+ All Categories
Home > Documents > 10 1ST GENERATION MODULES - VERSION...

10 1ST GENERATION MODULES - VERSION...

Date post: 06-Mar-2021
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
22
1 Special Program for Technical-Vocational Education Information and Communication Technology Technical Drafting NC II Quarter 1 – Module 7: Draft Septic Tank and Catch Basin Detail 10 ________________________________________________________________________________________________________________________________________________________________ Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV 1ST GENERATION MODULES - VERSION 2.0
Transcript
Page 1: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

1

Special Program for

Technical-Vocational

Education Information and Communication

Technology

Technical Drafting NC II

Quarter 1 – Module 7:

Draft Septic Tank and Catch

Basin Detail

10

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 2: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

2

Special Program for Technical Vocational Education (SPTVE) Grade 10

Alternative Delivery Mode

Quarter 1 - Module 7: Draft Septic Tank and Catch Basin Detail

First Edition, 2020

Republic Act 8293 section 176 states that: No copyright shall subsist in any work of

the Government of the Republic of the Philippines. However, prior approval of the government

agency or office wherein the work is created shall be necessary for the exploitation of such

work for a profit. Such an agency or office may, among other things, impose as a condition

payment of royalties.

Borrowed materials (i.e., songs, stories, poems, photos, brand names, trademarks,

etc.) included in this book are owned by their respective copyright holders. Every effort has

been exerted to locate and seek permission to use these materials from their respective

copyright owners. The publisher and authors do not represent nor claim ownership over them.

Published by the Department of Education Secretary: Leonor Magtolis Briones Undersecretary: Diosdado M. San Antonio

DEVELOPMENT TEAM OF THE MODULE

Writer : Charlou O. Litang

Editor : Jose Garry R. Napoles

Reviewers : Analorgie D. Destacamento

Chito R. Villacampa

Illustrator : Maribel J. Fuentes

Layout Artist : Maribel J. Fuentes

Management Team:

Schools Division Superintendent : Marilyn S. Andales

Assistant Schools Div. Superintendent : Leah B. Apao

Cartesa M. Perico

Ester A. Futalan

Chief Education Supervisor, CID : Mary Ann P. Flores

Education Program Supervisor, LRMDS : Isaiash T. Wagas

Education Program Supervisor, TLE : Jose Garry R. Napoles

Department of Education – Regional Office 7

Division of Cebu Province

Office Address : IPHO Bldg., Sudlon, Lahug, Cebu City, Philippines

Telefax : (032) 520-3216 – 520-3217; SDS Office: (032) 255 - 6405

E-mail Address : [email protected]

Bitoon National Vocational High School

Address : Bitoon, Dumanjug, Cebu

Telephone : (032) 471-8001

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 3: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

3

: 10

Special Program for

Technical-Vocational

Education Information and Communication

Technology

Technical Drafting NC II

Quarter 1 – Module 7:

Draft Septic Tank and Catch

Basin Detail

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 4: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

i

Key Message

For Educators:

Learning is a constant process. Amidst inevitable circumstances, the Department of

Education extends its resources and looks for varied ways to cater to your needs and to adapt

to the new system of Education as a fortress of the Learning Continuity Plan. One of the

probable solutions is the use of Teacher-made Educational Modules in teaching.

You are reading the Technical Drafting NC II for Grade 10: First Quarter Alternative

Delivery Mode (ADM) Module on Draft SepticTank and Catch Basin Detail as written and

found in the Department of Education –Strengthen Technical-Vocational Education-

Competency Base Curriculum

The creation of this module is an effort of competent trainers from Bitoon National

Vocational High School of the Department of Education-Cebu Province during this pandemic

period. In addition, this module is meticulously planned, organized, checked, and verified by

knowledgeable educators to assist you in imparting the lessons to the learners while

considering the physical, social, and economic restraints in the teaching process.

The use of the Teacher-made Educational Module aims to surpass the challenges of

teaching in a new normal education set-up. Through this module, the students are given

independent learning activities, which embodies in the Most Essential Learning Competencies

based on the K-12 Curriculum Competencies, to work on in accordance with their capability,

efficiency, and time. Thus, helping the learners acquire the prerequisite 21st Century skills

needed with an emphasis on utmost effort in considering the whole wellbeing of the learners.

As the main source of learning, it is your top priority to explain clearly how to use this

module to the learners. While using this module, learner’s progress and development should

be recorded verbatim to assess their strengths and weaknesses while doing the activities

presented independently in the safety of their homes. Moreover, you are anticipated to

persuade learners to comply and to finish the modules on or before the scheduled time.

