17/08/2011 Witoon Charoonyingyong Slide 1 1-stop-shopping for CDM @ E+H CDM Packaged Solutions
Transcript
Page 1: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

Witoon Charoonyingyong

Slide 1

1-stop-shopping for CDM @ E+H

CDM Packaged Solutions

Page 2: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 2

Content

Awareness…

Endress+Hauser ” The people for Process Automation

Solutions & Metering ” Pitfalls & Benefits

Calibration & Verification Services

Page 3: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

Witoon Charoonyingyong

Slide 3

Awareness...CDM ” at the end, it’s all about money…

Page 4: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 4

At the end, it’s all about money…

1. After the project is registered, the countdown starts. The longer your project takes, the less money you get.

2. UNFCCC Regulations are complex and changes are regularly. At the same time PDD’s are not 100% complete or lead to misinterpretation. Adjustments on site can occur but the PDD is the MASTER.

Time

Money

Flexibility

Competence

3. Humans intend to choose the most economical solution which is directly linked to the performance. For CDM projects, measuring performance is directly linked with the amount of CER’s.

Accuracy

Reliability

4. Every plant shutdown is a loss of money. The time to fix the problem is important.

TimeMoney

Competence Reliability

Time Money Flexibility Competence Accuracy ReliabilityKey Factors:

Page 5: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 5

What are the drivers for CDM investors?

On the example of a PDD:

Fossil fuel replacement with Methane capture from anaerobic digestion of bio waste.

The solution has to be:

As efficient as possible

Easy and fast to implement

Lowest risk in CDM validation process

Fastest return of investment

Durable to ensure the Verification after years of operation

Time Money Flexibility Competence Accuracy Reliability

Reliability

MoneyAccuracy

Competence

Time

Accuracy

Flexibility

=

Reliability

Page 6: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 6

There are different ways to build a Biogas plant

The simple way without any technology…

Page 7: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 7

Luaks Hablützel

Slide 7 / 44

There are different ways to build a Biogas plant

The professional way with process control forhigh efficiency and accuracy

Page 8: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 8

The proven way

Of course, there are many other ways between how to build a Biogas plant, but

there is not much flexibility in the way to engineer a CDM project…

Our competence and our solutions will help to

implement the CDM Biogas projects much faster and doubtless proven.

How a system integrationshould not look like!UNFCCC

CDMproject

Time Money Flexibility Competence Accuracy Reliability

Page 9: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 9

Accuracy is important for best ROI

Application example:

An average Palm Oil extraction plant

is processing 500t palm fruits per day.

Using the effluent to produce biogas,

the plant is able to generate

500,000 Euro (22 M THB) /a CER

Means 1,500-2,000 Euro (66,000-

88,000 THB) /d CER

Questions:

- How many days do you need to clarify with several suppliers several possible solutions?

- How do you control the delivery time of several suppliers?

- Who is doing the service for all the different instruments?

- 1-stop-shopping means 1 contact for all clarifications, procurement & services. You will save time and reduce risk…

Page 10: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 10

Business Model ” Example of ROI calculation

ROI example of a typical Palm Oil:A mid size Palm Oil Mill with capacity of 60t FFB / h ( Fresh fruit Bunches) and 10h/d working time will produce 500m3 POME/d (Palm Oil Mill Effluent) with an estimated COD value of 60- 70.000 mg/l

Biogas production /1m3 POME with 60 000 mg/l COD = 27.00 m3 Biogas (Norm)Methane Efficiency of POME 70%Vol. = 18.90 m3 MethaneCarbon Dioxide 20%Vol. = 5.40 m3 Carbon DioxideWater vapor 7%Vol. = 1.90 m3 MoistureHydrogen Sulfide H2S 2.5%Vol. = 0.67 m3 H2SOthers gases 0.5%Vol. = 1.35 m3 other gases

Mass / Density of Methane: 0.717 kg/m3, 18.9m3 CH4 = 13.55 kg Methane GWP (Global Warming Potential): x 21 = 284.60 kg CO2eq / m3 POME

Energy content: POME 500m3/d = 20.80 m3/h POME (continuous flow)Methane Production = 393.12 m3/h CH4

CH4 Energy content 10kWh/m3 = 3931.00 kWh/h CH4

CHP conversion 32% electricity = 1179 kW/h = 1.18 MW/h

CER’s (Carbon Emission Reductions) per year (300 working days)Calculation : 500m3

POME/d*360d*18.9m3CH4/m

3POME* 0.717kg/m

3CH4*21GWP/1000 = 51 223 t CO2e / a

Remark: Minus Leakage, energy consumption, etc. Estimated CER price : 13EUR / 1t CO2e

Total generated CER’s = 1.850 EUR (81,400 THB) / d= 55.500 EUR (2.44 M THB) /m= 666.000 EUR (29.3 M THB) /a

Page 11: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

Witoon Charoonyingyong

Slide 11

Endress+HauserThe People for Process Automation

MoneyCompetence =

Page 12: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 12

Welcome to the world of Endress+Hauser

Page 13: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 13

8.600 service-oriented employees worldwide…

Holding company in Reinach, Switzerland 19 production facilities in 11 countries Endress+Hauser sales centers in more than 40 countries Representatives in over 70 other countries Three regional sales support centres

We are worldwide yet still close to our customers!

