Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 1 of 46
No. 2015/RITES/RW&IE/GIS/DMW/Sub-Consultant
Dt. 19.1.15
M/s ……………………….,
…………………………….….,
……………………..…………,
…………………………………
Dear Sir
Sub:- Engagement of contractor for working as a sub-consultant for Review of “Group Incentive Scheme”
at Diesel Loco Modernization Works (DMW), Patiala.
1. RITES Limited (RITES), a Government of India Enterprise, has been has been awarded the contract for
undertaking Review of the “Group Incentive Scheme” at Diesel Loco Modernization Works, Patiala.
2. In this regard, RITES Limited, represented by the Group General Manager (RW&IE), RITES, seeks to
engage a contractor for working as a sub-consultant to RITES for execution of the subject work at
Diesel Loco Modernization Workshop, Patiala.
3. Accordingly, offers are invited from reputed, competent and experienced firms for working as a sub-
consultant to RITES for execution of the work as per the terms and conditions given in this tender
document. The stage description, stage deliverables, time frame for completion and proposed
payment schedule are given in the table below:-
Stage
No.
Stage
description
Stage deliverables Time frame for
completion
%
Payment
Stage 1
Draft Work
Measurement
Study Report -
Part 1
Submission of Draft Work Measurement
Study Report - Part 1 for Phase-I group
of shops and covering the following:-
a) Work Measurement Study results.
b) Working out of standard
manpower required based on the
Work Measurement Studies.
c) Fixing standard unit of production
with break-up of itemized /
activitywise SUs for all production
groups for Phase-I group of shops.
d) Review of itemized SUs for the
items manufactured in LMS.
90 days after
placement of order
(including 30 days
of mobilization
period)
30%
RW&IE SBU
2nd Floor, Centre Wing, RITES BHAWAN Plot No. 1, Sector 29, Gurgaon – 122 001, Haryana, (INDIA) Tele : +91(0124) 2818227 Fax : +91(0124) 2571627
CIN : U74899DL1974GOI007227
RITES LTD. (A Government of India Enterprise)
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 2 of 46
Stage 2
Draft Work
Measurement
Study Report -
Part 2
Submission of Draft Work Measurement
Study Report - Part 2 for Phase-II group
of shops and covering the following:-
a) Work Measurement Study results.
b) Working out of standard
manpower required based on the
Work Measurement Studies.
c) Fixing standard unit of production
with break-up of itemized /
activitywise SUs for all production
groups for Phase-II group of shops.
150 days after
placement of order
30%
Stage 3
Draft Work
Measurement
Study Report -
Part 3
Submission of Draft Work Measurement
Study Report - Part 3 for Support Shops
and Support Departments and covering
the following:-
a) Work Measurement Study results.
b) Working out of standard
manpower required based on the
Work Measurement Studies.
c) Fixing standard unit of production
with break-up of itemized / activity
wise SUs for all production groups
for Support Shops and Support
Departments.
d) Submission of review of formulae
for calculation of incentive including
examination of the relevance of
LOF, absentee factor and cube
factor in the formulae as also
working out incentive cut-off
percentage where induction of
manpower is more economical than
payment of incentive.
e) Submission of financial viability of
the proposed incentive scheme vis-
à-vis the saving that accrues in
consequence thereof.
210 days after
placement of order
15%
Stage 4
Draft Study
Report
Preparation, finalization and submission
of draft report covering all the previous
submissions incorporating the feedback
received on the same.
270 days after
placement of order
15%
Stage 5 Dry run &
implement-
tation
Dry run & implementation of the Study
Report after approval by Railway Board
30 days after
receipt of advice
from DMW/PTA for
commencement of
dry run &
implementation
10%
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 3 of 46
4. You are advised to submit your offer quoting a total “lump-sum fees” for carrying out the above
work. Taxes, if any, may be indicated separately.
5. Also, you are requested to submit your credentials and capability / experience details in support of
your claim to be able to execute the above work.
6. Offers should be submitted on or before 1500 hours on 3.2.2015 at the following address:-
Sh. Anil Vij
Group General Manager (RW&IE)
RITES Limited
RITES Bhawan, 2nd
Floor, Central Wing
Plot No. 1, Sector – 29
Gurgaon – 122 001, Haryana.
7. Offers received shall be opened at 1530 hours on 3.2.2015 in the office of Group General Manager
(RW&IE), RITES Limited in the presence of the bidders present.
8. The validity of the offer should be 90 days from the due date of opening of the tender.
9. RITES Limited reserves the right to accept or reject any or all of the offers without assigning any
reasons.
10. The terms and conditions for the contract are enclosed.
Thanking you
Yours sincerely,
(Anil Vij)
Group General Manager (RW&IE)
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 4 of 46
TERMS AND CONDITIONS FOR THE TENDER
PART-I
PREAMBLE AND GENERAL INSTRUCTIONS TO TENDERERS
1 Location of Works The Ministry of Railways, Government of India have set up at Patiala in the
State of Punjab a Production Unit for the manufacture of various
components for Diesel Electric Locomotives. The Plant site is connected by a
well laid metal led road with Patiala Railway Station. The plant had a
turnover of 1738 crores during the financial Year 2013-14.
1.2 Description Diesel Loco Modernization works (DMW) comprises of the following group of
Shops:-
(i) Manufacturing Group:- Shops under this group are engaged in
manufacturing of new components such as Light Machine Shop, Heat
Treatment Shop, Carbon Brush Shop and Coil Shop.
(ii) Remanufacturing Group:- These Shops are normally repairing the old engine
Parts by welding and re-machining or completely stripping and changing the
damaged parts. Traction Machine Shop Heavy Machine Shop etc.
(iii) Rebuilding Group:- These Shops are engaged in complete overhauling of the
Diesel Locomotive and rebuilding the same as a new Loco. Such shops are
Power Pack Shop, Bogie Shop, Stripping Shop, Loco rebuilding Shop etc.
1.3 Group General Manager(RW&IE), RITES, invites, on behalf of RITES Limited, Gurgaon, tenders for
Review of the “Group Incentive Scheme” at Diesel Loco Modernization Works Patiala as per the
scope of work given in this tender document.
1.4 The Tenderer shall execute the work as per terms & conditions of contract.
1.5 Tender in English
only
All information in the tender must be in English. Information in any other
language must be accompanied by its authenticated translation in English. In
the event of any discrepancy between a tender in a language other than
English and its English translation, the English translation will prevail.
1.6 Tender
typewritten or in
Indelible Ink.
The Tender shall be either typewritten or written neatly in indelible ink and
corrections, if any attested by the individual signing the tender. Corrections
and overwriting must be strictly avoided, in respect of rates both words and
figures.
1.7 Signing of Tenders Any individual(s) signing the tender or/and other documents connected
there with should specify whether he is signing: -
(i) As sole proprietor of the concern or as Attorney of the sole proprietor.
(ii) As a partner or partners of the firm and
(iii) As a Director, Manager or Secretary in the case of Limited Company, duly
authorized by a resolution passed by the Board of Directors or in pursuance
of the authority conferred by Memorandum of Association.
1.8 In the case of a firm not registered under the Indian Partnership Act; all the partners or the
Attorney duly authorized by all of them should sign the tender and all other connected
documents.
1.9 Requisite Power of Attorney or such other documents empowering the individual or the
individuals to sign should be furnished to RITES for verification.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 5 of 46
1 .10. RITES will not be bound by any power of Attorney granted by the tenderer or by changes in the
composition of the firm made subsequent to the execution of the contract. If anyone, however,
recognizes such power of Attorney and changes after obtaining proper legal advice, the cost of
which will chargeable to the contractor.
1.11 Tender to be
addressed to
Group General
Manager
(RW&IE), RITES.
The tender shall be addressed to Group General Manager (RW&IE), RITES
and submitted separately in a double envelope. The inner envelope
containing the offer shall be sealed & marked “Offer for tender No.
2015/RITES/RW&IE/GIS/DMW/Sub-Consultant”. The inner envelope shall
be addressed to Group General Manager (RW&IE), RITES.
1.12 Tender shall be sent through courier or by registered post acknowledgement due.
1.13 Tenderer’s
Address
The tenderer shall state in the tender its postal address fully and clearly. Any
communication sent in time to the tenderer by post at the said address shall
be deemed to have reached the tenderer duly in time. Important documents
will be sent through courier or by registered post.
