) ) Pre-Bid Queries Name of Work: CONSTRUCTION OF HIGH LEVEL CANCER INSTITUTE (SIGNATURE BUILDING) AT CHAKGANJARIA CITY, SULTANPUR ROAD,LUCKNOW. DATE: 1·Sep·15 S.No I ClauseNo. Clause Definition Civil Works 1 2 3 4 5 Soil Investigation report Area Statement NIT Pg 40 & Pg 125 Performa of Schedule List of Approved Makes - - --- -- --·· - -- ---- BOQ Pg 12 Sub Head A !Earth Work Item No. 2 & 3 · --· ··-t- - -- -~-- ---- t- ----- --- ------ 6 BOQ Pg 12 Sub Head B Item No. 2 RCC Works fla_11_ se_ Descriptlon SPCPL's Comments/Observations Consultants Remarks TECHINCAL QUERIES Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _, prQJ!lf : - - . - . . ---- - - - --- ---- Request you to kindly provide the Area Statement for all O t Alt h d Add to Item 251 for every additional 30m. (100 fts.) lead or part of 30m. (100 fts.) or for every additional 1.5 m. (5fts.) lift or part of 1.5m. (5fts.). the Buildin s. acumen ac e . ·---·--- g ·- - - -- -- - ----· - The tender document consists of two performa of schedules, one on page 40 and another on page 125. Schedule on page 125 is to be followed Kj n..Q.ly 9onfirm Ythich sch~dule_ !? !Q t;>e fo)IQYJed. _ All the List of makes attached with the tender document suggests us to use equivalent makes. By "EQUIVALENT" we presume that it means: "All the detailed technical specifications are generic, however all aproved makes/ suppliers own specifications will be accepted without compromising the functionality of the systems". The Item description contains the reference to item no 251 while the is no such item. Please clarify. Same is also observed in various other items. ·- - . - We would like to affirm our view that wherever an Equivalent is mentioned in the List of Makes for any item or product.it means that its quality and finish should match the makes which have been suggested by us. For any Item if an International brand(European I American) has been specified by us then an equivalent should always be inferred as product of matching specifications and therefore cannot be compared with something of Chinese or Indian origin. If at any stage if the Construction agency wants to get a brand incorporated which is Made in India or China than a prior approval of the same would be required from the clienVuser deptt. "251 (4 .1.1) & 254 (4.3) items are self explainatory. I - - -- -- ----' The -ftem- desc:ripiion under·concrete includes-binding of Foiiow CPWDSpecifications· as per Tencier. . -- -- reinforcement using 24 B.W.G.I binding wire while item documents will be followed no 8 under sun head B DSR item specification uses MS binding wire. Kindly confirm which Binding wire is to be BOQ Pg 15 Sub Head B Item No. B ----- · -- - -- ---- - - 1-- - ·-- . -~-- _ __ _ ___ _ _ ,used. ____________ . ______ ---1- . __ _ __ _ __ _ __ 7 BOQ Pg 13 Sub Head C I Brickwork Item No. 1 -----'-----------·-'----- Item No 1 First Class brick work in 1 :6 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all Item No 1 does not contain any quantity against it while materials, labour and tools item no 2 says we need to quote for 1:4 cement mortar and plants etc.required for instead of 1:6 Cemet mortar. proper completion of the work. Kindly confirm which cement mortar is to be used. Item No 2 As in Item (303) above, but In 1:4 cement and Coarse sand mortar. Item with coarse sand mortar shall be considered $/ ------ --1===~~ -
Transcript
Page 1: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

) ) Pre-Bid Queries

Name of Work: CONSTRUCTION OF HIGH LEVEL CANCER INSTITUTE (SIGNATURE BUILDING) AT CHAKGANJARIA CITY, SULTANPUR ROAD,LUCKNOW.

DATE: 1·Sep·15

S.No I ClauseNo. Clause Definition

Civil Works

1

2

3

4

5

Soil Investigation report

Area Statement

NIT Pg 40 & Pg 125 Performa of Schedule

List of Approved Makes

- - --- -- --·· - -- ----

BOQ Pg 12 Sub Head A !Earth Work Item No. 2 & 3

· --· ··-t- - -- -~-- ---- t--------- ------

6

BOQ Pg 12 Sub Head B Item No. 2

RCC Works

fla_11_se_Descriptlon SPCPL's Comments/Observations Consultants Remarks TECHINCAL QUERIES

Please provide the Soil Investigation report of the O

t Att h d · t acumen ac e .

_,prQJ!lf : - - . - . . ---- - - - --- ----Request you to kindly provide the Area Statement for all

O t Alt h d

Add to Item 251 for every additional 30m. (100 fts.) lead or part of 30m. (100 fts.) or for every additional 1.5 m. (5fts.) lift or part of 1.5m. (5fts.).

the Buildin s. acumen ac e . ·---·--- g ·- -· -· - - -- -- -· - ----· -The tender document consists of two performa of schedules, one on page 40 and another on page 125. Schedule on page 125 is to be followed Kj n..Q.ly 9onfirm Ythich sch~dule_!? !Q t;>e fo)IQYJed. _

All the List of makes attached with the tender document suggests us to use equivalent makes. By "EQUIVALENT" we presume that it means: "All the detailed technical specifications are generic, however all aproved makes/ suppliers own specifications will be accepted without compromising the functionality of the systems".

The Item description contains the reference to item no 251 while the is no such item. Please clarify. Same is also observed in various other items.

-· ·- - . -We would like to affirm our view that wherever an

Equivalent is mentioned in the List of Makes for any item or product.it means that its quality and finish

should match the makes which have been suggested by us. For any Item if an International

brand(European I American) has been specified by us then an equivalent should always be inferred as

product of matching specifications and therefore cannot be compared with something of Chinese or

Indian origin. If at any stage if the Construction agency wants to get a brand incorporated which is Made in India or China than a prior approval of the same would be required from the clienVuser deptt.

"251 (4.1.1) & 254 (4.3) items are self explainatory. I •

- - - - -- ----'The -ftem- desc:ripiion under· concrete includes -binding of Foiiow CPWDSpecifications· as per Tencier. . -- - -reinforcement using 24 B.W.G.I binding wire while item documents will be followed no 8 under sun head B DSR item specification uses MS binding wire. Kindly confirm which Binding wire is to be

BOQ Pg 15 Sub Head B Item No. B

-----·-- - -- ---- - - 1-- - ·-- . -~-- _ __ _ ___ _ _ ,used. ____________ . ______ ---1- . __ _ __ _ __ _ __

7 BOQ Pg 13 Sub Head C I Brickwork Item No. 1

-----'-----------·-'-----

Item No 1 First Class brick work in 1 :6 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all Item No 1 does not contain any quantity against it while materials, labour and tools item no 2 says we need to quote for 1 :4 cement mortar and plants etc.required for instead of 1 :6 Cemet mortar. proper completion of the work. Kindly confirm which cement mortar is to be used.

Item No 2 As in Item (303) above, but In 1:4 cement and Coarse sand mortar.

Item with coarse sand mortar shall be considered

$/------ --1===~~ -

Page 2: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

S.No

B

9

10

11

12

13

13

Clause No.

-- --· -

) ) Clause Definition I Clause Description I SPCPL's CommenW_Observatlons

Marble & Gra_ nite Works I Request you to kindly provide the Basic rates for Marble & Granite Items.

- -- Providing M-30 grade concrete instead of M-15 Please clarify the item, whether the rates to be provided

L

C:e>_n_sJJ_ltants Remarks

Already mentioned in SOR & DSR

BOQ Pg 15 Sub Head B I RCC Works Item No. 2

grade BMC/ RMC. (Note:- are for: Extra for providing M-30 instead of M-15 grade Cement content considered in concrete.

Rates for m-30 cement concrete will be Rs. 3931 .20 in addition of rates mentioned for m-15 cement concrete as per item no. 3 of BOQ page 2 of 3 shall be applicable.

M-30 is @ 340 kg/Cum) Also the rates should include additional cement ((12.2+6.B)-6.4)=12.6 beg@ consumed plus taxes.

_ ·---·· · -- • ,312 rs. - - -·-·Kindly provide-the.detailed BOO for Sign.ages Works as -i-- - - -·-- --· --

Sign ages

Art Works

B·oa Non Schedule llem~1- - - • Sub Head: D Flooring Terracotta Cladding Works __ _

BOQ

1--

--1--,-

List of Approved Makes

the the specifications provided are not sufficient to I Document Attached. _______ ·- ______ ,quote. _ _ . __ ..... _

Kindly provide the detailed description for Art Works as - . -- - ·-- - - ---- . the BQQ_erovid~<;! QQnQ! have the descri_etions. Document Attached. Kindly specify the colour oflh-e tiles io be-used fo.r - -- -- - - -- -- -- - --cla~ding purpose as ~here is huge variation in the price Breeze Red Orange-BR01 or Equivalent colour.

_ _ _ __ _ ---l of tiles due to color d1ff~r~n~. _ Kindly provide the BOQ in excel format for Civil &-MEP - - - - ------- --- - -··--

--___ 1'{V9rks. BOQ in excel format can not be uploaded.

Request you to kindly consider equiva;e~~~akes fo: Th~ f~llowing makes lo-be-considered: -1.Vitrified/ Glazed Ceramic Tiles: NITCO or Equivalent. 1.V1t~1fied I Glaz~d . . 2. Reinforcement Steel: JSPU JSW/ Electrosteel SRMB/ Tlles.Somany,KaJana,N1tco,Cengres,RAK & Orient Shyam/ CREST or Equivalent.. Tiles.2.Reinforcement Steel:The mentioned brands 3. Fire Doors: Sukruti Doors & Hardwares I Signum are ok,but all ~f them should meet the Indian Marketing or Equivalent.. Standards.3.Fire Doors:GMP Technical Solution Pvt 4. Flush Doors: Kit ply, Green Ply. Ltd,Shakti-Horman & Navair lnternational.4.Flush 5. NP2 Class RCC Pipe: SCI Pipes/ Universal Doors:Ok.5.NP2 Class RCC Pipe:Ok,but all of them Engineers/ Prakash Pipes or Equivalent.. should meet thelndian Standards.6.Admixture: 6. Admixtures: Kunal conchom/ SIKN Don chemicals or SI KA/Don Chemical/Fosroc/MYK Laticrete/BASF or Equivalent.. Equivalent.

---·f----------t--- -·--- - --+-- ----List of Approved Makes I --=1Request you· to· kindly-consider equivalent makes for t---. ----

-----1----- +·· --- ----1 . Pl!!_mbi!!9_and HVAC Works also. !Already incorporated in bid document. - · ··-·-·- - --··~ ___ _,

14

Kindly add the following approved makes for: J The following makes·io- be considered:-- -- -1) Rub_ber Insulation- K Flex/ Thermaflex or Equivalent.. 1 :Rubber lnsulatl~n:Thermaflex is accepted.

_._ 2) Sanitary Ware- Cera or Equivalent. 2.Sanitary Ware:Hindware I Cera or Parryware is --1.._. ----. ~C:f~~d. ___ - ·---- ·

15 List of Approved Makes

- ----'- ----

Jr/ 1--

Page 3: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

::>

) ) S.No ClauseNo. Clause Definition Clause Oescrlotion SPCPL's Comments/Observations Consultants Remarks

16 Drawings We request you to provide all the architectural, structural Drawings in PDF are being attached along with. drawings including MEP in Auto CAD format

DG Sets

--- - -·-----· ·-- -- -- - In- the.make list FG-Wilso-nis- given- asapproved~i- -16 DG Set & AMF Panel As per Tender Documents -

Make seems to be a topographical error, it should be Sterling --- - ------ --- -----·----- -.- - - --·-- l!, ,y\'jj~Q.11 (!:~rki~l,_Kindly confirm.

17 Alternator No make is there in list. Kindly approve Leroy Somer & Stamford, CGL, Leroy somer --- -- -- - -- -- - - §tamfgrd ~ -m2,ke for Altemator. --

18 Panels Kiindly approve Sterling & Wilson and ABB as approved As per Tender Documents

make for panels, so that TIA panels are provided. --- - - kindly confirm the.tests t o-be-carriecf outfor'c>G-seis_ & _ 19 Tests for DG Set As per Tender Documents

---- ----@alig,:i_Qf ea£_h test. - -··------ ---- ------------------ --------- -- ---

Lifts

- - ------- -- ---- ·-· -~ - - --- - ---· ... -· - ---- --OTIS,Kone~Thyssenkrupp,° Mitsubishi anlSchindler 20 Lifts (Make List) Kindly provide us the contact details of UT Lift.

-~ -·- ----- -- -- ---------- - - ----·--- - - - Lifts to be considered. Kindly-approve Johnson & Thy-ssenkruppfor ttie sa-me OTIS,Kone,Thyssenkrupp-;-Mitsubishi and Schindler -21 Lifts (Make List)

--- ----- as additional make. Lifts to be considered.

Lifts • BOQ item No. In many items of BOO, Thyssenkrupp make is Ok.Tendr to be open for all Elevator brands spe-cified

22 1.1.5, 2.1.2, 3.1.4, 4.1 .2, mentioned. Also ceiling design is mentioned as per TKEI above.

6 .1.2 design. That need to be deleted. The tender should be

-- -- --- IQrum_toalJ. - -- ----· - ------- - ----------The speed of the same is mentioned as 1 MPS. "OTIS" We recommend Lift speed to

Speed of 1768 Kg one of the approved vendors; requests to accept speed be 1 MPS & above.

23 of th is lift as 0.55 MPS also. Capacity lift So, we request you to keep the speed as 1 MPS or 0.55

MPS; so that the tender is open for all the lift manufactures. ---

Solar Power System

-~-----------··· -~-- ---24 Solar Power System Only BOQ is there, kindly provide the Technical Technical Specifications -Attached

Specffication~ fQI' the sam~·-25 Solar Power Svstem KindlY.£1:.0Vide _ the~'!EP!OVed_111~~e } isf f_2r} ~e~~"'!_e~ -- ---

Television

26 Television Kindly provide approved make for 42" LED. We propose HD Version of PANASONIC I SONY I SAMSUNG I

PANASONIC I SONY I SAMSUNG I LG for the same. LG is Acceptable

-

j} / t-

Page 4: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

S.No I ClauseNo.

Fire Alann System

27

List of Makes for Fire Alarm System mentioned in BOO of Fire Alarm System

) Clause Deflnltlon ~~us11 De~crlptl<>n

, _______ --- _,_

) SPCPL's Comments/Observations Consultants Remarks

Please approve Notifier make .Fire-Alarm System as welJ.INotifier & UTC Edwards are approved Notifier is one of the leading brand in fire alarm industry. All the AIIMS Hospital, ESIC Hospitals, ll&BS Hospilal, GTB Hospital, Medicity Gurgaon, DIAL T-3 Airport, Mumbai International Airport are on Notifier Fire Alarm System. However it comes equivalent or in better category but request to provide the make approval for the same.

""\

______ , __ .--,ltis-very unusual to use 12 no·s-of 4 loop panel where ·101As per Tender Documents

loop capacity panels are available in UL brands. Tender

28 BOO item no. 1, Fire Alarm System

is designed completely on One Make i.e. Cooper and they do not have more than 4 loop panel. Please approve 10 loop panel of 4 no's instead of using 12 no's

----- __ --tPL~JQQp_p__ane!. ___ _ ·- _ _

29 Alarm System

BOO Specs are favoring to only one brand i.e. Cooper. !As per Tender Documents However detailed tender specifications can be complied by other manufacturer as well. Kindly consider the products which are meeting the tender detailed

i900 ;t,m oo. 1, F;ra

---------1 --·- + 1specifications. __ -· ________ ·----

30

---·

BMS

31

32 ---

33

BOO item no. 3,4,5 Fire Alarm System

BOO Specs are favoring to only one brand i.e. Cooper. IAs per Tender Documents However detailed tender specifications can be complied by other manufacturer as well . Kindly consider the products which are meeting the tender detailed specifications. As per IS2189 /NFPA/UL guideline; Fault isolator shall be provided after every 20-30 detectors.

_______ .,_ __________ L __________ _,_,,K~l,,,ndl~appLQY.~he~a_me. ___________ _._ __________________ _.

Building Management System --BMS -

Kindly provide the lnpuUOutput Summary required fro l ocumenl Attached lquotin..9..thesame. ___ . ----------

--------t -I-- ______ ;~~~~i~~~~~;~ate~MS ~em I: be BAC-~~ -- -~acne~ c~:pl~n~ may~~ _a:pte~ _ . ·- -----

DOC Controller should be only 32 Bit as it is the latest Both 16/32 bit acceptable to be as per tender

-· ·------

BMS standard whereas 16 bit controller should be prohibited as these are older technology and also dosent evnly competes with 32bit controller comercially as well

--~BMS

BMS

maximum 2 AHU per controller must be used. And [To be as per tender +maximum 5 Fans per contrpller should be used. _____ . __ .. .•.. ___ _

Expantion 10 modules should not be extended to Suggestion accepted. diferent Controller.DOC controller and Its expantion 10 should be within same panel and Expantion 10 in a

-36 IBMS L_ ____

~ aperate panel should not be acceplfilL__ ____ _ __ DOC controller should be housed in IP 20 ABS/PC To be suitable for outdoor aaplications.

----1. enclosure. _ 1

fr/ t--

Page 5: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

) ) ':>

S.No ClauseNo. Clause Definition Clause Oescrlj>_tlon SPCPL·s Comments/Observations Consult.ants Remarks_

PAS

37 IPublicAddress System

--=-_]=- ---- --· - -- -···. --·- --- .. -· --··-·i---- --- - ...... -- --We request you to Kindly approve the Honeywell Make Honeywell & Bosch Makes approved for the same which also complies with the specifications to provide a competitive offer as only one Make i.e.

__ ___ _ _ ------- Bosch is agp;oved._ ____ _ _ _ _ __ , _ __ _ _ _ _ __ --· _

CCTV & Access Control

---- , -·· -- --------~ 38 !CCTV ----3----- 3 Kindiy approve HoneywelliPelco i Hikvision for the-- Henoyweii, Pelco , Bosch acceptable -

__ same. 39 !Access Control System I - --- Please include-Sch neider as-o"ne "of°the .. approved makes Schneider is-acceptabie -----

' _]____ __ for Access Controller and Softwares. ---------· - --·-- ------ ------- --- I

----· --·-

Data Centre ---~ -- c -- I --]Please inciuciesctineider as-one oilhe approved.makesJ Schn.eider/ AMP rMoiex /L egrand ___ -40 Data Center for Passive network Cable (Copper/Fibre), Racks, UPS

___ _ _ _ _____ and Other passiy~accessories,______ _ ____ ---------·

HVAC

---1-· !- -l Our-price-stiaii inclucJe wiinesstesiing- f-or- onec-hil-ler-o-nlyl &iggest-ion- accepted. . ...• - -­41 I Chiller - Specs-12 ,one person from client and one person from consultant

---+-- +- for witness testing shall be estimated, __ ---·- .. .-!,;-______ ····--- __ _ Request you to amend the clause as" IKWrrr at full load 1Suggestion accepted.

42

43

Technical Specification, chiller ,Page Nos. 11, Sr.no. 1i

Technical Specification, chiller ,Page Nos. 12, Coolers

shall not exceed 0.68in any case & AHRI selection sheet shall be submitted for the same. "COP should be as

-------t----------lECBC norm" Requesi you-to- amend- t-he- c:Jau-se-as- ;;-Th_e_c_ooiers"tia1n To-be-asper-approved ·manifacture-r.-s -sta°ndards-. -be tested and stamped against leaks as per ASME code for the refrigerant being used. The cooler shall be factory Insulated with 19 mm nltrile rubber insulation".

I I l----------i,.,sper BOO Fan s complele0

with motorwitti suitable ___ !Take the axial fan along its cost.

44 BOO, item nos. 13/Axial Fans

Electric starter panels. Electrical panel for fans is a separate item in BOO (item Nos.22). Request you to confirm whether we have to considered panels along

---rrechnical specification, r---- I l'Z::~~~::K~C:a~~~~globe valveand check valve shall ve ! All valvess-hali"beP N-16 ratingonly-. - . I 45 I page No. 33, sr. no. 5 PN-10. While as per BOO valve shall be of PN -16,

valve please confirm the PN rating for yalves. __ __ As per BOO Supply,installation,balancing and ~60% ducts may be allowed as factory made as per

46 BOO item nos. 34 Ducting

commissioning of site fabricated GSS sheet metal SMACNA whereas the balce 40% be taken as site rectangular/round duct. As per BOO duct qty Is very fabricated as per tender .. high 49000 sqmt so duct should be factory fabricated

~ ~-~-~-~------~--~-----~---------~i=ns=te=a=d~o=f~s=ite. ~-~-

} / (t__

Page 6: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

S.No I ClauseNo. I Clause Deflnltlon

47 Technical specification, I page No. 25, sr. no. 2 duct material

- --1------- - -·· -•·-- - -----·-48

BOO item nos. 26, Fire damper ____ _ ,-- _ _ _ __ -· ,-

49 Tertiary chilled water pump - BOW SN 3 e to j

50 I Pump - BOW SN 3 e to j

' Clause De_s_c:_rlptlQn

) SPCPL's Comments/Observatlons

As per technical specification galvanizing shall be uniform coating of zinc on both side(total) of 275 gm/sqmt.275 gm/sqmt duct is not available in market and it will take time for delivery so request you accept the_1f9_GSM ductin_g.____ _ -· ____ .• . • _

b

Consultants Remarks

120 GSM coating may be accepted when/ if 275 GSM is not available.

Request you to provide us the quantity of actuator for fire I Fire dampers shall be billed including actuator and damper. __ ·---· ·- _______ . _ all accessories as _per tender. __ _ _

Control valve shall not be part of tertiary chilled water As per bid document. pump. same shall be measured as a separate item.

Pump casing shail have CED coating I equivaient- - To be as per approved manifacturer,s standards-. -- ·

~:::~al;-;; ;s ~~ ;S-;I~ I eq~valent ;t~~dard. - f 'f o be as· per approved- manifacturer,s standard-s:- - -51 Hot water generator -BOO

--5; i::ooiingTower : soa - •- - - --- --t ·- ·--·- ·-- - --

To be as per approved-manifacturer,s standiirds.- -Item No. 4

53 _ ~HU .:.§E!l_~s -·!:age _17- ·t_ --_ ··-54 AHLI Electrical Panel -

Clause 9 / Page 1 B

-- - -·---- ---

- 55 or A-Hu -Bo61.2 · - -- - --- - -- - ------· !- --·---··-- ·--

56 IAHU fan

57

------------ ,_ ----------1-----FCU - BOO SN 9 / Specs clause 7 Page 19

--··-1--·-· --------! ·-

Cooling tower shall be direct drive.

Brain pan: ~ha.( be }_a9=- -- - . ··----·--- To be as per apP.fEY.~d_rna_n_!!actu~er,s stan~c!rclS. __ _ Electrical panel for AHLI shall be quoted under SN Suggestion accepted. ?0,21. ·- _ .. _ _ _ -- __ _ UVGI shall be sourced from India. - rro be a"s per approved inanifacturer,s standards.--AHU fan shall bes-eiectect baseci on-ci=r.,f and static- [As.per tender guidelines.' . - ·- --pressure, FAN dia , RPM and outlet velocity shall be

!~~:!~f:::!7r!::i1::~~we~:r spe~ification~ats jPls note it-as 2 wayconirol valve as per BOO. __ _ 3 way control valve. Pis clarify which type to consider?

1-- ----- ·-- ··-· · To be as per approved manifacturer,s standards. Cooling coil shall be 37 G thick instead of 0.56 mm. 58 ~CU - Clause 2 I Page 19

- 5~- . Pipe-sreiive-:specs- -· - -- ··- Pipe-sleeve-shall be.made-of P\ic-a-rid gap· shall be-filled ~uggestion accepted. Caluse ~ 36 ___ witti __ mlQ.~@!_wog_l j_nstead Qf lead ~co.le_ ·----··--__ __ _ . __ _ .. ·-- ··- _ _ .. . __ _ Floor type radiant Cooling Pis. provide 1. water in I out ten:iperture for radiant pipe To be as per approved manifacturer,s standards.

60 s stem_ BOO Item 18 to be_ opreted.2. U factor and thickness of slab 3.

-1 ~------ ~~~1

:1~f:r ~J~2:~:!~~ ~~ghowever ___ fAil valves-shatlbeP-N--1-6-rating-o-nly.

_ 61 B-~tt:~~~h~~k valve____ _ _______ .. ;~~~i~t\~~t~a::~i~=~? 10 pressure rati.ng. Pis clarify ------- ·- . . __ ··- _. . ____ . ·.----·-·- •

62 Duct- Specs Clause 2 W t t ccept 120 GSM . t· ~ 120 GSM coating may be accepted when/ 1f 275 GSM a e 25 e reques you o a zinc coa mg. is not available.

•---5~t aco-usticlining - ,__ ·--- soo-staf o:S-mm- thick-Aluminum cladding-however Pis follow soo. ----------63 ~OQ SN 37 I Secs page specification stats 37 G Aluminum cladding , Pis clarify

___ 41___ __ . ___ _ "'!'.Di~h thickness to.consider? _ _ . __

64 ~~~~~~~~~ • BOO p We request you confirm all critical are~s. Commissioning Ire be as per tender.

52 g g of these area shall be done by NSC's in-house team.

65 !General Request you to provide the technical specification of To b. e as per approved manifacturer,s standards. __ . axial fans/centrifugal fans/Air washer/radiant coolil}g. ___ __

1 Request you to provide the makes for Air & dirt separator Spirotech/Flammco I Expansion tank

I

66 !General

Jt,,/ ~

Page 7: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

) S.No ClauseNo. Clause Definition

67 !General

- 68- 1800 item nos. 7a, UVGl _ unit for OT's _ _

-· -- --- t -

69 I Cooling Tower 8004

70 ;~f ;:pern~~~nt_ Cool'.n~ l BOQ 1 B

MS pipe lsoa 71 -··---·--- ------- ·---,- ----------

72 !Pipe insulation cladding - - -- t-- ---- --1----·

73 I Duct insulation BOQ

----+ - - ---· ---------74

_ Z5_ [Make List _____ - -1 - --- ·----·•--·-·

76

Clause Descr!E_tlon

-· -

) SPCPL's Comments/Observations

Request you please incorporate coil mounted UVGI system in floor mounted AHU,s to maintain IAQ and improve coil efficiency the specification for the same

T

Consultants Remarks

To be as per tender.

_ ,;attach~g__i,arewith_, _ _ _ ___ __ _ __ _ __ __ ______ _ _ . _ __ __ _ __ _ __ __ __ _

~~;e;:;~~'._o.provide ~he te:hn~ca'. s~~~ficati~n-~ ~~r:o be~ per _ap~~o~ed manifacturer,~~t~ndards.

