21J10-C03 1
Perform Hydraulic Crane Setup
Procedures
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
2/41
21J10-C03 2
Terminal Learning Objective
Action: Perform Hydraulic Crane setup procedures.
Conditions: At a training site, given a guided discussion on set up
procedures, a hydraulic crane, TM 5-3810-307-10, a student guide, an
equipment records folder, a grease gun, petroleum, oil, and lubricants(POL), rags, goggles, gloves, hearing protection, a kevlar/hard hat,
and a pencil.
Standards: Perform Hydraulic Crane setup procedures by attaching
float pads to stabilizers and extending stabilizers 4" to 6" at a time
until they are fully extended. Level the crane by retracting the
stabilizers and verifying that the tires are off the ground.
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
3/41
21J10-C03 3
Administrative Data
Safety:
Risk Assessment:
Environmental:
Evaluation:
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
4/41
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
5/41
21J10-C03 5
Set-Up (Cont)Hoist Selection
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
6/41
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
7/41
21J10-C03 7
Set-Up (Cont)Parts of Line
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
8/41
21J10-C03 8
Set-Up (Cont)Confirmation Screen
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
9/41
21J10-C03 9
LCDLiquid Crystal Display
Provides the operator continuous crane status information
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
10/41
21J10-C03 10
Outriggers 360
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
11/41
21J10-C03 11
Rubber 360/Defined Arc
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
12/41
21J10-C03 12
Safe Lifting Areas
Crane accident at Baghdad International Airport
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
13/41
21J10-C03 13
Line Pull & Reeving
Information
** Permissible Line Pull for multiple
part reeving is 7,333 lbs. per part of line
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
14/41
21J10-C03 14
Hoists (Main & Auxiliary)
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
15/41
21J10-C03 15
Height Factors
Hook Block Height
Sling Height
Load Height
Lift Height
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
16/41
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
17/41
21J10-C03 17
Mid- Point Review
Basis for safe lifting
Lifting areas
Line pull and reeving informationHeight factors
Weight factors
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
18/41
21J10-C03 18
Working Range Diagram
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
19/41
21J10-C03 19
Factors needed to use
Working Range Diagram Operating Radius
Boom Pin Height(Total Height from ground)
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
20/41
21J10-C03 20
Operating Radius
Operating Radius
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
21/41
21J10-C03 21
Boom Pin Height
Hook Block Height
Sling Height
Load Height
Lift Height **Boom Pin Height (Height from ground)
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
22/41
21J10-C03 22
Working Range Diagram
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
23/41
21J10-C03 23
ATEC Lifting Capacities Charts
Outriggers 360
Rubber 360
Defined Arc 12 over rear (On Rubber)
Pick & Carry (Not to exceed 2.5 mph)
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
24/41
21J10-C03 24
Factors needed to use
Lifting Capacity Charts
Operating Radius
Boom Length
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
25/41
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
26/41
21J10-C03 26
Review
Range Diagram
Operating Radius
Boom Pin HeightLifting Capacity Charts
Boom Length
Boom Angle
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
27/41
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
28/41
21J10-C03 28
LMI Panel
1. Only acts as a safety device to warn the operatorof unsafe lifting conditions
2. Give both Audible and Visual Alarms
3. Will Lock Out controls if unsafe lifting if unsafelifting conditions continue.
IS NOT A SUBSTITUTE FOR GOOD SOUNDOPERATOR JUDGEMENT
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
29/41
21J10-C03 29
LCDLiquid Crystal Display
Provides the operator continuous crane statusinformation
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
30/41
21J10-C03 30
Start-UpSet-Up/ Self Test
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
31/41
21J10-C03 31
Set-Up (Cont)Hoist Selection
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
32/41
21J10-C03 32
Set-Up (Cont)Outriggers or Rubber
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
33/41
21J10-C03 33
Set-Up (Cont)Stationary 360 or Pick & Carry
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
34/41
21J10-C03 34
Set-Up (Cont)Parts of Line
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
35/41
21J10-C03 35
Set-Up (Cont)Confirmation Screen
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
36/41
21J10-C03 36
LimitationsRadius (Inner & Outer), Boom pin height,
Boom Angle (Lower & Upper)
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
37/41
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
38/41
21J10-C03 38
Limitations (Cont)Boom Pin Height
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
39/41
21J10-C03 39
Limitations (Cont)Boom Angle (Lower & Upper)
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
40/41
21J10-C03 40
Review
LMI Panel
Configuration Set Up
Limit Setting
8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p
41/41
21J10-C03 41
Summary
Action: Moved a load with a hydraulic crane andhookblock.