Popular Tags:
47
PUM PKIN H O LLO W NEVADA’S NEXT CO PPER M INE 1 Nevada Copper Corp. Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU
Transcript
Page 1: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE1

Nevada Copper Corp.

Nevada Copper Corp.

Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine -

January, 2008TSX: NCU

Page 2: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE2

Certain statements contained in this presentation constitute forward-looking statements. Such forward-looking statements involve a number of known and unknown risks, uncertainties and other factors which may cause the actual results, performance of achievements of the Corporation to be materially different from actual future results and achievements expressed or implied by such forward-looking statements. Investors are cautioned not to place undue reliance on these forward-looking statements.

This presentation describes “Measured”, “Indicated” and/or “Inferred” Resources. U.S. investors are advised that while such terms are recognized and required by Canadian regulations, the Securities and Exchange Commission does not recognize them. “Inferred Resources” have a great amount of uncertainty as to their existence and great uncertainty as to their economic feasibility. It cannot be assumed that all or any part of any inferred resource will ever be upgraded to a higher category. Exploration is an inherently risky proposition and investors are advised that most exploration projects fail to identify economic resources.

The Corporation has at present not confirmed the economic viability of any resources at the project.  The company plans drilling programs and studies with the objective of confirmation of Copper and Iron deposits and ultimately completing a feasibility study to demonstrate the economics of the resources.  Any historical estimates are not mineral reserves and do not have demonstrated economic viability and should not be relied upon.

Cautionary Note

Page 3: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE3

Corporate Highlights

Stock Symbol:…..............................TSX: NCU Frankfurt: ZYT

Shares Outstanding:.……..….........36.6 Million

Fully Diluted:………………………...45.8 Million*

*Options - 3.6 million @ $1.25 / Warrants – 5.6 million @ $1.75

Cash, January 15, 2008:.…..……...C$ 4.0 Million

Cash on exercise:.……………........C$14.4 Million

Market Cap/Cu Resource lb:……...C$0.013

Website:…………….…www.nevadacopper.com

Page 4: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE4

Investment Highlights

100% Owned Pumpkin Hollow, Located in Nevada.

NI 43-101 Compliant Resource (Nov.’07): 7.9 Billion Pounds of Copper, 1.3 Million ounces of Gold, 57 million ounces of Silver and 144 million tons of Iron. ► Open Mineralization in Several Directions of Deposits.

Significant Potential to Further Expand Resource.

Premier Permitting Site with Excellent Infrastructure.

Preliminary Economic Assessment/Scoping - March 2008.

Advanced Stage - Commence Feasibility Study in early 2008.

Creation of a Mid-Tier, Well Managed Copper Company.

Page 5: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE5

Nevada Copper Team

Giulio T. Bonifacio - President, CEO & Director

Joe Kircher - Vice President, COO & Director

Joe Chan - Vice President, CFO

Greg French - Project Manager

Technical Team: Tetra Tech – Resource Estimate, Open Pit & Preliminary Assessment

The Mines Group – Permitting & Environmental

Golder Associates – Geotechnical

Water Management – Hydrology

RDI – Metallurgy and Processing

Hazen Research – Metallurgical

Dynatec – Underground Mining

Harma Associates – Iron Processing and Marketing

Page 6: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE6

Location Map

Page 7: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE7

Land PositionYerington

Pumpkin Hollow Property – 21 sq. Miles

Page 8: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE8

1.9 Billion pounds of copper produced at 0.54% Cu grade; Anaconda Copper Mine - 1953 to 1978.

12 Billion pounds of copper found in other porphyry deposits in the district.

7.9 Billion pounds of copper at Pumpkin Hollow; a high grade large skarn associated with the cluster of porphyry deposits.

NCU holds a commanding land position in an exciting Copper District that hosts in excess of

20 Billion pounds of Copper.

District Summary

Page 9: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE

Project History - 1960 to 2001

Discovered 1960 by US Steel

Corporation.

Next 30 Years - Anaconda,

Cyprus, Conoco, delineates

large copper and iron resource.

590,000 feet (180,000 meters) of

drilling, metallurgy, mining,

economic studies completed.

US$50 Million in estimated

historical expenditures.