As many of the leading & reputed Indian cooling tower - tTo be as per tender. manufaturers are providing the CTI approved Cooling towers , we request you to accept the Bell / Paharpur/ Advance make also. The cooling tower fans shall be

~~~:~:f ~~~Y~~e~ITbe provided~~o·: ~e~vis-~ge th~~ ~ ~'.tache~~ _-__ ·--_ :_-__ - _ __

M.S. Pipe wall thickness above 150 mm dia shall be 6 Suggestion accepted.

·~i;e~~~~~/i~;;~;II have Aluminium cladding of 26 G Suggestion accepted-. ---instead of 24 G ___ _

We req:e~ ;o accept closed cell cross linked insulation !To be as per tender. with out aluminium foil instead on nitrile rubber.

Radiant cooling system Rehav shall be read as Rehau --I Suggestion accepted.

_, W~~request._yol)~a~{ followjng=~dditio!l_ ni-a!{i :. -- - -i--- - - - . - -- - - - . - - -____ 1PLs not ethe following makes as acceptable __ _

CTI certified Cooling tower : Bell/ Advance I Paharpur Nihon spindle/Marley/SAC

---.;;- - -Ai~i,-.;;dli~g-;nii ;-FCU0

i°Ai~ .,..;;;h·~; ~ Wa~~~/ Edgete~hTIFlakt/CarrierNTSNikram HitechNoltas/Zeco Zeco

- 78- ~- - __ - - ~cto~_made d~C!~ Y:Javes/_ Quc;:to_f2._b . ___ ______ ~ec.9.(.!:_coE_~ct/R_C?la~~r~av,~J ___ __ _ 1

79 Grills I Diffuser I MS Damper I Louvers I Fire damper : Caryaire/Trox/Airrnaster/Titus/systemaire . ___ _ _ _ __ --·--- §ystemair I Sa_ry~J5. I O_eella ---- ,

_ _!0_ _ ~xi!I_I f~n. : V!Ell~r _ _ _ _ ---·· . . • ~g~~~_ll_i!_~~e~-· _ 81 R~dlant ~li~e ~tem_:_G_!<!CC?~ini S~gestion accept~~- __ , _ 82 _ UVGI : AerC>_Pt!fe I M~9!.!_eto __ _ _ ___ __ ~~stion accept~d. ___________ _________ ,

_ 83_ _ ______ -· Air w~she~ • E~_etechfvVaves{_Z~co.!_Ro~~~----- £lakt/CarrierNTSNikra"!_~~e_c_!11Vo!!?~/Ze~C> ____ , 84_ _ f:rim~ I C~ndensei:_eu~ Wille I KifLoskar Xy)em(_Grundfos/Arrnstrong ____ . _____

1 85 ___ ------ __ ~~con~ I Teri~: Will~/ Kirloskar _________ Xylem/Grundfos/A_rrnstrong _________

1 86 _ _ Cooling_to~e~~ll /j'aharp_ur I Ajvance___ t:Jihon_s_pindle/B~C/Marl~_ _ _ _ ____

1 - ~7 ·- Atj_l,_J_ I HRV.J.FC\:!_; Waves I Edg_etech I Zeco _ _ _ . _.flakt/Car!ie~NTSNikram Hitec~Nolta!/Zeco. ___

1

88 Ducted I non ducted inline fan: Wolter I Airflow, also List Caryaire/Greeneck/systemaire/Ostberg __ -·-- -- _ ofMake_!!!lder_ltem 11Q.7_~il!_Q~fil>Elig!bl~- --·- ______ _

89 _ Centrifu~~n for _t.Hl,L~ f~n~~~i2!1_:_W()lt~r___ Nicotra/Kruger/Com_efre_i I 1_ 90 _ MS I~:__ Ml?L (_Ap()IIC? SJ:19gestion accepted. _ 9_! Check valve: Ca~t~_ __ ____ Suggestion accepted_:_

1 92 Ball valve: Zoloto I Lea<!_~r Suggestion accepted. ____ __ _ 93 Strainer: Flowe! __ ·---- Suggestion~cce_P!_e~ _ _ _ __ _ __

__!!!___ _ _ PIO I Motorized V§lve: Advance I Flowcon ·- - Danfoss/siemens/Schneider/Flowcon/Oventrop I

Flow switch: Anergy §u_g~tion accepted. 95

}/ (t__

Page 8: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

t,

) } S.No I ClauseNo. I Clause Definition I Clause D_e~~lptlon I SPCP.L's Comments/Observations Consultants Remarks

Tricolile/Advance/EAP/KEPL ------_ 96 __ ! ·!- --· ___ ---,--- . ___ ,Electrical Panel: App1ication_p~control - ~7- ·---___ ___ _ ____ .Q.L!~ inJ!!!~.!!_on~ A_-Fl~x . _ ··-· ____ _ _. _ ~u.9g!.S!l_(!n ~~~~te_d_. _ -~ ____ _

98 Flexible Duct Connection: Kanwal Suggestion accepted. __ 9.9_ ____ _ _ . ·------·- _ -·---- _ _ __ ttf3VHeat~~C~c!.nger: YIS __ .. ___ Sugg~stionaccepted. - · ---_ !QL. _ _ _ _ __ _ --·-- __ __ _ __ ~@1 f~n: Wp!t~ i:_ . . _. . __ . _ .§ugg~sli~!l ~~pie~. __ _ 101 ___ _ ____ --·----- _ --·--- · - _ Radiant cooling system: Giacomini_____ --· Sug~estion accepted ... .. _ _ _ _ 10L __ __. _ __ __ _ _____ uv91:_A!:!i:_9pure I Magnf:!to _ ___ __ ~~gneto_f£3.Y.!<~0il:1ericc!.n .UV ___ -·--- ~~! _________ ----·--- ·-- _ __ ~Ji:. & .l?Jrt ~?rator: An.ergy-Fl?m~v!:!nl ___ §pirotec!i~l~m_!!l_E~_ _ _ _ !.q_~ ____ _ _ _ _ _ ___ '!.f'..VBo~ f3uskin titus/Systemaire ___ ------- S!.J.9!l~.!!.C?.!1 ac~e.P..t.~d:._. _________ _

105 VFD: Danfoss/ABB Suggesticm accepted. STP& WTP

106 1soQ, Section XI, Point Please confirm, if we can offer Floating type MBBR 11 .1, ?.TP-PY,:.<3_1;.l,_ _ .• -. l!'~Q[~.C?f.Q!!rQ~n g~~n. ___ ---··---·

107 ~~~E~~ction XI, Point Please provide Inlet parameters for ETP

~ 08 soa-:Section- XI, Poin-t - -- Piease-provlde-OBFffniet and Outiet Ha.rdness·fo;.--11.1 STP & ETP Softener

- 1;- BOQ~Seciion xCsi'P&- --- - --- Ple~1se"provide capacity.anlheaci"oflrrigation and- --

. ___ ETF: . _ _ __ __ _ -- •. -- Fl~~hLng_ water !!~~ff:!r P~P-~-·---- -· - !Please do not deviate from BOQ item. 110 BOQ, Section XI, STP &

___ ETP ·- ____ --1 --t------- _

111 BOQ, Section XI, STP & ETP

Please provide Invert level of Sewage and Effluent ·-l- -- ···-- - . . ····-· - ···- ·-- -·-. . - -

No Technical specification mentioned in BOQ and Plumbing specs for STP and ETP. We will submit our offer considering specifications as per good engineering

C I ractice

·~OQ, Sectlon-x[s~ - -·---- Please Provide D raw1.·ngwith- Av"ailabie-Ciearheigh-1.--

~ !;T~_! '!{!?_____ . Marked Location qf_§TP, ETP and.filf:. __ ·-- • - Ji--------------- 1 Pressure Sand Filter, Activated Carbon Filter & Softner,

113 IWTP all of 8 LPS capacity with FRP Vessel - Query - MSEP Vessel acceptable, as FRP is with such large capacity

Can go with MSEP

_ 1WTP nolg@ferable ____ . - · _____ . -···--------­STP & ETP Item = Please clarify ii wil one STP I ETP

!plant of 500 KLD cape3.gty 114 ISTP & ETP This is including ETP (50KLD)

PLUMBING PANEL

~ I I

Outgoing Feeders Nos to be clearfied and capacity rating to be confirmed. For particularly for Filter feed pump 3 x 8.5 HP & waste. water sub panel feeders a . . nd J Please consider the BOQ item now. In GFC we will

. . borewel um~.feeders .. _ _ _ ---· _ __ _ see the final specs Further please confirm Sub panel Qty 14 Nos. are all for

_ 4 x 1 HP ~!!'.PS or differen!_p~m.J?. combination_. ___ _.._ _________________ ..,

Jr/ L

Page 9: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

~

) ) S.No ClauseNo. Clause Definition Clause Description SPCPL's Comments/Observations Consultants Remarks

CHILLERS

Reference - Technical Specification, Section 3

Clause No - 1, General

Description - Water

117 Chilling Screw Compressor Type Chilling Machines

Request you to specify a additional clause as " Only Suggestion accepted. AHRI certified chillers shall be acceptable"

Page no - 11

Specified in Tender -f'.dditio,n~_Clause ___ -·--- ---- - -·--- ----Reference - Technical Specification, Section 3

Clause No -Request you to specify a additional clause as " The Compressors compressor motor shall be accessible for servicing

Description - Water without removing the compressor base from the

118 Chilling Screw chiller. Compressor shall be fully field serviceable. To be as per approved manufacturer standards.

Compressor Type Compressors that must be removed and returned to

Chilling Machines the factory for service shall be unacceptable. Compressor bearings must have Individual design

Page no -11 life of 180,000 hours or greater''

Specified In Tender -Additional Clause --- - -·· -

_.. ___ ·-- ·---

Reference - Technical Specification, Section 3

Clause No - 1, General Request you to amend the clause as " IKWITR at full Request you to amend the load shall not exceed 0.68 in any case "on

Description - Water clause as" IKWITR at full load tender conditions" & AHRI selection sheets shall be

119 Chilling Screw shall submitted for the same. "NPLV of machine shall be less Suggestion accepted. Compressor Type not exceed 0.68 in any case & than 0.44 on tender conditions. Calculation of NPLV

Chilling Machines AHRI selection sheets shall be shall be carried out as per AHRI Standard 550/590 (l·P} submitted for the same. guidlines for calcutaion of NPL V. COP of machine shall

Page no-11 be more than or equal to 6.0 on AHRI conditions"

Specified In Tender -Additional Clause ·-------- --~

it/ l-

Page 10: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

S.No

120

ClauseNo.

Reference • Bill of Quantities (BOO) of HVAC & IBMS Works

Clause No· S.No 1 Part A, HVAC System

Description • Water Chilling Machine 4

Page no -491

ELECTRICAL

121 BOO-Electrical HT Side • item no. 1.2 • HT Panel

Clause Definition )

Clause Description

Supply,installation,testing and commissioning of water cooled Screw Chilling Machines complete with semihermatically sealed compressor/s, multi circuit chiller.shell and tube condenser,

BOO-Electrical HT Side . 1 - 1-- · - ----

) SPCPL's Comments/Observations

Request you to amend the clause as" Supply,installation,testing and commissioning of water cooled Screw Chilling Machines complete with semihermatically sealed compressor/s, multi circuiV pass chiller (maximum upto two passes),shell and tube condenser, ....

Consultants Remarks

Suggestion accepted.

Please approve authorised channel partner of approved ,No, only OEM's Panels acceptable OEM's.

------ -- - -+ As per Tender Documents

Please apporve Recons as additional make.

\0

122 j'tem no. 2 • Servo stabilizer

- 1-;3 Boa:-ElectricaiHTSide- - - - - -·- · --- -- ----·-· ---- ----- _ _ item no .. 5.2 - Inverter __ --· Please provide makes for inverter.

Luminous /Microtech I Neo wait I Powertron --

~

BOO-Electrical LT Side. Please provide Lighting & Power layoutdrawingsto - ,During f5etailede°ngineering Stage - --em no. 3 • Point wiring calculate point lengths. Also, provide the General layout

• ------·- .. _. drawings alo!!9!'!'ith SLD's BOO-Electrical LT Side· -- ----·----------,,

125 item no. 3.6.3 &

3_6

.4. As per Tender Documents Please provide additional makes for the same.

__ _,1,=B:.-=e=d head panel

126 BOO-Illumination System item no.5- Poles

Please approve Mayfair & VST poles as additional makes.

As per Tender Documents

127 BOO-Electrical HT & LT . As per BOO & LOM all the panels are Non-TTA type, JAs per Tender Documents

I

Side • LT Panels however specification asked for TT A panels. Please

128 ---~ OM-S. No. 22. Cable · ~~:'feapproved MEM, RICO, Steelways & JRC make~ per Tender Documents

Trays for cable trays as specified vendor's do not manufacture _____ . _ the same.

129 List of makes- Panels Kindly add the following makes for. Agreed _ __ . _ _ __ P.E.nels-Vidyut Control. _ -··· .....JlQ_ ~LQLm~l5_es Kindlv add the following make~_fQr: ~AE make~roved f. or.Risi!!9._Mains I . -· Risina MainsGod!&{ ZETA -- ·- - ---. - ·-- · -

LT Panel I MDBPTA Panels-:-sterling, Ambit, Advance, As per Tender Documents Adlec, SPC

I ,McB-DB /SOB (FactoryBuiii)ABB .• - -­Feeder PillarPTA Panels· Sterling, Ambit, Advance, Adlec. SPC

1,/ 01__

As per Tender Documents AsperTenderDocum~e~n~ts;;_ ________ _

Page 11: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

) S.No ClauseNo. Clause Definltlon Clause Description

- · - - 1- -------- - ·--, ------ ·• ---- - ·---·

----·----- -- - 1---- -- --- -1-- --- - 1-------·- !- --

• 1- -

-·-+---------

) SPCP L's Comments/Observatlons

Air Circuil BreakerABB MCCBABB ----···-· • · -MC BABB

' RCCB / RCBO IE LC BABB -- ---------- ---·--· - -RelaysABB /Alastom /Minilec TimerABB / Mlnilec

Consultants Remarks

_ [As. per T.· ender Document.s _ . As p~r :r~ng~r PPft,1m_Eli:!t§.

_ As_p~r T~n9~r DQC~~nl.§_ _ A~ p~r T~ng~r D99um~n!§.

PVC insulated single core stranded Cu wireRR Kable

A~ p_er Ie.n~!=l! 9-oc,:u~en~5.. As_p~r Tender Documents As per Tender Documents

~~rlQH!~Q Cel?le Tg1yS\f;?elw~ys I M1i,E ~~~. i JRC = Aii>~r I~nde~!)e>.cumj~ts

I\

---1

T~.l~phon~ g{!blf;?K~I ___ _ . _ _ _ _ . _ ('.~ p!;?r T.~!l~t~r f)Qft,J~~n-~ __ Switches and SocketsLegrand -Myrius I ABB - Clasic I Legrand-Miyrus is accepteed,rest as per tender

I f.{IK-_\Yrapro~_n9 . ·- ··-- ... __ --·. _ d.QC.:\!!:fl.e.nt . --· ---·----- _ _ __ Metal Clad Industrial Power Socket with MCBNeptune As per Tender Documents

-----1-------- - _ - •----.. ---------+!3aJI.§ ___ -·- _ --· __ _ __ __ _ ·---. _ _ . _ .. __ . __ Weather-Proof Industrial Plug Socket with MCBNeptune As per Tender Documents

-· I

.

Balls _- - i_ ---- ------1_ --- --- - _ 1----- ----- -- ·1D-G-Set&-AMFPa.nelPerkins-·_-- ----_ _ As-perTenderOociiments_ -

. , 5-~rve> [email protected]~ §~bi~;~rR~cqns . . . _ ··- _ ~§._E~r_I~ng~~ QQC.:\!~~r}t§_ ~ T -~~.f.i!QiJ_ ~.c.!n~;pc,:e>~ I fy_!€)trix $h~~~m- _ _ A§.P~~ T~~g~r DQc,:t,1m~~t§

- ----·------· --------

_ _ ____ U_P..§.iQt-J. !:.lf':!.filNl!m~~ic,: !_Ce>.!:!§t,J~/_Unilin.~.. _ _ _ _ A§ p~r T~ng~r DC>c,:t,1m~nl.§

~

$~e-~~i9.!!t _!:o_le~ J.Qf!c.!ge>~~~?l:lf?irs . ____ _ _ As Q~f J:~ng~r DC>ft,Jm~nl.§ _

-· ___ _____ _ _ _ __ Transformer {.11/433 KV ON~ECE_/ Svasca ____ As _per Tender Documents

---L ------·-__ ,___ --- _j------ ~!;~~~:;;~:;~~~~~-- · - ~~~~:ng~r_Q.Qft,J~~n!§_____ 1

Rising main & Bus Duct- EAE ___ ·--·- Accepkd._. . __ _ TELEVISION

131 I ± 1 _ 1:!. ~:~~~n/:nti~ri~~plication like Hotel TV. , Digital_ ~ Please Refer Item No. 26

132 Kindly provide approved make for 42" LED. We propose Please Refer Item No. 26 ___ ___ _ Phll_iQs for the same.

-- The actuai screen size i;e; 42" may- vary as per the As per Tender Documents . 133

SERVO STABILIZER

134

brands available in the market to either 40" or 43" etc. We request you to accept the same.

Input voltage Range mentioned in the BOO is 415 V -20% to 10%, whereas, in the technical specifications, it

As per BOO

, is mentioned as 300 to 460V. --, 1-------1 -t---- --·--- ---·--- -t;..·~·.;,;;-,:,;;:;,.i~ -- - -· ..•. "'" tJCI I c11uer Documents

135 Class of insulation will Class 'A', which is a standard practice in oil cooled equipments, as per IS Standard. ~.st I -· ---·1 Rate- of Correction in. rolling'"conta. cttype- s"tabilizer

0

will~As per Tender Documents -· ·-­be a rox. 5-6V/sec.

_ 1~[""' - ·---- B~r.!.9.hI§tab~izer: f9n.~~~~1C>r_i~pQ!J~~ir~~-:::--=--=- a~ted~- --

Jr/ l--

Page 12: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

S.No ClauseNo. Clause DefinlUo_r,

136

---- . - - -------·---

137

GENERAL 138 f.------ - -·--· --· ·-~ - -

BOO Item no 20 Supply & 139 Landscape installation of water

Clause Description \

SPCPL's Comments/u.,~ervatlons

ACS should be used on the output side of the stabilizer instead of MCCB, which should be in the scope of Panel suppliers. We shall provide you potential free terminals for low I high voltage & protection against single phasing, which will be connected to your outgoing ACS (ACB not in our scope).

The stabilizer required is whether for Unbalanced Load only or for Unbalanced input supply also, because in case of unbalanced input supply, 3 nos. Servo Motors will be used, whereas 1 No. Motor has been mentioned in your technical specifications (based on which it should be Balanced Type i.e. Balanced Input supply & unbalanced load). At the same time, you have also mentioned "3 nos. single phase servo voltage stabilizer connected" (base on which it should Unbalanced Type i.e. Unbalanced Input supply & unbalanced load).

1-- - ----· - -Kindly provide the quantifie-d breakup of the BOCfitems for which the total amount is 32 lakhs. Also the

Consultants Remarks

accepted.

servo siat>ilizer shell have - friJos: Servo Motors

Document Attached.

140

~~gfication~ r~9!!.lr~Q,_ Kindly provide the make & Mod~ - 1 As per Tender Document.

1 __ 1fealure equipment ---1---- _____ _ BOO Item No 17 Lighting

fixture::::s=--------~ Landscape

_ 141_ '=i~t Qf M!!~~~---- -- .Q§SD _____ F:ericlave~--==- -~-- ----- As_p~~J~.!lg~r D2£Yn:i~J, _ 142 _ Li~!.. of Makes __ Kitc_!l!!_Q _ Vanya l~_Q~!rial E~iQments __ ._6.§_eer !~Q~r Dgcument ___________

1

_ 143 List of Makes Laund Peri~~~ve _ _ As _p~r_!~nder Do~~ent __ _ 1~ !::!~ _2_f Makes M_ort~ Sri ht_§~r Air~on As eer !~Q~ D-9cu~~i:i_L __________ _

145 _ List 2! Makes _ C:_y_rtain_Jrack__ LM ~~gical ltajy__ As _g~_r J"~nd~_Q.Q_CUfl!~i:i_t_. 11§_ Li~_ofMakes Mod~l~r9i: _ _ __ __ ~1_~Q!_~~n.Q_P.Q~JALl~E A.,__§_Q~rI~s!~!J)o~!!!~nt, ___________ _

147 L'

1 f M k Kindly add following Bed Head Panels Horizontal I LM M d. 111 1 As per Tender Document.

,s O a es makes for the said works: Vertical e ,ca a y = 141!_- (!g ~{Makes_____ Pn~!!._m~i~ Tube ______ P~vc_Q_!,J~A--_-----------------1-A- ~~r !~nder Docume_i:i_t. 1 __ 149_ 1,J~t Qf Makes__ _ _QT c~i~i:i__g_p~nd~~~--- ~ Medical 11?1 _ As _e_~~T~ng~r DocumeQt ____ _ _ 150 '=isl of Makes Nur~ Q!!II §.~!em . l~l;B_NEX_§P_AIN _ __ __ j\~_p~r _ _I~_11~~r DQcum~_11J __ _ _ 1§1 List Q.! Makes QT do.£_~-- MEDIK_~_g !:_>Of3-IAhlNE__ _ ____ ___ ______ __ __ ~~__p~_r_I~g_~r_QQ~ m~t. 1

152

Lisi of Makes MOT walls ME.DIK and PORTALINE with option of EGP, HPL and

1

_ ------'- _ sta111tess steel ______ _

153 List of Makes Stainless Steel pipe Additional Make

LV Kindly add the following makes for LV works. 1. Fire Alarm System : Notifier 2. EPABX: Panasonic 3. PA System: Honeywell 154 I List of Makes

4. Audio Video System: Apart ._ __ _.__ ________ _.__ ________ ,__ __________ --'-"15,_,_. --"M"""a,.,,t""rixc,._-Switching : Kramer/Muxlab

Stainless Steel pipes confirming to JIS 3448 ASIS-316 & Fittings JWWA G116 (Prime Gold) may also be consider

1.Agreed. 2.As per Tender Documents 3.Agreed. 4.As per Tender Documents 5.As per Tender Documents.

JJ.-/ v-

Page 13: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

S.No ClauseNo. Clause Definition

Vol-ll,GCC,Cl-1A,Pg No- !Security Deposist 7

) ) Clause Description SPCPL's Comments/Observations

COMMERCIAL QUERIES

Deducting a sum at the rate of 5% of the gross amount of each R.A.bill till the sum alongwith the sum already deposited as earnest money will amount to security deposit of 5% of the tendered value of the work.

Released against BG issued by a scheduled bank.on its accumulations to a minimum of Rs.5 lakh subject to the conditions that amount of such BG.except last one.shall not be less than Rs. 5 lakh.

Kindly accept BG of eqal amount in place of cash retention. Also validity of this BG shall be upto OLP.

·~ Consultants Remarks

No cash retention shall be made after submission of B.G. of required amount.

----·- -- --- t--·--- ----'For delay upto 3 months: 1 % of cv per month.

--- - ----------------·---- --·

2 Liquidity Damages

For delay between 4 to 6 months: 2% of cv per month. For delay beyond 6 months: 9% of cv per month.

Kindly consider LO as 0.5% of the CV per week of delay subject to a maximum of 5% of the cv. !As per tender document.

maximum Id shall not exceed ____ _

---t- 1--1Q'}'o pf.s;y. ____ , ____ Requestyou_t_o -kindiy-payprice escalcitic:m" as- per CPWD As per tender document.

Not Applicable Clause 10CA/ 10 CC. • _ - - - --- - -- -·-------- - --3 Escalation

f I b --- - Kindly-provide fr,e spacefor. iabour hutment within the Labour Hutmenl may be made with in site premises. Space or a our . 4 I lhutments ~i~...e_~~ts~!i._______ --.-·--

l-1-·- + ·---· Kindly provide the details of the facilities to be provided As per tender document. to the client.if any 5 Facilities to Client

---·-·---·· ~ I-·. - ·--- - .. -- - · - · - ·-Our scope of work and Cost shall not include any

6 Approvals by Statutory Bodies

approvals from government I any other authorities required for works which is not directly related to our scope.

Regarding liaison with the Statutory Authorities for processing the NOC's and other approvals related to the commissioning of permanent works. We understand that the same has to be done by client as complete design being responsibility of client and our responsibility will be limited to assisting in this process only without any financial li:>hilitv

J}/ l--

Only pre construction clearances shall be provided by the department.

Page 14: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

l "' J ' \O.TAS

PllOJ[CT: I Construction of tH&h ltvtl Canter lnttlt.utt II Chak G.1r1j.ari1 City. Suttanpur Road. luctnow ISlrl\lture 8ulldln1)

SU8J(CT: Ptl:E 810 MUTING POINTS for HVAC work

SR, NO. ,,,. no. Cl.aus. No. aeterence Description Specified In Tendtf' O•rlfl<atlons lltQulted OurRemarkt

ShHt metal wort 275 GSM duc.t is not nslly avail.iblt, Request vouto acctpt tht duct inc can be accepted In c.a~of non availability.

1 lS 2 T echniul Spcclflc,ticn & Air d~trlbutlon

G1lv1nlzln1 Jha!I bt uniform ccauni o f zinc on both 1ldeltot1I) of 275 1m/1crmt. thltl be of dus VIII. UOGSM (both Ude}.

A.s pe r BOQ "'Suppfv, tnst,,lllt!on, balantlnc and comm!ulonina of site f~brlt1ted GSS she-ct As per 60Q duct qty tS very hit:h (49CX)() Sc;mt), s.o duct shall be factory 6o-K d:ucts fJCtory madt and 40% site made may be aecepttd.

2 76 34 80Q1ttm Oucttna mtt:.1 rect:1n1ul,u/roun.d d1.,ci:-. f.abnc.ated ;nsttad of ,111. k!ndly confirm.

Rt<autn you to prov1dt tht quantity cf actu1tcr which havt to cons,dtr r.r, dampen to be measured in m2 intl1JOin1 Ktuitors u tender.

3 71 46 BOQlttm Fire Dimpcr As ptr BOQ "F1rt d,lml)trs with actuators and 111 accencrrts'" for fire damPfr. Si me ls mis sin& In BOQ

Ten1ns ar.d b.alincin& for complete HVAC wcrtc shill be done by HVAC Tc,unc and commlulon,nc of crltlul arcu to be done u per

Teuing and commissionin& by NEBB certified commlnlonu·c a cent for Ciitic.al areu like contr6(1or only.Kindl., confirm. N£88 c.ertlfie-d commiulonin& ascnt u PC't tender.

• 78 52 eoanem Tt1tln1 and

Ots,prtparnion rooms, Isolation rooms. tmer&tnt;y rooms,ICUs,N1CUs ,l1boratorlts,blood comm1ss.ionlna

banks.CT scan rooms.MRI rooms.any ottler cr!tlcal areas as per drawincs ind spcclfic:.itlons.

Kindly confirm the application of axial fins wpply or exhaust. ti exhaust Axial fans are for buemcnt vcntJl.atlon.Oetalls u per 1e0<1cr 800. then normal tich.aust or smoke uh.lust. RtQ~st you to provide the

s 70 13 BOQlttm A•!il flow fan SITC of ,xial fan now typ-e fari fins complete with motor with &u!tab!e electric st.arttr dttailtd spaflcatlon c f aJu,11 / ctntnfucal f1n1. ~ncls.lt should be complete H per manufacturer's spcclflt.atlon.

UndC1' Ust of approved m11tci.1p.art from the specific names 1rven. 'equivalent' word Is also Ultd to choose from m1rkct. Our spcclflc request is that definition cf "equivalent" is quite: vague and it ur1 open to lot of ttchnical 11\d ccmmttd1l llt!1u!on durln1 execution. we requ,cst for approval of followmc acldfllonal ma kl! to meet tht

' 76 Approve M.1ke U.st of approve m:ltu I Equtvatent m.akts arc also ac:cei:,t.ablt, requisite technic,I spcdfititions and are of repute

1 76-78 Approve Mike Prlm.ary chilled water pump

Xyltm/Grundfoss/A.rmstronc Wile/ l!t1oskar / Secon Acceptable mall:ts •vlfnv'irundfoss/Atmmonc cnly

I 76-78 Appl'OVC! Make Stcon.d.1ry Pump Xylom/Gnmdfoss/Amlstron& Wile I Kir'lostar Acceptablt mates •vtenv'cnmdfoss/Armstron1 only

' 76-78 Approve Make Coolin& tower CTI Nlhont sptndJe / M,nlty I BAC een I Paharpur I Flwotcch ACCCpiable mall:es Martey/BAC/Nohon S.,.ncUe only.

10 76-78 Approve Makt Air handllnc unit I

Fllk-t/C1rrltrM'S/Vikram HitKh I Vo!tas Edcetech/Riviaircrm/Zeco /Wa~s Additionally Zea, may be accepted.

HRW

11 76-78 A.pprovt M.tkt hnC.OilUnit Clry1ire IC.oil company I Hrttch (d,etec:h/R1V1a1ra:m/Ztco/W1ves Additionally Zeco may be accepted.

12 76-78 Approve Mike A.Jr washer Vikram Hitec:.h/VTS/C:,rritr /VoltH Ed1tttd\/Ravialrcon/Zeco/Roots/Alrflow Addrtlonally Zeco miy be ,ccepted.

Axlal I centtlfucil Grtt11he<t I A<rflow/Wolttt Addrt1onaUy Greenhec:k mny be accepted. 13 76-78 APPt!)VtMJkt ,.., H1COtra/comtfrei /Kruau

F.tctory f.abrlcatt.d Ouctofab Mikes to be Zeco/ecoduct/Ro.1.tstar/Vcltu only u 76-78 Approve Mall:t UCO/Ecoduct/Rol.astar /Volt.as

duct

GrUI I Diffuser I Systtmalr I St-rvex /Opella /Tnstar Additionally sy1ttm11re an bt ,ccepttd. IS 76-78 Ape:,tOVe Make

damper Clryairc/Trox/Alrmasttt/Tltus

UPRNN f CPWD 1pproved Approved et pantls shall be Trlcoll1t/Adv1-nce/EAP/KEPl onty 15 76-78 Approve Make £1«-trbl panct Trlcollte/A<tv1nce/KEPl/EAP

AM'1r( Additionally Flamma, may be acceptable. 17 76-78 Approvt Make Dirt Sti>ll'l'tor ~rot•t:h

Giacomini Actclltlon.tUy Gl.acomlni m,y be acaptablt.

11 76-78 Approve Make lbdla.nt cootin1

UPNOIVREHAV/UCPEX Jystffll

} / ~

Page 15: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

) J ' :s Ob8ervatlons & ClprlllcpUons UABN.IN Con,troctton or High LP.vet CAncrr lnstltvte (It Chak Ganlarfa City. Sult~npur Ro~d. Lucknow (Signature Bulldfr,g)

~

·;:.. · ,,,r, i.;.,..;,'

t ~:r I .. v· 17-Aug-15

S.Na, Spoclllcatlan I

Tinder Clau•• Obacrvations I c11r1nc:1tlon& Client Remarks 800 Rtfef'lnce

Rtlor,nca • I echnd SPoQIQtoi, Socton 3

CJ1 u11 No· 1 General

fV!,,J be "CC.e.t'f~,,( 1 Ducrlptlan • Wotor CMin9 Sao1V Comp,e .. or Typo Chlllin9 Add4,on:>I Cbu:e

Request you to epOClfy a add;tio.-,1 cbu:e as " Only AHRl corllf,crJ chillora shall bt l.13d•nos acceptable" 1'"Y pt 1 , ~ k.-0 Pagt no -11

.A p-<-c:i rr~ . Soecllled In Tonder· AddltloMt Ctauso Roforonco • Technical Sp1cdiolt1on. Secl•on 3

CIAuoo tlo • lfi) Gemr~ Requ.,sl you to amend t/\e cleuso ts· 1KWITR 11 fuQ loDd sh3!I nol exceod O.Ga in any cau •on M,i,( be c.:c(.(!.pi~i Request you u, ar.>end tho d.lusa as" IKWITR •t ful lDad st..l tender condlliona• t AHRI sot«:,on &hee:s sh31 bt su!>mi:lcd fct u,e u mo. "NPLV of 1'7Y 0\ I\ 2 OcacrlpUon • Wale< Chilling Scrr..,C,:mpNtuar Typo C~.l,ng nol tl<C:Hd a.Ga.,, :>rrf =· & AHRI Hle<.11:>n shectl 1/U.I be machine shall be leat 1han o •• on tender conditions. Calc:ulollon ol NPLV 1h1II be ~}(,u.. Macnonct submited for lht same. ca rried oU1 as per AHRI Standard 550/590 (1-1') guldllnu for calcuulon of NPLV. COP al

...o-r-<.C; ~.e_.:,{_. Page no• ti machine 1htll bt more than or equal to 1.0 on AHRI candlllans"

Soeclntd In Tender• Addollcnol Cbu-.c

Refcrcnc1 • Bil of O.....i~.-1 {BOO) of HVAC & IBMS Worn

ClaulO No • S.No 1 Pait A, I IVAC Sy>!tm M .... a b.e. o..cc.e..p t..e.J. Dncrlptlon • Water Chla,og Macnlne Supply,insllllllllion,to1tlng •nd e<>mmluiorw'IJ of willer toolod Roques! you to emend the cJause as • Supply.ln1toll1lion,lesling and aimmlssloning of w11<1r ~ (A'-\ .""" k ~ • Page no ·491

Scrow Chlt:lng MAc:honts complete wtU1 .. mohormAtocally Htltd cooled Serew CMl,ng Maehms complete will> .. mhtrmatlca!ly seoled compreuarls, multi comprcuor/s, ~c:Nlm.shol a"ICI t1.a>e ccnden1tr clrcultl pua chltler (maalmum upto two pa11• s),1hal and t\.lblt condcmsor, ..

~.e. CJ..tf-V-Sp1ctned in Tendor. SUl)llly.nstalb!ion le&til,g and carnmisalonir'G ct watar coDled Saew Chlling Machnea compltll W1lh 1omhlrmatlcaly .. lllod a,mpno11or/s,multJ ci'cu,1 chilcr,sllefl and lubo condonser ....

.Dr/ t---

;.,.10, l

Page 16: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

-1--SUl?P..l-Y AND INSTALU\TION -QE WATlR.·'F~l\J)IEI;: ~ _"':

E(ll.llPMENT: ·, I;::,.!_.

l l 1 Diffuser· (ABS)

1.1.2 Pump lOHP Submersible,Three Phase (lOOxlOO).

l 1.3 Submersible light, MR 16 bulb 12v so·.·,, M.O C • Noryl, Protection- IP 68

l 1 4 Step Down Tramfarmer for tl1e lii.h:s. : :' s llun:ticn box

: ~ntrol Panel {t. lade of 16 f;UJj!C CRC sheet •;: : ·:,:Jer cca:ed with s:ar:er 3 ,:hase pre·:ention.

I : :.!: •1[~ \ ~~tnl!!t~r ·-~ '"'· ,., l"e!er TP

l · 1.~::5; rr~:~:~ :-, .. . .. ~ .-4 J"'. :: space for the

l~wer s•J opry for ttie :.6~:;

C.lp,tal fitting surh e: :::"::rel va\cs, tlRV's 1.1.7 Butterny valves c!c r eq .;.red for the final

installa tions.

1.1.8 Complete Internal Ph.:rrb.::5 ·:erm such as (uPVC pipe) & fittingsincluding Elbow, Tee, Socket etc.

1 : .9 Complete Electrical \'Jor~ tech as conduits,, bends, fittings etc. of rcqcired sizes.

Wires c l Various sizes including accessories for j

1.110 final equipment Installation.

Installing, Testing & Commissioning of the 1.1 11 equipments including shop drawing/as lluilt

drawings.

SUBTOTAL

:!1 . - ...

,.,_ ~ : . ~~--·~ TOJ~l COST OF CIVIL WORKS~ ;,. 'I • . :.:. ' >! .:~ .......

t.. ti . .,,

(1 ~ !> - ---- "' ... L__

~w ~

J:-~ .

NOS

NOS

NOS

NOS NOS

NOS

NOS

NOS

NOS

NOS

NOS

~-~

:..,.- :__, ~;_'t

lj.1,.- ..Et: ·6f. -

•,tj;; •

154 1500

9 38000

227 3700

20 6000 50 1000

s 700t"'()

l5 150000

l5 467115

l5 100000

LS 3SOOOO

200000

-.,,,_ .

::;~ ; ~ ... ~

. ,-:r .,it;· -~- . _;

Ir,

(~_l~ IER' SCAPES OOLS

--1""&.I ? ~~.•..: I

-- u,,,~ .

~~~&- t> --"'

n1000 ,.

3d2ociif t .. .• I ..

§39900 · ... w,w.prcm1 rl andscnpes.Ul

120000

50000

350000

150000

467l1S

100000

350000

200000

3200015.00

:s .. ..$ -~ . . - . --.r

~~\\ ~ -\ I ,

Page 17: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

,,,

-

1 SUPPLY AND INSTALLATION OF WATER FEATURE EQUIPMENT

1.1.1 Diffuser - (ABS) NOS 154 1500 231000

Pump lDHP Submersible,Three Phase 1.1.2

(lOOxlOO). NOS 9 38000 342000

1.1.3 Submersible Light, MR 16 bulb 12v sow, M .O.C -

Noryl, Protection· IP 68 NOS 227 3700 839900

1.1.4 Step Down Transformer for the lights. NOS 20 6000 120000

1.1.5 Junction box NOS 50 1000 50000

Control Panel (Made of 16 guage CRC sheet powder coated with starter, 3 phase prevention,

1.1.6 MCB, voltmeter, Amp meter TP NOS 5 70000 350000

MCB's,Protection circuits and space for the

power supply for the l ights.)

Capital fitting such as control valves, NRV's

1.1.7 Butterfly valves etc.required for the final NOS LS 150000 150000

installations.

Complete Internal Plumbing i tems such as

r 1.1.8 (uPVC pipe) & fittingsincluding Elbow, Tee, NOS LS 467115 467115

Socket etc.

Complete Electrical Work such as conduits, 1.1.9

bends, fittings etc. of required sizes. NOS LS 100000 100000

1.1.10 Wires of Various sizes including accessories for

NOS LS 350000 350000 final equipment installation.

Installing, Testing & Commissioning of the

1.1.11 equipments including shop drawing/as built NOS 200000 200000

drawings.

SUBTOTAL 3200015.10

- - --

TOTAL COST OF CIVIL WORKS 3200015.iO - -- -

-

Page 18: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

c B

.. 111 .c

Technical Description E uni t Qty :i z

Minimum 17 mm dia PE-Xa pipe with an oxygen diffusion layer of EVOH (ethylene vinyl alcohol), with thermal & mechanical memory effect. Complying with EN ISO 15875 and fulfils the requirement for oxygen diffusion resistance as per DIN 4726. These under floor heating and cooling pipes are suitable for

1 Q&E and quick & easy fittings. In 240m /120m Coil:

MTR 30000 Pipe spacing shall be 100mm

Application class 4+5/ 6 bar Design pressure 6/8 bar at 90°C/70°C Fire class: E according DIN EN 13501-1 Pipe origin shall be from Europe (Germany /Sweden)

2 Compression Adapter: Compression adapter for connection of PE-Xa pipes to PCE 420 manifolds. Female thread 3/4" eurocone acc. to DIN EN ISO 228-1. Material: Brass: Eurocone, Min 17 X 2.0 X 3/4 FT

Manifold Basic Kit: Manifold kit including brackets, flat sealing screw

3 connection pieces with swivel nut, thermometer and end pieces with manual air PCE 26

vent, filling and draining tap and a by-pass.

PPSU Manifold: PPSU Manifold nowmeter modules for 1,3,4 ,6 loops, comblneable to max. 12 loops, for connection with basic kit, connection right or left with flat sealing, or connection from below with optional elbowset, supply

4 with with Topmeter for balancing, shut-off and now view, prepared places for room name labels, return with valves and caps, prepared for actuators (DDC) loop connection G3/4 eurocone loop pitch SO mm header pitch 225 mm max. pressure: 6 bar max. temperature: 60°C: Manifold shall be of PPSU material

4.1 3 Port PR 10

4.2 4 Port PR 12

4 .3 6 Port PR 21

4.4 l Port PR 6

Cabinet on wall type: Cabinet on-wall NT For attachment of manifolds,

5 controller and pump control stations on universal rail fixation Incl. fixation set. PCE 26 Made of galvanized steel. All visible parts are powder coated In white colour . 1100 X 450 X 150mm

Multi texture foil with raster 0,25 mm·thick foil with printed on pattern 100 x

6 100 mm for laying over existing heat/sound Insulation or fixation of clamp MTK 2781 tracks. Prevents screed from flowing down Into the Insulating layer. Dimensions: 100 m x 1.03 m: 0.25mm

7 Edaina Strto with foil Taoe. PE SOm 150 X lOmm MTR 700

8 Exoanslon ioint nrofile 300 X Smm PCE 60

r 9

Multi pipe bend support galv steel Made of galvanized steel as bend support PCE 450 for the pipe at the manifold.

