Date post: | 28-Dec-2015 |
Category: |
Documents |
Upload: | roland-green |
View: | 219 times |
Download: | 0 times |
1
Cambrian School DistrictBond Project Update
March 6, 2014 Board of Trustees Meeting
Dr. Debbie BlowRick Kramer, Kramer Project Development Co.
Linda Mao, Sugimura Finney Architects
2
Bond timeline review Fammatre 3 Classrooms update Solar Project update Steindorf Project update – Lease opportunity at DO Workshop
TOPICS
3
Bond Timeline Review
We are here!
4
Current status:◦ Budget: $1.65M◦ Construction documents are in the works using
pre-approved plan◦ Target DSA “over the counter” review March 16◦ Lease, leaseback with Bruns Belmont for the
building. Award March 20◦ Bid sitework and utilities. Award April 3◦ Start construction end of April◦ Complete construction mid August
FAMMATRE 3 CLASSROOMS UPDATE
5
Fammatre Site Layout
3 New Kindergarten CR’s
6
Fammatre Classroom Layout
7
Current status:◦ Budget: $4.7M◦ Request for Proposals is being drafted by KPDC◦ Send to solar providers in March◦ Receive proposals and select solar provider in
April◦ April notice to proceed with design◦ September or October possible construction start
SOLAR PROJECT UPDATE
8
Current status:◦ Budget: $16.5M◦ Committee established STEAM requirements◦ Curriculum synopsis board presentation tonight◦ Building requirements board presentation tonight◦ Proceed with Schematic Design (SD)◦ SD presentation to board on April 17◦ April – May. Pause until bond election.◦ June 2014 – April 2015 CEQA, construction
documents, permitting and bidding◦ May 2015 construction start
STEINDORF PROJECT UPDATE
9
STEAM Curriculum Synopsis: School-wide focus on STEAM Curriculum
◦ Project-based learning: “Learning by doing” STEAM Labs and Makers Labs
◦ Integrated Curriculum◦ Common Core State Standards in action
More informational Text Depth of Knowledge
◦ The 4 Cs of 21st Century Skills Risk Taking
STEINDORF PROJECT UPDATE
10
Putting the “A” in STEAM Four areas of the Arts
◦ Visual Arts◦ Music◦ Theater Arts◦ Dance
Integrated Curriculum Examples◦ Mathematics – Visual Arts & Music
◦ Language Arts – Theater & Digital Media
◦ Science – Visual Arts, Music, & Makers Labs◦ Physical Education – Science & Dance
STEINDORF PROJECT UPDATE
11
STEAM Space Requirements:◦ Modernize existing buildings totaling 25,000 sf and
add two new buildings totaling 9,000 sf. Sustainable construction with LEED certification.
◦ 2 modernized classrooms per grade K8 = 18 CR’s (1 is new)
◦ Flexible multi-use space for dining, performing arts, PE
◦ Typical administrative support spaces and restrooms◦ Flexible Media Center◦ Flexible Makers Labs◦ Flexible Science Lab◦ Flexible outdoor learning spaces in courtyards◦ Outdoor amphitheater for performing arts◦ Parking and play areas
STEINDORF PROJECT UPDATE
12
Steindorf Conceptual Siteplan
13
Steindorf Conceptual Images
14
Steindorf Conceptual Images
15
Steindorf Space requirements
16
Steindorf Space requirements
17
Steindorf Space requirements
18
Steindorf Space requirements
19
Potential ability to accommodate some displaced Steindorf Tenants at the DO
Existing workshop 3,500 sf is underutilized. Could be quickly renovated and leased along with some of maintenance yard.
Build a new smaller workshop. 2,000 sf Expand maintenance yard into front
parking lot. Estimated cost around $1.3M
Lease opportunity at DO
20
Lease Opportunity at DO
21
Time for questions, discussion, opinions, direction.