+ All Categories
Home > Documents > 10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G... ·...

10 1ST GENERATION MODULES - VERSION 2bnvhsmodules.com/wp-content/uploads/2020/10/TECHDRAFT-G... ·...

Date post: 02-Feb-2021
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
22
1 Special Program for Technical-Vocational Education Information and Communication Technology Technical Drafting NC II Quarter 1 – Module 3: Draft Sanitary and Storm Drainage System Plan 10 ________________________________________________________________________________________________________________________________________________________________ Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV 1ST GENERATION MODULES - VERSION 2.0
Transcript
  • 1

    Special Program for

    Technical-Vocational

    Education Information and Communication

    Technology

    Technical Drafting NC II

    Quarter 1 – Module 3:

    Draft Sanitary and Storm

    Drainage System Plan

    10

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

  • 2

    Special Program for Technical Vocational Education (SPTVE) Grade 10

    Alternative Delivery Mode

    Quarter 1 - Module 3: Draft Sanitary and Storm Drainage System Plan

    First Edition, 2020

    Republic Act 8293 section 176 states that: No copyright shall subsist in any work of

    the Government of the Republic of the Philippines. However, prior approval of the government

    agency or office wherein the work is created shall be necessary for the exploitation of such

    work for a profit. Such an agency or office may, among other things, impose as a condition

    payment of royalties.

    Borrowed materials (i.e., songs, stories, poems, photos, brand names, trademarks,

    etc.) included in this book are owned by their respective copyright holders. Every effort has

    been exerted to locate and seek permission to use these materials from their respective

    copyright owners. The publisher and authors do not represent nor claim ownership over them.

    Published by the Department of Education Secretary: Leonor Magtolis Briones Undersecretary: Diosdado M. San Antonio

    DEVELOPMENT TEAM OF THE MODULE

    Writer : Charlou O. Litang

    Editor : Jose Garry R. Napoles

    Reviewers : Analorgie D. Destacamento

    Chito R. Villacampa

    Illustrator : Maribel J. Fuentes

    Layout Artist : Maribel J. Fuentes

    Management Team:

    Schools Division Superintendent : Marilyn S. Andales

    Assistant Schools Div. Superintendent : Leah B. Apao

    Cartesa M. Perico

    Ester A. Futalan

    Chief Education Supervisor, CID : Mary Ann P. Flores

    Education Program Supervisor, LRMDS : Isaiash T. Wagas

    Education Program Supervisor, TLE : Jose Garry R. Napoles

    Department of Education – Regional Office 7

    Division of Cebu Province

    Office Address : IPHO Bldg., Sudlon, Lahug, Cebu City, Philippines

    Telefax : (032) 520-3216 – 520-3217; SDS Office: (032) 255 - 6405

    E-mail Address : [email protected]

    Bitoon National Vocational High School

    Address : Bitoon, Dumanjug, Cebu

    Telephone : (032) 471-8001

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

  • 3

    : 10

    Special Program for

    Technical-Vocational

    Education Information and Communication

    Technology

    Technical Drafting NC II

    Quarter 1 – Module 3:

    Draft Sanitary and Storm

    Drainage System Plan

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

  • i

    Key Message

    For Educators:

    Learning is a constant process. Amidst inevitable circumstances, the Department of

    Education extends its resources and looks for varied ways to cater to your needs and to adapt

    to the new system of Education as a fortress of the Learning Continuity Plan. One of the

    probable solutions is the use of Teacher-made Educational Modules in teaching.

    You are reading the Technical Drafting NC II for Grade 10: First Quarter Alternative

    Delivery Mode (ADM) Module on Draft Sanitary and Storm Drainage System Plan as

    written and found in the Department of Education –Strengthen Technical-Vocational

    Education-Competency Base Curriculum

    The creation of this module is an effort of competent trainers from Bitoon National

    Vocational High School of the Department of Education-Cebu Province during this pandemic

    period. In addition, this module is meticulously planned, organized, checked, and verified by

    knowledgeable educators to assist you in imparting the lessons to the learners while

    considering the physical, social, and economic restraints in the teaching process.

    The use of the Teacher-made Educational Module aims to surpass the challenges of

    teaching in a new normal education set-up. Through this module, the students are given

    independent learning activities, which embodies in the Most Essential Learning Competencies

    based on the K-12 Curriculum Competencies, to work on in accordance with their capability,

    efficiency, and time. Thus, helping the learners acquire the prerequisite 21st Century skills

    needed with an emphasis on utmost effort in considering the whole wellbeing of the learners.

