Self Propelled Modular Transporters
-SPMT-
7/28/2019 13 Barnhart Moving Tierney
2/42
2
Goldhofer SPMT
1)Capabilities2)Past Projects
-roll in-launch
-float in
7/28/2019 13 Barnhart Moving Tierney
3/42
3
Goldhofer SPMT
36 min deckheight
60 max deck height
7/28/2019 13 Barnhart Moving Tierney
4/42
4
Goldhofer SPMT
7/28/2019 13 Barnhart Moving Tierney
5/42
5
Goldhofer SPMT
7/28/2019 13 Barnhart Moving Tierney
6/42
6
Goldhofer SPMT
1) Capacity (nominal 35 ton max per axle line) 420,000lbs per 6 line SPMT2) Length/width per 6 line (30ft length x 10 ft wide) + 14ft power pack
3) Steering modes as shown
http://www.goldhofer.com/gh/modules/scripts/wGallery.php?action=showImageSize&path=/gh/fotos/galerien/modulfahrzeuge/zeichnung-produkte-schwerlast-hydrostatisch-antrieb-pste-03g.gif&width=800&height=600http://www.goldhofer.com/gh/modules/scripts/wGallery.php?action=showImageSize&path=/gh/fotos/galerien/modulfahrzeuge/zeichnung-produkte-schwerlast-hydrostatisch-antrieb-pste-04g.gif&width=800&height=600http://www.goldhofer.com/gh/modules/scripts/wGallery.php?action=showImageSize&path=/gh/fotos/galerien/modulfahrzeuge/zeichnung-produkte-schwerlast-hydrostatisch-antrieb-pste-03g.gif&width=800&height=600http://www.goldhofer.com/gh/modules/scripts/wGallery.php?action=showImageSize&path=/gh/fotos/galerien/modulfahrzeuge/zeichnung-produkte-schwerlast-hydrostatisch-antrieb-pste-02g.gif&width=800&height=600http://www.goldhofer.com/gh/modules/scripts/wGallery.php?action=showImageSize&path=/gh/fotos/galerien/modulfahrzeuge/zeichnung-produkte-schwerlast-hydrostatisch-antrieb-pste-01g.gif&width=800&height=6007/28/2019 13 Barnhart Moving Tierney
7/42
7
7/28/2019 13 Barnhart Moving Tierney
8/42
8
7/28/2019 13 Barnhart Moving Tierney
9/42
9
7/28/2019 13 Barnhart Moving Tierney
10/42
10
7/28/2019 13 Barnhart Moving Tierney
11/42
11
Goldhofer SPMT
7/28/2019 13 Barnhart Moving Tierney
12/42
12
Possible Reductions to SPMT Capacity
Spine beam strength (3 point zoning vs 4 pointzoning)
Hydraulic Stability (allowable longitudinal / cross fall
limits) (3 point vs 4 point zoning)
Offset Center of Gravity
Ground bearing capacity
Barge deck capacity
Weight of cribbing/staging
7/28/2019 13 Barnhart Moving Tierney
13/42
13
Goldhofer SPMT - Roll In
Massachusetts DOT Phillipston Bridge
Replacement - 2010-Level and compacted runway for SPMT runway
-Center portion of the runway left open in order for movement of SPMT sunder the new bridge section, minimum 12 of clearance (left/right) for SPMT
movement
-Barnhart/Marino provided & utilized (2) 12line Goldhofer SPMTs with (16) 4shoring stools (8 on each trailer 2 high) and (2) 5 x 50 girders to transportbridge superstructure weighing 300ton from fabrication area (approximatetravel distance 140)
-Haul from lay down yard to final rest took approximately 4hrs (2hrs in pristineconditions) primarily because of the poor ground conditions due to the rain.Steel plates had to be placed as we were moving.