9

1970’s Drill Rigs

Core Sheds

Core Sheds

Page 10: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE10

Core Processing Facility

Page 11: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE

Nevada Copper History

Acquired Project in 2005, Copper Price ~ $1.40 per lb.

2006 Resource Calculated Based on Historic Database: 6.1 Billion Pounds of Copper NI 43-101 Compliant.

Nevada Copper goes public on TSX Venture – August, 2006.

Nevada Copper lists on Toronto Stock Exchange – August 2007.

2007 - Infill & Step-Out Drilling: (62,000 feet/19,000 Meters).

Baseline Data Collection for Feasibility & Permitting Started in Q1 2007.

2007 Updated Resource (Nov.07) - 7.9 Billion Pounds of Copper.

Preliminary Economic Assessment/Scoping nears Completion.

11

Page 12: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE12

Increased drill program from 12,000 Meters to 19,000 Meters based on extremely successful in-fill and step out program.

East Deposit - Converted Inferred to Measured & Indicated, increased grade and added metal.

E2 - Converted Inferred to Measured & Indicated, increased

grade.

North Deposit - Converted Inferred to Measured & Indicated, converted waste to ore, added strike and metal.

South Deposit - Confirmed shallow high grade Cu/Au deposit.

2007 Drilling Highlights

Page 13: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE13

The Copper Deposits

High Grade Underground

Copper Deposits

NORTH ZONE

SOUTH ZONE

EAST ZONE

SOUTHEAST

ZONE

2,000ft 3,000ft0ft

Outline of Patented Claims

(Note: Property extends off the map in all directions)

Copper - Iron Open Pit Deposits

JK-34 ZONE

E-2 ZONE

Page 14: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE14

Pumpkin Resource – 3D

Page 15: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE15

2007 Measured Indicated & Inferred

Copper Cutoff Tons (000) Cu (%) Cu (lbs/000)

0.20 % 780,899 0.50 7,874,513

0.30 % 458,547 0.69 6,324,491

0.75 % 115,668 1.37 3,168,487

2006 vs. 2007 ResourceNI 43-101 Compliant Estimate

2006 Measured Indicated & Inferred

Copper Cutoff Tons (000) Cu (%) Cu(lbs/000)

0.20 % 766,084 0.40 6,147,300

0.30 % 415,989 0.53 4,437,093

0.75 % 42,056 1.43 1,198,833

Page 16: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE16

2007Category Tons (000) Cu (%) Cu(lbs/000) Gold (Oz.) Silver (Oz.)

Meas. & Ind. 342,735 0.58 3,967,688 635,000 26,643,000

Inferred 438,164 0.45 3,906,825 647,000 30,680,000

2007 Resource DetailNI 43-101 Compliant Estimate (0.2% Copper Cutoff)

Prepared in Nov.’07 by Tetra Tech MM Inc., an Industry Leading International Engineering Firm.

7.9 Billion Pounds of Contained Copper 32% Increase in Copper Grade 44% Increase in Measured and Indicated Copper Resource 28% Overall Increase in Contained Copper Added 1.3 Million Oz. of Gold and 57 million Oz. of Silver 92% Increase in Iron to 144 Million Tons

2006Category Tons (000) Cu (%) Cu(lbs/000)

Meas. & Ind. 312,063 0.44 2,751,700

Inferred 454,021 0.37 3,395,600

6.1 Billion Pounds of Contained Copper plus 75 million tons of Iron Magnetite.

Page 17: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE17

2006 vs. 2007 : At 0.75% cutoff M&I increased 303% to 1.2 billion pounds from 301 million pounds. In all categories increased 168% to 1.85 billion pounds from 690 million pounds.

