AECOM 312-939-1000 tel 100 S. Wacker Drive, Suite 500 312-939-4198 fax Chicago, Illinois 60606 Z:\Projects\60318016\400-Technical\Biweekly Rpts\16th Ltr Rpt\16th Ltr Rpt Lakefront Tr_Apr-4-2017.doc April 4, 2017 Mr. Mike Jasek Project Manager, Lakefront Trail Improvement F.H. Paschen 5515 N. East River Road Chicago, IL 60656 RE: Radiological Survey Results – 16 th Letter Report Navy Pier Flyover / Lakefront Trail Improvement AECOM Project No. 60318016 Dear Mr. Jasek: Pursuant to requirements of the United States Environmental Protection Agency (USEPA) and conditions specified in permits issued by the City of Chicago Department of Public Health (CDPH), radiation monitoring is required to be performed for the above referenced project when construction activities will disturb fill that has not been previously screened for thorium. AECOM Technical Services, Inc. (AECOM) has been contracted to provide the required radiation surveillance and reporting. The last progress report (dated August 1, 2016) provided notification that screening activities would be conducted intermittently given that excavation activities requiring monitoring are occurring infrequently. Discussed below are the construction related excavation screening activities performed between July 1, 2016 and April 4, 2017. Retention Wall at E. Grand Ave. and Lake Shore Drive On-Ramp AECOM conducted radiological survey for fill excavation activities conducted to address installation of a retention wall east of the N. Lake Shore Drive (LSD) on-ramp and north of E. Grand Ave. (refer to Figure 1). The surveying was completed on August 10 and 23, 2016. The excavation was approximately 30-feet long, 4 to 5-feet wide, to a depth of 2 to 3-feet below ground surface (bgs). The gamma survey did not indicate that the urban fill material was above the removal action level established by the USEPA for the Streeterville area of Chicago. The USEPA removal action level for Chicago’s Streeterville area is 7.1 picocuries per gram (pCi/g) total radium (Ra-226 + Ra-228). Gamma radiation count measurements for the trench were made using Ludlum Model 2221 (S/N: 172039) survey meter and an unshielded 2 x 2 inch Nal probe Model 44-10 (S/N: 172039). For the instrument used the gamma count threshold indicative of the 7.1 pCi/g removal action level was 17,253 counts per minute (cpm) unshielded and 7,018 cpm shielded. The field gamma measurements within the excavation, and of the spoil, during the excavation process did not exceed the instrument threshold previously stated and unshielded readings ranged from a minimum of 4,700 cpm to a maximum of 11,300 cpm unshielded. Based on field observations there was no indication of the presence of radiologically-contaminated fill and/or an exceedance of the USEPA removal action level of 7.1 pCi/g total radium. A copy of a field sketch documenting the work area location, dimensions, and survey readings is included as an attachment (refer to Figure 1).
Transcript

AECOM 312-939-1000 tel 100 S. Wacker Drive, Suite 500 312-939-4198 fax Chicago, Illinois 60606

Z:\Projects\60318016\400-Technical\Biweekly Rpts\16th Ltr Rpt\16th Ltr Rpt Lakefront Tr_Apr-4-2017.doc

April 4, 2017 Mr. Mike Jasek Project Manager, Lakefront Trail Improvement F.H. Paschen 5515 N. East River Road Chicago, IL 60656

RE: Radiological Survey Results – 16th Letter Report Navy Pier Flyover / Lakefront Trail Improvement AECOM Project No. 60318016

Dear Mr. Jasek:

Pursuant to requirements of the United States Environmental Protection Agency (USEPA) and conditions specified in permits issued by the City of Chicago Department of Public Health (CDPH), radiation monitoring is required to be performed for the above referenced project when construction activities will disturb fill that has not been previously screened for thorium. AECOM Technical Services, Inc. (AECOM) has been contracted to provide the required radiation surveillance and reporting.

The last progress report (dated August 1, 2016) provided notification that screening activities would be conducted intermittently given that excavation activities requiring monitoring are occurring infrequently. Discussed below are the construction related excavation screening activities performed between July 1, 2016 and April 4, 2017.

Retention Wall at E. Grand Ave. and Lake Shore Drive On-Ramp

AECOM conducted radiological survey for fill excavation activities conducted to address installation of a retention wall east of the N. Lake Shore Drive (LSD) on-ramp and north of E. Grand Ave. (refer to Figure 1). The surveying was completed on August 10 and 23, 2016. The excavation was approximately 30-feet long, 4 to 5-feet wide, to a depth of 2 to 3-feet below ground surface (bgs).

The gamma survey did not indicate that the urban fill material was above the removal action level established by the USEPA for the Streeterville area of Chicago. The USEPA removal action level for Chicago’s Streeterville area is 7.1 picocuries per gram (pCi/g) total radium (Ra-226 + Ra-228). Gamma radiation count measurements for the trench were made using Ludlum Model 2221 (S/N: 172039) survey meter and an unshielded 2 x 2 inch Nal probe Model 44-10 (S/N: 172039). For the instrument used the gamma count threshold indicative of the 7.1 pCi/g removal action level was 17,253 counts per minute (cpm) unshielded and 7,018 cpm shielded.

The field gamma measurements within the excavation, and of the spoil, during the excavation process did not exceed the instrument threshold previously stated and unshielded readings ranged from a minimum of 4,700 cpm to a maximum of 11,300 cpm unshielded. Based on field observations there was no indication of the presence of radiologically-contaminated fill and/or an exceedance of the USEPA removal action level of 7.1 pCi/g total radium. A copy of a field sketch documenting the work area location, dimensions, and survey readings is included as an attachment (refer to Figure 1).

Navy Pier Flyover 16th Letter Report Page 2

Z:\Projects\60318016\400-Technical\Biweekly Rpts\16th Ltr Rpt\16th Ltr Rpt Lakefront Tr_Apr-4-2017.doc

Sidewalk Grading/Excavations at N. Lake Shore Drive and Lake Shore Drive On-Ramp

AECOM conducted radiological survey for fill excavation activities conducted to address an installation of concrete walk ways east of N. Lake Shore Drive (LSD) on-ramp and north of E. Grand Ave. (refer to Figure 1). The surveying was completed on August 12, 15, 18, and October 10, 2016. Three excavations/grading activities were conducted within the Site. The first excavation extended from the Flyover staircase east towards an existing asphalt walkway and continued north to additional existing asphalt walkway. The excavation was approximately 80-feet long, 5 to 20-feet wide, to a depth of 9 to 12-inches bgs. The second area extended from the northern extent of the Site, to approximately 150-feet south along the Flyover. This area was approximately 20-feet wide and excavated to 12-inches bgs. The third excavation was located on the west side of the Site, along N. Lake Shore Drive On-Ramp. The excavation was approximately 20-feet wide, 30-feet long, to a depth of less than 12-inches bgs.

The gamma survey did not indicate that the fill material was above the removal action level established by the USEPA for the Streeterville area of Chicago. Gamma radiation count measurements for the trench were made using Ludlum Model 2221 (S/N: 172039) survey meter and an unshielded 2 x 2 inch Nal probe Model 44-10 (S/N: 174496). For the instrument used the gamma count threshold indicative of the 7.1 pCi/g removal action level was 17,253 cpm unshielded and 7,018 cpm shielded.

The field gamma measurements within the excavation, and of the spoil, during the excavation process did not exceed the instrument threshold previously stated and the majority readings ranged from a minimum of 4,700 cpm to a maximum of 11,000 cpm unshielded. Some small areas exhibited readings with higher readings (<16,000 cpm), but did not exceed the threshold. Based on field observations there was no indication of the presence of radiologically-contaminated fill and/or an exceedance of the USEPA removal action level of 7.1 pCi/g total radium. A copy of a field sketch documenting the work area location, dimensions, and survey readings is included as an attachment (refer to Figure 1).

Light Bases at Lower N. Lake Shore Drive and E. Illinois St. / E. Grand Ave

AECOM conducted radiological survey for fill excavation activities conducted to address an installation of light bases at two locations; northeast corner of E. Illinois St. and Lower Lake Shore Drive and northeast of E. Grand Ave. and Lower Lake Shore Drive (refer Figure 1 and 2, respectively). The surveying was completed on August 15 and 16, 2016. The activities included excavations of three separate light bases, utilizing a hydrovac, rotary drill, and a mini-excavator. The light bases are approximately 2-feet in diameter, and excavated to a depth of 34 to 54-inches. A single light base required the area to be over-excavated due to a concrete obstruction.