1.13.1 Last date of
receipt
The tender, complete in all respects, shall reach Group General Manager
(RW&IE), RITES Limited, RITES Bhawan, 2nd Floor, Central Wing, Plot No. 1,
Sector – 29, Gurgaon - 122 001 latest by 1500 Hours on 3.2.2015.
1.13.2 Telegraphic bids will not be accepted under any circumstances.
1.13.3 The contract shall be covered by Indian Railways Standard conditions of Contract.
1.13.4 If date of opening is declared as holiday, the offers shall be opened on the next working day at the
same time.
1.13.5 RITES shall not be responsible for the loss of tender documents & delayed in postal transit.
1.13.6 The tenderers are also required to submit valid Income Tax Clearance certificate along with their
offers.
1.14 Opening of
tender
The tenders will be opened at 1530 hours on 3.2.2015 in the presence of the
tenderers or their authorized representatives, who may like to be present.
1.15 Tenderer’s
Credentials
The tender shall be open to all qualified and established contractors carrying
out the process specified in the tender and such tenderers shall provide
satisfactory evidence acceptable to RITES to show that :-
(a) It is an experienced and established firm which regularly undertakes such
work and has adequate technical knowledge and practical experience in this
particular field. The tenderer has to establish, to the full satisfaction of RITES,
its credentials and technical competency for executing the works.
(b) It has adequate financial stability and status to meet the obligations under
the contract.
(c) It has established organization to ensure that there is adequate quality
control at all stages of said work as mentioned in the Technical
Specifications.
(d) It has adequate expert personnel to complete the work within the time
schedule as per this tender.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 6 of 46
(e) It has adequate expertise to provide necessary management service
required for successfully complete the work as mentioned in para 1.3 above.
1.16 In addition to the above, further information regarding his credentials or the credentials of his
associate shall, if required by RITES, be given by the tenderer.
1.17 The work of Review of the “Group Incentive Scheme” at Diesel Loco Modernization Works Patiala
as per Scope of Works shall be completed in 300 (Three Hundred) Days from the issue of Letter of
Acceptance.
1.18 RITES attaches utmost importance to realistic and timely completion of the work. The basic
consideration and the essence of the contract shall be strict adherence to the stipulated time
phased and period of completion of work.
1.19 The tenderers shall keep his offer open for acceptance for a minimum period of 90 days from the
date of opening of the tender.
2. Earnest Money:
An Earnest Money equivalent to 1,00,000/- (One Lakh only) shall accompany the tender. Any
tender, not accompanied by Earnest Money valid for a period of 90 days from the date of opening
of tender, shall be rejected summarily. Earnest money shall be in any one of the following
alternative forms:-
a) Deposit Receipts.
b) Pay orders.
c) Demand Draft.
i) These forms of Earnest Money should be from a nationalized / scheduled
bank in India.
ii) Deposit receipts could be executed by any of the scheduled banks approved
by the Reserve Bank of India for this purpose.
iii) The Earnest Money shall remain deposited with RITES for the period of
validity of the offer prescribed in this tender viz. 90 (ninety) days from the
date of opening of the tender. If the validity of the offer is extended the
earnest money shall also be extended equally, failing which, the offer after
the expiry of the aforesaid period, shall not be considered by RITES.
iv) No interest will be paid by RITES on Earnest Money.
v) The Earnest Money/Bid Guarantee is likely to be forfeited, if the tenderer
withdraws its offer or derogates from the tender in any respect within the
period of validity of his offer.
vi) The Earnest Money of the successful tenderer shall be refunded to him only
after he furnishes the requisite Performance Guarantee, in terms of Para-15
of the General instructions to tenderers and signs the agreement.
vii) The successful tenderer shall furnish the Performance Guarantee specified
in Para-15 of the General instructions to tenderers and sign the Contract
Agreement normally within 15 (fifteen) days of issue of Letter of
Acceptance.
viii) The Earnest Money of unsuccessful tenderers will be returned to them by
RITES.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 7 of 46
2.1 The previous deposit of Earnest Money for adjustment against the present tender may be
considered, if so desired by the tenderers, only when the earlier tender has been rejected and the
Earnest Money deposited has actually become refundable and available without any attachment
on the date of opening of tender and there is no change in the constitution of the parties seeking
adjustment. However, any request for recovery from outstanding bills for Earnest Money against
present tender will not under any circumstances be entertained. Tender submitted with earnest
money in cheque / government securities or in any form, other than those specified above, shall
be summarily rejected.
3.
INSPECTION: - After completion the work, Draft/final review report of Review of the “Group
Incentive Scheme” at Diesel Loco Modernization Works Patiala as per Scope of Work shall be
accepted by Railway Board, New Delhi.
NOTE:-
Timely intimation should be given by the contractor to RITES/DMW authorities for this purpose.
RITES reserves the right to inspect the on-going works for progress review and stage inspection of
the work during Review of the “Group Incentive Scheme” at Diesel Loco Modernization Works
Patiala as per Scope of Work for which the contractor shall make all relevant arrangements.
The contractor would set up a study team of experts coordinated by a senior level functionary
with adequate experience. The study team will conduct field study in all groups/areas under
incentive at DMW, after carefully going through the existing process and procedures being
performed at DMW.
The contractor shall submit a Draft Report covering the scope of work in two copies. After
discussion on the draft Report with RITES and DMW, final report in six copies shall be submitted
within one month after incorporating modifications/correction/suggestions etc. from RITES and
DMW.
The contractor would assist RITES and DMW in dry run and implementation of the revised
scheme based on the study report accepted by DMW/Rly. Board.
4.
TENDER CONFIDENTIAL
The Tenderer shall treat the contents of his tender as private and confidential. He shall also treat
the prices quoted by him as strictly confidential till the tenders are opened.
5. CANVASSING AND BRIBERY
No tenderer shall convass any RITES / Government / Railway Official in respect of this or any other
tender. Contravention of this condition will involve rejection of the tender.
6. NO OBLIGATION TO ACCEPT LOWEST TENDER
It shall not be obligatory on the part of RITES to accept the lowest tender and no tenderer shall
demand any explanation for the cause of rejection of his tender.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 8 of 46
7. WRONG INFORMATION
If the tenderer deliberately gives wrong information in his tender, or wrongfully creates
circumstances for the acceptance of his tender, RITES reserves the right to reject such tender at
any stage.
8. EXPIRY OF TENDERER
If a tenderer expires after the submission of his tender or after the acceptance of this tender,
RITES shall deem such tender as cancelled. If a partner of a firm expires after the submission of
their tender or after the acceptance of their tender, RITES shall deem such tender as cancelled
unless the firm retains its character.
9.
NO CLAIM FOR REJECTION OF TENDER
The tender, when submitted shall constitute an agreement and the tenderer shall have no cause
of action or claim against RITES for rejection of his offer. RITES shall also be liberty to reject or
accept the offer at its own discretion. Any such action will not be called into question and the
tenderer shall have no claim in that regard, against RITES.
10.
ACCEPTANCE
Acceptance of tender will be communicated to the tenderer either by cable, telex, fax, telegram
or express letters and formal Letter of Acceptance (LOA) of tender. When acceptance is
communicated by telex, fax, telegram, cable or express letters, the formal Letter of Acceptance
will be sent to the tenderer as soon as possible but the cable, telex, fax, telegram or express letter
should be deemed to conclude the contract.
11.
EXECUTION OF AGREEMENT
The successful tender shall be required to execute one or more agreement, as may be considered
necessary by RITES, for carrying out the work according to the conditions of tender contract,
accepted rates, specifications, scope of works, schedule of prices and time schedules. Such
agreement shall be executed with the Group General Manager (RW&IE), RITES Ltd., Gurgaon.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 9 of 46
14. CONSERVANCY CESS CHARGES WILL BE RECOVERED FROM THE CONTRACTOR FOR CARRYING
OUT THE WORK AT SITE, AS PER RATES GIVEN BELOW :-
Description of Categories Average No. of
labourers /workman
employed per day
Conservancy cess charges to
be recovered
(PER MONTH) ( )
a)
Railway Contractors
Engg. Works contractors
(Engg., Elect., Mech., Signal etc.)
