PROVIDING SOLUTIONS FOR DEEP FOUNDATION NEEDS 1932 - 2007
Transcript

Providing SolutionS for deeP foundation needS

1932 - 2007

CHARLES LOWMAN POWER PLANTLeroy, Alabama

ProbLem: The need to install a drilled shaft pinning system on the edge of an unstable river bank

SoLuTion: Design and build a system of work bridges in conjunction with long reach drilling equipment

CHARLES LOWMAN POWER PLANT • Leroy, Alabama

JANUARY 2007S M T W T F S

1 2 3 4 5 6

7 8 9 10 11 12 13

14 15 16 17 18 19 20

21 22 23 24 25 26 27

28 29 30 31

The project was located on the banks of the Tombigbee river in Leroy, Alabama in the Charles r. Lowman Power Plant. The “Pinning System Project” consisted of one hundred 54-inch diameter cased drill shafts, averaging 112 feet in length. The drilled shafts were installed to stop the slope failure occurring at the banks of the Tombigbee river. beCK (in conjunction with Jordan Pile Driving of mobile, Alabama) designed and installed a system of trestle work bridges and long reach drilling equipment to construct the pinning shafts in the required location. This

was accomplished without applying any construction loads to the existing river bank. each drill shaft had an average of eighty feet of casing installed down to an underlying limestone stratum, and then a drilled penetration into the limestone another twenty feet. inclinometer casings and strain gauges were strategically placed in ten of the one hundred shafts to monitor the movement of the slope as new air quality control additions to the plant were constructed. enGineer: black & Veatch

CHARLES LOWMAN POWER PLANT Leroy, Alabama

3

10

17

1 2

4 5 6

18

131211

987

15

22212019

14 16

23

25 26 27 28 29 302431

DECEMBER 2006

4

11

18

1 2 3

5 6 7

19

141312

1098

16

23222120

15 17

24

26 27 2825

FEBRUARY 2007

A. H. BECK FOUNDATION CO. INC. ahbeck.com | ph 210.342.5261

The interstate 10 / uS 59 interchange near downtown Houston was touted as one of the busiest highway intersections in the state. Widening uS 59 at this intersection was no easy task for TxDoT, due to the cities’ growth surrounding the interchange. The design called for large diameter deep foundations (to support single columns) in very tight locations. beCK was the successful bidder due to their

experience and highly productive equipment for installing large diameter shafts with the high water table and soft coastal soils found at the site. beCK manufactured a 500 horse power drill attachment, mounted on a 165-ton crane, to install the 108” diameter shafts with depths of 140’ deep in these tight areas.enGineer: Texas Department of Transportation

US 59 at IH 10 LG DIAMETER DEEP SHAFTS Houston, Texas

A. H. BECK FOUNDATION CO. INC. ahbeck.com | ph 210.342.5261

FEBRUARY 2007S M T W T F S

1 2 3

4 5 6 7 8 9 10

11 12 13 14 15 16 17

18 19 20 21 22 23 24

25 26 27 28

7

1

14

21

2 3 4 5 6

8 9 10

22

171615

131211

19

26252423

18 20

27

29 30 31 28

JANUARY 2007

4

11

18

1 2 3

5 6 7

19

141312

1098

16

23222120

15 17

24

26 27 28 29 30 3125

MARCH 2007

US 59 AT IH 10 LARGE DIAMETER DEEP SHAFTS • Houston, Texas

US 59 AT IH 10 Houston, Texas

ProbLem: The need for high capacity foundations with limited working area

SoLuTion: Design of single shaft single column foundations requiring up to 108” diameter shafts 140’ deep

SUPER CONDUCTING SUPER COLLIDER • Waxahachie, Texas

SUPER CONDUCTING SUPER COLLIDER Waxahachie, Texas

ProbLem: The need to productively excavate large diameter deep access shafts

SoLuTion: Design and build drilling equipment capable of excavating 30’ diameter 300’ deep shafts

1 2 3

4 5 6 7 8 9 10

11 12 13 14 15 16 17

18 19 20 21 22 23 24

25 26 27 28 29 30 31

4

11

18

1 2 3

5 6 7

19

141312

1098

16

23222120

15 17

24

26 27 28 25

FEBRUARY 2007

1

8

2

15

22

3 4 5 6 7

9 10 11

23

181716

141312

20

27262524

19 21

28

30 29

APRIL 2007

MARCH 2007S M T W T F S

The super conducting super collider was a Department of energy project to build a giant underground atom smasher. To accomplish this, they had to construct a 30 foot diameter underground tunnel 64 miles long. The tunnel was shaped like an oval and would house large electromagnetic race track that would control the atoms. beCK was contracted to install access, alignment and vent shafts

to facilitate the tunnel excavation. These access shafts varied from 18 to 30 feet in diameter to depths of 285 feet. beCK developed a system of installing a series of secant piles to stabilize the upper soft soils and high torque drilling equipment to excavate the lower shales.