For the Learners:

As a significant stakeholder of learning, the Department of Education researched and

explored innovative ways to address your needs with high consideration on social, economic,

physical, and emotional aspects of your wellbeing. To continue the learning process, DepEd

comes up with an Alternative Delivery mode of teaching using Teacher-Made Educational

Modules.

Technical Drafting NC II for Grade 10: First Quarter Alternative Delivery Mode

(ADM) Module on Draft Septic Tank and Catch Basin Detail as written and found in the

Department of Education –Strengthen Technical-Vocational Education-Competency

Base Curriculum

This module is specially crafted for you to grasp the opportunity to continue learning

even at home. Using guided and independent learning activities, rest assured that you will be

able to take pleasure as well as to deeply understand the contents of the lesson presented,

recognizing your capacity and capability in acquiring knowledge.

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 5: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

ii

This module has the following parts and corresponding icons:

The first part of the module will keep you

on track on the Competencies,

Objectives, and Skills expected for you to

be developed and mastered. Some

reminders about the module are found in

here too.

This part aims to check your prior

knowledge of the lesson to take. If you

can get a perfect score and perform

competently the competency, you can

skip the module and proceed to the next

module. If not, continue to the next part.

This part helps you link the previous

lesson to the current one through a short

exercise/drill.

A brief discussion of the lesson can be

read in this part. It guides and helps you

unlock the lesson presented.

A comprehensive activity/es for

independent practice is in this part to

solidify your knowledge and skills of the

given topic. This can be a drill or exercise

or an activity.

This part of the module is used to process

your learning and understanding of the

given topic. It can be a series of questions

or an activity.

A transfer of newly acquired knowledge

and skills to a real-life situation is present

in this part of the module. This can be a

task sheet (used when doing simple

tasks), operation sheet (used when doing

or operating devices or a job sheet (used

in doing series of task for a specific job).

This activity assesses your level of

mastery towards the topic.

This contains answers to all activities in

the module.

GENERALIZATION

SELF – CHECK

LEARNING OUTCOME

REVIEW LESSON

INFORMATION SHEET

ACTIVITY SHEET

PERFORMANCE TASKS

PRE - ASSESSMENT

ANSWER KEYS

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 6: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

iii

At the end of this module you will also find:

In using this module, keep a note of the fundamental reminders below.

1. The module is government-owned. Handle it with care. Unnecessary marks are

prohibited. Use a separate sheet of paper in answering all the given exercises.

2. This module is organized according to the level of understanding. Skipping one

part of this module may lead you to confusion and misinterpretation.

3. The instructions are carefully laden for you to understand the given lessons.

Read each item cautiously.

4. This is a Home-Based class; your reliability and honor in doing the tasks and

checking your answers are a must.

5. This module helps you attain and learn lessons at home. Make sure to

comprehend the first activity before proceeding to the next one.

6. This module should be returned in good condition to your teacher/facilitator

once you completed it.

7. Answers should be written on a separate sheet of paper or notebook especially

prepared for TVE subjects.

If you wish to talk to your teacher/educator, do not hesitate to keep in touch with

him/her for further discussion. Know that even if this is a home-based class, your teacher is

only a call away. Good communication between the teacher and the student is our priority to

flourish your understanding of the given lessons.

We do hope that in using this material, you will gain ample knowledge and skills for

you to be fully equipped and ready to answer the demands of the globally competitive world.

We are confident in you! Keep soaring high!

References Printed in this part is a list of all reliable and valid resources

used in crafting and designing this module.

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 7: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

4

Good day dear learner!

This module is solely prepared for you to access and to acquire lessons befitted in your

grade level. The exercises, drills and assessments are carefully made to suit your level of

understanding. Indeed, this learning resource is for you to fully comprehend the Draft Septic

Tank and Catch Basin Detail independently, you are going to go through this module

following its proper sequence. Although you are going to do it alone, this is a guided lesson

and instructions/directions on how to do every activity is plotted for your convenience.

Using this learning resource, you are ought to Draft Septic Tank and Catch Basin

Detail as inculcated in the Department of Education –Strengthen Technical-Vocational

Education-Competency Base Curriculum

This module is composed of set of instructions for you to be guided in the activities that

you will perform later. Read and follow instructions properly, do not skip any parts and perform

each activity honestly. This module is intended for you finish within a week.