7/28/2019 13 Barnhart Moving Tierney
14/42
14
Goldhofer SPMT Roll in (Phillipston Bridge)
7/28/2019 13 Barnhart Moving Tierney
15/42
15
1) Barnhart5ft girdersystem
2) Barnhart48 100tonpipe stands
2) BarnhartGoldhoferSPMTadjustablestrokeallows foroffset
elevationheights
Goldhofer SPMT Roll in (Phillipston Bridge)
7/28/2019 13 Barnhart Moving Tierney
16/42
16
1) Securebridgespans toBarnhart 5ftgirders
2) Secure
Barnhartshoringsystem toGoldhoferSPMT
Goldhofer SPMT Roll in (Phillipston Bridge)
7/28/2019 13 Barnhart Moving Tierney
17/42
17
Goldhofer SPMT Roll in (Phillipston Bridge)
7/28/2019 13 Barnhart Moving Tierney
18/42
18
Use Goldhofer SPMT to lift girder above set elevation, drive girder into position, stroke downon SPMT to set atop anchor bolts/abutments
Goldhofer SPMT Roll in (Phillipston Bridge)
7/28/2019 13 Barnhart Moving Tierney
19/42
19
Fabrication Staging Area Phillipston Bridge
7/28/2019 13 Barnhart Moving Tierney
20/42
20
Transport Phillipston Bridge
7/28/2019 13 Barnhart Moving Tierney
21/42
21
Final Placement Phil lipston Bridge
7/28/2019 13 Barnhart Moving Tierney
22/42
22
Final Placement Phil lipston Bridge
7/28/2019 13 Barnhart Moving Tierney
23/42
23
Goldhofer SPMT - Launch
Connecticut DOT Hales Road - 2010
-Scope: Provide rigging solution for removal of existing trussbridge 60 x 25 x 93k and placement of eight precast decksections 60 x 4 x 2-3 x 68k each over Metro-North railroad
-The bridge is estimated to weigh 93k and measured 60L x25W. The project was complicated by the presence of poweredlines both above and below the bridge; standard means ofremoval were eliminated.
- A ~135 span of 5ft girder was assembled to remove thebridge. The girder configuration could not be set with a cranealone; instead the full length girder (144-2) was cantileveredapproximately 80 off of a 6-line SPMT and driven across thebridge. The girder configuration was counterbalanced withcounterweight at the opposite end.
7/28/2019 13 Barnhart Moving Tierney
24/42
24
Goldhofer SPMT Launch (Hales Rd)
7/28/2019 13 Barnhart Moving Tierney
25/42
25
Goldhofer SPMT Launch (Hales Rd)
7/28/2019 13 Barnhart Moving Tierney
26/42
26
Removal Concept
7/28/2019 13 Barnhart Moving Tierney
27/42
27
Removal Concept
7/28/2019 13 Barnhart Moving Tierney
28/42
28
Removal Concept
7/28/2019 13 Barnhart Moving Tierney
29/42
29
Removal Concept
7/28/2019 13 Barnhart Moving Tierney
30/42
30
Removal Concept
7/28/2019 13 Barnhart Moving Tierney
31/42
31
Removal Concept
7/28/2019 13 Barnhart Moving Tierney
32/42
32
Precast deck sections install
7/28/2019 13 Barnhart Moving Tierney
33/42
33
Goldhofer SPMT Float in
Category 4 Hurricane Ivan struckthe Pensacola area on September
16, 2004 damaging nearly a mileof the double span I-10 concretebridge over Escambia Bay.
Barnhart was selected by a joint-venture between Florida DOT andGilbert Sourthern to quicklyrespond to this event to reconstruct
the bridge and return its nearly42,000 vehicle commuters back tonormal life.
Photo courtesy of Kiewit Corporation
Scope of Work
7/28/2019 13 Barnhart Moving Tierney
34/42
34
Scope of Work
1. Transportation of 24
good spans from theeast bound lane tothe west bound lane
2. Realigning of 80bridges span
7/28/2019 13 Barnhart Moving Tierney
35/42
35
Relocation of Spans
7/28/2019 13 Barnhart Moving Tierney
36/42
36
7/28/2019 13 Barnhart Moving Tierney
37/42
37
7/28/2019 13 Barnhart Moving Tierney
38/42
38
7/28/2019 13 Barnhart Moving Tierney
39/42
39
7/28/2019 13 Barnhart Moving Tierney
40/42
40
Each span had to be aligned within tolerance.
7/28/2019 13 Barnhart Moving Tierney
41/42
41
We had 24 days to completeWe finished in 17 days
Over 3,000 Man HoursNo incidents