    As the main source of learning, it is your top priority to explain clearly how to use this

    module to the learners. While using this module, learner’s progress and development should

    be recorded verbatim to assess their strengths and weaknesses while doing the activities

    presented independently in the safety of their homes. Moreover, you are anticipated to

    persuade learners to comply and to finish the modules on or before the scheduled time.

    For the Learners:

    As a significant stakeholder of learning, the Department of Education researched and

    explored innovative ways to address your needs with high consideration on social, economic,

    physical, and emotional aspects of your wellbeing. To continue the learning process, DepEd

    comes up with an Alternative Delivery mode of teaching using Teacher-Made Educational

    Modules.

    Technical Drafting NC II for Grade 10: First Quarter Alternative Delivery Mode

    (ADM) Module on Draft Sanitary and Storm Drainage System Plan as written and found in

    the Department of Education –Strengthen Technical-Vocational Education-Competency

    Base Curriculum

    This module is specially crafted for you to grasp the opportunity to continue learning

    even at home. Using guided and independent learning activities, rest assured that you will be

    able to take pleasure as well as to deeply understand the contents of the lesson presented,

    recognizing your capacity and capability in acquiring knowledge.

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

  • ii

    This module has the following parts and corresponding icons:

    The first part of the module will keep you

    on track on the Competencies, Objectives,

    and Skills expected for you to be

    developed and mastered. Some reminders

    about the module are found in here too.

    This part aims to check your prior

    knowledge of the lesson to take. If you can

    get a perfect score and perform

    competently the competency, you can skip

    the module and proceed to the next

    module. If not, continue to the next part.

    This part helps you link the previous lesson

    to the current one through a short

    exercise/drill.

    A brief discussion of the lesson can be

    read in this part. It guides and helps you

    unlock the lesson presented.

    A comprehensive activity/es for

    independent practice is in this part to

    solidify your knowledge and skills of the

    given topic. This can be a drill or exercise

    or an activity.

    This part of the module is used to process

    your learning and understanding of the

    given topic. It can be a series of questions

    or an activity.

    A transfer of newly acquired knowledge

    and skills to a real-life situation is present

    in this part of the module. This can be a

    task sheet (used when doing simple

    tasks), operation sheet (used when doing

    or operating devices or a job sheet (used

    in doing series of task for a specific job).

    This activity assesses your level of

    mastery towards the topic.

    This contains answers to all activities in the

    module.

    GENERALIZATION

    SELF – CHECK

    LEARNING OUTCOME

    REVIEW LESSON

    INFORMATION SHEET

    ACTIVITY SHEET

    PERFORMANCE TASKS

    PRE - ASSESSMENT

    ANSWER KEYS

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

  • iii

    At the end of this module you will also find:

    In using this module, keep a note of the fundamental reminders below.

    1. The module is government-owned. Handle it with care. Unnecessary marks are

    prohibited. Use a separate sheet of paper in answering all the given exercises.

    2. This module is organized according to the level of understanding. Skipping one

    part of this module may lead you to confusion and misinterpretation.

    3. The instructions are carefully laden for you to understand the given lessons.

    Read each item cautiously.

    4. This is a Home-Based class; your reliability and honor in doing the tasks and

    checking your answers are a must.

    5. This module helps you attain and learn lessons at home. Make sure to

    comprehend the first activity before proceeding to the next one.

    6. This module should be returned in good condition to your teacher/facilitator

    once you completed it.

    7. Answers should be written on a separate sheet of paper or notebook especially

    prepared for TVE subjects.

    If you wish to talk to your teacher/educator, do not hesitate to keep in touch with

    him/her for further discussion. Know that even if this is a home-based class, your teacher is

    only a call away. Good communication between the teacher and the student is our priority to

    flourish your understanding of the given lessons.

    We do hope that in using this material, you will gain ample knowledge and skills for

    you to be fully equipped and ready to answer the demands of the globally competitive world.

    We are confident in you! Keep soaring high!

    References Printed in this part is a list of all reliable and valid resources

    used in crafting and designing this module.

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

  • 1

    Good day dear learner!

    This module is solely prepared for you to access and to acquire lessons befitted in your

    grade level. The exercises, drills and assessments are carefully made to suit your level of

    understanding. Indeed, this learning resource is for you to fully comprehend the Draft Sanitary

    and Storm Drainage System Plan independently, you are going to go through this module

    following its proper sequence. Although you are going to do it alone, this is a guided lesson and

    instructions/directions on how to do every activity is plotted for your convenience.