enGineer: PbmK - Parsons brinkerhoff / morrison Knudson

SUPER CONDUCTING SUPER COLLIDER Waxahachie, Texas

A. H. BECK FOUNDATION CO. INC. ahbeck.com | ph 210.342.5261

1 2 3 4 5 6 7

8 9 10 11 12 13 14

15 16 17 18 19 20 21

22 23 24 25 26 27 28

29 30

APRIL 2007S M T W T F S

During construction of a 5 mile elevated section of the Leroy Selmon Crosstown expressway, it was discovered that the installed drilled shaft foundations had insufficient capacity to carry construction loads. This deficiency was not discovered until approximately half of the segmental bridge was constructed and a failure occurred at the leading edge of construction. A geotechnical investigation determined 27 of the constructed bents needed remediation. 2-48” diameter sister shafts with depths of up to 90’ where installed at each deficient bent. The sister shafts had to be installed under the existing bridge, with as little as 18’ clearance, and in the 45’ median between the existing grade lanes of the toll road. beCK’s

limited access drilling capabilities were required to complete the remediation foundations. Temporary casings were installed down to limestone, and drilling fluid was used to stabilize the remainder of the excavation. A casing oscillator designed by beCK was used to advance the casing, and a low clearance drill rig designed and manufactured by beCK was used to excavate the foundations. After the excavation, the shafts where cleaned and SiD tested. The reinforcing cages and CSL tubes had to be spliced over the excavation and set in concrete with a pump, also designed and built by beCK.

enGineer: Ardaman & Associates, inc.

LEE ROY SELMON CROSSTOWN EXPRESSWAY Tampa, Florida

4

11

18

1 2 3

5 6 7

19

141312

1098

16

23222120

15 17

24

26 27 28 29 30 3125

MARCH 2007

6

13

20

1 2 3 4 5

7 8 9

21

161514

121110

18

25242322

17 19

26

28 29 30 3127

MAY 2007

A. H. BECK FOUNDATION CO. INC. ahbeck.com | ph 210.342.5261

LEE ROY SELMON CROSSTOWN EXPRESSWAY Tampa, Florida

ProbLem: installing large diameter deep shafts under low overhead

SoLuTion: Design and build specialty equipment to work under 18’ of head room

LEE ROY SELMON CROSSTOWN EXPRESSWAY • Tampa, Florida

CAROLINA BAYS PARKWAY myrtle beach, South Carolina

ProbLem: Design build team needed cost effective foundation solution to bring foundations back in budget

SoLuTion: beCK offered a turnkey design build foundation solution utilizing post grouted drilled shafts

CAROLINA bAYS PARkWAY • myrtle beach, South Carolina

This section of the new Carolina bays Parkway in myrtle beach, South Carolina crosses over SC 544. A. H. beck Foundation Co., inc. and Applied Foundation Testing offered an alternate foundation design utilizing beCK’s patented post grouting process, “Post Stressed Pier” uS Patent no. 6,371,698. The Post Grouted Shafts were implemented as a value added alternate to conventional drilled shafts. The use of the Post Grouted Shafts resulted in a

savings of up to 25 feet per shaft. The final design called for 10 - 54” diameter shafts 66 feet in depth. The first production shaft was instrumented and a full scale load test was run using AFT’s 2000 ton Statnamic testing device for design verification and to establish the grouting criteria.