10 Tacker pipe clip, standard Pipe staple Standard In blue, loaded Into magazine PCE 74000 for securing cooling/heating-system pipes onto Insulation. H = 40mm

Actuator Pro 24 V, with open/closed Indicator, suitable for use with Manifolds in connection with radio or wired control system. Closes when Idle. Wi th all-round

11 shower protection (IP 54). Suitable for operation at ambient temperature of up PCE to 60°C. Threaded connector M 30 x 1.5 mm MT. Height: 54 mm. Conformi ty:

CE

12 Q&E coupling, rings DR For connection of PE-Xa pipes, made of brass. PCE 250

Page 19: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

Balancing valve For the hydraulic balancing and shut-off of the Plus manifold, consist ing of: - G 1/Rp 1 Inlet control valve for the hydraulic balancing and Independent shutt-off of the manifold, including hand wheel and display for settings/closing kvs value: 5.4 m 3/h - G 1/Rp 1 return valve for the shut-off of

13 the manifold, including hand wheel and display for closing; adaptable for SET plastic manifold actuators. kvs value: 6.4 ml/h In conjunction with plastic manifold actuators, the kvs value Is 4.8 m 3/h. he connecting valve can be used to control individual zones. Material: Housing made In brass, hand wheels made In polyamide Max. testy pressure: 10 bar (water)

14 Automatic Air Vent 3/8" PCE 26

15 Ball Valve Gl·Gl Set PR 26

16 TF Quality EPS Insulation of SOmm thickness, 24kg/m3 density . Sqmt 2800

17 3Way on-off valve of 25mm dla Nos 26

18 Floor Sensor Nos 4

r

Page 20: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

r

High Level Cancer Institute at Lucknow IBMS Data Point Summary (HVAC,Electrical,Fire fighting and Plumbing)

·--· -- 1,

S.NO. ITEM DESCRIPTION • QTY

HVAC 1 WATER COOLED CHILLING MACHINES i Chiller start\stop command

ii Chiller run staus and trip alarm

iii Chiller manual operation status

iv Chilled water supply temperature at chiller outlet

v Common chilled water header supply temperature

vi Common chilled water header return temperature

vii Chilled water bypass line flow direction

viii Chiller currenl monitoring

ix Common chilled water header supply pressure

x Common chilled water header return pressure

xi Chiller/condenser isolation vaive -open/close ·sfgnal

xii Chiller/condenser isolation valve limit switch open/close status

xiii COW supply temperature at m/c outlet

xiv Common COW header supply and return temp sensor

xv Common header return flow monitoring

xvi Chilled water flow status

xvii ON I OFF commmand to CHW isolation butterfly valve

xviii ON I OFF commmand to COW isolation butterfly valve

xix ON I OFF status of CHW butterfly valves

xx ON I OFF status of COW butterfly valves

xxi Outside air temperature cum RH monitoring

xxii LT panelroom. air temperature cum RH monitoring

xxiii C02 level indication

xxiv Chillers Software Integration

2 Hot Water Generators

i HWG start stop command

ii HWG on/off status

iii Water out temperature

iv HWG pressure sensor

v Water tank levels

3 PRIMARY CHILLED WATER PUMPS

i Pump start\slop command - - i-i -~P_u_m_p_ ru_n_s_ta_l_us ____ _

iii Auto manual switch status

4 SECONDARY CHILLED WATER PUMPS

i Pump start\stop command

ii Pump run status

iii Auto manual switch status

LIMRA Consulting Engineers

9

5

9

9

Al AO DI

x x x

x x 18

x x 9

9 x x

x x

x x

x x

9 x x

x x

x x

x x x

x x 36

9 x x

2 x x

x x

x x 4

x x x

x x x

x x 18

x x 9

2 x x , __ _,_ __ ---2 x x

100 x x

x x x

x x x

x 5 x

5 x x

5 x x

x 5 x

x x x --; - ·~-9-

x x 9

x x x

x x 9

x x 9

DO

9

x

x

x

x

x

x

x

x

x

Field Devices

Relay Output

Potential free contact

Potential free contact

Immersion type temp sensor

Immersion type temp sensor

Immersion type temp sensor

Water flow switch with signal to chiller I ruonel for on/off Current transducer

Pressure sensor

Pressure sensor --·· -1---------- ----

8 Volt free contact by IBMS to mot valve

x

x

x

x

x

9

9

x

x

x

Volt free contact from mot.valve to IBMS

Immersion type temp sensor

Immersion type temp sensor

Flow Transmitter

Water flow switch

Relay Output

Relay Output

Potential free contact from Valve actuator Potential free contact from Valve actuator

OA temp. + RH sensor

--x-- Rm temp:+ RH sensor

x

x

5

5

x

x

x

9

Co Sensor

Bacnet/Modbus output by chiller supplier networked at one ""rt

Potential Free contacts

Potential Free contacts

Immersion type temp sensor

Pressure sensor

Level Switch

Relay Output -- - !-------------

Differential pressure switch x

x Potential free contact

9 Relay Output

x Differential pressure switch

x Potential free contact

Cancer lnslilute-LKO

Page 21: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

.1\ High Level Cancer Institute at Lucknow

IBMS Data Point Summary (HVAC.Electrical,Fire fighting and Plumbing)

-S.NO. ITEM DESCRIPTION QTV, Al AO DI DO Field Devices --

iv Pumps VFDs monitoring x x x x VFD to BMS software interface

5 CONDENSER WATER PUMPS 9

- i- 'Pump start/stop command ·---·-- ·- -·-- - ..

x x x 9 Relay Output

ii Pump run status x x 9 x Differential pressure switch

iii Auto manual switch status x x 9 x Potential free contact

6 Hot Water Pumps 5

i Pump start/stop command x x x 5 Relay Output

ii Pump run status x x 5 x Differential pressure switch

iii Auto manual switch status x x 5 x Potential free contact

7 Tertiary Water Pumps at each building 23

i Pump start/stop command x x x 23 Relay Output

ii Pump run status x x 23 x Differential pressure switch

iii Auto manual switch status x x 23 x Potential free contact

iv Pumps VFDs monitoring x x x x VFD to BMS software interface

B COOLING TOWERS FOR AIR-CONDITIONING 9 SYSTEM !Each CT shall have 3 fansl

I Cooling Tower Fan start /stop status x x x 27 Relay Output

ii Cooling Tower Fan run status x x 27 x Potential free contact

iii Cooling Tower Auto/manual operation status x x 27 x Potential free contact

iv Cooling Tower Sump level monitoring (high/low) x x 9 x Level Switches to be provided

v Common Condenser water header Inlet temperature 1 x x x Immersion type temp sensor

vi Cooling Tower water Outlet temperature 9 x x x Immersion type temp sensor

vii Cooling Tower isolation valve x x x 9 Volt free contact by IBMS to mot valve

viii Cooling Tower isolation valve limit switch open/close x x 18 x Volt free contact from mot.valve to IBMS

I status iv Fans VFDs monitoring x x x x VFD to BMS software interface

9 AIR HANDLING UNITS (FLOOR MOUNTED/CEILING 100

HUNG\ I AHU Fan start /stop command x x x 100 Relay Output

ii Air flow status x x 100 x Differential pressure switch

iii Auto-manual switch status x x 100 x Potential free contact

iv Return air temperature 100 x x x Duct type temperature sensor

v Signal to modulating valve x 100 x x Modulating valve

vii Filter status x x 100 x Differential pressure switch

viii Feedback from AHU Valve actuator for positon 100 x x x 0-10 voe signal from Valve Actuator

indication ix Fans VFDs monitoring x x x x VFD to BMS software Interface

10 OTAHUs 24

I AHU Fan start /stop command x x x 24 Relay Output

ii Air flow status x x 24 x Differential pressure switch

iii Auto-manual switch status x x 24 x Potential free contact

iv Return air temperature 24 x x x Duct type temperature sensor

v Signal to modulating valve x 24 x x Modulating valve

vii Filter status (pre and fine filters) x x 48 x Differential pressure switch

tv 2

Page 22: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

High Level Cancer Institute at Lucknow IBMS Data Point Summary (HVAC,Electrical ,Fire fighting and Plumbing)

;;; ·- - ,·

' ''_ DO S.NO. ITEM DESCRIPTION QTY Al AO ,~,DI.., Field Devices

viii Feedback from AHU Valve actuator for poslton 5 x x x 0-10 voe signal from Valve Actuator

indication

ix Fans VFOs monitoring x x x x VFO to BMS software interface

11 Heat Recovery Units (HRVs) 24

I Fan start /stop command for f/a intake and exhaust fans x x x 48 Relay Output

ii Air now status x x 48 x Differential pressure switch

iii Auto-manual switch status x x 48 x Potential free contact

·--- -- --- ------ ---- - ··- --- . - --iv Filter status x x 24 x Differential pressure switch

12 Main AC Panel 1

I Incoming ACB Status monitoring x x 2 x Voltfree contact from the panel

ii Incoming ACB Trip Status monitoring x x 2 x Voltfree contact from the panel

iii Bus Coupler status monitoring x x 1 x Voltfree contact from the panel

vi Bus Coupler Trip Status monitoring x x 1 x Voltfree contact from the panel

SUB Total for HVAC 410 134 808 308

ELECTRICAL

1 UPS MONITORING

ix Monitoring of UPS data through software Integration x x x x Bacnel/Modbus output by supplier networked at one port

2 DG SETS 6

x Fuel Tank HI / Lo level monitoring x x 6 x Level switch

xi Monitoring of OG set data through software Integration x x x x Bacnel/Modbus output by supplier networked at one port

3 HT PANELS ( 33 kV Panel) 1

I Main breaker Status x x 1 x Voll free contact from panel

ii Trip status x x 1 x Volt free contact from panel

r iii Incoming Voltage 1 x x x Voltage transducer

iv lncoing Current 1 x x x Current Transducer

v Power Factor Monitoring 1 x x x Power Factor transducer

vi Kw Metering 1 x x x Power transducer

4 33 KV TRANSFORMER BREAKERS 2

I Status monitoring x x 2 x Voltfree contact from the transformer

ii Trip Status x x 2 x Voltfree contact from the transformer

5 LT Panel 1

I Transformer Incoming ACB Status monitoring x x 1 x Voltfree contact from the panel

LIMRA Consulting Engineers 3 Cancer Institute-LKQ

Page 23: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

High Level Cancer Institute at Lucknow IBMS Data Point Summary (HVAC,Electrical,Fire fighting and Plumbing)

-

S.NO. ITEM DESCRIPTION QTY Al A01 DI DO Field Davrcas - -- - -ii Transformer Incoming ACB Trip Status monitoring x x 1 x Voltfree contact from the panel

iii DG Incoming ACB status monitoring x x 4 x Voltfree contact from the panel

iv DG Incoming ACB Trip Status monitoring x x 4 x Voltfree contact from the panel

v Bus Coupler status monitoring x x 4 x Voltfree contact from the panel

vi Bus Coupler Trip Status monitoring x x 4 x Voltfree contact from the panel

vii DG Auxiliary ATS status monitoring x x 1 x Voltfree contact from the panel

---DG Auxiliary ATS Trip Status monitoring

----- ··-·- --- ·- - ------- - ·--viii x x 1 x Voltfree contact from the panel

ix Lill Panel Main MCCB status monitoring x x 8 x Voltfree contact from the panel

x Monitoring and controlling of ACV Breaker data through x x x x Bacnet/Modbus output by ACV Beakers

software integration networked at one port

xi Lift Panel Main MCCB Trip Status monitoring x x 4 x Voltfree contact from the panel

Sub Total for Electrical 4 0 44 0

Fire Alarm System

I Monitoring of Fire Alarm control panel data through Bacnet/Modbus output by Fire alarm

software integration control panel networked at one port

PLUMBING

1 Tube well pumps 5

I Pump start/stop command x x x 5 Relay Output

ii Pump run status x x 5 x Differential pressure switch

iii Aulo manual switch status x x 5 x Potential free contact

iv Voltage at panel 5 x x x Volage transducer

v Current monitoring at panel 5 x x x Current transducer

2 Raw Water Feed Pumps 5

I Pump start/stop command x x x 5 Relay Output

ii Pump run status x x 5 x Differential pressure switch

iii Auto manual switch status x x 5 x Potential free contact

3 Filtered Water Transfer Pumps 5

I Pump start/stop command x x x 5 Relay Oulput

ii Pump run status x x 5 x Differential pressure switch

iii Auto manual switch status x x 5 x Potential free contact

iv Voltage at panel 5 x x x Volage transducer

v Current monitoring at panel 5 x x x Current transducer

-- - -- - - . --·· -- -- - --· -- -- -4 Soft Water Transfer Pumps 5

tv 4

Page 24: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

High level Cancer Institute at Lucknow IBMS Data Point Summary (HVAC,Electrical,Fire fighting and Plumbing}

- -- -- --S.NO. ITEM DESCRIPTION - QTY . Al - ADJ - DL DO EJeld Devices - -

I Pump start/stop command x x x 5 Relay Output

ii Pump run status x x 5 x Differential pressure switch

iii Auto manual switch status x x 5 x Potential free contact

iv Voltage at panel 5 x x x Volage transducer

v Current monitoring at panel 5 x x x Current transducer

5 Softener Feed Pumps 5

----- ---·-- -- ·--·- - - -- ·- --- ---- ---I Pump start/stop command x x x 5 Relay Output

ii Pump run status x x 5 x Differential pressure switch

iii Auto manual switch status x x 5 x Potential free contact

iv Voltage at panel 5 x x x Volage transducer

v Current monitoring at panel 5 x x x Current transducer

r 6 Drinking water Supply Pumps 5

I Pump start/stop command x x x 5 Relay Output

ii Pump run status x x 5 x Differential pressure switch

iii Auto manual switch status x x 5 x Potential free contact

7 Drainage Pumps 4

-- - --- -- -- - - - - - - --I Pump start/stop command x x x 4 Relay Output

ii Pump run status x x 4 x Differential pressure switch

iii Auto manual switch status x x 4 x Potential free contact

iv Voltage at panel 4 x x x Volage transducer

v Current monitoring at panel 4 x x x Current transducer

Subtotal for Plumbing 48 0 68 34

r Fire Fighting

8 Fire Pumps 4

I Pump start/stop command x x x 4 Relay Output

ii Jockey/HydranVSprinkler/ Engine /terrace pumps run x x 4 x Current relay

Status

iii Auto manual switch status x x 4 x Potential free contact

iv Voltage at panel 4 x x x Voltage transducer

v Line pressure 4 x x x Pressure Sensor

vi Current monitoring at panel 4 x x x Current transducer

9 Tanks

LIMRA Consulting Engineers 5 Cancer Institute-LKQ

Page 25: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

-I

r

S.NO. I

ii

High Level Cancer Institute at Lucknow IBMS Data Point Summary (HVAC,Electrical,Fire fighting and Plumbing)

-· -· ~ ~ = I• ' ITEM DESCRIPTION -- QTY Al AO DI DO Field Devices - -

Overhead tanks Hi/lo stalus 10 x x 20 x Level Switch

Under ground tank Hi/Lo status 10 x x 20 x Level Switch

Sub Total for Fire Fighting 12 0 48 4

- - ~.

Grand total of HVAC, Electrical Plumbino and Fire Flohtina 474 134 968. 34_6 - .

Total I/Os 1922

6

Page 26: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

r-

TECHNICAL SPECIFICATION OF STAND-ALONE ROOF-TOP SOLAR PV POWER PLANT

1. SCOPE

This specification covers the design, manufacture, testing at the manufacturer's works, packing & forwarding and delivery at the site including its installation, testing & commissioning of Stand-alone Rooftop Solar PV Power Plant as specified; complete with all accessories, fittings and auxiliary equipments as required for efficient and trouble-free operation.

2. SITE CONDITIONS

The power plant shall comply and perform satisfactorily at the following general climatic conditions, prevailing at project site:

a) Ambient temperature 45°C b) Relative humidity 95% (at 55°C)

The power plant shall be suitable for continuous operation at rated load for the above ambient temperature and relalive humidity, the maximum temperature and humidity, however, not occurring simultaneously.

3. STANDARDS

The design, manufacture and performance of equipment shall fully comply with all currently applicable statues, regulations and safety codes in the locality where the equipment will be installed. Nothing in this specification shall be construed to relieve the CONTRACTOR of his respon sibility. The equipment shall comply with the latest edition of the following standards :

1. IEC: 61215/1514286 Requirements for photovoltaic modules 2. IEC: 61730-1 Requirements for construction for photovoltaic

3. 4. 5.

6.

7. 8.

9.

modules IEC: 61730-11 Requirements for testing for photovoltaic modules IEC: 61683, 1999 Requirements for efficiency of photovoltaic modules IEC: 60068-2-1 ,(2-2. 14, 30) Requirements for Environment capacity for

photovoltaic modules IEC: 60529:1989+A1 :1999 Requirements for IP-65 protection of photovoltaic

modules IEC: 62109 Requirements for Safety of photovoltaic modules IEC: 61727 Requirements for Grid connectivity of photovoltaic

modules IEC: 60227/IS 694/IEC: 60502/ IS: 1554 (Pt.-1 & II) : PVC insulated Al /Cu conductor, armored/unarmored

Cable. IEC: 60947 part I, II , Ill/IS: 60947 Part-I, II , Ill/ EN: 50521 : L V Switchgear.

4. SYTEM CONFIGARATION: (Utilization Voltage & Variations).

a) Main Power circuits : 415V ±10% AC

Page 1 of 13

Page 27: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

b) Lighting Power circuits c) Emergency Power Supply d) Control Power e) Frequency

5. Qualification Requirements

: 240V ±10% AC 415V AC from DG Source 240V ±10% AC 50 Hz ±5%

The Solar PV Power Plant manufacturer shall have:

The bidder shall be an entity duly incorporated in India under relevant law and engaged in the business of solar power. Incorporation certificate to be provided. The company or its affiliates or its parent company shall be manufacturer of PV modules with IEC: 61215:2005, IEC: 61730:2007 parts 1 & 2, in conjunction with factory inspection. Relevant proof to be submitted. The PV module manufacturing plant shall be certified under ISO 9001 :2008 & ISO 14001 - proof to be submitted. Be MNRE approved channel partner and tested their products as per IEC standards. Have a minimum experience of 5 years in this field , The bidder shall have executed roof top solar P V power plants i.e. supply, installation, commissioning and O & M in India on turnkey basis in the last four years having a cumulative capacity not less than 1000kWp with at-least one such power plant of minimum 300kWp at single location; operating for more than 2 years- Purchase orders and Commissioning certificates shall be provided.

6. QUALITY AND WORKMANSHIP

~

Solar PV modules are designed to last 25 years or more. It is, therefore, essential that all system components and parts including the mounting structures, cables, junction boxes, distribution boxes and other parts also have a life cycle of 25 years. Therefore; all works shall be undertaken with the highest levels of quality and workmanship.

7. TECHNICAL SPECIFICATION

7.1 SOLAR PV MODULE:

o The photo-voltaic modules shall be Mono I Poly Crystalline with 235 - 250 Wp power class I total array capacity of 1.0 l<:N or respective capacity of Dual-Axis tracker.

o The photo-voltaic modules shall meet the requirements of: IEC: 61215 / IS: 14286 standards, IEC: 61730-1 for construction & IEC: 61730 part - 2 for testing and safety qualification.

o The photo-voltaic modules shall have high efficiency and very good low light performance.

o The PV modules shall be tested and approved from any of the NABL I BIS I IEC I MNRE accredited Testing Calibration Laboratories.

o The supplier shall provide perfonnance guarantee for the PV modules used in the power plant which shall be warranted for their output peak watt capacity:

Not less than 90% at the end of 10 years and 80% at the end of 25 years. Product Warranty: 5 years.

o Necessary 1-V curves of the SPV modules shall be furnished .

Page 2 of 13

Page 28: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

r

Detailed specifications of the solar PV modules are given below:

Type Crystalline silicon

Efficiency ~13%

Fill factor ~70%

Degradation ~ 90% of design nominal power after 10 years.

warranty ~ 80% of design nominal power after 20 years.

Module frame Non-corrosive and electrolytically compatible (Al) with the mounting structure material.

Termination box Thermo-plastic, IP 65, UV resistant

Blocking diodes Yes.

Module minimum rated The nominal power of a single PV module shall not be less

power than 250 Wp.

RF Identification tag Yes. and barcode serial RFID Must be able to withstand environmental conditions and

number for each solar last the life of the solar module and shall be kept inside the module module.

As per guidelines issued for off-grid and decentralized applications program under JNNSM, the RFID tag must be inside of the module from 01 .07.2013 onwards. Barcode serial number shall be kept inside the module.

RF Identification tag a) Name of the manufacturer of PV Module.

data b) Name of the Manufacturer of Solar cells c) Month and year of the manufacture (separately for solar cells and module).

d) Country of origin (separately for solar cells and module).

e) 1-V curve for the module.

f) Wm, Im, Vm and FF for the module.

g) Unique Serial No and Model No of the module. h) Date and year of obtaining IEC PV module qualification

certificate. i) Name of the test lab issuing IEC certificate.

j) Other relevant information on traceability of solar cells &

module as per ISO 9000 standard. Power output rating To be given for standard test conditions (STC). I_V curve of

the sample module shall be submitted. Compliance with IEC 61215 / IS 14286, IEC 61730 Part 1 and 2. standards and codes (Proof to be submitted).

Module dimension Shall be of size 1640 x 1000 x 34 mm. Tolerance on dimensions shall be more than± 2mm.·

Module Weight Shall not be more than 19 kg per module.

7.2 BATTERIES:

o VRLA tubular GEL type batteries; confirming to National I International standards; low maintenance and stationery at C / 10 rate shall be provided.

Page 3 of 13

Page 29: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

r

o The battery-bank will be stacked in racks; duly painted with acid resistant paint; to cover less space as necessary.

o The Test certificates shall be from any of the MNRE accredited Test centers:

SEC ERTL East ETDC Bangalore CPRI Bangalore

ERTL North UL Bangalore TUV Rhineland

lntertek (for the tests as indicated on MNRE website).

o System Autonomy: 1 +1 day.

7.3 INVERTERS

7 .3.1 OFF-GRID INVERTER:

7.3.1a. POWER CONDITIONING UNIT:

PC U of capacity 100 KVA I as required; shall convert DC Power into AC Power.

The Inverter shall:

o Be 'String Inverter' with efficiency of 98% or better and extensive DC and AC side protections.

o Be rated for continuous operation at full load. o Have Programmable battery management parameters. o Have 'Temperature compensated battery charging system'. o Have 'automatic re-start' after over-load triggered shutdown. o Have 'Continuous battery life' and ' state-of-health' monitoring. It shall have

Integrated data and fault logging. o Have industrial-type data communication with external SCADA network I PC. o Have faci lities like Remote diagnostics, monitoring and reporting via Internet and

GSM. o Product Warranty: 5 years, extend able to 10 years.

7.3.1 b. The PCU shall:

o Be equipped with a data logger for collecting & recording the hourly data of grid status particularly; voltage & frequency.

o Have provision for ' PCU by-pass' arrangement so as to cater load directly through DG set, in case of PCU failure.

o There shall be 'Emergency stop' switch on the front panel of PCU.

7.3.1c. BATIERY CHARGER:

o TYPE : MPPT.

Page 4 of 13

Page 30: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

r

7.3.2 SOLAR GRID INVERTER:

The solar grid inverter converts the DC power of the solar PV modules to grid- compatible AC power. The detailed specification of the solar grid inverter is follows:

Enclosure Free standing I Wall mounted, IP-21, Epoxy

powder coated.

Cooling Temperature controlled fan forced I Natural Air Cooling.

Total output power (AC) To match solar PV plant capacity while achieving optimum system efficiency.

Input DC voltage range As required for the solar grid inverter DC input.

Dielectric strength 1.1 KV between input I output and ground with EMI protections removed.

Maximum power point (MPPT) Yes

tracking

Number of independent MPPT 1 or more

Inputs

Output AC voltage Three phase: 415V (+ 12.5%, -20%)

Operating Frequency range 47.5 - 52.5 Hz

Nominal frequency 50 Hz

Power factor of the inverter > 0.98 at nominal power

Surge Rating @ 40° C 105% > 60 sec, 150% > 30 sec, 200% > 5 sec.

Total harmonic distortion <3%

Built-in Protection AC high/ low voltage; AC high /low Frequency

Anti-islanding protection As per VOE 0126-1-1 / IEC 60255.5 / IEC 62116 I equivalent standards. (Proof to be submitted).

No load consumption < 500W

Operating ambient temperature -10° C to +60° C

range Humidity 0 - 95% Rh, Non-condensing.

Inverter efficiency : ~95%

Weighted efficiency : 94%

Protection degree : IP 65 for outdoor mounting, : IP 54 for indoor mounting

Communication interface RS 485 Yes I RS 232 and RJ45 Cooling Convection Display type LCD for data display. LCD I LED for status display

: Output power (W). cumulative energy (Wh),

Display parameters to include DC voltage (V). DC current(A), : AC voltageM. AC frequency(Hz), AC current(A).

Inverter IEC Certificates: (Shall be provided along with the offer)

1. IEC: 61683:1999 2. IEC: 60068-2-1, (2-2,14,30) 3. IEC: 60529:1989+A1:1999 4. IEC: 62109

(Efficiency) (Environment) (IP 65)

: (Safety)

Page 5 of 13

Page 31: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

5. IEC: 61727 : (Grid Connectivity)

7.3.3 CONNECTION TO BUILDING ELECTRICAL SYSTEM

• The AC output of the solar grid inverter shall be connected to the building's electrical system. The solar grid inverter output shall be connected to a dedicated module in the Main Distribution Board (MOB) of the building. It shall not be connected to a nearby load or socket point of the building.

• For buildings or loads with diesel generator backup, the wiring of the solar grid inverter shall be such that the solar grid inverter cannot run in parallel with the diesel generator. This implies that the solar grid inverter must be connected to a distribution board on the grid side of the automatic or manual change-over switch.

7.4 CABLES & CABLE RACKS:

• All cables shall conform to IEC: 60227 I IS: 694 & IEC: 60502 I IS: 1554. Voltage rating: 1, 1 DOV AC, 1,500V DC.

• For the DC cabling: XLPE insulated and PVC sheathed, UV stabilized single core flexible copper cables shall be used. Multi-core cables shall not be used.

• For the AC cabling: PVC or XLPE insulated and PVC sheathed single or multi-core flexible copper cables shall be used. Outdoor AC cables shall have a UV- stabilized outer sheath.

• Total voltage drop: On the cable segments from the solar PV modules to the solar grid inverter shall not exceed 2.0%.

• Total voltage drop: On the cable segments from the solar grid inverter to the building distribution board shall not exceed 2.0%

• The DC cables from the SPV module array shall run through a UV stabilized PVC conduit pipe of adequate diameter with a minimum wall thickness of 1.5mm.

• Cables and wires used for the interconnection of solar PV modules shall be provided with solar PV connectors and couplers.

• All cables and conduit pipes shall be clamped to the rooftop, walls and ceilings as required with thermo-plastic clamps at intervals not exceeding 50 cm.

• The minimum cable size shall be:

DC cable size : 4.0 mm2 copper. AC cable size : 4.0 mm2 copper I Aluminum. In three phase system, the size of the neutral wire shall be equal to the size of the phase wires.

• The following color coding shall be used for cable wires:

DC positive

DC negative

: Red (the outer PVC sheath can be black with a red line marking)

: Black

AC single phase : Phase: red; neutral: black

AC three phase : Red, yellow, blue;

Neutral

Earth wires

: Black

: Green • Cables and conduits that have to pass through walls or ceilings shall be taken

through a PVC pipe sleeve. • Cable conductors shall be terminated with tinned copper end-ferrules to prevent fraying

& breaking of individual wire strands. Page 6 of 13

Page 32: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

-

• The termination of the DC and AC cables at the Solar Grid Inverter shall be as per instructions of the manufacturer, using special connectors.

• Cable trays made of hot dip galvanized steel sheet I angle iron & flats; depending on the site conditions; shall used in the installation.

7.5 SWITCHES I CIRCUIT BREAKERS I CONNECTORS:

All switches I circuit breakers I Connectors shall be as per IEC: 60947 part I, II, Ill I IS: 60947Part 1, 11 , 111/EN: 50521 .

7.6. JUNCTION BOXES

7.6.1 SOLAR ARREY JUNCTION BOXES I ENCLOSURE FOR INVERTERS I CHARGE CONTROLLERS & LUMINARIES:

• The cables from the array strings to the solar grid inverters shall be provided with: An array Junction box with DC fuse protection. DC Fuses shall have a voltage rating of 1000 V DC, current .rating as required and DIN rail mountable fuse holders. Housed in thermoplastic enclosures with transparent covers having IP 65 protection for outdoor/ IP 21 protection for indoor as per IEC: 60529.

• Array Junction Box shall be mounted close to the solar grid inverter and shall comprise the following components and cable terminations:

Incoming for each string both (Positive and negative DC); DC surge protection device (SPD). class 2 as per IEC: 60364-5-53;

Outgoing (Positive and negative DC) to the solar grid inverter.

Cable terminations shall be taken through thermo-plastic cable glands.

Cable ferrules shall be fitted at the cable termination points for identification.

• All Junction Boxes I Enclosure for Inverters I Charge Controllers I Luminaries shall be IP-65 (for outdoor) / IP-21 (for indoor) as per IEC: 6 0 529.

7.6.2 AC DISTRIBUTION BOX:

An AC distribution box shall be mounted close to the solar grid inverter. The AC distribution box shall be of the thermo-plastic enclosure with IP65 protection, DIN rail mounting arrangement and shall comprise the following components and cable terminations:

Incoming 3 core 15 core cable from the solar grid inverter.

AC circuit breaker, 2 pole / 4 pole.

AC surge protection device (SPD), class 2 as per IEC: 60364-5-53.

Outgoing cable to the building electrical distribution board.

7.7 ENERGY METER:

Energy Meter to measure the power generation of the PV system; shall be provided. The Energy meter shall be got approved by the local power distribution organization.

7.8 PROTECTION:

Page 7 of 13

Page 33: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

The system shall be provided with all necessary protections like earthing, lightning and grid islanding as follows:

7.8.1 LIGHTNING PROTECTION:

• The SPV power plant shall be provided with lightning & over-voltage protection to reduce the over-voltage to a tolerable value before it reaches the-PV &

other sub system components. • The source of over voltage can be lightning, atmosphere disturbances etc. • The entire space occupying the SPV array shall be suitably protected against

Lightning by deploying required number of Lightning Arrestors as per IEC:

62305 standard. • The protection against induced high-voltages shall be provided by the use of

metal oxide varistors (MOVs) and suitable earthing such that induced transients find an alternate route to earth.

7.8 .2 SURGE PROTECTION:

Internal surge protection shall consist of three MOV type surge-arrestors connected from +ve and -ve terminals to earth (via Y arrangement)

7.8.3 EARTH PROTECTION:

• Each array structure of the PV yard shall be grounded I earthed properly as per IS: 3043-1987. In addition, the lighting arrester I masts shall be earthed inside the array field. Earth resistance shall be tested in presence of the representative of client.

• PCU, ACDB and DCDB shall also be earthed properly. • Earth resistance shall not be more than 50. It shall be ensured that all the earth

points are bonded together to make them at the same potential.

7.8.4 GRID ISLANDING:

• In the event of a power failure of the electric grid, it is required that independent power­producing inverters attached to the grid 'turn-off in a short period of time. This prevents the DC-to-AC inverters from continuing to feed power into small sections of the grid, known as "islands."

• Powered islands present a risk to workers who may expect the area to be unpowered and may also damage grid-tied equipment.

• The Roof-top PV system shall be equipped with islanding protection. In addition to disconnection from the grid (due to islanding protection), disconnection due to under and over voltage conditions shall also be provided.

• A manual disconnect 4pole isolation switch; beside automatic disconnection to grid; would have to be provided at utility-end to isolate the grid connection by the utility personnel to carry out any maintenance. This switch shall be locked by the utility

personnel.

7.8.5 CAUTION SIGNS:

The standard caution and danger boards or labels as per Indian Electricity Rules, the Page 8 of 13

Page 34: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

AC distribution box near the solar grid inverter and the building distribution board to which the AC output of the solar PV system is connected, shall be provided with a noncorrosive caution label.

7.9 MODULE MOUNTING STRUCTURE:

• The PV modules shall be mounted on fixed I Dual Axis Tracker having suitable capacity and appropriate design to handle 'Fixed tilt SPV metallic structure' (in case of raised structure) and (in case of fixed modules) , as per the site requirement.

• The tracker shall be designed to withstand the load of the modules and high wind velocities up to 150 km per hour.

• The support structure shall be hot dip galvanized steel and aluminium.

7.9.1 Detailed specifications for the mounting structure are given below:

Wind velocity withstanding capacity 150 km I hour

Structure material Hot dip galvanized steel with galvanization thickness of min 80 micron.

Bolts, nuts, fasteners, panel Stainless steel SS-304 mounting clamps

Mounting arrangement for elevated The elevated structure has to be securely

structures anchored to the supporting surface. : Foundations of elevated structures shall be mounted directly on the pillar; bolted with anchor bolts of appropriate strength; mounted on RCC surfaces. : All anchoring on the RCC slabs shall be leak proof.

Installation The structures shall be designed for simple mechanical arrangement for 'on-site installation'.

Minimum distance between roof edge <!:0.30m.

& mounting structure (horizontal clearance)

Minimum clearance between lowest ::!: 1 OOmm or as per the tilt angle required at the

part of panel and mounting structure site. (Vertical Clearance) Access for panel cleaning and : All solar panels & Junction box must be

maintenance accessible for cleaning from the bottom.

Panel tilt angle North - south orientation with a fixed tilt angle suitable for required capacity of power plant (depending on location); south facing.

7 .9.2 FOUNDATION:

The legs of the structure; made with hot dip GI angles; will be fixed and grouted in the PCC foundation columns of size 300 mm x 300 mm; made with 1 :2:4 cement concrete.

Page 9 of 13

~I

Page 35: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

The minimum ground clearance from the lowest part of any module shall be 500 mm. While making foundation design; due consideration will be given to weight of module assembly & maximum wind speed of 150 km/ hr. The work includes excavation, concreting, back feeling, shoring and shuttering, waterproofing etc as required to erect, commissioning, operation and maintenance of the system at site.

7.10. 'SOLAR RADIATION' & 'AMBIENT TEMPERATURE' SENSORS AND REMOTE DATA ACQUISITION SYSTEM.

The Installer shall supply the following Components for remote data acquisition:

Irradiation Sensor, Ambient temperature sensor, PV Module temperature sensor.

The remote monitoring I Data Acquisition System shall be integrated with the local system as well as remotely via the web 1:1sing a standard I GSM modem.

The Inverter manufacturer shall provide compatible software and hardware within the Inverter so that data can be transmitted via standard modern. Network / Internet service shall be provided by the client.

7.10 SPECIFICATIONS FOR DUAL AXIS TRACKER

Tracking system increases energy production. Adding dual axis tracker to the Solar Plant; can enhance the generation by 35-40% depending up on the location of the plant. Control systems of high reliability and relative low cost are available to optimize the function of tracking systems and minimize the cost per unit of energy produced.

SPECIFICATION

Tracker type Survival Wind speed Material of construction Tracker alignment Rotation East West Rotation North South Maximum laden weight per frame Mounting Structure linear Actuators (IP 65) - stroke Drive Power consumption Motor control Feed- back mechanism Communication Life Aperture area of Modules Accuracy Weight of Tracker

RANGE

Tilt & Roll 47 rn/sec MS Galvanized East-West ± 45 degree ± 30 degree

200 kg 400mm. Linear Actuator < 100Watts On board programmer

Tilt and roll sensors/ photo cells RS 232 I Ethernet 20 years Up to 20sq.mtr ±1% < 300 Kg per 3KW module Capacity

Page 10 of 13

Page 36: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

7.11 SPV scheme:

ZliO ~ I

r,i.,-, I -t I - ..

- I •-r- i-I

__J

~ I

- -

I

I AC ! -

--l

8. DOCUMENTATION

The Installer shall supply the following documentation:

a) System description with working principles.

b) System single line diagram. c) Solar PV array lay-out.

d) Routing diagram of cables and wires.

1

I

.. -....

e) Data sheets and user-manuals of the solar PV panels and the solar grid inverter. f) A system operation and maintenance manual.

g) Name, address, mobile number and email address of the service centre to be contacted in case of failure or complaint.

h) Warranty cards.

i) Maintenance register.

9 . TEST CERTIFICATES AND REPORTS TO BE FURNISHED

Test Certificates I Reports from IECQ I NABL accredited laboratory for relevant IEC I equivalent BIS standard for quoted components shall be furnished. Type Test Certificates shall be provided for the solar modules and the solar grid inverter to provide evidence of compliance with standards.

Page 11 of 13

ISM

Page 37: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

r ,

10. PROJECT ACTIVITIES IN THE SCOPE OF VENDOR

10.1 Engineering Services:

The scope shall cover System design (as per standards applicable), detail engineering, installation, testing, pre-commissioning and commissioning.

10.2 Procurement Services:

The scope shall cover supply of all material, sufficient in quantity to build, commission and operate the offered Solar PV power plant for

DC part up to Inverter and including inverters.

AC part after Inverter and up to HT Panel located inside the plant premises

10.3 Commissioning Services:

The scope shall cover:

Installation of solar power plant as per the design, commissioning of each equipment involved in building the solar power plant, individually and collectively in synchronization with each other.

