    1/41

    21J10-C03 1

    Perform Hydraulic Crane Setup

    Procedures

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    2/41

    21J10-C03 2

    Terminal Learning Objective

    Action: Perform Hydraulic Crane setup procedures.

    Conditions: At a training site, given a guided discussion on set up

    procedures, a hydraulic crane, TM 5-3810-307-10, a student guide, an

    equipment records folder, a grease gun, petroleum, oil, and lubricants(POL), rags, goggles, gloves, hearing protection, a kevlar/hard hat,

    and a pencil.

    Standards: Perform Hydraulic Crane setup procedures by attaching

    float pads to stabilizers and extending stabilizers 4" to 6" at a time

    until they are fully extended. Level the crane by retracting the

    stabilizers and verifying that the tires are off the ground.

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    3/41

    21J10-C03 3

    Administrative Data

    Safety:

    Risk Assessment:

    Environmental:

    Evaluation:

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    4/41

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    5/41

    21J10-C03 5

    Set-Up (Cont)Hoist Selection

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    6/41

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    7/41

    21J10-C03 7

    Set-Up (Cont)Parts of Line

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    8/41

    21J10-C03 8

    Set-Up (Cont)Confirmation Screen

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    9/41

    21J10-C03 9

    LCDLiquid Crystal Display

    Provides the operator continuous crane status information

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    10/41

    21J10-C03 10

    Outriggers 360

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    11/41

    21J10-C03 11

    Rubber 360/Defined Arc

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    12/41

    21J10-C03 12

    Safe Lifting Areas

    Crane accident at Baghdad International Airport

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    13/41

    21J10-C03 13

    Line Pull & Reeving

    Information

    ** Permissible Line Pull for multiple

    part reeving is 7,333 lbs. per part of line

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    14/41

    21J10-C03 14

    Hoists (Main & Auxiliary)

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    15/41

    21J10-C03 15

    Height Factors

    Hook Block Height

    Sling Height

    Load Height

    Lift Height

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    16/41

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    17/41

    21J10-C03 17

    Mid- Point Review

    Basis for safe lifting

    Lifting areas

    Line pull and reeving informationHeight factors

    Weight factors

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    18/41

    21J10-C03 18

    Working Range Diagram

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    19/41

    21J10-C03 19

    Factors needed to use

    Working Range Diagram Operating Radius

    Boom Pin Height(Total Height from ground)

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    20/41

    21J10-C03 20

    Operating Radius

    Operating Radius

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    21/41

    21J10-C03 21

    Boom Pin Height

    Hook Block Height

    Sling Height

    Load Height

    Lift Height **Boom Pin Height (Height from ground)

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    22/41

    21J10-C03 22

    Working Range Diagram

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    23/41

    21J10-C03 23

    ATEC Lifting Capacities Charts

    Outriggers 360

    Rubber 360

    Defined Arc 12 over rear (On Rubber)

    Pick & Carry (Not to exceed 2.5 mph)

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    24/41

    21J10-C03 24

    Factors needed to use

    Lifting Capacity Charts

    Operating Radius

    Boom Length

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    25/41

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    26/41

    21J10-C03 26

    Review

    Range Diagram

    Operating Radius

    Boom Pin HeightLifting Capacity Charts

    Boom Length

    Boom Angle

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    27/41

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    28/41

    21J10-C03 28

    LMI Panel

    1. Only acts as a safety device to warn the operatorof unsafe lifting conditions

    2. Give both Audible and Visual Alarms

    3. Will Lock Out controls if unsafe lifting if unsafelifting conditions continue.

    IS NOT A SUBSTITUTE FOR GOOD SOUNDOPERATOR JUDGEMENT

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    29/41

    21J10-C03 29

    LCDLiquid Crystal Display

    Provides the operator continuous crane statusinformation

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    30/41

    21J10-C03 30

    Start-UpSet-Up/ Self Test

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    31/41

    21J10-C03 31

    Set-Up (Cont)Hoist Selection

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    32/41

    21J10-C03 32

    Set-Up (Cont)Outriggers or Rubber

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    33/41

    21J10-C03 33

    Set-Up (Cont)Stationary 360 or Pick & Carry

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    34/41

    21J10-C03 34

    Set-Up (Cont)Parts of Line

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    35/41

    21J10-C03 35

    Set-Up (Cont)Confirmation Screen

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    36/41

    21J10-C03 36

    LimitationsRadius (Inner & Outer), Boom pin height,

    Boom Angle (Lower & Upper)

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    37/41

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    38/41

    21J10-C03 38

    Limitations (Cont)Boom Pin Height

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    39/41

    21J10-C03 39

    Limitations (Cont)Boom Angle (Lower & Upper)

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    40/41

    21J10-C03 40

    Review

    LMI Panel

    Configuration Set Up

    Limit Setting

  • 8/13/2019 2006 Us Army General Construction Equipment Operator Course Phase 2 c03 Hook Block Ops. 41p

    41/41

    21J10-C03 41

    Summary

    Action: Moved a load with a hydraulic crane andhookblock.


Recommended