of 22
8/3/2019 120220 Pin Up
1/22
Intere
Wil
com
Wil
com
tec
Will reduce
but is a
in
Applicability
Element
WIND TURBINE AND COURTYARD COVER
8/3/2019 120220 Pin Up
2/22
8/3/2019 120220 Pin Up
3/22
EnergyFrom AwayEven though NYC generates asignificant portion of its ownenergy, the great majority ofelectrical power is delivered tothe city through a transmission gridthat collects energy from distantpower plants. As much as 70% ofthe fuel consumed in the generationof power for the grid is lost during
generation and transmission.Removing impediments torenewable energy within NYC willmake the power grid more reliable,reducing the risk of blackoutsand brownouts.
EF 16
Remove Landmarks Impedimentsto Alternative Energy
Issue:In historic districts, rooftop equipment including solar panels, wind turbines and micro-turbines -- is not permitted if visible from thestreet without a lengthy review by the LandmarksPreservation Commission.
Recommendation:Treat alternative and distributed energy equipmentthe same as other rooftop mechanical equipment,
which is allowed to be visible from the street.
Benefits Costs
Savings
Environment
Cost
Health & Safety
page 39, executive summary
This is a N
Whil
proposal
a
Adds a lo
cost becaus
Gives old b
opp
gener
Allow
Green Code Task Force
EF 16: Remove landmark impediments to alternate energy
8/3/2019 120220 Pin Up
4/22
Awareness =
EfficiencyNew York State studies have shownthat metering tenant electrical usein a multi-famliy building can reduceapartment electricity consumptionby approximately 17%-27%.
EO 2
Measure Electricity Usein Tenant Spaces
Issue:Because electricity is often unmetered incommercial tenant spaces, tenants are unaware ofthe energy they consume. This, in turn, can lead toexcessive use and waste.
Recommendation:All new commercial tenant spaces of 10,000 squarefeet or larger shall be metered for electricity. Asimilar proposal was incorporated into the Greener,Greater Buildings Plan, which became law prior tothe issuance of this report.
Benefits Costs
Health & Safety
Savings Cost
Environment
page 54, executive summary
This is
Whil
proposal
idea for
Co
co
Old build
metered b
c
Metering
appa
need
Green Code Task Force
EO 2: Measure electricity use in tenant spaces
8/3/2019 120220 Pin Up
5/22
Executive SummaryFebruary 2010
NYC GREEN
CODESTASK FORCE
A REPORT TO MAYOR MICHAEL R. BLOOMBERG & SPEAKER CHRISTINE C. QUINN
C-BIP Process
How to address city and design as inputs and outputs
HIGHLY
PRESCRIPTIVE
SOMEWHAT
PRESCRIPTIVE
PRESC
SOLU
INPUT
C
ANALY
PLAYER
S
8/3/2019 120220 Pin Up
6/22
Precedents
Projects with similar interests and goals
Girasol
8/3/2019 120220 Pin Up
7/22
Multi-directional turbine
Vertical axis quiet turbine
Research
Wind Turbines
8/3/2019 120220 Pin Up
8/22
Delight Cloth - woven optical fibers
Mycoply - flexible biomaterial
Research
Materials
8/3/2019 120220 Pin Up
9/22
Tools
SolidWorks - FloXpress - Wind simulator
nightTIME
8/3/2019 120220 Pin Up
10/22
Element
Applications
DAYTIME
nightTIME
8/3/2019 120220 Pin Up
11/22
8/3/2019 120220 Pin Up
12/22
Element
8/3/2019 120220 Pin Up
13/22
Element
Inputs/Outputs
external site specific
geometry
measure
parameter
distance
wind simulation
excel data
ground plane
corner points
module size
height factor
turbine angle
width ratio
output
t
e
internal
Element
8/3/2019 120220 Pin Up
14/22
Element
Turbine
external site specific
geometry
measure
parameter
point 3
point 4
output
internal turbine
enclosure
8/3/2019 120220 Pin Up
15/22
8/3/2019 120220 Pin Up
16/22
8/3/2019 120220 Pin Up
17/22
8/3/2019 120220 Pin Up
18/22
8/3/2019 120220 Pin Up
19/22
8/3/2019 120220 Pin Up
20/22
8/3/2019 120220 Pin Up
21/22
8/3/2019 120220 Pin Up
22/22