+ All Categories
Home > Documents > 15 SYPU-0 Model Results Within Firesheds 1. Total AcresBu ......P ar tilU nd eg ou ABD SR78 2 v , Ov...

15 SYPU-0 Model Results Within Firesheds 1. Total AcresBu ......P ar tilU nd eg ou ABD SR78 2 v , Ov...

Date post: 09-Oct-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
1
Sunrise Powerlink Project Alternative Routes Firesheds Proposed Project Firesheds Sunrise Powerlink Project September 2008 Forester's Co-Op Professional Forestry F C O & GIS Services (530) 273-8326 www.forco-op.com 0 32,000 16,000 Feet 0 8 4 Miles 15 805 5 8 8 8 8 1 905 2 3 2 1 94 67 79 15 125 78 94 94 78 78 79 94 78 94 D-5 D-0 CC-0 NC-0 SV-0 CC-0 OH-5 OH-0 SV-0 PM-5 PM-0 D-15 D-10 SBS-0 MRD-5 OH-20 OH-15 OH-10 OHR-0 BCD-5 BCD-0 I8-90 I8-85 I8-80 I8-75 I8-70 I8-65 I8-60 I8-55 I8-50 I8-45 I8-40 I8-35 I8-30 BSU-0 CNF-0 BSW-5 BSW-0 CWR-0 BCDS-5 BCDS-0 MRD-35 MRD-30 MRD-25 MRD-20 MRD-15 MRD-10 SYPU-5 SYPU-0 BCD-15 BCD-10 SR78-0 SR78-5 LPCM-0 SR78-30 SR78-25 SR78-20 SR78-15 SR78-10 80 70 65 60 140 135 130 125 120 115 110 105 N PFS-5 Poway Fireshed PFS-4 Ramona Fireshed PFS-1 Ranchita Fireshed AFS-4 El Capitan Fireshed AFS-6 Pine Hills Fireshed AFS-5 Boulder Creek Fireshed AFS-3 Guatay Fireshed AFS-2 La Posta Fireshed AFS-8 Dulzura Fireshed AFS-7 Campo Fireshed AFS-1 Boulevard Fireshed USA Mexico PFS-2 San Felipe Fireshed PFS-3 Santa Ysabel Fireshed Proposed Project and Alternative Routes Extreme Fire Weather - Estimated Fire Perimeter - Limited Fuel Model Data Wildfire Containment Conflict Model - Minimum 1.5 mile Segments Extreme Fire Weather - Fire Behavior Trend Modeled within Firesheds Environmentally Superior Southern Route, Overhead Portion Jurisdictional Land Owership Bureau of Land Management Land Department of Defense Land State Land State Park U.S. Forest Service Land Tribal Land Road Interstate Milepost Partial Underground ABDSP SR78 to S2 Alternative, Overhead Portion Partial Underground ABDSP SR78 to S2 Alternative, Underground Portion Pomerado Road to Miramar Area North Alternative, Overhead Portion Pomerado Road to Miramar Area North Alternative, Underground Portion Route D Alternative San Vicente Road Transition Alternative, Overhead Portion San Vicente Road Transition Alternative, Underground Portion Modified Route D Alternative Proposed Project Overhead 500kV Proposed Project Overhead 230kV Oak Hollow Road Alternative, Overhead Portion Oak Hollow Road Alternative, Underground Portion Overhead 500 kV ABDSP within Existing ROW Santa Ysabel Existing ROW Alternative Santa Ysabel Partial Underground Alternative, Overhead Portion Santa Ysabel Partial Underground Alternative, Underground Portion Santa Ysabel SR79 All Underground Alternative, Overhead Portion Santa Ysabel SR79 All Underground Alternative, Underground Portion Top of the World Substation Alternative Black Mountain to Park Village Road Underground Alternative Central South Substation Alternative Chuck Wagon Road Alternative, Overhead Portion Chuck Wagon Road Alternative, Underground Portion CNF Existing 69 kV Route Alternative Buckman Springs Underground Option Campo North Option Interstate 8 Alternative, Overhead Portion South Buckman Springs Option Interstate 8 Alternative, Underground Portion West Buckman Springs Option Los Peñasquitos Canyon Preserve-Mercy Road Alternative SDG&E Mesa Grande Alternative Proposed Project Underground 230kV 2. Assets At Risk 1,382 Residential Parcels 1. Total Acres Burned = 198,129 Acres Model Results Within Firesheds Residential Asset at Risk Final EIR/EIS AP.3E FIRE AND FUELS MANAGEMENT Final Environmentally Superior Southern Route, Overhead Portion Fire Behavior Trend Model 4 Burn Periods - Extreme Weather Figure Ap.3E-12
Transcript
Page 1: 15 SYPU-0 Model Results Within Firesheds 1. Total AcresBu ......P ar tilU nd eg ou ABD SR78 2 v , Ov e rh ad P oti n P ar tilU nd eg ou ABD SR78 2 v , Underground Portion Pomerado

