NCSX Modular coil winding pack
To shim or not to shim?
NCSX WBS 1 Engineering Meeting
July 7, 2004
•What is requirement?
•What is baseline winding pack design?
•What are alternate winding pack designs?
•How will we figure out what to do?
•What do we need to do now?
2
What is winding requirement?
Winding current center must be within .06 inches of theoretical winding
If current center is more than 30 cm from plasma, some relaxation may be possible.
3
Tolerance budget apportioned in thirds
Element Tolerance budget
Comment
Winding form +/- 0.01 in. Baseline on drawing
Copper cladding TBD Could be used to improve winding form tolerance if shims are allowed
Insulated conductor size +/- 0.01 in. Based on NEEWC input
VPI process TBD Assumed to be small
Total for Coil Winding +/- 0.02
Assembly of coil in field period
+/- 0.02 Adjusted to best fit, coil-to-coil with custom shims
Assembly of field periods +/- 0.02 Adjusted to best fit with custom shims
Total tolerance +/- 0.06 in.
(+/- 1.5 mm)
Minimum value, may be relaxed according to location around winding
1/3 for winding
1/3 for field period assembly
1/3 for final machine assembly
4
Baseline design: accuracy achieved by shimming
Each conductor layer can be custom shimmed
1.5 mm radius
tolerance on winding center
Custom shim layer
to layer
Custom shims adjust flanged joints between adjacent coil winding forms
Custom lateral shim
Winding position continuously adjusted to AVOID TOLERANCE STACKUP Form machined to high accuracy (Flanges to +/- 0.01 in, Contours to +/- 0.01 in) Windings placed to high accuracy relative to each other and the form Final position of coil form in assembly adjusted for optimum fit
5
Baseline design: What are issues?
Each conductor layer can be custom shimmed
1.5 mm radius
tolerance on winding center
Custom shim layer
to layer
Custom lateral shim
Measurement of each layer could be time consuming What fraction of winding needs custom
shimming? What fraction can use standard shim?
Measurement tools may not work properly on insulation layer
Other issues
6
Lumped shim concept Estimate total keystoning at each position along
winding pack Shim between tee and ground wrap Mid-course correction, if necessary
Variation: perform trial winding to quantify shim thickness
Pros Less work measuring and shimming
Cons Must be able to predict keystoning a priori Hard to gage compressibility of winding pack
and shims – are turns evenly distributed?
What are alternate winding pack concepts?
No keystoning, max shims
Max keystoning, no shims
7
No-shim – use winding form as is Take what we get, no shims
Pros Less work measuring and shimming
Cons Art says this won’t work – islands too big
What are alternate winding pack concepts? (2)
current center shifts, but stellarator symmetry preserved
Current center, desired
Current center, actual
8
No-shim – variable section winding form Predict keystoning machine winding form with variable
section to put winding center in correct place without shims
Pros Less work measuring and shimming
Cons Must be able to predict keystoning a priori Winding pack size varies, so clamps,
cladding, chill plates must vary
What are alternate winding pack concepts? (3)
No shims, winding form maintains current center
10
Need experience winding prototypical coil to select shimming technique Twisted racetrack will arrive this week Conductor has been ordered and is in house Ground wrap, insulation finalized Cladding, chill plate ideas are firming up Clamps are on order Lead block design nearly complete
Try two shimming approaches: Baseline on one side of coil Alternate approach on other side of coil (lumped shim) Trial winding first to determine lumped shim size
How do we make decision?
11
Order more conductor, if needed: Chrzanowski Figure out correspondence between layers of glass and
apparent thickness of shim: Chrzanowski et al Get drawings of new lead block design to PPPL: Fogarty Get drawings of new cladding to PPPL: Hargrove Test Romer arm scanner on insulated conductor: Raftopolous Order studs for stud welder: ? Make fixture for locating studs: ? Review TRT test objectives: Chrzanowski, Reiersen, Gettelfinger Finish test plan: Nelson
What do we do next?