At the end of this module, you are expected to achieve the following objectives:

1. Draft Septic Tank and Catch Basin Detail.

2.

3.

Assessment Criteria:

1.

2.

3

.

Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing

layout and details/p5. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources

are found in the reference part of the module.

LEARNING OUTCOME

Perform the design procedures in Drafting Septic Tank and Catch Basin Detail.

Acquire knowledge, skills, attitude and values in Draft Septic Tank and Catch Basin Detail.

Septic Tank and Catch Basin Detail is drawn according to the Plumbing Code of the Philippines.

Septic Tank and Catch Basin Detail is drafted according to the Plumbing general

requirements.

Detail plumbing drawings and symbols are drawn according to architectural requirements.

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 8: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

5

Draft Septic Tank and Catch Basin Detail

Skills Assessment

Directions: Listed below are some of the most important skills that you must gain in order to

Draft septic tank and catch basin detail.. On the right side of the matrix lists the skills expected

of you to master. Rate yourself by checking “Not much”, if you are not so familiar yet, “A little”

and/or “A lot”, if you are already familiar with the skills. Don’t feel bad if you checked “Not Much”

in all of the skills. Keep in mind that this is being administered to determine your pre-entry

knowledge of and skills on the lesson to be presented.

Skills in Drafting Septic Tank and Catch Basin Detail

Not Much

A little

A lot

I can draft septic tank detail according to the plumbing code.

I can draft catch basin detaill according to the plumbing code.

I can perform procedures in drafting septic tank and catch basin detail according to the plumbing general requirements.

I can draft septic tank and catch basin detail and symbols according to plumbing general requirements.

After reading the introduction and carefully answering the instrument, you might have

ideas of what you will be dealing with in this module. Now prepare to set your goals and targets for this module by completing the activity below. Write your answer in your notebook.

For ease of using this module, an activity matrix is presented below for you to be guided

in reading and answering this module.

Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing

layout and details/p5-54. Department of Education- Division of Cebu Province does not claim or own the presented contents.

Sources are found in the reference part of the module

Activity/ies

1.

2.

3.

4. Answer self-check.

PRE - ASSESSMENT

Draft Septic Tank and Catch Basin Detail, answer pre-assessment and review sheet.

Perform the procedures in Drafting Septic Tank and Catch Basin Detail in activities and

performance practice.

Acquire knowledge, skills, attitude and values in drafting Septic Tank and Catch Basin

Detail in the performance task.

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 9: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

6

Test I- Questions and Answers

Directions: Answer the following review questions as a springboard to our lesson this week. Use

another sheet of paper for your answers.

1. Describe isometric water, sanitary and storm drainage layout?

2. Enumerate the steps in lay outing isometric water, sanitary and storm drainage

layout.

3. What difficulties have you noted in lay outing isometric water, sanitary and

storm drainage layout plan?

Test II- Identification

Directions: Draw the following orthographic view of listed plumbing PVC fittings below, Draw

in a piece of paper and use regular proportions for your drawing.

1. 4” Sanitary Tee

2. 4” 90 degrees Elbow

3. 4” 45 degrees Sanitary Wye

4. 4” P-trap

5. 4” Clean out

The Septic Tank

The septic system converts solid wastes into liquid by bacterial action, the wastes flow into a septic tank some distance away from the house. The liquid waste flows thru to the sewer line while the sludge remains at the digestion chamber of the tank.

The size and type of the system varies according to the number of people served, the

contour and soil type.

Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing

layout and details/p5-56. Department of Education- Division of Cebu Province does not claim or own the presented contents.

Sources are found in the reference part of the module.

REVIEW LESSON

INFORMATION SHEET

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 10: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

7

The septic tank is a receptacle for

organic wastes from the house sewer. The septic tank decomposes the elements contained in a raw sewage. It combines two processes; sedimentation and anaerobic decomposition or the sludge. As organic wastes are decomposed, the septic tank produces gases in the process, such as methane gas.

The septic tank is constructed with reinforced concrete, and it should be located at a safe distance from the source of potable water, and it should also be airtight.

SANITARY FITTINGS

Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing

layout and details/p5-55. Department of Education- Division of Cebu Province does not claim or own the presented contents.

Sources are found in the reference part of the module

Inlet

Outle

These are the following PVC

pipe fittings materials that are

commonly use in the

construction of septic tank. See

names in the illustrations.

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 11: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

8

The Typical detail of a Septic Tank

The size of the Septic Tank

The septic tank should be constructed as to have enough room for accumulated sludge.