1 to 5
6 to 10
11 to 25
106/-
208/-
523/-
b) Genl. Goods handling contractors
including contracts awarded
by Stores Deptt.
26 to 50
51 to 100
101 to 200
762/-
1,023/-
1,285/-
c) Coal-handling Ashpit cleaning
contractors
201 to 300 1,546/-
d) Railways siding used by the
contractors
301 to 750
751 to 1500
1,785/-
3,590/-
e) Contractor supplying water to
Engines
1501 to 3000
3001 & over
7,182/-
14,345/-
15. PERFORMANCE GUARANTEE (P.G.)
On receipt of the order from RITES, the Contractor shall deposit with RITES, a Performance
Guarantee (P.G.) for the due and faithful fulfillment of the contract by it as follows:-
a) The successful bidder shall submit a Performance Guarantee (PG) within 15 (fifteen) days from
the date of issue of Letter of Acceptance (L.O.A.). Extension of time for submission of PG
beyond 15 (fifteen) days and upto 30 (thirty) days from the date of issue of L.O.A. may be
12. ADDRESS RITES’ RELEVANT ADDRESSES FOR VARIOUS PURPOSES CONNECTED WITH
TENDER ARE GIVEN BELOW:-
i. GENERAL CORRESPONDENCE AND SUBMISSION OF OFFER
Sh. Anil Vij, Group General Manager (RW&IE)
RITES Ltd., RITES Bhawan, Central Wing, 2nd
Floor, Plot No. 1, Sector-29,
Gurgaon – 122 001 (Haryana).
ii. EARNEST MONEY/SECURITY DEPOSIT:-
Sh. Anil Vij, Group General Manager (RW&IE)
RITES Ltd., RITES Bhawan, Central Wing, 2nd
Floor, Plot No. 1, Sector-29,
Gurgaon – 122 001 (Haryana).
13. DEVIATIONS A statement of deviations from the commercial and the technical clauses
must be submitted in the proforma at Annexure-I. In the absence of this
statement, it shall be assumed that there are no deviations.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 10 of 46
given by the Authority, who is competent to sign the contract agreement. However, a penal
interest of 15% per annum shall be charged for the delay beyond 15 (fifteen) days, i.e. from
16th
day after the date of issue of L.O.A. In case the Contractor fails to submit the requisite P.G.
even after 30 (thirty) days from the date of issue of L.O.A., the contract shall be terminated
duly forfeiting EMD and other dues, if any, payable against that contract. The failed contractor
shall be debarred from participating in re-tender for that work.
b) The successful bidder shall submit the Performance Guarantee (P.G.) in the form of a Bank
Guarantee amounting to 5% of the contract value.
c) The P.G. shall be initially valid upto the stipulated date of completion plus 60 days beyond
that. In case, the time for completion of work gets extended, the contractor shall get the
validity of P.G. extended to cover such extended time for completion of work plus 60 days.
d) The P.G. shall be released after physical completion of the work based on completion
certificate issued by the competent authority stating that the contractor has completed the
work in all respects satisfactorily. The Security Deposit shall, however, be released only after
expiry of the maintenance period and after passing the final bill based on ‘No claim Certificate’
from the contractor.
e) Whenever the contract is rescinded, the Security Deposit shall be forfeited and the
Performance Guarantee shall be encashed. The balance work shall be got done independently
without risk and cost of the failed contractor. The failed contractor shall be debarred from
participating in the tender for executing the balance work. If the failed contractor is a JV or a
Partnership firm, then every member/partner or such a firm shall be debarred from
participating in the tender for the balance work in his/her individual capacity or a partner of
any other JV/partnership firm.
f) RITES shall not make a claim under the Performance Guarantee except for amounts to which
RITES is entitled under the contract (not withstanding and/or without Prejudice to any other
provisions in the contract agreement) in the event of:
i) Failure by the contractor to extend the validity of the Performance Guarantee as
described herein above, in which event the Engineer may claim the full amount of the
Performance Guarantee.
ii) Failure by the contractor to pay RITES any amount due, either as agreed by the contractor
or determined under any of the Clause/Conditions of the Agreement, within 30 days of
service of notice to this effect by RITES.
iii) The Contract being determined or rescinded under provision of the GCC, the Performance
Guarantee shall be forfeited in full and shall be absolutely at the disposal of RITES.
15.1 The original contractor shall be debarred from participating in the tender for executing the balance
work. If the failed contractor is a joint venture (JV) or a partnership firm, then every
member/partner of such a firm should be debarred from participating in the tender for the balance
work either in his/her individual capacity or as a partner of any other JV/partnership firm. The
guarantee bond shall remain in full force and effect for at least six months from the date of signing
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 11 of 46
of contract agreement provided that before the expiry of the date of the validity of the guarantee
bond, the contractor on being called upon by RITES from time to time, obtain from the guaranteeing
bank, extension of time for validity there to, for a period of six months on each occasion. The
extensions aforesaid, executed on a non-judicial stamped paper of appropriate value, must reach
RITES at least fifteen days before the date of expiry of the existing guarantee bond, on each
occasion.
15.2 As and when an amendment to the contract is issued, the contractor shall within fifteen days of the
receipt of letter of amendment, furnish to RITES, an amendment to the Performance Guarantee
bond, rendering the same valid for the contract, as amended.
15.3 The Performance Guarantee bond and/or any amendment there to, shall be executed on a stamp
paper of requisite money value in accordance with the laws of the country in which the same is/are
executed by the party competent to do so.
15.4 Bank Guarantees (BGs) to be submitted by contractor should be sent directly to RITES by the issuing
Bank under registered Post A.D.
15.5 P-VAT and TDS will be deducted from the bills as per prevailing rates.
15.6 Telegraphic Bids/Faxed Bids will not be acceptable.
15.7 Tenderer should invariably furnish the following information along with the tender :-
i) Type of Bank Account
(Current Account / Saving Account )
ii) Bank Account No.
iii) Name of Bank.
iv) Specific Code No. of Bank.
v) Place/Address of Bank.
15.8 If the date of opening is declared a holiday, the offer shall be opened on the next working day at the
same time.
15.9 All the tender documents must be submitted in a sealed cover and should be deposited in the
tender box kept in the office of the Group General Manager(RW&IE), RITES Limited, RITES Bhawan,
Central Wing, 2nd
Floor, Plot no-1, Sector-29, Gurgaon – 122001 (Haryana), upto 1500 hours sharp
on 3.2.2015. The tender will be opened at 1530 hours on 3.2.2015 and the rates read out in the
presence of such tenderers as are present. Tenders which are received after the due time and date,
specified above, will not be considered.
15.10 JVs/ Consortiums/MOUs shall not be considered for the works having advertised cost less than
five Crores.
15.11 This office does not undertake any responsibility on account of postal delay, loss or mis-delivery of
Tender Documents sent by post. Bids of Tenderers, who have not purchased Tender documents,
shall be summarily rejected. Incomplete offers and offers not accompanied with Earnest Money shall
be liable to be rejected without any correspondence.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 12 of 46
15.12 Tenders, sealed and superscribed as aforesaid can also be sent by registered post/ courier addressed
to the Group General Manager(RW&IE), RITES Limited, RITES Bhawan, Central Wing, 2nd
Floor,
Plot no-1, Sector-29, Gurgaon – 122 001 (Haryana), but tenders received after the time and date,
specified in tender notice, shall not be considered. Tender documents delivered or sent otherwise
will be at the risk of the tenderer(s).
15.13 The rate should be quoted in figures as well as in words. If there is a contradiction between the rates
quoted in figures and words, the rates quoted in words shall be taken as correct. If more than one
or improper rate is quoted for same items, the tender is liable to be rejected. The rates quoted by
the Contractor will remain unaltered during the currency of Agreement. The revision of rates on any
reason, what so ever, will not be entertained.
15.14 Each page of the tender papers is required to be signed by the tenderer(s) or such persons(s) on
his/their behalf who, is/are legally authorized to sign for him/them.
15.15 Tenders containing erasures, correction, fluid and alterations are liable to be rejected, if not
authenticated (if any corrections become necessary). These must be made in ink and all such
alterations must be attested by the full signature of the tenderer.
