PROJECTS IN PROGRESS IN PROJECTS IN PROGRESS IN SOUTHERN REGIONSOUTHERN REGION
400 KV MADURAI-TRIVANDRUM LINE 400 KV MADURAI-TRIVANDRUM LINE WITH 400 KV SS AT TRIVANDRUMWITH 400 KV SS AT TRIVANDRUM
400 KV NELAMANGALA-MYSORE LINE 400 KV NELAMANGALA-MYSORE LINE WITH 400 KV SUBSTATION AT MYSOREWITH 400 KV SUBSTATION AT MYSORE
400 KV KAIGA-NARENDRA LINE ALONG 400 KV KAIGA-NARENDRA LINE ALONG WITH 400 KV SUB STATION AT WITH 400 KV SUB STATION AT NARENDRANARENDRA
400 KV 2400 KV 2ndnd GOOTY-NELAMANGALA LINE GOOTY-NELAMANGALA LINE 400 KV RAICHUR-GOOTY D/C QUAD LINE400 KV RAICHUR-GOOTY D/C QUAD LINE 400 KV RING MAIN AROUND BANGALORE400 KV RING MAIN AROUND BANGALORE 400 KV RING MAIN AROUND CHENNAI400 KV RING MAIN AROUND CHENNAI
3
PROJECTS IN SOUTHERN PROJECTS IN SOUTHERN REGIONREGION
400 KV RAMAGUNDAM – HYDERABAD-GOOTY-400 KV RAMAGUNDAM – HYDERABAD-GOOTY-NELAMANGALA LINE: RS 390 CRORESNELAMANGALA LINE: RS 390 CRORES
ADDITIONAL 500 MW HVDC POLE AT GAZUWAKA: ADDITIONAL 500 MW HVDC POLE AT GAZUWAKA: WORTH Rs 770 CRORESWORTH Rs 770 CRORES
ENHANCEMENT OF CAPACITY OF TALCHER POLES ENHANCEMENT OF CAPACITY OF TALCHER POLES BY 500MW (FROM 2000 MW TO 2500 MW FOR BY 500MW (FROM 2000 MW TO 2500 MW FOR UTILISATION DURING EMERGENCY ONLY): Rs 90 UTILISATION DURING EMERGENCY ONLY): Rs 90 CRORESCRORES
SYSTEM AUGMENTATION SCHEMES : Rs 415 SYSTEM AUGMENTATION SCHEMES : Rs 415 CRORESCRORES
KOODANKULAM NUCLEAR PLANT EVACUATION KOODANKULAM NUCLEAR PLANT EVACUATION SCHEME – 2000 MW CAPACITY- WORTH ABOUT Rs SCHEME – 2000 MW CAPACITY- WORTH ABOUT Rs 1700 CRORES1700 CRORES
ANOTHER HVDC LINK TO SR FROM ER/WRANOTHER HVDC LINK TO SR FROM ER/WR SYSTEM EXPANSION SCHEMES WORTH Rs 1233 SYSTEM EXPANSION SCHEMES WORTH Rs 1233
CRORESCRORES
4
NEW PROJECTS ON THE ANVILNEW PROJECTS ON THE ANVILKAIGA 3 & 4 TRANSMISSION SYSTEMKAIGA 3 & 4 TRANSMISSION SYSTEM
LINES : 413 KmsLINES : 413 Kms
MYSORE-KOZHIKODE D/C LINE MYSORE-KOZHIKODE D/C LINE
LILO OF KOLAR-SRIPERUMBADUR LILO OF KOLAR-SRIPERUMBADUR AT MELAKOTTAIYUR (40KM)AT MELAKOTTAIYUR (40KM)
NARENDRA-DAVANGERE D/C LINE NARENDRA-DAVANGERE D/C LINE
SUB-STATION : 2 Nos. NewSUB-STATION : 2 Nos. New
NEW 400/220KV SUBSTATION ATNEW 400/220KV SUBSTATION AT KOZHIKODE & MELAKOTTAIYURKOZHIKODE & MELAKOTTAIYUR
22NDND 315MVA TRANSFORMER 315MVA TRANSFORMER AT AT HIRIYUR S/S. HIRIYUR S/S. BAY EXTENSION AT NARENDRA, DAVANGERE (KPTCL) & BAY EXTENSION AT NARENDRA, DAVANGERE (KPTCL) &
HIRIYUR.HIRIYUR.
COST ESTIMATE : 512 CRORESCOST ESTIMATE : 512 CRORES
KERALA
5
NEW PROJECTS ON THE ANVILNEW PROJECTS ON THE ANVIL
KUDANKULAM TRANSMISSION KUDANKULAM TRANSMISSION SYSTEM( 2000MW)SYSTEM( 2000MW)
LINES : 601+ 350 = 950 Km. ESTIMATED COST = 1710 CRORESLINES : 601+ 350 = 950 Km. ESTIMATED COST = 1710 CRORES
KUDANKULAM-TIRUNELVELI KUDANKULAM-TIRUNELVELI 2 X 400 KV D/C LINES WITH 2 X 400 KV D/C LINES WITH QUAD (108 & 83 Km.)QUAD (108 & 83 Km.)