Page 14: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 14

Our service offer

Our range of services and software solutions help to make our customers’ processes work at optimum efficiency:

Commissioning

Operation

Maintenance

Calibration & Verification

Repair

We support our customers with comprehensive solutions for process engineering:

System integration

Inventory maintenance

Process control

Time Money Flexibility Competence Accuracy Reliability

Page 15: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 15

The Position of Endress+Hauser

Owner / Investor / Operator

CDM Consultant Biogas EPC

Authorities

Automation

Ensure CDM compliant automation solutions and calculate CER’s.

Process Design and Performance with PI&D according CDM rules.

PI and PDDCDMTeamWork

Time Money Flexibility Competence Accuracy Reliability

Page 16: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

Witoon Charoonyingyong

Slide 16

CDM Packaged SolutionsOne-stop-shopping saves time and reduce risk…

Time MoneyCompetence+ =

Page 17: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 17Slide 17 / 44

CDM Monitoring Solution - CARBOSYS CH4

CARBOSYS CH4 is a well balanced fully integrated system for Biogas and Landfill

applications with:

“ Air conditioned cabinet

“ Safety concept for highest availability

“ Memograph data manager to ensure data collection

“ Gas composition measurement

Time Money Flexibility Competence Accuracy Reliability

Page 18: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 18

Carbosys solution CDE70

CARBOSYS CH4

Is a fully integrated system, build in an air conditioned

cabinet with Memograph, gas composition measurement and

gas humidity measurement.

The solution is engineered with a safety concept for

hazardous areas and highest availability.

Accuracy is important:each % accuracy loss will cause

3,000-7,000 EUR loss/a of CER’s (132,000-308,000 THB)

Our max. uncertainty is 4.09% at the standard unit,with auto cal of gas composition measurement we reach <2.5%

Time Money Flexibility Competence Accuracy Reliability

Page 19: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 19

Luaks Hablützel

Slide 19 / 44

The Carbosys CH4 Solution

Gas composite measurement

CH4,CO2

H2SO2

Power

Gascooler

Actual flow CH4

Total CH4 Mass

Biogas %Vol. CH4

Biogas

CabinetAirCon

FN

Exhaust

UPS

Output / Display :(customized)

Ethernet

Condensate

GSM Telealarm

P TMdP T

Page 20: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 20

Remote Monitoring Data Acquisition Concept

Head quarter ofCDM Project owner

CDM Project 1

CDM Project 2

CDM Project 3

CDM Project 4 CDM Project…n

Communication over“ GSM, GPRS“ TCP/IP Ethernet, Internet

“ Collecting monitoring data“ Get error messages“ Get status reports

Time Money Flexibility Competence Accuracy Reliability

Page 21: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

Witoon Charoonyingyong

Slide 21

Metering SolutionsFlow measurement & Gas Analyzing Systems

MoneyAccuracy =

Page 22: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 22

Offering - Flow measurement - Summary

Prowirl (Vortex flow measurement)

“ Minimal flow rate has to be >10% of the measuring range “ The Vortex has more weight than dp-Flow “ Higher price but lower maintenance

Deltatop (Differential pressure flow measurement)

“ Even measuring results under low flow rate (increased uncertainty)“ Deltatop is according ISO 5167 “ Simple calibration over on site Zero-Point adjustment of dp-sensor and

orifice plate inspection

For the CDM measurement the accuracy of the flow measurement is important to get the most CO2eq and therefore the best ROI.

Time Money Flexibility Competence Accuracy Reliability

Page 23: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 23

CDM Solution with VortexNote: low-flow needs to be considered!

PT

Volume Flow QV

Pressure PTemperature T

FV

MODBUS

Gas composite measurement - Methane %V dry gas- CO2 %V dry gas

Complete calculation inside Memograph M

TM

Humidity: If the Biogas is water saturated Temperature is = °C dew point

Time Money Flexibility Competence Accuracy Reliability

Page 24: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 24

CDM Solution with dp-flow

P T

Norm Volume Flow QN

Volume Flow QV

Pressure p, Temperature T

dP

Operationaldensity

MODBUS

MODBUS MASTER

4-20mA

4-20mA

TM

Humidity: If the Biogas is saturated with water temperature is = °C dew point

Gas composite measurement - Methane %V dry gas- CO2 %V dry gas

MODBUS

RMC621 : Standardized flow calculationaccording DIN/ISO 5167 traceable forGMP and custody transfer solutions.

Ethernet / WWW

GSM ModemRemote Alarm

Time Money Flexibility Competence Accuracy Reliability

Page 25: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 25

Gas Analyzing Systems

Page 26: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 27

3. Portfolio/Offering - Gas Analyzer

Gas Range principle Accuracy repeatability Drift/a

CH4,

CO2

100 Vol.-% Infrared

two-beam

p. and t.-corr.