16. Additional conditions, or stipulations, if any, must be mentioned by the tenderer(s) in covering letter
with the tender. It should however, be noted that RITES reserves the right not to consider
conditional tenders and reject the same without assigning any reason. Only those additional
conditions, which are explicitly accepted by RITES shall form part of the contract.
17. CONSTITUTION OF FIRM ETC.:-
a) “The tenderer(s) who are the constituent of a firms, company association or society must forward
copies of the constitution of their concern, power of attorney & partnership deed with their tender,
duly attested by Notary Public or Executive Magistrate, if not already furnished. The tender
documents in such cases are to be signed by such persons, as may be legally competent to sign on
behalf of the firm company, association or society, as the case may be. The tenderer will have to
produce original copies of the documents as mentioned herein to RITES, as desired by RITES. If a
tenderer does not produce these documents in time, his tender may be rejected.
b) Tenders, which are not accompanied by the above document, are liable to be rejected. RITES will be
bound by any power of attorney granted by the tender/s or by changes of the composition of the
firm, made subsequent to execution of the contract. RITES may, however, recognize such power of
attorney, any changes after obtaining proper legal advice, cost of which will be chargeable to the
contractor.
17.1 If a Tenderer(s) expire after the submission of his tender or after the acceptance of his tender. RITES
shall deem such tender contract as cancelled. If the contractor’s firm is dissolved on account of
death or requirement of any partner for any reasons, what-so-ever before fully completing the
whole work or any part of it, the partners shall remain jointly severely and personally liable to
complete the whole work to the satisfaction of RITES and to pay compensation for less sustained, If
any, by RITES due to such dissolution. The amount of such compensation shall be decided by the
Group General Manager(RW&IE), RITES Ltd., RITES Bhawan, Central Wing, 2nd
Floor, Plot no-1,
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 13 of 46
Sector-29, Gurgaon – 122001 (Haryana) and his decision in the matter shall be final and binding on
the contractors.
17.2 The cancellation of any documents such as Power of Attorney, Partnership deed etc. shall forthwith
be communicated to RITES in writing, failing which RITES shall have no responsibility or liability for
any action taken on the strength of the said documents.
17.3 Should a tender or contractor, being an individual on the list of approved contractor, have a relative
employed in any capacity in the Diesel Loco Modernization Works, Patiala/RITES, Gurgaon or in the
case of a partnership firm or company incorporated under the Indian Company Law should a partner
or a share holder have a relative employed in any capacity in the DMW, Patiala/RITES, Gurgaon, the
authority inviting tender shall be informed of the fact at the time of submission of tender, if such
fact consequently comes to light, the contract may be rescinded in accordance with the provision of
the Clause-62 of the General Conditions of Contract-1999.
18. GENERAL:
If the tenderer(s) deliberately gives/give wrong information in his/their tender & thereby create
circumstances for acceptance of his/their offer, RITES reserves the right to reject such tender at any
stage.
The authority for acceptance of the tenders will rest with Group General Manager(RW&IE), RITES
Ltd., Gurgaon who do not bind him to accept the lowest or any other tender, nor does he
undertakes to assign reasons for declining to consider any particular tender or tenders.
19. The successful tenderer/s shall be required to execute an agreement with Group General
Manager(RW&IE), RITES Limited, for carrying out the work according to the tender conditions.
20. EXECUTION OF CONTRACT AGREEMENT:
The tenderer whose tender is accepted, shall be required to appear at the office of Group General
Manager(RW&IE), RITES Limited in person or in case of a firm or corporation, a duly authorized
representative shall so appear to execute the Contract Agreement documents within fifteen days
after notice that the contract has been awarded to him.
Failure to do so shall constitute a breach of the agreement effected by the acceptance of the tender
in which case the full value of the earnest money accompanying the tender, shall stand forfeited
without prejudice to any other rights or remedies.
In the event of any tenderer, whose tender is accepted, refuses to execute the contract documents
as herein before provided, RITES may determinate that such, tenderer has abandoned the contract
and there after his tender and the acceptance there of shall be treated as “Cancelled”. RITES shall
be entitled to forfeit the full amount of the earnest money and to recover the liquidated damages
for such default.
In case RITES negotiates for reduction of rates, such negotiations shall not amount to cancellations
or withdrawal of the original offer and rates originally quoted will be binding on the tenderer(s) till
the completion of work.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 14 of 46
No claim of any kind what-so-ever will be entertained, if the execution for the work is held up or
delay for want of approved plans & drawings or changes in the same or delay in supply of raw
materials/information/data to be arranged by RITES. The contractor should plan the execution of
the various works in close co-ordination with the Engineer or his authorized representative.
21. COMPLETION PERIOD
21.1 The complete contract shall run for a period of 300 (Three hundred) Days from the date of issue of
Letter of Acceptance, by the contractor or his authorized agent.
21.2 The work of Review of the “Group Incentive Scheme” at Diesel Loco Modernization Works, Patiala
shall be governed as per clause 17-B of GCC.
NOTE: The firm shall strictly execute the work of Review of the “Group Incentive Scheme” at Diesel Loco
Modernization Works Patiala as per scope of work and as per the stipulated time schedule. In the
event of failure on the part of the contractor to stick to the above time schedule, RITES shall have
the right to take action in terms of Clause-17(4) of Clause-62 of the Northern Railway Engineering
Department General Conditions of Contract and Instructions to Tenders & Standard form of
Contract-1999.
22. Payment schedule for the work of Review of GIS at DMW/PTA.
Stage
No.
Stage
description
Stage deliverables Time frame for
completion
%
Payment
Stage 1
Draft Work
Measurement
Study Report -
Part 1
Submission of Draft Work
Measurement Study Report - Part 1
for Phase-I group of shops and
covering the following:-
a) Work Measurement Study
results.
b) Working out of standard
manpower required based on
the Work Measurement Studies.
c) Fixing standard unit of
production with break-up of
itemized / activitywise SUs for all
production groups for Phase-I
group of shops.
d) Review of itemized SUs for the
items manufactured in LMS.
90 days after
placement of
order (including
30 days of
mobilization
period)
30%
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 15 of 46
Stage 2
Draft Work
Measurement
Study Report -
Part 2
Submission of Draft Work
Measurement Study Report - Part 2
for Phase-II group of shops and
covering the following:-
a) Work Measurement Study
results.
b) Working out of standard
manpower required based on
the Work Measurement Studies.
c) Fixing standard unit of
production with break-up of
itemized / activitywise SUs for all
production groups for Phase-II
group of shops.
150 days after
placement of
order
30%
Stage 3
Draft Work
Measurement
Study Report -
Part 3
Submission of Draft Work
Measurement Study Report - Part 3
for Support Shops and Support
Departments and covering the
following:-
a) Work Measurement Study
results.
b) Working out of standard
manpower required based on
the Work Measurement Studies.
c) Fixing standard unit of
production with break-up of
itemized / activity wise SUs for
all production groups for
Support Shops and Support
Departments.
d) Submission of review of
formulae for calculation of
incentive including examination
of the relevance of LOF,
absentee factor and cube factor
in the formulae as also working
out incentive cut-off percentage
where induction of manpower is
more economical than payment
of incentive.
e) Submission of financial viability
of the proposed incentive
scheme vis-à-vis the saving that
accrues in consequence thereof.
210 days after
placement of
order
15%
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 16 of 46
Stage 4
Draft Study
Report
Preparation, finalization and
submission of draft report covering
all the previous submissions
incorporating the feedback received
on the same.
270 days after
placement of
order
15%
Stage 5 Dry run &
implementation
Dry run & implementation of the
Study Report after approval by
Railway Board
30 days after
receipt of advice
from DMW/PTA
for
commencement
of dry run &
implementation
10%
22.2. Mandate is also required to be given by the Contractor for receiving their payment through
National Electronic Fund Transfer system (N.E.F.T.) in their bank account as per proforma enclosed
at Annexure-X.
NOTES:-
• No Extra/separate Sale Tax/VAT/ Service Tax/Excise Duty/Octroi or any other statutory levy will be
paid by RITES since the rates are all inclusive of Sales Tax/VAT/Service tax /Excise Duty /Octroi etc.