The gamma survey did not indicate that the fill material was above the removal action level established by the USEPA for the Streeterville area of Chicago. Gamma radiation count measurements for the trench were made using Ludlum Model 2221 (S/N: 172039, S/N: 176944) survey meter and an unshielded 2 x 2 inch Nal probe Model 44-10 (S/N: 174496, S/N: 21187). For the instrument used the gamma count threshold indicative of the 7.1 pCi/g removal action level was 17,253 and 18,278 cpm unshielded and 7,018 cpm and 6,123 cpm shielded, respectively.

The field gamma measurements within the excavation, and of the spoil, during the excavation process did not exceed the instrument threshold previously stated and the majority of unshielded readings ranged from a minimum of 7,000 cpm to a maximum of 10,000 cpm unshielded. One anomalous reading of 16,000 cpm unshielded was identified, though it did not exceed the unit’s threshold value. Based on field observations there was no indication of the presence of radiologically-contaminated fill and/or an exceedance of the USEPA removal action level of 7.1 pCi/g total radium. .

Sidewalk Excavations/Grading at Lower Lake Shore Drive and E. Illinois St.

AECOM conducted radiological survey for fill excavation activities conducted to address an installation of concrete walkways and removal of existing asphalt pavement, south of E. Illinois St. and east of Lower

Navy Pier Flyover 16th Letter Report Page 3

Z:\Projects\60318016\400-Technical\Biweekly Rpts\16th Ltr Rpt\16th Ltr Rpt Lakefront Tr_Apr-4-2017.doc

Lake Shore Drive north of the river walk (refer to Figure 3). The surveying was conducted on August 16, 17, 18 and September 29, 2016 as well as March 6, 7, 8, 9, 10, 13, and 15, 2017. The excavation was composed of several irregularly shaped areas, following a layout of a planned sidewalk (refer to Figure 3). The depth of the excavations varied from 6 to 18-inches bgs.

During grading on August 18, 2016, two areas with elevated readings were found at the southern edge near the river walk (Figure 3). The first area found was along the fence line just north of the river walk along Ogden Slip. The initial elevated readings were observed while concrete in the area was being broken up. After the removal of some of the concrete (approx. 8-inches thick) an area was observed with readings of approximately 100,000 cpm unshielded. This area was approximately 30-inches north of the Ogden Slip river walk. A second area was also discovered approximately 15-20 feet north of the first area beneath a layer of granite pavers was a layer of black cinders and ash. Gamma readings in this area after removal of the pavers ranged from approximately 16,000 to 22,500 cpm unshielded compared to an instrument threshold 17, 253 cpm. This second area was also approximately 10 x 25 feet. These areas were successfully remediated on October 27 and 28, 2016. Approximately, 35 cubic yards of contaminated fill was containerized during the remediation work. The USEPA verification samples collected from the area confirmed that the contamination had been removed. This material was loaded on February 23, 2017, for transport to and disposal at the US Ecology Grand View Idaho facility. Additional details regarding the remediation activities will be summarized in the remediation report for this area.

During the grading activities on March 6, 2017, an area covered with granite pavers approximately 20-feet by 40-feet, was identified with elevated gamma readings after the pavers were removed. Elevated readings of 11,200 to 24,000 cpm (shielded) were observed directly beneath the granite pavers in a layer of black ash and cinders. For the Ludlum (S/N: 326720) instrument utilized, the gamma count threshold indicative of 7.1 pCi/g removal action level was 7,097 cpm shielded. Gamma survey readings of the remaining grading areas (refer Figure 3), did not indicated that fill material was above the removal action level. The area identified with elevated gamma readings was successfully remediated on March 16, 2017. Approximately 33 cubic yards of contaminated fill was containerized during the remediation work. The USEPA verification sample collected from the area confirmed that the contamination had been removed. This material was loaded on April 4, 2017, for transport and disposal at the US Ecology Grand View Idaho facility. Additional details regarding the remediation activities will be summarized in the remediation report for this area.

The remaining areas involved in grading activities did not indicate that the fill material was above the removal action level established by the USEPA for the Streeterville area of Chicago. An additional Ludlum was used during gamma radiation count measurements; Ludlum Model 2221 (S/N: 172039) survey meter and an unshielded 2 x 2 inch Nal probe Model 44-10 (S/N: 174496). For this instrument used the gamma count threshold indicative of the 7.1 pCi/g removal action level was 17,253 cpm unshielded and 7,018 cpm shielded.

Excluding the areas with elevated gamma readings, the field gamma measurements during sidewalk slab removal and grading, did not exceed the instrument threshold previously stated. The unshielded readings ranged from a minimum of 4,800 cpm to a maximum of 9,900 cpm, while shielded readings ranged between 1,900 cpm to 5,200 cpm. Based on field observations there was no indication of the presence of radiologically-contaminated fill and/or an exceedance of the USEPA removal action level of 7.1 pCi/g total radium.

Central Sprinkler-Sprinkler Excavations at Lower Lake Shore Drive and E. Illinois St.

AECOM conducted radiological survey for fill excavation activities conducted to address sprinkler installation south of E. Illinois St. and east of Lower Lake Shore Drive (refer to Figure 3). The surveying was completed on August 22, 2016, as well as March 8, 9, 10, 13, and 15, 2017. The activities included several excavations within and outside of the Site. The excavations were 2-feet wide, 1 to 3-feet deep, with lengths of 20 to 100-feet respectively. Additional lateral sprinkler line were also excavated and

Navy Pier Flyover 16th Letter Report Page 4

Z:\Projects\60318016\400-Technical\Biweekly Rpts\16th Ltr Rpt\16th Ltr Rpt Lakefront Tr_Apr-4-2017.doc

installed, however the depth for lateral lines was approximately 8-inches and the surface survey conducted in March 2014 was adequate to address these shallow installations.

The gamma survey did not indicate that the fill material was above the removal action level established by the USEPA for the Streeterville area of Chicago. Gamma radiation count measurements for the trench were made using Ludlum Model 2221 (S/N: 172039) survey meter and an unshielded 2 x 2 inch Nal probe Model 44-10 (S/N: 174496). For the instrument used the gamma count threshold indicative of the 7.1 pCi/g removal action level was 17,253 cpm unshielded and 7,018 cpm shielded. A second Ludlum was utilized during the gamma survey (S/N: 326720) with threshold of 17,193 cpm shielded and 7,097 cpm unshielded.

The field gamma measurements within the excavation, and of the spoil, during the excavation process did not exceed the instrument threshold previously stated and unshielded readings ranged from a minimum of 6,400 cpm to a maximum of 10,800 cpm unshielded. Based on field observations there was no indication of the presence of radiologically-contaminated fill and/or an exceedance of the USEPA removal action level of 7.1 pCi/g total radium.

ADA Walkway Replacement at E. Grand Ave. and Lower Lake Shore Drive

AECOM conducted radiological survey for fill excavation activities related to replacement of intersecting ADA compliant walkways at the south east corner of the intersection of E. Grand Ave. and Lower Lake Shore Drive (refer to Figure 4). The surveying was completed on November 11, 2016. The activities included removal of existing non-ADA compliant walkways, regrading, and replacement. The area consisted of two walkway section measuring 10 to 16-feet wide, 20 to 32-feet long, and to a depth of 6 to 12-inches bgs. The depth of the excavation was sloped, east to west and south to north respectively, to meet ADA regulations.

The gamma survey did not indicate that the fill material was above the removal action level established by the USEPA for the Streeterville area of Chicago. Gamma radiation count measurements for the trench were made using Ludlum Model 2221 (S/N: 172039) survey meter and an unshielded 2 x 2 inch Nal probe Model 44-10 (S/N: 174496). For the instrument used the gamma count threshold indicative of the 7.1 pCi/g total radium removal action level was 17,253 cpm unshielded and 7,018 cpm shielded.

The field gamma measurements within the excavation, and of the spoil, during the excavation process did not exceed the instrument threshold previously stated and unshielded readings ranged from a minimum of 4,400 cpm to a maximum of 8,800 cpm unshielded. Based on field observations there was no indication of the presence of radiologically-contaminated fill and/or an exceedance of the USEPA removal action level of 7.1 pCi/g total radium. A copy of a field sketch documenting the work area location, dimensions, and survey readings is included as Figure 4 in the attachments.

Sign Base Installations

AECOM conducted radiological survey for fill excavation activities associated with two installations of sign bases. Sign base #1 was located northeast of the intersection of E. Grand Ave. and E. Ohio St, while base #2 was located southeast of the intersection of E. Grand Ave. and N. Streeter Dr. (refer to Figures 5 and 6, respectively). The surveying was completed on November 17, 2016. Both sign bases were approximately 1-foot in diameter to a depth of 4-feet bgs.