East and E2 UndergroundNI 43-101 Compliant Estimate

2007 Measured & Indicated

Cu Cutoff Tons (000) Cu (%) Cu (lbs/000) Au Oz Ag Oz

0.75 % 41,592 1.46 1,214,000 167,000 5,106,000

1.00 % 26,108 1.81 947,000 128,000 3,562,000

1.40 % 13,555 2.41 653,000 83,000 2,125,000

2007 Inferred

Cu Cutoff Tons (000) Cu (%) Cu(lbs/000) Au Oz Ag Oz

0.75 % 25,333 1.25 634,000 90,000 2,926,000

1.00 % 13,671 1.59 434,000 59,000 1,765,000

1.40 % 5,354 2.25 240,933 31,000 814,000

Page 18: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE18

North & South Open PitNI 43-101 Compliant Estimate

2007 Measured & Indicated

Cu Cutoff Tons (000) Cu (%) Cu (lbs/000) Au Oz Ag Oz

0.20 % 161,964 0.51 1,666,216 278,000 12,211,000

0.30 % 104,228 0.68 1,430,626 224,000 8,953,000

0.40 % 75,357 0.82 1,231,800 186,000 7,065,000

2007 Inferred

Cu Cutoff Tons (000) Cu (%) Cu(lbs/000) Au Oz Ag Oz

0.20 % 230,838 0.44 2,022,429 336,000 16,148,000

0.30% 116,338 0.63 1,460,355 230,000 11,892,000

0.40% 73,333 0.80 1,170,554 180,000 6,812,000

Page 19: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE

2007

Measured & IndicatedIron Cutoff Tons (000) Iron (%) Tons (000) Cu %

10 % 191,008 27.8 53,154 0.28

20 % 119,755 35.9 42,956 0.31

30 % 76,235 42.2 32,152 0.31

Inferred ResourcesIron Cutoff Tons (000) Iron (%) Tons (000) Cu %

10 % 465,337 19.6 91,363 0.23

20 % 135,144 34.1 46,097 0.37

30 % 74,474 42.1 31,349 0.44

Iron resources amenable to open-pit mining methods in the North and South Deposits. Metallurgical test-work has demonstrated amenability of generating marketable pellet feed.

1996: $ 28 per metric ton iron pellet feed.

2007: > $ 100 per metric ton iron pellet feed.

19

2007 Iron ResourceNI 43-101 Compliant Estimate

Page 20: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE20

Premier Development Site

Pumpkin Hollow Site

Page 21: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE21

Premier Development Site

RA

IL -

10

Mile

s

Pumpkin Hollow – 21 Sq. Mile Contiguous Land Position

98% of the Resource on Patented Property

Paved Road

Power line

Page 22: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE22

Alluvium

Volcanics

Sediments

E-2 DEPOSIT

EASTDEPOSIT

JK-34 ZONE (70 ft.

2.5%)

OPEN

E-2SERVICESHAFT

EASTPRODUCTION

SHAFT

S N5,000’

4,000’

3,000’

2,000’

SERVICE & HAULAGE LEVEL

ORE & WASTEPASSES

ORE & WASTEPASSES

EXHAUSTVENT

ACCESS RAMP

ORE PASS

CRUSHING &LOADING FACILITY

Intrusives

East and E-2 Mine Plan

NC06-03 (55 ft @ 2%)

Pre 2007 Modeling

Page 23: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE

Conceptual Mine Profile

Integrated open pit and

underground operation.

Throughput, 35,000 to 60,000

tons per day.

Single copper concentrator.

Producing 85,000 to 120,000

tons copper per year.

Mine life 20 to 30 years.

Employees 200 to 300

23

Page 24: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE24

Site Layout - Conceptual

Page 25: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE25

2007 2008 2009 2010 2011 2012

Description1st Q 2nd

Q3rd Q

4th Q

1st Q

2nd Q

3rd Q

4th Q

1st Q

2nd Q

3rd Q

4th Q

In-Fill & Step Out Drilling/

Re-Assay

Update Resource/

Prelim. Assess.

Feasibility

Permitting

Exploration Pre-Development

Surface Construction

Production

Preliminary Project Timeline

Page 26: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE26

N

1500 FEET

48,000 N

56,000 N

50,0

00 E

58,0

00 E

54,0

00 E

52,000 N

Open Targets/ Step-out

JK-34

E-2 Deposit

Open Mineral

Directions

East Deposit

KM-12

E91-1

North Deposit

North down Dip

Southeast Deposit

West East Extensions

NortheastShallow

South Deposit

South Up-dip

Northborder

Southwest extension

Sec 11

Page 27: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE27

N

1500 FEET

48,000 N

56,000 N

50,0

00 E

58,0

00 E

54,0

00 E

52,000 N

Exploration Targets

E-2 -Section 11

JK-34

E-2 Deposit

Open Mineral

Trends & Anomalies

East Deposit

FG-20

North Deposit

Southeast Deposit

NorthwestMag

Anomaly

South Deposit

Between North & South

East Ground

Mag

Sec 11

SoutheastStrike & dip

Page 28: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE28

2008 Results Oriented Drilling Program -15,000 meter In-Fill, Step Out & Exploration.

Assay Program – Continue Historic Drill Hole assaying program

for copper, gold & silver (Completed 5,300 Meters/85 Drill Holes)