• No Sales Tax will be paid separately by RITES on raw materials, components, etc. used by the
contractor for execution of the contract. Being a composite works contract, this work shall not
attract sales tax under extent law, RITES will not also be responsible for any payment of sales tax by
the contractor under misapprehension of law. Should there be any amendment to the law
subsequent to the signing of the contract extending sales tax liability be reimbursed to the
contractor by RITES on the contractor furnishing satisfactory proof of having paid it to the tax
authorities.
No separate payment shall be made by RITES to the contractor as reimbursement of excise duty, if
any, on the materials used in Review of the “Group Incentive Scheme” at Diesel Loco
Modernization Works Patiala as per Scope of Works or materials forming part of this contract.
• No separate Sales Tax/VAT/Service Tax/Excise Duty or any other statutory levy, will be payable on
the work by RITES. The contractor’s account number and name of bank to which the cheques are
payable will be indicated on the Cheques/DD. For this, the contractor will be required to indicate in
his offer/tender the account number and bank details of the bank in which payment is desired. This
shall be mentioned in the tender conditions and also in the payment terms of the purchase
order/detailed acceptance letter.
• Cheques/DDs will be dispatched by registered/speed post as per existing practice. Payments for the
work done will be made to the contractor only after formal agreement has been executed between
the parties.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 17 of 46
PART-II
GENERAL CONDITIONS OF CONTRACT
Except where specifically stated, in “Special Conditions of Contracts, Special Data and Specifications”
(attached along with), the work done under this contract shall be governed in accordance with the General
Conditions of Contract and Regulation for tenders & contract as contained in the Northern Railway
Engineering Department’s Works Hand Book (Part-I & Part-II). These conditions shall form an integral part
of the LOA.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 18 of 46
PART-III
PRICE AND PAYMENT
1 The terms & Conditions of payment for the various items of work to be executed under this
contract shall be as follows :-
2 No Extra/Separate Sale Tax, excise duty, octroi, Service Tax, VAT etc. shall be payable by RITES. The
prices should be all inclusive. Taxes, should, however, be indicated separately.
3 The prices shall remain firm without any variation during the currency & extended currency of the
contract.
4 Payment Schedule: Payment to the contractor shall be made by RITES through RTGS mode.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 19 of 46
PART – IV
ENTRY OF CONTRACTOR’S REPRESENTATIVE IN WORKSHOP AREA
No contractor’s labour/ representative is allowed to stay in the workshop area beyond the time
authorized in the monthly pass. All contractor’s labour/ representative must carry a valid monthly pass
issued to them through the concerned contractor for entering working in and going out of DMW
workshop area. The procedure for issue of these passes is laid down in the following paragraphs:-
By 25th
every month the contractor must apply in writing to his controlling officers for issue of monthly
passes to the representative who/he will be deputing to work, inside the workshop area during the next
month, giving the following particulars of each labour/ representative:-
a) Name of labourers/ representative
b) Name of father of labourers/ representative.
c) Labourers’ representative’s address at his native place.
d) Labourers’/ representative’s trade.
e) Visible identification marks of labourers/representative.
The controlling officer will forward the same, if approved by him, indicating the name of the working
hours of the labourers / representative to Dy.CME/Plg by 26th
of the month, who will co-ordinate the
issue of the passes with A.S.C.’s signature.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 20 of 46
PART-V
SCHEDULE OF WORK/RATES
1. NAME OF WORK
Review of the “Group Incentive Scheme” at Diesel Loco Modernization Works Patiala as
per Scope of Work.
2. Earnest Money 3. Date of opening 3.2.2015
4. Completion Period 300 (Three Hundred) Days from the date of issue of Letter of
Acceptance.
S. No. Description Rate In Remarks
In Figures In words
1. Basic Fees for review
of Group Incentive
Scheme at
DMW/Patiala
2. Taxes
Grand Total =
In Words =
No Extra/separate Sale Tax /VAT/Service Tax /Excise Duty/Octroi or any other statutory levy will be paid
by RITES. No advance payment in the form of mobilization advance shall be admissible/provided by
RITES.
The rates should be quoted in figure as well as in words. If there is a contradiction between the rates
quoted in figures and words, the rates quoted in words shall be taken as correct.
DECLARATION:
I/We clearly understand that I/We am/are not entitled to any other payment on any account what-so-ever
except the tendered rates for fully completed works as per tender conditions of the contract.
Signature and Seal of the Tenderer
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 21 of 46
Part-VI
Scope of work & Technical Specifications
The scope of work for Review of the “Group Incentive Scheme” at Diesel Loco Modernization Works,
Patiala shall be as under:-
In terms of Rly Board’s Letter No. 2008/M/(PU) /20 Dt.08.10.2013,
i) To work out standard man power required through work measurement studies for 2014-15 planned
work load.
ii) Fix standard unit of production with breakup of itemized /activitywise SU’s for all production groups.
iii) Review of formulae for calculation of incentive.
a. There is need to examine relevance of LOF, absentee factor and cube factor in the formulae. These
factors in the formulae are distorting linkage between incentive earnings and production.
b. To work out incentive cut off percentage where induction of man power is more economical than
payment of incentive.
iv) Review the itemized SU’s for the items manufactured in LMS in view of changes in manufacturing
processes and introduction of higher productivity machine tools since 1993-94 onwards.
v) Financial viability of the system viz-a-viz the saving that accrues in consequence thereof.
vi) To examine the demands of service department and Staff Council raised during the course of incentive
review the details of which shall be linked at an appropriate stage.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 22 of 46
ANNEXURE - I
PROFORMA FOR STATEMENT OF DEVIATIONS
a) The following are the particulars of the deviations from the requirements of the Technical
Specifications -
CLAUSE DEVIATIONS REMARKS
(Including Justification)
b) The following are the particulars of the deviations from the requirements of the Tender Conditions
(Part - I to Part – IV) and IRS conditions of contract –
CLAUSE DEVIATIONS REMARKS
(Including Justification)
Signature and Seal of the Tenderer
Note – Where there is not any deviation, the statements should be returned duly signed with an
endorsement indicating “No Deviations”.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 23 of 46
ANNEXURE –II
DETAILS OF PLANT AND MACHINERY ALREADY AVAILABLE WITH THE TENDERER(S)
S.No. Particulars of
equipment.
No. of
Unit
Kind & make Capacity
Date by which the
plant would be
available for use on
this work.
Age &
Condition
Work on which it is
being used.
1. 2. 3. 4. 5. 6. 7. 8.
Signature and Seal of the Tenderer
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 24 of 46
ANNEXURE –III
LIST OF ENGINEERS/PERSONNEL ALREADY AVAILABLE/PROPOSED TO BE EMPLOYED FOR DEPLOYMENT ON THIS WORK
S.No. Name & Designation Qualification Professional
experience
Organization with
whom working
Date by which personnel will be
available for this work.
1. 2. 3. 4. 5. 6.
Signature and Seal of the Tenderer
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 25 of 46
ANNEXURE – IV
STATEMENT OF WORKS EXECUTED/COMPLETED BY THE TENDERER(S)
Signature and Seal of the Tenderer
S.No. Name and
place of work
Authority/agency
for which work
was carried out
Date of
award &
agreement
No. & Date
Date of
completion
(original/actual)
Agreement
cost/completion
cost
Principal/Technical
features work in
brief.
S.No. at which
relevant
certificate/documents
are attached.
1. 2. 3. 4. 5. 6. 7. 8.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 26 of 46
ANNEXURE – V
STATEMENT OF WORKS BEING EXECUTED/IN HAND BY THE TENDERER(S)
S.No. Name
and
place of
work
Authority/agency
for whom the
work is being
carried out
Date of
award &
agreement
No. & Date
Date of
completion
(original/actual)
Agreement
cost of work
/likely cost
Principal/Technical
features work in
brief.
S.No. at which
relevant
certificate/documents
are attached.
Payment
taken till
1. 2. 3. 4. 5. 6. 7. 8. 9.
Signature and Seal of the Tenderer
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 27 of 46
ANNEXURE – VI
CONSTITUTION OF THE FIRM
1
Full name of contractor(s), constitution of firm and
year of establishment.
2
Registered head office, address
3
Branch office in India.
4
Address on which correspondence regarding this
tender should be done including Phone number,
Mobile Number, E-mail address and Fax Number.
5
Constitution of firm give full details including name of
partners executives/power of attorney/Holders etc.