The gamma survey did not indicate that the fill material was above the removal action level established by the USEPA for the Streeterville area of Chicago. Gamma radiation count measurements for the trench were made using Ludlum Model 2221 (S/N: 172039) survey meter and an unshielded 2 x 2 inch Nal probe Model 44-10 (S/N: 174496). For the instrument used the gamma count threshold indicative of the 7.1 pCi/g removal action level was 17,253 cpm unshielded and 7,018 cpm shielded.

Navy Pier Flyover 16th Letter Report Page 5

Z:\Projects\60318016\400-Technical\Biweekly Rpts\16th Ltr Rpt\16th Ltr Rpt Lakefront Tr_Apr-4-2017.doc

Sign base #1 gamma measurements within the excavation did not exceed the instrument threshold previously stated and unshielded readings ranged from a minimum of 8,800 cpm to a maximum of 14,500 cpm unshielded. Survey readings at the termination depth of sign base #1 were collected using a shield due to interference, with results ranging from a minimum of 5,800 cpm to a maximum of 6,100 cpm shielded. Sign base #2 gamma measurements within the excavation did not exceed the instrument threshold previously stated and unshielded readings tanged from a minimum of 8,100 cpm to a maximum of 12,500 cpm unshielded.

Based on field observations there was no indication of the presence of radiologically-contaminated fill and/or an exceedance of the USEPA removal action level of 7.1 pCi/g total radium.

Conduit Installation East of Lower Lake Shore Drive and E. Illinois St.

AECOM conducted radiological survey for fill excavation activities conducted to address an installation of an electrical conduit approximately 105-feet east of the intersection of Lower Lake Shore Drive and E. Illinois St. (refer to Figure 7). The surveying was completed on November 23, 2016. The activities included an excavation within a sidewalk extending south into the E. Illinois St. The excavation total dimensions were approximately 6-feet wide, 13-feet long, and 6 to 42-inches bgs.

The gamma survey did not indicate that the fill material was above the removal action level established by the USEPA for the Streeterville area of Chicago. Gamma radiation count measurements for the trench were made using Ludlum Model 2221 (S/N: 172039) survey meter and an unshielded 2 x 2 inch Nal probe Model 44-10 (S/N: 174496). For the instrument used the gamma count threshold indicative of the 7.1 pCi/g removal action level was 17,253 cpm unshielded and 7,018 cpm shielded.

The field gamma measurements within the excavation, and of the spoil, during the excavation process did not exceed the instrument threshold previously stated and unshielded readings ranged from a minimum of 7,700 cpm to a maximum of 15,100 cpm unshielded. Based on field observations there was no indication of the presence of radiologically-contaminated fill and/or an exceedance of the USEPA removal action level of 7.1 pCi/g total radium.

Jane Adams Memorial Park Walkway Grading and Excavations

AECOM conducted radiological survey during removal of temporary asphalt path, and excavation and grading operations of concrete walkways north of the intersection of E. Grand Ave. and Lower Lake Shore Drive. The area is considered to be part of Jane Adams Park. (refer to Figure 8). The surveying was completed between November 28 and December 6, 2016. The activities included several related excavations in the southwest area of the Jane Adams Park. The excavated areas were 350-feet long, 10 to 20-feet wide, and to a depth of 6 to 60-inches deep. The area with deepest cuts was sloped north to south to meet existing grade (refer to Figure 8).

The gamma survey did not indicate that the fill material was above the removal action level established by the USEPA for the Streeterville area of Chicago. Gamma radiation count measurements for the trench were made using Ludlum Model 2221 (S/N: 172039) survey meter and an unshielded 2 x 2 inch Nal probe Model 44-10 (S/N: 174496). For the instrument used the gamma count threshold indicative of the 7.1 pCi/g removal action level was 17,253 cpm unshielded and 7,018 cpm shielded.

The field gamma measurements within the excavation, and of the spoil, during the excavation process did not exceed the instrument threshold previously stated and the average unshielded readings ranged from a minimum of 6,000 cpm to a maximum of 12,000 cpm unshielded, with anomalous readings up to 15,400 cpm (refer to Jane Adams Memorial Park Survey Readings Table 1 which are located following Figure 8). Based on field observations there was no indication of the presence of radiologically-contaminated fill and/or an exceedance of the USEPA removal action level of 7.1 pCi/g total radium.

Jane Adam’s Memorial Park Hot Spot

Navy Pier Flyover 16th Letter Report Page 6

Z:\Projects\60318016\400-Technical\Biweekly Rpts\16th Ltr Rpt\16th Ltr Rpt Lakefront Tr_Apr-4-2017.doc

During the Jane Adams Memorial Park Walkway Grading and Excavations operations, between November 28 and December 6, 2016, AECOM identified elevated gamma readings and asbestos mantle strings. An area approximately 4 x 2-feet, was identified with unshielded readings of 24,000 to 50,000 cpm, between two sidewalk excavations (refer to Figure 8). The area was covered with plastic sheeting and covered will screened fill to prevent exposure and during ongoing construction activities. Further excavations were not required in this area limited delineation was performed. Furthermore, the area was fenced with snow fencing and signage. The area was successfully remediated on January 27, 2017. Approximately 3 cubic yards of contaminated fill was containerized during the remediation work. This material was loaded on February 23, 2017, for transport and disposal at the US Ecology Grand View Idaho facility. The USEPA verification samples confirmed that the contamination had been removed. Additional details regarding the remediation activities will be summarized in the remediation report for this area.

Jane Adam’s Memorial Park Tree Installations

AECOM conducted radiological survey during tree installation within Jane Adams Memorial Park, north of the intersection of E. Grand Ave. and Lake Shore Drive On-Ramp (refer to Figure 8). The surveying was completed on November 29, 2016. The excavation consisted of seven tree wells which were approximately 2 to 3-feet wide and 2-feet bgs.

The gamma survey did not indicate that the fill material was above the removal action level established by the USEPA for the Streeterville area of Chicago. Gamma radiation count measurements for the trench were made using Ludlum Model 2221 (S/N: 172039) survey meter and an unshielded 2 x 2 inch Nal probe Model 44-10 (S/N: 174496). For the instrument used the gamma count threshold indicative of the 7.1 pCi/g removal action level was 17,253 cpm unshielded and 7,018 cpm shielded.

The field gamma measurements within the excavation, and of the spoil, during the excavation process did not exceed the instrument threshold previously stated and the average unshielded readings ranged from a minimum of 7,000 cpm to a maximum of 12,000 cpm unshielded, with anomalous readings observed at tree well number 17, which exhibited readings of 13,100 to 16,100 cpm at 18-inches bgs (refer to Jane Adams Memorial Park Survey Readings Table 3 located on the page behind Figure 8). A shield was utilized for the final depth of 24-inches bgs with survey readings of 3,300 to 4,500 cpm (shielded). Despite the anomalous survey readings the observed readings were below the USEPA removal action level of 7.1 pCi/g total radium. Based on field observations the remainder of surveyed tree wells showed no indication of the presence of radiologically-contaminated fill and/or an exceedance of the USEPA removal action level.

Flyover Tree Installation E. Illinois St and Lower Lake Shore Drive

AECOM conducted radiological survey during tree installation and replacement of concrete walkways within the Ogden Slip Flyover area southeast of the intersection of E. Illinois St. and Lower Lake Shore Drive as well as the Jane Adams Memorial Park area north of the intersection of E. Grand Ave. and Lower Lake Shore Drive (refer to Figure 9). The surveying was completed on November 16 and 29, 2016. The excavation consisted of thirteen tree wells which were approximately 2 to 3-feet wide and 2-feet bgs and replacement of fractured concrete walkways, 22-feet long by 10-feet wide.

The gamma survey did not indicate that the fill material was above the removal action level established by the USEPA for the Streeterville area of Chicago. Gamma radiation count measurements for the trench were made using Ludlum Model 2221 (S/N: 172039) survey meter and an unshielded 2 x 2 inch Nal probe Model 44-10 (S/N: 174496). For the instrument used the gamma count threshold indicative of the 7.1 pCi/g removal action level was 17,253 cpm unshielded and 7,018 cpm shielded.

