1
Special Program for
Technical-Vocational
Education Information and Communication
Technology
Technical Drafting NC II
Quarter 1 – Module 3:
Draft Sanitary and Storm
Drainage System Plan
10
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
2
Special Program for Technical Vocational Education (SPTVE) Grade 10
Alternative Delivery Mode
Quarter 1 - Module 3: Draft Sanitary and Storm Drainage System Plan
First Edition, 2020
Republic Act 8293 section 176 states that: No copyright shall subsist in any work of
the Government of the Republic of the Philippines. However, prior approval of the government
agency or office wherein the work is created shall be necessary for the exploitation of such
work for a profit. Such an agency or office may, among other things, impose as a condition
payment of royalties.
Borrowed materials (i.e., songs, stories, poems, photos, brand names, trademarks,
etc.) included in this book are owned by their respective copyright holders. Every effort has
been exerted to locate and seek permission to use these materials from their respective
copyright owners. The publisher and authors do not represent nor claim ownership over them.
Published by the Department of Education Secretary: Leonor Magtolis Briones Undersecretary: Diosdado M. San Antonio
DEVELOPMENT TEAM OF THE MODULE
Writer : Charlou O. Litang
Editor : Jose Garry R. Napoles
Reviewers : Analorgie D. Destacamento
Chito R. Villacampa
Illustrator : Maribel J. Fuentes
Layout Artist : Maribel J. Fuentes
Management Team:
Schools Division Superintendent : Marilyn S. Andales
Assistant Schools Div. Superintendent : Leah B. Apao
Cartesa M. Perico
Ester A. Futalan
Chief Education Supervisor, CID : Mary Ann P. Flores
Education Program Supervisor, LRMDS : Isaiash T. Wagas
Education Program Supervisor, TLE : Jose Garry R. Napoles
Department of Education – Regional Office 7
Division of Cebu Province
Office Address : IPHO Bldg., Sudlon, Lahug, Cebu City, Philippines
Telefax : (032) 520-3216 – 520-3217; SDS Office: (032) 255 - 6405
E-mail Address : [email protected]
Bitoon National Vocational High School
Address : Bitoon, Dumanjug, Cebu
Telephone : (032) 471-8001
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
3
: 10
Special Program for
Technical-Vocational
Education Information and Communication
Technology
Technical Drafting NC II
Quarter 1 – Module 3:
Draft Sanitary and Storm
Drainage System Plan
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
i
Key Message
For Educators:
Learning is a constant process. Amidst inevitable circumstances, the Department of
Education extends its resources and looks for varied ways to cater to your needs and to adapt
to the new system of Education as a fortress of the Learning Continuity Plan. One of the
probable solutions is the use of Teacher-made Educational Modules in teaching.
You are reading the Technical Drafting NC II for Grade 10: First Quarter Alternative
Delivery Mode (ADM) Module on Draft Sanitary and Storm Drainage System Plan as
written and found in the Department of Education –Strengthen Technical-Vocational
Education-Competency Base Curriculum
The creation of this module is an effort of competent trainers from Bitoon National
Vocational High School of the Department of Education-Cebu Province during this pandemic
period. In addition, this module is meticulously planned, organized, checked, and verified by
knowledgeable educators to assist you in imparting the lessons to the learners while
considering the physical, social, and economic restraints in the teaching process.
The use of the Teacher-made Educational Module aims to surpass the challenges of
teaching in a new normal education set-up. Through this module, the students are given
independent learning activities, which embodies in the Most Essential Learning Competencies
based on the K-12 Curriculum Competencies, to work on in accordance with their capability,
efficiency, and time. Thus, helping the learners acquire the prerequisite 21st Century skills
needed with an emphasis on utmost effort in considering the whole wellbeing of the learners.
As the main source of learning, it is your top priority to explain clearly how to use this
module to the learners. While using this module, learner’s progress and development should
be recorded verbatim to assess their strengths and weaknesses while doing the activities
presented independently in the safety of their homes. Moreover, you are anticipated to
persuade learners to comply and to finish the modules on or before the scheduled time.
