-

Project- IWMP I District- Sant Ravidas Nagar

Sl. No. Area in different Soil Group (ha)

Light textured soil

(sand, loamy sand)

Medium textured

soil (Sandy loam, loam, silt loam)

Heavy textured soil

(Clayey)

Others specify

………..

1 Fine Silty:- 869.66

2 Loamy 6205.77

Total 7075.43

Table 3.4: Details of land holding pattern in the project areas *

Project- IWMP I District - Sant Ravidas Nagar

S. No. Name of Villages Land holding classification

Marginal Small Others Landless Total

1 Pure shyam 3 5 2 0 10

2 Jallapur 0 0 0 0 0

3 Rewra paraspur 4 7 2 1 14

4 Kom 29 61 12 17 119

5 Ramraipur 51 86 19 12 168

6 Rampur-z-saroi 11 19 5 4 39

7 Jairampur sir 3 8 4 0 15

Page 38: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(38 )

8 Jairampur khas 12 24 7 2 45

9 Hariyawan 37 68 31 4 140

10 Sultanpur 27 58 27 3 115

11 Kushahra 0 0 0 0 0

12 Hirday patti 21 37 15 2 75

13 Ahara 3 7 5 0 15

14 Bisunpur 8 19 7 1 35

15 Bhagtanpur-z-saroi 12 21 8 4 45

16 Dhaskari 23 44 17 1 85

17 Rampur Dhaskari 9 17 7 2 35

18 Gopal patti 0 0 0 0 0

19 Raghopur 39 62 16 3 120

20 Kansraipur 33 48 9 5 95

21 Dulamdaspur 27 41 15 1 84

22 Manikpur 7 15 5 1 28

23 Chaubeypur(Sudhist) 48 83 26 6 163

24 Pajapatipur 10 19 9 0 38

25 Banket-z-saroi 11 17 5 1 34

26 Harirampur 20 36 15 1 72

27 Saroi 24 53 17 2 96

28 Udhwa mafi 51 97 41 6 195

29 Chakphurahi 0 0 0 0 0

30 Banpurwa 2 5 2 0 9

31 Jhigurpur chakvijay 26 54 25 3 108

32 Chakdharani 0 0 0 0 0

33 Chakharibanshbhatan 25 48 21 3 97

34 Khemaipur 37 76 31 2 146

35 Mullupur 31 65 26 4 126

36 Chakharibanshpasiankala 40 61 22 2 125

37 Chakharibanshpasiankhurd 12 23 9 1 45

38 Puremudhiya 46 62 17 3 128

Page 39: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(39 )

39 Chak Holeman 11 25 9 0 45

40 Jangala 44 93 35 13 185

41 Rajpura 19 39 10 0 78

42 Katehra 0 0 0 0 0

43 Liladharpur 31 75 14 6 126

44 Bankat-z-Lilapur 0 0 0 0 0

45 Badi 27 53 25 3 108

46 Ismaila 18 37 19 1 75

47 Pachwal 9 19 7 3 38

48 Missirpur 5 9 3 1 18

49 Uchetha 41 82 31 8 162

50 Sabalpur 0 0 0 0 0

51 Bisapur 32 69 25 2 128

52 Badhauna 29 63 15 1 118

53 Chakbhawanigiri 2 6 2 0 10

54 Khetalpur 37 53 12 3 105

55 Bijla 42 80 29 9 160

56 Arjunpur 5 8 3 2 18

57 Bhalla 30 61 17 4 112

58 Dattipur 46 92 37 3 178

59 Taalkudawa 0 0 0 0 0

60 Kanehri 11 17 2 2 32

61 Gonda kanehri 0 0 0 0 0

62 Daribpur 57 109 30 11 207

63 Suwajag 17 31 12 0 60

64 Bhagwatidaspur 19 37 5 2 63

65 Chak fakirmafi 0 0 0 0 0

66 Tarapur 48 99 34 9 190

67 Baswa patti 0 0 0 0 0

68 Jawasanpur 27 58 17 4 106

69 Bagahi 16 38 6 0 60

Page 40: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(40 )

70 Giriya 7 14 1 0 22

71 Jogipur 30 73 19 3 125

72 Bhagwanpur kunehri 23 44 17 1 85

73 Basantpur 16 29 9 2 56

74 Chaksanath 4 8 1 1 14

75 Chak bisram 11 23 4 2 40

76 Musilatpur 108 304 52 19 566

77 Bejawan 115 256 63 16 450

78 Rampur lohara 3 9 1 0 13

79 Bharatpur 14 23 9 1 47

80 Poore uchit 6 17 3 0 26

81 Sarauli or Ramauli 29 53 11 1 94

82 Jaddupur N.shayar 17 28 0 1 46

83 Ugapur 105 212 47 9 373

84 Rauri 13 19 5 2 39

85 Pipar gaon 126 243 41 12 422

86 Daraudha 20 39 12 2 73

87 Jagdhari 15 41 6 3 65

Total 2027 4034 1179 259 7602

Page 41: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(41 )

Table 3.5: Major Crops, their Productivity and Production

IWMP-I District-Sant Ravidas Nagar

S.

No. Crop.

Area (ha) Productivity

(q/ha)

Production (q)

Grain/Main product Fodder/Fuel/other Product

Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed Irrigated Rainfed

A Kharif

1 Paddy 325.20 2022.20 0.00 8.00 0.00 16177.60 0.00 24266.40

2 Maize 0.00 175.60 0.00 4.7 0.00 258.13 0.00 387.20

3 Arhar 222.30 536.40 0.00 7.87 0.00 4221.47 0.00 6332.20

4 Urd/Mung 0.00 241.30 0.00 5.08 0.00 1225.80 0.00 1225.80

5 vegetables (Cropwise) 11.50 0.00 0.00 220.40 0.00 12518.72 0.00 12518.72

6 Fodder 20.20 56.80 0.00 0.00 0.00 0.00 0.00 0.00

.. Other, specify 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total 579.20 3032.30 242.82 34401.72 44730.32

B Rabi

1 Wheat 284.54 2235.12 25.00 18.00 7113.50 40232.16 1890.00 60348.24

2 Barley 54.50 127.60 0.00 10.47 0.00 1335.97 0.00 2003.96

3 Masoor 0.00 173.50 0.00 4.80 0.00 832.80 0.00 1041.00

4 Gram 33.00 335.60 0.00 6.56 0.00 2201.54 0.00 2751.92

5 Pea 0.00 7.50 0.00 10.43 0.00 78.23 0.00 78.23

6 Mustard 0.00 496.30 0.00 4.26 0.00 2114.24 0.00 3171.36

7 Potato 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8 vegetables (Cropwise) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

9 Fodder 0.00 12.70 0.00 0.00 0.00 0.00 0.00 0.00

.. Other, specify 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total 372.04 3388.32 25.00 54.52 7113.50 46794.93 1890.00 69394.70

C Zaid

Cultivable Area 5551.24 Cropping Intensity 132.80

Page 42: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(42 )

Summary

It was found that the productivity of wheat, Gram, Jowar, Arhar and Masoor are mainly

grown in the project area. Overall cropping intensity of the project area is 132.80%.

Horticulture Status

There is no systematic agroforestry and orchard in the project area, however scattered trees

are found in the study area. The details are given below:

Table 3.6: Project- IWMP I District - Sant Ravidas Nagar

S.

N.

Name of micro

watershed with code

Name of Important horticultural crop

Whole Fruit Crop Scattered Fruit Crop

Name Area

ha

Productivity

q/ha

Production

q

No. Productivity

q/No

Production

q

1 2 4 5 6 7 8

1 Dhaskari/2B3A3a2b

Nil

Nil

Nil

Nil

42

2.5

45

2 Kanehri/2B3A3a2a

Nil

Nil

Nil

Nil

42

2.8

45

3 Dattipur/2B3A3a2c Nil Nil Nil Nil

33

2.7

36

4 Chakharibansh

Bhatankala /2B3A3a3a

Nil

Nil

Nil

Nil

35

2.6

38

5 Musilatpur/2B3A3a3b

Nil

Nil

Nil

Nil

26

2.3

29

6 Jangala/2B3A3a3c

Nil

Nil

Nil

Nil

52

2.5

55

Total of project

Page 43: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(43 )

Livestock Population

There are Desi cows and bufflows are mostly found in the project area. The details of

livestock population are given below:

Table 3.7: Livestock Population in IWMP-I, Sant Ravidas Nagar

All Figure in No.

S. No. Name of Village livestock Resolution

Buffaloes Cows Bullocks Goat Other Total

1. Pure shyam 11 9 2 4 - 26

2. Jallapur 32 21 3 21 12 89

3. Rewra paraspur 71 56 26 48 11 212

4. Kom 47 33 11 25 19 135

5. Ramraipur 119 89 23 74 12 317

6. Rampur-z-saroi 125 98 24 73 42 362

7. Jairampur sir 13 11 3 7 4 38

8. Jairampur khas 29 34 5 12 7 87

9. Hariyawan 538 497 94 229 68 1426

10. Sultanpur 67 78 17 48 7 217

11. Kushahra 0 0 0 0 0 0

12. Hirday patti 101 117 14 54 11 297

13. Ahara 14 11 4 9 3 41

14. Bisunpur 9 14 6 2 1 32

15. Bhagtanpur-z-saroi 37 53 11 28 10 139

16. Dhaskari 69 57 14 49 18 207

17. Rampur Dhaskari 16 19 3 8 3 49

18. Gopal patti 0 0 0 0 0 0

Page 44: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(44 )

19. Raghopur 114 99 23 69 19 324

20. Kansraipur 96 104 21 54 12 287

21. Dulamdaspur 169 144 33 86 26 458

22. Manikpur 87 74 19 51 7 238

23. Chaubeypur(Sudhist) 59 45 13 41 9 167

24. Pajapatipur 94 88 26 26 4 238

25. Banket-z-saroi 33 21 7 19 6 86

26. Harirampur 91 59 15 79 13 257

27. Saroi 229 186 31 168 15 629

28. Udhwa mafi 143 162 18 128 12 463

29. Chakphurahi 23 16 6 9 3 57

30. Banpurwa 37 26 9 13 4 89

31. Jhigurpur chakvijay 197 143 26 53 13 432

32. Chakdharani 0 0 0 0 0 0

33. Chakharibanshbhatan 109 111 23 61 23 327

34. Khemaipur 286 243 46 208 32 815

35. Mullupur 93 64 29 81 17 284

36. Chakharibanshpasiankala 83 78 27 33 7 228

37. Chakharibanshpasiankhurd 42 36 13 18 4 113

38. Puremudhiya 53 47 12 12 3 127

39. Chak Holeman 66 53 10 48 9 186

40. Jangala 79 84 19 41 11 234

41. Rajpura 86 69 18 57 18 248

42. Katehra 17 14 3 11 4 49

43. Liladharpur 179 163 37 92 16 487

44. Bankat-z-Lilapur 0 0 0 0 0 0

45. Badi 159 163 41 57 12 432

Page 45: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(45 )

46. Ismaila 72 53 11 43 7 186

47. Pachwal 26 22 7 21 3 79

48. Missirpur 57 64 9 23 3 156

49. Uchetha 127 115 18 88 13 361

50. Sabalpur 24 21 5 8 1 59

51. Bisapur 117 102 22 94 7 342

52. Badhauna 151 133 27 89 11 411

53. Chakbhawanigiri 13 12 4 7 2 38

54. Khetalpur 86 79 22 72 8 267

55. Bijla 72 67 26 65 19 249

56. Arjunpur 11 8 3 4 1 27

57. Bhalla 121 125 43 97 11 397

58. Dattipur 49 43 11 35 3 141

59. Taalkudawa 0 0 0 0 0 0

60. Kanehri 36 38 13 19 3 109

61. Gonda kanehri 0 0 0 0 0 0

62. Daribpur 74 61 24 39 5 203

63. Suwajag 34 29 11 36 4 114

64. Bhagwatidaspur 103 89 32 57 6 287

65. Chak fakirmafi 0 0 0 0 0 0

66. Tarapur 97 104 31 45 9 286

67. Baswa patti 27 23 8 19 2 79

68. Jawasanpur 72 67 8 21 3 171

69. Bagahi 48 51 19 13 5 136

70. Giriya 42 39 23 42 3 149

71. Jogipur 84 71 31 29 2 217

72. Bhagwanpur kunehri 63 56 27 26 5 177

Page 46: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(46 )

73. Basantpur 46 41 21 49 4 161

74. Chaksanath 13 11 3 5 1 33

75. Chak bisram 27 22 17 7 2 75

76. Musilatpur 673 587 229 401 38 1928

77. Bejawan 123 148 37 93 12 413

78. Rampur lohara 0 0 0 0 0 0

79. Bharatpur 82 65 27 48 11 233

80. Poore uchit 103 95 33 42 12 285

81. Sarauli or Ramauli 84 91 29 84 8 296

82. Jaddupur N.shayar 67 62 19 23 2 173

83. Ugapur 153 146 32 96 8 435

84. Rauri 8 5 3 5 1 22

85. Pipar gaon 113 96 26 112 11 358

86. Daraudha 93 85 29 68 4 279

87. Jagdhari 76 55 24 57 3 215

TOTAL 7189 6470 1749 4288 780 20476

Page 47: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(47 )

Irrigation Status

Table 3.8: Details of Irrigation Status

Project- IWMP I District - Sant Ravidas Nagar

S.No. Name & Micro Watershed with

code

Gross Cultivated Area Net Cultivated

Area

Gross Irrigated Area Net Irrigated

Area

Rainfed Area

Kharif Rabi Zaid Total Kharif Rabi Zaid Total

1 2 3 4 5 6 7 8 9 10 11 12 13

1 Dhaskari/2B3A3a2b 475.5 542.1 12 1029.62 734.27 75.32 82.2 157.52 125.65 608.62

2 Kanehri/2B3A3a2a 723.1 624.2 32 1379.33 889.05 124.5 142.2 266.72 178.25 710.80

3 Dattipur/2B3A3a2c 580.2 614.2 20 1214.4 892.94 85.3 96.3 181.6 152.5 991.86

4 Chakharibansh Bhatankala /2B3A3a3a

524.4 560.3 5 1089.71 693.51 78.2 92.5 170.7 120.5 573.01

5 Musilatpur/2B3A3a3b 523.6 580.1 16 1119.7 612.50 65.2 84.2 149.4 122.14 490.36

6 Jangala/2B3A3a3c 1023 990.3 40 2053.35 1477.54 135.2 148.6 283.8 252.2 1225.35

Total for Project 3850 3911 125 7886 5551 563.7 646 1210 951.24 4600.00

Page 48: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(48 )

Ground Water Status

Table 3.9: Details of Ground Water Status

Project- IWMP I District - Sant Ravidas Nagar

S.

No.

Name & Code of

Micro watershed

Depth of Ground Water Table

(Below Ground level) in Meter

No. of Observation well Remarks

Before

Monsoon(M)

After Monsoon(M)

1 2 4 5 6 7

1 Dhaskari/2B3A3a2b 16-17 14-15 15 The observation has been

taken from open well of

the Villages of the project

area.

2 Kanehri/2B3A3a2a 15-16.5 14-15 11

3 Dattipur/2B3A3a2c 16-18 14-15 8

4 Chakharibansh

Bhatankala /2B3A3a3a 15-17 14-15 12

5 Musilatpur/2B3A3a3b 16-18 14-15 16

6 Jangala/2B3A3a3c 16-18 14-15 14

(Source:PPR)

Page 49: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(49 )

Details of infrastructure in the project areas*

Project- IWMP I District - Sant Ravidas Nagar

S

N

Name of

Micro

Watershed

Name of

villages Parameters Status

1 2 3 4 5

1 Dhaskari/

2B3A3a2b

As per list

(i)

Name of villages connected to the main road by an all-

weather road

All the Village of the project

area have been connected by

Pakka road.

2 Kanehri/

2B3A3a2a

-do- (ii) Village's Name provided with electricity All villages have been

electrified

3 Dattipur/

2B3A3a2c

-do- (iii) No. of households without access to drinking water About 80% Household having

facility of drinking water.

4 Chakharibans

h Bhatankala

/2B3A3a3a

-do-

(iv) No. of educational institutions :

Primary(P)/ Secondary(S)/ Higher Secondary(HS)/

vocational institution(VI)

(P)

51

(S)

36

(HS)

6

(VI)

5 Musilatpur/

2B3A3a3b

-do- (v) Names of villages with access to Primary Health Centre There are 15 PHC in the

project area.

6 Jangala/

2B3A3a3c

-do- (vi) Names of villages with access to Veterinary Dispensary There are 8 V.D. in the project

area.

(vii) Names of villages with access to Post Office There are 2Post Office in the

project area.

(viii) Names of villages with access to Banks There are 5 Banks in the

project area.

(ix) Names of villages with access to Markets/ mandis -

(x) Names of villages with access to Agro-industries -

(xi) Total quantity of surplus milk deficit -

(xii) No. of milk collection centres

(e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))

(U) (S) (PA) (O)

(xiii) Name of villages with access to Anganwadi Centre There are 9 Anganwadi centre

the project area.

(xiv) Any other facilities with names of villages (please specify) -

Page 50: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(50 )

Page 51: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(51 )

Page 52: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(52 )

CHAPTER - 4

INSTITUTION BUILDING &

PROJECT MANAGEMENT

Page 53: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(53 )

Project Implementing Agency: The Project Implementing Agency (PIA) for IWMP- I, Sant Ravidas

Nagar is BSA, Bhoomi Sanrakshan Unit, Land Development and Water Resources Department, District

Sant Ravidas Nagar, Uttar Pradesh. The project implementing agency was selected by State Level Nodal

Agency (SLNA) for Integrated Watershed Management Program (IWMP) in Sant Ravidas Nagar district.

The PIA was given responsibility to develop the micro-watershed by District Watershed Development Unit

(DWDU) and State Level Nodal Agency (SLNA) considering its vast experiences in handling land and water

management issues in the region. The PIA has well experienced trained and sufficient staff to handle the

watershed management programme efficiently.

The PIA will put dedicated Watershed Development team and will provide necessary technical

guidance to the Gram Panchayat for preparation of Development Plans for the Watershed Projects through

Participatory Rural Appraisal exercise. PIA will also undertake a) Community Organization, b) Trainings

for the village communities, c) supervise Watershed development Activities, d) inspect & authenticate

project accounts, e) monitor & review the overall project implementation, f) set up institutional

arrangements for post project operations and g) maintenance and further development of the assets

created during the project period.

Page 54: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(54 )

Table 4.1: Details of Project Implementing Agency (PIA)

Project- IWMP I District - Sant Ravidas Nagar

S. No. Particulars of PIA

1 2 3

(i) Date of selection of PIA 23-6-2010

(ii) Type of organization# Govt.

(iii) Name of organization Bhoomi Sanrakshan Unit, Land Development and Water Resources

Department, District Sant Ravidas Nagar, Bhadohi

(iv) Designation & Address BSA, Bhoomi Sanrakshan Unit, Land Development and Water Resources Department, District Sant Ravidas Nagar, Bhadohi

(v) Telephone 05444-223389

(vi) Fax -

(vii) E-mail Govt.

Page 55: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(55 )

Table 4.2: Details of Staff at PIA

S.