The field gamma measurements within the excavation, and of the spoil, during the excavation process did not exceed the instrument threshold previously stated and the unshielded readings, for tree well excavations, ranged from a minimum of 5,000 cpm to a maximum of 13,500 cpm unshielded (refer to

Navy Pier Flyover 16th Letter Report Page 7

Z:\Projects\60318016\400-Technical\Biweekly Rpts\16th Ltr Rpt\16th Ltr Rpt Lakefront Tr_Apr-4-2017.doc

Ogden Slip Flyover Survey Readings Table 1 on the page following Figure 9 in the attachments). The unshielded readings observed during the replacement of concrete walkway ranged between a minimum of 3,600 cpm to a maximum of 5,400 cpm (refer to Ogden Slip Flyover Survey Readings Table 2). Based on field observations there was no indication of the presence of radiologically-contaminated fill and/or an exceedance of the USEPA removal action level of 7.1 pCi/g total radium.

Jane Adams Memorial Park Utility Excavation

AECOM conducted radiological survey during utility trench excavation operations north of the intersection of E. Grand Ave. and Lake Shore Drive On-Ramp. The area is considered to be part of Jane Adams Park (refer to Figure 8). The surveying was completed on December 6, 2016. The excavation consisted of two trenches that joined at a single conduit box. The two trenches were approximately 1-foot wide, total length of 150-feet, to a depth of 30 to 66-inches bgs, depending on the location.

The gamma survey did not indicate that the fill material was above the removal action level established by the USEPA for the Streeterville area of Chicago. Gamma radiation count measurements for the trench were made using Ludlum Model 2221 (S/N: 172039) survey meter and an unshielded 2 x 2 inch Nal probe Model 44-10 (S/N: 174496). For the instrument used the gamma count threshold indicative of the 7.1 pCi/g removal action level was 17,253 cpm unshielded and 7,018 cpm shielded.

Due to the width of the trenches and interferences from the walls of the trench, a shield was utilized during the surveying operations. The field gamma measurements within the excavation, and of the spoil, during the excavation process did not exceed the instrument threshold previously stated with shielded readings ranged from a minimum of 2,400 cpm to a maximum of 5,400 cpm shielded, with (Jane Adams Memorial Park Survey Readings Table 2 located following Figure 8). Based on field observations there was no indication of the presence of radiologically-contaminated fill and/or an exceedance of the USEPA removal action level of 7.1 pCi/g total radium.

E. Illinois St. Sidewalk Replacement

AECOM conducted radiological survey during concrete sidewalk removal and grading activities, along the south side of E. Illinois St., east of the intersection of Lower Lake Shore Drive and E. Illinois St. (refer to Figure 9). The surveying was completed on March 13 and 15, 2017. The scope of work consisted of removal of existing sidewalk slab and grading activities. The area was approximately 160-feet long, 15-feet wide, and excavated to a depth of 6 to 12-inches bgs. For the Ludlum (S/N: 176944) instrument utilized, the gamma count threshold indicative of 7.1 pCi/g removal action level was 17,270 cpm unshielded and 6,175 cpm shielded.

During the sidewalk removal and grading activities, an area 16-feet by 5-feet, was identified with elevated gamma readings. In this area a 3-inch layer of tan fill sand was observed above a layer of black ash containing fill. The elevated readings appeared to be associated with the ash fill material. Elevated readings of 20,000 cpm (shielded) were observed at the surface tan sand. Gamma survey readings of areas (refer to Figure 9) to the north and south of the elevated gamma readings did not indicate fill material above the removal action level. The area identified with elevated gamma readings was successfully remediated on March 16, 2017. Approximately 45 cubic yards of contaminated fill was containerized during the remediation work. The USEPA verification sample collected from the area confirmed that the contamination had been removed. This material was loaded on April 4, 2017, for transport and disposal at the US Ecology Grand View Idaho facility. Additional details regarding the remediation activities will be summarized in the remediation report for this area.

Excluding the area with elevated gamma readings, the field gamma measurements during sidewalk slab removal and grading, did not exceed the instrument threshold previously stated and unshielded readings ranged from a minimum of 5,200 cpm to a maximum of 9,600 cpm, while shielded readings ranged between 1,200 cpm to 4,200 cpm. Based on field observations there was no indication of the presence of

Navy Pier Flyover 16th Letter Report Page 8

Z:\Projects\60318016\400-Technical\Biweekly Rpts\16th Ltr Rpt\16th Ltr Rpt Lakefront Tr_Apr-4-2017.doc

radiologically-contaminated fill and/or an exceedance of the USEPA removal action level of 7.1 pCi/g total radium.

Please contact us with any questions you have regarding this letter or the reported results. Regards,

Andrew Kozak Steven C. Kornder, Ph.D. Staff Geologist Senior Project Geochemist cc: Michael Herbert, F.H. Paschen Attachments: Sketches

SKETCHES AND SURVEY DATA

Sketch No. 2Readings

Area#/Depth CPM#10-2 feet (spoil) 5,600-6,4002 feet (floor) 5,200-7,400#20-3 feet (spoil) 6,500-8,1003 feet (floor) 7,200-11,300#3surface 4,700-6,800#4surface 5,700-7,50012inches 7,500-14,500#5surface 7,000-11,100#6surface 6,200-9,500#7surface 7,400-10,20012inches 8,200-9,800#89-12inches 7,100-9,100#918inches 12,000-16,00036inches (Shielded) 4,425-5,500#10surface 7,500-10,05018 inches 8,200-11,50036 inches 7,500-10,20054 inches 7,800-9,500

1 2

3

45

6

7

8

10

9

Survey EquipmentLudlum 2221 S/N: 172039Probe 2x2 NaI S/N: PR174496Unshielded: 17,253 cpmShielded : 7,018 cpmBackground: 6,800-8,300Personnel : A. Kozak, G. Nemeth

N

15-feet

11

Readings (continued)

Area#/Depth CPM#11surface6-24 inches (spoil) 5,600-8,40024 inches 12,000-16,00024 inches (shielded) 5,000-6,200

andrew_kozak
Rectangle
andrew_kozak
Rectangle
andrew_kozak
Polygon
andrew_kozak
Polygon
andrew_kozak
Line
andrew_kozak
Line
andrew_kozak
Line
andrew_kozak
Rectangle
andrew_kozak
Rectangle
andrew_kozak
Rectangle
andrew_kozak
Callout
Retention Wall Excavation 8/10, 8/23
andrew_kozak
Callout
Sidewalk Grading/Excavations 8/12, 8/15, 8/18
andrew_kozak
Arrow
andrew_kozak
Arrow
andrew_kozak
Callout
Sidewalk Grading/Excavations 8/12, 8/15, 8/18
andrew_kozak
Arrow
andrew_kozak
Callout
Light Base Installations 8/15, 8/16
andrew_kozak
Arrow
andrew_kozak
Typewriter
Readings Area#/Depth CPM #1 0-2 feet (spoil) 5,600-6,400 2 feet (floor) 5,200-7,400 #2 0-3 feet (spoil) 6,500-8,100 3 feet (floor) 7,200-11,300 #3 surface 4,700-6,800 #4 surface 5,700-7,500 12inches 7,500-14,500 #5 surface 7,000-11,100 #6 surface 6,200-9,500 #7 surface 7,400-10,200 12inches 8,200-9,800 #8 9-12inches 7,100-9,100 #9 18inches 12,000-16,000 36inches (Shielded) 4,425-5,500 #10 surface 7,500-10,050 18 inches 8,200-11,500 36 inches 7,500-10,200 54 inches 7,800-9,500
andrew_kozak
Typewriter
1
andrew_kozak
Line
andrew_kozak
Typewriter
2
andrew_kozak
Typewriter
3
andrew_kozak
Typewriter
4
andrew_kozak
Typewriter
5
andrew_kozak
Typewriter
6
andrew_kozak
Typewriter
7
andrew_kozak
Typewriter
8
andrew_kozak
Typewriter
10
andrew_kozak
Typewriter
9
andrew_kozak
Typewriter
andrew_kozak
Typewriter
Survey Equipment Ludlum 2221 S/N: 172039 Probe 2x2 NaI S/N: PR174496 Unshielded: 17,253 cpm Shielded : 7,018 cpm Background: 6,800-8,300 Personnel : A. Kozak, G. Nemeth
andrew_kozak
Arrow
andrew_kozak
Typewriter
N
andrew_kozak
Line
andrew_kozak
Typewriter
15-feet
andrew.kozak
Polygon
andrew_kozak
Typewriter
11
andrew_kozak
Typewriter
Readings (continued) Area#/Depth CPM #11 surface 6-24 inches (spoil) 5,600-8,400 24 inches 12,000-16,000 24 inches (shielded) 5,000-6,200
andrew.kozak
Text Box
Figure 1

