Introduction
A module that must be completed by bachelor and masterstudents as a requirement to receive the bachelor and masterdegree.
The aim of the module is to give students opportunity to applythe knowledge that they have gained throughout the programme
to solve or improve any management issues.
Students are expected to do their work independently most ofthe time, but their progress will be monitored closely by theirsupervisor.
Students will have to document their work in a thesis formatwhich must be bounded and submitted to the university
Prerequisite of this project : A student must completeat least 6 modules and pay 50% of programme fee.
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
3/22
Project Specifications
Scope of the project : Business Improvement (BI) Project must be in the area of programmes specialization.
Duration of the project : 4 months
Final grade of the project is based on assessment of the
following:
Project Proposal 10% Progress Meeting 10% Report Formatting 10% Project Implementation (Report)50%
Final Presentation & Viva 20%
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
4/22
Business Improvement (BI)
A Systematic approach to help an organization optimize its
underlying processes to achieve more efficient results in long termbasis.
Scopes of improvement :
Cost reduction
Increase of Monthly/Yearly Sales
Improve Quality
Product Innovation
Production Time
Customer Satisfaction
Business Relationship
Size of improvement can be either within department/division(personnel not less than 20) OR within a company (including
branches & consortium)
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
5/22
Project Phases
Project BriefingProposal &
Presentation1stMeeting
2ndMeetingReport &Abstract
Submission
FinalPresentation &
VIVA
Final Submission Result Release
3 weeks 3 weeks
3 weeks
2 weeks2 weeks
1 week
2 weeks
Total Week : 16
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
6/22
Student Responsibilities
Final Project
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
7/22
Project Proposal
Project proposal must be prepared using power point slideand highlight the following:
Each student will be given 20 minutes to present the proposaland 5 minutes for Q&A
IntroductionDescription about the project
Problem StatementClear and concise statement describes the reason why the project should be
implemented
Propose SolutionDescriptions of the solutions to the problem mentioned above.
Objective & ScopeSpecific objectives to be achieved and boundary of the project.
Limitation & ConstraintAnalysis of risks, challenges and problems might be faced.
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
8/22
Progress Meeting
Meeting 1
Draft of the report for Chapter 1 & 2 Draft of the Abstract
Meeting 2
Draft of the report for Chapter 3, 4 & 5 Final Abstract Discuss about final presentation
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
9/22
Project Report
Report of the project should include the following:
Students must submit 2 copies of the report (one copy for supervisorand one for assessor)
1. Standard Cover Page
2. Table of contents
3. Abstract of less than 1 page
4. Main text (Chapter 1 to 5)
5. References
6. Appendix
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
10/22
Main Text
CHAPTER 1 : INTRODUCTION
Introduction
Description about the project
Problem Statement
Clear and concise statement describes the reason why the project shouldbe implemented
Propose Solution
Descriptions of the solutions to the problem mentioned above.
Objective & Scope
Specific objectives to be achieved and boundary of the business/project.
Limitation & Constraint
Analysis of risks, challenges and problems might be faced.
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
11/22
Main Text
CHAPTER 2 : LITERATURE REVIEW
Company Background/Department/Unit
Study about company/department/unit that involved with project.
Current System/Process
Study of current system or practices including the strength and theweakness.
Solution Models
Study about existing models or sample related to the project and the
results.
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
12/22
Main Text
CHAPTER 3 : IMPLEMENTATION STRATEGY
Team
Size of team members and their specific roles.
Timeline Realistic milestones for the completion of tasks through the lifespan of
the project.
Implementation framework
Step by step process together with measurement framework.
Change Management
Systematic approach to educate changes within organization andexternal peoples involved.
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
13/22
Main Text
CHAPTER 4 : PROJECT BUDGET & COSTING
Project Budget
Forecasting of expenses and cost involve in the project.
CHAPTER 5 : CONCLUSION
Conclusion
Summary of the project together with lesson learnt and future of theproject
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
14/22
Final Presentation & VIVA
During Final Presentation & VIVA, students are given anopportunity to present their project to the assessor team and
defense their work.
The purpose of defense is only to verify whether the claimed
work is done by the corresponding student.
Each student will be given 20 minutes to present the summary
of all chapters and 5 minutes for Q&A.