    Using this learning resource, you are ought to Draft Sanitary and Storm Drainage

    System Plan as inculcated in the Department of Education –Strengthen Technical-

    Vocational Education-Competency Base Curriculum

    This module is composed of set of instructions for you to be guided in the activities that

    you will perform later. Read and follow instructions properly, do not skip any parts and perform

    each activity honestly. This module is intended for you finish within a week.

    At the end of this module, you are expected to achieve the following objectives:

    1. Draft Sanitary and Storm Drainage System Plan.

    2. Perform the procedures in drafting sanitary and storm drainage system plan.

    3. Acquire knowledge, skills, attitude and values in drafting sanitary and storm drainage

    system plan.

    Assessment Criteria: 1. Sanitary plan layout is drawn according to the Plumbing Code of the Philippines. 2. Storm drainage plan is drafted according to the Plumbing Code of the Philippines. 3. Detail drawings and symbols are drawn according to architectural requirements.

    Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout

    and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are

    found in the reference part of the module.

    LEARNING OUTCOME

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

    http://cbc-cblm/

  • 2

    Draft Sanitary and Storm Drainage System

    The sanitary installation is referred to as the network of pipes and fittings that carry off wastes and each plumbing fixture is titled with the appropriate pipe and fitting. The discharges are conveyed to the septic vault. The storm drainage system, on the other hand, consists of pipes, fittings, catch basins, area drain and is intended for getting rid of water from the building roof and it’s surrounding and is conveyed to the street sewer. The storm drainage is considered part of the plumbing system.

    The pipe used for sanitary and storm drainage most common to homeowners and

    contractors are the plastic pipe or PVC pipes and the concrete pipe for area drain.

    Skills Assessment

    Direction: Listed below are some of the most important skills that you must gain in order to Draft

    Sanitary and Storm Drainage System. On the right side of the matrix lists the skills expected of

    you to master. Rate yourself by checking “Not much”, if you are not so familiar yet, “A little” and/or

    “A lot”, if you are already familiar with the skills. Don’t feel bad if you checked “Not Much” in all of

    the skills. Keep in mind that this is being administered to determine your pre-entry knowledge of

    and skills on the lesson to be presented.

    Skills in Draft Sanitary and Storm Drainage System

    Not Much

    A little

    A lot

    I can draw a sanitary and storm drainage system layout according to the Plumbing Code

    I can draft sanitary and storm drainage plan according to the Plumbing Code general requirements

    I can draw details and symbols according to sanitary and plumbing general requirements

    After reading the introduction and carefully answering the instrument, you might have ideas of what you will be dealing with in this module. Now prepare to set your goals and targets for this module by completing the activity below. Write your answer in your notebook.

    Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout

    and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are

    found in the reference part of the module

    PRE - ASSESSMENT

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

    http://cbc-cblm/

  • 3

    For ease of using this module, an activity matrix is presented below for you to be guided

    in reading and answering this module.

    Activity/ies

    1.

    2. Perform the procedures in Drafting Sanitary and Storm Drainage System in activities.

    3.

    4. Answer self-check

    Drill

    Directions: Answer the following review questions as a springboard to our lesson this week.

    Use another sheet of paper for your answers.

    1. What is Drafting Isometric plumbing Water Distribution System?

    2. Enumerate the steps in lay outing Isometric plumbing Water Distribution System.

    3. What difficulties have you encounter in lay outing Isometric plumbing Water

    Distribution System?

    Overview

    Wastewater is discharged by gravity through the disposal system. All pipes in this system

    therefore must slant in a downward direction so the weight of the waste will cause it to move down. Because of this gravity flow, waste lines are larger than water lines. The stacks are the vertical lines while the branches are the horizontal lines. Vents are also provided for air circulation and to permit sewer gases to escape through the roof. This equalizes the air pressure in the drainage system.

    Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout

    and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are

    found in the reference part of the module

    REVIEW LESSON

    INFORMATION SHEET

    Draft Sanitary and Storm Drainage System, answer pre-assessment, review sheet read

    information sheet

    Acquire knowledge, skills, attitude and values in drafting Sanitary and Storm Drainage

    System in the performance task

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

    http://cbc-cblm/

  • 4

    The wastewater flows starting at the fixture trap, which is provided to stop gases from

    entering the building and each fixture has a separate trap or seal to prevent backflow of sewer gas, through the fixture branches to the main sewer line.