6 Particulars of registrations with Govt./Semi Govt.
Organization, Public Sector Undertakings and local
bodies etc.
7 Any other
Signature and Seal of the Tenderer
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 28 of 46
ANNEXURE – VII
RITES LIMITED, Gurgaon
(A Govt. of India Enterprise)
CONTRACT AGREEMENT NO Dated :
1. ARTICLES OF AGREEMENT made this day of _____ 2014 between RITES Limited, hereinafter called
RITES of the One part and M/s _______________________________ herein after called the
Contractor of the other part.
2. WHEREAS THE CONTRACTOR HAS AGREED WITH RITES for performance of the work --------------------
------------------------------------------------ as per the schedule hereto annexed upon as:-
i) Special conditions of contract and Preamble & General instructions to Tender (Part-I)
ii) Standard General Conditions of Contract (Part II)
iii) Relevant drawings and specifications.
3. Now this INDENTURE witness that in consideration of the payments to be made by RITES, the
Contractor will duly perform the said work in the said schedules set forth and shall execute the same
with great promptness, care and accuracy in a workman like manner to the satisfaction of RITES and
will complete the same in accordance with the said specifications and the said conditions of the
Contract on or before the ___________i.e. within a period of 15 (fifteen) days from the date of
receipt of Letter of Acceptance and will further operate and maintain the said works for a period of
18 months from the date of supply or 24 months from the date of fitment, whichever is earlier and
will further undertake to fulfill all warranty obligations in respect of said work for the period
stipulated in the contract and would observe fulfill and keep all the conditions therein
mentioned(which shall be deemed and taken to the part of this contract as if the same had been fully
set forth therein). AND, RITES both hereby agree that if the Contractor shall fully perform the said
work in the manner aforesaid and observe and keep the terms and conditions, RITES will pay to the
Contractor for the said works on the final completion thereof the amount due in the respect there of
at the rates specified in the schedule hereto annexed.
4. It is hereby agreed and declared that all the provisions and conditions of contract in the schedule
annexed which have been carefully read and understood by the contractor shall be as binding upon
the contractor and upon RITES as if the same had been repeated herein and shall be read as part of
these presents.
Group General Manager/RW&IE Contractor
RITES Ltd., Gurgaon Address:
Signature of Witness with address to
signature of contractor
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 29 of 46
ANNEXURE – VIII
PROFORMA OF BANK GUARANTEE
( BANK GUARANTEE FOR PERFORMANCE GUARANTEE )
TO BANK GUARANTEE NO.________
AMOUNT IN ________
Group General Manager/RW&IE, VALID UP TO _______________
RITES Ltd., GURGAON.
1. In consideration of RITES Ltd., Gurgaon (herein after called RITES having agreed to accept
________________________________________________ (hereinafter called the said contractor
form the demand, under the terms and conditions of an AGREEMENT NO.
_______________________________ made between Group General Manager(RW&IE),RITES Ltd.,
GURGAON and_____________________________________for the
________________________________________________________as per Tender Specification
(hereinafter called the said Agreement of security deposit for the due fulfillment by the said
contractor(s) of the terms and conditions contained in the said Agreement on production of Bank
Guarantee for _________________________ We ______________________________Bank
__________________________(hereinafter referred to as the Bank) do hereby undertake to pay to
RITES an amount not exceeding ________________________ against any loss or damage caused
to or suffered by RITES by reason of any breach by the said contractor(s) of any of the terms or
conditions contained in the said agreement.
2. We________________________Bank _________________________________________do hereby
undertake to pay the amounts due amount payable under this guarantee without any demur
merely on a demand from RITES that the amount claimed is due by way of loss or damage caused
to or would be caused to or suffered by RITES by reason of any breach by the said contractor(s) of
any of the terms for conditions sustained in the said Agreement or by reason of the contractors
failure to perform the said Agreement. Any such demand ma de on the Bank shall be conclusive as
regards the amount due and payable by the Bank under this guarantee. However, our liability under
this guarantee shall be restricted to an amount not exceeding _______
3. We further agree that the guarantee herein contained shall remain in full force and affect during
the period that would be taken for the performance of the said agreement and fit shall continue
to be enforceable till all the dues of RITES “Under or by virtue of said agreement have been fully
paid and it claim satisfied for discharged or till Group General Manager(RW&IE), RITES Ltd.,
GURGAON certified that the terms and conditions of the said agreement have been fully and
properly carried out by the said contractor(s) and accordingly” discharges the guarantee. Unless a
demand or claim under this guarantee is made on us in writing on or before we shall be discharged
from all liability under the Guarantee thereafter.
3 A. Notwithstanding anything to the contrary contained herein the liability of the Bank under this
guarantee will remain in force and effect until such time as the guarantee is discharged is earlier
and no claim shall be valid under this guarantee unless notice in writing thereof is given by RITES
within 2 months from the date of aforesaid.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 30 of 46
3 B. Provided always that We___________________________ Bank unconditionally undertakes to
renew this guarantee or to extend the period of guarantee from year to year within two months
before the expiry of the period of the extended period of the guarantee, as the case may be, on
being called upon to do so by RITES. If the guarantee is not renewed or the period extended on
demand, we_____________________ Bank shall pay RITES the full amount of the guarantees on
demand and without demur.
4. We__________________ Bank further agree with RITES that RITES shall have the fullest liberty
without our consent and without affecting in any manner our obligations hereunder to vary any of
the terms and conditions of the said Agreement or to extend time of performance of the said
contractor( s) from time to time or to postpone for any time or from time to time any of the powers
exercisable by RITES against the said Contractor(s) and to for bear of enforce any of the terms and
conditions relating to the said agreement and we shall not be relieved from our liability by reason
of any such variation or extension being granted to the said contractor(s) or for any forbearance,
act or omission on the part of RITES or any indulgence by RITES to the said Contractor or by any ,
such matter or thing whatsoever which under the law relating to sureties would but this provisions
have affect if so relieving from our liability.
5. We_______________ Bank lastly undertake not of revoke this guarantee during its currency except
with the previous consent of the payment in writing. This guarantee will not be revoked by any
change of the constitution of the Bank or of the security.
6. Not withstanding anything contained herein before this guarantee is restricted to
Rs._____________ our guarantee shall remain in force till _____________ unless claim is made on
us on or before that date, all your rights under the said guarantee shall be forfeited and we shall be
released and discharged from all liability hereunder.
Date_____________________________ Seal of Bank Manager with Signature of
the Agent Manager.
Attested by Notary Public with his Seal
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 31 of 46
ANNEXURE – IX
DIESEL LOCO MODERNISATION WORKS
PATIALA
Joint Procedure Order
Sub: Entry and Exist of Personnel and Vehicles to/from DMW Premises.
EFFECTIVE
DATE
1. This procedure order takes effect from 1.5.90 and supersedes all the
procedure orders issued so far in this regard.
2. For the entry and exit of all materials, equipment, machinery etc. the
existing procedures shall continue.
3. Entry and exist to/from DMW Workshop Premises.
3.1 For the purpose of easy identification, the various workshop gates are
designated in this procedure order as follows:-
Time Office Gate GATE-A
Gate near the Administrative Building GATE-B
Scrap Yard Gate GATE-C
Gate on the Railway Line Side GATE-D
Railway Shunting Gate GATE-E
GATE-A 3.2 GATE-A: This is the main workshop gate. All DMW Supervisors and staff
are allowed to use only this gate for their passage to and from DMW
workshop. Similarly vehicles to DMW workshop are allowed to enter only
through this gate.
GATE-A
TIMINGS
3.2.1 The Gate-A is opened as per the timings given below for the convenience of
DMW supervisors and staff at shift changing periods. Only bonafide DMW
staff carrying their identity cards are allowed to pass through this gate
during these timings. The RPF staff on duty at the gate must check and
ensure that only staff carrying valid identity badges are allowed to pass
through the gate. The DMW staffs are allowed to gate in and out their
personal vehicles through this gate, but must step at the gate for check by
RPF staff over time they pass through. The three sections of the gate are
designated for use by different groups of staff to ensure orderly passage
through the gate.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 32 of 46
3.2.2. GATE-A TIMINGS:
SHIFT SHIFT TIMINGS GATE TIMINGS HRS.