No. Name Designation Qualification

M/F Field of

Experience &

Period(Year)

1 2 3 4

1 Sri Satish Chandra Srivastava Bhoomi Sanrakshan Adhikari Intermediate, Engg. Diploma. M 22

2 “ Jagdish Prasad Junior Engineer Intermediate, Engg. Diploma. M 22

3 “ Santosh Kumar Srivastava Accountant M.Com M 20

4 “ Rajeev Lochan Accountant M.Com M 18

5 “ Lalta Prasad Draftsman B.A,Diploma in Draughtsman M 19

6 “Suresh Kumar Tracer Intermediate M 20

7 “ Kamal Bajpayee Senior clerk B.A. M 22

8 “ Shamsher Singh Junior clerk B.A. M 20

9 “ Mohan Lal Gupta A.S.C.I. B.Sc (Ag) M 23

10 “ Harish Prasad Srivastava A.S.C.I. B.Sc (Ag) M 21

11 “ Sunder Lal Bajpayee Seech Paryavechhak Intermediate M 19

12 “Raj Kumar Shukla Seenchpal Intermediate M 18

13 “Shiv Murat Seenchpal Intermediate M 20

14 “Ram Kedar Seenchpal Intermediate M 20

15 “Rama pati Shukla Seenchpal Intermediate M 21

16 “Ram Swaroop Yadav Seenchpal Intermediate M 20

17 “Iftekhar Hussain Rizvi Seechpal Intermediate M 20

18 “Ganga ram Munshi B.A. M 4

Note:- Details of all the persons working in BSA Unit is to be incorporated

Page 56: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(56 )

The Watershed Development Team (WDT):

It is an integral part of the PIA. WDT will assist gram Sabha in a) constitution of Watershed

Committee and its functioning, b) organize and strengthening User groups, Self Help Groups, c)

conducting participatory baseline survey, d) training and Capacity Building, e) preparing detailed resource

development plan including Soil & Water Conservation, f) undertake engineering surveys, g) prepare

engineering drawings and cost estimate for structure to be built.

Table 4.3: Details of Watershed Development Team (WDT) in the project area

Project- IWMP I PIA-BSA, LDWR District - Sant Ravidas Nagar

1 2 3 4 5 6 7 8

S. N.

Name of WDT member

M/F# Age Qualification / Experience

Description of professional

training

Role/ Function##

Date of appointment of

WDT member

1

Mr R.A.Verma M 30 B.Sc.(Ag) Agriculture Watershed

Management

March,2011

2 Mr Sumant

Shukla

M 28 Intermediate Diploma (Ag.) Water

Management

3 Mr Shalendra

Singh

M 60 B.Sc.(Ag) Agriculture Soil

Conservation

4 Smt Parbati Yadav

F 28 B.A. Social work Social Mobilization

Page 57: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(57 )

Watershed Committees:

Watershed committees are being formed in all villages. Each committee would consist of at least of 10

members. Their representation will be as under:

Minimum of 50% members from SHGs and UGs, SCs, women and landless

One member from Watershed Development Team, especially women member (subject matter

specialist in Social Science).

Watershed Committees would nominate one of their members as Watershed Secretary to perform the

following duties:

1. Convening meetings of Watershed Committee, Gram Sabha.

2. Maintaining all records and proceedings of the meetings.

3. Follow up action on all decisions taken in the meetings.

4. Ensuring people’s participation.

Watershed Secretary will be imparted training in maintaining the accounts as well other activities related

to Project.

Page 58: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(58 )

Details of Watershed Committee (WC)

Name of Micro watershed- Dhaskari Name of Project:- IWMP I District- Sant Ravidas Nagar

1 2 3 4

5 6 7 8 9 10 11 12 13 14 15 16 17

Sl.

No.

Name of

Gram

Sabha/ GP

Date of

Constitution/

Registration

as a Society

(dd/mm/

yyyy)

Name of

Members

Designation M/F SC ST SF MF LF Land-

less

UG SHG GP Any

other

Educa-

tional

qualifi-

cation

Function(s)

assigned#

1 Dhaskari 15.9.2010 Ram Morat President M √ √

Ravi

Shanker

Yadav

Secretary M √

Ram Kedar

Yadav Member M

Inter

Girja Devi Member F

Satya

Narayan

Member M

Mul

Chandra

Yadav

Member

M

Nagesh

Mishra

Member M

Mangaru Member M

Ramdhani Member M

Sheshdhar

Yadav

Member M

Mohan Lal

Yadav

Member M

Note: WC to be constituted for each GP included in the MWS

Page 59: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(59 )

Name of Micro watershed- Kanehri Name of Project:- IWMP I, District- Sant Ravidas Nagar

1 2 3 4

5 6 7 8 9 10 11 12 13 14 15 16 17

Sl.

No.

Name of

Gram

Sabha/ GP

Date of

Constitution/

Registration

as a Society

(dd/mm/

yyyy)

Name of

Members

Designation M/F SC ST SF MF LF Land-

less

UG SHG GP Any

other

Educa-

tional

qualifi-

cation

Function(s)

assigned#

2 Kanehri 16.9.2010 Phoolpatti

Devi President F √ √

Raj Nath Secretary M √ √

Harish

Prasad

Srivastava

(ASCI)

Member M

B.Sc.

Ag.

Jaynath

Yadav

Member M √

Baliram

Yadav

Member M √

Panna Lal Member M √

Jiledar

Upadhya

Member M √

Usha Devi Member F √

Asha Devi Member F √

Krishna

Kumar

Member M √

Chandrika Member M √

Page 60: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(60 )

Name of Micro watershed- Dattipur Name of Project:- IWMP I District- Sant Ravidas Nagar

1 2 3 4

5 6 7 8 9 10 11 12 13 14 15 16 17

Sl.

No.

Name of

Gram

Sabha/ GP

Date of

Constitution/

Registration

as a Society

(dd/mm/

yyyy)

Name of

Members

Designation M/F SC ST SF MF LF Land-

less

UG SHG GP Any

other

Educa-

tional

qualifi-

cation

Function(s)

assigned#

3 Dattipur 17.9.2010 Raj Kr.

Singh President M

Dharmendra

Kr. Singh Secretary M

R K Shukla

(seechpal) Member M

Inter

Radha Devi Member F

Ranno Devi Member F

Namvar

Singh

Member M

H N Singh Member M

R S Yadav Member M

Mangal

Singh

Member M

H L Yadav Member M

A K Singh Member M

Page 61: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(61 )

Name of Micro watershed- Chakharibansh Bhatankal Name of Project:- IWMP I

District- Sant Ravidas Nagar

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Sl. No.

Name of Gram Sabha/ GP

Date of Constitution/

Registration as a Society (dd/mm/

yyyy)

Name of Members

Designation M/F SC ST SF MF LF Land-less

UG SHG GP Any other

Educa-tional qualifi-cation

Function(s) assigned#

4 Chakhari-bansh Bhatankal

18.9.2010 Amrit lal President M

Sharwan

Kr. Maurya

Secretary M

Shivmurat

Chaursiya

(seechpal)

Member M

MA

Sarth lal Member M

Mahesh Member M

Nazir Member M

Santosh Member M

Sanjay Member M

Hargen Member M

Basantu Member M

Ranno Devi

Member F

Page 62: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(62 )

Name of Micro watershed- Musilatpur

Name of Project:- IWMP I District-Sant Ravidas Nagar

1 2 3 4

5 6 7 8 9 10 11 12 13 14 15 16 17

Sl.

No.

Name of

Gram

Sabha/ GP

Date of

Constitution/

Registration

as a Society

(dd/mm/

yyyy)

Name of

Members

Designation M/F SC ST SF MF LF Land-

less

UG SHG GP Any

other

Educa-

tional

qualifi-

cation

Function(s)

assigned#

5 Musilatpur 19.9.2010 Gopal

Prajapati President M

Ram

Bahadur Secretary M

S L Bajpai

(Seech Pr.) Member M

Inter

K K Bind Member M

M L Bind Member M

Mohan

Prajati

Member M

Chhannu

Lal

Member M

Angina Devi Member M

A K

Kanojiya

Member M

Lalji Gaud Member M

S N

Prajapati

Member M

Page 63: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(63 )

Name of Micro watershed- Jangala

Name of Project:-IWMP I District- Sant Ravidas Nagar

1 2 3 4

5 6 7 8 9 10 11 12 13 14 15 16 17

Sl.

No.

Name of

Gram

Sabha/ GP

Date of

Constitution/

Registration

as a Society

(dd/mm/

yyyy)

Name of

Members

Designation M/F SC ST SF MF LF Land-

less

UG SHG GP Any

other

Educa-

tional

qualifi-

cation

Function(s)

assigned#

6 Jangala 20.9.2010 Keshav

Prashad President M

Brijesh

kumar Secretary M

M L Gupta

(ASCI) Member M

BSc

(Ag)

Prem

Shanker

Member M

Dinesh

Chandra

Member M

Sabhajeet Member M

Harish

Chandra

Member M

Satmi Devi Member F

Hriday

Narayan

Member M

Ram Murat Member M

Pandhari

Pal

Member M

Page 64: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(64 )

Formation of Self Help Groups:

The formation of SHGs in all watershed villages is underway. It is proposed to form at least 2 SHGs

in each village. Each SHG will consist of 12/15 members. The members would be mainly from landless,

SCs and women, small and marginal farmers. Few groups exclusively of unemployed youth have also been

identified. These groups will be homogeneous having common goal for increasing their income by

establishing micro enterprise. Under the Project, each SHGs would be given a revolving fund of

Rs.20000/25000 each after 6 months from the date of formation (subject to qualifying the 1st grading and

meeting the laid down norms). After having discussions with the village community The SHGs may opt any

of the Income Generating Activities from the list given below.

1. Bakery Products 2. Soap & Detergent making 3 Cutting and Tailoring 4 Embroidery 5. Fisheries 6.

Mushroom cultivation 7 Household wiring, Motor winding 8.Plumbing 9 Carpentry 10.Bee keeping 11.

Pickles, sauces, jam, jelly etc. 12.Two wheelers repairing 13.Animal husbandry 14.Backyard poultry 15.

Vermi compost & Carpet Viewing

However, decision for adopting Economic Activities would rest with respective SHGs. Accordingly;

these SHGs would be imparted trainings in the IGAs they opt for. Preliminary survey reveals reasonable

potentials for the above mentioned Economic Activities and these could prove to be beneficial to poor

people residing in selected Watershed villages.

Page 65: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(65 )

Details of Self Help Groups (SHGs) in the project area

Project- IWMP I District - Sant Ravidas Nagar

1 2 3 4 5 6 7 8

S.

N.

Name of

MWS

Names of

villages

Total no. of Constituted/registered

SHGs No. of members

No. of SC/ST in each

category

No. of BPL in each

category Date of formation of SHGs With

only

Men

With only

Women

With both

Total Categories M F Total M F Total M F Total

1 Dhaskari/

2B3A3a2b

(87

Villages, As per list )

3 3 2 8 (i) Landless 12-9-2010

(ii) SF

(iii) MF

(iv) LF

2 Kanehri/

2B3A3a2a

3 2 - 5 (i) Landless 14-9-2010

(ii) SF

(iii) MF

(iv) LF

3 Dattipur/

2B3A3a2c

2 3 - 5 (i) Landless 14-9-2010

(ii) SF

(iii) MF

(iv) LF

4 Chakharibansh

Bhatanka l/

2B3A3a3a

3 2 - 5 (i) Landless

(ii) SF

(iii) MF

(iv) LF

5 Musilatpur/

2B3A3a3b

1 2 1 4 (i) Landless

(ii) SF

(iii) MF

(iv) LF

6 Jangala/

2B3A3a3c

1 2 2 5 (i) Landless

(ii) SF

(iii) MF

(iv) LF

Total of Project Total 12 13 3 28

(M – Male, F – Female)

Page 66: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(66 )

Details of Formation of Self Help Groups

Project- IWMP I District- Sant Ravidas Nagar

S. No.

Name of micro watershed

Name of village

Name of group

Date of constitution

Name of Adhyaksh

Name of Sachiv

Total No. of Members Name of Bank and Address

Account No. & Date

Up to date Saving Rs.

Group activities Wo-men Sc/St Other Total

1 2 3 4 5 6 7 8 9 10 11 12 13

1 Dhaskari/2B3A3a2b

Rampur Dhaskari

Maa Durga SHG

15.9.10

Shakuntala Devi

Sangeeta 11 3 8 11 K G S G

Bank 2023199 3300 G M S

Rampur Dhaskari

Shivam SGH

Amrawati Devi

Shayam Kumari

11 2 9 11 -do- 2023200 3300 G K

Raghopur D B R A

SHG Urmila Devi Savita Devi 11 4 7 11 -do- 2023242 3300 PO.

GopalPatti G P SHG Ratana Devi Fulwanti 11 1 10 11 -do- 2023201 3300 Diary

Dhaskari J H SHG Samudra

Devi Usha Ddevi 11 3 8 11 -do- 2023202 3300 Tailoring

Raghopur J M K SHG

Sonpatti Hirawati 11 2 9 11 -do- 2023243 3300 Kaleen Ferry

Dhaskari M V SGH

Mmohara Devi

Chirauji 11 3 3 11 -do- 2023198 3300 G K

2 Kanehri/2B3A3a2a Giriya Amit SHG

16.9.10 Jaynath Raj narayan - 2 9 11 G M S

3 Dattipur/2B3A3a2c

Uchetha J M V SGH

17.9.10

Ashok Kumar

Pankaj Kumar

- 2 10 12 - - - Diary

Uchetha O Sai SGH

Mangla Prasad

Pankaj Kumar

- 3 7 10 - - - Tailoring

Uchetha M V D SGH

Namvar Singh

shivam - 2 8 10 - - - G K

Uchetha S S SHG Dhamraj Ranvijay - 1 9 10 - - - G M S

Uchetha J M D SGH

Mahendra Kr.

Samar Bahadur

- 3 8 11 - - - Diary

Uchetha O G SGH

Dharmendra Raj kumar - 2 8 10 - - - G K

Saroi Baudh SGH

Suraymani Akhilesh - 1 9 10 - - - G M S

Saroi M L SGH Prem

Shanker Akhilesh - 2 8 10 - - - Tailoring

4 Chakharibansh

Bhatanka l/2B3A3a3a

Udhawa mafi J H SGH 18.9.10 Mahesh Kr. Pawan kr. - 3 6 11 - - - Kaleen Ferry

5 Musilatpur/2B3A3a3b Musilatpur J M V SHG

19.9.10 Sunita Manju 8 3 - 11 - - - Diary

6 Jangala/2B3A3a3c Rajaipur

Durga SGH

20.9.10 Sona Devi Urmila Devi 11 3 8 11 - - -

Kaleen Ferry -

Rajaipur M S SGH

Sushama Devi

Jadawati Devi

12 2 10 12 - - - Tailoring

Page 67: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(67 )

S. No. Name of Project & Code (M.W.S.) Name of S.H.G. Occupation of S.H.G. Name of Chairman & No. Members

1 2 3 4 5 6

1 Dhaskari 2B3A3a2b

1.Maa Parvati ,S.H.G.

Making of woolen Balls Smt Parvati Devi

“ Smt.Arti Devi “ Smt Shiv Kumari “ Smt Niranjana “ Smt Rajkumari “ Smt.Savitri Devi “ Smt Chohgari “ Smt.Shubhwanti “ Smt Geeta Devi “ Smt Dulari “ Smt Devraji

2.Sri Ganeshji,S.H.G.

Animal Husbandry Shri Ram ashray “ Shri Samarjeet yadav “ Shri Devi Charan “ Shri Haridas yadav “ Shri Abhimanyu “ Shri Bhagelu ram “ Shri Ram dayal “ Shri Dharmendra Kumar “ Shri Bhag Chandra pal “ Shri Nand dhari “ Shri Vishram yadav

2 Dattipur 2B3A3a2c

1. Jai Maa Durge S.H.G.

Kaleen Ferry Shri Shobnath “ Shri Kamla Shanker “ Shri Devi Prasad “ Shri Ram Garib “ Shri Bechu Lal “ Shri Piyare “ Shri Ram Khelawan “ Shri Chauharja “ Shri Algu “ Shri Kailash Nath “ Shri Dunagar

2. AmbikaS.H.G.

Bangle work Smt Seetabi “ Smt Kabootri devi “ Smt Kamla “ Smt Girja devi “ Smt Sona devi “ Smt Mola devi “ Smt Matavi “ Smt Mukundi “ Smt Prabhawati

Page 68: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(68 )

“ Smt Dukhni “ Smt Saraswati devi

3 Kanehri 2B3A3a2a

1. Shankar S.H.G.

Diary Shri Lalman “ Shri Sushil “ Shri Rama Shanker “ Shri Ashok “ Shri Suresh “ Shri Shiv ram “ Shri Ramesh “ Shri Sukhraj “ Shri Nind Raj “ Shri Ram lal gupta “ Shri Awadh Narayan

2.Mateshwari S.H.G.

Tailoring Smt Gaura devi “ Smt Mewa devi “ Smt Lal Mani “ Smt Chandra kala “ Smt Seeta devi “ Smt Adalati “ Smt Chamli devi “ Smt Durgawati “ Smt Nirmala devi “ Smt Vidya devi “ Smt Phoolwanti

4 Chakharibansh bhatankala 2B3A3a3a

1.Bholenath S.H.G.

Goat Farming Shri Bimlesh “ Shri Rashid “ Shri Trilochan “ Shri Sarvesh kuar “ Shri Pramod “ Shri Satish “ Shri Anand “ Shri Raju kumar “ Shri Kamlesh “ Shri Sharafat ali “ Shri Munshi

2.Jwala devi S.H.G.

Packing Smt Moti rani “ Smt Manju devi “ Smt Nirmala “ Smt Motana devi “ Smt Lalti “ Smt Indu devi “ Smt Malti “ Smt Shakuntala “ Smt Dharma devi “ Smt Sunita “ Smt Savitri devi

5 Musilatpur 2B3A3a3b 1. Jai Maa Vindhavasini devi Kaleen Ferry Shri Ram Lochan

Page 69: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(69 )

S.H.G. “ Shri Dukhi “ Shri Lal Mani “ Shri Budhi Ram “ Shri Shalik ram “ Shri Ram sewak “ Shri Nanhku “ Shri Jagganath “ Shri Barkhu “ Shri Ram Sumer “ Shri Lurkhur

2.Dayawanti S.H.G.

Tailoring Smt Rajeshwari Devi “ Smt Mamta “ Smt Dulari “ Smt Babni devi “ Smt Panna devi “ Smt Phoolwanti “ Smt Shubhwati devi “ Smt Savitri devi “ Smt Phooldeyi “ Smt Shushila “ Smt Jhoora devi

6 Jangala 2B3A3a3c

1. Jai Ambe S.H.G.

Dari ferry Shri Anil “ Shri Sant lal “ Shri Nand lal “ Shri Brij lal “ Shri Nirahu kumar “ Shri Doodh nath “ Shri Budhi ram patel “ Shri Ram soorat “ Shri Mithai lal “ Shri Radhey patel “ Shri Preetam

2.Begum Hazrat S.H.G.

Making wollen balls Smt Asma Biwi “ Smt Isha “ Smt Munninisha “ Smt Panna devi “ Smt Hafizam “ Smt Anati “ Smt Prabhawati devi “ Smt Jahida Begum “ Smt Kitabun “ Smt Shahjahan “ Smt Antarib

Page 70: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(70 )

User groups:

The members of User groups would be those persons who would directly derive benefits from Watershed

Activities. Resource use agreements are being worked out. The User groups will be responsible for the

operation and maintenance of all the assets created under the Project. Formation of User groups is under

process in all the villages covered under the Project. The members of User Groups would be imparted

training by PIA for effectively managing the assets created.