A: COM JOBTITLE flyove,y rct.IctW<.-7- (_C<-feJ? ~ Dr~'0" J ;r: / /r!L-<orr /c""rct t,c(

I

Jos No. G o:::,~s.-26'"" cALcuLATION No. ___,..,.....,=========--oRIGINATOR {4, . K C97 q ~ DATE _....L.e;:f-:/-=-£"l_ ... L..../_1 ro...,"' -------

REVIEWER :, k'o I t-,cfe.J, DATE 8//,, e !tr SCALE ---==::=:=======---- SHEET- N=-0. -'-'-+• ,..,-=--OF-=----=----=----=----=--=--=--=====

Is'

()) P~te (covtere.feJ lB'1

® r ._ •-/err- ( cv .. ,c.rt?4) t·S ' ' &£~/

S 'l d

CPk! I 'I 7C><fJ - t1[.ek 7 ~ B,l./bo ' . I j

{7~ - 21.2,~

l

Grid: 5x5 = 1 in

andrew.kozak
Text Box
Figure 2

Sketch No. 3

5 4 3 2610ft

7 1

12

1110

9

13

Survey EquipmentLudlum 2221 S/N: 172039Probe 2x2 NaI S/N: PR174496Unshielded: 17,253 cpmShielded : 7,018 cpmBackground: 6,800-8,300Personnel : A. Kozak

21

1422

8

16

1517

1819

23

24

20

25

Survey EquipmentLudlum 2221 S/N: 326720Probe 2x2 NaI S/N: PR360158Unshielded: 17,193 cpmShielded : 7,097 cpmBackground: 7,600-8,000Personnel : A. Kozak

andrew_kozak
Polygon Line
andrew_kozak
Polygon
andrew_kozak
Polygon
andrew_kozak
Polygon
andrew_kozak
Polygon
andrew_kozak
Polygon
andrew_kozak
Polygon
andrew_kozak
Polygon
andrew_kozak
Typewriter
5
andrew_kozak
Typewriter
4
andrew_kozak
Typewriter
3
andrew_kozak
Typewriter
2
andrew_kozak
Typewriter
6
andrew_kozak
Typewriter
10ft
andrew_kozak
Typewriter
7
andrew_kozak
Typewriter
1
andrew_kozak
Rectangle
andrew_kozak
Polygon
andrew_kozak
Polygon
andrew_kozak
Polygon
andrew_kozak
Polygon
andrew_kozak
Typewriter
12
andrew_kozak
Typewriter
11
andrew_kozak
Typewriter
10
andrew_kozak
Typewriter
9
andrew_kozak
Typewriter
13
andrew_kozak
Typewriter
Survey Equipment Ludlum 2221 S/N: 172039 Probe 2x2 NaI S/N: PR174496 Unshielded: 17,253 cpm Shielded : 7,018 cpm Background: 6,800-8,300 Personnel : A. Kozak
andrew_kozak
Rectangle
andrew_kozak
Rectangle
andrew_kozak
Typewriter
21
andrew.kozak
Polygon
andrew.kozak
Line
andrew_kozak
Typewriter
14
andrew.kozak
Text Box
Figure 3
andrew.kozak
Text Box
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew_kozak
Rectangle
andrew.kozak
Polygon
andrew_kozak
Rectangle
andrew_kozak
Typewriter
22
andrew_kozak
Rectangle
andrew_kozak
Rectangle
andrew_kozak
Typewriter
8
andrew_kozak
Typewriter
16
andrew_kozak
Typewriter
15
andrew_kozak
Typewriter
17
andrew_kozak
Typewriter
18
andrew_kozak
Typewriter
19
andrew_kozak
Typewriter
23
andrew_kozak
Typewriter
24
andrew_kozak
Typewriter
20
andrew_kozak
Rectangle
andrew_kozak
Typewriter
25
andrew.kozak
Callout
Remediation Area 3/16/17
andrew.kozak
Cloud
andrew.kozak
Callout
General Location of a Remediation Area 3/16/17
andrew.kozak
Callout
General Location of a Remediation Area 10/28/16
andrew.kozak
Cloud
andrew_kozak
Typewriter
Survey Equipment Ludlum 2221 S/N: 326720 Probe 2x2 NaI S/N: PR360158 Unshielded: 17,193 cpm Shielded : 7,097 cpm Background: 7,600-8,000 Personnel : A. Kozak

Ogden Slip Flyover

SIdewalk Grading and Sprinkler Main Installaltion

Figure 3

Section # Depth (bgs) Readings (cpm) Section # Depth (bgs) Readings (cpm)

1) 0" surveyd March, 2014 20) 0" surveyd March, 2014

9" 5600‐6400 9" 3400‐6900

2) 0" surveyd March, 2014 18" 8000‐10000

9" 5900‐7900 18"‐24" 2100‐4200 (shielded)

3) 0" surveyd March, 2014 21) 0" surveyd March, 2014

9" 5000‐7000 9" 3400‐6900

4) 0" surveyd March, 2014 18" 7400‐10800

9" 4800‐6800 22) 0" surveyd March, 2014

5) 0" surveyd March, 2014 0‐24" (spoil) 6,400‐8,900

9" 4900‐7900 23) 0" surveyed March 2014

6) 0" surveyd March, 2014 16" 3000‐3800 (shielded)

9" 5500‐6600 24) 0" surveyed March 2014

7) 0" surveyd March, 2014 16‐18" 2600‐4100 (shielded)

9" 6200‐8800 25) 0" surveyed March 2014

8) 0" surveyd March, 2014 18" 1900‐2000

9" 5600‐6400 24‐30" 2400‐4000

11,200‐20,400 (shielded)

9) 0" surveyed March 2014

18" 6100‐8300

10) 0" surveyed March 2014

18" 7100‐9400

11) 0" surveyed March 2014

18" 6900‐9900

12) 0" surveyed March 2014

18" 6400‐7500

13) 0" surveyed March 2014

18" 5800‐6400

14) 0" surveyed March 2014

9" 3400‐6900

15) 0" surveyed March 2014

9" 6400‐9000

16) 0" surveyed March 2014

14"‐18" 1900‐5200 (shielded)

17) 0" surveyed March 2014

16" 2100‐3400 (shielded)

18) 0" surveyed March 2014

12" (stone) 1800‐3600 (shielded)

19) 0" surveyed March 2014

14" 2,100‐3800 (shielded)

Table 1. Sidewalk Grading Table 2. Sprinkler Main Installation

21‐27" (Remediation Area) *all readings are unshielded unless specified

*all readings are unshielded unless specified

JOB TITLE Alavv 0ex F4cot&Y- C: c;rct~ ltue. f Lf D ~lA- kl-<-fp JOB NO. b c::>~/60 ( b CALCULATION NO. -r---------

ORIGINATOR A-· leoz.alt DATE __:.l _:_jl/'-'/~~..!,_!t:.....:/&:-----------REVIEWER S, f<.c-~-...._k DATE ____,l=z.-L/=z=S-'--/ .L./ ,(.::..__ _ ____ _

A: COM

SCALE I >1 :- 2.. -c u SHEET NO. I OF _ ___;_ ___ _

.5_,dv_tfy ~~p~ t...v..dluvc--t z:zzt 1

.)/).): l?l03C'f ?~~&cz 2.)<-2. A/q.I S/)J ~ 174' c{Cf,(

I I

-l I I I

L..~.rt<,~lde.d: 17, 25".:3 ~"" s?t /d.deJ ! 7( ore f..()"'-.

bc:.cdjllO~"'& t ~CirliQo C/f" ~..s-o~"'el : tA . KoZc.t ~

4---~ ~ke. ~L...o1re 'l>t.~v~--. -~z-r+ .

. La. k. ~~~ To\XZ¥ S"o\ AJ. Lake .s~ lk.

..

1'2..~.

~

3 ..g 4~ ~ 0 ...