OPENING CLOSING
1. For 2 Shift Shops
FIRST SHIFT
a) First Period 07.00 - 11.30 06.30 07.30
b) Second Period 12.30 - 16.00 11.30 12.30
SECOND SHIFT
a) First Period 16.00 - 20.00 15.30 16.30
b) Second Period 12.30 - 00.30 20.00 20.30
24.00 00.30
2. FOR 3 SHIFT SHOPS:
FIRST SHIFT
a) First Period 06.00 - 10.30 05.30 06.30
b) Second Period 11.00 - 14.00 10.30 11.00
SECOND SHIFT
a) First Period 14.00 - 19.00 13.30 14.30
b) Second Period 19.30 - 22.00 19.00 19.30
THIRD SHIFT
a) First Period 22.20 - 02.00 21.30 22.30
b) Second Period 02.30 - 06.00 02.00 02.30
3. FOR STORES DEPOT CIVIL &
ELECTRICAL MAINTENANCE
STAFF
a) First Period 07.00 - 12.00 06.30 07.30
b) Second Period 13.00 - 17.00 12.00 02.30
MONDAY
13.00 - 16.30 17.00 17.30
TUESDAY TO FRIDAY MONDAY
07.00 - 12.00 16.30 17.00
Saturday Tuesday to Friday
RESTRICTIONS:
AT OTHER TIMES
3.2.3 During the periods when Gate-A is closed passage through this
gate is restricted to the following persons/vehicles.
PERSONEL 3.2.3.1 DMW Officers.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 33 of 46
3.2.3.2 DMW staff with identity badges have red bands and green bands
with ‘W’.
3.2.3.3 DMW staff with other identity badges must have a specific
authority (gate pass) issued as per paragraph 2.10 of this
procedure order to enter or leave.
3.2.3.4 Contractor’s labour having monthly entry pass valid for the
current month. Procedure for issue of this monthly pass is laid
down in paragraph 3.9 of this procedure order.
3.2.3.5 All other visitors must have a gate pass issued by the
receptionist as per paragraph 4.4 of this procedure order.
VEHICLES: 3.2.3.6 All DMW Vehicles.
3.2.3.7 All private vehicles of DMW staff, if carrying the concerned staff,
during the gate open times and at other times if the person has
a valid authorization as paragraphs 3.2.3.1.
3.2.3.8 Outside vehicles will be allowed to go inside the workshop only
for delivering the materials such vehicles will be allowed to go
inside with a gate pass issued as per paragraph 3.8 of the
procedure order. RPF staff on duty will enter all relevant details
in this register before allowing him to go inside. These vehicles
must clear the workshop area before 16.00 hrs. Vehicles will be
allowed to remain beyond this time only in special cases
permitted in writing by Dy. CME/Plg./DCOS or higher authorities.
VEHICLES
CARRYING
MATERIALS
3.2.3.9 Vehicles carrying materials are allowed to enter or leave the
workshop only during 07.00 hrs. to 16.00 hrs. unless allowed by
authorities mentioned in para No.3.2.3.8.
GATE – B 3.3 GATE – B:
This gate is closed for all vehicles including bicycles. The road
gates are kept locked with the keys under the custody of the RPF
staff at this gate, to be opened only for the visit of VIPs with the
authorization issued Secy. To CAO(R). The wicket gate here is
kept open and only persons with the authorization as indicated
below are allowed to pass through this wicket gate, which must
be ensured by RPF Sainik on duty at this gate.
a. DMW Officers.
b. DMW staff issued with identity badges with red bands & others
having the special marking A or W on them, issued to those who
have to visit Workshop & Administrative Building frequently
during the course of their duty.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 34 of 46
c. Gate pass issued by the receptionist at the Administrative
building as per paragraph 4.8 of this procedure order.
d. Gate pass issued by the S.S. concerned as mentioned in
paragraph 3.11 of this procedure order.
In case of (C) & (D) details of the gate pass shall be entered in
the gate pass register maintained at the gate by the RPF Sainik
on duty.
GATE – C 3.4 GATE – C:
This gate is kept locked and sealed the keys being with the RPF
Staff and is opened only to pass the vehicles taking out scrap
from the scrap yard, with all the relevant documents.
GATE – D 3.5 GATE – D:
This gate is kept permanently closed, to be opened only in case
of grave emergencies with the authorization of Dy. CME/Plg.
GATE – E 3.6 GATE – E:
This gate is normally kept locked and is opened only to allow
locomotives and other rolling stock to enter or to be taken out.
VISITORS 3.7 Anyone, not having the authorization laid down in paragraphs
3.2 to 3.2.3 and wishing to visit the workshop, can contact the
receptionist of the Administrative building and make his request.
The receptionist then shall contract by telephone the DCOS or
the shop superintendent concerned with whom the visitor has
business and on getting their approval shall issue an early pass
after registering the name in the visitors register maintained by
him. The visitor must get his/her pass signed by DCOS or
WM/AWM concerned and deposit it back at the GATE-A or B as
the case may be with the RPF Sainik on duty at the time of going
out through the gate.
3.7.1 No visitor is allowed to take his vehicle inside the Workshop.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 35 of 46
FOR RAILWAY
STAFF
3.7.2 However, no other Railway Staff, visiting DMW to escort spares
and other materials issued to them, shall be directed by the
receptionist to AWM/Liaison who will then issue necessary gate
pass to them.
3.7.3 Similarly, the representatives of M&P Suppliers who come to
install, commission or repair the machines shall be directed to
WM/Plants who will then issue the gate passes to them.
VEHICLES PASS 3.8
In the case vehicles not having the authorization prescribed in
paragraphs 3.2.3.6 & 3.2.3.7 the same procedure as laid down
under paragraphs 3.7 to 3.7.3 must be followed.
CONTRACTORS 3.9 No contractor’s labour is allowed it stay in the workshop area
beyond the time authorized in the monthly pass. All contractor’s
labour must carry a valid monthly pass issued to them through the
concerned contractor for entering working in and going out of
DMW workshop area. The procedure for issue of these passes is
laid down in the following paragraphs:-
3.9.1 By 25th every month the contractor must applied in writing to his
controlling officers for issue of monthly passes to the labours
who/he will be deputing to work, inside the workshop area during
the next month, giving the following particulars of each labourer:-
a. Name of labourer/ representative.
b. Name of father of labourer/representative.
c. Labourer’s/ representative address at his native place.
d. Labourer’s/ representative trade.
e. Visible identification marks of labourer/ representative.
3.9.2 The controlling officer will forward the same if approved by him
indicating the name of the working hours of the labourer/
representative to Dy. CME/IE by 26th of the month who will/co-
ordinate the issue of the passes with ASC’s signature.
GATE PASS FOR
GATE - A
3.10 During the period when the Gate –A is normally closed, entry/exist
through this gate of DMW.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 36 of 46
STAFF not having the identity badges with a red band, is controlled
WM\AWM to the staff controlled by them under the following
circumstances;
a. When staff are deputed on duty outside DMW premises.
b. When staff are sent for medical attention.
c. When leave is granted to staff.
d. Other emergencies such as when staff have been asked to stay back
for some urgent work after completion of shift etc.
3.10.1. When allowing such staff holding a valid gate pass to pass through
the Gate-A RPF Sainik on duty must registered the same in Gate Pass
Register and retain the gate pass, in case it does not contain are –
entry permit for the same shift.
3.10.2 In case of re-entry permit is issued along with the gate pass the staff
nothing the same is allowed to re-enter the workshop on surrender
of the same to the RPF Sainik on duty at the Gate A.
3.10.3 Staff are allowed to take their personal vehicles through the Gate-B
when they hold the valid gate pass or re-entry permit as laid down in
paragraphs 3.10 to 3.10.2
GATE-B 3.11 When workshop staff are required to visit the DMW Administrative
office during shift hours, they are issued with a pass for the Gate-B
of the workshop by the DY.COS/DCOS/WM/AWM concerned. The
RPF Sainik on duty at this gate must register these in the gate pass
register kept at the gate and allow the staff to pass.
3.11.1 The gate pass so issued can be retained by the staff concerned to be
used a re-entry pass when he has to return to the workshop, at
which time it has to be surrender to the RPF Sainik on duty at the
gate.