Details of Formation of User Groups (UGs)

Project- IWMP I District - Sant Ravidas Nagar

S. No.

Name of micro watershed

Name of village Name of group

Date of constitutio

n

Name of Adhyaksh

Name of Sachiv/

Treasurer

Total No. of Members Name of Bank and

Address

Account No. & Date

Up to date

Saving

Group Activeties

Status of User

Agreement Women Sc/St Other Total

1 2 3 4

5 6 7 8 9 10

1 Dhaskari/2B3A

3a2b

1- RampurDhaskari

15.9.10

Kali Charan Prem

Chandra - 3 7 10

2- Dhaskari Hind Lal Shiya Ram

4 6 10

3- RampurDhaskari Ram Kumar Sheshman

3 8 11

4- Raghopur Ram Murat Vijay

Shanker 2 13 15

5- Dhaskari Ram Sumer Rajpat

3 7 10

6- Dhaskari Dev Saran Raj Narain

2 8 10

2 Kanehri/2B3A3

a2a

1-Giriya

16.9. 10

Baliram Radhe

Shayam 1 10 11

2-Giriya Krishan Kr. Ramjatan

4 11 15

3-Bighi R S

Chauhan K S Chauhan

3 11 14

Page 71: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(71 )

3 Dattipur/2B3A3

a2c Uchtha

17.9. 10

N V Singh Sangeeta

singh 2 3 7 12

Hindraj Singh

Nagendra Singh

3 11 14

M P Yadav Kunta Devi 2 2 7 11

S L Gautam Lakshamdhar

i 2 2 10 14

4 Chakharibansh Bhatankal/2B3

A3a3a Udhawa Mafi

18.9. 10

Bansi Lal Amrit Lal

2 13 15

Hori Ram Ram

Khelawan 5 10 15

Bechu Lal Panna Lal

4 10 14

Lal Bahadur Tilak Dhari

4 12 16

Ram Lal Hansh Raj

3 12 15

Vimla Devi Gulab

Chandra 11

11

5 Musilatpur/2B3

A3a3b Munshi Bhawanpur

19.9. 10

Raj Bahadur Raj Narayan

2 10 12

Shyam

Narayan Mokadam

5 7 12

6 Jangala/2B3A3

a3c

1-Jangala

20.9. 10

H N Saroj J L Saroj

3 8 11

2-Rajaipur H Chandra Rakesh Kumar

5 7 12

Sabhajeet Ashok Kumar

4 10 14

S Chandra

Shyam Mohan

5 6 11

R Lolarakh

Chandra Shekhar

2 8 10

Page 72: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(72 )

Details of Fund flow of Watershed Committee Accounts (Amount in Rs.)

Name of Project IWMP I District - Sant Ravidas Nagar

S.

No.

Name of

MWS

with code

Name of

watershed

committee

(WC)

Opening Balance

Deposit Withdrawal

Interest accrued

Closing balance

DRDA/ ZP

cheque No./date

Amount

/ Date of

deposit in WC Account

Total amount

available in WC Account

Amount withdrawn

by Cash/ Cheque

Date of with-

drawal

Purpose

of with-drawal

1 2 3 4 5 6 7 8 9 10 11 12

1 Dhaskari/

2B3A3a2b Dhaskari 0.00 513864.00 513864.00 - - - - 513864.00

2 Kanehri/

2B3A3a2a Kanehri 0.00 422721.00 422721.00 - - - - 422721.00

3 Dattipur/

2B3A3a2c Dattipur 0.00 954405.00 954405.00 - - - - 954405.00

4

Chakharibansh Bhatankal/

2B3A3a3a

Chakharibansh Bhatankal

0.00 468369.00 468369.00 - - - - 468369.00

5 Musilatpur/

2B3A3a3b Musilatpur 0.00 1047582.00 1047582.00 - - - - 1047582.00

6 Jangala/

2B3A3a3c Jangala 0.00 1166859.00 1166859.00 - - - - 1166859.00

Total for Project

0.00 4573800.0 4573800.0 4573800.0

Page 73: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(73 )

Details of Convergence of IWMP with other Schemes*

Project IWMP - I District - Sant Ravidas Nagar

S.

No.

Name of Micro

Watershed

Names of

Departments

with Schemes

converging with

IWMP

Fund made available to IWMP due to

convergence (Rs. in lakh)

Was this fund included in Rs.12,000/

15,000 per ha.

Name of activity/task/structure

undertaken with converged funds

Reference no. of

activity/ task/

structure in DPR@

Level at which decision for convergence was taken$

Yes No

(a) Structures

(b) livelihoods

(c ) Any other (pl. specify)#

1 2 3 4 5 6 7 8 9 10

1 Dhaskari MNREGA 3.40 Structures

2 Kanehri MNREGA 4.29 Structures

3 Dattipur MNREGA 5.45 Structures

4 Chakharibansh

Bhatankal MNREGA 4.49 Structures

5 Musilatpur MNREGA 2.86 Structures

6 Jangala MNREGA 6.96 Structures

Total for project 27.44

Page 74: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(74 )

CHAPTER – 5

MANAGEMENT / ACTION PLAN

Page 75: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(75 )

ENTRY POINT ACTIVITY (EPA)

EPA activities are taken up under watershed projects to newly build or repair the already existing

structures with the consultation of village community at the beginning of the project; generally, certain

important works which are in urgent demand of the local community are taken up. A group Discussion was

conducted with watershed Development Committee regarding the EPA activity, It was conveyed to the WC

that an amount of 24.39 Lakhs was allotted for EPA activity, which was 4 per cent of total allocated

budget. The villagers discussed various activities which they fell is important but after a brief discussion it

was conveyed to them that only those activities can be taken, which revive the common natural

resources. It was also taken into priority that there should be an instrument of convergence which will

result in sustainability of activities.

In total 27 EPA activities were executed in the project area with an budget of Rs. 24.39 Lacs.

Photographs of Entry Point Activities done in the project are given below:

Page 76: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(76 )

Page 77: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(77 )

Page 78: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(78 )

Table 5.1: Entry point activities (EPA)

S.No. Name of The Project

Amount

Earmarked for

EPA

Entry Point Acitivies

Estimated

Cost (Rs. in

Lakh)

1 Dhaskari/ 2B3A3a2b

24.39

Repair of Well, Construction of Chabutara. 3.02

2 Kanehri/

2B3A3a2a

Well Platform & Chabutara Construction

3.81

3 Dattipur/ 2B3A3a2c

Well Platform & Chabutara Construction 4.85

4 Chakharibansh Bhatanka l/

2B3A3a3a

Well Platform & Chabutara Construction 3.99

5 Musilatpur/ 2B3A3a3b

Well Platform & Chabutara Construction 2.54

6 Jangala/

2B3A3a3c

Well Platform & Chabutara Construction 6.19

Total 24.39

Page 79: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(79 )

Details of Livelihood Activities in the project area

During discussions with the village communities by our Livelihood experts, several activities were

discussed with them. The main objectives of these discussions were:

Assure one livelihood option to poor families

Assured livelihood for at least 300 days in a year

At least one daily job per family SCs/BPL/ very poor families.

Form SHGs would be imparted skill training on identified Economic Activities nd it is proposed to impart

them trainings. It is proposed to lend revolving fund of Rs. 25000/- to each SHG/individuals formed in the

watershed villages. Since the members from SHGs/landless are very poor, they do not have resources to

start micro enterprises. It is envisaged that they should be assisted and given loan of this amount in the

shape of Revolving Fund Assistane (RFA) so that they do not get trpped by money lenders. Funds thus

given on loan are recoverable from SHGs/individuals in easy instalments. It is also proposed to impart skill

training to atleast 10 unemployed youth from each village and give them trainings of their choice so that

they establish some small enterprises. It is further proposed to give them interest free loan of Rs. 12000/-

each as Revolving Fund Assistane (RFA) to meet their urgent needs of funds for establishing micro

enterprises. Such funds recovered could either be back to SHGs/ individuals so some other SHGs/

individuals depending upon assessment of their respective needs. It is proposed to form 2 SHGs in each

village and identify at least 10 youths in each village for imparting training and giving Revolving Fund.

Activities that is likely to be taken up by SHGs/ individuals

Cutting & Tailoring

Page 80: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(80 )

Household wiring, motor winding

Carpentry

Bee keeping

Pickles, sauces, jam, jelly, etc.

Two wheelers repairing

Animal husbandry/ Dairy

Goat Rearing.

General store shops, etc.

Table 5.2 : Details of Livelihood activities in the project area (LIVELIHOOD ACTION PLAN-LAP)

YEARWISE FINANCIAL BREAK UP OF LIVELIHOOD ACTIVITIES IWMP-I,

DISTRICT- SANT RAVIDAS NAGAR

Amount in Lacs

S. No. Micro

watershed

Project

Area

Proposed

Amount

Livelihood Activities 9% of the Total project Cost

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

1 Dhaskari 629.21 6.80 0.00 0.76 1.89 1.89 2.27 6.80

2 Kanehari 794.64 8.58 0.00 0.95 2.38 2.38 2.86 8.58

3 Dattipur 1009.39 10.90 0.00 1.21 3.03 3.03 3.63 10.90

4 Chak Harivansh Bhatan kala

830.90 8.97 0.00 1.00 2.49 2.49 2.99 8.97

5 Musilatpur 528.73 5.71 0.00 0.63 1.59 1.59 1.90 5.71

6 Jangala 1289.13 13.92 0.00 1.55 3.87 3.87 4.64 13.92

Total 5082.00 54.89 0.00 6.10 15.25 15.25 18.30 54.89

Page 81: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(81 )

GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF LIVELIHOOD ACTIVITIES IWMP-I,

DISTRICT- SANT RAVIDAS NAGAR

CODE- 2B3A3a2b

Amount in Lacs

S. No. Gram

Panchayat

Project

Area

Proposed

Amount

Livelihood Activities 9% of the Total project Cost

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL 1 Hirday Patti 94.77 1.02 0.00 0.11 0.28 0.28 0.34 1.02

2 Chaubepur 91.21 0.99 0.00 0.11 0.27 0.27 0.33 0.99

3 Ahamadpur Phulwaria

48.57 0.52 0.00 0.06 0.15 0.15 0.17 0.52

4 Mahboobpur 11.37 0.12 0.00 0.01 0.03 0.03 0.04 0.12

5 Raghopur 213.00 2.30 0.00 0.26 0.64 0.64 0.77 2.30

6 Dulandaspur 12.80 0.14 0.00 0.02 0.04 0.04 0.05 0.14

7 Ramraipur 111.01 1.20 0.00 0.13 0.33 0.33 0.40 1.20

8 Saroi 45.79 0.49 0.00 0.05 0.14 0.14 0.16 0.49

9 Rajpura 0.68 0.01 0.00 0.00 0.00 0.00 0.00 0.01

Total 629.21 6.80 0.00 0.76 1.89 1.89 2.27 6.80

GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF LIVELIHOOD ACTIVITIES IWMP-I,

DISTRICT- SANT RAVIDAS NAGAR

CODE- 2B3A3a3b

Amount in Lacs

S. No. Gram

Panchayat

Project

Area

Proposed

Amount

Livelihood Activities 9% of the Total project Cost

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

1 Udhawa Mafi 108.13 1.17 0.00 0.13 0.32 0.32 0.39 1.17

2 Jhingurpur 19.13 0.21 0.00 0.02 0.06 0.06 0.07 0.21

3 Hariyawan 302.50 3.27 0.00 0.36 0.91 0.91 1.09 3.27

4 Khemaipur 42.35 0.46 0.00 0.05 0.13 0.13 0.15 0.46

5 Rajpura 9.77 0.11 0.00 0.01 0.03 0.03 0.04 0.11

6 Rampur Z Saroi 12.47 0.13 0.00 0.01 0.04 0.04 0.04 0.13

7 Gangapur 34.39 0.37 0.00 0.04 0.10 0.10 0.12 0.37

Total 528.73 5.71 0.00 0.63 1.59 1.59 1.90 5.71

Page 82: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(82 )

GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF LIVELIHOOD ACTIVITIES IWMP-I,

DISTRICT- SANT RAVIDAS NAGAR

CODE- 2B3A3a2a

Amount in Lacs

S. No. Gram

Panchayat

Project

Area

Proposed

Amount

Livelihood Activities 9% of the Total project Cost

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

1 Hirday Patti 100.03 1.08 0.00 0.12 0.30 0.30 0.36 1.08

2 Bhagwati Daspur 78.04 0.84 0.00 0.09 0.23 0.23 0.28 0.84

3 Kom 5.46 0.06 0.00 0.01 0.02 0.02 0.02 0.06

4 Bhalla 136.00 1.47 0.00 0.16 0.41 0.41 0.49 1.47

5 Badhauna 0.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00

6 Daribpur 177.54 1.92 0.00 0.21 0.53 0.53 0.64 1.92

7 Chak Sanath 128.00 1.38 0.00 0.15 0.38 0.38 0.46 1.38

8 Dattipur 2.86 0.03 0.00 0.00 0.01 0.01 0.01 0.03

9 Awashanpur 74.23 0.80 0.00 0.09 0.22 0.22 0.27 0.80

10 Sharbat Khani 40.88 0.44 0.00 0.05 0.12 0.12 0.15 0.44

11 Palahiya 51.46 0.56 0.00 0.06 0.15 0.15 0.19 0.56

Total 794.64 8.58 0.00 0.95 2.38 2.38 2.86 8.58

Page 83: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(83 )

GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF LIVELIHOOD ACTIVITIES IWMP-I,

DISTRICT- SANT RAVIDAS NAGAR

CODE- 2B3A3a2c

Amount in Lacs

S. No. Gram

Panchayat

Project

Area

Proposed

Amount

Livelihood Activities 9% of the Total project Cost

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

1 Bharatpur 11.25 0.12 0.00 0.01 0.03 0.03 0.04 0.12

2 Bishapur 168.70 1.82 0.00 0.20 0.51 0.51 0.61 1.82

3 Hirday Patti 153.03 1.65 0.00 0.18 0.46 0.46 0.55 1.65

4 Badhauna 166.95 1.80 0.00 0.20 0.50 0.50 0.60 1.80

5 Bhagwati Daspur 9.35 0.10 0.00 0.01 0.03 0.03 0.03 0.10

6 Bhalla 171.87 1.86 0.00 0.21 0.52 0.52 0.62 1.86

7 Dulamdaspur 57.86 0.62 0.00 0.07 0.17 0.17 0.21 0.62

8 Ismaila 0.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00

9 Khetalpur 40.49 0.44 0.00 0.05 0.12 0.12 0.15 0.44

10 Pure Uchit 0.65 0.01 0.00 0.00 0.00 0.00 0.00 0.01

11 Rampur Lohara 3.50 0.04 0.00 0.00 0.01 0.01 0.01 0.04

12 Uchetha 29.82 0.32 0.00 0.04 0.09 0.09 0.11 0.32

13 Saroi 2.16 0.02 0.00 0.00 0.01 0.01 0.01 0.02

14 Tarapur 26.38 0.28 0.00 0.03 0.08 0.08 0.09 0.28

15 Bhagwanpur 32.60 0.35 0.00 0.04 0.10 0.10 0.12 0.35

16 Bejavan 134.45 1.45 0.00 0.16 0.40 0.40 0.48 1.45

Total 1009.39 10.90 0.00 1.21 3.03 3.03 3.63 10.90

Page 84: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(84 )

GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF LIVELIHOOD ACTIVITIES IWMP-I,

DISTRICT- SANT RAVIDAS NAGAR

CODE- 2B3A3a3a

Amount in Lacs

S. No. Gram

Panchayat

Project

Area

Proposed

Amount

Livelihood Activities 9% of the Total project Cost

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

1 Badi 0.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2 Chaubepur 75.82 0.82 0.00 0.09 0.23 0.23 0.27 0.82

3 Udhawa Mafi 61.28 0.66 0.00 0.07 0.18 0.18 0.22 0.66

4 Jhingurpur 63.30 0.68 0.00 0.08 0.19 0.19 0.23 0.68

5 Puremudhia 139.65 1.51 0.00 0.17 0.42 0.42 0.50 1.51

6 Dulamdaspur 40.38 0.44 0.00 0.05 0.12 0.12 0.15 0.44

7 Chaubepur 28.89 0.31 0.00 0.03 0.09 0.09 0.10 0.31

8 Hariyawana 32.55 0.35 0.00 0.04 0.10 0.10 0.12 0.35

9 Ismaila 88.68 0.96 0.00 0.11 0.27 0.27 0.32 0.96

10 Rampur 58.03 0.63 0.00 0.07 0.17 0.17 0.21 0.63

11 Raghopur 11.53 0.12 0.00 0.01 0.03 0.03 0.04 0.12

12 Rajpura 21.07 0.23 0.00 0.03 0.06 0.06 0.08 0.23

13 Rampur Z Saroi 83.31 0.90 0.00 0.10 0.25 0.25 0.30 0.90

14 Saroi 97.76 1.06 0.00 0.12 0.29 0.29 0.35 1.06

15 Khemaipur 28.40 0.31 0.00 0.03 0.09 0.09 0.10 0.31

Total 830.90 8.97 0.00 1.00 2.49 2.49 2.99 8.97

Page 85: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(85 )

GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF LIVELIHOOD ACTIVITIES IWMP-I,

DISTRICT- SANT RAVIDAS NAGAR

CODE- 2B3A3a3c

Amount in Lacs

S. No. Gram

Panchayat

Project

Area

Proposed

Amount

Livelihood Activities 9% of the Total project Cost

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

1 Badi 153.00 1.65 0.00 0.18 0.46 0.46 0.55 1.65

2 Mullupur 152.92 1.65 0.00 0.18 0.46 0.46 0.55 1.65

3 Dulamdaspur 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00

4 Ismaila 123.41 1.33 0.00 0.15 0.37 0.37 0.44 1.33

5 Jangla 245.22 2.65 0.00 0.29 0.74 0.74 0.88 2.65

6 Khetalpur 60.00 0.65 0.00 0.07 0.18 0.18 0.22 0.65

7 Khemaipur 23.23 0.25 0.00 0.03 0.07 0.07 0.08 0.25

8 Lila Dharpur 163.72 1.77 0.00 0.20 0.49 0.49 0.59 1.77

9 Marchwar 82.88 0.90 0.00 0.10 0.25 0.25 0.30 0.90

10 Poore Uchit 5.18 0.06 0.00 0.01 0.02 0.02 0.02 0.06

11 Rauri 12.29 0.13 0.00 0.01 0.04 0.04 0.04 0.13

12 Uchetha 23.33 0.25 0.00 0.03 0.07 0.07 0.08 0.25

13 Ugapur 3.29 0.04 0.00 0.00 0.01 0.01 0.01 0.04

14 Jagadhari 59.63 0.64 0.00 0.07 0.18 0.18 0.21 0.64

15 Bejavan 146.63 1.58 0.00 0.18 0.44 0.44 0.53 1.58

16 Sarouli 34.38 0.37 0.00 0.04 0.10 0.10 0.12 0.37

Total 1289.13 13.92 0.00 1.55 3.87 3.87 4.64 13.92

Page 86: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(86 )

DETAILS OF LIVELIHOOD ACTIVITIES AT GLANCE UNDER IWMP-I,

DISTRICT-SANT RAVIDAS NAGAR

S. No.

Gram Panchayat

General Merchant Shop Goat Keeping Poultry

20

09

-10

20

10

-11

20

11

-12

20

12

-13

20

13

-14

Tota

l

20

09

-10

20

10

-11

20

11

-12

20

12

-13

20

13

-14

Tota

l

20

09

-10

20

10

-11

20

11

-12

20

12

-13

20

13

-14

Tota

l

1 Dhaskari 2 2 1 2 7 1 2 1 1 5 1 1 1 1 4

2 Kanehari 1 1 2 1 5 1 1 1 1 4 1 2 1 1 5

3 Dattipur 1 1 2 2 6 1 2 1 1 5 2 1 1 1 5

4 Chak Harivansh

Bhatan kala 1 2 1 1 5 1 2 1 2 6 1 1 1 2 5

5 Musilatpur 1 1 2 2 6 1 2 1 1 5 1 1 1 1 4

6 Jangala 2 1 1 1 5 2 1 1 1 5 2 2 1 1 6

Total 0 8 8 9 9 34 0 7 10 6 7 30 0 8 8 6 7 29

S. No.

Gram Panchayat

Diary Tailoring Pottery Carpet Weaving

20

09

-10

20

10

-11

20

11

-12

20

12

-13

20

13

-14

Tota

l

20

09

-10

20

10

-11

20

11

-12

20

12

-13

20

13

-14

Tota

l

20

09

-10

20

10

-11

20

11

-12

20

12

-13

20

13

-14

Tota

l

20

09

-10

20

10

-11

20

11

-12

20

12

-13

20

13

-14

Tota

l

1 Dhaskari 1 1 1 1 4 1 2 1 1 5 1 1 1 1 4 1 2 1 1 5

2 Kanehari 1 2 1 1 5 1 1 1 1 4 1 2 2 1 6 1 2 2 1 6

3 Dattipur 1 1 2 1 5 1 2 1 2 6 1 1 1 2 5 1 1 1 2 5

4 Chak Harivansh

Bhatan kala 1 1 1 2 5 1 1 1 1 4 1 2 2 1 6 1 2 1 1 5

5 Musilatpur 1 2 1 1 5 1 2 1 2 6 2 2 1 2 7 1 2 1 2 6

6 Jangala 1 1 1 1 4 1 1 1 1 4 2 1 1 1 5 1 1 2 1 5

Total 0 6 8 7 7 28 0 6 9 6 8 29 0 8 9 8 8 33 0 6 10 8 8 32 Approx cost:- General Merchant Shop @ Rs. 25000/- Goat Keeping @ Rs. 25000/- Poultry @ Rs. 25000/- Diary @ Rs. 25000/- Tailoring @ Rs. 20000/-

Pottery @ Rs. 15000/- Carpet Weaving @ Rs. 25000/-

Page 87: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(87 )

Total allocation of fund in this activity is Rs. 54.89 lacs. Out off which Rs. 49.00 lacs have been

allocated in different activity as required in the project area. 10% of the fund would be proposed later on.