Statutory approvals from authorized Electricity body, strictly related to execution of erection and commissioning of the Solar Power Plant alone (CEIG of Power Plant, etc).

10.4 Support Services:

The scope shall cover technical assistance required by customer lo get statutory approvals and clearances from Government and designated authorities as and when requested, as required under the scope of customer.

10.5 Ancillary Services:

The scope shall cover:

Control Room & Inverter Room, Internal Piping for water outlet, WBM roads for internal access of PV array area, PV array yard lighting, Rain water soak pits. Apply for Duty Exemption for related components in the solar power plant.

10.6. GUARANTEE AND PERFORMANCE

The vendor shall guarantee the design, materials and workmanship as well as satisfactory operation of all items of the plant, machinery and equipment offered by him, with respect to all individual items and collective items comprising a group of equipment and for the whole plant and equipment in accordance with the performance requirements indicated in the tender documents. In this respect, the tenderer shall indicate clearly in his offer the details of various outputs, accuracy, consumption and performance test procedure as well as guarantees for the plant and equipment offered, the Penalties payable in case of non-fulfillment of performance guarantees up to acceptable tolerance limits.

Page 12 of 13

Page 38: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

-(

-'

10.7. WARRANTY

The mechanical structures. electrical works including power conditioners I inverters I charge controllers I maximum power point tracker units/distribution boards/digital meters/switch gear/storage batteries, etc. and over all workmanship of the SPV power plants I systems shall be warranted against any manufacturing/ design/ installation defects for a minimum period of 5 years.

10.8. INSURANCE

Transit insurance up to the arrival at destination and for 30 days storage thereafter, shall be arranged by the VENDOR and shall communicate details of goods as soon as these are d ispatched. The VENDOR shall be solely responsible and held liable lo pay for the loss incurred during transit.

11. PREFERRED MAKES

S. No. DESCRIPTION APPROVED MAKE Df2-. eQu,v 1. PV Module Solar panel PV Power-tech I Waaree I Vikram Emvee I

SOLON I As approved by MNRE.

2. Inverter SCHNEIDER I ABB I BONFIGLOLI I DELTA

3. Array Combiner Box AEG I TRINITY/ ABB I SCHNEIDER (Outdoor)

4. SCADA Power Plant control GE I ABB I SCHNEIDER I SOLON VEGA Monitoring & Analytics

5.a DC cabling- Solar Grade SIECHEM /LAPP I POL YCAB

5.b DC cabling-AJB to Inverter PAGODA I FINOLEX I PLOYCAB I TOP I RPG

5.c AC cabling PAGODA I FINOLEX I PLOYCAB I TOP I RPG

6. Cable tray 080 I EAE / LEGRAND

7. Step-Up Transformers ELECTROTHERM I SERVOMAX I SCHNEIDER I ABB/ESENNAR

8. LT-Panels L&T I ABB I SCHNEIDER

9. HT-Panels L&T I ABB I SCHNEIDER

10. Switch Yard I Metering As per Local Electricity Board's Standards.

11 Earthing As approved by CPWD I As per IS: 3043.

12 Battery Charger SMA I Power-one-ups I Amar Raja I Neowatt.

Page 13 of 13

~

Page 39: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

BUILDING SIGNAGE WORKS SUMMARY - -

s. No. Description NDSRAmount - - ---·

Building Signage Works 85,76,450.00

VAT-12.5% 10,72,056

Cost of labor for installation of all external signage 75,000.00

Cost of labor for installation of all internal signage 75,000.00

Cost of packing for all signage 45,000.00

Cost of designer for ad drawing in Coral 30,000.00

Cost of Cartridge from Delhi of 2 truck 95,000.00

Service Tax-14% 31,500.00

Total Amount 1,00,00,006

Total Amount Say 100.00 Lacs

Page 40: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

HIGH LEVEL CANCER INSTITUTE AT LUCKNOW SIGNAGE BOQ

Item Description Unit Qty RATE AMOUNT

1 Signage-1 (ground1Mountea}I . -- -~

1.1 "HIGH LEVEL CANCER INSTITUTE"

Branding signage in ss: This sign materials all kind of stylish sign designs are

possible without the need of intrusive frameworks and casing being visible. ss signage is smoother than other

sign base material:

- 302 stainless steel as side. - this is a metabolic, waterproof, fireproof, corrosion

resistance. - High brightness, less internal heat, energy

conservation and environment protection

- Long life-span, Strong wind resistance, suitable use at

front, top building front and so on. - Import acrylic board, no color fade, high pervious to

light, well-balanced; - Shape roller forming and bandings possible without

joints. Items use in fabrication of signage:

- Letters of SS of 304/18/.

- Imported NC Led Modules & Converters.

- 3mm acrylic for letters for glow on front side

• 3M Viny - Branded It wire

- Branded fasters - Depth of letters will be 4 inches

Heights of letters will be 18", ground Mounted with ss

pipe & 2nd with wall mounted.

Size of Signage-387"x18" and 1295"x54"

All above Specifications for Signage-1 & 2.

1.1.1 Cost of Signage Nos 2 1,30,000.00 2,60,000.00

1.1.2 Cost of Ss frame Nos 1 39,500.00 39,500.00

Total Amount 2,99,500.00

j_ ··-· Slgnage-2 (Wa!l1Mo1'riJe:dJ - ··- - _- - ,_ ff ~- .. - - ~-·

2.1 Heights of letters will be 54"

2.1.1 Cost of Signage Nos 4 5,75,000.00 23100,000.00

Total Amount 23,00,000.00

Page 41: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

'-1 \

3 'sig~ge-3 (Grolffid)Mggn.tedP ~- - ·~ , . ~

3.1 Pylon sign on entry of gates; Double sided glow by Led,

size 10 x 3.6 sft.: depth 1' & S' base will be under earth. This will be fixed

on road side near main entrance. Angle+ MS Pipe

structure + ACP+ Acrylic+ Led light in every letters

separately. This will fixed on road side & Glow both side.

You will have to give a power point at installation location. Items use in fabrication of Signage:

- MS l Angle.

• MS Pipe. - ACP

- 20 mm Acrylic letters.

- 3M Vinyl. • R.C.C.

- MS Heavy Plate. - MS Heavy wire for base.

- Red Oxide for MS Structure. - led module for internal lighting. Foundation of Totem Signage: The depth of base will be

5' in RCC.

• R.C.C. - Bricks

- Iron wire.

- MS Heavy sheet,

There will be heavy base plate of iron. From bottom Wire will be turn in L shape for increasing strength, will

be covered by RCC, depth of this base will be 12". From

bottom up to earth level 5', there will be base of Brick & Cement. On every 6" there will be ring for increasing

more strength. MS framework with regular

reinforcements at regular intervals CAD CAM made in

the shape of the signage.

3.1.1 Cost of Signage Nos 3 1,90,000.00 5, 70,000.00

Total Amount 5,70,000.00

4 .~

slfi,'age:;.i (GrotindafMounte)il, - - - ~ -- ,. --·-·- ~ -

4.1 Block or building led lit signage; all letters 18" will be in

capital:

Items use in fabrication of signage:

- Letters of SS of 304/18/. - Imported NC l ed Modules & Converters.

- 3mm acrylic for letters for glow on front side

- 3M Vinyl

- Branded It wire

- branded fasters - Depth of letters will be 4 inches 094

4.1.1 IPD Block: Cost of signage Nos. 2 80,000.00 1,60,000.00

4.1.2 OT Block: Cost of signage Nos. 2 70,000.00 1,40,000.00

Page 42: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

4.1.3 Diagnostic Block: Cost of signage Nos. 1 1,00,000.00 1,00,000.00

4.1.4 Admin Block: Cost of signage Nos. 2 1,00,000.00 2,00,000.00

4.1.5 OPD Block: Cost of signage Nos. 2 80,000.00 1,60,000.00

4.1.6 Kitchen Block: Cost of signage Nos. 1 70,000.00 70,000.00

4.1.7 Food court Block: Cost of signage Nos. 1 90,000.00 90,000.00

4.1.8 Pharmacy Block: Cost of signage Nos. 2 80,000.00 1,60,000.00

4.1.9 Radiology Block: Cost of signage Nos. 1 90,000.00 90,000.00

Total Amount 11,70,000.00

~

Signage-5 (Walll!Mouttted} - -~ s_ -

5.1 Internal signage:

5.1.1 Exit, and entry, staff Exit, staff entry, signage wall mounted; back wash led glow; height 18":

Items use in fabrication of signage: - Letters of SS of 304/18/. - Imported NC Led Modules & Converters. - 3mm acrylic for letters for glow on front side

- 3M Vinyl - Branded It wire - branded fosters - Depth of letters will be 4 inches - All will be in Capital 0137

I Cost of Exit signage No. 1 18,000.00 18,000.00

II Cost of entry signage No. 1 22,425.00 22,425.00

Ill Cost of staff Exit signage No. 1 40,000.00 40,000.00

IV Cost of staff entry signage No. 1 45,000.00 45,000.00

Total Amount 1,25,425.00

6 Signage~ (Wafl M.ounted)f ~ ~ . ~ " --- - ~ - --- - -

6.1 Gate no of Exit and entry signage wall mounted ss back

wash led glow; 18": Items use in fabrication of signage:

- Letters of SS of 304/18/. - Imported NC Led Modules & Converters. - 3mm acrylic for letters for glow on front side

r -3M Vinyl - Branded It wire - branded fosters - Depth of letters will be 4 inches - All will be in Capital 0149

Cost of no. signage No. 3 10,000.00 30,000.00

Total Amount 30,000.00

Page 43: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

t l Signage-7 (Wall M.,ountetll[ .:: -- - - ~ ~. -- - -- - ~

7.1 Stairs wall mounted non lit sign (12x12)" - 3M Vinyl Cut letters ; will directly Pasted over 5MM

Acrylic.

Cost of Wall mounted by screw signage No. 145 325.00 47,125.00

Total Amount 47,125.00

-8 Signage-8, (Walli Mp)lnted)

-- ~

--

8.1 Fire Exit (12x6)" in MS Box, wi th battery backup:

No other light source is as closely Tailored to modern light ing needs or as versatile as the

led. This signage will be fixed near stairs. CNC Router cut engraving on 8 mm Acrylic + Led light +

Battery backup+ MS Box for ceiling Signage will be

fix with ceiling. This signage will be fixed near stairs.

Cost of Signage No. 225 4,200.00 9,45,000.00

Total Amount 9,45,000.00

9 Signage-9 (WallfMdU)lted)1 .. -- - ,- - ~

-,;; - u

--·-'II' -

9.1 Lift wall mounted non lit sign; 600x150:

- 5MM Acrylic.

- 3M Vinyl

Cost of Wall mounted by screw signage No. 278 450.00 1,25,100.00

Total Amount 1,25,100.00

- 10 Slgnage-10 (W_alllMounted)' ~ - - - ~ ~= -- ._._ -

10.1 Lift instructions wall mounted non lit sign; 300x900:

- 5MM Acrylic - 3M Vinyl Printing.B188

Wall mounted by screw Cost of signage No. 85 975.00 82,875.00

Total Amount 82,875.00

- 11' _ SJgnage-1~ (WaU Mgybted)i - t--- - - ... k" -

- .

11.1 In case of fire do not uses lifts: wall mounted 300x300:

- 5MM Acrylic. - 3M Vinyl Cut letters Pasting over acrylic.

Cost of Wall mounted by screw signage No. 85 325.00 27,625.00

Total Amount 27,625.00

Page 44: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

1~ - Signage-t'Zl(WaU,M_o~cf), - - . 0 ~ - .-w

12.1 Toilets: size 12"x12"

- 5MM Acrylic.

- 3M Vinyl digital Printing. This will be fixed with door of bathroom form, f, h.

Cost of Wall mounted by screw signage No. 222 325.00 72,150.00

Total Amount 72,150.00

13 Signage-13 {Wall Mou-nted): -, , ., c

- --- - -

13.1 Toilets sign in corridor size {15x12)" double sided:

- 5mm acrylic

- 3M vinyl

Cost of Wall mounted by screw signage No. 60 550.00 33,000.00

Total Amount 33,000.00

- 14T- SJgnage:14~{WaU Mouoted)l .. -- --- -

14.1 Floor sign wall mounted Size-24" x 24"

- 5rnrn acrylic

- 3M vinyl

Cost of Wall mounted by screw signage No. 222 1,200.00 2,66,400.00

Total Amount 2,66,400.00

15 Sjgnage-15 (Wall;Mo1fot_gd). -- - -~ - ~

·- . -

15.1 Ceiling Suspended Double Side, DIRECTIONAL SIGN 1200

x 450 Way finding kiosks help visitors navigate around a large area without having to ask for directions, this improves

satisfaction and increases the chance that visitors will

arrive at their appointment on time.

- 5MM Acrylic - 3M Vinyl Printing.

Cost of ceiling mounted slgnage by ms chain No. 300 2,100.00 6,30,000.00

Total Amount 6,30,000.00

Page 45: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

'= 16 , Signage-16 ~WjlfilMo'i.iJJiec:J)> .,....,, -.- . .....,.,,. ---·- -

·--

16.1 DIRECTIONAL SIGN 24 x 12 sq mm Ceiling Suspended

Double Side.

Single lines; barcodes can be provided on appointment

forms with directions so visitors will immediately know

which rooms to go to when they get to the hospital. Quick and easy ways to get your patients to their

required destination reduces stress and also a better customer experience as well as the workload on staff to

escort patients and visitors to the correct area.

This signage will be for indicating main departments.

E245 white Acrylic . 3M Vinyl Printing.

Cost of ceiling mounted signage by ms chain No. 300 750.00 2,25,000.00

Total Amount 2,25,000.00

1r,,'· Sijnage-1.ti(Wall lMilufft"e'ltE K- .... - f -N - ~' -

17.1 Departmental Plate, wall mounted, Size· 24"X12"

• 5MM Acrylic

• 3M Vinyl Printing.

Cost of signage No. 300 600.00 1,80,000.00

Total Amount 1,80,000.00

18 Si~ge-18 '(Wrul!MPlintecJ) ,=,, - - - -

18.1 IPD No: wall mounted; 36"xl2"

• 5MM Acrylic • 3M Vinyl Printing. 8278

Cost of signage No. 75 950.00 71,250.00

.,- Total Amount 71,250.00

~ 19 - srgfillge-1§ ((~ Mourn.gd)1 ~ "' - - - -- -19.1 BED No. Size-75 x 200

5mm acrylic+ 3m printing+ lamination

Cost of signage No. 245 150.00 36,750.00

Total Amount 36,750.00

Page 46: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

r20 _ Signage-20 (\l\l.c!.01 MoUnteg} - - - - -1 -

20.1 Danger or Caution signage. Size-12x12

This will also include patient room numbers

• 5MM Acrylic 8298

- 3M Vinyl Printing.

Cost of signage No. 70 325.00 22,750.00

Total Amount 22,750.00

21 Sigoage-21 (Wajl 1fy1o_unt~1 --·-,< ·-·- ,;- - -=., =-= - -.. ~· -

21.1 Evocations Plan in floors, Size-900x600 One of the biggest gripes for emergencies is the speed to

get the information to everyone ... networked digital

signage enables one message to be sent down the network for immediate display to all screens - this might

be an evacuation, or perhaps a lockdown or even a

medical emergency or warning to shut down certain

r areas. Fire evacuations are one example where instructions must be conveyed quickly, clearly and with

authority. Together with way finding directing people to the correct exit, instead of visitors using static signage

and going in the wrong direction.

- 5MM Acrylic.

- 3M Vinyl Printing. - 3M fluorescent vinyl.

Cost of Wall mounted by screw signage No. 250 2,700.00 6,75,000.00

Total Amount 6,75,000.00

e22' - Sjgnage-221(\l!lalll MolfJJleJtp, -- --- - -..- -- - -- . -- -

22.1 Doctor name plate: wall mounted 15x4

- Galvanized aluminum

• 3 MM Acrylic r - 3M Vinyl cut letters.

Cost of Wall mounted by screw signage No. 200 800.00 1,60,000.00

Total Amount 1,60,000.00

Page 47: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

23 Signage-23 (Wall Mounted)1 - ·- '" --- - ~

23.1 Hospital DIRECTORY (96x48}" - Galvanized aluminum frame

- 3 MM Acrylic - 3M Vinyl cut letters.

- 3M Vinyl digital Printing.

Cost of Wall mounted by screw slgnage No. 15 7,000.00 1,05,000.00

Total Amount 1,05,000.00

24 Signage-24 {Wall Mourit~), -·~ - • -- - -··

, __ ...... - -- u..

24.1 Assembly Point, wall mounted. Size-600 x 600

- 5MM Acrylic. - 3M Vinyl Print ing.

- 3M fluorescent vinyl.

Cost of Wall mounted by screw signage No. 5 2,150.00 10,750.00

r Total Amount 10,750.00

- 25 - Sjgnage-25 (Wall M_oontt?il); -- - ·-- -~ . -- - - •c

25.1 Emergency Codes for rooms, Size-600 x 300

- 5MM Acrylic.

- 3M Vinyl Printing.

Cost of Wall mounted by screw signage No. 140 600.00 84,000.00

Total Amount 84,000.00

26 Signage-26 t(WallltMolJnfedf -- = - ~ - -·- - -

26.1 Patient right & responsibility, Size-900 x 900

- 5MM Acrylic. - 3M Vinyl Printing.

This signage will be install near all receptions and

waiting hall

Cost of Wall mounted by screw signage No. 20 2,800.00 56,000.00

Total Amount 56,000.00

27 Signage-27 {Wall Mounted), ·- ~ ' "" - "' ~ .. - - - ·- - -.- -

~ - - ·-

27.1 CODE SYSTEM, Size-600 x 300

- 5MM Acrylic. - 3M Vinyl Printing.

Cost of Wall mounted by screw signage No. 40 600.00 24,000.00

Total Amount 24,000.00

Page 48: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

28 Sjguag'e-:_281{Wall~Mbun"tedh - ·- ·- ·-_., ---

28.1 HAND HYGIENE, Size-900 x 900

- 5MM Acrylic.

- 3M Vinyl Printing. This signage will be install near all receptions and

waiting hall

Cost of Wall mounted by screw signage No. 40 2,800.00 1,12,000.00

Total Amount 1,12,000.00

i9 Sjgnjge-29-{Wa!IJ_Mfu!lited)Y - -,_ " ,_ --·----29.1 PN OT, Size-900 x 900

- 5MM Acrylic. - 3M Vinyl Printing.

This signage will be install near all receptions and

waiting hall

r Cost of Wall mounted by screw signage No. 10 2,800.00 28,000.00

Total Amount 28,000.00

• ' 30' - Slgnage-30 {WamMqurftecl) --- - -... - - --30.1 No smoking, Size- 600 x 300

- 5MM Acrylic. - 3M Vinyl Printing.

Cost of Wall mounted by screw signage No. 110 325.00 35,750.00

Total Amount 35,750.00

3-1 Sjgnage-31' (@ailJlMounted) ~ ~- -

- - . -- . 31.1 Non lit Reception sign, wall mounted. Size-(60x24)"

- 5MM Acrylic - 3M Acrylic I cut letters.

Cost of Wall mounted by screw signage No. 2 13,000.00 26,000.00

Total Amount 26,000.00

= -~ GRAND TOTAL

, ____ = -- "85;76,{SO ... ® --

{ __ , • ·~ - -

Page 49: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

NWIIIE ©F. eR,G>lJBeffi - HU&til l!H"dtll! ~NIER IN&ffll W E,

W€HN8Wi

N{AME 0f. G.WENili -~ !RA8E~Kt'li NlftMAN NJGAM

Page 50: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

so

HIGH LEVEL CANCER INSTITUTE AT LUCKNOW

Summary _ S. No. Descriptign

- ~

AMOUNT

1 Art Works 3,40,50,000.00

2 Fish Tank 10,23,83,587.50

Grand Total 13,64,33,587.50

r

r

Page 51: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

5t

HIGH LEVEL CANCER INSTITUTE AT LUCKNOW

ARTWORKS

S.No. SPACE ALLOCATION CATEGORY TOTAL ART PIECES BUDGET(Rs)

1 Directors Cabin Master artwork 1 56,25,000

2 Board Rooms Senior Artists 2 37,50,000

3 Conference Hall Established Contemporary artist 1 9,00,000

4 Private Wards Upcoming artists 80 54,00,000

5 Consultation Rooms Mix of Serigraphs, Lithographs

40 2400000 and Etchings

6 Shared Wards Upcoming artists 60 40,50,000

7 HOD Rooms Upcoming to Medium

10 to 15 18,00,000 Established artists

8 Associate Doctors Rooms Established artists 20 22,50,000

9 Assistant Professors Rooms Upcoming - Medium Established

20 22,50,000 artists

r Waiting Lobby Areas

Archival Prints and mixed media 10 artworks

10 to 12 3,75,000

11 Corridors Upcoming artists 7,50,000

12 Outdoor Areas Sculptures and Sculptural

Installations 8 15,00,000

13 Main Entrance Large Sculpture by a renowned

sculptor 1 30,00,000

TOTAL 3,40,50,000

Page 52: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

HIGH LEVEL CANCER INSTITUTE, LUCKNOW FISH TANK

Cichlid Aquarium • ( 42.5' X 13' X 13' ) Cichlld Aquarium: The aquarium measures Approx 42.5 ft in length, 13 ft in width and 13' ft in height.The

aquarium is a five-sided glass pane with minimal steel bracing. The tank will have an independent,state of the art biological,mechanical and chemical filtration unit,assisted by an automated lighting console to enhance the clarity

of water as well as the quality of the selected flora and fauna to provide unmatched viewing pleasure.

5. No. Item Description Amount (RS.)

1 Acrylic Aquarium Tank ( 42.5' X 13' X 13' )· A moulded acrylic tank one piece

structure fused together. No reinforcement or structure materail used.

2 The Life Support System will consist of the following: Filter Canister, Submersible Pump, Filter Media, Bio Bacterium etc,

3 Decorrative Accessories : Drift Wood, River Rock and Fiber Rock to cover plumbing

pipes.

4 Lighting : Battery of LED focus lights over the tank. Hung from the ceiling at four 10,23,83,587.50

locations to provide adequate light to the Aquarium.

5 Aeration Pumps : Air Pump, Air Stone I Diffuser

6 Fauna : Varieties of Cichlids fish.

7 Design lnstallation,Setup,system testing and optimization of water chemistry

Total 10,23,83,587 .so

Note: 1) Structure: Civil work to be done as per LWS design requirment.

Page 53: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

ANALYSIS OF RATE

Cichlid Aquarium - ( 42.5' X 13' X 13' ) Cichlid Aquarium: The aquarium measures Approx 42.5 ft in length, 13 ft in width and 13' ft in height.The

aquarium Is a five-sided glass pane with minimal steel bracing. The tank will have an independent.state of the art

biological.mechanical and chemical filtration unit,assisted by an automated lighting console to enhance the clarity

of water as well as the quality of the selected flora and fauna to provide unmatched viewing pleasure.

Note: 1) Structure: Civil work to be done as per LWS design requlrment.

S.No. Item Description Amount (RS,)

1 Acrylic Aquarium Tank ( 42.5' X 13' X 13' )- A moulded acrylic tank one piece

structure fused together. No reinforcement or structure materail used.

2 The Life Support System will consist of the following: Filter Canister, Submersible Pump, Filter Media, Bio Bacterium etc,

3 Decorrative Accessories : Drift Wood, River Rock and Fiber Rock to cover plumbing

pipes.

4 Lighting : Battery of LED focus lights over the tank. Hung from the celling at four 8,97,50,000.00

locations to provide adequate light to the Aquarium.

5 Aeration Pumps : Air Pump, Air Stone I Diffuser

6 Fauna : Varieties of Cichlids fish.

7 Design lnstallation,Setup,system testing and optimization of water chemistry

Total 8.97 .50.000.00

TERMS & CONDITIONS

Design Fee A Design Fee of- Rs. 1,00,000.00 will be charged irrespective of the 1,00,000.00

approval of project. Project design will be furnished after design fee is paid.

(To consult w ith the Structural Engineer.)

Taxes VAT@ 14.5% on 75% Taxable components. 97,60,312.50

Service Tax@ 12.36% on 25% of Taxable comoonents. 27 73,275.00

= -Total say. 10~J83}58I..50

"' - ·-

r

Page 54: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

Dated 13.10.2014

Ref : Art Requirement for High Level Cancer Institute at Lucknow

Dear Mr.Visharad Sharma,

r· Greetings!

This is in reference to your upcoming project titled 'High Level Cancer Institute at Lucknow' . We are attaching budget for sourcing artworks for this hospital which will include paintings, sculptures, etchings and installations. These are going to be a mix of renowned artists as well as upcoming artists from across the country.

The artworks will be brought in from different parts of the country and the budget includes expenses such as framing and installation.

We look forward to having an association with your Organisation,

Warm Regards,

Samit Khullar

+919899009911

Page 55: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

Art Reguirement for High Level Cancer Institute at Lucknow

Total number of

Spaces Allocated Category artworks Budget

1 Directors Cabin Master artwork 1 75,00,000

2 Board Rooms Senior Artists 2 50,00,000

Established

3 Conference Hall Contemporary artist 1 12,00,000

4 Private Wards Upcoming artists 80 72,00,000

Mix of Serigraphs, Lithographs and

5 Consultation Rooms Etchings 40 3200000

6 Shared Wards Upcoming artists 60 54,00,000

Upcoming to Medium

7 HOD Rooms Established artists 10 to 15 24,00,000

8 Associate Doctors Rooms Established artists 20 30,00,000

Upcoming - Medium

9 Assistant Professors Rooms Established artists 20 30,00,000

Archival Prints and mixed media

10 Waiting Lobby Areas artworks 10 to 12 5,00,000

11 Corridors Upcoming artists 10,00,000

Sculptures and Sculptural

12 Outdoor Areas Installations 8 20,00,000

Large Sculpture by a

13 Main Entrance renowned sculptor 1 40,00,000

Total 4,54,00,000

f__,

Page 56: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

LIWASyzAQUAPvrLTD No. 19, Queens Road, Cantonment, Bangalore - 560052

livinq™(, V/OtGr -· -

Tel: 080-2 234 0210, 080- 2225 6778 Mobile: +91 94490 12963

DyDtGmZ

Ref: LWSIHLCI_CA/QTN-235/14-16

To, Mis. High Level Cancer Institute Lucknow

Sub : Estimate for Clchlld Aquarium

Cichlid Aquarium - ( 42.5' X 13' X 13' )

Cichlld Aquarium: The aquarium measures Approx 42.5 ft in length, 13 ft in width and 13' ft in height.The aquarium is a

five-sided glass pane wilh minimal steel bracing. The tank will have an independent.state of the art biological.mechanical and chemical filtration unit.assisted by an automated lighting console to enhance the darity of water as well as the quality of

the selected flora and fauna to provide unmatched viewing pleasure.

Note: 1) Structure: Civil work to be done as per LWS design requlrment.

SI. No Item Description Amount (RS.)

A-1 Acrylic Aquarium Tank · A moulded acrylic tank one piece structure fused together. No reinforcement or structure materail used.

3 The Life Support System will consist of the following:

Filter Canister, Submersible Pump, Filter Media, Bio Bacterium etc.

4 Oecorratlve Accessories : Drift Wood, River Rock and Fiber Rock to cover plumbing pipes.

Lighting : Battery of LEO locus lights over the tank. Hung from the ceiling at lour locations to provide 8,97,50,000.00

5 adequate light to the Aquarium.

6 Aeration Pumps : Air Pump, Air Stone I Diffuser

7 Fauna : Varieties of Cichlids fish.

8 Design lnstallatlon,Setup,system testing and optimization of water chemistry

Total 8,97,50,000.00

TERMS & CONDmONS

Design Fee A Design Fee of - Rs. 1,00,000.00 will be charged irrespective of the approval of project. Project design will be furnished after design lee is paid. (To consult with the Structural Engineer.)

VAT@ 14.5% on 75% & Service Tax@ 12.36% on 25% of Taxable components. Taxes Non Taxable components : Fauna.

Final Bill will have no breakun of Items for StatutoN nurnt>se.

Delivery Tlme The total time required to complete the project is 16 - 20 weeks alter the civil works end specified requirement provided.

Quote Validity 30 days from date.

Payment Terms 60% along with Purchase Order, 25% on Delivery of materials to site, 15% on Installation and delivery.

Requirements 1. Packing & Transportation for materials & equipment to be borne. from your end

2. Insurance for transportation of materials & equipment to be borne.

3. Space to store materials and equipments (lockab4e) to be provided.

4. Access to a water outlet and electricity at the time of installation.

5. Facility for a water inlet and an outlet during maintenance.

6. All Civil construdion to be provided ii required.

7. Boarding, Lodging and travel expenses to be borne for the execution team as well as for site meetings at various stages of work

Page 57: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

,. ... '

_,,.-.

Note o Payments must be cleared on final delivery.

o All payments are to be made payable at Bangalore in favour of Mis. Llwasyz Aqua Pvt. Ltd. or amount can be transferred to our account 50200001540760, HDFC Bank Ltd, RT Hagar Branch, IFSC Code: HDFC0000140,

Bangalore.

o Any cost changes in design and materials are to be borne by the client

o Electrical equipment that carries the manufacturers warranty is warranted from the date of Purchase order.

o LWS will not be responsible for breakage of any material and equipment during work and transport

We reserve the right to change. wholly or partially. the characteristics of our products and the content of this document. without prior notice.

Prices are subject to change without prior notice.

Trust our offer is in accordance with your requirement: we look forward to hearing from you. Should you need any further clarification. please

feel free to call us.

Thanking you.

For Llwasyz Aqua Pvt. Ltd

Rufus Monteiro

Page 58: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

-~ tota]ftlot'Ar.ea _ - -~ .. "': ___ f.Q. 100 Me

Proposed Blliltup Area --- '2~059 sgrrd~ 13,~.ia<Jlisqft - -·- -- -

Proposed Carpet Area - - - r - 1_,12,553 'sqmil 12';1'1',520 ,sqff

Proposed Ground Coverage 41,737 sqm 10.31 Acre

Proposed Landscape Area 3,09,730 sqm 76.54 Acre

Proposed Road Area 53,273 sqm 13.16 Acre

- ~ n- I __ ;~rea1 -.. 7. --w

11sr.No,. Descr{ptioo (A) I s'tiim - ~

·---- ---· - _&

A OUT PATIENT DEPARTMENT/ EMERGENCY

1 Ground Floor 3,778 40,668

2 First Floor 3,833 41,258

3 Second Floor 3,778 40,668

4 Third Floor 3,964 42,667

Total 15,353 1,65,261

B RADIOLOGY

1 Ground Floor 2,150 23,144

2 First Floor 2,154 23,189

3 Second Floor 2,154 23,189

Total 6,459 69,522

c OPERATION THEATRE/ I.C.U.

1 Ground Floor 2,137 22,998

2 Service Floor 4,767 51,309

3 First Floor 4,880 52,529

4 Second Floor 4,880 52,529

5 Third Floor 4,880 52,529

6 Fourth Floor 4,976 53,566

Total 26,520 2,85,460

D IN PATIENT DEPARTMENT

1 Ground Floor 3,580 38,540

2 First Floor 4,049 43,580

3 Second Floor 4,812 51,793

4 Third Floor 4,270 45,958

5 Fourth Floor 4,270 45,958

6 Fifth Floor 4,612 49,641

7 Sixth Floor 2,250 24,215

8 Seventh Floor 1,985 21,367

9 Eighth Floor 1,985 21,367

10 Ninth Floor 2,135 22,979

Total 33,946 3,65,397

Page 1

Page 59: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

.- ·- - - - . ......,. -~ .- ·co ,11 ..-..-... --SF .. NO, Desglpllqn (A) r - l --- - 'Ulffll

E RADIATION ONCOLOGY/ NUCLEAR MEDICINE

1 Ground Floor 4,175 44,939

2 First Floor 1,796 19,335

3 Second Floor 1,796 19,335

4 Third Floor 1,961 21,110

Total 9,729 1,04,719

F ADMINISTRATION

1 Ground Floor 3,541 38,118

2 First Floor 2,327 25,051

3 Second Floor 2,965 31,911

4 Third Floor 1,094 11,772

Total 9,927 1,06,852

G MAIN ENTRANE SQUARE / CENTRAL RECEPTION/BILLING

1 Ground Floor 3,610 38,853

H RAIN BASERA / VISITORS

1 Ground Floor 1,584 17,050

I KITCHEN/ LAUNDRY

1 Ground Floor 2,789 30,017

J MORTUARY/ BIO MEDICAL WASTE

1 Ground Floor 317 3,410

K CENTRAL STORES / WORKSHOP

1 Ground Floor 886 9,542

L ELECTRICAL SUBSTATION

1 Ground Floor 886 9,542

M HVAC PLANT ROOM/ M.G.P.S.

1 Ground Floor 703 7,562

N DIRTY/ CLEAN SUPPLY SERVICE CORRIDOR

1 Basement Floor 4,364 46,97

0 CENTRAL STREET 4

1 Ground Floor 7,237 77,898

p STP/ETP

1 Underground 325 3,498

Q CENTRAL PUMP HOUSE

1 Underground 425 4,575 --

Page 2

Page 60: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

r /

REPORT

ON

SUB SOIL INVESTIGATIONS

FOR CONSTRUCTION

OF

SUPER SPECIALITY CANCER INSTITUTE ( SIGNATURE BUILDING )

AT

GAJARIYA FARM, SULTANPUR ROAD, LUCKNOW

U.P. RAJKEYA NIRMAN NIGAM LTD. UNIT 10 A, LUCKNOW

design point 1 b, Ground Floor, Royal court Apartments,

4/45, wazir hasan road , lucknow

ph 0522-2206373 9415007187

Page 61: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

{ '

ACKNOWLEDGEMENT

We are grateful to the Project

Manager U.P. Rajkeya Nirman Nigam Ltd.,

Unit 1 0 A, Lucknow for providing us an

opportunity to carry out these

investigations.

The co-operation extended by the site

staff during site investigat_ions is thankfully

acknowledged.

Page 62: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

-

. .--

REPORT ON SUB SOIL INVESTIGATIONS AT THE SITE OF PROPOSED

CONSTRUCTION OF SUPER SPECIALITY CANCER INSTITUTE

BUILDING) AT GAJARIYA FARM. SULTANPUR ROAD. LUCKNOW

INTRODUCTION

SIGNATURE

The construction of Super speciality Cancer Institute ( Signature Building ) at

Gajariya farm, Sultanpur road . Lucknow is proposed to be taken up by U.P.

Rajkeya Nirman Nigam Ltd .• Unit 10 A • Lucknow . The work of conducting sub

soil investigations at the site of construction of the proposed Super speciality

Cancer Institute ( Signature Building ) at Gajariya farm, Sultanpur road • Lucknow

was entrusted to M/S Design Point • 1 b, Ground Floor, Royal court Apartments.

4/45, Wazir Hasan Road, Lucknow by the Project Manager • U.P. Rajkeya Nirman

Nigam Ltd .. Unit 1 0 A . Lucknow . This report covers the results of investigations

conducted accordingly.