Sunrise Powerlink Project

Alternative Routes Firesheds

Proposed Project Firesheds

Sunrise Powerlink Project

September 2008

Forester's Co-OpProfessional ForestryF

CO

& GIS Services(530) 273-8326

www.forco-op.com

0 32,00016,000 Feet

0 84 Miles

15

805

5

8

8

8

15

8

1

905

2

63

2

1

94

6779

15125

78

78

94

94

78

78

79

94

78

94

D-5

D-0

CC-0

NC-0

SV-0

CC-0

OH-5

OH-0

SV-0

PM-5

PM-0

D-15

D-10

SBS-0

MRD-5

OH-20

OH-15OH-10

OHR-0

BCD-5

BCD-0

I8-90

I8-85

I8-80

I8-75

I8-70

I8-65

I8-60

I8-55

I8-50

I8-45

I8-40

I8-35I8-30

BSU-0

CNF-0

BSW-5

BSW-0

CWR-0

BCDS-5

BCDS-0

MRD-35

MRD-30

MRD-25

MRD-20 MRD-15MRD-10

SYPU-5

SYPU-0

BCD-15

BCD-10

SR78-0

SR78-5

LPCM-0

SR78-30

SR78-25

SR78-20 SR78-15

SR78-1080

70

65

60

140135

130

125

120

115

110

105

N

PFS-5 Poway Fireshed

PFS-4 Ramona Fireshed

PFS-1 Ranchita Fireshed

AFS-4 El CapitanFireshed

AFS-6 Pine HillsFireshed

AFS-5 BoulderCreek Fireshed

AFS-3 Guatay Fireshed

AFS-2 La Posta Fireshed

AFS-8 Dulzura Fireshed

AFS-7 Campo Fireshed

AFS-1 Boulevard Fireshed

USAMexico

PFS-2 San FelipeFireshed

PFS-3 Santa Ysabel Fireshed

Proposed Project and Alternative Routes

Extreme Fire Weather -Estimated Fire Perimeter - Limited Fuel Model Data

Wildfire Containment Conflict Model -Minimum 1.5 mile Segments

Extreme Fire Weather -Fire Behavior Trend Modeled within Firesheds

Environmentally Superior Southern Route, Overhead Portion

Jurisdictional Land Owership

Bureau of Land Management Land

Department of Defense Land

State Land

State Park

U.S. Forest Service Land

Tribal Land

RoadInterstate

Milepost

Partial Underground ABDSP SR78 to S2 Alternative, Overhead Portion

Partial Underground ABDSP SR78 to S2 Alternative,Underground Portion

Pomerado Road to Miramar Area North Alternative, Overhead PortionPomerado Road to Miramar Area North Alternative, Underground PortionRoute D AlternativeSan Vicente Road Transition Alternative, Overhead PortionSan Vicente Road Transition Alternative, Underground Portion

Modified Route D Alternative

Proposed Project Overhead 500kVProposed Project Overhead 230kV

Oak Hollow Road Alternative, Overhead Portion

Oak Hollow Road Alternative, Underground PortionOverhead 500 kV ABDSP within Existing ROW

Santa Ysabel Existing ROW AlternativeSanta Ysabel Partial Underground Alternative, Overhead PortionSanta Ysabel Partial Underground Alternative, Underground PortionSanta Ysabel SR79 All Underground Alternative, Overhead PortionSanta Ysabel SR79 All Underground Alternative,Underground PortionTop of the World Substation AlternativeBlack Mountain to Park Village Road Underground AlternativeCentral South Substation AlternativeChuck Wagon Road Alternative, Overhead PortionChuck Wagon Road Alternative, Underground PortionCNF Existing 69 kV Route AlternativeBuckman Springs Underground OptionCampo North OptionInterstate 8 Alternative, Overhead PortionSouth Buckman Springs OptionInterstate 8 Alternative, Underground PortionWest Buckman Springs OptionLos Peñasquitos Canyon Preserve-Mercy Road AlternativeSDG&E Mesa Grande Alternative

Proposed Project Underground 230kV

2. Assets At Risk 1,382 Residential Parcels1. Total Acres Burned = 198,129 AcresModel Results Within Firesheds

Residential Asset at Risk

Final EIR/EIS

AP.3E FIRE AND FUELS MANAGEMENT

Final Environmentally Superior Southern Route, Overhead Portion

Fire Behavior Trend Model4 Burn Periods - Extreme Weather

Figure Ap.3E-12

Recommended