  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    1/21

    1

    Advanced PD Monitoring of Power TransformersSupporting Asset Management

    www.ldic.de

    Gregor Pudlo

    Doble Lemke

    Germany

    Switzerland

  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    2/21

    2

    Abstract

    Reasons for (PD monitoring of transformers

    Partial Disc!arge Detection principles

    "lectrical PD diagnostic tec!ni#ues

    $ PD measuring circuits according to %"& ')*

    Advanced tools for PD monitoring

    $ Acoustic and electromagnetic PD measuring principle

    $ &one+s!aped drain valve ,-.+sensors / Performance &!ec0

    $ &ase studies 1 ,-. PD measurements

  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    3/21

    3

    Reasons2 PD Monitoring of Power Transformers

    Power transformers are t!e most important and e3pensive

    pieces of e#uipment in substations4

    A new power transformer costs millions of dollars4

    ,nplanned outage and repair costs5 penalties5 etc4 sum up

    Transformers design life is )+67 years4 8it! proper maintenance t!ey can remain in service for '

    years4

    As transformers age5 t!eir internal conditions degrade w!ic!

    increases t!e ris0 of failures4

    Time+based maintenance c!anges to condition+basedmaintenance approac!es

  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    4/21

    5

    Partial Disc!arge Detection Principles

    Optical

    Mechanical

    Chemical

    Acoustic

    Opto-acoustic

    HV

    Electrical IEC 60270

    HF/VHF/UHF

    Optical Eects

    !"i#ht$

    %ressure &a'e

    !(oun)$

    *ischar#e Eects

    *ielectric "osses

    Hi#h Fre+uenc,

    &a'es

    Chemical Eects

    Heat

    Macroscopic+P!ysical"ffects

    *etection Metho)s

    *rat IEC 62 7.

  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    5/21

    6

    "lectrical PD diagnostic tec!ni#ues

    PD measuring circuits according to IEC 60270

    a)coupling device in series wit! t!e coupling capacitor b)measurement at a bus!ing tap

    ComponentsA& voltage source U5 optional bloc0ing impedance Z5 coupling capacitor C

    K5

    measuring impedance Zm5 a measuring instrument Mand generalized test ob9ectC

    a4

    1ni# 3445

    !re"uentl# used circuit intest laboratories

    o!ten applied in on$site%on$line PD in&estigations

  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    6/21

    7

    "lectrical PD diagnostic tec!ni#ues

    PD 'easuring Impedance !or (using *ap Installation

    Decoupling of PD signals from t!e bus!ing tap

    in a wide fre#uency range up to 6 M-z

    :ower cut+off fre#uency ; ' 0-z

    Additional voltage signal for p!ase+resolved

    measurements

    Superimposed PD and test voltage signal

    )7 mm5 lengt! >) mm?8eig!t2 ) 0g

    Special feature for continuous PD monitoring (%P '@

    7 0< Transformer us!ing

  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    7/21

    9

    IEC 62+7, $ Dra!t le&el

    -on$con&entional PD$measurements/

    $Electromagnetic PD Detection in te 1%31%41) $ range

    $5coustic PD measurements

    $'ied acoustic and electromagnetic metod

    $ PD location in Power *rans!ormers and 8eactors

  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    8/21

    10

    Advanced tools for PD monitoring 1 "lectromagn4 PD Tests

    Cone$saped acti&e drain &al&e 41$sensors

    for t!e decoupling of electromagnetic PD signals from t!e inner of an o il+paper+insulated transformer

    PD+signals in t!e ,-. fre#uency range

    (mainly 6 M-z 1 > G-z

    sensors support BPerformance/Sensitivity &!ec0C (!ig!+fre#uency test impulses can be in9ected wit!