Page 88: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(88 )

FARM PRODUCTION SYSTEM (10%)

Camps (Demo) for Farm Production System:

IWMP-Ist SANT RAVIDAS NAGAR

Type Seed Demonstration Details

Rabi Season

Wheat Sorghum

1. Variety K 8027 , NW-1012, 1076, HDR-77, Raj -107

2. Sowing Time: 15 November to 25 December

3- Seed rate – 100 -125 Kg/ hectare

4- Requirement of fertilizers / ha N- 125 Kg , P- 70 -75 Kg, K-70-

75 Kg

5. FYM: 60 Ou.

6. Flowering Period: 80 to 85 days.

7. Crop Duration: 120-145 days.

8. Harvesting time : April to May

9. Yield: Irrigated: 50-60 Q/ha

Un-irrigated: 30-35 Q/ha

Note- Hence demonstration cost of wheat /ha is Rs 13000.00 and

the Total cost increases @ 10 % for next year

1. Variety: CSH-16, 9, 14, CSB-13, 15

2. Requirement of Seed /ha - 15 kg

3. Sowing Time - 15 th July to 15 th August

4. Requirement of fertilizers/ha N- 60.0 Kg , P- 40.00Kg, K- 40.00 Kg

5. Fertilizers requirement / ha N- 80.0 Kg , P- 50Kg, K- 40 Kg FYM: 50q

6. Flowering Period: 80-85 days.

7. Crop Duration: 120 to 130 days.

8. Harvesting time : 25 September to 5 October

9. Yield: Grain: 18-20 q/ha Dry Fodder: 200-250q/ha

Note- Hence demonstration cost of SORGHUM /ha is Rs 6500.00 and the Total cost increases @ 10 % for next year.

Kharif Season

Arahar Maize

1. Variety -Long Durtion: Malviya -13 NA -1, NA-2 Short Duration: UPAS-120, ICPL-151, 8801 2- Seed rate /ha – 20 Kg 3. Sowing Time: June-July 4- Fertilizers requirement / ha N- 20.0 Kg , P- 50Kg, K- 40 Kg 4. FYM: 50 Q 5. Flowering Period: Long Duration:160 to 175 days. Short Duration: 110-120 days 6. Crop Duration: Long Duration: 270-280 days. Short Duration: 130-140 days 7. Harvesting time : Long Duration: March To April, Short Duration:

1. Variety: Hybrid: Ganga-2, 11,Shaktiman, Dakkan-7, Prakash, Sartaj

2. Sankul: Tarun, Naveen, Kanchan, Sweta, Prabhat, Gaurav

3. Requirement of Seed /ha - 15 kg I

3. Sowing Time - 15 th July to 15 th August

4. Requirement of fertilizers / ha N- 60.0 Kg , P- 40.00Kg, K- 40.00 Kg

5. Fertilizers requirement / ha N- 80.0 Kg , P- 50Kg, K- 40 Kg

FYM: 50 Q

6. Flowering Period: 80-85 days.

7. Crop Duration: 120 to 130 days.

Page 89: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(89 )

November to December 8. Yield : Long Duration: 18-20 Q/ha Short Duration: 20-25 Q/ha Note- Hence demonstration cost of Arahar /ha is Rs 10000.00 and the Total cost increases @ 10 % for next year.

8. Harvesting time : 25 September to 5 October

9. Yield: Grain: 18-20 Q/ha

Dry Fodder: 200-250 Q/ha

Note- Hence demonstration cost of SORGHUM /ha is Rs 6500.00 and the Total cost cost

increases @ 10 % for next year.

Seed

Distribution of high yield verity seed of Arhar, Wheat and maize, etc.

Animal Husbandry

Organize of health camp animals, and feed for animals.

Agriculture Toolkit

Distribution of agriculture toolkit to the individual.

YEARWISE FINANCIAL BREAK UP OF PRODUCTION & MICRO ENTERPRISES, IWMP-I,

DISTRICT- SANT RAVIDAS NAGAR

Amount in Lacs

S. No. Micro

watershed

Project

Area

Proposed

Amount

Production System & Microenterprises 10% of the Total

Project Cost WDF

2009-

10 2010-11 2011-12 2012-13 2013-14 TOTAL

1 Dhaskari 629.21 7.55 0.00 0.76 1.89 1.89 3.02 7.55 0.76

2 Kanehari 794.64 9.54 0.00 0.95 2.38 2.38 3.81 9.54 0.95

3 Dattipur 1009.39 12.11 0.00 1.21 3.03 3.03 4.85 12.11 1.21

4 Chak

Harivansh Bhatan kala

830.90 9.97 0.00 1.00 2.49 2.49 3.99 9.97 1.00

5 Musilatpur 528.73 6.34 0.00 0.63 1.59 1.59 2.54 6.34 0.63

6 Jangala 1289.13 15.47 0.00 1.55 3.87 3.87 6.19 15.47 1.55

Total 5082 60.98 0.00 6.10 15.25 15.25 24.39 60.98 6.10

Page 90: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(90 )

GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF PRODUCTION & MICRO ENTERPRISES, IWMP-I,

DISTRICT- SANT RAVIDAS NAGAR

CODE- 2B3A3a2b Amount in Lacs

S. No. GRAM

PANCHAYAT

Project

Area

Proposed

Amount

Production System & Microenterprises 10% of the Total Project Cost

WDF 2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

1 Hirday Patti 94.77 1.14 0.00 0.11 0.28 0.28 0.45 1.14 0.11

2 Chaubepur 91.21 1.09 0.00 0.11 0.27 0.27 0.44 1.09 0.11

3 Ahamadpur Phulwaria

48.57 0.58 0.00 0.06 0.15 0.15 0.23 0.58 0.06

4 Mahboobpur 11.37 0.14 0.00 0.01 0.03 0.03 0.05 0.14 0.01

5 Raghopur 213.00 2.56 0.00 0.26 0.64 0.64 1.02 2.56 0.26

6 Dulandaspur 12.80 0.15 0.00 0.02 0.04 0.04 0.06 0.15 0.02

7 Ramraipur 111.01 1.33 0.00 0.13 0.33 0.33 0.53 1.33 0.13

8 Saroi 45.79 0.55 0.00 0.05 0.14 0.14 0.22 0.55 0.05

9 Rajpura 0.68 0.01 0.00 0.00 0.00 0.00 0.00 0.01 0.00

Total 629.21 7.55 0.00 0.76 1.89 1.89 3.02 7.55 0.76

GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF PRODUCTION & MICRO ENTERPRISES, IWMP-I,

DISTRICT- SANT RAVIDAS NAGAR

CODE- 2B3A3a2a Amount in Lacs

S.

No.

GRAM

PANCHAYAT

Project

Area

Proposed

Amount

Production System & Microenterprises 10% of the Total Project

Cost WDF

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

1 Hirday Patti 100.03 1.20 0.00 0.12 0.30 0.30 0.48 1.20 0.12

2 Bhagwati Daspur 78.04 0.94 0.00 0.09 0.23 0.23 0.37 0.94 0.09

3 Kom 5.46 0.07 0.00 0.01 0.02 0.02 0.03 0.07 0.01

4 Bhalla 136.00 1.63 0.00 0.16 0.41 0.41 0.65 1.63 0.16

5 Badhauna 0.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

6 Daribpur 177.54 2.13 0.00 0.21 0.53 0.53 0.85 2.13 0.21

7 Chak Sanath 128.00 1.54 0.00 0.15 0.38 0.38 0.61 1.54 0.15

8 Dattipur 2.86 0.03 0.00 0.00 0.01 0.01 0.01 0.03 0.00

9 Awashanpur 74.23 0.89 0.00 0.09 0.22 0.22 0.36 0.89 0.09

10 Sharbat Khani 40.88 0.49 0.00 0.05 0.12 0.12 0.20 0.49 0.05

11 Palahiya 51.46 0.62 0.00 0.06 0.15 0.15 0.25 0.62 0.06

Total 794.64 9.54 0.00 0.95 2.38 2.38 3.81 9.54 0.95

Page 91: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(91 )

GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF PRODUCTION & MICRO ENTERPRISES, IWMP-I,

DISTRICT- SANT RAVIDAS NAGAR

CODE- 2B3A3a2c Amount in Lacs

S.

No.

GRAM

PANCHAYAT

Project

Area

Proposed

Amount

Production System & Microenterprises 10% of the Total Project

Cost WDF

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

1 Bharatpur 11.25 0.13 0.00 0.01 0.03 0.03 0.05 0.13 0.01

2 Bishapur 168.70 2.02 0.00 0.20 0.51 0.51 0.81 2.02 0.20

3 Hirday Patti 153.03 1.84 0.00 0.18 0.46 0.46 0.73 1.84 0.18

4 Badhauna 166.95 2.00 0.00 0.20 0.50 0.50 0.80 2.00 0.20

5 Bhagwati Daspur 9.35 0.11 0.00 0.01 0.03 0.03 0.04 0.11 0.01

6 Bhalla 171.87 2.06 0.00 0.21 0.52 0.52 0.82 2.06 0.21

7 Dulamdaspur 57.86 0.69 0.00 0.07 0.17 0.17 0.28 0.69 0.07

8 Ismaila 0.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

9 Khetalpur 40.49 0.49 0.00 0.05 0.12 0.12 0.19 0.49 0.05

10 Pure Uchit 0.65 0.01 0.00 0.00 0.00 0.00 0.00 0.01 0.00

11 Rampur Lohara 3.50 0.04 0.00 0.00 0.01 0.01 0.02 0.04 0.00

12 Uchetha 29.82 0.36 0.00 0.04 0.09 0.09 0.14 0.36 0.04

13 Saroi 2.16 0.03 0.00 0.00 0.01 0.01 0.01 0.03 0.00

14 Tarapur 26.38 0.32 0.00 0.03 0.08 0.08 0.13 0.32 0.03

15 Bhagwanpur 32.60 0.39 0.00 0.04 0.10 0.10 0.16 0.39 0.04

16 Bejavan 134.45 1.61 0.00 0.16 0.40 0.40 0.65 1.61 0.16

Total 1009.39 12.11 0.00 1.21 3.03 3.03 4.85 12.11 1.21

Page 92: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(92 )

GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF PRODUCTION & MICRO ENTERPRISES, IWMP-I,

DISTRICT- SANT RAVIDAS NAGAR

CODE- 2B3A3a3a Amount in Lacs

S.

No.

GRAM

PANCHAYAT

Project

Area

Proposed

Amount

Production System & Microenterprises 10% of the Total Project

Cost WDF

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

1 Badi 0.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2 Chaubepur 75.82 0.91 0.00 0.09 0.23 0.23 0.36 0.91 0.09

3 Udhawa Mafi 61.28 0.74 0.00 0.07 0.18 0.18 0.29 0.74 0.07

4 Jhingurpur 63.30 0.76 0.00 0.08 0.19 0.19 0.30 0.76 0.08

5 Puremudhia 139.65 1.68 0.00 0.17 0.42 0.42 0.67 1.68 0.17

6 Dulamdaspur 40.38 0.48 0.00 0.05 0.12 0.12 0.19 0.48 0.05

7 Chaubepur 28.89 0.35 0.00 0.03 0.09 0.09 0.14 0.35 0.03

8 Hariyawana 32.55 0.39 0.00 0.04 0.10 0.10 0.16 0.39 0.04

9 Ismaila 88.68 1.06 0.00 0.11 0.27 0.27 0.43 1.06 0.11

10 Rampur 58.03 0.70 0.00 0.07 0.17 0.17 0.28 0.70 0.07

11 Raghopur 11.53 0.14 0.00 0.01 0.03 0.03 0.06 0.14 0.01

12 Rajpura 21.07 0.25 0.00 0.03 0.06 0.06 0.10 0.25 0.03

13 Rampur Z Saroi 83.31 1.00 0.00 0.10 0.25 0.25 0.40 1.00 0.10

14 Saroi 97.76 1.17 0.00 0.12 0.29 0.29 0.47 1.17 0.12

15 Khemaipur 28.40 0.34 0.00 0.03 0.09 0.09 0.14 0.34 0.03

Total 830.90 9.97 0.00 1.00 2.49 2.49 3.99 9.97 1.00

Page 93: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(93 )

GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF PRODUCTION & MICRO ENTERPRISES, IWMP-I,

DISTRICT- SANT RAVIDAS NAGAR

CODE- 2B3A3a3b Amount in Lacs

S.

No.

GRAM

PANCHAYAT

Project

Area

Proposed

Amount

Production System & Microenterprises 10% of the Total Project

Cost WDF

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

1 Udhawa Mafi 108.13 1.30 0.00 0.13 0.32 0.32 0.52 1.30 0.13

2 Jhingurpur 19.13 0.23 0.00 0.02 0.06 0.06 0.09 0.23 0.02

3 Hariyawan 302.50 3.63 0.00 0.36 0.91 0.91 1.45 3.63 0.36

4 Khemaipur 42.35 0.51 0.00 0.05 0.13 0.13 0.20 0.51 0.05

5 Rajpura 9.77 0.12 0.00 0.01 0.03 0.03 0.05 0.12 0.01

6 Rampur Z Saroi 12.47 0.15 0.00 0.01 0.04 0.04 0.06 0.15 0.01

7 Gangapur 34.39 0.41 0.00 0.04 0.10 0.10 0.17 0.41 0.04

Total 528.73 6.34 0.00 0.63 1.59 1.59 2.54 6.34 0.63

Page 94: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(94 )

GRAM PANCHAYAT WISE FINANCIAL BREAK UP OF PRODUCTION & MICRO ENTERPRISES, IWMP-I,

DISTRICT- SANT RAVIDAS NAGAR

CODE- 2B3A3a3c Amount in Lacs

S.

No.

GRAM

PANCHAYAT

Project

Area

Proposed

Amount

Production System & Microenterprises 10% of the Total Project

Cost WDF

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

1 Badi 153.00 1.84 0.00 0.18 0.46 0.46 0.73 1.84 0.18

2 Mullupur 152.92 1.84 0.00 0.18 0.46 0.46 0.73 1.84 0.18

3 Dulamdaspur 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

4 Ismaila 123.41 1.48 0.00 0.15 0.37 0.37 0.59 1.48 0.15

5 Jangla 245.22 2.94 0.00 0.29 0.74 0.74 1.18 2.94 0.29

6 Khetalpur 60.00 0.72 0.00 0.07 0.18 0.18 0.29 0.72 0.07

7 Khemaipur 23.23 0.28 0.00 0.03 0.07 0.07 0.11 0.28 0.03

8 Lila Dharpur 163.72 1.96 0.00 0.20 0.49 0.49 0.79 1.96 0.20

9 Marchwar 82.88 0.99 0.00 0.10 0.25 0.25 0.40 0.99 0.10

10 Poore Uchit 5.18 0.06 0.00 0.01 0.02 0.02 0.02 0.06 0.01

11 Rauri 12.29 0.15 0.00 0.01 0.04 0.04 0.06 0.15 0.01

12 Uchetha 23.33 0.28 0.00 0.03 0.07 0.07 0.11 0.28 0.03

13 Ugapur 3.29 0.04 0.00 0.00 0.01 0.01 0.02 0.04 0.00

14 Jagadhari 59.63 0.72 0.00 0.07 0.18 0.18 0.29 0.72 0.07

15 Bejavan 146.63 1.76 0.00 0.18 0.44 0.44 0.70 1.76 0.18

16 Sarouli 34.38 0.41 0.00 0.04 0.10 0.10 0.17 0.41 0.04

Total 1289.13 15.47 0.00 1.55 3.87 3.87 6.19 15.47 1.55

The activity has already been shown in the respective map.