SCOPE OF WORK

The scope of work included drilling two boreholes of 6 . 00 mts in Entrance square

two boreholes of 8.00 mts in Emergency. five boreholes of 10.00 mts in OPD

& OT areas. seven boreholes of 12.0 mts. in Admin building & Staff housing . nine

boreholes of 20.0 mts in five to seven storied IPD building at specified locations,

conducting Standard Penetration Tests. collection of undisturbed and disturbed

samples and carrying out necessary laboratory tests and submission of report

with bearing capacity calculations.

The boring points were located at the site in consultation with the authorised

representative of department. Locations of boreholes are marked on the bore

hole location plan issued by the Architect attached with report .

LOCATION

The site is located in Gajariya farm. Sultanpur road adjoining Ansal API campus.

Lucknow.

Page 63: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

SITE INVESTIGATIONS

The investigations were conducted during third & fourth week of August 2014.

Nominal 1 50 mm diameter bores were drilled by manual operation using

hand operated post hole auger and bailer I casing arrangements as

required . During boring visual observations about the strata were also

recorded .

Undisturbed samples were collected normally at interval of 1 .5 mts. or at

change of strata if met earlier . These samples were collected using open drive

sampler having this walls and internal diameter 100 mm. with a cutting edge at the

bottom in accordance with IS 1932. After recovery of the sample from the

bore holes. the sampling tubes were properly waxed at the ends, to avoid

loss of moisture. properly labeled with the depth and bore number etc and

brought to the laboratory for laboratory investigations.

ST AND ARD PENETRATION TESTS

The Standard Penetration Tests were carried out in soil deposits at 1 .5

mts. depth intervals by driving a Standard split spoon sampler of outside

diameter 50.8 mm and inside diameter 35mm using a hammer weight of 63.5

Kg falling freely from a height of 7 50 mm. The number of blows for each 1 50

mm penetration of the sampler were recorded till the sampler penetrated

450mm. The first 150 mm penetration was considered as the seating drive.

The total number of blows required for the second and third 1 50 mm

penetration is termed as Standard Penetration Test SPT value. The tests are

conducted as per IS 1931. The observed values are corrected for the effect

of overburden and sub soil water in case of sands and silts.

Page 64: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

-

The corrected values of SPT are recorded in the result sheet (pp 1 4 to 38 ) &

plotted in bore logs (pp 39 to 63) and also plotted therein.

WATER TABLE

The depth of sub soil water in the boreholes was observed after waiting for 24

hours.

LABORATORY INVESTIGATIONS

All the soil samples recovered from the bore holes were tested for index

properties viz. Atterberg's limits and sieve analysis for classification of soil as per

Indian standard Specification 1498.

Natural moisture content and density tests were conducted on all the undisturbed

samples recovered from the boreholes.

Particle size analysis tests were conducted on all the soil samples.

Triaxial shear tests were conducted on all undisturbed samples to

determine the shear characteristics.

Consolidated tests were conducted on the cohesive samples to compute the

anticipated settlement of the foundations.

Specific gravity tests were conducted on all the samples.

A sample of sub soil water from the borehole was subjected to chemical examination

for the presence of harmful salts if any.

All the results are presented in the result sheet at pp 14 & 38.

Page 65: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

GENERAL NATURE OF SOIL STRATA

The bore logs appended at pp 39 to 63 and the result sheet appended at pp 14 to

38 indicate the general nature of soil strata at this site. The results indicate almost

similar strata in all the boreholes but for presence of non plastic sandy silt of ML

group in thin top layer in few boreholes & presence of very low to low plastic silty clay

of MLCL & CL groups in 2.50 to 6.00 mts depth . In general the strata at site is non

plastic siltysand of SM group I sandy silt of ML group in top 4 . 50 to 6 . 00 mts. depth

followed by poorly graded sand with little or no fines of SM/SP & SP groups right upto

the boring depth in all the bore holes .. The SPT values indicate relative density of non

cohesive strata as loose in upper layer & medium in lower layers in general &

consistency of cohesive strata as low to medium.

Sub soil water was observed in all the boreholes after 2 4 hours of boring & found

at an approximate depth of 0 .50 to 4 .00 mts. in the month of August depending upon

the topography and is expected to rise to a max upto existing ground level in post

mansoon months. However proper consideration for the same has peen taken for

bearing capacity calculations .

TYPE OF FOUNDATIONS & LOAD CARRYING CAPACITY

A. R.C.C. RAFT/ ISOLATED FOOTING FOUNDATION

Keeping in view the soil strata & sub soil strata RCC Isolated footing type

foundations may be able to serve the load requirements of proposed RCC frame

structure corridor .

B. PILE FOUNDATIONS

The sub soil conditions being poor shallow foundations may not be able to serve

the load requirements or may not prove to be economical in case of very heavy loads

I very high sub soil water level poor soil conditions.

Alternatively suitably designed pile foundations of required depth may be adopted

depending upon the relative economics .

The allowable bearing capacity of shallow foundations is governed by two

considerations viz . safety against failure by shearing action and safety against

6

Page 66: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

--

excessive settlement. Where as calculations for bearing capacity by shear

considerations are governed by IS 6403 . the settlement calculations are

governed by IS 8009 (Part I) . (Relevant extracts from these IS are enclosed as

App. A) . The design & construction of under ream Pile foundations are governed by IS

2911 part 111 - 1984.

BEARING CAPACITY CALCULATIONS

Bearing capacity calculations for the proposed building are appended as App B 1 a

B2a. 81 band B2b pp 9 to 12.

CHEMICAL ANALYSIS

Chemical examination of a sample of surface soil indicates that the harmful salts are

within the permissible limits.

CONCLUSION AND RECOMMENDATIONS

Based on the results of these investigations, the following recommendations are

made.:-

a) A net safe bearing capacity of 9 .50 Tons/sq.mt . may be adopted for RCC

isolated footing type foundations laid at a depth of 1 . 20 mts below general ground

level in Admin Building Area.

b) A net safe bearing capacity of 8 .90 Tons/sq.mt. may be adopted for RCC

isolated footing type foundations laid at a depth of 1 .20 mts below general ground

level in OPD building area.

c) A net safe bearing capacity of 7 .95 Tons/sq.mt. may be adopted for RCC

isolated footing type foundations laid at a depth of 1 . 20 mts below general ground

level in Entrance square Area.

d} A net safe bearing capacity of 8 .50 Tons/sq.mt. may be adopted for RCC

isolated footing type foundations laid at a depth of 1 . 20 mts below general ground

level in OT building area.

e) A net safe bearing capacity of 9.50 Tons/sq.mt. may be adopted for RCC

isolated footing type foundations laid at a depth of 1 .20 mts below general ground

level in IPD building area behind OT complex (Goverened by BH 10, 11, 12 & 13).

f) A net safe bearing capacity of 9 .00 Tons/sq.mt. may be adopted for RCC

isolated footing type foundations laid at a depth of 1 .20 mts below general ground

level in Staff Housing area.

g) Suitably designed single I double under ream bored compaction pile I simple

bored cast in situ piles foundations of 6 .00 to 8 .00 mts depth may be adopte as

Page 67: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

-

foundations depending upon the load requirements & relative economy in Emergncy

Complex.

h) Suitably designed single I double under ream bored compaction pile foundations

of 8 .00 to 10.00 mts. depth or simple bored cast in situ piles of 12.5 to 16.00

mts depth may be adopted as foundations in IPD Building area governed by borehole

16, 17, 18, 19 & 20 depending upon the load requirements & relative economy.

The load carrying capacity, design & construction of the same shall be governed

by IS 2911 part 111 -1984. However initial load test as per IS 2911 part IV-1980

are recommended on test piles to confirm the load carrying capacity of different

dia piles.

These recommendations are based on the basis of soil encountered upto boring depth

only .

Guidelines of 151893-2000 , IS 4326-1993, 1513920-1993 , 1513828-1993 & IS

1893-1984 are also recommended in design & construction or building.

Rahul Trepathe)

B.Sc (Engg.) Civil

8

Page 68: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

APPENDIX .A

CRITERIA FOR BEARING CAPACITY CALCULATIONS

The bearing capacity of shallow foundation strip footings and isolated footings is governed by two considerations viz. safety against shear failure and safety against excessive settlement. The bearing capacity on shear considerations is worked out in accordance with IS 6403 whereas the settlement worked out in accordance with IS 8009 (Part- I) is restricted to

within the limits laid down in IS 1904. Bearing capacity on shear considerations

Para 5 .1 .2 of IS 6403 lays down the following formulae for bearing capacity calculations on shear considerations:-

a) In case of general shear:-qd = C.Nc.sc.dc. ic + q(Nq-1 )sq .dq .iq + O.SB.r.Nr.sr.dr.ir.W'

b) In case of local shear failures :-q'd = (2/3)C.N'c.sc.d.ic. + q(N'q-1 )sq.dq .iq + O.SB.r.N'r.sr.dr.ir.W'

Where: -qd,q'd = Ultimate net bearing capacity q = Effective overburden Ne, Nq, Nr, N'c, N'q, N'r = Bearing capacity factors sc.sq,sr = Shape factors dc,dq,dr = Depth factors ic,iq,ir = Inclination factors W' = Correction factor for position of water table.

Settlement Considerations The safe bearing pressure has to be so restricted that it neither exceeds the net bearing capacity on shear considerations as worked out above, nor does it result in settlement exceeding the permissible values as given in

IS 1904. For non-cohesive strata the settlement is worked out on the basis of

SPT values in accordance with fig 9 pp 17 of IS 8009 (Part-I). Settlement in case of cohesive strata are worked out by the

formula :-

Page 69: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

-

S = (Cc.Ht.)/(1 +eo) Log (Po +P)/Po) Where:-

S = Settlement Cc = Compression Index eo = Void ratio for pressure Po Po = Original pressure at mid depth of clay layer P = Change in pressure at mid depth of clay layer

Ht = Thickness of clay layer under considerations

APPENDIX.81 A

BEARING CAPACITY CALCULATIONS ON SHEAR CONSIDERATIONS

1 . R.C .C. ISOLATED FOOTINGS

The governing shear parameters are:­Cohesion C = O. 00 Kg/sq cm

Internal friction O = 29. 50 degrees Void ratio e = 0 .620 (Interpolation between Local & Gen. shear)

For a foundation depth of 1 .20 mts below ground level i.e. the effective overburden works out to 0 .198708Kg/sq.cm.

The parameters for RCC isolated footing are:­The shape factors are:-

Sq = 1.20 ; Sr = 0 .80 The depth factors (for a foundation width of 1.0 mts are :­

dq = 1 .092 ; dr = 1.092 The bearing capacity factors are:-

Nq = 17.626 ; Nr = 21 .248

The ultimate net bearing capacity on considerations of General shear:

qd 0 .198708*(17 .626-1 )*1 .092*1 .20 + 0.50*3.00*21 .248 *0. 165590*1 .092*0.80*0.50

= 6 .634 kG/Sq .cm

For local shear O' = Tan inv (0.67 Tan 29 .5) deg

20.66 deg say 20

10

L---

Page 70: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

-•

to:

0.87

0 .50

0 .80

The bearing capacity factors are:-N'q = 6 .400 ; N'r = 5 .390

The ultimate net bearing capacity on considerations of local shear works out

q'd = 0 .198708*(6.400-1)*1 .47*1 .20 o .so·3 .oo·s .390 ·0.155590•1 .04 ro.80 ·a.so

= 1 .991 kG/Sq .cm

+

For a void ratio of O. 7 31 , the value of ultimate net bearing capacity on considerations of interpolation between general & local shear failure works out to 2.432 kg/sq.cm and for a factor of safety of 2 .50 the net permissible

value on shear considerations is 0 .973 kg/sqcm say 9 .73 Tons/sq.cm. However, the allowable bearing pressure is also to be checked on considerations of settlement as worked out in App 82.

SETILEMENT OF NON COHESIVE STRATA

(ADMIN BUILDING)

1 . Lowest average SPT value below foundation level

2 . Settlement per unit increase of pressure

3 . Fox Correction for depth

4 . Correction for Water Table

5 . Regidity Factor

6 . Corrected settlement at per unit increase in pressure

7 . Bearing pressure for 5 . 00 mm permissible settlement

Adopted bearing pressure

Appendix B2A

9 .5

3 .50

4.872

ems

=5/572

1 .026 Kg/sqcm.

=9 .50 Tons/sqmt.

safe

Page 71: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

SETILEMENT OF NON COHESIVE STRATA

(OPD AREA)

1 . Lowest average SPT value below foundation level

2 . Settlement per unit increase of pressure

4 .00

3. Fox Correction for depth

0 .87

Appendix B2b

09

4. Correction for Water Table assuming partly submerged conditions O. 50

5 . Regidity Factor

0 .80

6. Corrected settlement at per unit increase in pressure

5 .568

7 . Bearing pressure for 50.0 mm permissible

= 5/5 .568

ems

settlement

,(

Page 72: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

- ,

-

Adopted bearing pressure

EXTRACTS FROM : I.S. 1080-1980 Depth of Foundations

0 .898Kg/sqcm.

= 8 .90 Tons/sqmt.

APPENDIX-C

The depth of which foundations should be carried depend upon fallowing factors :-a) The securing of permissible allowable bearing capacity (See I. S.: 604-1981) b) In the case of clay soils, penetration below the zone where shrinkage and

swelling due to seasonal weather changes are likely to cause appreciable movements. c) In fine sands and silts, the penetration below the zone in which trouble may be expected from frost; and d) The maximum depth of scour wherever relevant shall also be considered and the foundation should be located sufficiently below this depth.

All foundation shall extend to a depth of at least 50 cm. below natural ground levels. except on rock or such other weather resisting natural ground, removal of the top soil may be all that is required . In later cases the surface shall be cleaned and, if necessary, stepped or otherwise prepared

so as to provide a suitable bearing and thus prevent slipping or other unwanted

13

l>

Page 73: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

--'

-

movements.

Dimensions of Footings

The dimensions of the spread foundation shall be such as to provide allowable margin for any differential settlement and enough load bearing area. The dimensions of footings shall also be such that the maximum stress in the concrete or masonary is within permissible limits as specified in I.S. 456-1978 and I.S . 1905-1969 respectively.

The width of footings should not be less than that given by; B 2W + 30 cm

where B Width at base in cm. and W = Width of supported wall in cm:

The angle of spread of the load from the wall base to the outer edge of the ground bearing shall not exceed the following values;

In brick work and stone masonary In lime In cement concrete

1 /2 horizontal to 1 vertical 1/3 1

14

Page 74: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

-.

design point soil & material testing,

structure & services consultants, engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute ( Signature Building ) at Gajariya farm, Sultanpur road I Lucknow

BORE HOLE N0-1 (OPD)

Partide

Depth s Soil Distribution

(m) p aassifi than T cation 4.75 4.75

mm mm

1.00 05 SM 100 100 2.50 00 SM 100 100 4.00 10 SMSP 83 78 5.50 14 SMSP 100 100 7.00 17 SP 100 100 850 19 SP 100 100 10.0 19 SP 100 100

Size Partide % Finer distribution

4.75 ~.75 $and silt mm mm

100 38 62 29 100 31 69 20 77 10 100 08 92 05 99 05 95 04 96 03 100 04 96 04

LOCATION OF W.T. 2.00 mt. below G.L. in the month of August , 2014

size moistur Alterllelg's Limits e Densities

~fie (%) c 0 ;:on tent :C.-avity Cc (Kg/ (deg.)

day %) Ory u I PL I Pl an2)

I I 09 12.00 1.46 2.52 Non plastic 0.00 29.5 11 23.70 1.45 2.51 Non plastic

2390 1.44 2.48 Non Dias tic 0.00 30.0 03 24.00 1.44 2.46 Non plastic 0.00 30.5

24.20 1.43 2.46 Non plastic 01 24.50 1.42 2.44 Non plastic 0.00 31.5

00 24.50 1.42 2.43 Non plastic

Page 75: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

-,

design point soil & material testing,

structure & services consultants, engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute ( Signature Building } at Gajariya farm. SUltanpur road • Lucknow

BORE HOLE NO -2 (OPD)

Partide Size s Soil Distributioo % Finer

Depth p Classifi than (m)

T catioo 4.75 4.75 4.75 4.75 mm mm mm mm

1.00 08 SM 100 100 100 29 2.50 08 Ml 100 100 100 59 4.00 10 SMSP 83 78 77 10 5.50 11 SMSP 100 100 100 10 7.00 16 SP 100 100 99 05 8.50 18 SP 100 100 95 06 100 19 SP 100 100 100 05

LOCATION OF W.T. 2.40 mt. below G.L. in the month of August, 2014

Partide size moistur Alterberg's Limits distributioo

Densities Specific (%) c 0 e Cc (Kg/

sand silt day Coo tent Dry Gravity

LL I PL I Pl an2) (deg.) (%)

I I 71 18 11 12.50 1.45 2.51 Non plastic 0.00 30.0 41 45 14 24.30 1.51 2.53 Non plastic

24.30 1.45 2.48 Non plastic 0.00 30.5 90 06 04 24.20 1.46 2.49 Non plastic 0.00 31.5

23.90 1.43 2.46 Non plastic 24.10 1.42 2.45 Non plastic 0.00 32.0

95 04 01 24.00 1.42 2.44 Non plastic

Page 76: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

design point soil & material testing,

structure & services consultants, engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute ( Signature Building lat Gajarlya farm, Sultanpur road I Lucknow

BORE HOLE NO -3 (OPD)

Depth Soil

(m) SPT aassifi

cation

1.00 06 SM 1.50 ML 2.50 08 SMSP 4.00 08 SMSP 5.50 12 SMSP 7.00 14 SP 6.50 16 SP 10.0 20 SP

Partide Distribution than 4.75 4.75 mm mm

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

Size Partide % Finer distribution

4.75 ~.75 sand silt mm mm

98 32 100 57 43 44 99 11 95 10 00 00 100 08 92 05 99 05 100 05 95 03 95 05 95 04

LOCATION OF W.T. 1.50 mt. below G.L. in the month of August , 2014

size moistur Alterberg's Limits a Densities Specific (%) c 0 .::::tent :ravity Cc (Kg/ (deg.)

day %) Dry LL I PL I Pl an2)

I I 14.10 1.45 2.49 Non plastic 0.00 29.5

13 Non elastic 24.20 1.43 2.45 Non plastic

04 23.00 1.43 2.46 Non elastic 0.00 32.5 03 24.20 1.42 2.46 Non plastic

24.10 1.42 2.47 Non plastic 02 24.50 1.41 2.47 Non Dias tic 0.00 32.5 01 23.00 1.42 2.46 Non plas lie 0.00 33.0

11

Page 77: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

design point soil & material testing,

structure & services consultants, engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute ( Signature Building } at Gajariya farm, Sultanpur road I Lucknow

BORE HOLE NO -4 LOCATION OF W.T. 2.30 mt. below G.L. in the month of August, 2014 ( ADMIN BLOCK)

Partide Size I

Soil Distribution % Finer Partide size moistur Densities

Atterbelg's Limits c s distribution e ~fie (%) 0 Depth p Classifi than Cc (Kg/ (m) T cation 4.75 4.75 4.75 4.75 ~nd silt day

:on tent Dry ufllvity

LL I PL I Pl an2) (deg.)

mm mm mm mm %)

I I 1.()() 08 SM 100 100 100 33 67 22 11 13.60 1.47 2.53 Non plastic 0.00 30.0

2.50 09 ML 100 100 100 59 41 45 14 24.30 1.51 2.54 Non plastic

4.00 13 SMSP 100 100 100 11 24.10 1.45 2.54 Non plastic 0.00 31.0

5.50 15 SMSP 100 100 100 10 90 07 03 24.00 1.44 2.48 Non plastic 0.00 31.0

7.00 17 SP 100 100 99 05 24.10 1.42 2.47 Non plastic

8.50 18 SP 100 100 100 05 95 03 02 23.90 1.41 2.47 Non plastic 0.00 32.5

10.0 21 SP 100 100 95 05 95 04 01 24.20 1.42 2.48 Non plastic 0.00 325

11.5 22 SP 100 100 99 04 24.40 1.43 2.45 Non olastic

ts

Page 78: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

... _

design point soil & material testing,

slructure & services consultants. engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute ( Signature Building lat Gajariya farm, Sultanpur road I Lucknow

BORE HOLE NO -5 LOCATION OF W.T. 1.20 mt. below G.L. in the month of August , 2014 ( ADMIN BLOCK)

Partide Size Partida size moistur Atterbelg's Limits

Depth s Soil Distribution % Finer distribution Densities Specific {%)

c 0 p Oassifi than

e Cc (Kg/ (m) T cation 4.75 4.75 4.75 ~.75 sand Sill day

Content Dry Gravity LL I PL I Pl an2) (deg.)

mm mm mm mm (%)

I I 1.00 07 SM 100 100 100 37 63 25 12 14.20 1.45 2.51 Non plastic 0.00 29.5

2.50 09 SMSP 63 78 77 05 23.80 1.46 2.50 Non elastic 0.00 30.5 4.00 11 SMSP 95 94 94 08 87 05 03 23.90 1.45 2.51 Non plastic 0.00 30.5 5.50 15 SP 100 100 100 05 95 03 02 2420 1.44 2.46 Non elastic

7.00 18 SP 100 100 99 05 24.90 1.43 2.46 Non plastic

8.50 19 SP 100 100 95 04 96 03 01 24.00 1.44 2.45 Non elastic 0.00 31.5 10.0 21 SP 100 100 95 05 24.30 1.43 2.43 Non plastic 0.00 32.0

11.5 24 SP 100 100 100 03 97 03 00 24.50 1.41 2.41 Non plas lie 0.00 32.5

II

Page 79: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

design point soil & material testing,

structure & services consultants, engineering survey & pile foundations

Result sheeU bore log chart for construction of SUper speciality Cancer Institute ( Signature Building l at Gajariya farm, SUltanpur road I Lucknow

BORE HOLE NO -o LOCATION OF W.T. 1.20 mt. below G.L. in the month of August, 2014 ENTRANCE SQUARE.

Partide Size Partida size moistur Alterberg's Limits Depth s Soil Distribution % Finer distribution Densities

Specific (%) c 0 p Classifi than e Cc (Kg/ (m) T cation 4.75 4.75 4.75 4.75 $and silt day Content Dry Gravity LL I PL I Pt an2) (deg.)

mm mm mm mm (%)

I I 1.00 06 SM 100 100 100 29 71 18 11 14.20 1.45 2.51 Non plastic 0.00 29.5 2.50 08 SMSP 100 100 100 09 91 05 04 24.10 1.46 2.50 Non elastic 400 11 SMSP 83 78 77 10 24.30 1.45 2.48 Non plaslic 0.00 30.5 5.50 12 SMSP 100 100 100 10 90 06 04 24.20 1.46 2.49 Non elastic 0.00 31.5

I I

20

Page 80: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

design point soil & material testing,

structure & services consultants, engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute ( Signature Building } at Gajariya farm, SUltanpur road I Lucknow

BORE HOLE NO -7 LOCATION OF W.T. 1.20 mt. below G.L. in the month of August , 2014 ENTRANCE SQUARE.

Partida Size Partide size moistur Alterberg's Limits Depth

Soil Distributim % Finer distributim B

Densities Specific (%) c 0 SPT aassifi than Cc (Kg/ (m) cation 4.75 4.75 4.75 ~.75 sand silt day

.;;'!'tent Dry

:::ravity LL I PL I Pl an2) (deg.)

mm mm mm mm %)

I I t.00 06 SM 100 100 98 32 14.10 t.45 2.49 Non plastic 0.00 29.5 2.50 07 ML 100 100 100 55 45 43 12 24.40 1.51 2.54 Non plastic 4.00 10 SMSP 100 100 99 11 24.50 1.43 2.45 Non plastic 5.50 11 SMSP 100 100 95 07 93 05 02 24.00 1.43 2.46 Non plastic 0.00 31.5

21

Page 81: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

/'

design point soil & material testing,

structure & services consuttants, engineering survey & pile foundations

Result sheeU bore log chart for construction of super speciality Cancer Institute ( Signature Building l at Gajariya farm, SUltanpur road I Lucknow

BORE HOLE NO -8 LOCATION OF W.T. 1.40 mt. below G.L. in the month of August, 2014 (OT BLOCK)

Partide Size Partida size moistur Atterberg's Limits s Soil Distribution % Finer distribution e Densities Specific (%) c 0 Depth p Classifi than Cc (Kg/

(m) -ontent ~ravity (deg.) T cation 4.75 4.75 4.75 ~.75 sand silt day %) Dry LL I PL I Pl an2)

mm mm mm h1m I I

1.00 08 SM 100 100 98 44 66 32 12 14.00 1.45 2.48 Non plastic 0.00 29.5

2.50 11 ML 100 100 100 54 45 42 12 24.10 1.51 2.54 Non plaslic

4.00 13 SMSP 100 100 100 11 24.30 1.45 2.54 Non plaslic 0.00 300

550 16 SMSP 100 100 100 10 90 07 03 24.50 1.44 2.48 Non plastic 0.00 31.0

7.00 17 SP 100 100 99 05 25.20 1.42 2.47 Non plastic

8.50 22 SP 100 100 100 05 95 03 02 24.70 1.41 2.47 Non plastic 0.00 32.5

10.0 23 SP 100 100 95 05 95 04 01 24.60 1.42 2.48 Non plastic 0.00 32.5

n

Page 82: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

design point soil & material testing,

structure & services consultants, engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute ( Signature Building lat Gajariya farm, Sultanpur road I Lucknow

BORE HOLE NO -9 LOCATION OF W.T. 1.20 mt. below G.L. in the month of August, 2014 (OT BLOCK)

Partide Size Partidesize moistur Atterbefg's Limits s Soil Distribution % Finer Densities c

Depth p aassifi than distribution e Specific (%)

Cc (Kg/ 0 (m) T caUon 4.75 4.75 4.75 4.75 sand Silt day

Content Dry Gravity LL I PL I Pl cm2) (deg.)

mm mm mm mm (%)

I I 1.()0 07 SM 100 100 100 33 67 22 11 11.ro 1.47 2.52 Non olastic 0.00 29.5

2.50 OB ML 100 100 100 59 41 45 14 24.30 1.51 2.50 Non plastic

4.00 10 SMSP 84 84 81 06 24.30 1.45 2.51 Non plastic 0.00 30.5

5.50 15 SMSP 100 100 100 OB 92 06 02 24.20 1.44 2.46 Non plastic

7.00 17 SP 100 100 99 05 24.50 1.43 2.46 Non nlastic

8.50 19 SP 100 100 95 04 96 03 01 24.00 1.44 2.45 Non plastic 0.00 31.5

10.0 18 SP 100 100 95 05 24.75 1.43 2.43 Non plastic 0.00 32.0

L 23

Page 83: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

r-

design point soil & material testing,

structure & services consultants, engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute ( Signature Building ) at Gaiarlya farm, Sultanpur road , Lucknow

BOREHOLEN0-10 ( IPD BEHIND OT Block) LOCATION OF W.T. 1.50 mt. below G.L. in the month of August, 2014

Partide Size Partida size moistur Alterberg's Limits Depth s Soil Distributioo % Finer distributioo e Densities Specific (%) c 0 (m)

p Oassifi than :on tent - ,wvi!y Cc (Kg/ (deg.)

T catioo 4.75 4.75 4.75 4.75 sand silt day Dry LL I PL I Pl cm2) mm mm mm mm

%)

I I 1.00 06 SM 100 100 100 38 62 29 09 13.40 1.51 2.57 Non plastic 0.00 29.5

2.50 07 SM 100 100 100 34 66 23 11 24.10 1.47 2.52 Non plastic 4.00 09 SMSP 100 100 100 11 89 07 04 2430 1.42 2.45 Non plastic

5.50 12 SMSP BJ 78 77 10 24.40 1.44 2.44 Non plastic 0.00 30.0

7.00 16 SMSP 100 100 100 08 92 05 03 24.50 1.44 2.46 Non plastic 0.00 30.5

8.50 19 SP 100 100 99 05 24.20 1.43 2.46 Non plastic

10.0 19 SP 100 100 95 04 96 03 01 24.50 1.42 2.44 Non plastic 0.00 31.5

11.5 20 SP 100 100 100 04 96 04 00 24.50 1.42 2.43 Non plastic

13.0 22 SP 100 100 100 05 09 69 22 24.40 1.42 2.41 Non plastic 0.00 32.5

14.5 25 SP 100 100 100 06 24.60 1.41 2.40 Non plastic

16.0 27 SP 100 100 100 04 96 02 02 24.30 1.39 2.38 Non plastic 0.00 34.0

17.5 28 SP 100 100 100 03 97 03 00 24.20 1.42 2.41 Non plastic

19.0 29 SP 100 100 100 04 96 03 01 24.40 1.41 2.40 Non plastic 0.00 33.5

20.0 29 SP 100 100 100 05 2410 1.39 2.38 Non elastic

Page 84: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

r

design point soil & material testing,

structure & services consultants, engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute l Signature Building ) at Gajariya farm. Sultanpur road I Lucknow

BORE HOLE NO -11 LOCATION OF WT 1 20 mt below G L in the month of August 2014 . . .. . . . ( IPD BEHIND OT Block)

Partide Size Partidesize moistur Atterbelg's Lirnils

Depth s Soil Distribution % Finer distribution Densities

Specific (%) c 0 p Classifi than e Cc (Kg/

(m) T cation 4.75 4.75 4.75 ~.75 sand silt day

Content Ory

Gravity LL I PL I Pl an2) (deg.)

mm mm mm mm (%)

I I 1.00 07 SM 100 100 100 29 71 18 11 17.70 1.45 2.51 Non Dias tic 0.00 30.0

2.50 08 SM 100 100 100 32 24.10 1.45 2.50 Non plastic

4.00 10 SMSP 100 100 100 09 91 05 04 2430 1.46 2.50 Non plastic

5.50 12 SMSP 83 78 77 10 24.30 1.45 2.48 Non plastic 0.00 30.5 7.00 14 SMSP 100 100 100 10 90 06 04 24.20 1.46 2.49 Non plastic 0.00 3L5

8.50 15 SP 100 100 99 05 2400 1.43 2.46 Non plastic 10.0 15 SP 100 100 95 06 24.75 1.42 2.45 Non plastic 0.00 32.0

11.5 19 SP 100 100 100 05 95 04 01 24.30 1.42 2.44 Non plastic

13.0 19 SP 100 100 100 03 97 03 00 24.50 1.42 2.41 Non olastic 14.5 23 SP 100 100 100 04 96 03 01 24.60 1.41 2.40 Non olaslic 0.00 32.5

160 24 SP 100 100 100 05 24.60 1.39 2.38 Non plastic

17.5 19 SP 100 100 99 04 24.00 1.43 2.45 Non plastic 0.00 33.0

19.0 26 SP 100 100 95 05 95 04 01 25.30 1.43 2.42 Non plastic

20.0 26 SP 100 100 100 04 96 03 01 25.10 1.42 2.40 Non plastic 0.00 33.5

Page 85: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

r

design point soil & material testing,

structure & services consultants, engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute { Signature Building l at Gajariya farm, Sultanpur road I Lucknow

BORE HOLE N0-12 LOCATION OF W.T. 1.50 mt. below G.L. in the month of August , 2014 ( IPD BEHIND OT Block)

Partide Size Partide size Attefbelg's Limits

Depth Soil Distribution % Finer distribution mcistur Densities

~fie (%) c 0 SPT aassifi than a Content Cc (Kg/

(m) cation 4.75 4.75 4.75 4.75 sand silt day %) Dry

~ravity LL I PL I Pl an2) (deg.)

mm mm mm mm I I

1.00 13 SM 100 100 98 32 15.10 1.45 2.49 Non plastic 0.00 29.5

2.50 15 SMSP 100 100 100 11 89 07 04 23.40 1.44 2.46 Non plastic 0.00 31.5

4.00 16 SMSP 100 100 99 10 24.25 1.43 2.45 Non plastic

5.50 19 SMSP 100 100 95 10 90 00 03 23.90 1.43 2.46 Non plastic 0.00 32.5

7.00 19 SP 100 100 100 04 96 03 01 24.20 1.42 2.46 NOil plastic

8.50 20 SP 100 100 99 05 24.10 1.42 2.47 Non plastic

10.0 23 SP 100 100 100 05 95 03 02 24.50 1.41 2.47 Non elastic 11.5 26 SP 100 100 95 05 95 04 01 24.30 1.42 2.48 Non plastic 0.00 32.5

13.0 19 SP 100 100 99 04 24.40 1.43 2.45 Non plastic

14.5 26 SP 100 100 95 05 95 04 01 24.30 1.43 2.42 Non olastic 0.00 33.0

16.0 26 SP 100 100 100 04 96 03 01 24.10 1.42 2.40 Non plastic

17.5 28 SP 100 100 100 05 95 03 02 24.20 1.41 2.41 Non elastic

19.0 31 SP 100 100 100 04 96 04 00 24.60 1.42 2.39 Non plastic 0.00 32.0 20.0 32 SP 100 100 100 02 98 02 00 24.80 1.40 238 Non plastic

Page 86: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

design point soil & material testing,

structure & services consultants, engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute ( Signature Building l at Gajariva farm, Sultanpur road • Lucknow

BORE HOLE NO -13 LOCATION OF W.T. 1.50 mt. below G.L. in the month of Augusl 2014 ( IPD BEHIND OT Block)

Partida Size Partida size moistur Attert>erg's Limils

Depth SP Sal Distribution % Finer distribution ~

Densities ~fie (%) c 0

(m) T Classifi than Content 'r.,.,,vily Cc (Kg/ (deg.) cation 4.75 4.75 4.75 4.75 sand silt day %) Dry LL I PL I Pl cm2)

mm mm mm mm I I

1.00 06 SM 100 100 100 31 14.BO 1.45 2.48 Non plastic

2.50 08 SMSP 100 100 100 10 90 07 03 24.00 1.44 2.48 Non plastic 0.00 30.0 4.00 10 SMSP 100 100 100 11 24.10 1.45 2.54 Non plaslic 0.00 31.0 5.50 15 SMSP 100 100 100 10 90 07 03 24.30 1.44 2.48 Non plastic 0.00 31.0 7.00 19 SP 100 100 99 05 24.30 1.42 2.47 Non plastic

8.50 22 SP 100 100 100 05 95 03 02 24.50 1.41 2.47 Non plastic 0.00 32.5 100 24 SP 100 100 95 05 95 04 01 24.40 1.42 248 Non plastic 0.00 32.5 11.5 25 SP 100 100 99 04 24.40 1.43 2.45 Non plastic

13.0 26 SP 100 100 95 05 95 04 01 25.30 1.43 242 Non plastic 0.00 33.0

14.5 26 SP 100 100 100 04 96 03 01 24.70 1.42 2.40 Non plastic

160 28 SP 100 100 100 04 96 03 01 24.20 1.42 2.40 Non plastic

17.5 30 SP 100 100 100 05 95 03 02 24.30 1.41 2.41 Non plastic

190 32 SP 100 100 100 03 24.40 1.40 2.40 Non plastic 0.00 32.5 20.0 33 SP 100 100 100 03 97 02 01 24.60 1.39 2.39 Non plastic

Page 87: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

design point so~ & material testing,

structure & services consultants, engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute ( Signature Building } at Gajariya farm, Sultanpur road I Lucknow

BORE HOLE N0-14 LOCATION OF W.T. 1.00 mt. below G.L. in the month of August , 2014

{EMERGENCY BUILDING).

