Sunrise Powerlink Project

Alternative Routes Firesheds

Proposed Project Firesheds

Sunrise Powerlink Project

September 2008

Forester's Co-OpProfessional ForestryF

CO

& GIS Services(530) 273-8326

www.forco-op.com

0 32,00016,000 Feet

0 84 Miles

15

805

5

8

8

8

15

8

1

905

2

63

2

1

94

6779

15125

78

78

94

94

78

78

79

94

78

94

D-5

D-0

CC-0

NC-0

SV-0

CC-0

OH-5

OH-0

SV-0

PM-5

PM-0

D-15

D-10

SBS-0

MRD-5

OH-20

OH-15OH-10

OHR-0

BCD-5

BCD-0

I8-90

I8-85

I8-80

I8-75

I8-70

I8-65

I8-60

I8-55

I8-50

I8-45

I8-40

I8-35I8-30

BSU-0

CNF-0

BSW-5

BSW-0

CWR-0

BCDS-5

BCDS-0

MRD-35

MRD-30

MRD-25

MRD-20 MRD-15MRD-10

SYPU-5

SYPU-0

BCD-15

BCD-10

SR78-0

SR78-5

LPCM-0

SR78-30

SR78-25

SR78-20 SR78-15

SR78-1080

70

65

60

140135

130

125

120

115

110

105

N

PFS-5 Poway Fireshed

PFS-4 Ramona Fireshed

PFS-1 Ranchita Fireshed

AFS-4 El CapitanFireshed

AFS-6 Pine HillsFireshed

AFS-5 BoulderCreek Fireshed

AFS-3 Guatay Fireshed

AFS-2 La Posta Fireshed

AFS-8 Dulzura Fireshed

AFS-7 Campo Fireshed

AFS-1 Boulevard Fireshed

USAMexico

PFS-2 San FelipeFireshed

PFS-3 Santa Ysabel Fireshed

Proposed Project and Alternative Routes

Extreme Fire Weather -Estimated Fire Perimeter - Limited Fuel Model Data

Wildfire Containment Conflict Model -Minimum 1.5 mile Segments

Extreme Fire Weather -Fire Behavior Trend Modeled within Firesheds

Environmentally Superior Southern Route, Overhead Portion

Jurisdictional Land Owership

Bureau of Land Management Land

Department of Defense Land

State Land

State Park

U.S. Forest Service Land

Tribal Land

RoadInterstate

Milepost

Partial Underground ABDSP SR78 to S2 Alternative, Overhead Portion

Partial Underground ABDSP SR78 to S2 Alternative,Underground Portion

Pomerado Road to Miramar Area North Alternative, Overhead PortionPomerado Road to Miramar Area North Alternative, Underground PortionRoute D AlternativeSan Vicente Road Transition Alternative, Overhead PortionSan Vicente Road Transition Alternative, Underground Portion

Modified Route D Alternative

Proposed Project Overhead 500kVProposed Project Overhead 230kV

Oak Hollow Road Alternative, Overhead Portion

Oak Hollow Road Alternative, Underground PortionOverhead 500 kV ABDSP within Existing ROW

Santa Ysabel Existing ROW AlternativeSanta Ysabel Partial Underground Alternative, Overhead PortionSanta Ysabel Partial Underground Alternative, Underground PortionSanta Ysabel SR79 All Underground Alternative, Overhead PortionSanta Ysabel SR79 All Underground Alternative,Underground PortionTop of the World Substation AlternativeBlack Mountain to Park Village Road Underground AlternativeCentral South Substation AlternativeChuck Wagon Road Alternative, Overhead PortionChuck Wagon Road Alternative, Underground PortionCNF Existing 69 kV Route AlternativeBuckman Springs Underground OptionCampo North OptionInterstate 8 Alternative, Overhead PortionSouth Buckman Springs OptionInterstate 8 Alternative, Underground PortionWest Buckman Springs OptionLos Peñasquitos Canyon Preserve-Mercy Road AlternativeSDG&E Mesa Grande Alternative

Proposed Project Underground 230kV

2. Assets At Risk 1,382 Residential Parcels1. Total Acres Burned = 198,129 AcresModel Results Within Firesheds

Residential Asset at Risk

Final EIR/EIS

AP.3E FIRE AND FUELS MANAGEMENT

Final Environmentally Superior Southern Route, Overhead Portion

Fire Behavior Trend Model4 Burn Periods - Extreme Weather

Figure Ap.3E-12

Top Related