+ All Categories
Home > Documents > 156 - 29-1-2008

156 - 29-1-2008

Date post: 07-Apr-2018
Category:
Upload: pradeep-narayan-gokhale
View: 215 times
Download: 0 times
Share this document with a friend

of 27

Transcript
  • 8/6/2019 156 - 29-1-2008

    1/27

    WELCOME

    Maharashtra Jeevan Pradhikaran

    By

  • 8/6/2019 156 - 29-1-2008

    2/27

    Government Function

    offelicitation ofMJP

    Engineerswho have contributed

    Outstanding Performances

    and shared STATE MEDA2006

    Special Award

    For MJP

    29-1-2008

  • 8/6/2019 156 - 29-1-2008

    3/27

    Award winning

    Presentations

    Amaravati Water supply

    Scheme Combined Regional Rural

    Water Supply Scheme for

    156 Villages and twotowns

  • 8/6/2019 156 - 29-1-2008

    4/27

    Combined Regional Rural Water

    Supply Scheme for 156 Villages

    and two towns

    Project area 3250 sq. km 3 times PMC + PCMC

    Spread in 3 Talukas ofAmaravati

    District Daryapur, Anjangaon, Bhatkuli

  • 8/6/2019 156 - 29-1-2008

    5/27

    Whole area is in saline track

    Salinity around 1500 ppm

  • 8/6/2019 156 - 29-1-2008

    6/27

    Whole area was supplied

    with underground waterfrom tube wells and supply

    was maintained by MJP for

    more than 30 years

  • 8/6/2019 156 - 29-1-2008

    7/27

    In rural areas the supplywas on stand posts and

    it was irregular.

    Recovery was

    practically NIL by the

    Grampanchayats

  • 8/6/2019 156 - 29-1-2008

    8/27

    Three separate schemes were

    prepared for Daryapur,Anjangaon, and 156 Villages from

    the same source Shahanur Dam.

    Two Schemes were Sanctioned

    by the Govt.

    Third was to be sanctioned.

  • 8/6/2019 156 - 29-1-2008

    9/27

    Three Schemes werecombined.

    Combination ensured saving

    of Rs. 83 crores.

    Combined scheme was

    sanctioned for Rs. 181 Croreson 15-10-98

  • 8/6/2019 156 - 29-1-2008

    10/27

    Initial pumping was

    modified and scheme

    was converted intoTOTAL GRAVITY

    SCHEME

  • 8/6/2019 156 - 29-1-2008

    11/27

    Agency fixed in 3/99

    Execution was done up to 2002

    Commissioning of Anjangaon in 3/2002

    Commissioning of Daryapur in 4/2002

    And Village Nimbhari in 5/2002

    All villages commissioned in 2003

  • 8/6/2019 156 - 29-1-2008

    12/27

    Proposal to increase the level of

    service was approved by the Govt. in

    rural area.

    Demand for the all House connections

    and no stand posts was upheld.

    Every connection holder paid deposit

    of Rs. 500 + Rs. 100 towards popular

    contribution + Rs. 50 for Form fee.

    Consumer had to expend for G.I. pipe

    for connection

  • 8/6/2019 156 - 29-1-2008

    13/27

    MJP was to maintainthe scheme and collect

    the revenue

  • 8/6/2019 156 - 29-1-2008

    14/27

    Rural house connections 21000Urban house connections 11500

    Total house connections 32500

    There are no stand postsLevel of service has been increased

    Level of satisfaction has been reflected

    in the realization

  • 8/6/2019 156 - 29-1-2008

    15/27

    Recovery in rural areas is 95%

    Recovery in urban area is 75%Overall recovery is more than 80%

    Recovery in 2006-07 is Rs. 257.88 Lakhs

    Based on recovery % Govt.has given grants

    of Rs. 76 lakhsDeposit for connections has gone above

    Rs. 125 lakhs

  • 8/6/2019 156 - 29-1-2008

    16/27

    Consumers feel that supply is regular and

    reliable. There are no complaints from any

    pocket regarding non-supply or less pressure.There is a constant increase in demand for

    connections.