Page 95: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(95 )

DETAILS OF PRODUCTION SYSTEM & MICRO ENTERPRISES ACTIVITIES AT GLANCE UNDER IWMP-I, DISTRICT-SANT RAVIDAS NAGAR

S. No.

Gram Panchayat

CROP DEMOSTRATION ANIMAL HUSBANDRY HORTICULTURE NURSURY SEED DISTRIBUTION

2009

-10

2010

-11

2011

-12

2012

-13

2013

-14

Tot

al

2009

-10

2010

-11

2011

-12

2012

-13

2013

-14

Tot

al

2009

-10

2010

-11

2011

-12

2012

-13

2013

-14

Tot

al

2009

-10

2010

-11

2011

-12

2012

-13

2013

-14

Tot

al

2009

-10

2010

-11

2011

-12

2012

-13

2013

-14

Tot

al

1 Ramraipur 0 1

1 0

1 1 0 1

1 0

1

1 0

1 1

2 Bharatpur 0

1

1 0

1

1 0

1

1 0

1

1 0

1

1

3 Bishapur 0

1

1 0 1

1 0

1 1 0

1 1 0 1

1

4 Ugapur 0 1

1 0

1

1 0 1

1 0 1

1 0

1

1

5 Jagadhari 0

1

1 0

1

1 0

1

1 0

1

1 0

1 1

6 Bejavan 0

1 1 0 1

1 0

1

1 0 1

1 0

1

1

7 Sarouli 0 1

1 0

1

1 0

1 1 0

1

1 0 1

1

8 Rauri 0

1

1 0

1 1 0 1

1 0

1 1 0

1

1

9 Lila Dharpur 0

1 1 0 1

1 0

1

1 0

1

1 0

1 1

10 Marchwar 0 1

1 0

1

1 0

1

1 0 1

1 0

1

1

11 Tarapur 0

1

1 0

1

1 0

1 1 0

1

1 0 1

1

12 Bhagwanpur 0

1 1 0

1 1 0

1

1 0

1 1 0

1

1

13 Bejavan 0 1

1 0 1

1 0 1

1 0

1

1 0

1

1

14 Rampur Lohara

0

1

1 0

1 1 0

1

1 0 1

1 0

1 1

15 Mahboobpur 0

1

1 0

1

1 0

1

1 0

1

1 0

1

1

16 Ahamadpur Phulwaria

0

1 1 0

1

1 0

1 1 0

1 1 0 1

1

17 Hirday Patti 0 1

1 0 1

1 0 1

1 0

1

1 0

1

1

18 Badhauna 0

1

1 0

1 1 0

1

1 0 1

1 0

1 1

19 Bhagwati Daspur

0

1

1 0

1

1 0

1

1 0

1

1 0

1

1

20 Bhalla 0

1 1 0

1

1 0

1 1 0 1

1 0

1

1

21 Palahiya 0 1

1 0 1

1 0 1

1 0

1

1 0 1

1

22 Daribpur 0

1

1 0

1 1 0

1

1 0 1

1 0

1

1

23 Chak Sanath 0

1

1 0

1

1 0

1

1 0 1

1 0

1 1

24 Chaubepur 0 1

1 0 1

1 0

1

1 0

1 1 0

1

1

25 Dulamdaspur 0

1

1 0

1

1 0

1 1 0 1

1 0

1

1

Page 96: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(96 )

26 Udhawa Mafi 0

1 1 0

1

1 0 1

1 0

1

1 0 1

1

27 Hariyawan 0 1

1 0

1 1 0

1

1 0

1

1 0

1

1

28 Ismaila 0

1

1 0 1

1 0

1 1 0

1 1 0

1 1

29 Jhingurpur 0

1 1 0

1

1 0

1

1 0 1

1 0

1

1

30 Raghopur 0 1

1 0

1

1 0 1

1 0

1

1 0

1

1

31 Saroi 0

1

1 0

1 1 0

1

1 0

1

1 0

1

1

32 Rampur Z

Saroi 0

1 1 0

1

1 0

1

1 0

1 1 0 1

1

33 Puremudhia 0 1

1 0 1

1 0

1

1 0 1

1 0

1 1

34 Mullupur 0

1

1 0

1

1 0

1 1 0

1

1 0

1

1

35 Jangla 0

1 1 0

1 1 0

1

1 0 1

1 0

1

1

36 Rampur 0 1

1 0

1

1 0

1

1 0

1

1 0 1

1

37 Kom 0

1

1 0 1

1 0 1

1 0

1 1 0

1 1

38 Dattipur 0

1 1 0

1

1 0

1

1 0

1

1 0

1

1

39 Awashanpur 0

1

1 0

1

1 0

1 1 0 1

1 0

1

1

40 Poore Uchit 0 1

1 0

1 1 0 1

1 0

1

1 0

1

1

41 Uchetha 0

1

1 0 1

1 0

1

1 0

1 1 0 1

1

42 Hariyawana 0

1

1 0

1 1 0

1

1 0

1

1 0

1 1

43 Khemaipur 0

1 1 0

1

1 0

1 1 0 1

1 0

1

1

44 Rajpura 0 1

1 0

1

1 0 1

1 0

1

1 0

1

1

45 Sharbat Khani 0

1

1 0 1

1 0

1

1 0

1 1 0 1

1

46 Gangapur 0

1

1 0

1

1 0

1 1 0 1

1 0

1 1

47 Badi 0

1 1 0

1

1 0

1

1 0

1

1 0

1

1

48 Khetalpur 0 1

1 0 1

1 0 1

1 0

1

1 0

1

1

Total 0 15 14 7 12 48 0 13 13 11 11 48 0 12 13 12 11 48 0 15 12 11 10 48 0 10 16 11 11 48

Approx cost of crop demonstration is No. 1. Wheat – 13000.00 per ha., 2. Surghum - 6500.00 per ha., Arhar – 10000.00 per ha.,

Paddy – 13000.00 per ha and Maize – 6500.00 per ha. Seed distribution Rs. 20000.00 per GP, Animal husbandary – 20000.00 per GP,

Horticulature – 15000.00 per GP and Nursery – 22000.00 per GP.

Page 97: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(97 )

GRAM PANCHAYAT WISE PRODUCTION SYSTEM AND MICRO ENTERPRISE ACITIVITY

Overall fund in the activities is Rs. 60.98 lac.

The above action plan has been prepared according to the need and resources available in the

project area. Individual activity fund distribution has been made the details would be given beneficiary

wise in the project file. Demonstration of crop, animal husbandry camp distribution of seed and plantation

of fruit trees are the essential requirement of the project area. Therefore the above plan has been

constituted according to the aforesaid activity and the funds were allocated as per the norms.

Page 98: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(98 )

MAJOR PROBLEMS OF THE WATERSHEDS

Moisture stress-Drought conditions

Erosion hazard

Excess runoff .

Land degradation

Low fertility of soil

Ground water depletion/Low ground water table, poor quality of groundwater

Low cropping intensity

Lack of technical knowledge

Lack of irrigation facilities

Low productivity of crops

Low availability of drinking water for human as well as animals

Overgrazing

Poor vegetative cover

Poor/low productive breeds of miltch animals

Lower milk production

Lack of feed & fodder availability

Non availability of wood/fuel

Lack of proper market facilities

Lack of educational, transportation, medical & health care facilities

Low wages

Small land holdings

Low income of the households

Lack of employment opportunity.

Migration from the project area.

An annual action plan for the entire activity of the project according to availability of budget has

been proposed for the annual schedule from 2009-10 to 2013-14.The details given below.

Page 99: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(99 )

ANNUAL ACTION PLAN OF IWMP-Ist, SANT RAVIDAS NAGAR

S. No. Gram Panchayat Area Watershed

Development Work Livelihood Activities

Production System & Micro Enterprises

Total Remarks

1 2 3 4 5 6 7 8

1 Ramraipur 111 7.46 1.20 1.33 9.99

2 Bharatpur 11 0.76 0.12 0.13 1.01

3 Bishapur 169 11.34 1.82 2.02 15.18

4 Ugapur 3 0.22 0.04 0.04 0.30

5 Jagadhari 60 4.01 0.64 0.72 5.37

6 Bejavan 147 9.85 1.58 1.76 13.20

7 Sarouli 34 2.31 0.37 0.41 3.09

8 Rauri 12 0.83 0.13 0.15 1.11

9 Lila Dharpur 164 11.00 1.77 1.96 14.73

10 Marchwar 83 5.57 0.90 0.99 7.46

11 Tarapur 26 1.77 0.28 0.32 2.37

12 Bhagwanpur 33 2.19 0.35 0.39 2.93

13 Bejavan 134 9.04 1.45 1.61 12.10

14 Rampur Lohara 3 0.24 0.04 0.04 0.31

15 Mahboobpur 11 0.76 0.12 0.14 1.02

16 Ahamadpur Phulwaria 49 3.29 0.53 0.59 4.41

17 Hirday Patti 348 23.39 3.76 4.18 31.32

18 Badhauna 167 11.22 1.80 2.00 15.03

19 Bhagwati Daspur 87 5.85 0.94 1.04 7.83

20 Bhalla 308 20.70 3.33 3.70 27.72

21 Palahiya 51 3.43 0.55 0.61 4.59

22 Daribpur 178 11.96 1.92 2.14 16.02

23 Chak Sanath 128 8.60 1.38 1.54 11.52

24 Chaubepur 196 13.17 2.12 2.35 17.64

25 Dulamdaspur 111 7.46 1.20 1.33 9.99

26 Udhawa Mafi 169 11.36 1.83 2.03 15.21

Page 100: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(100 )

27 Hariyawan 302 20.29 3.26 3.62 27.18

28 Ismaila 212 14.25 2.29 2.54 19.08

29 Jhingurpur 82 5.51 0.89 0.98 7.38

30 Raghopur 225 15.12 2.43 2.70 20.25

31 Saroi 146 9.81 1.58 1.75 13.14

32 Rampur Z Saroi 96 6.45 1.04 1.15 8.64

33 Puremudhia 140 9.41 1.51 1.68 12.60

34 Mullupur 153 10.28 1.65 1.84 13.77

35 Jangla 245 16.46 2.65 2.94 22.05

36 Rampur 58 3.90 0.63 0.70 5.22

37 Kom 5 0.34 0.05 0.06 0.45

38 Dattipur 4 0.27 0.04 0.05 0.36

39 Awashanpur 74 4.97 0.80 0.89 6.66

40 Poore Uchit 6 0.40 0.06 0.07 0.54

41 Uchetha 53 3.56 0.57 0.64 4.77

42 Hariyawana 33 2.22 0.36 0.40 2.97

43 Khemaipur 94 6.32 1.02 1.13 8.46

44 Rajpura 32 2.15 0.35 0.38 2.88

45 Sharbat Khani 41 2.76 0.44 0.49 3.69

46 Gangapur 34 2.28 0.37 0.41 3.06

47 Badi 153 10.28 1.65 1.84 13.77

48 Khetalpur 100 6.72 1.08 1.20 9.00

Total 5082 341.52 54.89 60.98 457.38

Page 101: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(101 )

Financial Break up of Watershed Development Works Fin. : in Lacs

For Project Proposed 2009-10

Activity Target as AAP Actual Achievment

2009-10 2010-11 2011-12 2012-13 2013-14 Total 2010-11 2011-12 Justification

Land Development Afforestation 0.00 2.28 4.10 3.93 4.92 15.23

Horticulture 0.00 0.93 1.67 1.61 2.00 6.22

Agriculture

Pasture

SMC Staggered trenching

Contour Bonding 0.00 16.03 28.74 27.57 34.52 106.86

Bench terracing

Others FB/MB/PFB 0.00 12.22 21.93 21.01 26.32 81.48

Veg. & Engg. Structures Earthen Checks 0.00 6.33 11.35 10.90 13.63 42.21

Brushwood Checks

Gully Plugs 0.00 2.23 4.00 3.84 4.81 14.89

Loose Boulders 0.00 0.55 0.98 0.95 1.18 3.65

Gabion Structures

Others

WHS Farm Ponds 0.00 0.84 1.51 1.44 1.81 5.60

Check dams/Tanks 0.00 5.01 8.97 8.63 10.79 33.40

Nallah Bunds 0.00 1.17 2.11 2.02 2.53 7.82

Percolation Tanks 0.00 1.02 1.83 1.77 2.21 6.83

Ground Water Recharge Structures 0.00 1.02 1.83 1.77 2.21 6.83

Others WHB/SB 0.00 1.57 2.81 2.71 3.39 10.48

Sub Total 0.00 51.2 91.83 88.15 110.32 341.5

Livelihood on-Farm activities 0.00 1.65 6.59 4.94 3.29 16.47

off-Farm activities 0.00 3.84 15.37 11.53 7.68 38.42

Sub Total 0.00 5.49 21.96 16.47 10.97 54.89

Production System Production System 0.00 5.11 20.45 21.91 13.51 60.98

Total 0.00 61.80 134.25 126.52 134.81 457.38

Page 102: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(102 )

Financial Break up of Watershed Development Works Fin. : in Lacs

MWS Code- 2B3A3a2b MWS Name- Dhaskari

Activity Target as AAP Actual Achievment

2009-10 2010-11 2011-12 2012-13 2013-14 Total 2010-11 2011-12 Justification

Land Development Afforestation 0.00 0.26 0.46 0.44 0.55 1.71

Horticulture 0.00 0.10 0.19 0.18 0.23 0.70

Agriculture

Pasture

SMC Staggered trenching

Contour Bonding 0.00 1.80 3.23 3.10 3.88 12.01

Bench terracing

Others FB/MB/PFB 0.00 1.37 2.46 2.36 2.96 9.15

Veg. & Engg. Structures Earthen Checks 0.00 0.71 1.28 1.22 1.53 4.74

Brushwood Checks

Gully Plugs 0.00 0.25 0.45 0.43 0.54 1.67

Loose Boulders 0.00 0.06 0.11 0.11 0.13 0.41

Gabion Structures

Others

WHS Farm Ponds 0.00 0.09 0.17 0.16 0.20 0.63

Check dams/Tanks 0.00 0.56 1.01 0.97 1.21 3.75

Nallah Bunds 0.00 0.13 0.24 0.23 0.28 0.88

Percolation Tanks 0.00 0.11 0.21 0.20 0.25 0.77

Ground Water Recharge Structures 0.00 0.11 0.21 0.20 0.25 0.77

Others WHB/SB 0.00 0.18 0.32 0.30 0.38 1.18

Sub-Total 0.00 5.73 10.34 9.9 12.39 38.37

Livelihood on-Farm activities 0.00 0.18 0.74 0.55 0.37 1.85

off-Farm activities 0.00 0.43 1.73 1.29 0.86 4.32

Sub-Total 0 0.61 2.47 1.84 1.23 6.17

Production System Production System 0.00 0.57 2.30 2.46 1.52 6.85

Total 0.00 6.94 15.08 14.21 15.15 51.39

Page 103: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(103 )

Financial Break up of Watershed Development Works Fin. : in Lacs

MWS Code- 2B3A3a2c MWS Name- Dattipur

Activity Target as AAP Actual Achievment

2009-10 2010-11 2011-12 2012-13 2013-14 Total 2010-11 2011-12 Justification

Land Development Afforestation 0.00 0.48 0.86 0.82 1.03 3.18

Horticulture 0.00 0.19 0.35 0.34 0.42 1.30

Agriculture

Pasture

SMC Staggered trenching

Contour Bonding 0.00 3.34 6.00 5.75 7.20 22.30

Bench terracing

Others FB/MB/PFB 0.00 2.55 4.58 4.39 5.49 17.00

Veg. & Engg. Structures Earthen Checks 0.00 1.32 2.37 2.27 2.84 8.81

Brushwood Checks

Gully Plugs 0.00 0.47 0.83 0.80 1.00 3.11

Loose Boulders 0.00 0.11 0.20 0.20 0.25 0.76

Gabion Structures

Others

WHS Farm Ponds 0.00 0.18 0.32 0.30 0.38 1.17

Check dams/Tanks 0.00 1.05 1.87 1.80 2.25 6.97

Nallah Bunds 0.00 0.24 0.44 0.42 0.53 1.63

Percolation Tanks 0.00 0.21 0.38 0.37 0.46 1.43

Ground Water Recharge Structures 0.00 0.21 0.38 0.37 0.46 1.43

Others WHB/SB 0.00 0.33 0.59 0.57 0.71 2.19

Sub-Total 0.00 10.68 19.17 18.4 23.02 71.28

Livelihood on-Farm activities 0.00 0.34 1.37 1.03 0.69 3.44

off-Farm activities 0.00 0.80 3.21 2.41 1.60 8.02

Sub-Total 0 1.14 4.58 3.44 2.29 11.46

Production System Production System 0.00 1.07 4.27 4.57 2.82 12.73

Total 0.00 12.90 28.01 26.40 28.13 95.44

Page 104: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(104 )

Financial Break up of Watershed Development Works Fin. : in Lacs

MWS Code- 2B3A3a2a MWS Name- Kanehri

Activity Target as AAP Actual Achievment

2009-10 2010-11 2011-12 2012-13 2013-14 Total 2010-11 2011-12 Justification

Land Development Afforestation 0.00 0.21 0.38 0.36 0.46 1.41

Horticulture 0.00 0.09 0.15 0.15 0.19 0.57

Agriculture

Pasture

SMC Staggered trenching

Contour Bonding 0.00 1.48 2.66 2.55 3.19 9.88

Bench terracing

Others FB/MB/PFB 0.00 1.13 2.03 1.94 2.43 7.53

Veg. & Engg. Structures Earthen Checks 0.00 0.58 1.05 1.01 1.26 3.90

Brushwood Checks

Gully Plugs 0.00 0.21 0.37 0.36 0.44 1.38

Loose Boulders 0.00 0.05 0.09 0.09 0.11 0.34

Gabion Structures

Others

WHS Farm Ponds 0.00 0.08 0.14 0.13 0.17 0.52

Check dams/Tanks 0.00 0.46 0.83 0.80 1.00 3.09

Nallah Bunds 0.00 0.11 0.19 0.19 0.23 0.72

Percolation Tanks 0.00 0.09 0.17 0.16 0.20 0.63

Ground Water Recharge Structures 0.00 0.09 0.17 0.16 0.20 0.63

Others WHB/SB 0.00 0.15 0.26 0.25 0.31 0.97

Sub-Total 0.00 4.73 8.49 8.15 10.19 31.57

Livelihood on-Farm activities 0.00 0.15 0.61 0.46 0.30 1.52

off-Farm activities 0.00 0.36 1.42 1.07 0.71 3.55

Sub-Total 0.00 0.51 2.03 1.53 1.01 5.07

Production System Production System 0.00 0.47 1.89 2.03 1.25 5.64

Total 0.00 5.71 12.41 11.69 12.46 42.27

Page 105: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(105 )

Financial Break up of Watershed Development Works Fin. : in Lacs

MWS Code- 2B3A3a3a MWS Name- Chakharibansh Bhatankala

Activity Target as AAP Actual Achievment

2009-10 2010-11 2011-12 2012-13 2013-14 Total 2010-11 2011-12 Justification

Land Development Afforestation 0.00 0.23 0.42 0.40 0.50 1.56

Horticulture 0.00 0.10 0.17 0.16 0.21 0.64

Agriculture

Pasture

SMC Staggered trenching

Contour Bonding 0.00 1.64 2.94 2.82 3.53 10.94

Bench terracing

Others FB/MB/PFB 0.00 1.25 2.25 2.15 2.70 8.34

Veg. & Engg. Structures Earthen Checks 0.00 0.65 1.16 1.12 1.40 4.32

Brushwood Checks

Gully Plugs 0.00 0.23 0.41 0.39 0.49 1.52

Loose Boulders 0.00 0.06 0.10 0.10 0.12 0.37

Gabion Structures

Others

WHS Farm Ponds 0.00 0.09 0.16 0.15 0.19 0.57

Check dams/Tanks 0.00 0.51 0.92 0.88 1.10 3.42

Nallah Bunds 0.00 0.12 0.22 0.21 0.26 0.80

Percolation Tanks 0.00 0.10 0.19 0.18 0.23 0.70

Ground Water Recharge Structures 0.00 0.10 0.19 0.18 0.23 0.70

Others WHB/SB 0.00 0.16 0.29 0.28 0.35 1.07

Sub-Total 0.00 5.24 9.42 9.02 11.31 34.95

Livelihood on-Farm activities 0.00 0.17 0.67 0.51 0.34 1.69

off-Farm activities 0.00 0.39 1.57 1.18 0.79 3.93

Sub-Total 0 0.56 2.24 1.69 1.13 5.62

Production System Production System 0.00 0.52 2.09 2.24 1.38 6.24

Total 0.00 6.33 13.75 12.96 13.81 46.84

Page 106: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(106 )

Financial Break up of Watershed Development Works Fin. : in Lacs

MWS Code- 2B3A3a3b MWS Name- Musilatpur

Activity Target as AAP Actual Achievment

2009-10 2010-11 2011-12 2012-13 2013-14 Total 2010-11 2011-12 Justification

Land Development Afforestation 0.00 0.52 0.94 0.90 1.13 3.49

Horticulture 0.00 0.21 0.38 0.37 0.46 1.42

Agriculture

Pasture

SMC Staggered trenching

Contour Bonding 0.00 3.67 6.58 6.31 7.91 24.47

Bench terracing

Others FB/MB/PFB 0.00 2.80 5.02 4.81 6.03 18.66

Veg. & Engg. Structures Earthen Checks 0.00 1.45 2.60 2.50 3.12 9.67

Brushwood Checks

Gully Plugs 0.00 0.51 0.92 0.88 1.10 3.41

Loose Boulders 0.00 0.13 0.22 0.22 0.27 0.84

Gabion Structures

Others

WHS Farm Ponds 0.00 0.19 0.35 0.33 0.41 1.28

Check dams/Tanks 0.00 1.15 2.05 1.98 2.47 7.65

Nallah Bunds 0.00 0.27 0.48 0.46 0.58 1.79

Percolation Tanks 0.00 0.23 0.42 0.40 0.51 1.56

Ground Water Recharge Structures 0.00 0.23 0.42 0.40 0.51 1.56

Others WHB/SB 0.00 0.36 0.64 0.62 0.78 2.40

Sub-Total 0.00 11.72 21.02 20.18 25.28 78.2

Livelihood on-Farm activities 0.00 0.38 1.51 1.13 0.75 3.77

off-Farm activities 0.00 0.88 3.52 2.64 1.76 8.80

Sub-Total 0.00 1.26 5.03 3.77 2.51 12.57

Production System Production System 0.00 1.17 4.68 5.02 3.10 13.97

Total 0.00 14.16 30.75 28.98 30.88 104.76

Page 107: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(107 )

