Project EslabonPeru, Mining Country
Project Eslabon 1
Table of Content
Peru – Mining Industry Overview 3
Project Eslabon 10
Contact Information 27
Project Eslabon 2
Project Eslabon
Peru – Mining Industry Overview
3
Peru – Mining Industry Overview
Peru In Worldwide Production Rankings
• #1 – Silver• #2 – Copper & Zinc• #3 – Tin• #4 – Lead• #6 – Gold
FURTHER, PERU is • 3rd destination in the world for
Exploration Investment and 1st destination in Latin America.
• one of the fastest growing mining economies in the world.
• Peru has only 0.69% of the country area in production, creating a vast opportunity to capitalize on, given cause of mineralization in Peru and existing worldwide status.
Project Eslabon 4
Peru – Mining Industry Overview
Cause of Peru’s Mineralization
The Andes is a young, substantially non-eroded mountain range that crosses the Peruvian territory. Along its length, 03 frames of mountain range (Cordillera Negra, Cordillera Blanca and Cordillera Central), with key mineralization dominating across 03 knots, Vilcanota Knot on south, Pasco Knot on Center and Mollepata Knot in the North. Such knots were caused by strong orogenic movements favorable for mineralization.
It is not ”IF” there is mineral across these western parts of Peru… it is HOW MUCH and how accessible is the mineral?
Our focus is accessible, high grade, operating properties.
The Eslabon Project is one of such properties.
Project Eslabon 5
Peru – Mining Industry Overview
Cause of Peru’s Mineralization (Continued)
The presence of different intrusive pulses (batholiths) in conjunction with the presence of different types of rocks, gave rise to the various mineral deposits in Peru.
Project Eslabon 6
Peru – Mining Industry Overview
Cause of Peru’s Mineralization (Continued)
The key mineralization belts along western parts of Peru - recognizing key areas of gold, copper and polymetallic.
The Eslabon Project resides in the Central Peru Polymetaliic Skarn & Replacement Belt.
Project Eslabon 7
Peru – Mining Industry Overview
Existing Worldclass Projects
Yanacocha – Newmount +60 Million Oz of Gold
Lagunas Norte – Barrick +12 Million Oz of Gold
Pierina – Barrick
+10 Million Oz of Gold
Project Eslabon 8
Peru – Mining Industry Overview
Existing Worldclass Projects (Continued)
Antamina– BHP Billiton / Xstrata
745 Mt @ 1.06% Cu 0.671% Zn
Cerro de Pasco – VOLCAN
+120 Mt @ 7.2% Zn, 2.3% Pb
Cuajone – Southern Peru
+4,294 Mt @ 0.44% Cu, 0.021% Mo
Project Eslabon 9
Project Eslabon
Project Eslabon
10
Project Eslabon
Project Eslabon 11
Project Eslabon – Ancash, Peru
Project Eslabon 12
Project Eslabon – Geological Formation
Project Eslabon
229400
229400 229800
229800
88
94
00
08
89
44
00
88
94
00
0
229000
229000
B R E C C I A P O R T U G U E S A
INTRUSIVECALIPUY GROUPBRECCIA PIPEVEINFAULT
300 450 600
COMPAÑIA MINERA PARAC SAC
FIG.ArchivoNAS
0300
SCALE
150
1:250
PSAD56 18S
Job No.
Job No.
W. LOPEZ
Referencia:
ESLABON
MARZO 2010
N. LAREDO
Obtenido del plano geológico de S. Cayo 1995
Geología
Plano N°Prospecto
Fecha
Datum
Revisado PLANO GEOLOGICO SUPERFICIAL
PARAC
PROSPECTO ESLABON
13
Project Eslabon – Portuguesa Breccia Pipe
Project Eslabon 14
Project Eslabon – Breccia Pipe Structure
Project Eslabon 15
Project Eslabon – Cause of Mineralization
Project Eslabon 16
Project Eslabon – Ximena Vien
Project Eslabon
• Camp
• Ximena Vein
17
Project Eslabon – Reserves, Resources
Project Eslabon
4600
4500
4550
4650
NV-4730
4700
NV-4730
4500
4550
4600
4650
4700
S E C T I O N P A - 2
RECURSO MEDIDORECURSO INDICADORECURSO INFERIDO
18
Project Eslabon – Reserves, Resources
Project Eslabon
- Reserve, resource per tonne calculations reduced for a potential risk adjustment : Measured Reserves – 15%, Indicated Reserves – 25%, Inferred Resources – 50%
- The RED line highlights that the total calculations consider only 1st 200 meters of depth from operating mine.