enGineer: Wilbur Smith and Associates / The LPA Group

CAROLINA BAYS PARKWAY Myrtle Beach, South Carolina

1 2 3 4 5

6 7 8 9 10 11 12

13 14 15 16 17 18 19

20 21 22 23 24 25 26

27 28 29 30 31

MAY 2007S M T W T F S

3

10

17

1 2

4 5 6

18

131211

987

15

22212019

14 16

23

25 26 27 28 29 30 24

JUNE 2007

1

8

2

15

22

3 4 5 6 7

9 10 11

23

181716

141312

20

27262524

19 21

28

30 29

APRIL 2007

A. H. BECK FOUNDATION CO. INC. ahbeck.com | ph 210.342.5261

1 2

3 4 5 6 7 8 9

10 11 12 13 14 15 16

17 18 19 20 21 22 23

24 25 26 27 28 29 30

JUNE 2007S M T W T F S

This project consisted of installing 4 wells to house sump pumps that collect condensate from steam powered generator turbines. These wells were installed inside an existing power generation facility with a 5 foot thick reinforced concrete slab. This section of the facility was constructed below sea level so the 5’ concrete slab was the only thing keeping the plant from flooding. beCK designed a method to create an artificial water head at each sump location so the 5’ thick

slab could be penetrated and the sumps could be excavated down to -40.0 in elevation. once the sumps were excavated a pump casing had to be installed and concreted into place. Limited access drilling equipment and all materials had to be flown in with an overhead crane to reach the locations inside the building to prevent flooding of the facility basement.

enGineer: rust engineering

PREPA COMBINED CYCLE WELLS

6

13

20

1 2 3 4 5

7 8 9

21

161514

121110

18

25242322

17 19

26

28 29 30 3127

MAY 2007

1

8

2

15

22

3 4 5 6 7

9 10 11

23

181716

141312

20

27262524

19 21

28

30 31 29

JULY 2007

A. H. BECK FOUNDATION CO. INC. ahbeck.com | ph 210.342.5261

PrePA CombineD CYCLe WeLLS

PREPA COMBINED CYCLE WELLS

ProbLem: installing sumps inside an existing facility from elevation -12

SoLuTion: Design method of installing sumps with artificial head to overcome water head from working below sea level

MARAVEN REFINERY Punto Fijo, Venezuela

ProbLem To install drilled shaft foundation for an elevated pipe rack over an existing at-capacity sleeper way

SoLuTion Design and build drilling equipment to be able to reach 65’

MARAVEN REFINERY • Punto Fijo, Venezuela

The project consists of 1100 drilled shafts from 48 inches to 72 inches in diameter and 50 feet deep, for a 4.4 miles long pipe rack connecting the new facilities of “Petroleos de Venezuela” (PDVSA) Cardon refinery in Venezuela. The work was carried out through a variety of soil conditions, from very soft soil to very hard-abrasive coquina. The 72 inch diameter drilled shafts were required to install several vertical oil pumps throughout the refinery. beCK

teamed up with a local contractor who provided local labor, support equipment and materials for the project and completed the original scope in six (6) months. Additional scope was added to beCK’s contract as a result of the speed of construction, having a final scope with over 2,500 drilled shafts completed in only nine (9) months. enGineer: m. W. Kellogg

MARAVEN REFINERY Punto Fijo, Venezuela

A. H. BECK FOUNDATION CO. INC. ahbeck.com | ph 210.342.5261

1 2 3 4 5 6 7

8 9 10 11 12 13 14

15 16 17 18 19 20 21

22 23 24 25 26 27 28

29 30 31

JULY 2007S M T W T F S

3

10

17

1 2

4 5 6

18

131211

987

15

22212019

14 16

23

25 26 27 28 29 30 24

JUNE 2007

5

12

19

1 2 3 4

6 7 8

20

151413

11109

17

24232221

16 18

25

27 28 29 30 31 26

AUGUST 2007

AUGUST 2007S M T W T F S

1 2 3 4

5 6 7 8 9 10 11

12 13 14 15 16 17 18

19 20 21 22 23 24 25

26 27 28 29 30 31

This section of the scenic natchez Trace Parkway in natchez mississippi crosses Catherine’s Creek and melvin’s bayou. An elevated bridge structure 1720 feet in length was designed to span both streams. The design also had to assume that the future convergence of these two streams would be under the bridge, so up to 60 feet of scour in some areas, had to be factored into the foundation design. Due to this large depth of scour, the original foundation design consisted of clusters of H piles along with drilled shafts, which resulted in a very expensive design. A. H. beck Foundation Co., inc.

and Applied Foundation Testing offered an alternate foundation design utilizing beCK’s patented post grouting process, “Post Stressed Pier” uS Patent no. 6,371,698, which significantly reduced the depths of the drilled shafts to the minimum tip elevation for lateral design limits and helped to bring the project back into budget. The final design called for the installation of 26 post grouted shafts 72” in diameter ranging from 75 to 100 feet deep. one full scale test shaft was also installed and tested using AFT’s 2000 ton Statnamic testing device.enGineer: Wilbur Smith and Associates