Financial Break up of Watershed Development Works Fin. : in Lacs

MWS Code- 2B3A3a3c MWS Name- Jangala

Activity Target as AAP Actual Achievment

2009-10 2010-11 2011-12 2012-13 2013-14 Total 2010-11 2011-12 Justification

Land Development Afforestation 0.00 0.58 1.05 1.00 1.26 3.89

Horticulture 0.00 0.24 0.43 0.41 0.51 1.59

Agriculture

Pasture

SMC Staggered trenching

Contour Bonding 0.00 4.09 7.33 7.03 8.81 27.26

Bench terracing

Others FB/MB/PFB 0.00 3.12 5.59 5.36 6.71 20.79

Veg. & Engg. Structures Earthen Checks 0.00 1.61 2.90 2.78 3.48 10.77

Brushwood Checks

Gully Plugs 0.00 0.57 1.02 0.98 1.23 3.80

Loose Boulders 0.00 0.14 0.25 0.24 0.30 0.93

Gabion Structures

Others

WHS Farm Ponds 0.00 0.21 0.39 0.37 0.46 1.43

Check dams/Tanks 0.00 1.28 2.29 2.20 2.75 8.52

Nallah Bunds 0.00 0.30 0.54 0.51 0.65 2.00

Percolation Tanks 0.00 0.26 0.47 0.45 0.56 1.74

Ground Water Recharge Structures 0.00 0.26 0.47 0.45 0.56 1.74

Others WHB/SB 0.00 0.40 0.72 0.69 0.86 2.67

Sub-Total 0.00 13.06 23.45 22.47 28.14 87.13

Livelihood on-Farm activities 0.00 0.42 1.68 1.26 0.84 4.20

off-Farm activities 0.00 0.98 3.92 2.94 1.96 9.80

Sub-Total 0 1.4 5.6 4.2 2.8 14

Production System Production System 0.00 1.30 5.22 5.59 3.45 15.56

Total 0.00 15.77 34.25 32.28 34.39 116.69

Page 108: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(108 )

CHAPTER – 6

CAPACITY BUILDING PLAN

Page 109: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(109 )

The total amount in this activity is Rs 30.49 Lacs have been allocated. According to distribution of fund in

different level, a comprehensive detail action plan has been prepared for proper execution of human

resource development in the project activities.

YEARWISE FINANCIAL BREAK UP OF INST. & CAP. BULDG. PROGRAMME OF IWMP-I, DISTRICT- SANT RAVIDAS NAGAR

PIA LAVEL

S. No. Micro watershed Project Area Proposed Amount

Institutional & Capacity Building 5% of the Total Project

2009-10 2010-11 2011-12 2012-13 Total

1 Dhaskari 629.21 2.87 1.04 0.69 0.87 0.26 2.87

2 Kanehari 794.64 3.62 1.32 0.88 1.10 0.33 3.62

3 Dattipur 1009.39 4.60 1.67 1.11 1.39 0.42 4.60

4 Chak Harivansh Bhatan

kala 830.9 3.79 1.38 0.92 1.15 0.35 3.79

5 Musilatpur 528.73 2.41 0.88 0.58 0.73 0.22 2.41

6 Jangala 1289.13 5.88 2.13 1.42 1.78 0.54 5.88

Sub Total 5082 23.17 8.42 5.61 7.01 2.13 23.17

WCDC LEVEL

1 Dhaskari 629.21 0.68 0.23 0.15 0.19 0.11 0.68

2 Kanehari 794.64 0.86 0.29 0.19 0.24 0.14 0.86

3 Dattipur 1009.39 1.09 0.36 0.24 0.30 0.18 1.09

4 Chak Harivansh Bhatan

kala 830.9 0.90 0.30 0.20 0.25 0.15 0.90

5 Musilatpur 528.73 0.57 0.19 0.13 0.16 0.10 0.57

6 Jangala 1289.13 1.39 0.46 0.31 0.39 0.23 1.39

Sub Total 5082 5.49 1.83 1.22 1.52 0.91 5.49

SLNA LEVEL

1 Dhaskari 629.21 0.23 0.09 0.06 0.08 0.00 0.23

2 Kanehari 794.64 0.29 0.11 0.08 0.10 0.00 0.29

3 Dattipur 1009.39 0.36 0.15 0.10 0.12 0.00 0.36

4 Chak Harivansh Bhatan

kala 830.9 0.30 0.12 0.08 0.10 0.00 0.30

5 Musilatpur 528.73 0.19 0.08 0.05 0.06 0.00 0.19

6 Jangala 1289.13 0.46 0.19 0.12 0.15 0.00 0.46

Sub Total 5082 1.83 0.73 0.49 0.61 0.00 1.83

Total 5082 30.49 10.98 7.32 9.15 3.05 30.49

Page 110: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(110 )

Year-wise bifurcation of capacity building activities IWMP -I, Sant Ravidas Nagar

First Year Second Year

S. No. Level Total no of

person

No of person to be trained

No of training to

be conduct

Training day

Total Cost No of

person to be trained

No of training to

be conduct

Training day

Total Cost

1 SLNA 0.73

2 WCDC 14 0 0 0 0 14 3 3 1.83

3 PIA 11 0 0 0 0 11 4 3 1.68

4 WDT 4 0 0 0 0 4 12 2 0.84

5 SHG 96 0 0 0 0 500 1 2 2.1

6 UG 120 0 0 0 0 400 1 2 2.95

7 WC 48 0 0 0 0 350 1 1 0.84

TOTAL 0 10.98

Third Year Fourth Year Fifth Year

No of person to

be trained

No of training

to be conduct

Training day

Total Cost

No of person to

be trained

No of training

to be conduct

Training day

Total Cost

No of person to

be trained

No of training

to be conduct

Training day

Total Cost

0.49 0.61 0

14 2 3 1.22 14 2 4 1.52 0 0 0 0.91

11 3 4 1.12 11 2 4 1.4 11 2 4 0.43

4 4 4 0.56 4 3 6 0.7 4 2 6 0.21

250 1 3 1.4 150 1 3 1.75 50 1 1 0.53

400 1 2 1.96 300 1 2 2.45 75 1 1 0.75

175 1 1 0.56 100 1 2 0.7 85 2 1 0.21

7.32 9.15 3.05

Page 111: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(111 )

List of identified training institutes for capacity building

Project IWMP - I District - Sant Ravidas Nagar

Sr.

No.

Name of the

Training

Institute

Full Address

with contact

no, website

& e-mail

Designation

of the Head

of Institute

Type of

Institute

Area(s) of

specialization

No. of

training

assigned

No. of

persons

to be

trained

Allocation

to be

made to

the

institute

1 2 3 4 5 6 7 8 9

1 Hind Swaraj

Trust(Ralegan

Sidhdhi)

Ahmadnagar

Ahmadnagar.

Maharashra

Kendra

Adhyash

Training Rural

Development

1 1 Rs:-15000

2 SIRD Director Director Training Rural

Development

4 5

3 CSWCRT(Agra) Director Director Training Conservation

of Soil

&Water

1 10 Rs:-22356

Page 112: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(112 )

CHAPTER -7

PHASING OF PROGRAMME

& BUDGETING

Page 113: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(113 )

FINANCIAL BREAKUP OF VARIOUS COMPONENT IN TERMS OF % OF IWMP-I,

DISTRICT-SANT RAVIDASNAGAR

Amount in Lacs

S.

No.

Micro

Watershed P

ro

ject

Area

Pro

po

sed

Am

ou

nt

Ad

min

istr

ati

ve 1

0%

EP

A 4

%

In

sti

tuti

on

an

d C

B 5

%

DP

R 1

%

Wate

rsh

ed

develo

pm

en

t

wo

rk

56

%

Liv

elih

oo

d f

or

Asset

less

9%

Pro

du

cti

on

syste

m a

nd

Mic

ro

en

terp

ris

es 1

0%

Mo

nit

orin

g 1

%

Evalu

ati

on

1%

Co

nso

lid

ati

on

3%

To

tal

10

0%

1 Dhaskari 629.21 75.51 7.55 3.02 3.78 0.76 42.28 6.80 7.55 0.76 0.76 2.27 75.51

2 Kanehari 794.64 95.36 9.54 3.81 4.77 0.95 53.40 8.58 9.54 0.95 0.95 2.86 95.36

3 Dattipur 1009.39

121.13 12.11 4.85 6.06 1.21 67.83 10.90 12.11 1.21 1.21 3.63 121.13

4

Chak

Harivansh

Bhatan kala

830.90 99.71 9.97 3.99 4.99 1.00 55.84 8.97 9.97 1.00 1.00 2.99 99.71

5 Musilatpur 528.73 63.45 6.34 2.54 3.17 0.63 35.53 5.71 6.34 0.63 0.63 1.90 63.45

6 Jangala 1289.13 154.70 15.47 6.19 7.73 1.55 86.63 13.92 15.47 1.55 1.55 4.64 154.70

Total 5082.00 609.84 60.98 24.39 30.49 6.10 341.51 54.89 60.98 6.10 6.10 18.30 609.84

Page 114: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(114 )

YEARWISE PHYSICAL AND FINANCIAL BREAK UP OF WORK COMPONENT OF IWMP-I, DISTRICT-SANT RAVIDAS NAGAR

Amount in Lacs, Phy. in ha.

Watershed Development Works 56% of the Project Cost

S.

No.

Micro

Watershed

Project

Area

Propose

d

Amount

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin.

1 Dhaskari 629.21 42.28 0.00 0.00 84.25 5.66 183.73 12.35 179.77 12.08 181.46 12.19 629.21 42.28

2 Kanehari 794.64 53.40 0.00 0.00 106.40 7.15 232.03 15.59 227.03 15.26 229.17 15.40 794.64 53.40

3 Dattipur 1009.39 67.83 0.00 0.00 135.16 9.08 294.74 19.80 288.38 19.38 291.11 19.56 1009.39 67.83

4

Chak

Harivansh

Bhatan

kala

830.90 55.84 0.00 0.00 111.26 7.48 242.62 16.30 237.39 15.95 239.63 16.10 830.90 55.84

5 Musilatpur 528.73 35.53 0.00 0.00 70.80 4.76 154.39 10.37 151.06 10.15 152.49 10.25 528.73 35.53

6 Jangala 1289.13 86.63 0.00 0.00 172.61 11.60 376.43 25.29 368.30 24.75 371.79 24.98 1289.13 86.63

Total 5082 341.51 0.00 0.00 680.48 45.74 1483.94 99.71 1451.93 97.57 1465.65 98.49 5082.00 341.51

Page 115: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(115 )

GRAM PANCHAYAT WISE PHYSICAL AND FINANCIAL BREAK UP OF WORK

COMPONENT OF IWMP-I, DISTRICT- SANT RAVIDAS NAGAR

Code- 2B3A3a2b

S.

No.

Gram

Panchayat

Project

Area

Proposed

Amount

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy

(ha,) Fin.

1 Hirday Patti 94.77

6.37 0.00 0.00 12.69 0.85 27.67 1.86 27.08 1.82 27.33 1.84 94.77 6.37

2 Chaubepur 91.21

6.13 0.00 0.00 12.21 0.82 26.63 1.79 26.06 1.75 26.30 1.77 91.21 6.13

3 Ahamadpur

Phulwaria 48.57

3.26 0.00 0.00 6.50 0.44 14.18 0.95 13.88 0.93 14.01 0.94 48.57 3.26

4 Mahboobpur 11.37

0.76 0.00 0.00 1.52 0.10 3.32 0.22 3.25 0.22 3.28 0.22 11.37 0.76

5 Raghopur 213

14.31 0.00 0.00 28.52 1.92 62.20 4.18 60.85 4.09 61.43 4.13 213.00 14.31

6 Dulandaspur 12.8

0.86 0.00 0.00 1.71 0.12 3.74 0.25 3.66 0.25 3.69 0.25 12.80 0.86

7 Ramraipur 111.01

7.46 0.00 0.00 14.86 1.00 32.41 2.18 31.72 2.13 32.02 2.15 111.01 7.46

8 Saroi 45.79

3.08 0.00 0.00 6.13 0.41 13.37 0.90 13.08 0.88 13.21 0.89 45.79 3.08

9 Rajpura 0.68

0.05 0.00 0.00 0.09 0.01 0.20 0.01 0.19 0.01 0.20 0.01 0.68 0.05

Total 629.2

42.28 0.00 0.00 84.25 5.66 183.73 12.34 179.76 12.08 181.46 12.19 629.20 42.28

Page 116: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(116 )

GRAM PANCHAYAT WISE PHYSICAL AND FINANCIAL BREAK UP OF WORK

COMPONENT OF IWMP-I, DISTRICT- Sant Ravidas Nagar

Code- 2B3A3a2a

S.

No.

Gram

Panchayat

Project

Area

Proposed

Amount

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy

(ha,) Fin.

1 Hirday Patti 100.03 6.72 0.00 0.00 13.39 0.90 29.21 1.96 28.58 1.92 28.85 1.94 100.03 6.72

2 Bhagwati Daspur 78.04 5.24 0.00 0.00 10.45 0.70 22.79 1.53 22.30 1.50 22.51 1.51 78.04 5.24

3 Kom 5.46 0.37 0.00 0.00 0.73 0.05 1.59 0.11 1.56 0.10 1.57 0.11 5.46 0.37

4 Bhalla 136 9.14 0.00 0.00 18.21 1.22 39.71 2.67 38.86 2.61 39.22 2.64 136.00 9.14

5 Badhauna 0.15 0.01 0.00 0.00 0.02 0.00 0.04 0.00 0.04 0.00 0.04 0.00 0.15 0.01

6 Daribpur 177.54 11.93 0.00 0.00 23.77 1.60 51.84 3.48 50.72 3.41 51.20 3.44 177.54 11.93

7 Chak Sanath 128 8.60 0.00 0.00 17.14 1.15 37.38 2.51 36.57 2.46 36.92 2.48 128.00 8.60

8 Dattipur 2.86 0.19 0.00 0.00 0.38 0.03 0.84 0.06 0.82 0.05 0.82 0.06 2.86 0.19

9 Awashanpur 74.23 4.99 0.00 0.00 9.94 0.67 21.68 1.46 21.21 1.43 21.41 1.44 74.23 4.99

10 Sharbat Khani 40.88 2.75 0.00 0.00 5.47 0.37 11.94 0.80 11.68 0.78 11.79 0.79 40.88 2.75

11 Palahiya 51.46 3.46 0.00 0.00 6.89 0.46 15.03 1.01 14.70 0.99 14.84 1.00 51.46 3.46

Total 794.64 53.40 0.00 0.00 106.40 7.15 232.04 15.59 227.03 15.26 229.18 15.40 794.65 53.40

Page 117: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(117 )

GRAM PANCHAYAT WISE PHYSICAL AND FINANCIAL BREAK UP OF WORK

COMPONENT OF IWMP-I, DISTRICT- Sant Ravidas Nagar

Code- 2B3A3a2c

S.

No.

Gram

Panchayat

Project

Area

Proposed

Amount

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy

(ha,) Fin.

1 Bharatpur 11.25 0.76 0.00 0.00 1.51 0.10 3.29 0.22 3.21 0.22 3.24 0.22 11.25 0.76

2 Bishapur 168.7 11.34 0.00 0.00 22.59 1.52 49.26 3.31 48.20 3.24 48.65 3.27 168.70 11.34

3 Hirday Patti 153.03 10.28 0.00 0.00 20.49 1.38 44.68 3.00 43.72 2.94 44.13 2.97 153.03 10.28

4 Badhauna 166.95 11.22 0.00 0.00 22.35 1.50 48.75 3.28 47.70 3.21 48.15 3.24 166.95 11.22

5 Bhagwati Daspur 9.35 0.63 0.00 0.00 1.25 0.08 2.73 0.18 2.67 0.18 2.70 0.18 9.35 0.63

6 Bhalla 171.87 11.55 0.00 0.00 23.01 1.55 50.19 3.37 49.10 3.30 49.57 3.33 171.87 11.55

7 Dulamdaspur 57.86 3.89 0.00 0.00 7.75 0.52 16.90 1.14 16.53 1.11 16.69 1.12 57.86 3.89

8 Ismaila 0.35 0.02 0.00 0.00 0.05 0.00 0.10 0.01 0.10 0.01 0.10 0.01 0.35 0.02

9 Khetalpur 40.49 2.72 0.00 0.00 5.42 0.36 11.82 0.79 11.57 0.78 11.68 0.78 40.49 2.72

10 Pure Uchit 0.65 0.04 0.00 0.00 0.09 0.01 0.19 0.01 0.19 0.01 0.19 0.01 0.65 0.04

11 Rampur Lohara 3.5 0.24 0.00 0.00 0.47 0.03 1.02 0.07 1.00 0.07 1.01 0.07 3.50 0.24

12 Uchetha 29.82 2.00 0.00 0.00 3.99 0.27 8.71 0.59 8.52 0.57 8.60 0.58 29.82 2.00

13 Saroi 2.16 0.15 0.00 0.00 0.29 0.02 0.63 0.04 0.62 0.04 0.62 0.04 2.16 0.15

14 Tarapur 26.38 1.77 0.00 0.00 3.53 0.24 7.70 0.52 7.54 0.51 7.61 0.51 26.38 1.77

15 Bhagwanpur 32.6 2.19 0.00 0.00 4.37 0.29 9.52 0.64 9.31 0.63 9.40 0.63 32.60 2.19

16 Bejavan 134.45 9.04 0.00 0.00 18.00 1.21 39.26 2.64 1.61 2.58 0.16 2.61 16.13 9.04

Total 1009.39 67.83 0.00 0.00 135.16 9.08 294.75 19.80 251.59 19.38 252.50 19.56 891.09 67.83

Page 118: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(118 )

GRAM PANCHAYAT WISE PHYSICAL AND FINANCIAL BREAK UP OF WORK

COMPONENT OF IWMP-I, DISTRICT- Sant Ravidas Nagar

Code- 2B3A3a3a

S.

No.

Gram

Panchayat

Project

Area

Proposed

Amount

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy

(ha,) Fin.