±2%o.range ±0,2%o.range ±2%o.range

O2 0-25 vol.-% paramagmetic ±0,1%o.range ±0,2%o.range No drift

H2S 0-20 ppm

0-5000ppm

Electrochemical ±3%o.range ±1%o.range ±2%o.range/month

±5%

Standard Uncertainty … as given !… ‚improved‛ uncertainty due to ‚auto calibration‛ Carbosys reaches :

+/- 0.6 Vol.-% and 0 drift!

Time Money Flexibility Competence Accuracy Reliability

Page 27: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 28

Service Strategy for CDE70

The fundamentals of the CDM solution is a certified and GMP conform system

controlled by an external authority. The customer has therefore only limited access

and maintenance task.

“ Visual Control of tubing and pumps.

“ Cleaning of the cabinet“ Confirm Alarm settings

“ Recalibration“ Replacement consumables“ Replacement spare parts“ Inside Cleaning of the cabinet

Customer responsibility: Endress+Hauser responsibility:

All actions on the Carbosys are monitored and recorded. Even open the door must be assigned and justified.

Time Money Flexibility Competence Accuracy Reliability

Page 28: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

Witoon Charoonyingyong

Slide 29

Increased plant availability...With on-site calibration services

Time MoneyCompetence+ =

Page 29: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 30

5 general methods to check a flow measuring point

Factory recalibration (e.g. Production Facility E+H Switzerland)

Local Calibration Rig (e.g. E+H Thailand, Flowlab)

On-site calibration with Master Meter

Verification with Ultrasonic Clam-On

eVerification with Fieldcheck

minimal process shutdown

noprocess shutdown

long process shutdown or replacement needed

CDM

Time Money Flexibility Competence Accuracy Reliability

Page 30: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 31

On-site calibration

Page 31: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 32

Master 1 / DN15Manufacturer: Endress+HauserType: 63FS15 Serial No: 413300Flow Range: 0..6,5 t/h / 0..6,5 m3/hSpecification: +/- 0.1 % of readingSCS- Calibration No: 10224767

Master 2 / DN50Manufacturer: Endress+HauserType: 63FS50 Serial No: 293930FLow Range: 0..70 t/h / 0..70 m3/hSpecification: +/- 0.1 % of readingSCS- Calibration No: 10108516

Master 3 / DN04Manufacturer: Endress+HauserType: 63AT04 Serial No: 293930Flow Range: 0..450kg/h 0..450dm3/hSpecification: +/- 0.1 % of readingSCS- Calibration No: 10224566

You partner for calibration serviceMobile Calibration Rig

Page 32: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 33

E+H Calibration ServiceMobile calibration rig with Promass / Cal. accuracy: ±0.25

Page 33: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 34

E+H Calibration Services

Mobile Calibration gun‘sCal. accuracy: ±0.25

Page 34: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 35

On-site calibration with Master Meter

General Advantages

Little down time

Meter will be checked under process conditions

Cost are low (if equipment & trained people are available)

General Disadvantages

In general: Achievable accuracy is limited- for CDM projects no issue because Vortex & dp-flow

In general: Equipment and trained people must be available - E+H has already invested in equipment and Cal. Engineers

Cost for test equipment and manpower can be high - E+H has already invested in equipment and Cal. Engineers

Limits in flow rates- for CDM projects no issue because small line sizes

minimal process Shutdown

Time Money Flexibility Competence Accuracy Reliability

Page 35: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 36

Experienced pitfalls of monitoring, metering & calibration

Buying the most economical monitoring solution results in…

…in lower total accuracy (loss of CER)

…lower quality products (more downtime, loss of CER)

…several instruments from several suppliers with sometimes different interfaces (replace or

modify instrument, additional cost, additional time)

Choosing metering equipment without consulting the experts before results in…

…wrong instruments or measuring principle in place (e.g. absolute pressure, thermal mass

flow)

Using untrained people for calibration services without proper equipment results in

…no SOP’s available (DOE probably wants to see it), higher downtime, more risk (e.g.

wrong parameterisation of the instruments afterwards)

Page 36: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 37

Customer benefits at a glance

Quick ROI: Optimized project timing due to complete solution package with CDM compliant documentation.

(Delivery time 6-8 weeks)

Ease: Preparation of PDD with pre- engineered and customized parameter, SOPs and documentation.

Safety: Data Manager provides safety for all recorded data against loss and manipulation.

Services: Competent and long term sustainable service for traceable field recalibration and documentation during the CDM validity period with SOP’s.

Page 37: 1-stop-shopping for CDM @ E+Hconference.tgo.or.th/download/2011/workshop/180811/PPT/... · 2011-09-05 · 1-stop-shopping for CDM @ E+H CDM Packaged Solutions. 17/08/2011 CTC 2011

17/08/2011

CTC 2011 Endress+Hauser (Thailand) Ltd.

Witoon Charoonyingyong

Slide 38

Any Questions?

We are the

‚People for Process Automation‛


Recommended