    Supply is 30 to 40 minutes in the morning andit has proved to be sufficient. Consumers have

    accepted rise in rate from Rs. 50 per month to

    Rs. 70 per month.Consumers are conscious about wastage of

    water

  • 8/6/2019 156 - 29-1-2008

    17/27

    More than 800 km of metallic gravity line

    About 350 km of village distribution in PVC

    11MBRs

    96 ESRs

    Have very little maintenance

    System up to ESRs run 24 X 7.

    For last five years flow is continuous without

    any valve operation.

  • 8/6/2019 156 - 29-1-2008

    18/27

    Expenditure on salary is about 75%

    On chemicals 12%

    M & R is 9%

    Sundries 2%

    Energy for lighting etc. 2%

  • 8/6/2019 156 - 29-1-2008

    19/27

    SYSTEM IS DYNAMICALLY BALANCED

    SYSTEM

    LOSSES ARE LESS THAN 10%

  • 8/6/2019 156 - 29-1-2008

    20/27

    SOCIO-ECONOMIC BENEFITS ARE YET

    TO BE DOCUMENTEDHEALTH IMPROVEMENTS AND

    STANDARD OF LIVING ARE OTHER

    FACTORS TO BE DOCUMENTED

    A GOOD ECOSAN PROJECT CAN BE

    TAKEN AS PILOT IN THIS AREA

  • 8/6/2019 156 - 29-1-2008

    21/27

    PROJECT SANCTION COST IS Rs. 181 CRORES

    PROJECT COMPLETION COST IS Rs. 153CRORES

    PROJECT IS COMPLETED WITHIN FOUR

    YEARS

    DESIGN BENEFICIARY POPULATION IS 425000

    SOULS

    PRESENT UTILIZATION OF CAPACITY IS 33%

  • 8/6/2019 156 - 29-1-2008

    22/27

    MJP HAS CARRIED OUT SOFT PART IN THE

    VILLAGES, CONDUCTED SURVEYS FORDEMAND ASSESSMENT, CONDUCTED

    MEETINGS IN THE VILLAGES TO REALIZE

    DEMANDS OF THE PEOPLE.

    HOUSE CONNECTIONS PROPOSAL WAS

    UPHELD BY THE GOVT. IT WAS BASED ON

    THE DEMAND OF THE PEOPLE. IT WAS

    FOUND TO BE ECONOMICAL ALSO.

  • 8/6/2019 156 - 29-1-2008

    23/27

    THERE IS A PROPOSAL OF ADDING 79

    MORE VILLAGES NEAR TO THE PROJECTAREA FROM THE SAME TREATMENT

    PLANT.

    IT HAS ACAPACITY TO ACCOMMODATETHESE VILLAGES

    IT WILL FURTHER ECONOMISE THEM& R OF THE TOTAL SCHEME

  • 8/6/2019 156 - 29-1-2008

    24/27

    TOTAL GRAVITYNO ENERGY

    EXCELLENT PEOPLE PARTICIPATION

    GOOD RECOVERY

    RELIABLE SOURCE

    NEGLIGIBLEMAINTENANCE

    RELIABLE LEVEL OF SERVICE

    24 X 7 SYSTEM FLOW

  • 8/6/2019 156 - 29-1-2008

    25/27

    THAT IS WHY

    THE PROJECT HAS BEEN PLACED IN

    THE LIMCA BOOK OF RECORDS

    IN 2005

  • 8/6/2019 156 - 29-1-2008

    26/27

    ENERGY IS NOT CONSERVED IN THIS

    PROJECT ENERGY IS ELIMINATED FORTHIS PROJECT

    HENCE, IT RECIVED THE SPECIALAWARD

    FROM STATE AUTHORITY,MEDA

    FOR THE YEAR 2006

  • 8/6/2019 156 - 29-1-2008

    27/27


Recommended