1 Badi 0.27 0.02 0.00 0.00 0.04 0.00 0.08 0.01 0.08 0.01 0.08 0.01 0.27 0.02

2 Chaubepur 75.82 5.10 0.00 0.00 10.15 0.68 22.14 1.49 21.66 1.46 21.87 1.47 75.82 5.10

3 Udhawa Mafi 61.28 4.12 0.00 0.00 8.21 0.55 17.89 1.20 17.51 1.18 17.67 1.19 61.28 4.12

4 Jhingurpur 63.3 4.25 0.00 0.00 8.48 0.57 18.48 1.24 18.08 1.22 18.26 1.23 63.30 4.25

5 Puremudhia 139.65 9.38 0.00 0.00 18.70 1.26 40.78 2.74 39.90 2.68 40.28 2.71 139.65 9.38

6 Dulamdaspur 40.38 2.71 0.00 0.00 5.41 0.36 11.79 0.79 11.54 0.78 11.65 0.78 40.38 2.71

7 Chaubepur 28.89 1.94 0.00 0.00 3.87 0.26 8.44 0.57 8.25 0.55 8.33 0.56 28.89 1.94

8 Hariyawana 32.55 2.19 0.00 0.00 4.36 0.29 9.50 0.64 9.30 0.62 9.39 0.63 32.55 2.19

9 Ismaila 88.68 5.96 0.00 0.00 11.87 0.80 25.89 1.74 25.34 1.70 25.58 1.72 88.68 5.96

10 Rampur 58.03 3.90 0.00 0.00 7.77 0.52 16.94 1.14 16.58 1.11 16.74 1.12 58.03 3.90

11 Raghopur 11.53 0.77 0.00 0.00 1.54 0.10 3.37 0.23 3.29 0.22 3.33 0.22 11.53 0.77

12 Rajpura 21.07 1.42 0.00 0.00 2.82 0.19 6.15 0.41 6.02 0.40 6.08 0.41 21.07 1.42

13 Rampur Z Saroi 83.31 5.60 0.00 0.00 11.16 0.75 24.33 1.63 23.80 1.60 24.03 1.61 83.31 5.60

14 Saroi 97.76 6.57 0.00 0.00 13.09 0.88 28.55 1.92 27.93 1.88 28.19 1.89 97.76 6.57

15 Khemaipur 28.4 1.91 0.00 0.00 3.80 0.26 8.29 0.56 8.11 0.55 8.19 0.55 28.40 1.91

Total 830.92 55.84 0.00 0.00 111.26 7.48 242.63 16.30 237.39 15.95 239.64 16.10 830.92 55.84

Page 119: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(119 )

GRAM PANCHAYAT WISE PHYSICAL AND FINANCIAL BREAK UP OF WORK

COMPONENT OF IWMP-I, DISTRICT- Sant Ravidas Nagar

Code- 2B3A3a3b

S.

No.

Gram

Panchayat

Project

Area

Proposed

Amount

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy

(ha,) Fin.

1 Udhawa Mafi 108.13 7.27 0.00 0.00 14.48 0.97 31.57 2.12 30.89 2.08 31.18 2.10 108.13 7.27

2 Jhingurpur 19.13 1.29 0.00 0.00 2.56 0.17 5.59 0.38 5.47 0.37 5.52 0.37 19.13 1.29

3 Hariyawan 302.5 20.33 0.00 0.00 40.50 2.72 88.33 5.94 86.42 5.81 87.24 5.86 302.50 20.33

4 Khemaipur 42.35 2.85 0.00 0.00 5.67 0.38 12.37 0.83 12.10 0.81 12.21 0.82 42.35 2.85

5 Rajpura 9.77 0.66 0.00 0.00 1.31 0.09 2.85 0.19 2.79 0.19 2.82 0.19 9.77 0.66

6 Rampur Z Saroi 12.47 0.84 0.00 0.00 1.67 0.11 3.64 0.24 3.56 0.24 3.60 0.24 12.47 0.84

7 Gangapur 34.39 2.31 0.00 0.00 4.60 0.31 10.04 0.67 9.83 0.66 9.92 0.67 34.39 2.31

Total 528.73 35.53 0.00 0.00 70.80 4.76 154.39 10.37 151.06 10.15 152.49 10.25 528.74 35.53

Page 120: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(120 )

GRAM PANCHAYAT WISE PHYSICAL AND FINANCIAL BREAK UP OF WORK

COMPONENT OF IWMP-I, DISTRICT- Sant Ravidas Nagar

Code- 2B3A3a3c

S.

No.

Gram

Panchayat

Project

Area

Proposed

Amount

2009-10 2010-11 2011-12 2012-13 2013-14 TOTAL

Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy. Fin. Phy

(ha,) Fin.

1 Badi 153 10.28 0.00 0.00 20.49 1.38 44.68 3.00 43.71 2.94 44.13 2.97 153.00 10.28

2 Mullupur 152.92 10.28 0.00 0.00 20.48 1.38 44.65 3.00 43.69 2.94 44.10 2.96 152.92 10.28

3 Dulamdaspur 0.03 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.01 0.00 0.01 0.00 0.03 0.00

4 Ismaila 123.41 8.29 0.00 0.00 16.52 1.11 36.04 2.42 35.26 2.37 35.59 2.39 123.41 8.29

5 Jangla 245.22 16.48 0.00 0.00 32.83 2.21 71.60 4.81 70.06 4.71 70.72 4.75 245.22 16.48

6 Khetalpur 60 4.03 0.00 0.00 8.03 0.54 17.52 1.18 17.14 1.15 17.30 1.16 60.00 4.03

7 Khemaipur 23.23 1.56 0.00 0.00 3.11 0.21 6.78 0.46 6.64 0.45 6.70 0.45 23.23 1.56

8 Lila Dharpur 163.72 11.00 0.00 0.00 21.92 1.47 47.81 3.21 46.77 3.14 47.22 3.17 163.72 11.00

9 Marchwar 82.88 5.57 0.00 0.00 11.10 0.75 24.20 1.63 23.68 1.59 23.90 1.61 82.88 5.57

10 Poore Uchit 5.18 0.35 0.00 0.00 0.69 0.05 1.51 0.10 1.48 0.10 1.49 0.10 5.18 0.35

11 Rauri 12.29 0.83 0.00 0.00 1.65 0.11 3.59 0.24 3.51 0.24 3.54 0.24 12.29 0.83

12 Uchetha 23.33 1.57 0.00 0.00 3.12 0.21 6.81 0.46 6.67 0.45 6.73 0.45 23.33 1.57

13 Ugapur 3.29 0.22 0.00 0.00 0.44 0.03 0.96 0.06 0.94 0.06 0.95 0.06 3.29 0.22

14 Jagadhari 59.63 4.01 0.00 0.00 7.98 0.54 17.41 1.17 17.04 1.14 17.20 1.16 59.63 4.01

15 Bejavan 146.63 9.85 0.00 0.00 19.63 1.32 42.82 2.88 41.89 2.82 42.29 2.84 146.63 9.85

16 Sarouli 34.38 2.31 0.00 0.00 4.60 0.31 10.04 0.67 0.41 0.66 0.04 0.67 4.13 2.31

Total 1289.14 86.63 0.00 0.00 172.62 11.60 376.43 25.29 358.90 24.75 361.91 24.98 1258.89 86.63

Page 121: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(121 )

CHAPTER – 8

CONSOLIDATION/WITHDRAWAL

STRATEGY

Page 122: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(122 )

WATERSHED DEVELOPMENT FUND

The major source of financial assistance after post implementation period is Watershed Development

Fund. The contribution of it will come mainly from the fund generated.

USER CHARGES

Various user groups will be formed in village. These user groups will collect user according to the

designated rules formed during the formation of user group. These funds will be transferred to the WDF

funds as per these formulated rules. The secretary of watershed committee (WC) shall maintain the

records.

SUSTAINABILITY AND ENVIRONMENT SECURITY

In the proposed watershed management plan of I.W.M.P.-I, Sant Ravidas Nagar watershed, proper

blending of bio-engineering measures will be applied on 60% of the total watershed area. Based on the

results of studies conducted in this region, it is estimated that more 50% of the watershed area will be

treated and consequently the soil loss and runoff from the area is expected to be reduced by 70% and

65% respectively. The proposed land use plan will improve the land utilization index and crop

diversification index significantly as compared to the existing one. It will help in maintaining ecosystem

integrity on sustained basis along with improving the livelihood security of the farming community.

Page 123: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(123 )

ECONOMIC ANALYSIS

Economic analysis of the project was carried by taking direct benefits and costs considering 25 year

project life at 10 per cent discount rate. For this purpose of economic analysis, whole watershed

development plan was divided into three sectors namely,

Agriculture, horticulture and forest/fuel wood plantation. Net present value (NPV), Benefit cost ratio (BC)

ratio criteria were employed to judge the economic efficiency of each enterprise and sector.

AGRICULTURE

In rain-fed agriculture the development cost can be recovered within one year as the present rain-

fed agriculture is being done on well maintained field, therefore, does not require much investment.

Page 124: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(124 )

CHAPTER -9

EXPECTED OUTCOME

Page 125: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(125 )

ABTRACT OF OUTCOMES

The overall assessment of the project certain parameters have been evaluated on the present and

future basis. As mentioned in the above the food grain production according to the expenditure has been

analyzed after the completion of the project.

Ratio of Cost and Profit

S. No. Name of Cereal Area in ha Production /Ha in q Invest Cost/ ha Rate/q Net profit/ha Total Net profit

1 Paddy 2022.00 16.77 4000.00 1000.00 12770.00 25820940.00

2 Arhar 536.40 7.87 2300.00 4500.00 33115.00 17762886.00

3 Urd/Mung 241.30 5.08 3300.00 800.00 764.00 184353.20

4 Wheat 2235.12 28.20 4200.00 1000.00 24000.00 53642880.00

5 Mustard 496.30 4.26 2600.00 2000.00 5920.00 2938096.00

Total 5531.12 100349155.20

Status After Work

S. No. Name of Cereal Area in ha Production /Ha in q Invest Cost/ ha Rate/q Net profit/ha Total Net profit

1 Paddy 2100.00 20.00 4000.00 1000.00 16000.00 33600000.00

2 Arhar 540.00 8.00 2300.00 4500.00 33700.00 18198000.00

3 Urd/Mung 250.00 7.50 3600.00 800.00 2400.00 600000.00

4 Wheat 2300.00 22.00 4200.00 1000.00 17800.00 40940000.00

5 Mustard 500.00 12.00 2600.00 2000.00 21400.00 10700000.00

Total 5690.00 104038000.00

Page 126: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(126 )

Bhoomi Sanrakshan after the treatment of Land 104038000.00

Bhoomi Sanrakshan before the treatment of Land 100349155.20

Net Profit 3688844.80

Ratio of cost and profit 1.04

The above ratio clearly indicated that the conservation of land is extremely profitable.

Page 127: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(127 )

SUMMARY OF EXPECTED /ESTIMATED OUTCOMES OF IWMP-I, SANT RAVIDAS NAGAR (2009-2010)

S.

No.

Name of

the

District

Item Unit of

Measurement Pre-project Status

Expected Post-

project Status

1 2 3 4 5 6

1.

Sant

Ravidas

Nagar

Status of water table Meter 16.00-17.00 14.00-15.00

2. Grand water structure repaired/ rejuvenated - - -

3. Quality of drinking water Good Good Good

4. Availability of drinking water Meter 10months 12 Months

5. Increase in irrigation potential

6. Change in cropping/land use pattern - Single Crop Double Cropping

7. Area under agriculture crop ha 3666.00 3800.00

8. i- Area under single crop ha 1180 1652

9. ii- Area under double crop ha 1914 2400

10. iii- Area under multiple crop ha - 50

11. iv-Cropping Intensity % 132.80 155.00

12. Increase in area under vegetation ha 175 250

13. Increase in area under horticulture ha 165 300

14. Increase in area under fuel & fodder ha 3.50 9.0

15. Increase in milk production % 3 4

16. No. of SHGs No. 16 25

17. Increase in no. of livelihoods No. - 54

18. Migration No. 260 150

19. SHG Federation formed No. - -

20. Credit Linkage with banks - - -

Page 128: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(128 )

Chapter-10

COST NORMS & DESIGN OF STRUCTURE

PROPOSED

Page 129: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(129 )

DRAWING OF C.B., P.B., AND M.B. (Not to Scale)

(C.B., Cross-Section – 1.085 m2) (S.B., Cross-Section – 1.845m2)

(Field Bund, Cross-Section – 0.50 m2) (S.B. /P.B. /M.B., Cross-Section – 3.445 m2)

(All dimensions in Metre)

0.50

2.60

0.70

0.70

0.90

1.30 0.50

0.50 0.70

3.40

1.50 4.60

Page 130: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(130 )

DRAWING OF EARTHEN CHEKDAM / GULLY PLUG

(Not to Scale)

(C.D. /G.P., Cross-Section – 11.97 m2) (C.D. /G.P., Cross-Section – 17.50 m2)

(W.H.B., Cross-Section – 22.00 m2)

(All dimensions in Metre)

2.50 2.10

1.50 2.00

9.90 12.00

2.50

13.50

2.75

Page 131: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(131 )

DESIGN OF CONTOUR BUND Type of Soil -Loam,Sandy Loam Rain fall -24 hr in cm -25 cm Field Stop -1% Vertical Interval (VI) = [s/3+2] x 0.3 = [1/3+2] x 0.3 = 0.70 m Horizontal Interval (HI) = 100 x V.I/s = 100 x 0.7/1

Height of bund h = Re=maximum rainfall in cm

=

=

= 0.59 Say 0.60 m Free board =15% of height minimum -10 cm Height = 0.60 + 0.10 = 0.70 m Taking top width of bund 0.50 m and side slope 1.5:1 Then base of Bund = 0.50 + (1.50 d) x 2 = 2.60 m Cross-Section of bund = (0.50 + 2.60) x 0.70 / 2 = 1 .085 m2 Length of bund = 100 s / V.I. = 100 x 1 / 0.70 =142.85 m/ha Say 150 m/ha Earth work/ha = 150x1.085 = 162.75 cum Cost Rs. / ha = 162.75 x 39.16 = 6373.29 Say 6375.00

Page 132: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(132 )

TYPICAL SECTION OF P.B., M.B

Top width = 0.70 m

Side slope = 1.5:1

Height = 1.30 m

Bottom = 4.60 m

Cross section = (0.70+4.60)x1.30/2

= 3.445 m2

Cost/ meter = Rs. 142.oo

TYPICAL SECTION OF EARTHEN CHECK DAM / GULLY PLUG

Top width = 1.50 m

Side slope = 2:1

Height = 2.10m

Bottom Width = 9.90 m

Cross section = (1.50 + 9.90) x 2.10 / 2

= 11.97 m2

Cost per meter = Rs. 551.45

Page 133: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(133 )

TYPICAL SECTION OF CHECK DAM / GULLY PLUG

Top width = 2.00m

Side slope = 2:1

Height = 2.50 m

Bottom Width = 12.00 m

Cross Section = (2.00 + 12.00) x 2.50 / 2

= 17.50 m2

Cost /meter = Rs. 839.12

TYPICAL SECTION OF W.H.B

Top width = 2.50 m

Side slope = 2:1

Height = 2.75 m

Bottom Width = 13.50 m

Cross section = (2.50 + 13.50) x 2.75 / 2

= 22.00 m2

Per meter cost = Rs. 1085.92

Page 134: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(134 )

CHAPTER -11

MAPS

Page 135: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(135 )

MAPS

An attempt has been to map the surface details of the project area, as per the instruction of the

common Guide lines-2008, All the thematic maps of the study area have been prepared through using

remote sensing and geographical information system(G.I.S.) technique, following the fundamental norms

of the National Map Policy-2006. The details of the thematic maps have been given below.

1- Project Map

2- Contour Map

3- LCC Map

4- Land use/ Land cover Map

5- Gram Panchayat Boundary Map

6- Soil Erosion Map

7- Slope Map

8- Crop Demonstration Map

9- Action Plan Maps

10- Action Plan Maps- 2B3A3a3a

These maps were interpreted from the high resolution satellite dada freely available on internet.

Page 136: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(136 )

Page 137: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(137 )

Page 138: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(138 )

Page 139: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(139 )

Page 140: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(140 )

Page 141: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(141 )

Page 142: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(142 )

Page 143: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(143 )

Page 144: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(144 )

Page 145: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(145 )

Page 146: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(146 )

Annexure-1

Cost estimate of watershed work, IWMP-Ist Sant Ravidas Nagar

MWS code - 2B3A3a3a

CONTOUR BUND S. No. ACTIVITY LENGTH (M) KHASRA NO C S E W RATE AMOUNT AREA VILL. NAME

1 CB - 1 574.52 1159 (0.45+1.65)/2*0.60=0.63 361.95 39.20 14188 5.54

Hariyawan 2 CB - 2 440.56 1143 “ “ 277.55 39.20 10880 4.25

3 CB - 3 878.48 1100, P, 1104, 1100, 1098, 1076 “ “ 553.44 39.20 21695 8.47

4 CB - 8 802.68 7, 10, 5, 52, 53, 51, 37, 55 “ “ 505.69 39.20 19823 7.74 Misirpur

5 CB - 10 1085.88 275, 276, 266, 263, 260, 269, 265, 267 “ “ 684.10 39.20 26817 10.48

Chak Harbans Bhatan Kala

6 CB - 13 451.3 792, 797, 802, 809, 803, 794, 792, 795, 796, 798, 284 “ “ 284.32 39.20 11145 4.35

7 CB - 7 405.88 249, 249, 260, 283 “ “ 255.70 39.20 10024 3.92

8 CB - 9 409.32 334, 219, 330, 335, 336 “ “ 257.87 39.20 10109 3.95

9 CB - 10 1085.88 229, 262, 261, 243, 255, P, 246, 229, 243, 244 “ “ 684.10 39.20 26817 10.48

10 CB - 11 367.28 311, 317, 307, 312 “ “ 231.39 39.20 9070 3.54

11 CB - 12 390.28 P, 163, 161 “ “ 245.88 39.20 9638 3.76

12 CB - 14 291.08 P, 227, 210 “ “ 183.38 39.20 7189 2.81

13 CB - 15 292.68 198, P “ “ 184.39 39.20 7228 2.82

14 CB - 16 289.78 201, 206, P “ “ 182.56 39.20 7156 2.80

15 CB - 17 217.72 250, 253, 254, P “ “ 137.16 39.20 5377 2.10

16 CB - 18 246.88 195, 190, P “ “ 155.53 39.20 6097 2.38

17 CB - 19 272.9 P, 195, 196 “ “ 171.93 39.20 6740 2.63

18 CB - 20 307.7 P, 197, 198 “ “ 193.85 39.20 7599 2.97

19 CB - 21 494.44 P, 172, 167, 168, 169 “ “ 311.50 39.20 12211 4.77

20 CB - 1 574.52

“ “ 361.95 39.20 14188 5.54 Rampur Z.Saroi

21 CB - 4 371.72 168 “ “ 234.18 39.20 9180 3.59

22 CB - 5 324.76 169, 168, 152, 155, 154, 156 “ “ 204.60 39.20 8020 3.13

23 CB - 6 782.38 121, 116, 117, 135, 147, 140, 139, 149, 148, 78, 120, 338, 148 “ “ 492.90 39.20 19322 7.55

24 CB - 10 1085.88

“ “ 684.10 39.20 26817 10.48

Page 147: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(147 )