3.11.2 If any DMW staff working in the Administrative Building out having
an identity badge as per paragraph 3.1.(e)has to be sent to
workshop area, he must be issued with a gate pass by his/her
controlling supervisor not below the rank of an OS or DY.SS, which
may be surrendered at the gate on his/her return from the
workshop.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 37 of 46
VALID IDENTITY
CARDS
3.12 IDENTITY CARDS:
Identity Cards are issued to all DMW employees. The
categories of valid identity cards are indicated below:-
COLOUR CODE GREEN BLUE RED
LETTER INSCRIBED
PLAIN ‘W’ PLAIN ‘A’ PLAIN ‘O’
TO WHOM ISSUED
Office
Staff
only
Office
Staff
authoriz
ed to
visit
W/shop
Worksho
p Staff
only
Workshop
Staff
authorized
to visit
Admn.
Building.
All SS’s &
Equivalent
Ranks
All
Officers.
AUTHORISED TO PASS
THROUGH WHICH
WORKSHOP GATE
None Gate-
A&B Gate-A Gate-A&B Gate-A&B
Gate-
A&B
NOTES: 1. Inspiration’s ‘W’ or ‘A’ is provided only the approval of the
controlling Dy. HOD.
2. Casual Khalasis & trainees are issued with authority slips by
the concerned Shop Supdts. To pass through the Workshop
Gate-A.
ADMINIST
RATIVE
BUILDING
DMW
STAFF
Entry & Exit to from DMW Administrative Building.
4.1 DMW staff holding valid identity badges are allowed to
enter & go out the Administrative Building either through
the main entrance or through the side entrance Near the
cycle/scooter stand.
VISITORS: 4.2 Visitors to the building are permitted to enter & go out only
through the main entrance.
MAIN
ENTRANCE
4.3 The following persons are allowed to pass through the main
entrance of the Administrative Building.
a. DMW staff with valid identity badges.
b. Other Railway Officers having Railway metal passes.
c. Visitors holding a visitor’s.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 38 of 46
VISITORS
PASS
4.4. Any visitor to the DMW Administrative building can
approach the receptionist at the main entrance for the
issue of a visitor pass. The receptionist then contact
through telephone the officer concerned whom the visitor
wants to meet and on obtaining his/her permission issues
the visitor’s pass after registering the same in the visitor’s
register.
4.5 In case of other Railway Staff and M&P suppliers
representatives the receptionist shall direct them to
AWM/Liaison and WM (P) respectfully as laid down in
paragraph 3.7.3.
SECURITY
CHECK
4.6 The RPF Sainik on duty at the entrance shall allow the
visitor to enter after security check and verification of the
visitor’s pass. All hand baggage shall be checked by the RPF
staff at the designated counter of the main entrance.
4.7 The visitor must get his/her visitor’s pass signed by the
concerned officer whom he has met and surrender the
same at the main entrance when he/she leaves.
VISITOR TO
WORKSHO
P:
4.8 Visitors to the Workshop area shall be issued with the
visitor’s pass for the Workshop gates by the receptionist
following the procedure as in paragraph 4.4. of this
procedure order.
4.9 Those visitors to the Admn. Building holding a visitor’s pass
are allowed to visit the Workshop through the Workshop
gate near the building if accompanied by a DMW
employee authorized to pass through the gate.
5.0 This procedure order is issued with the approval of CAO(R).
C.M.E. C.O.S. FA & CAO
ANNEXURES:
• Staff gate pass specimen.
• Visitor’s gates pass for Workshop specimen.
• Visitor’s pass to Admn. Building specimen.
• Visitors register specimen.
• Gate pass register specimen.
• Monthly pass for contractor’s labour specimen.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 39 of 46
ANNEXURE-IX/1
DIESEL LOCO MODERNISATION WORKS
PATIALA
STAFF GATE PASS
No. ___________________ Date ________________
Time ________________
For Gate :
Name of Staff :
Identity Card No.
Shop where working:
Purpose:
Re-entry permit
(only if Expected to return
during the same shift).
EXPECTED TIME OF RE-ENTRY
Issuing Authority
Signature
Name
Designation
Shop Seal
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 40 of 46
ANNEXURE-IX/2
DIESEL LOCO MODERNISATION WORKS
PATIALA
VISITORS GATE PASS
No. ___________________ Date ________________
Time ________________
Time of exit ________________
Name of Visitor:
To whom meet:
(Designation Of Officer)
Purpose (Official/Private)
Vehicle Type & Regn. No.
Issuing Authority
Signature
Name
Designation
Signature of Officer met by Visitor.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 41 of 46
ANNEXURE-IX/3
DIESEL LOCO MODERNISATION WORKS
PATIALA
VISITOR’S PASS FOR ADMINISTRATIVE BUILDING
No. ___________________ Date ________________
Time of issue ________________
Time of exist ________________
Name of Visitor:
To whom meet:
(Name / Designation Of Officer)
Signature of Receptionist
Signature of Officer met by Visitor.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 42 of 46
ANNEXURE-IX/4
DIESEL LOCO MODERNISATION WORKS
PATIALA
GATE PASS REGISTER
NAME OF GATE: _________________
S.N Gate
Pass
No.
Date Time
of
issue
Name of
staff
Shop Purpose Time
of
exist
Time
of
entry
Signature
of staff.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 43 of 46
ANNEXURE-IX/5
DIESEL LOCO MODERNISATION WORKS
PATIALA
VISITOR’S REGISTER
NAME OF GATE: _________________
S.N Pass
No.
Date Time
of
issue
Name of
Visitor
Vehic
le
No.
Purpose Time
of
entry
Time
of
exist
Signature
of visitor
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 44 of 46
ANNEXURE-IX/6
DIESEL LOCO MODERNISATION WORKS
PATIALA
IDENTITY SLIP FOR CONTRACTOR’S LABOURERS/REPRESENTATIVE
Valid Up to _______________ Date of issue: _______________
Working hours from _______________ to _______________
Name of work :
Name & Address of Contractor :
Name of Labourer :
Father’s/Husband’s Name :
Trade (Designation) :
Permanent Address :
Local Address :
Visible marks of identification
(1)
(2)
Age : _________________ Height (Approx.) ____________________
Signature Left thumb impression.
I certify that Sh/Smt. _____________________________ the representative/labourer employed by
me is personally known to me and bears a good moral character to the best of my knowledge.
___________________ _____________________
Signature of the official Signature of the contractor
_______________
Signature of R.P.F.
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 45 of 46
ANNEXURE – X
N.E.F.T. PERFORMA
( To be given in duplicate )
Mandate to be given by the Contractor (of RITES ) desirous of receiving their payment through Electronic
credit in their Bank Account.
1. Name of the Firm/Contractor ___________________________________
2. Address of the Firm ___________________________________
3. Account Number __________________________________
4. Type of Account (Current/Saving) ______________________________
5. Bank Name __________________________________
6. Address of Bank Branch __________________________________
7. MICR Code __________________________________
8. IFS Code __________________________________
Above particulars are certified I/We_________________________________
_______________________hereby authorise
RITES to credit out all payments through Electronic
transfer in our Bank Account as per mandate given
above.
(Signature & Name of Bank
Branch Manager along with
Stamp).
(Signature and Name of person authorised)
M/s. ____________________________
_________________________________
( Stamp of the firm)
Note: Please enclose one cancelled MICR cheque of beneficiary (Contractor).
Tender for engagement of sub-consultant for Review of GIS at DMW, Patiala Page 46 of 46
ANNEXURE – XI
MINIMUM TECHNICAL ELIGIBILITY CRITERIA
1. Tenderer should have completed similar work for a minimum value of Rs. 15 lakhs at the
time of opening of tender in the last three financial years (i.e. current year and three
previous financial years).
2. Total contract amount received by tenderer during the last three years, should be
minimum of Rs. 75 lakhs. For this, tenderer should submit attested copy of audited
balance sheet duly certified by chartered accountant.
3. Similar nature of work physically completed within the qualifying period, i.e. last 3 financial
years and current financial year (even though the work might have commenced before the
qualifying period) shall only be considered in evaluating the eligibility criteria.
4. The total value of similar nature of work completed during the qualifying period and not
the payments received within qualifying period alone, shall be considered.