Preliminary Economic Assessment/Scoping – March 2008

Continue with baseline date collection: Metallurgical,

Hydrological and Geotechnical programs to support

permitting and a feasibility study.

Commence Bankable Feasibility Study – Early 2008

Updated Resource – Late 2008

Market Catalysts

Page 29: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE29

Peer Group ComparablesMarket Value per pound of Copper in situ ($C cents per lb)

* Feasibility / ** Acquired / *** Represents Copper Value Only

Market Comparables @ January 31, 2008

Group Average: 4.9 cents Cu & equivalent Industry Average: 5.6 cents Cu & equivalent (Haywood Securities)

6.1 cents Cu & equivalent (Canaccord Adams)

3.9

3.3

3.8

10.3

Northern Peru**

Chariot Resources*

Augusta Resources*

New Gold *

3.4

1.3Nevada Copper ***

Peru Copper**

4.9 Average0

2

4

6

8

10

12

New Gold Augusta Chariot NorthernPeru

PeruCopper

NevadaCopper

10.3

3.8 3.3 3.43.9

1.3

Page 30: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE30

The following pages present cross sections,photos and 3 D Models of the:

East, E-2 and North Deposits.

Deposit Geology Section

Page 31: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE31

Underground Deposits

High Grade Underground

Copper Deposits

NORTH ZONE

SOUTH ZONE

EAST ZONE

SOUTHEAST ZONE

2,000ft 3,000ft0ft

Outline of Patented Claims (Note: Property extends off the map in all directions)

Copper - Iron Open Pit Deposits

JK-34 ZONE

E-2 ZONE

Page 32: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE32

East Deposit E-2 Deposit

East Deposit View

South Deposit

Looking East

Page 33: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE33

East & E2 Resource – 3D

Page 34: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE34

400 FEET

N

NC07-21OPEN

NC07-5

NC07-8

NC07-2

NC07-14

54600N

54200N

53400N

East Deposit – Plan View

Nevada Copperdrill holes

Historic drill holes

OPEN

EAST DEPOSIT

OPEN

Patented property outline only

Nov.’07 43-101 Resource: 50.8 Million tons @

1.38% Copper

@ 0.75% copper cutoff

0ft 2000ft

EAST

DEPOSIT

Page 35: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE35

East Section - 54600N

SECTION 49600N

SECTION 54600N

EAST

5800 feet

3500

fee

t

EAST

E2

Page 36: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE

0ft 2000ft

36

4800’

3600’

3000’

2400’

NC07-5 NC07-21

HJ-11

39’2.59% Cu

6’2.38% Cu

6’2.89% Cu

J-11

5’2.58% Cu

9’4.74% Cu

40.5’4.08% Cu

57’2.33% Cu

19’2.37% Cu

10.5’5.0% Cu

20’2.10% Cu

2’2.03% Cu

15’2.24% Cu5’

2.03% Cu

87’2.76% Cu

56’4.34% Cu

3.5’2.3% Cu

57.5’3.34% Cu

JK-12

KM-12

Section shortened forvisual efficiency

19’2.37% Cu

Mes

ozo

ic

ConglomerateTertiary volcanicsLimestone, MarbleHornfelsMagnetite skarnCal-silicate skarnIntrusive+ 1% Cu+ 2% Cu

Trace of drill holeIntersected length of Mineralization in feet, %Cu

8’4.59% Cu

400 FEET

4600’3800’

Note: Assays <1% not plotted

Patented Property Outline only NC07 – 540.5 feet @ 4.08% Cu10.5 feet @ 5.00% Cu57.5 feet @ 3.34% Cu