NATCHEZ TRACE PARKWAY Natchez, Mississippi

1

8

2

15

22

3 4 5 6 7

9 10 11

23

181716

141312

20

27262524

19 21

28

30 31 29

JULY 2007

2

9

16

1

3 4 5

17

121110

876

14

21201918

13 15

22

24 25 26 27 28 292330

SEPTEMBER 2007

A. H. BECK FOUNDATION CO. INC. ahbeck.com | ph 210.342.5261

NATCHEZ TRACE PARKWAY natchez, mississippi

ProbLem: Design build team needed cost effective foundation solution to bring foundations back in budget

SoLuTion: beCK offered a turnkey design build foundation solution utilizing post grouted drilled shafts

NATCHEz TRACE PARkWAY • natchez, mississippi

FLOOD CHANNEL IMPROVEMENTS

ProbLem: The need for a soldier pier wall constructed below sea level under an existing bridge

SoLuTion: modify existing equipment to be able to install casing and drill below 13’ 0” of head room

FLooD CHAnneL imProVemenTS

SEPTEMBER 2007S M T W T F S

1

2 3 4 5 6 7 8

9 10 11 12 13 14 15

16 17 18 19 20 21 22

23 24 25 26 27 28 29

To widen and deepen the flood channel, new soldier pier retaining walls were constructed to protect the existing bridge abutments. A total of 67-50” diameter soldier piers 50’-0” deep were constructed under 13’-0” of overhead clearance. each soldier pier had 24-#18 vertical full length reinforcing bars that had to be spliced together in sections as each went into the shaft. To protect the existing abutment, full length temporary segmental casing was osculated in place as the shafts were constructed.

on many occasions the existing piling had to be cut out of the new shafts using cutting teeth on the bottom of the segmental casing. All of the channel wall work was constructed inside a levee at an elevation of –4 below sea level with the river running at elevation +1 on the other side of the levee. Phase ii of the project consists of installing 20 new shafts to support the existing bridge bents after the channel is deepened. These 50” diameter shafts ranged in depth from 70 to 90’-0” deep.

enGineer: Army Corp of engineers

DE DIEGO BRIDGE MODIFICATIONS

5

12

19

1 2 3 4

6 7 8

20

151413

11109

17

24232221

16 18

25

27 28 29 30 31 26

AUGUST 2007

7

1

14

21

2 3 4 5 6

8 9 10

22

171615

131211

19

26252423

18 20

27

29 30 31 28

OCTOBER 2007

30

A. H. BECK FOUNDATION CO. INC. ahbeck.com | ph 210.342.5261

OCTOBER 2007S M T W T F S

1 2 3 4 5 6

7 8 9 10 11 12 13

14 15 16 17 18 19 20

21 22 23 24 25 26 27

28 29 30 31

Project consisted of two 12 foot diameter drilled shafts 130 feet deep. While the majority of the structures were constructed with a pile cluster/footing foundation, two piers required single large diameter drilled shafts due to the limited width of the construction zone and to eliminate the differential settlement of the embankment. beCK worked with Dorsett brothers Concrete Supply, Doran Steel, TnT Crane & rigging, and PumpCo to manufacture a 12’ diameter auger, mix 3000 bbl of bentonite mineral slurry, set 12’ diameter x 20’ long permanent casing and excavate the 12’

diameter x 130’ deep slurry displaced drilled shaft. Steel plate templates were furnished to facilitate the tying and placing of a 75,000 lb reinforcing cage with 40 #18 bars. A 7 sk concrete was designed with admixtures to maintain a minimum 4” slump for the duration of the pour. 625 CY was batched, delivered, and placed in less than 4 hours with the use of two articulated boom pumps pumping into two 12” tremie pipes.

enGineer: Texas Department of Transportation

IH 45 DIRECT CONNECTORS Houston, Texas

2

9

16

1

3 4 5

17

121110

876

14

21201918

13 15

22

24 25 26 27 28 292330

SEPTEMBER 2007

4

11

18

1 2 3

5 6 7

19

141312

1098

16

23222120

15 17

24

26 27 28 29 30 25

NOVEMBER 2007

A. H. BECK FOUNDATION CO. INC. ahbeck.com | ph 210.342.5261

IH 45 DIRECT CONNECTORS • Houston, Texas

IH 45 DIRECT CONNECTORSHouston, Texas

ProbLem: Construct a 12’ diameter x 130’ deep slurry displaced drilled shaft on the centerline of iH 45 near nASA rd. 1

SoLuTion: A.H. beck worked with Dorsett brothers Concrete Supply, Doran Steel, TnT Crane & rigging, and PumpCo to:

1) manufacture a 12’ diameter auger.2) mix 3000 bbl of bentonite mineral slurry.3) Set 12’ diameter x 20’ long permanent casing

and excavate the 12’ diameter x 130’ deep slurry displaced drilled shaft.