    Waste stacks carry only wastewater while solid wastes runs thru the soil lines, which are

    the largest in the system and are flushed with water after each use.

    Piping systems are vital to modern society. Some systems may be complex; others may be simple such as in a residential dwelling unit. But they share some common elements, whether they are steel, plastic, copper pipes, or tubing.

    Sanitary and storm drainage for

    residential dwelling are either wrought iron pipes, Polyvinylchloride (PVC) pipes and for drainage is either concrete pipe or PVC pipe. The more common today is the un plasticized Polyvinylchloride (u PVC) pipe.

    Polyvinyl pipe and fittings are

    available in commercial length of 3.0 meters and also available in schedule 40 and 80. They are usually assembled with slip joint fittings and solvent, both PVC and chlorinated Polyvinylchloride (c PVC) pipes are commonly available in sizes ranging from ½’ to 4” inside diameter. The Sewage Disposal System

    Absence of a good sewage

    disposal system can result to contamination of water and water-borne diseases. It is important to value a good disposal system. There are different types of sewage disposal system, from the old to the more scientific ones;

    1. Cesspool

    2. Privy

    3. Septic Tank

    4. Public Sewer line

    Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout

    and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are

    found in the reference part of the module.

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

    http://cbc-cblm/

  • 5

    The sanitary system is of two types; the intercepting and the tributary or contributing

    sewer. The intercepting type is constructed with concrete pipes while the tributary sewer is laid in

    an open trench and is made of vitrified clay or bricks.

    Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout

    and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are

    found in the reference part of the module.

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

    http://cbc-cblm/

  • 6

    The Septic Tank The septic system converts solid

    wastes into liquid by bacterial action. The wastes flow into a septic tank some distance away from the house. The liquid waste flows thru to the sewer line while the sludge remains at the digestion chamber of the tank.

    The septic tank is constructed with

    reinforced concrete, it should be located at a safe distance from the source of potable water, and it should also be airtight.

    The size and type of the system varies

    according to the number of people served, the

    contour, and soil type.

    Types of Sanitary Fittings Used in

    Plumbing System of Septic Vaults

    Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout

    and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are

    found in the reference part of the module

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

    http://cbc-cblm/

  • 7

    The Typical Detail of a Septic Tank

    The Size of the Septic Tank The septic tank should be

    constructed as to have enough room for accumulated sludge.

    Here are some of the suggested

    sizes;

    Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout

    and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are

    found in the reference part of the module.

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

    http://cbc-cblm/

  • 8

    Procedures of Household Sanitary Plumbing Layout: 1.

    2. Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout

    and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are

    found in the reference part of the module

    ACTIVITY SHEET

    With the given floor plan,

    you are supposed to draw

    the sanitary layout for this

    housing unit. Indicate first

    where you would locate

    your septic vault outside

    the building; use sheet of

    paper for your drawing

    layout practice.

    After locating the place

    where you would

    construct your septic

    vault, draw and indicate

    the location of the different

    storm drainage fixtures

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

    http://cbc-cblm/

  • 9

    3.

    4.

    Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout

    and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are

    found in the reference part of the module

    Note from the trainer:

    After learning the

    procedure of lay outing

    schematic sanitary

    plumbing water

    distribution simulation, this

    time, your will prepare for

    final graded performance

    below. But before that

    answer first the following

    questions prepared for you

    in the generalization.

    Indicate the location of the different sanitary fixtures by drawing their symbols on the area where they are best located. Then draw the layout, gray water collection should be connected to the catch basin or directly connected to sewer line and the septic vault with the sewer line connecting to the street sewer.

    After drawing the layout,

    you will now indicate the

    different pipes and fittings

    used by the drawing thier

    symbols on the sewer line

    layout and write down also

    the material specs for the

    fixture used and legend.

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

    http://cbc-cblm/

  • 10

    Directions: At this point in time, I do believe that you still have the knowledge skills, attitude and

    values in drafting/drawing plumbing water distribution system plan hoping that nobody forget the

    principle in drafting it. But still you will have to answer the questions below so that I could

    determine your learning until this day.

    Answer the following questions; write your answer in a piece of paper for me to find out what you

    have learned at this point.

    Questions:

    1. What have you learned in the process of drawing Schematic isometric plumbing water distribution system plan in the simulation?

    2. Enumerate the steps in drawing Schematic isometric plumbing water distribution system

    plan?