For the Learners:
As a significant stakeholder of learning, the Department of Education researched and
explored innovative ways to address your needs with high consideration on social, economic,
physical, and emotional aspects of your wellbeing. To continue the learning process, DepEd
comes up with an Alternative Delivery mode of teaching using Teacher-Made Educational
Modules.
Technical Drafting NC II for Grade 10: First Quarter Alternative Delivery Mode
(ADM) Module on Draft Sanitary and Storm Drainage System Plan as written and found in
the Department of Education –Strengthen Technical-Vocational Education-Competency
Base Curriculum
This module is specially crafted for you to grasp the opportunity to continue learning
even at home. Using guided and independent learning activities, rest assured that you will be
able to take pleasure as well as to deeply understand the contents of the lesson presented,
recognizing your capacity and capability in acquiring knowledge.
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
ii
This module has the following parts and corresponding icons:
The first part of the module will keep you
on track on the Competencies, Objectives,
and Skills expected for you to be
developed and mastered. Some reminders
about the module are found in here too.
This part aims to check your prior
knowledge of the lesson to take. If you can
get a perfect score and perform
competently the competency, you can skip
the module and proceed to the next
module. If not, continue to the next part.
This part helps you link the previous lesson
to the current one through a short
exercise/drill.
A brief discussion of the lesson can be
read in this part. It guides and helps you
unlock the lesson presented.
A comprehensive activity/es for
independent practice is in this part to
solidify your knowledge and skills of the
given topic. This can be a drill or exercise
or an activity.
This part of the module is used to process
your learning and understanding of the
given topic. It can be a series of questions
or an activity.
A transfer of newly acquired knowledge
and skills to a real-life situation is present
in this part of the module. This can be a
task sheet (used when doing simple
tasks), operation sheet (used when doing
or operating devices or a job sheet (used
in doing series of task for a specific job).
This activity assesses your level of
mastery towards the topic.
This contains answers to all activities in the
module.
GENERALIZATION
SELF – CHECK
LEARNING OUTCOME
REVIEW LESSON
INFORMATION SHEET
ACTIVITY SHEET
PERFORMANCE TASKS
PRE - ASSESSMENT
ANSWER KEYS
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
iii
At the end of this module you will also find:
In using this module, keep a note of the fundamental reminders below.
1. The module is government-owned. Handle it with care. Unnecessary marks are
prohibited. Use a separate sheet of paper in answering all the given exercises.
2. This module is organized according to the level of understanding. Skipping one
part of this module may lead you to confusion and misinterpretation.
3. The instructions are carefully laden for you to understand the given lessons.
Read each item cautiously.
4. This is a Home-Based class; your reliability and honor in doing the tasks and
checking your answers are a must.
5. This module helps you attain and learn lessons at home. Make sure to
comprehend the first activity before proceeding to the next one.
6. This module should be returned in good condition to your teacher/facilitator
once you completed it.
7. Answers should be written on a separate sheet of paper or notebook especially
prepared for TVE subjects.
If you wish to talk to your teacher/educator, do not hesitate to keep in touch with
him/her for further discussion. Know that even if this is a home-based class, your teacher is
only a call away. Good communication between the teacher and the student is our priority to
flourish your understanding of the given lessons.
We do hope that in using this material, you will gain ample knowledge and skills for
you to be fully equipped and ready to answer the demands of the globally competitive world.
We are confident in you! Keep soaring high!
References Printed in this part is a list of all reliable and valid resources
used in crafting and designing this module.
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
1
Good day dear learner!
This module is solely prepared for you to access and to acquire lessons befitted in your
grade level. The exercises, drills and assessments are carefully made to suit your level of
understanding. Indeed, this learning resource is for you to fully comprehend the Draft Sanitary
and Storm Drainage System Plan independently, you are going to go through this module
following its proper sequence. Although you are going to do it alone, this is a guided lesson and
instructions/directions on how to do every activity is plotted for your convenience.
Using this learning resource, you are ought to Draft Sanitary and Storm Drainage
System Plan as inculcated in the Department of Education –Strengthen Technical-
Vocational Education-Competency Base Curriculum
This module is composed of set of instructions for you to be guided in the activities that
you will perform later. Read and follow instructions properly, do not skip any parts and perform
each activity honestly. This module is intended for you finish within a week.