4) Furnish templates and tie a 75,000 lb reinforcing cage with 40 #18 bars.

5) Lift, place and suspend reinforcing cage in the shaft.6) Design, furnish, and deliver in less than 4 hours 625

CY of 7sk concrete with admixtures to maintain a minimum 4” slump for the duration of the pour.

7) Pump, place, and finish 625 CY of concrete in less than 4 hours with two articulated boom pumps pumping into two 12” tremie pipes.

IH 10 REPLACEMENT BRIDGE GuLFPorT, miSSiSSiPPi

ProbLem: installing high capacity foundations in between existing structures over water

SoLuTion: beCK designed long reach drilling equipment in order to reach a large cluster of drill shafts

IH 10 REPLACEMENT bRIDGE OVER jOURDAN RIVER • Gulfport, mississippi

This project consisted of 97 drilled shaft foundations 60 inches in diameter, between 90 and 120 feet in depth. Phase i of the project had to be constructed in between the two existing iH 10 bridges, leaving a working width of only eighty feet (80’). The scope of work also included an osterberg cell load test for design verification.

Due to the footing for the new bridge foundations (consisting of clusters of 12-60” diameter shafts) and the narrow working width between the bridges, beCK used long reach drill attachments they had fabricated to be able to reach across the footings and construct each one from only one side.

enGineer: mississippi Dept. of Transportation

IH 10 REPLACEMENT BRIDGE Gulfport, Mississippi

NOVEMBER 2007S M T W T F S

1 2 3

4 5 6 7 8 9 10

11 12 13 14 15 16 17

18 19 20 21 22 23 24

25 26 27 28 7

1

14

21

2 3 4 5 6

8 9 10

22

171615

131211

19

26252423

18 20

27

29 30 31 28

OCTOBER 2007

2

9

16

1

3 4 5

17

121110

876

14

21201918

13 15

22

2431

25 26 27 28 292330

DECEMBER 2007

A. H. BECK FOUNDATION CO. INC. ahbeck.com | ph 210.342.5261

DECEMBER 2007S M T W T F S

1

2 3 4 5 6 7 8

9 10 11 12 13 14 15

16 17 18 19 20 21 22

23 24 25 26 27 28 29

The job consisted of drilling 74 drill shafts behind an existing damaged historical wall. The fortifications of old San Juan represent a highly significant cultural and historic landmark to Puerto rico. The national Park Service is charged with the preservation and maintenance of this historical landmark. The nPS issued a permit to Pr DToP to reinforce the damaged wall, which would later be reconstructed in the same manner it was originally constructed more than 300 years ago.

beCK designed and installed 74 – 36” diameter shafts close to 80’ deep soldier piers to support and protect the existing historical wall. beCK also had to rebuild the existing sidewalk and street above the wall after the soldier pier construction was complete. Due to the historical nature of this repair several agencies were involved: Pr Historic Conservation office, nPS, Pr DToP, Autoridad de Carreteras, and the San Juan mayors office, along with personnel from the Governor’s office.enGineer: Autoridad de Carreteras

RETAINING WALL NORZAGARAY ST. Old San Juan, Puerto Rico

6

13

20

1 2 3 4 5

7 8 9

21

161514

121110

18

25242322

17 19

26

28 29 30 31 27

JANUARY 2008

4

11

18

1 2 3

5 6 7

19

141312

1098

16

23222120

15 17

24

26 27 28 29 30 25

NOVEMBER 2007

30 31

A. H. BECK FOUNDATION CO. INC. ahbeck.com | ph 210.342.5261

RETAINING WALL NORZAGARAY ST. old San Juan, Puerto rico

ProbLem Stabilize and protect a 300 year old historic wall in old San Juan

SoLuTion beCK designed and constructed a soldier pier retaining wall

RETAINING WALL, NORzAGARAY ST. • old San Juan, Puerto rico

Large Photo: US 59 REALIGNMENT, LAUREL MISSISSIPPIConstructed using beCK built hydraulic rotary powered by the 811 horsepower Liebherr 110 ton crane.