    3. Give your learning difficulties in lay outing plumbing water distribution system plan.

    4. Give your learning the easiest way in lay outing plumbing water distribution system plan.

    Directions: Shown below is floor plan of a residential house for you to draw/ draft plumbing sanitary distribution system layout using the scale: 1:50 m. This is a graded practice exercise of plumbing layout plan draw it in a piece of paper, For your performance grade, refer to the rubrics below, appendix A

    Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout

    and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are

    found in the reference part of the module.

    GENERALIZATION

    PERFORMANCE TASKS

    TOILET AND BATH PLUMBING SANITARY LAYOUT PLAN Scale: 1: 50 m. m

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

    http://cbc-cblm/

  • 11

    Note:

    After Drafting/Drawing the schematic plumbing sanitary distribution system layout prepare it for submission to the teacher trainer for checking using the performance rubrics

    below.

    Directions: This time you have to apply what you have in learn in the simulation that we have the

    other day. From the floor plan layout drawn, draft the sanitary and plumbing diagram. Use standard of the faucet and other fixture required. Use your bond paper for your output scale 1:100 m. For your performance grade, refer to the rubrics below Appendix A.

    1. Draft/Draw schematic Plumbing Lay out of sanitary distribution system plan

    Requirements; 1-WC w/ faucet 1-Kitchen Sink 1-Lav w/ faucet 1-SH w/ faucet below

    Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout

    and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are

    found in the reference part of the module.

    SELF-CHECK

    Plumbing Sanitary Distribution System Layout Plan Scale: 1:100 M

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

    http://cbc-cblm/

  • 12

    Note: For the answers that may vary, the teacher will be the one to check it upon the

    submission of the module together with your output and answer sheets.

    .

    ANSWER KEYS

    Pre-Assessment

    Answer vary

    Review

    Answer Vary

    Activity

    Answer Vary

    Generalizations

    Answer may vary

    Performance Task

    Answer vary

    Self-Check

    Answer vary

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

  • 13

    Appendix A.

    Assessment Tool: Performance Rubrics

    Name: Year & section:

    Criteria 5 points 3 points 1 point

    Proficiency Perform the task with competence and exceptional performance

    Perform the task with competence and with standard performance

    Perform the task with competence but below standard performance

    Method Followed the given procedure from start to finish, observed correct usage of command tools

    Followed the given procedure, noted once incorrect usage of command tools

    Followed the given procedure, noted more than once incorrect usage of command tools.

    Accuracy Perform the task with no error

    Perform the task with at least 1-2 errors

    Perform the task with more than 2 errors

    Time Management

    Finish the work on/before the given time

    Finish the work after the given time

    Unable to finish the work

    Rating Scale: Points Earned Numerical Rating Descriptive Rating

    17 – 20 91 – 100 Outstanding

    13 – 16 86 – 90 Very Good

    9 – 12 81 – 85 Good

    5 – 8 76 – 80 Fair

    1 - 4 71 - 75 Needs Improvement

    Teacher’s Comments:

    Signature: Date:

    Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout

    and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are

    found in the reference part of the module.

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

    http://cbc-cblm/

  • 14

    Appendix B.

    SAMPLE OF FINISHED OUTPUT AS REFERENCE

    Marie Desiere H. Escandallo Technical Drafting NC II Complete Building Plan –Plumbing Plan 2017 sheet No. 6 of 8

    Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout

    and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are

    found in the reference part of the module.

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

    http://cbc-cblm/

  • 15

    REFERENCES

    Printed Materials

    Gregorio, M. S., et.al (2009).–Department of Education-STVEP-CBC CBLM-Drafting Technology,

    Draft Sanitary and Plumbing Layout and Details. Page 5-32.

    Max B. Fajardo Jr, .M. B., (2001). - Plumbing Design and Estimate- 2nd Edition

    Escandallo, M. D. H., (2017). - Complete Building Plan-Plumbing Plan-Sheet no.6 of 8, Appendix-

    B

    Online Sources

    Kupdf.net_tle-ict-technical drafting-grade 10-Draft Sanitary and Plumbing Layout and

    Details

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0

  • 16

    For inquiries or feedback, please write or call: Department of Education: DepEd-Cebu Province Office Address : IPHO Bldg., Sudlon, Lahug, Cebu City, Philippines Telefax : (032) 520-3216 – 520-3217; SDS Office: (032) 255 - 6405 E-mail Address : [email protected] Bitoon National Vocational High School Office Address : Bitoon, Dumanjug, Cebu Telefax : (032) 471-8001 Website : [email protected]

    ________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV

    1ST G

    ENER

    ATION

    MODU

    LES -

    VERS

    ION 2.0


Recommended