At the end of this module, you are expected to achieve the following objectives:
1. Draft Sanitary and Storm Drainage System Plan.
2. Perform the procedures in drafting sanitary and storm drainage system plan.
3. Acquire knowledge, skills, attitude and values in drafting sanitary and storm drainage
system plan.
Assessment Criteria: 1. Sanitary plan layout is drawn according to the Plumbing Code of the Philippines. 2. Storm drainage plan is drafted according to the Plumbing Code of the Philippines. 3. Detail drawings and symbols are drawn according to architectural requirements.
Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout
and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are
found in the reference part of the module.
LEARNING OUTCOME
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
http://cbc-cblm/
2
Draft Sanitary and Storm Drainage System
The sanitary installation is referred to as the network of pipes and fittings that carry off wastes and each plumbing fixture is titled with the appropriate pipe and fitting. The discharges are conveyed to the septic vault. The storm drainage system, on the other hand, consists of pipes, fittings, catch basins, area drain and is intended for getting rid of water from the building roof and it’s surrounding and is conveyed to the street sewer. The storm drainage is considered part of the plumbing system.
The pipe used for sanitary and storm drainage most common to homeowners and
contractors are the plastic pipe or PVC pipes and the concrete pipe for area drain.
Skills Assessment
Direction: Listed below are some of the most important skills that you must gain in order to Draft
Sanitary and Storm Drainage System. On the right side of the matrix lists the skills expected of
you to master. Rate yourself by checking “Not much”, if you are not so familiar yet, “A little” and/or
“A lot”, if you are already familiar with the skills. Don’t feel bad if you checked “Not Much” in all of
the skills. Keep in mind that this is being administered to determine your pre-entry knowledge of
and skills on the lesson to be presented.
Skills in Draft Sanitary and Storm Drainage System
Not Much
A little
A lot
I can draw a sanitary and storm drainage system layout according to the Plumbing Code
I can draft sanitary and storm drainage plan according to the Plumbing Code general requirements
I can draw details and symbols according to sanitary and plumbing general requirements
After reading the introduction and carefully answering the instrument, you might have ideas of what you will be dealing with in this module. Now prepare to set your goals and targets for this module by completing the activity below. Write your answer in your notebook.
Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout
and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are
found in the reference part of the module
PRE - ASSESSMENT
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
http://cbc-cblm/
3
For ease of using this module, an activity matrix is presented below for you to be guided
in reading and answering this module.
Activity/ies
1.
2. Perform the procedures in Drafting Sanitary and Storm Drainage System in activities.
3.
4. Answer self-check
Drill
Directions: Answer the following review questions as a springboard to our lesson this week.
Use another sheet of paper for your answers.
1. What is Drafting Isometric plumbing Water Distribution System?
2. Enumerate the steps in lay outing Isometric plumbing Water Distribution System.
3. What difficulties have you encounter in lay outing Isometric plumbing Water
Distribution System?
Overview
Wastewater is discharged by gravity through the disposal system. All pipes in this system
therefore must slant in a downward direction so the weight of the waste will cause it to move down. Because of this gravity flow, waste lines are larger than water lines. The stacks are the vertical lines while the branches are the horizontal lines. Vents are also provided for air circulation and to permit sewer gases to escape through the roof. This equalizes the air pressure in the drainage system.
Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout
and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are
found in the reference part of the module
REVIEW LESSON
INFORMATION SHEET
Draft Sanitary and Storm Drainage System, answer pre-assessment, review sheet read
information sheet
Acquire knowledge, skills, attitude and values in drafting Sanitary and Storm Drainage
System in the performance task
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
http://cbc-cblm/
4
The wastewater flows starting at the fixture trap, which is provided to stop gases from
entering the building and each fixture has a separate trap or seal to prevent backflow of sewer gas, through the fixture branches to the main sewer line.
Waste stacks carry only wastewater while solid wastes runs thru the soil lines, which are
the largest in the system and are flushed with water after each use.
Piping systems are vital to modern society. Some systems may be complex; others may be simple such as in a residential dwelling unit. But they share some common elements, whether they are steel, plastic, copper pipes, or tubing.
Sanitary and storm drainage for
residential dwelling are either wrought iron pipes, Polyvinylchloride (PVC) pipes and for drainage is either concrete pipe or PVC pipe. The more common today is the un plasticized Polyvinylchloride (u PVC) pipe.
