17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS
Transcript
Page 1: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

17 N

ovem

ber 2

015

WATER RESOURCES PRACTICE LEADERBLACK & VEATCH WATER PAMELA P. KENEL

QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS

DRAFT

Page 2: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

2

• Benefits of Quarry to Reservoir Conversion• Feasibility Evaluations

• Volume of Storage• Limiting Geotechnical Conditions• Groundwater Interaction

• Program Schedule / Implementation

AGENDA

Page 3: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

3

1. Re-use of retired rock quarries for beneficial use

2. Limited environmental impacts3. Location in developed and urbanizing areas4. Storage provides climate resilience5. Storage of water for range of purposes

• Water supply operational or emergency storage • Wet weather storage

BENEFITS OF QUARRY RESERVOIRS

Page 4: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

"Piedmontmap". Licensed under Creative Commons Attribution-Share Alike 2.5 via Wikimedia Commons - http://commons.wikimedia.org/wiki/File:Piedmontmap.png#mediaviewer/File:Piedmontmap.png

• New Jersey

• Pennsylvania

• Delaware

• Maryland

• Virginia

• North Carolina

• South Carolina

• Georgia

• Alabama

PIEDMONT PLATEAU REGION

4

Page 5: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

5

QUARRY RESERVOIR EXAMPLES

Thornton Quarry Reservoir 7.9 BG Elmhurst Quarry Reservoir 4 BG

Travilah Quarry Reservoir 17 BGMcCook Quarry Reservoir 10 BG

Page 6: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

6

To Answer the Key Questions:• What volume of storage will quarry provide?• Are there existing geological or geotechnical

conditions that may prevent use or limit usefulness?• Potential for negative groundwater interactions?• Potential water quality issues affecting long-term

use?• How to integrate reservoir asset in to the existing

system?

FEASIBILITY EVALUATIONS

Page 7: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

WHAT VOLUME OF STORAGE WILL THE QUARRY PROVIDE?

7

Page 8: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

8

• Mining plan and future volume• Can mining plan be altered to optimize capacity?• Consider range of scenarios

• To what level can quarry be filled and drawn down?• Ground improvement needs• Groundwater influence• Low level limitations (water quality, physical

pumping limitations)

WHAT VOLUME OF STORAGE WILL QUARRY PROVIDE?

Page 9: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

9

• Consider range of scenarios in multi-year increments

• Can mining be concurrent with reservoir operation?

• Can mining plan be altered to optimize capacity?

• Can mining plan accommodate timing needs?

MINING PLAN AND SCHEDULE

Page 10: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

EN

VIR

ON

ME

NTA

L R

EV

IEW

TRAVILAH QUARRY 1964

10

Page 11: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

EN

VIR

ON

ME

NTA

L R

EV

IEW

TRAVILAH QUARRY 1981

11

Page 12: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

EN

VIR

ON

ME

NTA

L R

EV

IEW

TRAVILAH QUARRY 2000

12

Page 13: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

EXISTING GEOLOGICAL FEATURES OR GEOTECHNICAL CONDITIONS THAT LIMIT QUARRY'S USE AS A RESERVOIR?

13

Page 14: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

• Geotechnical Impacts• Permeability of rock (floor and walls)

• Geologic and Hydrogeological Assessment:• Geologic mapping• Confirm and identify other major geologic features• Identify quarry seeps and estimated flows• Determine if deleterious rock is present• Confirm quarry sump discharge• Obtain regional groundwater data• Evaluate wall stability and permeability

WILL THE QUARRY HOLD WATER?

14

Page 15: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

GROUND IMPROVEMENT REQUIRED

15

Page 16: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

IS THERE POTENTIAL FOR HARMFUL LOCAL GROUNDWATER INTERACTION?

16

Page 17: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

OPERATING QUARRY IS A SINK

17

Page 18: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

EN

VIR

ON

ME

NTA

L R

EV

IEW

ENVIRONMENTAL DATABASE SEARCH FOR PAST CONTAMINATION

18

Page 19: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

GROUNDWATER PROTECTION SYSTEM

Page 20: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

CAN THE MINING PLAN BE COORDINATED TO FACILITATE CONVERSION TO USE AS A RESERVOIR?

20

Page 21: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

21

• Improve pipeline / tunnel connection constructability

• Maximize capacity• Improve quarry

highwall stability• Improve long-term

reservoir access • Reduce contaminants

from quarry operations

MINING PLAN OPTIMIZATION

Page 22: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

PU

MP

STA

TIO

N D

ES

IGN

• Submerged Intake

• Inclined Cans

• Vertical Cans

QUARRY PUMPING STATION OPTIONS

22More economical / potential maintenance issues/ easy to maintain

Page 23: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

Dependent on Owner and Operator Coordination

• Steps:• Planning, Feasibility Studies (2-10 years)• Agency Review and Permitting (6mths – 2yrs)• Design (~2 yrs)• Construction (2 -10 yrs)

• Potential Approaches:• Construction Packaging & Phasing• Early Partial Utilization of Quarry

PROGRAM SCHEDULE

23

Page 24: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

24

MULTIPLE QUARRIES PROVIDE FLEXIBILITY -TO MINING OPERATION AND FUTURE OWNER

Page 25: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

25Investigation of hydropower potential

CONTINUED EVALUATION OF OPPORTUNITIES

Page 26: 17 November 2015 WATER RESOURCES PRACTICE LEADER BLACK & VEATCH WATER PAMELA P. KENEL QUARRY CONVERSION: CRITICAL PLANNING & DESIGN ELEMENTS DRAFT.

Recommended