W"o/ 'ka4Ja.sc Pc;;p"'-" ~"\~ ( a>M) o~' (c.o~c,-~

C/'- 1211 (i/~ AJ~) C.,1oe- ~({o&

f/t~~) -'" - '12.'' ( s~eJ ~) ~~ q(£- ,, .~(JQ

~

Grid: 5x5 = 1 in

andrew.kozak
Text Box
Figure 4

A: COM JoBTITLE J/qv,vPkN FlyoGC>C - ~-'3''""*1 jJ . .>ka:lev bf11v~ ~ t:F.s,.--tA-~ JOB NO. r; c:r::8 I f30/ C CALCULATION fO. -,--========----ORIGINATOR 14.. l<.crzctk DATE _ll/j_.!...7~~~~~!.__ ______ _ REVIEWER f. f<<M v...der DATE _____.:.l ::.l~..::/l:...!.r_L/--L/~6~-------SCALE l ~ r 2.. ~ e SHEET NO. ( OF _____ _

?"'wo/ E~r---~ /...t....d/t.t-. 2. "22. I S./AJ. ; Pt<Db.: 2v:; g. )}J S/1):

~,~. ...i £C-.t!d4/ : tl-.. ·.tJe.J :

bee ci:..:r ~ c.c. ~ : pet-~u ..,eJ :

1.~'

J

1"?2 e>3Cf r?C/ t.{q; l?,Z~? c.p...., c,O!€> C(p-

6,a»o c.p-. A- . l<.ozq{t,

~ (/ ')

~ ~

'-J! ll

/ I It>' C_o'-1.~ S.14_.,_,_a. (h

I ' - I

~'V!Jt ~tey ( t.ctf I e.Q.c/l ... ~t e«e., ..c c.c rl-a/efde..( "'-"' l«~t r pt!u'l.,•ed)

kc..f.r'oe... ~ Re.sci.''='S* (C~.,(.t,~ .1. O'' f1 OQo. "'

IE/' ll,loo .3' II /'-1, ~0!) t.IB'' ~~-,~toe> c~~'d.kJ~

l L

[

~ l ~ ....... 0

~

1

Grid: 5x5 = 1 In

andrew.kozak
Text Box
E. Grand Ave. and E. Ohio St.
andrew.kozak
Text Box
Figure 5

A: COM JOB TITLE Na.vy ~ey Fly«'(/ev - s,y(A <14"2.. E. Gr-gw:f ~ ~ A}. Si'(ed-~ bt. JOB NO. hO"!:Jf6fP/£ CALCULATION NO. ---;-========-- --

ORIGINATOR lA. Ko2ak. DATE __ l::....:l+/-:--'17~/7t ,!ll__ _____ _ REVIEWER S. k:o r~Adev DATE ----'t=z.:..L:/l=9'-1/__,_t='-------scALE l :t·: l.[JI SHEET NO. 2.. OF_ ---=Z..=----- --

l ~' ver, ~cf: ~J L!_c.../11~~ 2.-zzt S:/.)): (IZ03q Pt ebt- 2..-2 Alc..I sm : 17t/ '{q,

j f.A.'1f~~ -~ dt!../ ~ ' 1?1 z.h cp ,._ .rt..Jefc/.~: 7! ~(8 cp~

lf,~c ';::r• cr..~cf~ ~~ cfl'"'­re~t-SQ tA<1e.l: ~ .l:::ozq lr-

t c .

} '1

: t J _ L

J

C'\

~

~ ., ~ ~ ~

6 '

~·3"' bctl"

tr" ~

$) 1- Ji j p t

s

~ "+:::.

cr f iS-~

"l fr T t 6 ~ '

i( ~

..

Grid: 5x5 = 1 in

andrew.kozak
Text Box
2
andrew.kozak
Oval
andrew.kozak
Typewriter
2
andrew.kozak
Text Box
Figure 6

AS' COM JOB TITLE F~ytC>i/&'r - [ r/1,/..,_or'.r 5/. JOB NO. (C;(")3 ( 6~ ( 6

ORIGINATOR iJ.,_ . (<<DZQ k REVIEWER S:, /('o'riA-d<Z-'r

SCALE I tot :._ ll.+

~G{. r l/ <'i'S( c~b~ee..£ <-'-'-Y·(uc-, f-zz ( :;;,.(}} )?rce6~ ZKC. JJc.:L ~/ )J

llz.o:;q 17 <+( t/'16

il - t-

r

-11 i I

{A~, , t,_e_f ded ·. s"-1 /ef old !

b.:1 1C~ ~CD£.1' t,.c{:

I ""' \-' -5 0

Ill

~

1

l( 1l§"3cpc..., l 1 tPf8 cp""" gf ,ccv cpvL

~~I @ '

'1~ .

Sw•vev Depl/i.,

Gl' G'' 2'1" !..(2..- lf

\2 II

3P 1'

L/2_ {I

CALCULATION NO. --:--==========--­DATE II } t:.5 / /£ DATE I z I! fJ I 16 SHEETNO. ( OF __ ,;__ __ _

1.4

~ ~

~

~k.f (CP.VO':>

l,7oq -S ,5cp

~: ~OO -$ 1500 e,rt;:({> -Cf , 6·CO

\I,OCC'J I?:, 12CCl 1, :r-eo- 8,zcdJ '7/DO -'lrfoe q,CCO- lf/OO

r -- ~---

(

I I

~~-.

Grid: 5x5 = 1 in

andrew.kozak
Text Box
Figure 7
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew.kozak
Oval
andrew.kozak
Oval
andrew.kozak
Oval
andrew.kozak
Oval
andrew.kozak
Oval
andrew.kozak
Oval
andrew.kozak
Oval
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew.kozak
Polygon
andrew.kozak
Typewriter
1
andrew.kozak
Typewriter
13
andrew.kozak
Typewriter
3
andrew.kozak
Typewriter
2
andrew.kozak
Typewriter
1
andrew.kozak
Typewriter
1
andrew.kozak
Typewriter
1
andrew.kozak
Typewriter
1
andrew.kozak
Typewriter
1
andrew.kozak
Typewriter
9
andrew.kozak
Typewriter
1B
andrew.kozak
Typewriter
6
andrew.kozak
Typewriter
7
andrew.kozak
Typewriter
8
andrew.kozak
Typewriter
5
andrew.kozak
Typewriter
4
andrew.kozak
Typewriter
10
andrew.kozak
Typewriter
11
andrew.kozak
Typewriter
12
andrew.kozak
Polygon
andrew.kozak
Typewriter
3C
andrew.kozak
Typewriter
2B
andrew.kozak
Typewriter
3B
andrew.kozak
Typewriter
4C
andrew.kozak
Typewriter
4B
andrew.kozak
Typewriter
7B
andrew.kozak
Callout
14
andrew.kozak
Callout
15
andrew.kozak
Callout
16
andrew.kozak
Callout
17
andrew.kozak
Callout
18
andrew.kozak
Callout
19
andrew.kozak
Callout
20
andrew.kozak
Rectangle
andrew.kozak
Arrow
andrew.kozak
Arrow
andrew.kozak
Arrow
andrew.kozak
Typewriter
2ft
andrew.kozak
Typewriter
4ft
andrew.kozak
Typewriter
12ft
andrew.kozak
Callout
Hot Spot
andrew.kozak
Arrow
andrew.kozak
Typewriter
Area sloped to the south
andrew.kozak
Text Box
Survey Equipment Ludlum 2221 S/N : 172039 Probe 2x2 NaI S/N : 174496 unshielded: 17,270 cpm shielded: 6,175 cpm background: 8,000 cpm
andrew.kozak
Rectangle
andrew.kozak
Oval
andrew.kozak
Rectangle
andrew.kozak
Typewriter
Walkways
andrew.kozak
Typewriter
Catch Basin
andrew.kozak
Typewriter
Utility Lines
andrew.kozak
Typewriter
Legend
andrew.kozak
Typewriter
Tree wells
andrew.kozak
Rectangle
andrew.kozak
Rectangle
andrew.kozak
Arrow
andrew.kozak
Typewriter
N
andrew.kozak
Text Box
Figure 8

Tables 1, 2 and 3Jane Adams Memorial Park Survey Readings

(all survey readings are unshielded unless specified

Section # Depth Readings (CPM) Section # Depth Readings (CPM)

1 0" (asphalt) ‐ 1B 0"‐12" see table 1 section #1

6" 4,600 ‐ 7,200 30" 2,400 ‐ 4,200 (shielded)

12" 7,100 ‐ 12,000 2B 0" ‐ 48" see table 1 section #2

2 0" (asphalt) ‐ 60" 2,700 ‐ 5,100

6" 4,200 ‐ 5,500 3B 0" ‐ 24" see table 1 section #3

24" 6,800 ‐ 10,100 66" 3,700 ‐ 5,400 (shielded)

36" 8,700 ‐ 12,800 4B 0" ‐ 32" see table 1 section #4

48" 9,100 ‐ 15,400 50" 3,100 ‐ 4,900 (shielded)

3 0" (asphalt) ‐ 4C 0" ‐ 32" see table 1 section #4

6" 3,800 ‐ 5,300 50" 3,600 ‐ 5,200 (shielded)

24" 6,600 ‐ 9,800 7B 0" ‐ 12" see table 1 section #7

42" 7,500 ‐ 11,900 30" 2,700 ‐ 4,500 (shielded)