Presentation Outline :
Introduction Project Objectives
Project Scope
Project Framework & Implementation
Project Budget & Costing
Conclusion
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
15/22
Writing Abstract
The abstractis a summary, usually of approximately 150-300 words,
of what the reader can expect to find in the report.
A good dissertation abstract normally consists the following
a statement of the problem/issue that you are probing, including an
indication of the requirement for your research;
your research/project methods; your results/findings;
your main conclusion(s) and recommendation(s)
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
16/22
Project Assessment Guidelines
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
17/22
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
18/22
Project Progress Rubric
Barely acceptable
1 point
Basic
2 points
Good
3 points
Very good
4 points
X1. Progress Far behind Slow progress
and require
changes
Progress,
somehow
require
changes.
Good progress
and well done
work
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
19/22
Project Implementation RubricBarely acceptable
1 point
Basic
2 points
Good
3 points
Very good
4 points
I1. Problem
formulation
and systemanalysis
Bare formulation
Bare understanding
of the problem, with
scarce knowledge of
relevant material
Basic formulation
Basic understanding
of the problem, but
lack appropriate
study of relevant
material
Clear formulation
Good
understanding of
the problem, with
study of relevant
material
Good system
analysis
Clear formulation with
well defined scope
Very good
understanding of the
problem and relevant
material
Near production quality
system analysis
I2. Problem
solving skills Obvious solution,
sketchyfunctionalities
Simple, yet mostly
complete solutionthat solves the stated
problem
Complete solution
with nontrivialfunctionalities
Provide solution to
complex problems;demonstrate through a
working prototype /
experiment
I3. Innovation
and self-study Basic concepts used
correctly
Lack self-study, but
apply previously
taught technique on asatisfactory level
Superficial usage of
new concepts
Self-study of new
technique, with basic
understanding
Self-study of new
concepts /
technique, with
good understanding
Minor innovativework
New concepts used
frequently
Self-study of new
technique and solve
technical difficulties; Innovative work with
research value
I4. Self-
motivation and
project
management
Slow progress, with
barely satisfactory
result
Unresponsive to
supervisor
Slow progress, with
basic project outcome
Rely on supervisors
push to work
Good progress
Need reminder
sometimes
Minor problems in
project
management
Steady progress
Highly self-motivated
Good project
management
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
20/22
Project Report Rubric
Barely acceptable
1 point
Basic
2 points
Good
3 points
Very good
4 pointsR1. Content
Important points
covered only
superficially
No major errors and
misconceptions
Covers important
points
A few inaccurate or
irrelevant points
All major points
covered and
explained clearly and
correctly
Major points strongly
supported with
suitable detail
R2. Writing Frequent errors in
spelling and
grammar
Mostly readable, but
a few points are
hard to understand
Some errors in
spelling and grammar
Readable
Follow basic written
report structure
A few errors in
spelling and grammar
Readable and easy to
understand
Well proofread
Clear and easy to
understand
Graphs and diagrams
used appropriately
R3.
Formatting Not fulfill the
requirement at all
Poor formatting Good formatting but
not throughout the
report
Follow exactly the
requirements until
the end of the report
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
21/22
Barely acceptable
1 point
Basic
2 points
Good
3 points
Very good
4 points
P1.Content Important points
covered onlysuperficially
No major errors andmisconceptions
Covers importantpoints
A few inaccurate orirrelevant points
All major pointscovered and explainedclearly and correctly
Major points stronglysupported withsuitable detail
P2.Presentationskills
Bare organization andpreparation
Lack of confidence andfamiliarity in someparts of thepresentation
Basic organization andpreparation
Confident in only someparts of thepresentation
Good organization andpreparation
Confident in mostparts of thepresentation
Attractive to audience
Excellent organizationand preparation
Confident and relaxedin the wholepresentation
Engaging to audience
P3.Communication
Answer at least onequestions correctly
Need clarification
Answer most questionscorrectly
Need clarification
sometimes
Answer most questionscorrectly and concisely
Handle difficultquestions with easeand confidence
Illustrative explanation
P4.Originality
Project is not original Project is somewhatoriginal
Project is original Project is original,develops fresh insightthat challenges thereaders thinking
Final Presentation Rubric
8/13/2019 1.Project Briefing - Master & Bachelor(Student Copy)
22/22
Questions an Answers