    additionally integrated electrode

    sensor !ead is grounded (for lower fre#uencies

    sensor application at oil valves5 w!ic! are available e4g4 for oil filling or draining (li#uid tig!tness is

    tested for >)& warm oil wit! 7 bar compression

  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    9/21

    12

    Per!ormance Ceck

    .unctional c!ec0 of t!e w!ole measuring pat! including sensors and partial disc!arge (PD

    ac#uisition system t!roug! in9ection of !ig!+fre#uency test impulses

    Bsingle+portC solutions are possible

    t!e Performance &!ec0 BcontrolsC e4g4 t!e effect of a contact to grounded elements wit!in t!e

    oil valve4

    Cone$saped acti&e 41$sensorD 90%,0 oil gate$&al&e)

    41 PD spectra !or groundedand ungrounded sensor ead

    input pat

    output pat

  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    10/21

    14

    Transformer

    Drain valve

    41 PD probe D,0

    Eutput

    %nput

    Pre+amplifier

    -ig!+pass filter

    Per!ormance Ceck

    Per!ormance ceck at 790 '1:

    Pase$resol&ed &iew in 41 PDde&ice LD;$6%41

  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    11/21

    17

    Advanced tools for PD monitoring 1 "lectromagn4 PD Tests

    Case stud# ( $ on$line 41 PD measur. o! a 200 '35 single$pase trans!ormer

    6@/))0

  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    12/21

    18

    Advanced tools for PD monitoring 1 "lectromagn4 PD Tests

    Case stud# C $ on$line 41 PD measur. o! a 4 G-z

    gas+in+oil !ydrogen indication BuselessC due to active !ot spot customer wanted to test for PD and c!ec0 a potential load dependency of PD

    full in+service sensor application and measurement

    %nception and e3tinction voltage could be identified5 load dependency e3cluded

    5pplicationbene!it

    -00 -20 0 20 00 70 3000

    -30

    -300

    -0

    0

    0

    300

    30

    amplitu)e!mV$

    time !ns$

    0800 082 080 087 38000

    2

    6

    .

    30

    32

    amplitu)e!Vs$

    re+uenc, !9H:$

  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    13/21

    19

    41 PD 'easurements and

    deli&ered 41 PD Probe D90%,0*aiwan

    Taipe!

    Cina

    S!angai

    (elgium:in0ebee0

    =erman#

    erlin

    -eidenau

    Riesa

    Ireland > 4?

    Ardnacrus!a

    &as!la

    Dublin

    :out!

    Pilippines

    Manila

    ;audi 5rabiaFedda!

    Fizan

    45E

    Dubai

    Eg#ptairo

    Colombiaogota

  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    14/21

    21

    41 PD measurements in Ireland

  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    15/21

    22

    41 PD measurements in Ireland

    5pplication bene!it

    $ Tested measurements !ave been performed using non+conventional decoupling met!ods ta0ing

    advantage of electromagnetic field coupling$ PD measurements on t!e power transformers !ave been functioned on t!e drain valves of t!e 6+ p!ase

    >>/))70< power transformers wit! t!e !elp of t!e ,-. probe D= 7

    $ T!ree transformers found wit! minor PD activity5 one transformer wit! clear PD

    Locations

    $ Lout

    $ Dublin

    $ 5rdnacrusa

    $ Casla

  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    16/21

    23

    Drain 3al&e

    5pplied 41 Drain3al&e ;ensor

    'ounting o! te41 Probe D90 wit5dapter D90%D,0)

    'easuring ;#stemLD;$6%41

    'easuring Instrument

    $ PD Measuring System :DS+'/,-.

    $ ,-. Probe D=7 (wit! Adapter D=7/D=@

    $ ,-. &alibrator :D&+'/,-.

    $ Pre Amplifier :DA+7/G%S

    41 PD measurements in Ireland

  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    17/21

    24

    3 @ 990 m3 at measuring

    !re"uenc# 960 '1:

    3 @ 2

  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    18/21

    25

    41 PD measurements in i:an ;audi 5rabia

  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    19/21

    26

    41 PD measurements in i:an ;audi 5rabia

    Drain 3al&e Power *rans!ormer

    on

  • 7/24/2019 152638716 Doble Lemke Power Transformer Advanced PD Monitoring UHF 2009

    20/21

    27

    41 PD measurements in i:an ;audi 5rabia

    PRPD Pattern at t!e measuring

    fre#uency of H M-z < I >** m


Recommended