Here are some of the suggested sizes.

Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing

layout and details/p5-54. Department of Education- Division of Cebu Province does not claim or own the presented contents.

Sources are found in the reference part of the module.

NUMBERS OF PERSONS SERVED

INSIDE DIMENSION OF DIGESTION CHAMBER

D- DEPTH W- WIDTH L - LENGTH

METERS METERS METERS

10 1.20 0.90 1.30

15 1.20 1.00 2.20

20 1.20 1.25 2.50

25 1.20 1.40 2.80

30 1.30 1.50 3.00

35 1.30 1.60 3.20

40 1.40 1.65 3.30

45 1.40 1.75 3.50

50 1.50 1.80 3.60

55 1.50 1.85 3.90

70 1.50 2.00 4.00

80 1.60 2.20 4.40

90 1.80 2.30 4.50

100 1.80 2.50 5.00

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 12: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

9

The Catch Basin

It receives water discharges from the roof and conveys it to the storm drainage line.

It is more or less of the same use as the area drain. It also serves as manhole for cleaning.

Catch basin has a grate on top and a drainage pipe that slopes away from the basin.

This box is set into the ground at a low point on the property. This pipe typically connects to the larger local plumbing system and directs the water to a sewage plant or stream.

Storm drain is a curbside drain with the sole function of collecting rainwater from our

properties and streets and transporting it to local waterways through a system of underground piping, culverts and/or drainage ditches. Storm drains can also be found in parking lots and serve the same purpose.

Directions: Answer the following question below, Use sheet of paper for your answers.

1. Describe the usage and function of septic tank in a building?

Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing

layout and details/p5-35. Department of Education- Division of Cebu Province does not claim or own the presented contents.

Sources are found in the reference part of the module

ACTIVITY SHEET

A Typical Catch Basin Detail

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 13: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

10

2. What are the two chambers of the septic tank? Describe each chambers.

3. Why it is called catch basin?

4. What are the main materials use in constructing catch basin of the building?

Directions: At this point in time, I do believe that you still have the knowledge skills, attitude

and values in drafting/drawing plumbing septic tank and catch basin detail, hoping that nobody

forget the principle in drafting it. But still you will have to answer the questions below so that I

could determine your learning until this day.

Answer the following questions; write your answer in a clean sheet of paper.

Questions:

1. How could we determine the exact size of a septic for a residential building?

2.

3. What are the steps/procedures in drawing septic tank?

4.

Part I

KNOWLEGDGE AND SKILLS APPLICATION PERFORMANCE Draft Septic Tank Detail Procedures:

1.

2.

.

Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing

layout and details/p5-53. Department of Education- Division of Cebu Province does not claim or own the presented contents.

Sources are found in the reference part of the module

GENERALIZATION

PERFORMANCE TASKS

What are the two parts of septic tank?

Give the steps/procedures in drawing the catch basin.

Take down the measurements: width, height and length. Transfer such measurement on your drawing paper.

Look at the table for recommended sizes of septic vaults. See if the number of persons in the household fits in the data for recommended size of vault.

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 14: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

11

3.

4.

5.

6.

Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing

layout and details/p5-55. Department of Education- Division of Cebu Province does not claim or own the presented contents.

Sources are found in the reference part of the module

Indicate also the location of the manhole and the manhole cover. After drawing the outline and re-checked your measurements, write down your dimensions and you are ready to draw the reinforcing bars. You may draw your rebar’s covering the whole area of the vault or you can have a portion of it only.

Draw the vertical and horizontal bars for the reinforcement of the septic vault. The standard distances and size of the rebar’s are 12mm Ø for vertical bars and 10mmØ for horizontal bars. For the slabs on top of it would be 10mm Ø spaced at 20cm on both ways of the slab.

Draw only the portion you wish to show the detail of the reinforcements. Indicate now the inlet valve, its position or location and its size, together with the outlet valve.

Draw the outline of the septic vault with your pencil using light guidelines only. As you draw the outline, draw also the thickness of

the sides of the septic vault.

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 15: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

12

7. 8.

9. 10. 11. after the completion of your drawing, review for any discrepancy. 12. Label your drawing Isometric Water, Sanitary and Storm Drainage Layout scale 1:20 13. Submit your output for evaluation.

Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing

layout and details/p5-56. Department of Education- Division of Cebu Province does not claim or own the presented contents.