MARGINAL BUND

S. No. ACTIVITY LENGTH (M) KHASRA NO C S E W RATE AMOUNT AREA VILL NAME

1 MB - 11 722.62 86, 85, 87 (0.60+3.60)/2*1.00=2.10 1517.50 39.20 59486 13.52 Ismaila

2 MB - 12 657.42 67, 68, 59, 58, 51, 26, 25, 21, 22, 23, 18, 13, “ “ 1380.58 39.20 54119 12.30 Pachwal

3 MB - 15 1375.22 129, 127, 125, 126, 135 “ “ 2887.96 39.20 113208 25.73

Chak Holman

4 MB - 16 587.6 29, 21, 17, 24, 23 “ “ 1233.96 39.20 48371 10.99

5 MB - 17 461.84 45, 77, 76, 72, 73, 249, “ “ 969.86 39.20 38019 8.64

6 MB - 18 280.1 391, 396, 394, 403 “ “ 588.21 39.20 23058 5.24

7 MB - 19 223.4 386, 391, 390, 381, “ “ 469.14 39.20 18390 4.18

8 MB - 15 1375.22 22, 32, 4, 9, 86, 89, 77, 6, 84, 5, 69, P, 85, 76, 74, 32, 10, 76 “ “ 2887.96 39.20 113208 25.73

Pure Mudiya

9 MB - 20 614.94 105, 90, 64, 65, 79, 103, 66, 92, P, 60, 61, 62, 58, 57, 53 “ “ 1291.37 39.20 50622 11.50

10 MB - 1 562.48 121, 108, 123, 128, 156, 155 “ “ 1181.21 39.20 46303 10.52

Rampur Z.Saroi

11 MB - 2 625.56 168, 172, 186, 188 “ “ 1313.68 39.20 51496 11.70

12 MB - 3 205.48 168, 151, 153 “ “ 431.51 39.20 16915 3.84

13 MB - 4 616.98 168, 93, 106, 108, 107, 141, 137 “ “ 1295.66 39.20 50790 11.54

14 MB - 5 459.2 224, 194, 168, 199, 195, 209, “ “ 964.32 39.20 37801 8.59

15 MB - 6 542.54 243, 342, 340, 244, 241, 248, 168 “ “ 1139.33 39.20 44662 10.15

16 MB - 7 542.36 482, 459, 458, 451, 418 “ “ 1138.96 39.20 44647 10.15

17 MB - 8 634.88 149, 151, 135, 134, 132, 128, 126, 113 “ “ 1333.25 39.20 52263 11.88

Saroi 18 MB - 9 406.02 159, 151, 152, 134, 155 “ “ 852.64 39.20 33424 7.60

19 MB - 10 261.14 248, 246, 266, 249 “ “ 548.39 39.20 21497 4.89

20 MB - 13 792.04 64, 68, 66, 72, 73, 74, 96 “ “ 1663.28 39.20 65201 14.82

Ubhwa Mafi

21 MB - 14 480.48 77/554, 64, 83, 72, 82 “ “ 1009.01 39.20 39553 8.99

Page 148: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(148 )

PERIFERAL BUND

S.No. Activity LENGTH (M) KHASRA NO C S E W RATE AMOUNT AREA Village Name

1 PB - 7 785.1 171, 172 (1.00+4.00)/2*1.00=2.50 1962.75 39.20 76940 17.49

Duladaspur 2 PB - 9 753.88 177, 178, 204, 202, P, 182, 183, 213 “ “ 1884.70 39.20 73880 16.79

3 PB - 11 547.04 225, 234, 221, P, 224, 220, 213, “ “ 1367.60 39.20 53610 12.18

4 PB - 12 384.92 224 “ “ 962.30 39.20 37722 8.57

5 PB - 10 1048.32 84, 22, 118, 83, 71, 70, 69, 75, 66, 60, 65, 59, 58, 50, 47, 49, 1, 83, 82, 80, 48 “ “ 2620.80 39.20 102735 23.35

Ismaila 6 PB - 13 388.84 16, 17, 12, 13, 123, 15, 16, 21, 22, 19, 6 “ “ 972.10 39.20 38106 8.66

7 PB - 14 628.06 6, P, 8, 2 “ “ 1570.15 39.20 61550 13.99

8 PB - 14 628.06 122, 121, 118, 116, 126, 118 “ “ 1570.15 39.20 61550 13.99

9 PB - 25 1322.24 110, 111, 109, 126, 100, 108, 103, 101, 107, 106 “ “ 3305.60 39.20 129580 29.45 Jhingurpur

10 PB - 3 188.4 780, 782, 786 “ “ 471.00 39.20 18463 4.20 Khemaipur

11 PB - 25 1322.24 272 “ “ 3305.60 39.20 129580 29.45

12 PB - 18 319.5 418, 417, 415, 421, 403 “ “ 798.75 39.20 31311 7.12

Pure Mudiya

13 PB - 19 744.06 401, 402, 403, 383, 384, 378, 380 “ “ 1860.15 39.20 72918 16.57

14 PB - 20 198.18 295, 290 “ “ 495.45 39.20 19422 4.41

15 PB - 21 2257.44 297, 295, 252, 60, 287, 258, 286, 288, 255, 256, 254, 252, 55, “ “ 5643.60 39.20 221229 50.28

16 PB - 22 1709.18 23, 14, 111, 55, 110, 5, 4, 3, 16, 15, 2, 31, 34, 22, “ “ 4272.95 39.20 167500 38.07

17 PB - 15 664.9 4 “ “ 1662.25 39.20 65160 14.81

18 PB - 17 966.18 39, 36, 34 P, 4, 27, 41, 47 “ “ 2415.45 39.20 94686 21.52

19 PB - 23 361.1 71, 73, 69, 70 “ “ 902.75 39.20 35388 8.04

20 PB - 1 701.26 102, 94 “ “ 1753.15 39.20 68723 15.62

Rampur Z.Saroi

21 PB - 2 321.26 108, 112, 104, 105, 94 “ “ 803.15 39.20 31483 7.16

22 PB - 3 1241.16 155, 156, 160, 178, 177, 175, 181, 160, 209 “ “ 3102.90 39.20 121634 27.64

23 PB - 5 426.84 221, 218, 202, 204, 224 “ “ 1067.10 39.20 41830 9.51

24 PB - 15 664.9 67, 66, 57, 59, 56 “ “ 1662.25 39.20 65160 14.81

25 PB - 22 1709.18 209, 418 “ “ 4272.95 39.20 167500 38.07

26 PB - 6 492.46 113, 65, 57, 58, 56, 60, 55, 53, 52, 54 “ “ 1231.15 39.20 48261 10.97

Saroi 27 PB - 7 785.1 246, 249, 260, 265, 264, 262, P, 263, 259 “ “ 1962.75 39.20 76940 17.49

28 PB - 8 640.78 241, 209, 246, 244, 247, 242, 244, 243, 278, 248 “ “ 1601.95 39.20 62796 14.27

29 PB - 16 1191.06 44 “ “ 2977.65 39.20 116724 26.53

Ubhwa Mafi 30 PB - 17 664.9 83, 64, 84, 90, 91, 93, 87 “ “ 1662.25 39.20 65160 14.81

31 PB - 16 1191.06 44, 51, 49, 41, 50, 53, 57, 59, 58, “ “ 2977.65 39.20 116724 26.53

Page 149: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(149 )

GULLY PLUG

S. No. Activity LENGTH (M) KHASRA NO C S E W RATE AMOUNT AREA Village Name

GP GP - 1 155.4 13 (2.50+10.00)/2*2.50=15.63 2428.90 120.00 291468 24.29 Ismaila

GP GP - A 155.4 418, 421 (2.50+10.00)/2*2.50=15.63 2428.90 120.00 291468 24.29 Chak Holman

Earth Work

4387564 830.90

Brick Work

1196084

Total

5583648

Gram panchayat wise break up of Watershed Development

Activities in the Micro Watershed to be included in Detail Project Report (DPR)

MWS code - 2B3A3a3a

CONTOUR BUND

S. No. ACTIVITY LENGTH (M) KHASRA NO C S E W RATE AMOUNT AREA Gram Panchayat

1 CB - 1 574.52 1159 (0.45+1.65)/2*0.60=0.63 361.95 39.20 14188 5.54

Hariyawan 2 CB - 2 440.56 1143 “ “ 277.55 39.20 10880 4.25

3 CB - 3 878.48 1100, P, 1104, 1100, 1098, 1076 “ “ 553.44 39.20 21695 8.47

4 CB - 8 802.68 7, 10, 5, 52, 53, 51, 37, 55 “ “ 505.69 39.20 19823 7.74 Ismaila

5 CB - 10 1085.88 275, 276, 266, 263, 260, 269, 265, 267 “ “ 684.10 39.20 26817 10.48 Jhingurpur

6 CB - 13 451.3 792, 797, 802, 809, 803, 794, 792, 795, 796, 798, 284 “ “ 284.32 39.20 11145 4.35 Khemaipur

7 CB - 7 405.88 249, 249, 260, 283 “ “ 255.70 39.20 10024 3.92

Pure Mudiya

8 CB - 9 409.32 334, 219, 330, 335, 336 “ “ 257.87 39.20 10109 3.95

9 CB - 10 1085.88 229, 262, 261, 243, 255, P, 246, 229, 243, 244 “ “ 684.10 39.20 26817 10.48

10 CB - 11 367.28 311, 317, 307, 312 “ “ 231.39 39.20 9070 3.54

11 CB - 12 390.28 P, 163, 161 “ “ 245.88 39.20 9638 3.76

12 CB - 14 291.08 P, 227, 210 “ “ 183.38 39.20 7189 2.81

13 CB - 15 292.68 198, P “ “ 184.39 39.20 7228 2.82

14 CB - 16 289.78 201, 206, P “ “ 182.56 39.20 7156 2.80

15 CB - 17 217.72 250, 253, 254, P “ “ 137.16 39.20 5377 2.10

16 CB - 18 246.88 195, 190, P “ “ 155.53 39.20 6097 2.38

Page 150: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(150 )

17 CB - 19 272.9 P, 195, 196 “ “ 171.93 39.20 6740 2.63

18 CB - 20 307.7 P, 197, 198 “ “ 193.85 39.20 7599 2.97

19 CB - 21 494.44 P, 172, 167, 168, 169 “ “ 311.50 39.20 12211 4.77

20 CB - 1 574.52

“ “ 361.95 39.20 14188 5.54 Rampur Z.Saroi

21 CB - 4 371.72 168 “ “ 234.18 39.20 9180 3.59

22 CB - 5 324.76 169, 168, 152, 155, 154, 156 “ “ 204.60 39.20 8020 3.13 Saroi

23 CB - 6 782.38 121, 116, 117, 135, 147, 140, 139, 149, 148, 78, 120, 338, 148 “ “ 492.90 39.20 19322 7.55

24 CB - 10 1085.88

“ “ 684.10 39.20 26817 10.48 Ubhwa Mafi

MARGINAL BUND

S. No. ACTIVITY LENGTH (M) KHASRA NO C S E W RATE AMOUNT AREA Gram Panchayat

1 MB - 11 722.62 86, 85, 87 (0.60+3.60)/2*1.00=2.10 1517.50 39.20 59486 13.52 Ismaila

2 MB - 12 657.42 67, 68, 59, 58, 51, 26, 25, 21, 22, 23, 18, 13, “ “ 1380.58 39.20 54119 12.30

3 MB - 15 1375.22 129, 127, 125, 126, 135 “ “ 2887.96 39.20 113208 25.73

Pure Mudiya

4 MB - 16 587.6 29, 21, 17, 24, 23 “ “ 1233.96 39.20 48371 10.99

5 MB - 17 461.84 45, 77, 76, 72, 73, 249, “ “ 969.86 39.20 38019 8.64

6 MB - 18 280.1 391, 396, 394, 403 “ “ 588.21 39.20 23058 5.24

7 MB - 19 223.4 386, 391, 390, 381, “ “ 469.14 39.20 18390 4.18

8 MB - 15 1375.22 22, 32, 4, 9, 86, 89, 77, 6, 84, 5, 69, P, 85, 76, 74, 32, 10, 76 “ “ 2887.96 39.20 113208 25.73

9 MB - 20 614.94 105, 90, 64, 65, 79, 103, 66, 92, P, 60, 61, 62, 58, 57, 53 “ “ 1291.37 39.20 50622 11.50

10 MB - 1 562.48 121, 108, 123, 128, 156, 155 “ “ 1181.21 39.20 46303 10.52

Rampur Z.Saroi

11 MB - 2 625.56 168, 172, 186, 188 “ “ 1313.68 39.20 51496 11.70

12 MB - 3 205.48 168, 151, 153 “ “ 431.51 39.20 16915 3.84

13 MB - 4 616.98 168, 93, 106, 108, 107, 141, 137 “ “ 1295.66 39.20 50790 11.54

14 MB - 5 459.2 224, 194, 168, 199, 195, 209, “ “ 964.32 39.20 37801 8.59

15 MB - 6 542.54 243, 342, 340, 244, 241, 248, 168 “ “ 1139.33 39.20 44662 10.15

16 MB - 7 542.36 482, 459, 458, 451, 418 “ “ 1138.96 39.20 44647 10.15

17 MB - 8 634.88 149, 151, 135, 134, 132, 128, 126, 113 “ “ 1333.25 39.20 52263 11.88

Saroi 18 MB - 9 406.02 159, 151, 152, 134, 155 “ “ 852.64 39.20 33424 7.60

19 MB - 10 261.14 248, 246, 266, 249 “ “ 548.39 39.20 21497 4.89

20 MB - 13 792.04 64, 68, 66, 72, 73, 74, 96 “ “ 1663.28 39.20 65201 14.82 Ubhwa Mafi

21 MB - 14 480.48 77/554, 64, 83, 72, 82 “ “ 1009.01 39.20 39553 8.99

Page 151: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(151 )

PERIFERAL BUND

S. No.

Activity LENGTH (M) KHASRA NO C S E W RATE AMOUNT AREA Gram

Panchayat

1 PB - 7 785.1 171, 172 (1.00+4.00)/2*

1.00=2.50 1962.75 39.20 76940 17.49

Duladaspur 2 PB - 9 753.88 177, 178, 204, 202, P, 182, 183, 213 “ “ 1884.70 39.20 73880 16.79

3 PB - 11 547.04 225, 234, 221, P, 224, 220, 213, “ “ 1367.60 39.20 53610 12.18

4 PB - 12 384.92 224 “ “ 962.30 39.20 37722 8.57

5 PB - 10 1048.32 84, 22, 118, 83, 71, 70, 69, 75, 66, 60, 65, 59, 58, 50, 47, 49, 1, 83, 82, 80,

79, 48 “ “

2620.80 39.20 102735 23.35

Ismaila 6 PB - 13 388.84 16, 17, 12, 13, 123, 15, 16, 21, 22, 19, 6 “ “ 972.10 39.20 38106 8.66

7 PB - 14 628.06 6, P, 8, 2 “ “ 1570.15 39.20 61550 13.99

8 PB - 14 628.06 122, 121, 118, 116, 126, 118 “ “ 1570.15 39.20 61550 13.99

9 PB - 25 1322.24 110, 111, 109, 126, 100, 108, 103, 101, 107, 106 “ “ 3305.60 39.20 129580 29.45 Jhingurpur

10 PB - 3 188.4 780, 782, 786 “ “ 471.00 39.20 18463 4.20 Khemaipur

11 PB - 25 1322.24 272 “ “ 3305.60 39.20 129580 29.45

12 PB - 18 319.5 418, 417, 415, 421, 403 “ “ 798.75 39.20 31311 7.12

Pure Mudiya

13 PB - 19 744.06 401, 402, 403, 383, 384, 378, 380 “ “ 1860.15 39.20 72918 16.57

14 PB - 20 198.18 295, 290 “ “ 495.45 39.20 19422 4.41

15 PB - 21 2257.44 297, 295, 252, 60, 287, 258, 286, 288, 255, 256, 254, 252, 55, 67, 66, 57,

59, 56 “ “

5643.60 39.20 221229 50.28

16 PB - 22 1709.18 23, 14, 111, 55, 110, 5, 4, 3, 16, 15, 2, 31, 34, 22, “ “ 4272.95 39.20 167500 38.07

17 PB - 15 664.9 4 “ “ 1662.25 39.20 65160 14.81

18 PB - 17 966.18 39, 36, 34 P, 4, 27, 41, 47 “ “ 2415.45 39.20 94686 21.52

19 PB - 23 361.1 71, 73, 69, 70 “ “ 902.75 39.20 35388 8.04

20 PB - 1 701.26 102, 94 “ “ 1753.15 39.20 68723 15.62

Rampur Z.Saroi

21 PB - 2 321.26 108, 112, 104, 105, 94 “ “ 803.15 39.20 31483 7.16

22 PB - 3 1241.16 155, 156, 160, 178, 177, 175, 181, 160, 209 “ “ 3102.90 39.20 121634 27.64

23 PB - 5 426.84 221, 218, 202, 204, 224 “ “ 1067.10 39.20 41830 9.51

24 PB - 15 664.9

“ “ 1662.25 39.20 65160 14.81

25 PB - 22 1709.18 209, 418 “ “ 4272.95 39.20 167500 38.07

26 PB - 6 492.46 113, 65, 57, 58, 56, 60, 55, 53, 52, 54 “ “ 1231.15 39.20 48261 10.97

Saroi 27 PB - 7 785.1 246, 249, 260, 265, 264, 262, P, 263, 259 “ “ 1962.75 39.20 76940 17.49

28 PB - 8 640.78 241, 209, 246, 244, 247, 242, 244, 243, 278, 248 “ “ 1601.95 39.20 62796 14.27

Page 152: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

(152 )

29 PB - 16 1191.06 44 “ “ 2977.65 39.20 116724 26.53

Ubhwa Mafi 30 PB - 17 664.9 83, 64, 84, 90, 91, 93, 87 “ “ 1662.25 39.20 65160 14.81

31 PB - 16 1191.06 44, 51, 49, 41, 50, 53, 57, 59, 58, “ “ 2977.65 39.20 116724 26.53

GULLY PLUG

S. No. Activity LENGTH (M) KHASRA NO C S E W RATE AMOUNT AREA Gram Panchayat

GP GP - 1 155.4 13 (2.50+10.00)/2*2.50=15.63

2428.90 120.00 291468 24.29 Ismaila

GP GP - A 155.4 418, 421 (2.50+10.00)/2*2.50=15.63

2428.90 120.00 291468 24.29 Pure Mudiya

Earth Work

4387564 830.90

Brick Work

1196084

Total

5583648

Page 153: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

153

CHAPTER -12

ABBRIVIATIONS/

REFERENCES

Page 154: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

154

LIST OF ABBRIVIATIONS/REFERENCES

DOLR Department of Land Resources

IWMP Integrated Watershed Management Programme

SLNA State Level Nodal Agency

CGL Common Guidelines

PIA Project Implementing Agency

BSA Bhoomi Sangrakshan Adhikari

WDT Watershed Development Team

WC Watershed Committee

UC User Group

SHG Self Help Group

CB Contour Bund

MB Marginal Bund

PFB Peripheral Bund

REFERENCES

Common Guideline of watershed development-2008.

Jila Sankhikiya Patrika

Census 2001

www.raebareli.nic.in

Page 155: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

155

Preparation of DPR

Detail Project Report of Integrated Watershed Management Programme IWMP-I had been prepared through base line/

bench Mark survey for physiography climate, soil, land use, vegetation, and hydrology and socio economic data analysis. PRA

have been exercised to collect primary data, secondary data have been collected from Revenue, Statistics department, Statistical

Magazine of the district Snat Ravidas Nagar, Topo sheet (1 : 50000) survey of India- Deheradoon and technical & specific input

for preparation and drafting of detail project report.

S. NO. Name Designation

1 2 3

1 Sri Satish Chandra Srivastava Bhoomi Sanrakshan Adhikari

2 Sri Jagdish Prasad Junior Engineer

3 Sri Santosh Kumar Srivastava Accountant

4 Sri Rajeev Lochan Accountant

5 Sri Lalta Prasad Draftsman

6 Sri Suresh Kumar Tracer

7 Sri Mohan Lal Gupta A.S.C.I.

8 Sri Harish Prasad Srivastava A.S.C.I.

9 Sri A. K. Srivastava M.D. Kalyani Geospatial, Lucknow

10 Dr. A. K. Kulshestra Consultant

11 Sri Dipendra Kumar Sharma Statistical Analyst

12 Ku. Sulochna Pareekh GIS Analyst

13 Ku. Sunita GIS Analyst

14 Sri Uday Bhan Singh Planning Expert

15 Sri Rahul Sharma Cad expert

16

Ku Manju Lata Land use Expert

17 Ku Sunita Kothari Hydrologist

Page 156: (1 )upldwr.up.nic.in/pdfs/Updated_DPR/2009_10/SharadaSahayak...survey and Village level data collection from Talati – cum mantri. Household census survey includes a detailed questionnaire

156


Recommended