NC07 – 2120 feet @ 2.10% Cu87 feet @ 2.76% Cu56 feet @ 4.34% Cu

East Section - 54600N

EAST

DEPOSIT

Page 37: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE37

East Section – 53400N

SECTION 49600NSECTION 53400N

Page 38: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE38

19’2.37% Cu

Mes

ozo

ic

ConglomerateTertiary volcanicsLimestone, MarbleHornfelsMagnetite skarnCal-silicate skarnIntrusive+ 1% Cu+ 2% Cu

Trace of drill holeIntersected length of Mineralization in feet, %Cu

Note: Assays <1% not plotted

East Section - 53400N

400 FEET 1800’

2400’

3000’

3600’

4000’4600’

4800’

57800E55400E

NC07-14

111’3.31% Cu

116.2’3.08% Cu

28’3.89% Cu

36’5.04% Cu

44’2.75% Cu

JK-19KM-20

M-20

C-12C-6

C-8

Page 39: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE39

E-2 Section – 49600N

SECTION 49600NE2

5800 feet

3500

fee

t

EastE2

Page 40: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE40

E-2 Section - 49600N

400 FEET1800’

3800’4600’

4800’

58000E

NC07-23

63’2.29% Cu

145’2.44% Cu

115’4.45% Cu

135’2.66% Cu

C-11

3200’

2000’

2600’

56000E

C-13

KM-45

KM-44

M-44

19’2.37% Cu Trace of drill hole

Intersected length of Mineralization in feet, %Cu

Note: Assays <1% not plotted

Mes

ozo

ic

Tertiary volcanicsLimestone, MarbleHornfelsMagnetite skarnCal-silicate skarnIntrusive+ 1% Cu+ 2% Cu

>0.3% Cu

E-2

Page 41: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE41

Open Pit Deposits

High Grade Underground

Copper Deposits

NORTH ZONE

SOUTH ZONE

EAST ZONE

SOUTHEAST ZONE

2,000ft 3,000ft0ft

Outline of Patented Claims (Note: Property extends off the map in all directions)

Copper - Iron Open Pit Deposits

JK-34 ZONE

E-2 ZONE

Page 42: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE42

North Deposit View

Looking North

North Deposit

Page 43: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE43

North Deposit – 3D

Page 44: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE44

North Section – 47700E

SECTION 47700E

North

4500 feet

2000 fe

et

Page 45: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE45

19’2.37% Cu Trace of drill hole

Intersected length of Mineralization in feet, %Cu

Note: Assays <1% not plotted

Mes

ozo

ic

Tertiary volcanicsLimestone, MarbleHornfelsMagnetite skarnCal-silicate skarnIntrusive+ 1% Cu+ 2% Cu

>0.3% Cu

North Section - 47700E

400 FEET

4800’

52500N

4000’

2800’

3400’

53000N53500N54000N54500N

NC07-9USS-7999-799-6

USS-70

USS-76

USS-41

99-4

99-2

USS-95

USS-46

99-3

42’2.49% Cu

115.5’2.51% Cu

109.9’3.22% Cu

24.9’3.38% Cu 12.5’

2.53% Cu

North

Page 46: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE46

19’2.37% Cu Trace of drill hole

Intersected length of Mineralization in feet, %Cu

Note: Assays <1% not plotted

Mes

ozo

ic

ConglomerateTertiary volcanicsLimestone, MarbleHornfelsMagnetite skarnCal-silicate skarnIntrusive+ 1% Cu+ 2% Cu

North Section - 47900E

400 FEET

4800’

53000N

4000’

2800’

3400’

53500N54000N54500N54500N

NC07-1USS-56 USS-96 USS-34

USS-43

USS-46

USS-88

99-1

USS-70

USS-88

USS-48

USS-76

52500N

342’@ 2.03%

North

Page 47: 1 Nevada Copper Corp. Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine - January, 2008 TSX: NCU.

PUMPKIN HOLLOW – NEVADA’S NEXT COPPER MINE47

Nevada Copper Corp.

Nevada Copper Corp.

Developing the Pumpkin Hollow Copper Deposit - Nevada’s Next Major Copper Mine -

January, 2008TSX: NCU