Polyvinyl pipe and fittings are
available in commercial length of 3.0 meters and also available in schedule 40 and 80. They are usually assembled with slip joint fittings and solvent, both PVC and chlorinated Polyvinylchloride (c PVC) pipes are commonly available in sizes ranging from ½’ to 4” inside diameter. The Sewage Disposal System
Absence of a good sewage
disposal system can result to contamination of water and water-borne diseases. It is important to value a good disposal system. There are different types of sewage disposal system, from the old to the more scientific ones;
1. Cesspool
2. Privy
3. Septic Tank
4. Public Sewer line
Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout
and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are
found in the reference part of the module.
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
http://cbc-cblm/
5
The sanitary system is of two types; the intercepting and the tributary or contributing
sewer. The intercepting type is constructed with concrete pipes while the tributary sewer is laid in
an open trench and is made of vitrified clay or bricks.
Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout
and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are
found in the reference part of the module.
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
http://cbc-cblm/
6
The Septic Tank The septic system converts solid
wastes into liquid by bacterial action. The wastes flow into a septic tank some distance away from the house. The liquid waste flows thru to the sewer line while the sludge remains at the digestion chamber of the tank.
The septic tank is constructed with
reinforced concrete, it should be located at a safe distance from the source of potable water, and it should also be airtight.
The size and type of the system varies
according to the number of people served, the
contour, and soil type.
Types of Sanitary Fittings Used in
Plumbing System of Septic Vaults
Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout
and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are
found in the reference part of the module
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
http://cbc-cblm/
7
The Typical Detail of a Septic Tank
The Size of the Septic Tank The septic tank should be
constructed as to have enough room for accumulated sludge.
Here are some of the suggested
sizes;
Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout
and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are
found in the reference part of the module.
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
http://cbc-cblm/
8
Procedures of Household Sanitary Plumbing Layout: 1.
2. Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout
and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are
found in the reference part of the module
ACTIVITY SHEET
With the given floor plan,
you are supposed to draw
the sanitary layout for this
housing unit. Indicate first
where you would locate
your septic vault outside
the building; use sheet of
paper for your drawing
layout practice.
After locating the place
where you would
construct your septic
vault, draw and indicate
the location of the different
storm drainage fixtures
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
http://cbc-cblm/
9
3.
4.
Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout
and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are
found in the reference part of the module
Note from the trainer:
After learning the
procedure of lay outing
schematic sanitary
plumbing water
distribution simulation, this
time, your will prepare for
final graded performance
below. But before that
answer first the following
questions prepared for you
in the generalization.
Indicate the location of the different sanitary fixtures by drawing their symbols on the area where they are best located. Then draw the layout, gray water collection should be connected to the catch basin or directly connected to sewer line and the septic vault with the sewer line connecting to the street sewer.
After drawing the layout,
you will now indicate the
different pipes and fittings
used by the drawing thier
symbols on the sewer line
layout and write down also
the material specs for the
fixture used and legend.
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
http://cbc-cblm/
10
Directions: At this point in time, I do believe that you still have the knowledge skills, attitude and
values in drafting/drawing plumbing water distribution system plan hoping that nobody forget the
principle in drafting it. But still you will have to answer the questions below so that I could
determine your learning until this day.
Answer the following questions; write your answer in a piece of paper for me to find out what you
have learned at this point.
Questions:
1. What have you learned in the process of drawing Schematic isometric plumbing water distribution system plan in the simulation?
2. Enumerate the steps in drawing Schematic isometric plumbing water distribution system
plan?
3. Give your learning difficulties in lay outing plumbing water distribution system plan.
4. Give your learning the easiest way in lay outing plumbing water distribution system plan.
Directions: Shown below is floor plan of a residential house for you to draw/ draft plumbing sanitary distribution system layout using the scale: 1:50 m. This is a graded practice exercise of plumbing layout plan draw it in a piece of paper, For your performance grade, refer to the rubrics below, appendix A
Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout
and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are
found in the reference part of the module.