4 0" (asphalt) ‐

6" 5,600 ‐ 7,300

24" 8,700 ‐ 9,800

32" 7,000 ‐ 8,500 Section # Depth Readings (CPM)

5 0" (asphalt) ‐ 14 0" previously surveyed

6" 5,300 ‐ 9,100 18" 7,100 ‐ 8,200

18" 6,100 ‐ 9,900 24" 7,400 ‐ 10,000

6 0" (asphalt) ‐ 15 0" previously surveyed

6" 5,100 ‐ 6,900 18" 7,600 ‐ 10,000

12" 4,700 ‐ 9,200 24" 8,900 ‐ 11,500

7 0" (asphalt) ‐ 16 0" previously surveyed

6" 6,100 ‐ 9,100 18" 7,700 ‐ 10,000

12" 5,200 ‐ 8,700 24" 8,500 ‐ 11,800

8 0" (asphalt) ‐ 17 0" previously surveyed

6" 4,000 ‐ 6,200 18" 13,100 ‐ 16,100

18" 5,800 ‐ 8,300 24" 3,300 ‐ 4,500 (shielded)

9 0" (stone) surveyed 8/16 18 0" previously surveyed

16" 7,700 ‐ 12,600 18" 11,000 ‐ 12,400

10 0" previuosly surveyed 24" 13,100 ‐ 14,000

12" 7,600 ‐ 10,000 19 0" previously surveyed

11 0" previuosly surveyed 18" 8,300 ‐ 9,000

12" 6,200 ‐ 10,000 24" 9,000 ‐ 10,800

12 0" previuosly surveyed 20 0" previously surveyed

12" 8,000 ‐ 11,800 18" 8,300 ‐ 9,900

13 0" previuosly surveyed 24" 11,000 ‐ 12,400

12" 7,900 ‐ 11,700

Table 3. Tree Wells

Table 1. Asphlat removal, walkway excavations Table 2. Utility Excavations 

---------------------------------

PROPOSEDFLYOVERSTRUCTURE

,-- P·ROF'OSEoD STAIRS SERVING FLYOVER STRUCTURE

LIMITS OF PLANTING BED, PLANTING BED SOIL TO BE AMENDED WITH 3" OF SOIL CONDITIONER TILLED INTO TOP 10" OF EXISTING SOIL

PROPOSED SIDEWALK

EXISTING TREE TO REMAIN (TYP)

----------------------------------------------------------------------------------------~

ILLINOIS STREET ONE WAY

- - ---= =---= u =-=-\-=----- ~~=====\=-=-==-=-=~-3;F =----=--= =---= =----=--= =---= =----=--= :o: -= =--- p =---= =----=--= =---= =----=- :o: ---= b ---=--= =---= =----=--= =---= =---:o: =---= =----=--= =---= =----=--= =---= =--:o: -= =---= =- if! -=

Iii I !l! _j

\ \ \

II)

In \ l PROPOSED CONNECTION J: ~TOEX.WATERLINEWITH 1- 1 WATER TAP, 1 VALVE, W 1-~\_-1 w.l 1 METER AND 1 BACKFLOW W \ PREVENTER (RPZ), SEE ~ PROPOSE~ W TER SHEET LAN-08 FOR DETAILS z SERVICE LINE

:J \ ... ::t: if! I ~ - "\ \

:::!! ~ ~

BILL OF MATERIALS DESCRIPTION UNIT

PULVERIZED TOPSOIL MIX CUYD

SHREDDED HARDWOOD BARK MULCH SQYD

SODDING, SALT TOLERANT SQYD

SOIL CCNDITIONER, 31NCH CUYD

TREE PRUNING EACH

VERTICAL MULCHING EACH

GROWING MEDIUM, 24 INCH CUYD

SCUPPER DOWNSPOUT OUTFALL EACH

WATER TAP, 2 INCH EACH

WATER VALVE ASSEMBLY, 21NCH EACH

WATER METER IN VAULT, 2 INCH EACH

WATER SERVICE LINE, 21/21NCH FEET

BACKFLOW PREVENTER (RPZ), 21NCH EACH

IRRIGATION SYSTEM SQYD

IRRIGATION SYSTEMS FALL SHUTDOWN LSUM

IRRIGATION SYSTEMS SPRING STARTUP LSUM

IRRIGATION SYSTEMS INSPECTION LSUM

TREE IRRIGATION BAGS EACH

--

LAKESHORE DRIVE EXIT RAMP

!'

PLANTING BED SOIL AMENDED

r-;;;--, WITH 3" OF SOIL CONDITIONER

TILLED INTO TOP 10'' OF EXISTING SOIL

-- ...... ' ' -~

·~.

EXISTING ABUTMENT FOR LIMITS OF PLANTING BED· CONTINUE SHREDDED BARK MULCH UNDER TREES

ONE WAY -------1:>-

PROPOSED IRRIGATION SYSTEM FOR BIOSWALE PERENNIALS,

267 SQ YD SERVICE AREA, SEE SHEET LAN-08 FOR DETAILS

REPAIR )

(

EXISTING SOIL AND SOD LAWN

.......

QUANTITY

200

141

3260

33

1

1

190

2

1

1

1

150

1

267

1

1

1

30

AUTO RAMP

-_....- - ....

OGDEN SLIP

--- ~...,_ p_ - ~-- ..;:-_--0

END OF PROPOSED WALL

Iii w J: II)

w 1-1 -..,,.------11 w 1-----1 !Q '\...PROPOSED~· WATER J:

==r­_:::3

I I

______ (~ISTINGb----------~---------- ~--~ if/------~=-~=00-~~l ----\)--- ""'\ ..... "" 0 0 \..: --------- II - - - - - - - - _ , __ - - - - .h - - - .._.- - - - - - - - - - - - - - - - - - - - - - - - Ct I

TREE INSTALLATION ALONG OGDEN SLIP MUST BE DONE CAREFULLY TO AVOID WALL TIE BACKS, IF HIT CONTACT ENGINEER

II II I I I I II I I II

SEE SHEET LAN-08 lfl II)

w z :J J: u !4: :::!!

PROPOSED LANDSCAPE PLAN

BILL OF MATERIALS (CONTINUED)

COMMENT TREE INSTALLATION

QUANTITY SPECIFIED FOR BOTH SHEETS LAN-04 I LAN-05 CANOPY TREES

CODE UNIT QUANTITY BOTANICAL NAME COMMON NAME QUANTITY SPECIFIED FOR BOTH SHEETS LAN-04 I LAN-05

LADE EACH 4 LARIX DECIDUA EUROPEAN LARCH

QUANTITY SPECIFIED FOR BOTH SHEETS LAN-04 I LAN-05 ORNAMENTAL TREES

QUANTITY SPECIFIED FOR BOTH SHEETS LAN-04 I LAN-05 MADP EACH 6 MALUS 'DREAM PINK' DREAM PINK CRABAPPLE

QUANTITY SPECIFIED FOR BOTH SHEETS LAN-04 I LAN-05 SYPE EACH 20 SYRINGA PEKINENSIS PEKING LILAC TREE

QUANTITY SPECIFIED FOR BOTH SHEETS LAN-04 I LAN-05 PLANT INSTALLATION SHRUBS

SEE LAN-06 FOR DETAILED BILL OF MATERIALS FOR PAY ITEM VIXC EACH 21

VIBURNUM CARLIESII X CYUGA KOREAN SPICE VIBURNUM

MACROCEPHALUM 'CAYUGA'

SEE LAN-06 FOR DETAILED BILL OF MATERIALS FOR PAY ITEM HYDRANGEA PANICULA TA DHARUMA HYDRANGEA HYDH EACH 46 'DHARUMA'

QUANTITY AS SPECIFIED ON SHEET LAN-04, DETAILS ON SHEET LAN-08 HYDRANGEA QUERCIFOLIA PEE WEE DWARF OAK LEAF HYQP EACH 29 'PEE WEE' HYDRANGEA

QUANTITY AS SPECIFIED ON SHEET LAN-04, DETAILS ON SHEET LAN-08 RHGL EACH 114 RHUS AROMATICA 'GRO LOW GRO LOW FRAGRANT SUMAC