TIRUNELVELI-UDUMALPET TIRUNELVELI-UDUMALPET D/C LINE WITH TWIN D/C LINE WITH TWIN MOOSE (300Km)MOOSE (300Km) LILO OF BOTH CIRCUITS OF LILO OF BOTH CIRCUITS OF MADURAI-TRIVANDRUM LINE MADURAI-TRIVANDRUM LINE AT TIRUNELVELI ( 2 X 55 Km)AT TIRUNELVELI ( 2 X 55 Km) EDAMON-EDAMON-MUVATTUPUZHA MUVATTUPUZHA D/C LINE QUAD (150Km)D/C LINE QUAD (150Km) TIRUNELVELI-EDAMON 400KV D/C LINE (110Km).TIRUNELVELI-EDAMON 400KV D/C LINE (110Km).
MUVATTUPUZHA-TRICHUR 400KV D/C LINE WITH MUVATTUPUZHA-TRICHUR 400KV D/C LINE WITH QUAD QUAD CONDUCTORS (90Km)CONDUCTORS (90Km)
T N
KARNATAKA
KERALA
6
NEW PROJECTS ON THE ANVILNEW PROJECTS ON THE ANVIL
KUDANKULAM TRANSMISSION KUDANKULAM TRANSMISSION SYSTEM( 2000MW)SYSTEM( 2000MW)
SUB-STATIONSSUB-STATIONS
NEW 400/220KV SUBSTATIONS AT TIRUNELVELI, NEW 400/220KV SUBSTATIONS AT TIRUNELVELI, MUVATTUPUZHAMUVATTUPUZHA
AUGMENTATION OF TRANSFORMATION CAPACITY BY ONE AUGMENTATION OF TRANSFORMATION CAPACITY BY ONE TRANSFORMER EACH AT UDUMALPET & TRIVANDRUM S/STRANSFORMER EACH AT UDUMALPET & TRIVANDRUM S/S
SUPPLEMENTARY TRANSMISSION SYSTEMSUPPLEMENTARY TRANSMISSION SYSTEM LILO OF ONE CIRCUIT OF 400KV MADURAI-TRICHY LILO OF ONE CIRCUIT OF 400KV MADURAI-TRICHY AT KARAIKUDI ( 60 Km) ALONG WITH SUBSTATION ATAT KARAIKUDI ( 60 Km) ALONG WITH SUBSTATION AT KARAIKUDI (TAMILNADU)KARAIKUDI (TAMILNADU)
LILO OF ONE CIRCUIT OF TALAGUPPA-NELAMANGALA LILO OF ONE CIRCUIT OF TALAGUPPA-NELAMANGALA 400KV LINE AT HASSAN ( 80 KM) ALONG WITH SUBSTATION AT400KV LINE AT HASSAN ( 80 KM) ALONG WITH SUBSTATION AT HASSAN.(KARNATAKA)HASSAN.(KARNATAKA)
7
NEW PROJECTS ON THE ANVILNEW PROJECTS ON THE ANVILNLC-TS-II EXPANSION TRANSMISSION SYSTEMNLC-TS-II EXPANSION TRANSMISSION SYSTEM
LINES : 467 Km.LINES : 467 Km.
2 NOS. 400KV S/C LINES FROM 2 NOS. 400KV S/C LINES FROM NEYVELI-TS-II (EXISTING) NEYVELI-TS-II (EXISTING) TO NLC TS-II (EXPAN) (8 KM).TO NLC TS-II (EXPAN) (8 KM). NEYVELI-PUGALUR D/C LINENEYVELI-PUGALUR D/C LINE
PUGALUR-MADURAI D/C LINEPUGALUR-MADURAI D/C LINE
UDUMALPET-ARASUR D/C LINEUDUMALPET-ARASUR D/C LINE
LILO OF NEYVELI-SRIPERUMBU-LILO OF NEYVELI-SRIPERUMBU- DUR LINE AT PONDY.DUR LINE AT PONDY.
SUB-STATIONSUB-STATION
NEW 400/220KV SUBSTATIONS AT PUGALUR, ARASUR & NEW 400/220KV SUBSTATIONS AT PUGALUR, ARASUR & PONDICHERRY.PONDICHERRY.
COST ESTIMATE : 721 CRORESCOST ESTIMATE : 721 CRORES
T N
KERALA
KARNATAKA
8
BANGALORE 400 KV RING BANGALORE 400 KV RING MAIN(INTERIM)MAIN(INTERIM)
400 KV RING MAIN
SOMANAHALLI
NELAMANGALA
KOLAR
HOODY
FROM GOOTY
9
BANGALORE 400 KV RING BANGALORE 400 KV RING MAIN(FINAL)MAIN(FINAL)
400 KV RING MAIN
SOMANAHALLI
NELAMANGALA
KOLAR
HOODY
FROM GOOTY