Sources are found in the reference part of the module

From the plan you have already drawn, project dimensions downward and draw a longitudinal section of your septic vault .Remember the thickness and measurements of the plan should be the same as your section.

With the data on its depth you have gathered, layout the depth of the septic vault, including its foundation and footing. Indicate the location of your inlet and outlet valves which should have a distance from the bottom of the slab of about 30 cm. for the air space and the water level.

Review the drawing, its dimensions and measurements. Finalize the drawing by darkening the lines with a technical pen. Write down the material specifications and construction notes.

Draw vertical and

horizontal bars on the

sides and on the footing.

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 16: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

13

Part II

KNOWLEGDGE AND SKILLS APPLICATION PERFORMANCE

Catch Basin Detail

Procedures:

1.

2.

3. Draft outlines of pipes and slope of pipes

Indicate the size of catch basin

according to structural design

standard.

Indicate the size of catch basin

according to structural design

standard.

Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y3-Drafting Sanitary and

plumbing layout and details/p5-56. Department of Education- Division of Cebu Province does not claim or own the presented

contents. Sources are found in the reference part of the module

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 17: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

14

Note:

After Drafting/Drawing the Septic Tank and Catch Basin Detail Layout prepare it for

submission to the teacher trainer for checking using the performance rubrics at appendix-

A.

4. Darken lines or ink drawing .draft dimensions and specifications.

Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y3-Drafting Sanitary and

plumbing layout and details/p5-56. Department of Education- Division of Cebu Province does not claim or own the presented

contents. Sources are found in the reference part of the module

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 18: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

15

Note: For the answers that may vary, the teacher will be the one to check it upon the

submission of the module together with the answer sheets.

ANSWER KEYS

Pre-Assessment

Answer vary

Review

Answer Vary

Activity

Answer Vary

Generalizations

Answer may vary

Performance Task

Answer vary

Self-Check

Answer vary

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 19: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

16

Appendix A. Assessment Tool: Performance Rubrics

Name: Year & section:

Criteria 5 points 3 points 1 point

Proficiency Perform the task with competence and exceptional performance

Perform the task with competence and with standard performance

Perform the task with competence but below standard performance

Method Followed the given procedure from start to finish, observed correct usage of command tools

Followed the given procedure, noted once incorrect usage of command tools

Followed the given procedure, noted more than once incorrect usage of command tools.

Accuracy Perform the task with no error

Perform the task with at least 1-2 errors

Perform the task with more than 2 errors

Time Management

Finish the work on/before the given time

Finish the work after the given time

Unable to finish the work

Rating Scale: Points Earned Numerical Rating Descriptive Rating

17 – 20 91 – 100 Outstanding

13 – 16 86 – 90 Very Good

9 – 12 81 – 85 Good

5 – 8 76 – 80 Fair

1 - 4 71 - 75 Needs Improvement

Teacher’s Comments:

Signature: Date:

Appendix B

Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y3-Drafting Sanitary and

plumbing layout and details/p5. Department of Education- Division of Cebu Province does not claim or own the presented

contents. Sources are found in the reference part of the module

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 20: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

17

Appendix B

SAMPLE OF FINISHED OUTPUT AS REFERENCE

Marie Desiere H. Escandallo Technical Drafting NC II Complete Building Plan –Plumbing Plan 2017 sheet No. 6 of 8

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 21: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

18

REFERENCES

Printed Materials

Gregorio, M. S., et.al (2009).–Department of Education-STVEP-CBC CBLM-Drafting

Technology, Draft Sanitary and Plumbing Layout and Details, pages 5-34.

Fajardo Jr., M. B., (2013). - Plumbing Design and Estimate- Second Edition.

Escandallo, M. D. H., (2017). - Complete Building Plan-Plumbing Plan-Sheet no.6 of 8

Appendix-B.

Online Sources

Kupdf.net_tle-ict-technical drafting-grade 10-Draft Sanitary and Plumbing Layout and Details

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0

Page 22: 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G...Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology

19

For inquiries or feedback, please write or call: Department of Education: DepEd-Cebu Province Office Address : IPHO Bldg., Sudlon, Lahug, Cebu City, Philippines Telefax : (032) 520-3216 – 520-3217; SDS Office: (032) 255 - 6405 E-mail Address : [email protected] Bitoon National Vocational High School Office Address : Bitoon, Dumanjug, Cebu Telefax : (032) 471-8001 Website : [email protected]

________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

1ST GENERATION MODULE

S - VERSION 2.0


Recommended