GENERALIZATION
PERFORMANCE TASKS
TOILET AND BATH PLUMBING SANITARY LAYOUT PLAN Scale: 1: 50 m. m
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
http://cbc-cblm/
11
Note:
After Drafting/Drawing the schematic plumbing sanitary distribution system layout prepare it for submission to the teacher trainer for checking using the performance rubrics
below.
Directions: This time you have to apply what you have in learn in the simulation that we have the
other day. From the floor plan layout drawn, draft the sanitary and plumbing diagram. Use standard of the faucet and other fixture required. Use your bond paper for your output scale 1:100 m. For your performance grade, refer to the rubrics below Appendix A.
1. Draft/Draw schematic Plumbing Lay out of sanitary distribution system plan
Requirements; 1-WC w/ faucet 1-Kitchen Sink 1-Lav w/ faucet 1-SH w/ faucet below
Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout
and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are
found in the reference part of the module.
SELF-CHECK
Plumbing Sanitary Distribution System Layout Plan Scale: 1:100 M
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
http://cbc-cblm/
12
Note: For the answers that may vary, the teacher will be the one to check it upon the
submission of the module together with your output and answer sheets.
.
ANSWER KEYS
Pre-Assessment
Answer vary
Review
Answer Vary
Activity
Answer Vary
Generalizations
Answer may vary
Performance Task
Answer vary
Self-Check
Answer vary
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
13
Appendix A.
Assessment Tool: Performance Rubrics
Name: Year & section:
Criteria 5 points 3 points 1 point
Proficiency Perform the task with competence and exceptional performance
Perform the task with competence and with standard performance
Perform the task with competence but below standard performance
Method Followed the given procedure from start to finish, observed correct usage of command tools
Followed the given procedure, noted once incorrect usage of command tools
Followed the given procedure, noted more than once incorrect usage of command tools.
Accuracy Perform the task with no error
Perform the task with at least 1-2 errors
Perform the task with more than 2 errors
Time Management
Finish the work on/before the given time
Finish the work after the given time
Unable to finish the work
Rating Scale: Points Earned Numerical Rating Descriptive Rating
17 – 20 91 – 100 Outstanding
13 – 16 86 – 90 Very Good
9 – 12 81 – 85 Good
5 – 8 76 – 80 Fair
1 - 4 71 - 75 Needs Improvement
Teacher’s Comments:
Signature: Date:
Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout
and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are
found in the reference part of the module.
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
http://cbc-cblm/
14
Appendix B.
SAMPLE OF FINISHED OUTPUT AS REFERENCE
Marie Desiere H. Escandallo Technical Drafting NC II Complete Building Plan –Plumbing Plan 2017 sheet No. 6 of 8
Disclaimer: The contents above are borrowed from Stvep/cbc-cblm 2009/drafting technology y4-Drafting Sanitary and plumbing layout
and details/p5-32. Department of Education- Division of Cebu Province does not claim or own the presented contents. Sources are
found in the reference part of the module.
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
http://cbc-cblm/
15
REFERENCES
Printed Materials
Gregorio, M. S., et.al (2009).–Department of Education-STVEP-CBC CBLM-Drafting Technology,
Draft Sanitary and Plumbing Layout and Details. Page 5-32.
Max B. Fajardo Jr, .M. B., (2001). - Plumbing Design and Estimate- 2nd Edition
Escandallo, M. D. H., (2017). - Complete Building Plan-Plumbing Plan-Sheet no.6 of 8, Appendix-
B
Online Sources
Kupdf.net_tle-ict-technical drafting-grade 10-Draft Sanitary and Plumbing Layout and
Details
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0
16
For inquiries or feedback, please write or call: Department of Education: DepEd-Cebu Province Office Address : IPHO Bldg., Sudlon, Lahug, Cebu City, Philippines Telefax : (032) 520-3216 – 520-3217; SDS Office: (032) 255 - 6405 E-mail Address : [email protected] Bitoon National Vocational High School Office Address : Bitoon, Dumanjug, Cebu Telefax : (032) 471-8001 Website : [email protected]
________________________________________________________________________________________________________________________________________________________________Subject to further validation for IP compliance, this material is for first quarter use only. Circulation shall be limited to public schools within the jurisdiction of the Division of Cebu Province. LR-PIPCV
1ST G
ENER
ATION
MODU
LES -
VERS
ION 2.0