Partida Size Partida size moistur Atterbelg's Limits

Depth s Soil Distribution % Finer distribution Densities Specific (%) c 0

p aassifi than e Cc (Kg/

(m) T cation 4.75 4.75 4.75 ~.75 ~nd Silt day Content Ory Gravity

LL I PL I Pl an2) (deg.)

mm mm mm lnm (%)

I I 1.()() 05 SM 83 78 77 07 24.30 1.47 2.50 Non plastic 0.00 30.5

2.50 05 MLCL 100 100 100 74 26 56 18 24.20 1.54 2.56 25 21 04

4.00 08 MLCL 100 100 99 73 24.90 1.54 2.55 26 20 06

5.50 11 SMSP 100 100 95 11 89 06 05 24.10 1.44 2.45 Non plastic 0.00 31.5

7.00 13 SMSP 100 100 95 11 24.00 1.43 2.43 Non plastic 0.00 32.0

8.00 15 SMSP 100 100 100 10 90 05 05 24.80 1.41 2.41 Non Dias tic 0.00 32.5

Page 88: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

design point soil & material testing,

structure & services consultants, engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute ( Signature Building ) at Gajariya farm, Sultanpur road I Lucknow

BORE HOLE N0-15 LOCATION OF W.T. 0.70 mt. below G.L. in the month or August , 2014 (EMERGENCY BUILDING).

Partida Size Partidesize moistur Atterberg's Limits

Depth s Soil Distribution % Finer distribution Densities Specific (%) c 0

p Classifi than e Cc (Kg/

(m) T catioo 4.75 4.75 4.75 4.75 sand silt day Content Ory

Gravity LL I PL I Pl an2) (deg.)

mm mm mm rnm (%)

I I 1.00 04 ML 100 100 100 56 44 44 12 23.70 1.52 2.57 Non elastic 0.05 24.0

2.50 05 CL 100 100 97 80 20 71 19 24.20 1.60 2.61 30 20 10 0.132 0.15 20.0

4.00 07 CL 100 100 96 96 74 63 31 24.10 31 21 10

550 09 CL 100 100 97 96 04 74 22 23.60 2.63 2.63 32 20 12 0131 0.15 20.0

7.00 12 CL 100 100 100 99 01 76 23 23.00 31 21 10

800 12 SMSP 100 100 95 09 24.l) 1.42 2.45 Non plastic 0.00 32.0

Page 89: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

r-

design point soil & material testing,

structure & services consultants, engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute ( Signature Building l at Gajariya farm, SUltanpur road , Lucknow

BORE HOLE NO -16 (IPD)

LOCATION OF W.T. 0.70 mt. below G.L. in the month of August , 2014

Depth s p

(m) T

0.50 1.00 OJ 2.50 05 4.00 09 5.50 13 7.00 15 850 17 100 18 11.5 24 13.0 25 14.5 26 16.0 26 17.5 28

19.0 30 20.0 31

Partide Size Partida size moistur Atteibelg's Limits Sal Distribution % Finer distribution Densities Specific (%) c 0

Classifi than e Cc (K!r'

cation 475 4.75 4.75 4.75 ~nd sill day Content Dry Gravity LL I PL I Pl an2)

(deg.)

mm mm mm mm (%)

I I SM 100 100 100 30 70 17 11 Non plastic

MLCL 100 100 100 67 33 51 16 24.10 1.53 2.60 26 I 21 I 05 0.103 0.08 23 .0

MLCL 100 100 100 64 36 50 14 24.30 1.51 2.60 26120 1 06 SMSP 100 100 100 11 24.30 1.45 2.48 Non plastic 0.00 30.5

SMSP 100 100 100 10 90 06 04 24.20 1.46 2.49 Non plastic 0.00 31.5

SMSP 100 100 99 09 23.90 1.45 2.46 Non plastic

SP 100 100 95 06 24.10 1.42 2.45 Non plastic 0.00 32.0

SP 100 100 100 05 95 04 01 24.00 1.42 2.44 Non plastic

SP 100 100 95 05 95 04 01 23.90 1.42 2.48 Non plastic 0.00 32.5

SP 100 100 99 04 24.40 1.43 2.45 Non plastic

SP 100 100 95 05 95 04 01 2530 1.43 2.42 Non plastic 0.00 33.0

SP 100 100 100 04 96 03 01 24.70 1.42 2.40 Non plastic

SP 100 100 100 04 96 03 01 24.20 1.42 2.40 Non plastic

SP 100 100 100 05 95 OJ 02 24.30 1.41 2.41 Non plastic 0.00 32.0

SP 100 100 100 04 96 OJ 01 24.70 1.42 2.40 Non plastic 0.00 32.5

Result sheeU bore log chart for construction of Super speciality Cancer Institute ( Signature Building l at Gajariya farm, SUltanpur road , Lucknow

Page 90: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

, -.... ,

BORE HOLE NO -17 ( IPD)

Soil Depth

SPT Classifi (m) catioo

0.50 SM 1.00 OS MLCL 2.50 06 MLCL 4.00 07 SMSP 5.50 09 SMSP 7.00 10 SMSP 8.50 13 SP 10.0 16 SP 11.5 20 SP 13.0 24 SP 14.5 26 SP 16.0 28 SP 17.5 29 SP 19.0 31 SP 20.0 , 32 SP

Partida Size Distribution % Finer than 4.75 4.75 475 ~.75 mm mm mm mm

100 100 100 32 100 100 100 72 100 100 100 69 100 100 99 10 100 100 95 10 100 100 100 11 100 100 99 OS 100 100 100 OS 100 100 95 OS 100 100 99 04 100 100 95 OS 100 100 100 04 100 100 100 OS 100 100 100 04 100 100 100 02

Partida size distribution

sand silt day

68 20 12

31 54 15

90 06 03 69 07 04

95 03 02 95 04 01

95 04 01 96 03 01 95 03 02 96 04 00 98 02 00

design point soil & material testing,

structure & services consultants, engineering survey & pile foundations

LOCATION OF W.T. 0.50 mt. below G.L. in the month of August , 2014

Alterberg's Limits moisbJr Densities c

a Content ~fie (%) Cc (Kg/ 0 %) Dry

::;ravity LL I PL I Pl an2) (deg.)

I I Non plastic

24.30 1.52 2.61 26121105 0.00 29.5 24.40 1.51 2.59 27 I 21 I 06 0.00 31.0 24.20 1.43 2.45 Non Dias tic 24.00 1.43 2.46 Non plastic 0.00 31.5 24.20 1.42 2.46 Non plastic 24.10 1.42 2.47 Non elastic 24.50 1.41 2.47 Non nlo<tic 24.30 1.42 2.48 Non plastic 0.00 32.0 24.40 1.43 2.45 Non plastic 24.30 1.43 2.42 Non Dlastic 0.00 33.0 24.10 1.42 2.40 Non plastic 24.20 1.41 2.41 Non Dlastic 24.60 1.42 2.39 Non plastic 0.00 32.0 24.60 1.40 2.38 Non plastic

31

Page 91: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

-,

design point so~ & material testing,

structure & services consultants, engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute ( Signature Building lat Gajariya farm, SUltanpur road I Lucknow

BORE HOLE N0-18 LOCATION OF WT O 70 mt below G L in the month of August 2014 .. .. . IPD\

Partide Size Partidesize moistur Attelberg's Lirnils Depth s Soil Distribution % Finer distribution

Densities Specific {%) c 0 p Classifi than e Cc (Kg/

(m) T cation 4.75 4.75 4.75 ~.75 sand silt day Content Ory

Gravity LL I PL I Pl cm2) (deg.)

mm mm mm hlm (%)

I I 1.00 06 SM 100 100 100 32 24.10 1.45 2.50 Non plastic

2.50 07 SMSP 100 100 100 09 91 05 04 24.30 1.46 2.50 Non plastic

4.00 11 SMSP 83 78 77 10 24.30 1.45 2.48 Non Dias tic 0.00 30.5

5.50 13 SMSP 100 100 100 10 90 06 04 24.20 1.46 2.49 Non plastic 0.00 31.5

7.00 16 SP 100 100 99 05 24.80 1.43 2.46 Non plastic

8.50 18 SP 100 100 95 06 24.75 1.42 2.45 Non plastic 0.00 32.0

10.0 20 SP 100 100 100 05 95 04 01 24.30 1.42 2.44 Non Dias tic

11 .5 22 SP 100 100 100 03 97 03 00 24.50 1.42 2.41 Non plastic

130 24 SP 100 100 100 04 96 03 01 24.!iO 1.41 2.40 Non nl~•tic 0.00 32.5

14.5 25 SP 100 100 100 05 24.!iO 1.39 2.38 Non plastic

16.0 27 SP 100 100 99 04 2480 1.43 2.45 Non plastic 0.00 32.5

17.5 29 SP 100 100 97 05 95 04 01 25.10 1.43 2.43 Non plastic

190 31 SP 100 100 95 05 95 04 01 25.30 1.43 2.42 Non plastic 0.00 33.0

20.0 33 SP 100 100 100 04 96 03 01 Non plastic

Page 92: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

design point soil & material testing,

strudure & services ex>nsultants, engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute { Signature Building ) at Gajarlya farm, Sultanpur road , Lucknow

BORE HOLE N0-19 (IPD)

Partida Size s Soil Oistributioo % Finer

Depth p Classifi than (m) T calioo 4.75 4.75 4.75 4.75

mm mm mm mm

0.50 CL 100 100 100 81 1.00 04 MLCL 100 100 100 67

2.50 06 MLCL 100 100 100 64 4.00 08 SMSP 100 100 100 11 5.50 12 SMSP 100 100 100 10

7.00 13 SMSP 100 100 99 09 8.50 18 SP 100 100 95 06

10.0 18 SP 100 100 100 05 11.5 22 SP 100 100 95 05 13.0 25 SP 100 100 99 04

14.5 24 SP 100 100 95 05 16.0 24 SP 100 100 100 04

17.5 26 SP 100 100 100 04

19.0 29 SP 100 100 100 05 20.0 29 SP 100 100 100 04

LOCATION OF W.T. 0.50 mt. below G.L. in the month of August , 2014

Partidesize moistur Attertlelg's Limits distribulioo

Densities Specific {%) c 0 e Cc (Kg/

sand silt day Content Ory Gravity

LL PL Pl an2) {deg.)

(%)

19 62 19 28 21 07

33 51 16 24.00 1.54 2.60 26 20 06 0.106 0.09 22 .0

36 50 14 24.20 1.56 2.62 26 21 05 24.10 1.45 2.48 Non plastic 0.00 30.5

90 06 04 24.20 1.46 2.49 Non plastic 0.00 31.5 24.30 1.45 2.46 Non plastic 24.20 1.43 2.44 Non plastic 0.00 32.0

95 04 01 24.00 1.42 2.42 Non plastic

95 04 01 24.10 1.42 2.43 Non plastic 0.00 32.5

24.70 1.43 2.42 Non plastic

95 04 01 25.10 1.43 2.42 Non plastic 0.00 33.0

96 03 01 24.70 1.42 2.40 Non plastic

96 03 01 24.20 1.42 2.43 Non plastic

95 03 02 24.30 1.41 2.42 Non plastic 0.00 32.0

96 03 01 24.70 1.42 2.40 Non plastic

Page 93: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

design point so,1 & material testing,

structure & services consultants, engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute ( Signature Building ) at Gajariya farm. SUltanpur road, Lucknow

BORE HOLE NO -20 (IPD)

Depth SP Sal

(m) T Oassifi catioo

1.00 06 SM 2.50 07 SI.ISP 4.00 10 SMSP 5.50 14 SMSP 700 16 SP 850 18 SP 10.0 20 SP 11.5 21 SP 13.0 24 SP 14.5 25 SP 16.0 27 SP 17.5 28 SP 19.0 31 SP 20.0 31 SP

Partide Size Distlibution % Finer than 4.75 4.75 4.75 4.75 mm mm mm mm

100 100 100 31 100 100 100 11 100 100 100 09 89 BB 84 OB 100 100 99 05 100 100 100 05 100 100 100 05 100 100 99 04 100 100 95 05 100 100 100 04 100 100 100 04 100 100 100 05 100 100 100 03 100 100 100 03

LOCATION OF W.T. 1.00 mt. below G.L. in the month of Augus~ 2014

Partida size moistur Alterbelg's Limits distlibutioo a Densities

~fie (%) c 0

~ootent -:~,..;ty Cc (Kg/ (deg.) ~d silt day %) Dry LL I Pl I Pl an2)

I I 24.40 146 253 Non ~ 0.00 29.5

89 07 04 24.10 1.44 251 Non wslic 24.10 1.45 250 Non plastic 0.00 30.0

81 05 02 24.30 1.44 2.48 Non plastic 24.30 1.42 2.47 Non plastic

95 OJ 02 24.50 141 247 Non aastx: 0.00 32.5 95 04 01 24.40 1.42 2.48 Non plastic 0.00 325

24.40 1.43 2.45 Non plastic 95 04 01 24.70 1.43 2.42 Non plastic 0.00 33.0 96 03 01 24.50 1.42 2.43 Non plastic 96 03 01 24.20 1.42 2.42 Non plastic 95 03 02 24.:ll 1.41 2.41 Non plastic

24.40 1.40 2.40 Non plastic 0.00 33.0 97 02 01 24.00 139 2.39 Non plastic

Page 94: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

design point soil & material testing.

structure & services consultants. engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute ( Signature Building ) at Gajarlva farm. Sultanpur road • Lucknow

BORE HOLE NO -21 (HOUSING)

Partide

Depth s Soil Distribution p aassifi than (m) T catioo 4.75 4.75

mm mm

1.00 09 SM 100 100 2.50 10 SM 100 100 4.00 11 SMSP 83 78 5.50 15 SMSP 100 100 7.00 19 SP 100 100 8.50 20 SP 100 100 10.0 23 SP 100 100 115 24 SP 100 100

Size % Finer

4.75 4.75 mm mm

100 38 100 31 n 10 100 OB 99 05 95 06 100 05 95 05

LOCATION Of W.T. 4.00 mt. below G.L. in the month of August, 2014

Partide size moistur Alterl>etg's Limits distribution ~

Densities Specific (%) c 0 Cc (Kg/ ~d silt day

"~tent Ory

... uvily u I Pl I Pl an2) (deg.) %)

I I 62 29 09 11.30 1.50 254 Non plastic 0.00 29.5 69 20 11 1320 145 254 Non plas Ii:

23.lll 1.44 2.48 Non Dias Ii: 0.00 30.0 92 05 03 24.00 1.44 2.46 Non plas tic 0.00 30.5

24.20 1.43 2.46 Non Dias Ii: 94 04 02 24.50 1.42 2.44 Non plastic 0.00 315

24.60 1.42 2.43 Non Dias tic 24.40 1.42 2.44 Non plastic 0.00 31.5

Page 95: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

design point soil & material testing,

structure & services consultants. engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute ( Signature Bullding ) at Gajariva farm, Sultanpur road I Lucknow

BORE HOLE NO -22 (HOUSING)

Partide Size

Depth s Soil Distribution % Finer p Oassifi than (m) T cation 4.75 4.75 4.75 ~.75

mm mm mm mm

1.00 08 SM 100 100 100 29 250 09 ML 100 100 100 59 4.00 12 SMSP BJ 78 77 10 5.50 15 SMSP 100 100 100 10 7.00 18 SP 100 100 99 05 850 21 SP 100 100 95 06 10.0 24 SP 100 100 100 05 11.5 25 SP 100 100 95 04

LOCATION OF W.T. 3.00 mt. below G.L. In the month of August , 2014

Partida size moistur Alterberg's Limits distribution Densities

Specific (%) c 0 e Cc (Kg/

sand silt day Content Dry Gravity

LL I PL I Pl an2) (deg.) (%)

I I 71 18 11 1270 1.47 2.51 Non plaslJc 0.00 JO.O 41 45 14 13.30 151 2.50 Non plastic

24.10 1.45 2.48 Non plasbc 0.00 31.0 90 06 04 24.20 1.46 2.49 Non Dias tie 0.00 31.5

24.00 1.43 2.46 Non pl as tie 24.JO 1.42 2.45 Non plastic 0.00 320

95 04 01 2400 1.42 2.44 Non plasbc

96 03 01 24.50 1.42 2.44 Non plastic 0.00 32.5

Page 96: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

design point soil & material testing,

structure & services consultants, engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute { Signature Bullding ) at

BORE HOLE NO -23 (HOUSING)

Depth Soil

SPT aassi6 (m) cation

1.00 07 SM 2.50 10 ML 4.00 13 SMSP 5.50 15 SMSP 7.00 19 SP B.50 24 SP 10.0 25 SP 11.5 27 SP

Partide Size Distribution % F1r1er than 4.75 4.75 4.75 ~.75 mm mm mm mm

100 100 98 32 100 100 100 57 100 100 95 10 100 100 100 08 100 100 99 05 100 100 95 04 100 100 100 04 100 100 100 05

Galariya farm, Sultanpur road I Lucknow

LOCATION OF W.T. 3.00 mt. below G.L in the month of August , 2014

Particle size moisbJr Alterberg's Limits distribution B

Densities ~.fie (%) c 0 Cc (Kg/

sand silt day =tent

Dry _ravity

LL I PL I Pl an2) (deg.) %)

I I 10.10 1.45 2.49 Non plastic 0.00 29.5

43 44 13 17.40 1.54 2.56 Non olaslic 90 06 04 23.90 1.43 246 Non otasbc 0.00 325 92 05 03 24.20 1.42 2.46 Non Dlasllc

24.10 1.42 2.47 Non plas lie 96 OJ 01 24.50 1.42 2.44 Non Illas lie 0.00 31.5 96 04 00 24.50 1.42 243 Non DlaS lie 95 OJ 02 24.50 1.41 2.47 Non Dlasllc

JI

Page 97: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

design point soil & material testing,

slrudure & services consultants, engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute ( Signature Bulldlng } at Gajariya farm, Sultanpur road , Lucknow

BORE HOLE NO -24 (HOUSING)

Partida

Depth s Soil Distribution p Oassifi than

(m) T cation 4.75 4.75

mm mm

1.00 oa SM 100 100 2.50 09 SMSP 100 100 400 13 SMSP 100 100 5.50 15 SMSP 100 100 7.00 17 SP 100 100 8.50 18 SP 100 100 10.0 21 SP 100 100 11.5 22 SP 100 100

Size Partida % Finer distribution

4.75 ~.75 sand silt mm mm

100 33 67 22 100 12 88 08 100 11 100 10 90 07 99 05 100 05 95 03 95 05 95 04 99 04

LOCATION OF W.T. 1.90 mt. below G.L. in the month of Augus~ 2014

size mdstur Allert>e,g's Limits e Densities

eiieafic (%) c 0 Cc (Kg/ day

rr.ntent Dry

_'!!!vity LL I PL I Pl an2) (deg)

%)

I I 11 11.60 1.47 251 Non plastic 0.00 29.4 04 24.30 1.44 2.45 Non plastic

2410 1.45 2.47 Non Olastic 0.00 30.5 03 24.00 1.44 2.48 Non plastic

24.10 142 2.47 Non IUS!ic 02 23.90 1.43 2.47 Non plastic 0.00 32.5 01 24.Zl 1.43 2.45 Non nlaslic 0.00 32.5

24.40 1.42 2.43 Non plastic

L

Page 98: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

design point soil & material testing,

structure & services consuttants, engineering survey & pile foundations

Result sheeU bore log chart for construction of Super speciality Cancer Institute ( Signature Building } at Gajariya farm, Sultanpur road I Lucknow

BORE HOLE NO -25 (HOUSING)

Particle Size s Sol Distribution % Finer

Depth p Classifi than {m) T cation 4.75 4.75 4.75 ~.75

mm mm mm mm

1.00 09 SM 100 100 100 34 2.50 12 SMSP 100 100 100 06 4.00 14 SMSP 95 94 94 08 5.50 16 SP 100 100 100 05 7.00 18 SP 100 100 99 05 8.50 22 SP 100 100 95 04 10.0 24 SP 100 100 95 05

11.5 24 SP 100 100 100 03

Partida size distribution

sand Silt day

66 23 11

87 05 03 95 03 02

96 03 01

97 03 00

LOCATION OF W.T. 1.60 mt. below G.L. in the month of August , 2014

moistur Altefberg's Limits Densities

Specific (%) c 0 e Cc (Kg/

Content Dry

Gravity LL I PL I Pl cm2) (deg.)

(%)

I I 17.20 1.49 2.53 Non plastic 0.00 30.0 24.10 1.46 2.50 Non plastic 24.20 1.45 2.48 Non plastic 0.00 30.5 24.30 1.44 2.46 Non plastic

24.50 1.43 2.44 Non plastic 24.fiO 1.44 2.43 Non olastic 0.00 31.5 24.30 1.43 2.42 Non olastic

24.40 1.41 2.42 Non plastic 0.00 32.0

Page 99: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

LIST OF APRROVED MAKES For "Medical Gas Pipeline System·

Sr. No. Descriotlon List of Approved Makes Q(lf:l!'lUI V Pr 1- rJT 1

1. Main Cylinder manifold complete with middle frame with chain for individual cylinder along with Non Return

Beacon Medaes /Penlon Medical Gas/ Solutions/OHIO Medical/Allied Health Care/Dragger/ Tritech Medical Inc. USA/MIM-UK/ Delta P

Valves for every cylinder and copper pig tail pipes. ( • cylinders will be provided by the hospital) (Fully Complies and meets with HTM 02-01 standards of UK or NFPA-99 standards of USA/EN ISO 7396-1)

2. Imported Fully automatic control panel (Fully Complies Beacon Medaes/Penlon Medical Gas and meets with HTM 02-01 standards of UK or NFPA- Solutions/OHIO Medical /Allied Health

Care/ Dragger/ Tritech Medical Inc.

99 standards of USA /EN ISO 7396-1) USA/MIM-UK/ Delta P

3. Emergency Reserve manifold Beacon Medaesf Penlon Medical Gas ( • cylinders will be provided by the hospital) SolutionslOHIO Medical /Allied Health

Carel Dragger/ T r itech Medical Inc. (Fully Complies and meets with HTM 02-01 standards USA/MIM-UK/ Delta P of UK or NFPA-99 standards of USA /EN ISO 7396-1)

4. Imported Gas Terminal Unit/Outlet Points. Beacon Medaesl Penlon Medical Gas (Fully Complies and meets with HTM 02-01 standards Solutions/OHIO Medical I Allied Health

Care I Dragger/ Tritech Medical Inc. of UK or NFPA-99 standards of USA /EN ISO 7396-1) USA/MIM-UK/ Delta P

5. Imported Oxygen flow Beacon Medaesf Penlon Medical Gas meters with humidifier and adapter. Solutions/OHIO Medical I Allied Health

Care I Dragger/ Precision Medical USA/Tritech Medical Inc/ MIM UK/Therapy Equipment Ltd UK/ Delta

(Fully Complies and meets with HTM 02-01 standards p of UK or NFPA-99 standards of USA !EN ISO 7396-1) It should be CE marked with CE no. or UL Listed with UL

-6. Imported Probe Beacon Medaesf Penlon Medical Gas

(Fully Complies and meets with HTM 02-01 standards Solutions/OHIO Medical I Allied Health Care I Dragger/ Precision Medical USA/ Therapy Equipment Ltd UK/

of UK or NFPA-99 standards of USA /EN ISO 7396-1) It Delta P/ Tritech Medical Inc/ MIM UK should be CE marked with CE no. or UL Listed with UL no.

7. Imported Medical gas hose pipe shall comply with BS Beacon Medaes/Penlon Medical Gas EN ISO 5359 or NFPA 99 OR ASTM All hoses shall incorporate an anti-static SolutionslOHIO Medical I Allied Health

Care I Dragger/ Tritech Medical Inc. USA/MIM UK /Therapy Equipment Ltd UK/ Delta P

8. Medical Vacuum Plant 50 Hz 3 Phase Beacon Medaesf Penlon Medical Gas (Fully Complies and meets with HTM 02-01 standards SolutionslOHIO Medical I Allied Health

Care I Dragger/ T r itech Medical Inc. of UK or NFPA-99 standards of USA/EN ISO 7396-1) USA/MIM-UK/ Delta P

9. Medical Air Plant 50 Hz 3 Phase Beacon Medaesf Penlon Medical Gas (Fully Complies and meets with HTM 02-01 standards SolutionslOHIO Medical I Allied Health

Page 1

~/

Page 100: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

of UK or NFPA-99 standards of USA/EN ISO 7396-1) Care/ Drager/ Tri tech Medical Inc. USA/M IM -UK/ Delta P

Vacuum Unit with Regulator, Collection Jar of 1700 ml 10. made of polysulphone Beacon Medaes/Penlon Medical Gas

with Bracket Solutions/OHIO Medical I Allied Health Care I Dragger/ T herapy Equirment Ltd UK/ Precision Medical USA D elta P/

(Fully Complies and meets with HTM 02-01 standards of UK or NFPA-99 standards of USA /EN ISO 7396-1)

Tritech Medical Inc I MIM UK

11. Imported Low Suction Regulator Beacon Medaes/Penlon Medical Gas Vacuum levels : 0-250 mbar/hPa. Solutions/OHIO Medical I Allied Health

Care I Dragger/ I Therapy Equipment Ltd UK/ Precision Medical USA/

. It should have a D elta P/ MIM UK/ T ritech Medical Inc device with a outlet tubing nipple integrated in the body of the reaulator for a better safety, emeraencv suctions can even be processed. It should be sunntied

I with a over trap safety equipped with a mechanical anti-over flow safety valve and single use antibacterial Plastic filter upfront along with vacuum adaptor. (Fully Complies and meets with HTM 02-01 standards of UK or NFPA-99 standards of USA/EN ISO 7396-1)

12. Imported Theatre Vacuum Unit Beacon Medaes/Penlon Medical Gas Consist of one vacuum regulator and two 2000ml Solutions/OHIO Medical I Allied Health

Care I Dragger/ Therapy Equi) ment Ltd UK/ Precision Medical USA Del ta Pl

polysulphide collection jar and both to be mounted on a trolley. (Fully Complies and meets with HTM 02-01 standards of UK or NFPA-99 standards of USA/EN ISO

Tritech Medical Inc/ M IM UK

7396-1) It should be CE marked with CE no. or UL Listed with UL no.

13. Pressure Reducing Station Beacon Medaes/Penlon Medical Gas Solutions/OHIO Medical I Allied Health Care I Dragger/ T ritech Medical Inc. USA/MIM-UK/ D elta P 1 nese shou ld be mbmlt by tne manufacturers in the above mentioned

14. Electrical Control Panel for Compressed Air & Vacuum air, vacuum and AGSS plants System <Cascadinq I seq.) with single ohase oreventer and time totalise

15. Medical Grade Copper Tube/Pipes Lawton UK/ Beacon Medaes UK/Penton

The piped distribution system shall use copper pipes Medical Gas Solutions UK/ Dragger Germany/Mueller UK/USA/Delta Pl Tritech Medical Inc/ M IM UK/ Ohio

manufactured from phosphorous de-oxidised non- Medical I Allied Health Care arsenical copper to BS EN 1412: 1996 grade CW024A (Cu-DHP), manufactured to metric outside diameters and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half hard) or R290 (hard) . Degreasing of pipe shall be such that there Is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008. As per NHS C11 section 05 all conner tube suooliers are to have BS kite mark and certificate number

Page 101: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

)~

16. Imported Master Alarm Panel Beacon Medaes/Penlon Medical Gas (Fully Complies and meets with HTM 02-01 standards Solutions/OHIO Medical I Allied Health

Care I Dragger ff ritech Medical Inc. of UK or NFPA-99 standards of USA/EN ISO 7396-1) USA/MIM-UK/ Delta P

17. Imported Med Gas Area Alarm Beacon Medaes/Penlon Medical Gas (Fully Complies and meets with HTM 02-01 standards Solutions/OHIO Medical I Allied Health

Care I Dragger ffritech Medical Inc. of UK or NFPA-99 standards of USA/EN ISO 7396-1) USA/MIM-UK/ Delta P

Imported AVSU I Zonal valve box with valves and pressure gauges: Single, Double or more Service Area

18. Valve Unit Beacon Medaes/Penlon Medical Gas (Fully Complies and meets with HTM 02-01 standards Solutions/OHIO Medical I Allied Health

Care I Dragger ffritech Medical Inc. of UK or NFPA-99 standards of USA/EN ISO 7396-1) USA/MIM-UK

19. Isolation Valves in the Risers and Shafts as per Beacon Medaes/Penlon Medical Gas requirement Solutions/OHIO Medical I Allied Health

,,..-.. Care I Dragger ff ritech Medical Inc.

(Fully Complies and meets with HTM 02-01 standards USA/MIM-UK/ Delta P of UK or NFPA-99 standards of USA/EN ISO 7396-1)

20. Imported Vertical Bed Head Panels& Ce1t111g Pendants Beacon Medaes/Penlon Medical Gas (Fully Complies and meets with HTM 02-01 standards Solutions/OHIO Medical I Allied Health

Care I Trilux/Biolume/ Dragger/LM Medical

of UK or NFPA-99 standards of USA/EN ISO 7396-1) It Division Italy/ Tritech Medical Inc USA/MIM -UK/ Delta P

should be CE marked with CE no. or UL Listed with UL

21 . Imported Duplex AGSS System - Twin stand alone Beacon Medaes/Penlon Medical Gas AGSS pumps of 3 phase 2600 I/min or to suit 20 OTs capacity each with Solutions/OHIO Medical I Allied Health

Care I Dragger ffritech Medical Inc. USA/MIM-UK/ delta P

Mounted on single frame with control panel and Separate warning label. One pump will be standby with the other in operation.

(Fully Complies and meets with HTM 02-01 standards of UK or NFPA-99 standards of USA/EN ISO 7396-1) It

22. Imported AGSS Hose Assembly Beacon Medaes/Penlon Medical Gas (Fully Complies and meets with HTM 02-01 standards Solutions/OHIO Medical I Allied Health

Care I Dragger ff ritech Medical Inc. of UK or NFPA-99 standards of USA/EN ISO 7396-1) It USA/MIM-UK/ Delta P should be CE marked with CE no. or UL Listed with UL

IBP Connex/Lawton/Penlon/Flex-Flow/ Janya I Mandev/ Delta P/ Beacon Medaes I Penlon/ Ohio I Allied I Draeger/ Tritech

23. Imported Copper Fittings Medical Inc/ Mueller UK/ USA/ Lawton UK

; / Page 3

Page 102: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

LIST OF ACCEPTABLE MAKES C> (<.. ~ Q \)l V At,E l\YJ

APPROVED/ACCEPTABLE MAKES for ALL ITEMS

Pneumatic Tube Conveying System:

Hortig/Swiss Log/Sumtezberger/ Aerocom/ Equivalent furnishing similar conditions and

specifications

Imported Vertical Bed Head Panels :

Biolume /Ondal/ Trilux/Drager/ Kenswlck Germany, Danmedlcs Germany

Nurse Call System:

lntercall/Tunstall/GE/Slncron/Codaco/ Danmedics Germany, Unites associates

Curtain Track:

Nelson/ OTRT/Swish Curtain Track/HCS/ UA United associates/ Equivalent

Nat Steel/A.J .Costa Lda/CISNGetinge

Laundry

Nat Steel/Ramsons/StefaB/ Equivalent

Kitchen

Kumar Kitchen/Rans/Consolated/Wang Hospitality, Vimla/ Equivalent

Mortuary

Blue Star/Medikraft/Freezers India)

Page 4

Page 103: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

Modular Operation Theatre

S.No. Particulars Approved Makes o R.. ~ Q\l l v Pn c;;. f',.;:)1 Revised 08042015

EGP 18-20 mm; OR HPL Conf Industries, Medikraft, Du-point, Drager, Altro,

1 Wall Panels 15 mm; OR Danmedics Germany, PW, SHD Italia, Comessa, Medik SS 304 1.5 Germany mm ONLY

2 Laminar Air Flow Conf Industries, Admeco, Drager, WIESPL, Air Micron, Danmedics Germany, SHD Italia, Comessa

- 3 Sliding Door Metaflex, Conf Industries, Label, Rebbon, Danmedics Germany, KOS Germany, Medik Germany

Surgeons Mediktaft, Tedisel, Alvo, WIESPL, Danmedics

4 Germany, SHD Italia, Comessa, Sagicofim Italy, Conf Control Panel industries

5 OT Light Admeco, Dragger, Convida, Maquet, Danmedics Germany, Stryker Berchotld, Martin

6 Peripheral Lights Medi kraft, Conf Industries, WIES PL, SH D Italia, Comessa, Danmedics, Medik Germany

7 Flooring Gerfloor,Tarkett,LG,Forbo

8 Return Air Duct Conf Industries, Admeco, Dragger, WIESPL, PW, Danmedics, SHD Italia

9 Pendant/Bridge Dragger, Module Teknik, Admeco,Danmedics, Ondal Germany, Trilux, Stryker, Maquet, Medgas

10 Scrub Sink Alvo, United, AOV, PW, Danmedics, Sagicofim, SHD Italia, Medik Germany

11 X ray view Medikraft, United, AOV, Surgitech, SHD Italia, Danmedics,

screen Comessa

Barrfab, Convida, Maquet, Eshman, Maquet Germany, 12 OT Table Danmedics Germany, Drager, Trilux, OPT Italy, Medifa

Germany, Shaerer Swiss

13 Aluminium Ducting Jindal, Hindalco, Balco

14 OT Storage Unit SHD Italia, Danmedics, Comessa, Trilux, Medik Germany

15 OT View window SHD Italia, Danmedics, Comessa, Trilux, Medik Germany, Conf indistries

16 Wires and DBs Havell, Polycab, AKG, RR Kabel/ equivalent - Fire resistant, smokeless

Page 5

Page 104: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

-

-

Technical Specifications For Medical Gases Pipeline System ( All Imported must be from either USA/UK/Germany / Italy/Europe and all

specifications should confir m lo HTM 02 01, or NFPA 99 or ISO lnternationsl)

A. Oxygen System 1 Oxygen Manifold (20+20 cylinders} Manifold ( without cylinders ) must be imported and strictly confirms to and as per HTM-02-01 or NFPA 99 or ISO witness along with manufacturer technical catalogues/ data sheets out of approved fist of makes only.

2.Fully Automatic Control Panel (for Oxygen}

Fully Automatic control panel must be Imported with an output of minimum 2000 lpm at 50/60 psi pressure and strictly confirms to and as per HTM-02-01 or NFPA 99 or DIN or ISO lo witness along with manufacturer technical catalogues/ data sheets out of approved fist of makes only.

3. Oxygen Emergency System { 8 cylinders ) This must be Imported and strictly confirms to and as per HTM-02-01 or NFPA 99 or DIN or ISO witness along with manufacturer technical catalogues/ data sheets out of approved fist of makes only.

