Maharashtra Jeevan Pradhikaran
By
8/6/2019 156 - 29-1-2008
2/27
Government Function
offelicitation ofMJP
Engineerswho have contributed
Outstanding Performances
and shared STATE MEDA2006
Special Award
For MJP
29-1-2008
8/6/2019 156 - 29-1-2008
3/27
Award winning
Presentations
Amaravati Water supply
Scheme Combined Regional Rural
Water Supply Scheme for
156 Villages and twotowns
8/6/2019 156 - 29-1-2008
4/27
Combined Regional Rural Water
Supply Scheme for 156 Villages
and two towns
Project area 3250 sq. km 3 times PMC + PCMC
Spread in 3 Talukas ofAmaravati
District Daryapur, Anjangaon, Bhatkuli
8/6/2019 156 - 29-1-2008
5/27
Whole area is in saline track
Salinity around 1500 ppm
8/6/2019 156 - 29-1-2008
6/27
Whole area was supplied
with underground waterfrom tube wells and supply
was maintained by MJP for
more than 30 years
8/6/2019 156 - 29-1-2008
7/27
In rural areas the supplywas on stand posts and
it was irregular.
Recovery was
practically NIL by the
Grampanchayats
8/6/2019 156 - 29-1-2008
8/27
Three separate schemes were
prepared for Daryapur,Anjangaon, and 156 Villages from
the same source Shahanur Dam.
Two Schemes were Sanctioned
by the Govt.
Third was to be sanctioned.
8/6/2019 156 - 29-1-2008
9/27
Three Schemes werecombined.
Combination ensured saving
of Rs. 83 crores.
Combined scheme was
sanctioned for Rs. 181 Croreson 15-10-98
8/6/2019 156 - 29-1-2008
10/27
Initial pumping was
modified and scheme
was converted intoTOTAL GRAVITY
SCHEME
8/6/2019 156 - 29-1-2008
11/27
Agency fixed in 3/99
Execution was done up to 2002
Commissioning of Anjangaon in 3/2002
Commissioning of Daryapur in 4/2002
And Village Nimbhari in 5/2002
All villages commissioned in 2003
8/6/2019 156 - 29-1-2008
12/27
Proposal to increase the level of
service was approved by the Govt. in
rural area.
Demand for the all House connections
and no stand posts was upheld.
Every connection holder paid deposit
of Rs. 500 + Rs. 100 towards popular
contribution + Rs. 50 for Form fee.
Consumer had to expend for G.I. pipe
for connection
8/6/2019 156 - 29-1-2008
13/27
MJP was to maintainthe scheme and collect
the revenue
8/6/2019 156 - 29-1-2008
14/27
Rural house connections 21000Urban house connections 11500
Total house connections 32500
There are no stand postsLevel of service has been increased
Level of satisfaction has been reflected
in the realization
8/6/2019 156 - 29-1-2008
15/27
Recovery in rural areas is 95%
Recovery in urban area is 75%Overall recovery is more than 80%
Recovery in 2006-07 is Rs. 257.88 Lakhs
Based on recovery % Govt.has given grants
of Rs. 76 lakhsDeposit for connections has gone above
Rs. 125 lakhs
8/6/2019 156 - 29-1-2008
16/27
Consumers feel that supply is regular and
reliable. There are no complaints from any
pocket regarding non-supply or less pressure.There is a constant increase in demand for
connections.
Supply is 30 to 40 minutes in the morning andit has proved to be sufficient. Consumers have
accepted rise in rate from Rs. 50 per month to
Rs. 70 per month.Consumers are conscious about wastage of
water
8/6/2019 156 - 29-1-2008
17/27
More than 800 km of metallic gravity line
About 350 km of village distribution in PVC
11MBRs
96 ESRs
Have very little maintenance
System up to ESRs run 24 X 7.
For last five years flow is continuous without
any valve operation.
8/6/2019 156 - 29-1-2008
18/27
Expenditure on salary is about 75%
On chemicals 12%
M & R is 9%
Sundries 2%
Energy for lighting etc. 2%
8/6/2019 156 - 29-1-2008
19/27
SYSTEM IS DYNAMICALLY BALANCED
SYSTEM
LOSSES ARE LESS THAN 10%
8/6/2019 156 - 29-1-2008
20/27
SOCIO-ECONOMIC BENEFITS ARE YET
TO BE DOCUMENTEDHEALTH IMPROVEMENTS AND
STANDARD OF LIVING ARE OTHER
FACTORS TO BE DOCUMENTED
A GOOD ECOSAN PROJECT CAN BE
TAKEN AS PILOT IN THIS AREA
8/6/2019 156 - 29-1-2008
21/27
PROJECT SANCTION COST IS Rs. 181 CRORES
PROJECT COMPLETION COST IS Rs. 153CRORES
PROJECT IS COMPLETED WITHIN FOUR
YEARS
DESIGN BENEFICIARY POPULATION IS 425000
SOULS
PRESENT UTILIZATION OF CAPACITY IS 33%
8/6/2019 156 - 29-1-2008
22/27
MJP HAS CARRIED OUT SOFT PART IN THE
VILLAGES, CONDUCTED SURVEYS FORDEMAND ASSESSMENT, CONDUCTED
MEETINGS IN THE VILLAGES TO REALIZE
DEMANDS OF THE PEOPLE.
HOUSE CONNECTIONS PROPOSAL WAS
UPHELD BY THE GOVT. IT WAS BASED ON
THE DEMAND OF THE PEOPLE. IT WAS
FOUND TO BE ECONOMICAL ALSO.
8/6/2019 156 - 29-1-2008
23/27
THERE IS A PROPOSAL OF ADDING 79
MORE VILLAGES NEAR TO THE PROJECTAREA FROM THE SAME TREATMENT
PLANT.
IT HAS ACAPACITY TO ACCOMMODATETHESE VILLAGES
IT WILL FURTHER ECONOMISE THEM& R OF THE TOTAL SCHEME
8/6/2019 156 - 29-1-2008
24/27
TOTAL GRAVITYNO ENERGY
EXCELLENT PEOPLE PARTICIPATION
GOOD RECOVERY
RELIABLE SOURCE
NEGLIGIBLEMAINTENANCE
RELIABLE LEVEL OF SERVICE
24 X 7 SYSTEM FLOW
8/6/2019 156 - 29-1-2008
25/27
THAT IS WHY
THE PROJECT HAS BEEN PLACED IN
THE LIMCA BOOK OF RECORDS
IN 2005
8/6/2019 156 - 29-1-2008
26/27
ENERGY IS NOT CONSERVED IN THIS
PROJECT ENERGY IS ELIMINATED FORTHIS PROJECT
HENCE, IT RECIVED THE SPECIALAWARD
FROM STATE AUTHORITY,MEDA
FOR THE YEAR 2006