QUANTITY AS SPECIFIED ON SHEET LAN-04, DETAILS ON SHEET LAN-08

RONW EACH 301 ROSA RUGOSA' NEARLY WILD' NEARLY WILD ROSE

QUANTITY AS SPECIFIED ON SHEET LAN-04, DETAILS ON SHEET LAN-08 PERENNIAL MIX TYPE A

QUANTITY AS SPECIFIED ON SHEET LAN-04, DETAILS ON SHEET LAN-08 EUPU EACH 122 EUPATORIUM PURPUREUM PURPLE JOE PYE WEED

QUANTITY AS SPECIFIED ON SHEET LAN-04 LISP EACH 122 LIATRIS SPICATA DENSE BLAZING STAR

QUANTITY AS SPECIFIED ON SHEET LAN-04 VEFA EACH 122 VERNONIA FASCICULATA COMMON IRONWEED

QUANTITY AS SPECIFIED ON SHEET LAN-04 PERENNIAL MIX TYPE B

QUANTITY AS SPECIFIED ON SHEET LAN-04 SOSP EACH 263 SCLIDAGO SPECIOSA SHOWY GOLDENROD

TROH EACH 263 TRAIDESCANTIA OHIENIS OHIO SPIDERWORT

ZIAU EACH 263 ZIZIAAUREA GOLDEN ALEXANDER

SIZE COND CCMMENT

41N. BB SPECIMEN QUALITY

7FT. BB MULTI-STEM

8FT. BB MULTI-STEM

361N. CONT. 42" O.C. SPACING

30 IN. CONT. 30" O.C. SPACING

18 IN. CONT. 30" O.C. SPACING

18 IN. CONT. 54" O.C. SPACING

18 IN. CONT. 30" O.C. SPACING

1 GAL. CONT. 18" O.C. SPACING

1 GAL. CONT. 18" O.C. SPACING

1 GAL. CONT. 18" O.C. SPACING

1 GAL. CONT. 18" O.C. SPACING

1 GAL. CONT. 18" O.C. SPACING

1 GAL. CONT. 18" O.C. SPACING

KEY @J PROPOSED TREES

-PROPOSED SHRUBS

CY EXISTING TREES TO REMAIN

PERENNIAL MIX TYPE A

PERENNIAL MIX TYPES

~ MULCHED I NON-PLANTED ~AREAS

GENERAL NOTES: MAINTAIN EXISTING GRADE AROUND TREES. DO NOT DISTURB ROOT ZONE. MAINTAIN AND PROVIDE POSITIVE DRAINAGE IN ALL PLANTING AREAS

THE SOIL FOR THE SHRUB PLANTING BEDS OUTSIDE OF THE BIOSWALE WILL BE AMENDED WITH SOIL CONDITIONER. 3 INCHES OF SOIL CONDITIONER TO BE TILLED INTO TOP 10 INCHES OF EXISTING SOIL.

NO. BY OAT£ DESCRIPllON

RE\nSIONS

LAKEFRONT TRAIL IMPROVEMENT FROM JANE ADDAMS PARK

TO OGDEN SLIP

PROPOSED LANDSCAPE PLAN

NAVY PIER ACCESS RAMP

CONSULTANT

MNTB CITY OF CHICAGO

DEPARTMENT OF TRANSPORTATION BUREAU OF BRIDGES & TRANSIT

DRAWN Jl.S/SAH SHEET NO.

CHECKED Jl.S/SAH

APPROVED Jl.S/SAH LAN-04 DAlE 10/19/12

SCALE 1:20 4 OF 9 SHEETS

CONTRACT NO. 14115 PROJECT NO. 44867

kchavez
Ellipse
kchavez
Ellipse
kchavez
Ellipse
kchavez
Ellipse
kchavez
Ellipse
kchavez
Ellipse
kchavez
Ellipse
kchavez
Ellipse
kchavez
Ellipse
kchavez
Ellipse
kchavez
Ellipse
kchavez
Ellipse
kchavez
Ellipse
kchavez
Ellipse
kchavez
Ellipse
kchavez
Ellipse
andrew.kozak
Pencil
andrew.kozak
Pencil
andrew.kozak
Pencil
andrew.kozak
Pencil
andrew.kozak
Pencil
andrew.kozak
Pencil
andrew.kozak
Pencil
andrew.kozak
Pencil
andrew.kozak
Rectangle
andrew.kozak
Callout
concrete replacement
andrew.kozak
Typewriter
6
andrew.kozak
Typewriter
7
andrew.kozak
Typewriter
10
andrew.kozak
Typewriter
8
andrew.kozak
Typewriter
5
andrew.kozak
Typewriter
4
andrew.kozak
Typewriter
3
andrew.kozak
Typewriter
2
andrew.kozak
Typewriter
9
andrew.kozak
Typewriter
11
andrew.kozak
Typewriter
12
andrew.kozak
Typewriter
13
andrew.kozak
Typewriter
1
andrew.kozak
Typewriter
1
andrew.kozak
Typewriter
2
andrew.kozak
Line
andrew.kozak
Arrow
andrew.kozak
Arrow
andrew.kozak
Typewriter
10'
andrew.kozak
Typewriter
22'
andrew.kozak
Rectangle
andrew.kozak
Rectangle
andrew.kozak
Rectangle
andrew.kozak
Rectangle
andrew.kozak
Rectangle
andrew.kozak
Rectangle
andrew.kozak
Rectangle
andrew.kozak
Text Box
Survey Equipment (tree wells) Ludlum 2221 S/N : 172039 Probe 2x2 NaI S/N : 174496 unshielded: 17,270 cpm shielded: 6,175 cpm background: 8,000 cpm
andrew.kozak
Rectangle
andrew.kozak
Rectangle
andrew.kozak
Oval
andrew.kozak
Typewriter
Walkways
andrew.kozak
Typewriter
Legend
andrew.kozak
Typewriter
Tree wells
andrew.kozak
Rectangle
andrew.kozak
Arrow
andrew.kozak
Typewriter
N
andrew.kozak
Text Box
Figure 9
andrew.kozak
Polygon
andrew.kozak
Line
andrew.kozak
Rectangle
andrew.kozak
Line
andrew.kozak
Line
andrew.kozak
Line
andrew.kozak
Line
andrew.kozak
Typewriter
andrew.kozak
Typewriter
1
andrew.kozak
Typewriter
2
andrew.kozak
Typewriter
3
andrew.kozak
Typewriter
4
andrew.kozak
Typewriter
5
andrew.kozak
Typewriter
6
andrew.kozak
Arrow
andrew.kozak
Typewriter
~ 160 ft
andrew.kozak
Callout
Existing sidewalk removal and grading area
andrew.kozak
Rectangle
andrew.kozak
Callout
Remediation Area
andrew.kozak
Text Box
Survey Equipment (Sidewalk along E. Illinois St.) Ludlum 2221 S/N : 172039 Probe 2x2 NaI S/N : 174496 unshielded: 17,270 cpm shielded: 6,175 cpm background: 7,600 cpm

Ogden Slip Flyover

Survey Readings ‐ Tree Wells and Sidewalk Removal

(all survey readings are unshielded unless specified)

Section # Depth Readings (CPM) Section # Depth Readings (CPM)

1 0" surveyd March, 2014 1 0" (asphalt) ‐

18" 9,000 ‐ 11,200 6" 3,700 ‐ 5,400

2 0" surveyd March, 2014 2 0" (asphalt) ‐

18" 8,700 ‐ 10,000 6" 3,600 ‐ 4,700

3 0" surveyd March, 2014

18" 9,800 ‐ 12,900

4 0" surveyd March, 2014 Section # Depth Readings (CPM)

18" 10,000 ‐ 12,500 1 6" 5,200‐8,400

5 0" surveyd March, 2014 2 6" 6,100‐9,600

18" 8,800 ‐ 10,800 12" (curb) 6,000‐7,200

6 0" surveyd March, 2014 3 6" 1,200‐3,300 (shielded)

18" 7,600 ‐ 9,100 12" (curb) 1,900‐4,200 (shielded)

7 0" surveyd March, 2014 4 6" 1,900‐4,000 (shielded)

18" 9,900 ‐ 13,000 5 6" 1,900‐3,300 (shielded)

8 0" surveyd March, 2014 12" (curb) 1,600‐2,200 (shielded)

18" 11,000 ‐ 13,200 6 6" 2,000‐3,000 (shielded)

9 0" surveyd March, 2014

18" 9,700 ‐ 12,900

10 0" surveyd March, 2014

18" 8,900 ‐ 11,100

11 0" surveyd March, 2014

18" 9,100 ‐ 10,800

12 0" surveyd March, 2014

18" 11,000 ‐ 13,500

13 0" surveyd March, 2014

18" 5,000 ‐ 7,300

Table 1. Tree Wells Table 2. Concrete Removal

Table 3. Sidewalk Slab Removal


Recommended