5. Oxygen Flow meter with Humidifier Bottle Oxygen flowmeter Imported along with inbuilt oxygen suitable oxygen gas outlet with 0-15 lpm flow-rate along with humidifier duly CE marked or UL listed.

6. High pressure tube Imported either CE marked or UL listed for 02, N20, CAir & Vacuum It must be imported colour coded for individual services color coded, antistatic.

B. Nitrous Oxide System 1 N20 Manifold (6+6) Manifold ( without cylinders ) must be imported and strictly confirms to and as per HTM-02-01 or NFPA 99 or DIN or ISO witness along with manufacturer technical catalogues/ data sheets out of approved fist of makes only.

2. Fully Automatic Control Panel (for N20} Fully Automatic control panel must be Imported with an output of minimum 230 !pm at 50/60 psi pressure and strictly confirms to and as per HTM-02-01 or NFPA 99 or DIN or ISO to witness afongwith manufacturer technical catalogues/ data sheets out of approved fist of makes only.

3 Emergency N20 Manifold Cylinder System (4 Cylinders) !his must be Imported and strictly confirms to and as per HTM-02-01 or NFPA 99 or DIN or ISO witness along with manufacturer technical catalogues/ data sheets out of approved fist of makes only.

C Medical Air System Medical Air plant Imported with an output flowrate of minimum 6000 lpm at 50 to 60 psi pressure must be Imported and strictly confirms to and as per HTM-02-01 or NFPA 99 or DIN or ISO, air compressors must be oil-less type witness along with manufacturer technical catalogues/ data sheets out of approved list of makes only.

D Surgical Air System Surgical Air plant Imported with an output flowrate of minimum 2000 lpm at 120 psi pressure must be Imported and strictly confirms to and as per HTM-02-01 or NFPA 99 or DIN or ISO witness along with manufacturer technical catalogues/ data sheets out of approved fist of makes only.

E Vacuum System

Medical Vacuum Plant Imported with Fully Automatic control panel with output flowrate of minimum 4000 !pm at 450 mm Hg pressure and strictly confirms lo and as per HTM-02-01 or NFPA 99 or DIN or ISO

))/ Page 6

Page 105: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

witness along with manufacturer technical catalogues/ data sheets out of approved list of makes only.

2 Ward Vacuum Unit

Ward Vacuum Unit must be Imported with one suction regulator along with minimum 1500 ml one collection jar made out of poly-sulphone having safety float and replaceable cartridge filters with color change indication needs replacement. Complete Unit must be CE marklld or UL Listed witness along with manufacturer technical catalogues/ data sheets out of approved list of makes only.

3) Theatre Suction unit

Theatre Vacuum Unit must be Imported mounted on trolley with one suction regulator along with minimum 1500 ml each hvo collection jars made out of poly-sulphone having safety float and replaceable cartridge filters with color change indication needs replacement. Complete Unit must be CE marked or UL Listed witness along· with manufacturer technical catalogues/ data sheets out of approved list of makes only.

E Copper Piping 1.1 Copper pipes (material):

,...-.. Copper piping must be Imported and strictly confirms to and ns per HTM-02-01 or NFPA 99 or DIN or ISO to witness along with manufacturer technical catalogues/ data sheets out o( npproved list of makes only.

Valve Box

Valve Boxc.,s with Isolation valves and pressure gauges must be Imported and strictly confirms to and as per HTM-02-01 or NFPA 99 or DIN or ISO to witness along with manufacturer technical catalogues/ data sheets out of approved list of makes only.

F !\,faster Alarm

Master Alarm must be Imported and strictly confirms to and as per HTM-02-01 or NFPA 99 or DIN or ISO to witness along with manufacturer technical catalogues/ data sheets out of approved list of makes only.

G Medical Gas Alarm (Main & Arca)

Medical Gas Alarm ( Main & Area ) must be Imported and strictly confirms lo and as per HTM-02-01 or NFPA 99 or DIN to witness along with manufacturer technical catalogues/ data sheets out of approved list of makes only.

H. Vertical Bed Head Panel wall mount with minimum 1800 mm length

Vertical Bed Head Panel made out of extruded aluminum must be Imported, CE marked or UL Listed, having inbuilt LED lights with minimum length 1800 mm length along with reflectors and lamps and with provisions for required numbers of gas outlets from 2 to 5 numbers, one nurse call switch as per requirement and with inbuilt RJ 11 and one RJ 45 and minimum 6 inbuilt electrical switched sockets of combination 5 &16 amps to witness along with manufacturer technical catalogues/ data sheets out of approved list of makes only.

I. Single Arm rotatable with up and down movement ceiling pendant for Operation Theatre

(Must be Imported and UL Listed or CE marked) The Ceiling Pendant Systems designed to provide convenient positioning of medical equipment, medical gas terminal units, ell'Ctrical and spt.'Ciality services. The Ceiling Pendants must strictly confirms to and to accept gas outlets as per NFPA 99 or HTM-02-01 or DIN or ISO to witness along with manufacturer technical catalogues/ data sheets out of approved list of makes only.

Page J 7

Page 106: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

The Pendant should be available as follows: • 900 mm minimum moveable arms each with 340 deg. Horizontal and vertical movements. Vertical movement

should be motorised 1l1e weight carrying capacity of the arm should not be less than 100 Kgs.

• Each arm should be capable of 340 degrees of rotation, which can be easily adjusted to suit the desired mode of operation.

• 1l1e arms may be fitted with pneumatic brakes to prevent inadvertent movement. • 1l1e Pendant Service Heads of minimum length of 1000 mm should have modular head. The head should be

capable of accepting a range of shelves, drafters and infusion poles or other accessories. The Pendant Service Head should be supplied with medical gas terminal units and 5/15 Amps. Sockets. The medical gas outlets should be provided with pendant as per specification of gas outlets.

• Ead1 pendant should have : Inbuilt one of the selected standards and make gas outlets l.e, Oxygen Outlets- 2, Nitrous Oxide Outlet -1, Air (4 bar) Outlets -1,Air (7 bar) Outlets- 1 Vacuum Outlets- 2

o Inbuilt Electrical switched Sockets 5 & 15 amps - 6 nos, Monitor input & Output o Inbuilt Two Shelves out of switch with draw and both the shelves should have rails one on each sides

Note: Complete MGPS should be Imported fo llowed with one of the given makes/ suppliers and one of the given international standards.

Page, g

Page 107: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

S.NO. 1

2

3

-- 4

5

6

7

8

9

10

11

12

13 14

Technical Specification of LAUNDRY EQUIPMENTS Descriotion of Items . Qtv. (Nos.)

Industrial DrvinQ Tumbler. Front Loading Open Pocket, Reversible, Steam Heated 60 KG Capacity, Automatic Cool Down Feature. 60 ke Caoacity, Steam Heated. Flat Bed Press. Pneumatic, Automatic, Steam heated. Automatic digital timed. Powerful moisture suction blower. Pneumatic raising & lowerine of sorine: susoended & Teflon lined Head. Adjustable ironine pressure

Head Size : 1500 x 750 Flat Work Dryinq Irone r. 1 Roll. Heated Chest Tvoe, Front Feed, Rear Return,

Steam Heated, Washroom Trolley. S.S. 100 kg capacity Overall Size: 1250 x 675 x 780 ht. Orv Line n Trolley. 4

S.S. 50 k2: capacity Overall Size: 1100 x 600 x 1500 ht Shelf Trolley. 2

S.S. 100 ke capacity Overall Size: 1200 x 600 x 1700 ht Mobile Table. 2

S.S. Too Size : 1150 x 750 Laundrv Scrub Station with 2 Sinks. 1

All S.S. Size: 1600 x 550 x 900 height Vacuum Finishinq Table. 2

Table Size: 1200 x 750 Electric Steam Iron, Teflon shoe, aluminium armoured

& Sarine: loaded Condensate seoarator. Industrial Washer Extractor. 4

30 ke: Caoacity High Soin, Susoended. Com outer Controlled, steam heated. Industrial Washer Extractor. 4

60 kg Caoacity High Soin, Susoended.

Comouter Controlled, steam heated. Mobile Table. 2

S.S.Too Size : 2350 x 750 Air Comoressor, 3 HP Double Stae:e, 160 ltrs Tank 2

Steam Boiler, 500 kg Capacity with Water Softener 2

Page !!) C\

)i:1b (uJ

Page 108: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

Sr. Technical Specification CSSD EQUIPMENTS Qty. (Nos.) No 1 Horizontal Rectangular High Pressure High Vacuum Double 3

Door Sterilizer. The sterilizer will be manufactured as per IS:No.3829 (Part 1)-1978 with ISi Mark/CE Standards. The unit will be designed for operating pressure 30 to 32 psi. and corresponding to a temperature of 134oC. The sterilizer chamber would be formed out of SS 316. The Jacket will be formed out of mild steel. The jacket outer cover will be of SS 304. The sterilizer will be provided with 2 Nos. pressure locking type hinged doors. The door plate will be of SS 316 with shooting bolts.flush mountings and steam generator will be of SS 304. The stand of the sterilizer wi ll be of mild steel. The Sterilizer will be automatic with PLC with 5 pre-sets programs and 1 variable program, MMI with Dot-matrix printer wherein date, time, load identification no. cycle selected, cycle parameter including time, temperature and phase etc. Can be seen and documented. Finally, the automation is so designed that once the program is selected then no further intervention is required from the operator till the end of the program.

Steam Generator enclosed inside the sterilizer cabinet and should have multiple door locking and safety functions.

Should have Double Door for pass through system. Doors should be fully automatic vertically sliding type with pneumatically controlled function.

The sterilizer will also be provided with an intelligent transducer for heater protection

Should be CE certified or FDA approved product conforming to EN 285, MOD 93/42/CEE, CE 97/23 PED for Pressure Vessel, EN 61010-1 , EN 61010-2, EN 60204-2, Validated as per EN ISO 17665-1. Current Valid copy of Certificates to be attached wherever applicable.

Should have complete monitoring of cycle operation and provided with at least two Digital Pressure sensors and analog gauges for chamber pressure & jacket pressure indication.

Should have High Precision Digital Sensors for measure measurement of chamber Temperature (PT100 type) & Pressure values.

Should have option for Water conservation approx. 50%. Company should specify the extent of water saving in their system. The unit will be complete with vacuum pump and condenser and inter- connecting piping.

Page a 10

Page 109: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

Sr. Technical Specification CSSD EQUIPMENTS Qty. (Nos.) No

Should be high-grade Stainless steel construction inside and outside including all internal piping and external panels. Chamber, Jacket &

Door Material: Stainless steel 316 Titanium Grade.

Should have all internal Piping components, Pneumatic Valves and connections made of Stainless Steel AISI 316L grade.

Should have External Panels & Machine Frame: S.S. 304 grade.

Should have at least 50mm thick insulation materials on jacket and in doors to ensure low thermal losses. Exposed surface temperature should be approx. 45 deg C.

Manufacturing facility should have ISO 9001 :2000 & ISO 13485:2004 Certifications or equivalent. Certificates to be attached wherever applicable.

Sterilizer as above of chamber size 600 mm x 600 mm x 1200 mm depth (2'x2'x4') suitable for electrical operation on

400/440 volts, 3 phase, AC supply, electrical load 21 KW. 2 Stainlesss Steel 316 carriage suitable for Rectangular Sterilizer 2 3 Stainlesss Steel 304 trolley suitable for above carriage 3 4 S.S. Control and packing table with drawer 3

table is used for separation, control and packing of various sets of sterilized goods for wards, clinics, operation theatres etc. and is designed for standing and sitting workers. A removable hatch made of laminated particles board is provided. The hatch contains a SS drawer and a laminated particles board plate. Overall size: 2000mm L x 1400mm W

5 Stainless steel Work Table 3 Table is used for wet goods with undershelf. The table top is fabricated out of 16 SWG SS 304 qlty. ground and polished to a smooth surface without high edge sections. The table top frame is a complete assembly with front, back and two ends welded together at corners. Overall size 1500mm x610x890Ht.

6 S.S. Vertical Sliding Door 1 Door is used between clean and dirty areas in hospitals, pharmaceuticals etc. The sliding door is mounted on an existing wall opening. The door is made of stainless steel counter-balanced by built in counterweight. The door is provided with nylon wheels at the side for easy of movement. The door is made along with stainless steel cover plates for the wall opening. The door is provided with a built in safety lock which ensures the door from closing if the counterweight rope breaks. Opening 500 x 500mm

7 Stainless steel work table with two sink 2 The bench top is fabricated out of 16SWG SS 304 qlty. ground and polished with smooth surface and edge section. The top is designed to give a stable work surface. The table top frame is a complete

A.../ Page c:12 t I

Page 110: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

Sr. Technical Specification CSSD EQUIPMENTS Qty. (Nos.)

No assembly with front, back and two ends welded together. The sinks are made of stainless steel with inside ground and polished. Each sink is provided with a drain valve and a strainer. On the bench top, just above the sinks mixer for hot and cold water connection is provided. Overall size 2400mmL x650mm Wx900mm Ht

8 Washer Disinfector 2

Washer Disinfector, double door, Horizontal movement with

interlocked doors to avoid simultaneous operation suitable for

cleaning and disaffection of surgical instruments, anesthetic

equipment, suction bottles, cleaning buckets, general circulation goods, dental tray and glassware with a fully closed process.

The washer disinfector, fully automatic, has an advanced micro-processor which controls all services, programming and statistic functions. For safety reasons the service and programming functions are coded. The door would be provided with interlocking system. The chamber is equipped with four spray arms which ensure good water penetration from all directions. Various attachments are provided to suit the load to be washed. Suitable dosage of detergent can be preset with the dosinq pump. The provision of a double wall with insulation in between enables the Washer Oisinfector to run with minimum sound and heat emission.

The wash chamber, the inside the door, the pipework system and the circulation arms are made entirely of stainless steel.

The Washing chamber & other internal parts should be made up of

316 stainless steel.

Clear visibility of the process through toughened glass door & illuminated chamber.

With Powerful Water Circulation pump & Built-In Dryer with Powerful

Air Blower Pump.

Suitable for electrical operation on Capacity of 275 ltrs.

Electrical load 30 Kw -3 phase 4 wires,400 to 440 volts 50Hz AC supply & Should have built-In Boiler. Will meet standards of quality and safety like ASME,TUV,etc in ISO 9001 :2008,ISO 13485:2003 certified facility. Should be CE certified.

9 Ultrasonic Cleaner 2 Ultrasonic Cleaner of overall size 530mm L x 330mm W x350mm H Internal Dimensions: 505 x 300 x 200 mm, output frequency 35khz. Capacity 30 litres.

·,}/ Page a. I 1...-

Page 111: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

Sr. No

10

11

12

13 14

Technical Specification CSSD EQUIPMENTS

The Ultrasonic cleaners are manufactured using Solid State technology For the Ultrasonic Generator and PZT Transducers for converting the electrical energy to mechanical vibrations in the cleanino liquid. The unit will be complete with a thermostat and a timer, insert basket for tank and tank cover. The unit is suitable for electrical operation on 220/240 Volts, sinqle phase, 50 cvcles, AC suoolv. Drying Cabinet with single door Digital timer Controlled Drying Cabinet with single door suitable for easy and quick drying of instruments, utensils, glass wares and anesthetic accessories such as corrugated hoses, breathing masks, resp iration baas and suroical instruments travs etc. The unit would be provided with digital display with countdown drying time and drying time selectors, temperature selector including indication of selected temperature. The system would have adjustable adjustment temperature range of 60-90oC. The system would have drying time range of 0-90 minutes. The system would take air from the work area and clean it by appropriate filter. The air is to be heated to an operator selected temperature by electric heating element. The system would also have an exhaust connection to vent outside. The unit would be provided with Cassettes and protective shelves for instruments, hoses, bladders and catheters as accessories.

Chamber volume 275 litres. Suitable for electrical operation on 230 volts, single phase, 15 Amps. Electric load 3.6 KW. . Will meet standards of quality and safety in ISO 9001 :2008,ISO 13485:2003 certified facility. Should be CE certified.

Stainless steel racks with bullet feet, overall size

1830x535x1830mmH. Stainless steel table trolley with 2 shelves Stainless steel table trolley with 2 shelves is for use in the sterile goods store when batching sterile goods for delivery and also for short internal transport. The trolley is also suitable for use as a temporary storage or utility space at packing tables. The frame is mounted on 4nos. heavy duty swiveling castors for easy movement in narrow passages. Overall size 1080x530x800H

Gauze cutting machine with SS table size 900x600x750mm Single Distilled Water Still Single Distilled Water Still, generally as per the Barnstead Type. The Still is guaranteed to produce pyrogen free and chemically pure water to comply with IP/BP Standards. The Still will be manufactured as per "IS:No.3830" and it will also bear the Bureau of Indian Standard Certification Mark.

The evaporator, the multi-baffle and the condenser will be made out of stainless steel with the joints welded. The condenser will be oroYided with stainless steel tubes, water inlet and outlet

Jy / Page il l~

~ 111

Qty. (Nos.)

1

2 2

1 1

Page 112: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

,.,­ ...

-

Sr. No

15 16

Technical Specification CSSD EQUIPMENTS Qty. (Nos.)

connection.

The Water Still will be supplied in a ready to use condition mounted on a suitable stand. Water Still as above of capacity 20 litres, per hour suitable for electric operation on 400/440 volts, 3 phase AC supply, electrical load beinQ 15 KW. Stainless Storage tank, electric load 6 kw., capacity 120 litres. 2

Spray Gun Rinser 2

Spray Gun Rinser with attachments is used for cleaning syringes, catheters, endoscopes, cystoscopes and variety of other instruments and articles used in sterile services.

Page !I I l-\

Page 113: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

,,3+

Technical Specification of Kitchen Equipments S.NO. Kitchen Equipments which consists of following items Qty.

(Nos.) 1 MILK BOILER 2

Cap.1 OOLtrs. S.S. Sheet insulated body with triple jacket The water jacket will be fitted with 2 Kw heating element. Milk outlet, water level indicator & draw off valve at the bottom & water tank. Phillips element, Elcon thermostat, GVC rotary switch, LED indicator fo r Power, 4mm thickness 3 core wire Rajdoot/ Plaza make

2 TEA BOILER 4 Cap.100Ltrs. S.S. Sheet insulated body with triple jacket The water jacket will be fitted with 2 Kw heating element Milk outlet, water level indicator & draw off valve at the bottom & water tank. Phillips element, Elcon thermostat, GVC rotary switch, LED indicator for Power, 4mm thickness 3 core wire Raidoot/ Plaza make

3 MICROWAVE OVEN 4 Cao.20-30Ltrs.

4 PICK UP COUNTER WITH OVERSHELF 4 Size 1800X600X850+300 Top 3 sides, under & over shelf of s.s.sheet, on m.s.angle & s.s.tubular legs frame work. The counter will have 3 sides fully covered, operator side open. With one under shelf. One over shelf300mm wide & running along the full length of counter u type heating element of 1 Kw is placed under the one head shelf to keep the dishes warm provided with toggle switch also connected with 4 mm 3 core wire.

5 WORK TABLE FOR SUPPORT OF TWO BURNER RANGE 4 Size 1350x600x850mm Top & undershelf of s.s.sheet on m.s.anlge frame work & s.s.tubular legs, with adjustable feet. Top to have sound deadning material lining as required.

6 TWO BURNER COOKING RANGE 4 App. Size 1200X600X850mm Frame work of m.s.anlge duly painted, mounted on s.steel tubular legs with adjustable feet. Top & sides & under shelf of s.s.sheet. The range will be complete with Znos. Hy-pressure gas burners with individual control valves. Cast iron pan support EXHAUST HOOD (Without Ducting, Fixing & Extraction fan) FOR

7 TWO BURNER RANGE 12 Size 1950x750x600mm Made of s.s teel sheet, ZOG thick duly welded & pop rivetted as required. The hood will be complete with s.s.sheet removable type baffle filters. Complete with greese collection channel & greese collection cuo/s.

8 JUICER (table top model) 4

j ./ Page 16 t~

Page 114: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

Technical Specification of Kitchen Equipments S.NO. Kitchen Equipments which consists of following items Qty.

(Nos.) Cast Aluminum/Cl body, duly polished I painted, with worm & perforated insert. Top feeding tray. Worm easily cleanable fitted with 1/2HP elect. motor.

9 CONVEYOR TOASTER 4 App. Cap. 100-125 Toasts/hr. S.S.Sheet body, having s.s.sheet conveyor belt App.225mm wide. The unit will have heating elements on top & lower portion of conveyor belt with variable heat & soeed control switch. rMADE IN ITALY)

10 WORK TABLE WITH SINK FOR JUICER STATION 4

Size 1800x750x850+150 Top & Sink bowl of s.s.sheet, on s.s.anlge & s.s.tubular frame work with cross bracing at lower portion. Sink bowl will be integrally welded with too & grinded smooth. Sink bowl size 450x450x250mm.

11 WORK TABLE WITH SINK FOR IDLY STEAMER 4

Size 1950x600x850+150 Top & Sink bowl of s.s.sheet, on s.s.anlge & s.s.tubular frame work with cross bracing at lower portion. Sink bowl will be integrally welded with too & grinded smooth. Sink bowl size 450x450x250mm.

12 UNDER COUNTER REFRIGERATOR WITH PICK UP SHELF 4

Size 1200x600x850+450+300 Double walled 'PUF' insulated s.s.sheet outer & inner body of s.s.sheet O.Bmm thick having hinged doors with rubber gascuts. Inside s.s.wire shelves on adjustable channel frame complete with 'Kirloskar/Tecumesh' make compressor. Having condensor,

13 FOUR DOOR REFRIGERATOR 4

App, Size 1200x675x2000mm Double walled, insulated 'PUF' body made of 0.8 MM thick s.s. sheet. Inside chamber to have 4nos. S.s.wire shelves on adjustable channel. The unit will have 4 doors with magnatic rubber gascuts & locking provision.

-- The condensing unit, consistine: of 'Kirlos

14 WORK TABLE 6

Size 1500X600X850mm Top & undershelf of s.s.sheet on m.s.anlge frame work & s.s.tubular legs, with adjustable feet Top to have sound deadning material lining as reauired.

15 EXHAUST HOOD (Without Ductino. Fixino & Extraction fan) 10

Size 1950x750x600mm Made of s.steel sheet, 20G thick duly welded & pop rivetted as required. The hood will be complete with s.s.sheet removable type baffle filters. Complete with greese collection channel & e:reese collection cuo/s.

16 WORKTABLE 4

Size 1500X600X850mm Top & undershelf of s.s.sheet on m.s.anlge frame work & s.s.tubular legs, with adjustable feet. Top to have sound deadning material lining as reauired.

Page 115: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

Technical Specification of Kitchen Equipments S.NO. Kitchen Equipments which consists of following items Qty.

(Nos.)

17 DOSA PLATE 6

0/S 1500X600X850 Framework made of m.s. angle of size 38x38x5mm and 25x25x5 mm. Top made of 16 mm thick m.s. plate with stainless steel channel for draining ·-the excess oil from fry top. The verticals of the equipment are made of stainless steel of size 38 mm dia and cross

18 IDLY STEAMER (CAP. - 104 IDLY per batch} 4

STD MODEL Made of stainless steel sheet, fitted with Elect Controls. EXHAUST HOOD (Without Ducting, Fixing & Extraction fan) for low

19 heiaht burner 4

Size 1650x750x600mm Made of s.steel sheet, 20G thick duly welded & pop rivetted as required. The hood will be complete with s.s.sheet removable type baffle filters. Complete with e:reese collection channel & greese collection cuo/ s.

20 LOW HT. TABLE for supportina low heiaht burner 4

Size 750x750x600mm Specification same as that of work table but the table will be without undershelf & will have cross bracing support at lower portion.

21 LOW HT. BURNER 4

Size 750x750x600mm Specification same as that of cooking range but the unit will be without undershelf, but will only have cross bracing support at lower portion. EXHAUST HOOD (Without Ducting, Fixing & Extraction fan) for 03

22 burner cookina ranoe 4

Size 1650x750x600mm Made of s.steel sheet, 20G thick duly welded & pop rivetted as required. The hood will be complete with s.s.sheet removable type baffle filters. Comolete with greese collection channel & greese collection cup/s.

23 THREE BURNER COOKING RANGE 2

0/S 1800X600X850 Structure made of m.s. angle of size 38x38x5mm, duly rust proof painted. Top of 16Swg thick s.s.sheet All four side covered up to height of app. 10" by 20Swg stainless steel sheet Bottom stainless steel stripes sheets complete with gas burners, valves

24 WORK TABLE for support of 03 burner cookina ranae 2

Size 1500X600X850mm Top & undershelf of s.s.sheet on m.s.anlge frame work & s.s.tubular legs, with adjustable feet. Top to have sound deadning material lining as reauired. EXHAUST HOOD (Without Ducting, Fixing & Extraction fan) for

25 bulk cooker/boiler & fryer 2

Size 1950x750x600mm Made of s.steel sheet, 20G thick duly welded & POP rivetted as reauired.

~../ Page~ 11

Page 116: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

Technical Specification of Kitchen Equipments S.NO. Kitchen Equipments which consists of following items Qty.

(Nos.) The hood will be complete with s.s.sheet removable type baffle filters. Comolete with greese collection channel & E?:reese collection cup / s.

26 BULK COOKER/boiler TILTING TYPE 2

Cao.160Ltrs. Specification same as Sno.13 but the frying pan will be Of rectangular shaped with 12"depth & a pouring lip & the unit will be fitted with v type high pressure gas burner with control valve & oilot lamp.

27 BULK FRYER TILTING TYPE 2

Cao.1 OOLtrs. Triple jacketed body of stainless steel sheet, Inner most jacketed of 16g thick with 12g thick dish ended bottom, second wall for air gap of 18g stainless steel sheet & outer insulation jacket also of 18g stainless steel sheet. The unit will have counter

28 WET GRINDER 2

Cao.151trs (1 .0 HP) Stainless steel sheet constd. Body with s.s.sheet constd. Revolving drum, chromium plated pillar support on m.s.angle frame work fitted with electric motor gear box & e:rindine: stones & coconut scraoer.

29 DOUGH KNEADING MACHI NE 2

(CROMPTON MOTOR 2.0 HP) App, Can of Bowl 25Ltrs. S.S.Mixing bowl, with s.s.rod/ strip mixing arm, mounted on steel tubular & sheet frame work duly painted. Complete with 1.0HP Elect. Motor with control switch.

30 POTATO PEELER 2

Cao.15Kg./chrgs.(CROMPTON MOTOR 1.0 HP) 16 gauge Stainless steel sheet peeling drum, lined inside with Abrasive material, stainless steel /cast iron rotating peeling disc. Top of the drum - will have a potato inlet door, waste Inlet provision peeled potato discharge door & waste water Outlet oioe

31 PULVERISER (Std .) 2

(CROMPTON MOTOR 1.0 HP) Stainless steel sheet body,20g thick the unit will have A top feeding tray & a housing of stainless steel casting With grinding plates & 3 type of meshes for variable type Of grinding requirements. The unit will be fitted with 1.0 hp single Phase electri

32 WORK TABLE s upport of oulverisor 2

Size 1500X600X850mm Top & undershelf of s.s.sheet on m.s.anlge frame work & s.s.tubular legs, with adjustable feet. Top to have sound deadning material lining as reauired.

33 WORK TABLE WITH SINK for veqetable washing 2

Size 1950x600x850+150 Top & Sink bowl of s.s.sheet, on s.s.anlge & s.s.tubular frame work with

Page 117: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

Technical Specification of Kitchen Equipments S.NO. Kitchen Equipments which consists of following items

cross bracing at lower portion. Sink bowl will be integrally welded with too & e:rinded smooth. Sink bowl size 450x450x250mm.

34 CHOPPING BOARD for manual vegetable cutting

size:- 1200X600X850mm Frame work made of s.s.anlge top will have P.P./Nylon Board for chopping 700x700x100mm chopping board.

35 VEGETABLE CUTTING MACHINE Aluminium casted body with 1h hp electric motor safety switch & double feed pusher for round flat & vertical shaped food items etc., the unit will be Table top model with easy to clean provision. Provided with 4 no cutting discs for slicing grating Dicing

36 CHAPPATI COLLECTION TABLE

Size 1500X600X800 Top tray of 16G s.s.sheet, tray will have App.100mm ht collor all around, mounted on s.s.tubular legs with adjustable feet & one s.s.sheet undershelf.

37 CHAPPATI ROLLING TABLE Size 2100x750x850mm Top & undershelf of s.s.sheet on m.s.anlge frame work & s .s.tubular legs, with adjustable feet. Top to have sound deadning material lining as required. THREE SIDE CROSS BRACING MADE OF S.S. PIPE 1" DIA FOR UNDERNEATH STORAGE.

38 CHAPPATI PLATE CUM PUFFER Size 1800x750x850mm Frame work of m.s.anlge, mounted on s.s.tubular legs frame work. All sides pannels & undershelf of s.s.sheet, top plate 10mm thick mild steel with cast iron puffing grills for puffing of chappaties. Complete with 'V' shape LPG burners with individual cont EXHAUST HOOD (Without Ducting, Fixing & Extraction fan) for

39 chaoatti plate Size 1950x750x600mm Made of s.steel sheet, 20G thick duly welded & pop rivetted as required. The hood will be complete with s.s.sheet removable type baffle filters. Comolete with greese collection channel & greese collection cuo / s. FOOD TROLLEY WITH 4 ROUND PANS, 1 RICE TRAY & STORAGE

40 beneath 0/S 1350X750X900mm S.S.Sheet insulated body, Framework of m.s.anlge of size 38x38x5mm, mounted on 4 castors (2 with brakes) of size 150mm top to have cutout for 4nos. Round pans for Dal, Subzi etc. with 1 rice tray & storage below. Three side covered with s.s.sheet withs.

41 TRAY CARRIER TROLLEY

Size 1200X600X1200mm S.S.Bottom base shelf mount at 150mm with all four sides turned down SOmm in 12mm and secured to welded s.s.anlge frame work &

w PagelO IC\

Qty. (Nos.)

3

2

2

2

2

8

24

2

,~ \11

Page 118: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

Technical Specification of Kitchen Equipments S.NO. Kitchen Equipments which consists of following items Qty.

(Nos.) PROVIDED WITH THREE NOS. OF DETACHABLE TRAYS CUM SHELFS UNIT WILL BE MOUNTED ON 4" PILLAR TYPE CASTORS WHEELS (2 NOS. WITH BRAKE & 2 NOS. WITHOUT BRAKE) TRAY SET UP COUNTER WITH BAIN MARIE & DOUBLE

42 OVERSHELVES 4 Size 1800x600x850+375+225 Top of 16G s.s.sheet, Bain Marie water tank of 18G s.s.sheet, fitted with 3.0kw heating element with automatic temperature controller. Water outlet provision w ith drain valve, 3 sides covered with 20G s.s.sheet, Top to accommodate s.s.sheet Food Pans with GN pan lx2x4" depth with lid 5 sets.

43 STORAGE CABINET 4 Size 1200X600X850mm

r Top of 16Swg S.S.Sheet one over shelf, three sides of 20SWG s.s. sheet Dish storage cabinet with 2 s helves and sliding door will be provided on service side.

44 STORAGE RACK 4 Size 900X450X1800 Vertical of 32 mm dia stainless steel pipe with adjustable feet 4 no of 18 S.S Sheet at eaualv distance.

45 INGREDIENT BINS 7

Size 600X600X600mm Made of S.S. 18 SWG WITH TOP HINGE OPENABLE DOORS SUPPORT WITH FOUR NOS. OF CASTORS, anti crack body, top half hinged lid. Provided with a SCOOP.

46 DUNNAGE RACK 2

Size 1200X600X500mm Made of s.s.square pipes of size 32x32mm, with support of 25mm square s.s.pipe.

47 DIGITAL WEIGHING SCALE 2

CAP. 300KG

48 POT RACK-3 TIER 6

Size 1200X600X1500mm Verticals of 32mmX32mm square s.s.pipe, 3 shelves welded with vertical frame of 19mm dia s .s.pipe shelves with equal space between two tubes mounted on adiustable feet.

49 SOILED DISH LANDING TABLE WITH GARBAGE CHUTE 1

Size 2400x600x850mm Top of 16G s.s.sheet with 'Sunkun' top. A garbage chute provided on top with a s pace below to keep dust bin (Not part of equipment). The top will be mounted on m.s.anlge, rust proof painted & s.s.vertical tubular legs with cross bracing: support on 3 sides

so THREE SINK UNIT 2

Size 1800x600x850+ lSOmm

jy/ PageC u,

Page 119: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

Technical Specification of Kitchen Equipments S.NO. Kitchen Equipments which consists of following items Qty.

I Nos.) Top & 3 sink bowls of 16G s.s.sheet. Duly welded, grinded & polished smooth mounted on m.s.anlge & s.s.tubular frame work with 150mm back splash. Each Sink Bowl Size 500x500x300mm (without sanitory fittingsl

51 CLEAN DISH TABLE 2

Size 2100x600x850mm Specification same as that of work table but with 2 undershelves.

52 CLEAN DISH RACK 10

Size 900x450x1800mm Vertical of 32 mm dia stainless steel pipe with adjustable feet 5 no vertical at equal distance 1st shelf fixed at 150mm from floor level.

53 Pot stacking platform for heavy pot storaoe 2

Size 1500x750x150mm S.S Palate frame will be made of 1.5" S.S Square pipe with adjustable bullet feet. And shelf will be made of 2"x3mm S.S Flat Patti.

54 Masala trolley 2

Size 600x600x750mm

55 Plateform trolley 2

Size 900X600X900mm Structure will be made of 40x40x5mm duly painted with rust proof paint. Top will be made of 10 SWG. M.S Sheet 6" high moving wheel (02 Break + 02 Movingl

56 PRE WASH SINK UNIT 2

Size 1800x750x850+150 Top & Sink bowl of s.s.sheet, on s.s.anlge & s.s.tubular frame work with cross bracing at lower portion. Sink bowl will be integrally welded with top & grinded smooth. Sink bowl size 450x450x250mm.

57 HOOD TYPE COMMERCIAL DISHWASHER 4

IFB I WINTERHALTER MAKE

Cap. 40-50 Racks oer Hr. CYCLE TIME TOTAL/RINSE (SEC) 60-120-180/20

BASKET SIZE 500X500 MM

WATER CONSUMPTION 3L/CYCLE

TANK CAPACITY 20L

RINSE CAPACITY 12L

WASH PUMP 1.lKW WASH TANK 3KW

RINSE TANK 8KW MAXIMUM USED POWER 9.1

WATER HARDNESS 70-140 PPM

WATER PRESSURE 2-4 BAR

POWER SUPPLY 400/3+N-/50

58 DIRTY DISH UNLOADING TABLE 2

Page 120: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

Technical Specification of Kitchen Equipments S.NO. Kitchen Equipments which consists of following items Qty.

(Nos.)

Size 1500x600x850mm Top of stainless steel sheet, mounted on m.s.angle & stainless steel tubular frame work. One 18g thick stainless steel sheet bottom Shelf will be fitted on table at a ht dia 150mm from floor.

59 CLEAN DISH TABLE 2

Size 2100x750x850mm Specification same as that of work table but with 2 undershelves.