Small Photos:(Left) US 82 OVER THE MISSISSIPPI RIVER APPROACH STRUCTURE, GREENVILLE, MS. Constructed using a beCK built hydraulic rotary mounted on a Link belt LS218Hii 110 ton crane.

(right) ST PETERSBURG OUTER LOOP PROJECT, ST. PETERSBURG, RUSSIA. Constructed using the first slurry displaced drilled shafts in russia with a uS made crane drill attachment mounted on a 60 ton russian electric crane.

A. H. BECK FOUNDATION CO., INC. - PROVIDING SOLUTIONS TO YOUR DEEP FOUNDATION NEEDS

1 2 3 4 5

6 7 8 9 10 11 12

13 14 15 16 17 18 19

20 21 22 23 24 25 26

27 28 29 30 31

JANUARY 2008S M T W T F S

From building the first mechanized steam powered drilling rig to the high torque hydraulic drilling rigs of today, A. H. beCK FounDATion Co., inC. is the name you can trust to provide solutions for all your deep foundation needs.

With A. H. beCK’s people, design-build capabilities, and experience on your project, you have the confidence of knowing your foundation problems have solutions.

A. H. BECK CO. - 1932 A. H. BECK CO. - 2007

3

10

17

1 2

4 5 6

18

131211

987

15

22212019

14 16

23

25 26 27 28 29 24

FEBRUARY 2008

2

9

16

1

3 4 5

17

121110

876

14

21201918

13 15

22

2431

25 26 27 28 292330

DECEMBER 2007

A. H. BECK FOUNDATION CO. INC. ahbeck.com | ph 210.342.5261

5123 Blanco Rd. | San antonio, tx 78216 | ph 210.342.5261 | www.ahbeck.com

CHARLES LOWMAN POWER PLANT • Leroy, Alabama

JAnuArY

US 59 AT IH-10 • Houston, Texas

FebruArY

SUPER COLLIDER • Waxahachie, Texas

mArCH APriL

SELMON CROSSTOWN EXPRESSWAY • Tampa, Florida

CAROLINA bAYS PARkWAY • Myrtle beach, SC

mAY

PrePA CombineD CYCLe WeLLS

June

MARAVEN REFINERY • Punto Fijo, Venezuela

JuLY AuGuST

NATCHEz TRACE PARkWAY • natchez, mississippi

FLooD CHAnneL imProVemenTS

SePTember

IH-45 DIRECT CONNECTORS • Houston, Texas

oCTober

IH-10 REPLACEMENT bRIDGE • Gulfport, Mississippi

noVember DeCember

RETAINING WALL NORzAGARAY ST. • Old San juan, Puerto Rico

71

1421

2 3 4 5 68 9 10

22171615

1312111926252423

18 2027

29 30 31 28

JANUARY 2007

41118

1 2 35 6 7

19141312

10981623222120

15 1724

26 27 28 25

FEBRUARY 2007 4

1118

1 2 35 6 7

19141312

10981623222120

15 1724

26 27 28 29 30 3125

MARCH 200718

2

1522

3 4 5 6 79 10 11

23181716

1413122027262524

19 2128

30 29

APRIL 2007 6

1320

1 2 3 4 57 8 9

21161514

1211101825242322

17 1926

28 29 30 3127

MAY 2007

3

1017

1 24 5 6

18131211

9871522212019

14 1623

25 26 27 28 29 30 24

JUNE 2007

18

2

1522

3 4 5 6 79 10 11

23181716

1413122027262524

19 2128

30 31 29

JULY 2007 5

1219

1 2 3 46 7 8

20151413

111091724232221

16 1825

27 28 29 30 31 26

AUGUST 2007 2

916

13 4 5

17121110

8761421201918

13 1522

24 25 26 27 28 292330

SEPTEMBER 2007

71

1421

2 3 4 5 68 9 10

22171615

1312111926252423

18 2027

29 30 31 28

OCTOBER 2007

41118

1 2 35 6 7

19141312

10981623222120

15 1724

26 27 28 29 30 25

NOVEMBER 2007 2

916

13 4 5

17121110

8761421201918

13 1522

2431

25 26 27 28 292330

DECEMBER 2007

2007 AT A GLAnCe

Houston brancH office13650 hycohenhouston, texas 77047phone (713) 413-3800Fax (713) 413-3811

Puerto rico brancH officeluchetti industrial park, Suite #2#245 Road #5, KM.26.2Bayamon, puerto Rico 00959phone (787) 622-4815Fax (787) 622-4814


Recommended