60 COLD ROOM SECTION 4

WALK IN CHILLER CUM FREEZER External Room Dimensions : 3600X3000mm CHILLER Room Temcerature - (+ 2°C to 8 °C) Product Entering Temo - + 30°C Pull Down Time -15hrs. Product Loading - Aoo.550kg./24hrs. Wall & Ceiling Panels Insulation - 80mm thick Prefabricated RPUF Panels Floor Panel Insulation - 80mm thick RPUF Panels with layer of Tarfelt sheet on both sides. Panel Finish - Internal :PCGI , External: PCGI Refrigerant -R-22 No. of Units -1 rMAKE:- KIRLOSKAR/ TECUMSEH/ CARRIER Connected Load - 2.5 KW

61 ALUMINIUM RACK FOR COLD ROOM 5

Size 11 OOX500X 1500 Vertical of 50x50x5mm aluminium angle with adjustable feet 4 no of 18 swg. Sheet perforated aluminium shelves ..

62 ALUMINIUM PALLET FOR COLD ROOM STORAGE 4

Size 1500X450X150MM Top made of 16 swg aluminum sheet placed with s.s. angle 35x35x4 frame work with adiustable bullet feet.

63 L.P.G GAS PIPE LINE (200 RUNNING FEET APPROX or 60.96 Rmt) 1

ACTUAL MEASUREMENT WILL BE ACCORDING TO As per site conditions

64 CENTRIFUGAL EXHAUST BLOWER 4

20000 CFM 65 S.S GRATING for kitchen drainaQe trouQh 1

(APPROX 40 RUNNING FEET or 12.195 Rmt) ACTUAL MEASUREMENT WILL BE ACCORDING TO As per site conditions EXHAUST HOOD DUCTING (APPROX 2000 SQUARE FEET or

66 185.806 Sqm) 1

Actual measurement will be according to as oer site conditions.

Page ll\t l. "'\,,

Page 121: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

Sr. No.

1

Technical Specification of Mortuary

MORTAURY CHAMBER Capacity (d) Four Bodies Features : Cabinet : Energy Efficient Units Modular construction with Stainless steel: Efficient Internal lighting R 22 refrigerants: Vapor proof incandescent lamp Automatic Temp. control systems: Pull out drawer system High Density Polyurethane Insulation: Easy to maintain and clean Stainless Steel door: Extended choice of control options PUF Insulation temperature: ISO and CE marked Audio visual alarm for high and tow: Corrosion free exterior, Digital temperature indication T emperature Range and Control : Mortuary cabinets are available with temperature range of 2°C to 8°C. For accurate measurement and display of temperature a LED display is used. These units are equipped with microprocessor based digital control panel which is operated with push buttons. For security and safe working high and low temperature alarm system is used. Refrigeration System Mortuary cabinets are equipped with full functional cold storage facility. Refrigeration system is energy efficient, environment friendly. Mortuary chambers are of double walled construction and made of 304 grades corrosion resistant stainless steel. For insulation high pressure-injected polyurethane is used for minimizing thermal loss and meeting the particu lar requirements of refrigeration in mortuaries. Doors Doors are made of stainless steel. These doors are situated in front and allows easy loading of Bodies. These doors feature lining in odorless rubber gasket and anti-condensation resistors. Internal Lighting Lighting system comes with waterproof fluorescent ceiling lamps which are fitted with a switch on the control panel. Technical specification:

Number of Bodies 4 Temperature range 2° C to 8° C

Temperature Control Digital Micro-processor

Temperature Display LED display

Construction Inner & Outer stainless Steel

Insulation High Grade poly Urethane

Doors Made of Steel Sheets & External Lock

Trolleys Made of Steel and slid ing on telescopic rails

Compressor ISi Marked

))!/ Page 1»1, ~

~ \)..\

Qty.

6

Page 122: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

Technical Specification of Mortuary Sr. Qty. No.

Evaporation Internal evaporator system Forced draught

Internal drainage Yes Integral temp. gauge Yes Refrigeration System Air cooled Hermetically sealed Air circulation Forced air Circulation

Alarm High/ Low alarm system

Internal Lighting Waterproof fluorescent ceiling lamps

Locking System Standard key locks

Power supply 220 Volts/ 50 Hz

--

jy/

Page ilS '},~

Page 123: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

.-

'ab ':l-)

PNEUMATIC TUBE SYSTEM

TECHNICAL SPECIFICATION

Main Controller:

The entire system has to be electronically controlled by microprocessors/ computer. The main control unit, which

controls the sending process and the compressor unit, supervises all system components.

The sending process has to be indicated on display devices. The device also has to provide information to find the

cause of a system malfunction. Customer-specific data such as the system's layout, target numbers, target names,

arrival signals, priority and special functions must be selectable on site without change or external reprogramming

of memory devices. A integrated uninterrupted power supply must provide the requested system back up time to

paste all date before shutting down the system, so after power source is providing energy again a automatic

system start will occur and the system status will get back in the operation mode as before. Chosen targets at

stored containers must be kept in the memory to proceed them automatically after power failure restart.

All components of the pneumatic tube conveyor are constantly monitored; the operating software has to be based

on action reaction control for any device. The status of each device can be checked by the master control unit. A

test program must be included to automatically check, move and supervise all of the system's devices, or specific

selected devices, by access via service code from the Station control panel.

During both normal operation and testing, all devices inform the master control unit that the selected functional

position has been reached. This ensures that this position truly has been reached. The system is designed in such a

way that it does not allow the unobserved pivoting of devices.

The system has to come with an efficient fault-clearance program that automatically recognizes operating errors,

power failures, t ime-out errors and other system errors. It also allows the system to continue functioning; there is

no need for the operating personnel to intervene.

It should be possible to redirect empty containers which have exceeded the pre-allocated distance limit to a Station for maintenance to be carried out - new drivers to be fitted for example. It should include the following:-• Main Control Unit Hardware for main controller, for maximum of 24 bus systems, for systems up from 128

devices and transfer zone. • Main Control Unit Hardware • Router for "Main Control" with 4 ports for connection of several Main Control

Units. • Patchable for connection router to Main Control

• Main Control Unit - Dongle • UPS Uninterruptable Power Supply for PC-Monitoring • Software package for main controller includes the following:-

);> Software for one Line, );> Extension Software for further lines, );> Software for Code-Tag System/Transponder System, );> Software for Visualization & Editor for 1 Client, );> Software for History & Evaluation,

• Patchable for Connection PC/Laptop to Power Control

• Power Supply Unit, • Power Supply Kit External, • Power Supply connecting cable for Power Control. • Keyboard SCB2000/3 - Usable for Desktop Installation Only

Page 124: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

-

• To be provided with Wifi connectivity with special ability to view the system movement etc. on wireless tablet &

smart phones.

Blower:

It should have a separate Blowers 2.3 kW, 3 phase 400v/50Hz, 2850 rpm, 220 mbar pressure, 5.1 m3/min for flow

rate, with low noise, unidirectional rotation with electronic air switch to switch between compressed air and

vacuum. EQUIVALENT BLOWER SPECS WILL ALSO BE ACCEPTED

Each blower should be provided with Frequency Converter for Control of slow speed for sensitive laboratory

samples by frequency control of Compressor. The blower should be set go up to 75Hz with the help of Frequency

Converter.

Frequency converter should help the system to run on blowers of 2.6 Kw.

It should be provided with all the mounting accessories and soundproof enclosure.

Station 160mm - Pass Through Type:

The Pneumatic Station should be designed as a fully automatic dispatch and receiving unit and used as pass­

through station.

The Pneumatic Station should be able to send and receive carriers.

The conveying direction of the carriers should be both sided (single tube reversing principle).

Inserting a carrier into the Pneumatic Station and selecting a target number should be possible independent from

system status.

The carrier should be loaded on the top side of the Pneumatic Station.

The Pneumatic Station should be controlled by the use of the LCD display memberane key pad in 34 Station areas

and with integrated Touch Panel Display in 5 Station areas. OR EQUIVALENT

The Pneumatic Station should be Steel made, maintenance free gear mechanism, with self adjusting optical

switches, with self adjusting maintenance free gaskets for noise less operations, contact less sensoring of the unit

positions. There should not be any air exiting at the pneumatic station. With RFID readers for carrier ID and

inventory, which should ensure automatic carrier redistribution to its home address & also non-acceptance of any

items than authorized carrier.

The Pneumatic Station should have Air cushioned soft landing facility for arriving carrier to protect samples.

Provided with carrier rack and receiving basket with cushion.

Pass through Type Stations should be in 39 Numbers in quantity.

Dimensions: (80 x 50 x 50 cm) Approx. to occupy least possible space. OR EQUIVALENT

Station 160mm - Multi Receive and Multi Send Station for Laboratory:

The Pneumatic Station should be able to send and receive carriers from the same unit.

Inserting a carrier into the pneumatic station and selecting a target number should be possible independent from

system status.

Page '¥/ U,

Page 125: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

It should control the condition of the receiving station when sending to the selected receiving station is possible.

It should be Microprocessor-controlled.

The Lab should be provided with Multi Receive and Multi Send Station to handle bulk loads.

It should be designed as a fully automatic dispatch and receiving unit and can only be used as end station.

The Pneumatic Station should be Steel made, maintenance free gear mechanism, with self adjusting optical

switches, with self adjusting maintenance free gaskets for noise less operations, contact less sensoring of the unit

positions. With RFID readers for carrier ID and inventory, which should ensure automatic carrier redistribution to

its home address & also non-acceptance of any items than authorized carrier.

It should be built in a way that after a power failure it is self-examining and if necessary self-repairing.

It should have Air cushioned soft landing facility for arriving containers to protect samples.

It should be provided with carrier rack & PVC Slide bend, sliced from the top for soft landing of the samples.

Dimensions: 100 (H) x 32(W) x 30(0) cm OR EQUIVALENT

Station 160mm - Automatic unload:

The Lab should be provided with an Automatic Unload Pneumatic Station.

When the carrier comes into the pneumatic station it should automatically open inside the stations (without

exiting the station), sample bags should slide out, the carrier should automatically return to its origin pneumatic

station based on RFID transponder technology.

The Pneumatic Station should be Steel made, maintenance free gear mechanism, with self adjusting optical

switches, with self adjusting maintenance free gaskets for noise less operations, contact less sensoring of the unit

positions. With RFID readers for carrier ID and inventory, which should ensure automatic carrier redistribution to

its home address & also non-acceptance of any items than authorized carrier.

Should have Air cushioned soft landing facility for arriving containers to protect samples above the station, with

the help of slide gate.

Should be provided with carrier rack & SS Slide for sample soft slide-landing.

Touch Screen Panel for Critical Areas:

PTS Stations of Critical areas i.e. ICU, OT, Pharmacy, Sample Collection & Dialysis should be provided 7" touch

screen display with multifunctional operation screens in Pneumatic Station with the following features:

1. LCD display I 7" touch screen display with multifunctional operation screens 2. Touch panel operation via finger, safety gloves or styluses 3. Individual programmable user profiles and customized hotkeys 4. Individual authorization levels for personalized users profiles S. Touch screen surface protection for easy cleaning addressees are individually programmable; Search

button and addressee index simplify the usage.

Page JB ·2,1

Page 126: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

6. With integrated Bar Code Reader for Pharmacy Stations, Bload Bank Stations, Lab Station and Sample Collection anly.

Inter Connector Zone System:

The system is provided with the State of the Art "Inter Connector Zone System" which provides an excellent

throughput and has fast transfer capabilities.

Inter Connector Zone is the only system:

}> Transfer time per carrier 10 seconds. }> Having one storage unit for different carriers. }> Occupies a less space. }> can connect up to 6 lines.

Forwarding Tube:

Forwarding tube should include the cost of cable and other tube mounting accessories as are required for

networking between Pneumatic Stations. Every Station and Diverter must provide transparent tube.

The forwarding tube should be made of PVC of 160 mm OD x 153.6 mm ID. Good Physical tensile strength, general medium density, absorption of water, combustibility self-extinguishing.

Bends: It should be of 90 deg. with radius not more than 800 mm (centre) with length approx 1.5 mtrs, for optimal space

utilization, grey colour.

Composite System Cable: It should not be localized and it should be imported with company brand name marked.

Inserts:

Eprouvette Bag PVC for holding vacuutalners.

Diverter:

The forwarding tube diverter must provide one incoming and three outgoing delivery tubes. The Diverter must

provide a smooth connection between incoming and outgoing tube, to prevent impact on transported items. A

maintenance free belt driven rotary oscillating pipe has to be pneumatically sealed to the device housing, to

prevent air loss, self-adjusting Teflon gaskets have to provide airtight operation in vacuum and pressure operation.

Dimensions: llS(H) x SO(W) x 40(0) cm

Carriers:

Carrier for hospital use should be with easy to operate swivel top mechanic, sealed load chamber, to prevent

contamination of tubing in the unlikely event of spill of transported goods. This must be realized only by closing

the sealed swivel top mechanism.

The "closed" position should be fastened in a lock-in position. The lid should be kept in this position by a spring

force and has to be equipped with seals. Furthermore the design of the container must be done in a way that an

j)r / Page :5 l.~

Page 127: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

open carrier can't be sent. Any carrier has to be equipped with two free programmable data transponder, system

according to send receive device used by the manufacturer In the Pneumatic Stations send magazines.

Transponders are used to electronically identify any carrier by a unique address and to offer the user automatic

redistribution to home Pneumatic Station and optionally a second address for dedicated locations or special

carrier use. The carriers must provide a easily visible wear and tear resistant colour coding system, which must be

changeable also on site by the user without damage and not requiring special tools.

Normal Carriers should be 134 numbers in quantity.

Inside-loading-dimension for carrier 0 160mm swivel top 0115 x 400mm

Outer-dimension for Carrier 0 160mm swivel top 0150 x 420mm

EQUIVALENT SPECS OF ABOVE WILL ALSO BE ACCEPTED

With suitable holders of vaccutainers and a pair shuttle bung for each container.

Automatic Unload Carriers:

Automatic Unload carrier should be such that no manual handling be required.

The carrier should automatically unload ·at the Pneumatic Station then automatically close & go back to the origin

Pneumatic Station.

The system should not accept an open carrier.

The carrier should also be able to open manually.

It should have at least two free programmable data transponder system.

Automatic Unload Carriers should be 41 numbers In quantity.

Inside-loading-dimension for System 0 160mm swivel top 0110 x 260mm OR EQUIVALENT

Page 30 ~

Page 128: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

The system provided should be equipped with RFID reader cards on all stations (except for Stations which are only

for receiving), for a proper management of Carriers with the help of return of empty carriers. All the carriers

should be equipped with RFID Chip on both sides of the carrier and should be programmed for the home station

no.

S. No. Name of Item Qty

1 Main Controller with Wireless Tablet for Maintenance Department 1 Set.

2 Blower 5 Nos.

Station 160mm

3 (a) Pass Through Type - 39 Nos. 41 Nos.

(b) Multi Receive and Multi Send Station (Combo)-1 No.

(cl Automatic unload - 1 No.

4 Inter Connector Zone System 1 Set.

5 Forwarding Tube 2200 Mtrs.

6 Bends 210 Nos.

7 Composite System Cable 3200 Mtrs.

8 Inserts (per station) 2

9 Diverter - 3 Way 14 Nos.

Carriers

10 175 Nos.

(a) Normal Carriers .134 Nos. (b) Automatic Unload Carriers - 41 Nos.

In all stations 11 RFID (Included) and carriers.

12 Special Adhesive Glue 110 Ltrs

13 Sleeve 2100 Nos.

14 Monitor/Mouse/Keyboard LG/Samsung/

HP

Tubing Material & Other Accessories sourced from India, including: Pipe Clamps,

15 Screw Bolts, Conduit for Composite System Cable, Cable Clips, Hose Clamps & Indigenous

Baskets, Cushions and Racks for Stations

n / Page . '.IO

Page 129: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

SPECIFICATION FOR VERTICAL & HORIZONTAL BED HEAD PANEL

1. Supply Inst a llation Testing & Commissioning of ceil ing Mounted Bed Head Pane l Vertical Bed Head Unit- Imported

The bed head unit will provide a safe, efficient means of delivering services to patients/staff in general wards application. Original concept "static" equipment (such as inhalers, monitoring) for a better mobility of the movable equipment (such as infusion pumps, infusion stands) .Designed equipment for more security and comfort for medical staff :static column, movable arm and efficient care lighting (optional).

The bed head unit will meet the following criteria: 1. 3 thick aluminum profiles strong column for a secure load (up to 250 kg) and eventual front bed

shock. 2. Aluminum profiled compartments for electricity and gas (6 separate compartments with clipping front covers for easy maintenance). Real segregation between electrical components and medical gas equipment.

3. Its modular design allows any extension of additional equipment (electrical sockets, data sockets, medical (gas outlets). Without need of manufacturer. 4. Economy: no double wall mounted equipment required (copper piped medical gas outlets).No special installation required. 5. Large space between outlets allowing a direct connection of the flow meter on column. 6. Medical equipment are placed in the "dead" angles and closer to the bed where "static" equipment is placed. 7. Easy organization of medical staff around the patient (head and body) and large possibility of control on equipment on 360° without constraints. 8. Easy access to infusion installation. Full 260°horizontal arm space movement allowing a large circular movement over the bed (possible height adjustment up and down of 420 mm). 9. The wide shelf can be placed at 6 different places around the column. Many possibilities for all types of accessories or equipment, by the 3 stainless steel tubes position. 10. New technicity of care requires adapted lighting. The 40 000 lux care lamp is the answer to efficient lighting.Easy handling and movement (operation theatre lighting technique). 11 . Movement on 3 axis and over the whole surface of the bed. 12. ELV halogen lamp. Possible dimming on request. 13. The movable area "head" acceptsa large quantity of required electricalsockets for such infusion areas. 14. The 2 stainless tubes (diameter30 mm - height 700mm) can receiveeither 6 standard Syringe pump +6 optional or all types of shelves, rails or biomedical equipment(extra infusion rod can completethis range). 15. Load capacity:40 kg. OR EQUIVALENT 16. Segregation of services i.e. extra voltage (less than 48 volts) low voltage (less than 600 volts but greater than 48 volts) and medical gases will be maintained throughout. Individual modular fascia plates will be removed using a screwdriver, allowing easy access for services. The bed head panels will be European CE marked to medical devices directives and will be duly EN 41312588 certified. OR EQUIVALENT 17. Color choice is available as per the design/color of wall & flooring of the ICU. Designed equipment for more security and comfort for medical staff: static stainless steel mounting brackets, rounded shape design polycarbonate box with cover and efficient care lighting (optional).

Page ie ; I

Page 130: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

2. SPECIFICATION of Horizontal Bed Head Panel Horizontal Bed Head Unit- Imported

The bed head unit will provide a safe, efficient means of delivering services to patients/staff in general wards application. The bed head unit will meet the following criteria:

1. Modular system for all brands and type of medical gases outlets, stainless steel mounting brackets, and rounded shape design polycarbonate box with cover. Possible use of manufacturer's gas cover. 2. Medical gas and electrical equipment placed on trunking rail individual insulation by plastic box. 3. Total Segregation between IV and elv services. Individual covers for electricity and medical gases with Efficient and invisible ventilation. 4. The electrical and gas equipment's should be completely modular which allows the components to be extended and/or re-moved with individual box. 5. General up lighting by a removal batten equipped with 1 or 2 fluorescent tubes with integration night light. 6. Direct reading/cares light by 1 or 2 fluorescent tubes on 45 degree sloping panel. Easy access to lightings with protection of unbreakable polycarbonate diffusers with a double prism.

~ /

Page 18 i 'l../

Page 131: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

-.,

Technical Specifications For Nurse Call System (Imported)

(The System should confirm ALL INTERNATIONAL CERTIFICATIONS OF US/UK/GERMANY/EUROPE

PART 1 - GENERAL

OVERVIEW Should Furnish and install all equipment, accessories, and materials in accordance with these specifications and drawings to provide a complete and operating Nurse/Patient

1.1 SCOPE OF WORK: Should Furnish and install a Nurse/ Patient Communications System comprised of nurse consoles, patient stations, dome lights, entertainment cords, call cords, pull cord stations, emergency push button stations, bed side-rail interfaces, pocket page interfaces, computer interfaces, printer interfaces, wireless/ telephone network interfaces and wiring as shown on the drawings

The Nurse/Patient Communications System should be installed initially in the specified areas and then be expanded in the future to additional areas. Systems provided in the initial area shall have the capacity to expand to provide seem-less service to the entire facility.

All necessary equipment required to meet the intent of these specifications, whether or not enumerated within these specifications, should be supplied and installed to provide a complete and operating nurse/patient communications network.

1.2 REFERENCES A. Underwriter's Laboratories Standard 1069 (UL1069)

B. Canadian Standards Association

C. National Electrical Code

D. U.S. Dept. of Labor/ Occupational Safety and Health Administration

E. State Hospital Code/ Joint Commission of Hospitals - Nurses Call Requirements

SYSTEM SUPPLIER QUALIFICATIONS

The System Supplier should be an Authorized Distributor for the product proposed with full manufacturer's warranty privileges.

The System Supplier should have technicians who have attended and successfully completed the manufacturer's technical certification classes for the proposed system.

PART 2 - PRODUCTS

2.1 QUALITY ASSURANCE

The nurse/ patient communications system should be listed by Underwriter's Laboratories under UL

Standard 1069 - 6th Edition (published March, 2001). Underwriter's Laboratories shall be the only acceptable NRTL for system listing.

2.2 HEAD-END CONTROL EQUIPMENT

A. Power Supplies - Should Provide ample power for control equipment, consoles, patient stations, sub-stations, and corridor lamps. All system power supplies must be UL1069 listed as an integral part of the core system. Power supplies which carry only component listings or are otherwise not part of the core system UL listing are not acceptable.

Page :illl ; J,,

Page 132: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

2.3

2.4

2.5

B. Should Furnish as needed in each area a nurse/patient communications network hub controller. The system as a whole shall be capable of supporting at least 25 hub controllers. Each hub controller shall provide the following: I . Support for at least 10 console clusters consisting of standard LCD consoles or annunciate panels.

2. Support for at least 150 rooms. C. It shall be possible for network hub to act as stand alone controller should loss of nehvork

communication occur. D. System Audio - The system shall be designed to provide audio meeting the minimum standards

detailed by the National Electrical Manufacturers Association standard for nurse call system audio.

I. The system should utilize 25 Volt balanced signal distribution behveen head end equipment and room stations.

2. Audio transmission beh\'een hub controllers shall be digital.

CALL ROUTING / PROCESSING

A. Call Routing - The system should support the routing of patient calls to any console, pager, phone or other annunciating device anywhere in the facility or to any combination of the above regardless of the location of the calling station. Calls may be routed and processed based on location, priority or combination.

I. The system should support the ability to swing any individual room or any group of rooms by touching one labeled touch point. Room(s) and consoles may be located anywhere within hospital nurse/patient communications nehvork.

2. The system should allow a console to capture an individual nursing unit, selected units, or all units in hospital by touching single custom labeled touch point. .

B. Call Priorities - The system should support a minimum of 200 unique, user-definable call priorities.

I . Eacl1 call priority should be reported via a user-defined nmemonic of up to 14 alphanumeric characters.

2. Selectable call-in tone type, level, and corridor light behavior for each type of call priority.

STAFF REGISTRATION

The system should support staff registration. Staff members may, by pressing a dedicated button when entering a room, indicnte their presence to the system. Staff presence in the room shall be indicated by illuminating the room's green corridor lamp. A. Users may review the location of staff members using an LCD Console and / or an Annunciate Panel. B. If a call or service requirement is present in the room when a staff member registers into the room, the

system should automatically cancel the call(s). C. If a call is placed from a room in which a staff member is already registered, the system should be

capable of automatically upgrading the priority of that call to indicate the need for staff assistance.

SERVICE REQUIREMENTS

The system shall support service requirement reminders. Staff members may, by pressing a button on the console, initiate a service requirement reminder. A. Service Requirements shall be indicated on the corridor lamp by a flashing lamp. B. Users may review the location of service requirements using an LCD Console and I or an Annunciate

Panel. C. If a service requirement remains unanswered for a pre-determined period of time, an overtime call

shall automatically be initiated.

2.6 STAFF FOLLOW

The system should support manual or automatic Staff Follow functions. When Staff Follow is enabled, call­tones for a prescribed area will automatically be fonvarded to the room station speaker where staff

} / Page :e;~

Page 133: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

members are located. Staff location may be detennined manually by entering the room number into the console or automatically using staff register stations. Pressing the call button on Uu1t station shall silence the tones. When a new call is placed, the tones shall automatically be restored.

27 ROOM MONITORING

The system should allow staff members to audibly monitor selected rooms. A. Manual Monitor - Staff members may listen in to a selected room. B. Sequential Monitor - Staff Members may enter a selected group of rooms for monitoring. The system

will automatically switch from room to room allowing the staff member to sequentially monitor the rooms. ·

1. During monitoring, U1e staff member may press a button on the console to stop on the current room to listen longer and Ulen press Resume to restart the sequencing.

2. The staff member may adjust the time U1at tile system spends on each room.

3. During Sequential Monitoring, the number of the room currently being monitored shall appear on the console.

28 ROOM PRIVACY

The system should allow staff members to place a room in Privacy Mode to prevent unauthorized or accidental audible monitoring of tile room. A. Rooms may be entered into or removed from Privacy by staff members using the console. B. When a room that is in Privacy is dialed from a console or telephone, the staff member may speak into

U1e room but Uley may not listen to the room.

I . Privacy in the room may be temporarily suspended to allow two-way communications by pressing U1e call-in button in the room. When the conversation is terminated, Privacy shall automatically be restored.

2. If a call-in is placed from U1e room, the call may be answered from tlle console as normal using two-way communications.

C. The rooms in privacy may be reviewed from tile LCD console.

I . During the review process, rooms may be removed from Privacy mode.

29 CONSOLES/ ANNUNCIATOR PANELS

System consoles should be provided as indicated on tlle plans and drawings. All system consoles shall be UL1069 listed as an integral part of tlle core system. Telephones, personal computers or other devices which carry only component listings or are othenvise not part of tlle core system UL listing are not acceptable.

A. LCD consoles:

1. The LCD console should be a small self-contained unit, which shall not occur; more Ulan 87 square ind1es of desk space. The console shaJJ include an easy-to-read 4-line SO-character backlit LCD display.

2. The console should provide function selector buttons and a telephone-style 12-button dial pad. Selector buttons may be used to access user-configured 24-function menu.

3. The console may display up to three incoming calls each with an individual elafsed timer indicating how long the call has been pending. Ability to scroll to see additiona pending calls.

4. While idle, tlle console should disl,'lay the time of day. Time may be displayed in 12 or 24-hour format. Time display shall be cons1Stent system wide.

5. Console shall include capabilities for botll open voice (speaker / microphone) and telephone style handset. Audio direction (talk / listen) for speaker / microphone and handset may be accomplished via automatic voice switching (VOX) or manually via a Push-to-Talk button.

6. The highest priority (or longest pending) call may be answered automatically by lifting the handset or by pressing U1e Push-to-Talk button. Calls may be answered out of sequence using line selector buttons or by dialing the desired room number.

Pageff!i ~

Page 134: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

7. Console shall provide independent volume controls for day / night call-in tones. A Mute button shall be provided to temporarily suppress tones for pending calls.

8. The console may be desk or wall mounted.

9. The console should employ a modular quick-disconnect connector. It shall be possible to remove and/ or replace the console without removing power from the system.

B. Annunciator Panels I . Annunciator Panels should be small sell-contained units.

2. Each Panel will include 36 room indicator points. Each point will include two LED indicators and space for labeling the point.

a. The LED's should provide visual annunciation of room status. Indications will include calls pending, service requirements pending and staff presence.

b. Variable colors and flash rates should provide differentiation of annunciation. A Minimum of six distinct tone types shall be available for different types of calls.

3. Up to eleven expanders may be added to the panel each adding the ability to process 36 additional room points per expander.

4. Panel shallJrovide indeP.endent volume controls for day / night call-in tones. A Mute button shall be provide to temporanly suppress tones for pending calls.

5. The panel may be desk or wall mounted.

6. The panel shall ernrloy a modular quick-disconnect connector. It shall be possible to remove and / or replace the pane without removing power from the system.

210 CORRIDOR LAMPS/ ROOM CONTROLLERS

2.11

Corridor Lamps ( 4-lamp style) should be provided as indicated on the plans and drawings. A. Corridor Lamps shall utilize LED's for high visibility, long life and low maintenance. Corridor Lamps

utilizing incandescent lamps shall not be acceptable.

I . The corridor lamp shall make use of multiple colors and programmable flash rates and patterns to indicate pending calls, service requirements and staff presence.

B. Corridor Lamps shall serve as the hub for all room wiring. All field wire connections shall be accomplished using modular connectors.

C. Any Corridor Lamp shall be able to function as a Zone Lamp that shall visually annunciate calls from assigned rooms/ stations without the use of a Zone Lamp controller such as a duty station.

D. The Corridor Lamp shall be equipped with a heart-beat LED (visible to service personnel) to indicate that the unit is functioning properly.

E. The Corridor Lamp shall accommodate a paper label to indicate the room number. The manufacturer shall provide, at no cost, laser-printing template software to create custom room labels.

ROOM ST A TIONS Room Stations (single) should be provided as indicated on the plans and drawings. A. Room Stations shall be equipped with:

I. DIN style receptacle(s) for call cord or pillow speaker.

2. Stations in areas requiring two-way communication shall be equipped with a speaker microphone with level matclting transformer.

a. Minimum speaker size shall be 3.0" / 7.6 cm

3. Reset Button to cancel pending calls. Reset button shall be able to cancel calls from other stations in the room if desired.

4. Green LED to indicate that audio to the station is active.

5. Red LED(s) to indicate call placement from one or both of the call points.

6. Push call button with cancel button Patient station . B. Room Station functions shall include:

I. Calls from dual stations should be annunciated independently.

2. Removing a call cord shall place a Cord Out call.

Page YI~

Page 135: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

.-

212

a. Cord Out calls may be cancelled locally using the Cancel Button. No Dummy Plugs shall be required.

C. Room Stations should employ modular connectors. It should be possible to service Room Stations without removing power from the system.

D. Room Stations should support inputs frosm local equipment alarm contacts (e.g. ventilator, IV drip, fire detector, etc.) to notify console of local alarm condition in patient room. There shall be at least four auxiliary call in identifications available.

SUB-STATIONS Provide Sub-stations as indicated on the plans and drawings. Sub-station types shall include: A. Pull Cord Stations - Pull cord sub-stations should be water resistant with a PVC (poly-vinyl chloride)

pull-cord, membrane reset button and covered call assurance LED. Unit may utilize remote cancel button for ease of nurse cancel when pull cord station is mounted in inaccessible location (e.g. ceiling).

B. Dual Call Pushbutton Stations - Dual Call Pushbutton stations should be equipped with two call buttons, reset button and call assurance LED's.

I . Call Button shall be labeled to clearly define its function.

2. Call Buttons shall annunciate independently of one another.

3. Call Buttons shall be backlit for easy location / identification in reduced light settings and shall be labeled to clearly define its function.

4. Reset button should be able to cancel calls from other stations in the room if desired,

5. Bottom Call Button can start a digital clock/timer is shown on plan, sub-station shall interface (10 mA, opto-isolated output) for count up timer feature.

2.13 PATIENT ENTERT Al NM ENT SPEAKER/ CALL CORDS

Patient Entertainment Speakers/ Call Cords should be provided as indicated on the plans and drawings. All Patient Entertainment Speakers I Call Cords shall be UL1069 listed as an integral part of the core system. Devices which carry only component listings or are otl1erwise not part of the core system UL listing are not acceptable. A. Patient Entertainment Speakers - Patient Entertainment Speakers should be provided for patient call-in

and entertainment system control / audio.

I. All control buttons including call button should be raised and textured membrane style. Buttons shall be labeled graphically for easy identification of functions. Control buttons shall be Braille embossed.

2. Control buttons shall include:

a. Single easy to activate call button

b. Television/ Radio controls as required.

3. The TV control mechanism shall be analog or digital as required by the facility televisions.

4. Cord shall be 10' / 30Ckm and shall be modular for replacement by maintenance personnel. A sheet dip shall be attaclled to the cord.

5. Speaker (minimum size 225" / 5.7cm) shall be liquid resistant. Thumb-wheel volume control shall be provided.

6. Call Assurance LED shall be integral to the unit.

7. Cord Saver - All Patient Entertainment Speakers shall be provided with a 15" I 3&m DIN style Cord Saver.

8. Patient Entertairm1ent Speaker Hanger - All Patient Entertainment Speakers shall be provided with a wall hanging bracket.

214 REPORTING SOFTWARE Reporting Software should be provided with the system to allow for recording and reporting of system activity. A. The Reporting Software should be installed on a Personal Computer which shall in tum be connected

to the Nurse/ Patient Communications System. B. Reporting Software should support real time system activity display.

Page(JBJ)

Page 136: 1===~~ - - :: UPRNNuprnn.co.in/tender/pre_bid_queries_020915.pdf · Please provide the Soil Investigation report of the O t Att h d · t acumen ac e . _,prQJ ... Sanitary Ware-Cera

I . Real time call waiting display with the ability to filter by call types and nursing units. Call information shall be displayed and caU-in tones shall be sounded.

2. Real time Nurse Communications Network service reminder display and staff locations.

3. Should the connection between the nurse / patient communications system and the Reporting Software PC be lost, a warning signal shall be generated by the Reporting Software.

C. Reporting Software should allow users to generate/ print reports on system activity. Access to reports shall be controlled based on user name and password. Reports shall be capable of indicating call priority, room number and patient information, call placed time, service reminder set, staff registration.

I . Reporting Detailed Analysis of Call Data by Arca

2. Analysis of Call Data by Arca

3. Analysis of Call Data by Room/Bed

4. Analysis of Call Data by Resident

5. Resident 01eck-Jn Exception

D. Reporting Software shall support a networked operation in which the Management Software PC is connected to the hospital LAN. Users with access to the LAN can then generate reports from local work stations.

2.15 CHASSIS FAULT, POWER MONITOR, AND SUPERVISED CODE Provide a separate chassis short / power fault monitor to monitor integrity of network wiring for short(s) to earth ground and to notify staff of loss of power. An audible alert tone shall sound if short or loss of power is detected. Provide test button to test operation.

2.16 SYSTEM DIAGNOSTICS The system should provide continuous self-diagnostics. The system shall also support advanced computer diagnostics by local or remote technical personnel. A. All components in the system shall be continuously supervised for both power and signal to

ensure proper operation and in the case of system faults to aid in troubleshooting. B. The system shall have the ability to diagnose all network active components, controllers, control

stations, and sub-station operation from any designated nehvork data interface location, on or off site. Nehvork administrator shall be able to:

I . Review system faults reported (i.e. station failure) C. TI11.: system shall provide the ability to automatically notify maintenance personnel via pocket

page in the event of a system trouble or failure.

NOTE: EQUIVALENT OR SIMILAR NURSE CALL SPECIFICATION CAN ALSO BE

QUOTED WHICH CONFORM TO INTERNATIONAL STANDARDS FROM

US/UK/DIN/EN ISO/EUROPE

Page 19 J. E


Recommended