19
Project Eslabon
Reserve, Resource Calculations
The total calculated reserves stand at :
Measured Reserves - 150,952 MT Indicated Reserves – 463,713 MT Indicated Resources –571,758 MTTOTAL 1,186,423 MT
The economic value of the initially determined and future potential of the reserves and resources can easily reach hundreds of millions dollars at today’s prices.
20
Project Eslabon – Reserves, Resources
Project Eslabon – Brecchia Pipe Reserves
Project Eslabon
Reserve Calculation (Continued)
The Portuguese Breccia Pipe is the main part of Eslabon in the current state of the project.
The Brecchia Pipe geological model determines:
- width, approximates 110 x 50 meters
- depth, recognizing only the first 200 meters
The total reserves of Portugese Breccia Piple is 970,000 metrics tons, which is 82% of the total reserves we have estimated.
The other part of reserves is Ximena Vien, which holds 295,000 metric tons.
21
Brechia Pipe
129,240
387,720
452,340
969,300
Measured Proven
Indicated
Inferred Potential
TOTAL
Project Eslabon – Silver Reserves
Project Eslabon
Average Grade control:Silver: 13.2 oz / tonLead: 9.6%
Projected Mine Life:10.8 years: assuming a production
level of 350 tons/day and no new reserve is found.
SILVER Reserves:
Measured silver reserve 1,390,125 oz.
At market value of $30/oz, the value approximates $41.7 million.
Total silver resources 10,900,000 oz.
At market value averaging of $23.22/ oz, the value approximates $253.8 million
22
$ / Oz # OZ Ag Venta VALUE
Reserves Measured $30.00 1,390,125 $ 41,703,746
Reserves Indicated $25.00 4,270,349 $ 106,758,734
Reserves Inferred $20.00 5,265,336 $ 105,306,720
Reserves TOTAL Ag # Oz 10,925,810 $ 253,769,200
Project Eslabon – Lead Reserves
Project Eslabon
LEAD Reserves, Resources:
Measured Lead Reserves: 23.6 million pounds, or 10,726
tons. At average value of US $1.10 per lb,
the total value is at $26 million.
Total Lead Reserves, Resources 158.8 million pounds, or 72,200
tons.At average value of US0.95 per lb, the
total value approximates $150.8million
** All data is estimated using an average net metallurgical recovery rate of 70%.
23
Reserves Measured
Reserves Indicated
Reserves Inferred
Reserves TOTAL
$ / Lb POUNDS PbSALES VALUE
$ 1.10 23,641,788 $ 26,005,967
$ 1.00 66,023,300 $ 66,023,300
$ 0.85 69,195,657 $ 58,816,308
Pb # Ib 158,860,745 $150,845,575
Project Eslabon – Community Relations
Project Eslabon 24
Community Relations:
A key part of mining in Peru is maintaining good relations with the community.
The company has signed a 5 year community agreement for the use of land, water at the mine. We have also been granted the right to build a roads and install a plant, if we deem appropriate.
In December 2010, the company sponsored a Christmas party for the children. Noted beside, are company representatives and community women providing hot chocolate and gifts to the children.
Project Eslabon – In Conclusion
Project Eslabon
Eslabon Existing and Upside Potential:
Due to the nature and scope of the mineralization, we believe the existing and future potential of Project Eslabon can be substantially higher than indicated and, at today’s prices, can reach into the hundreds of millions of dollars.
If you share our view, and are interested to learn more…. and, share the view of many in the market… that metal prices will continue to be strong and continue their positive upward trend for the foreseeable future… do contact us, now.
We have participation arrangements for you to profit with us!
25
Project Eslabon
Contact Information
26
Contact Information
Project Eslabon
WE WELCOME YOU TO BENEFIT & PARTICIPATE WITH US!
There exists a vast opportunity to capitalize on right now, given Peru’s existing worldwide mining status, the Eslabon Project, other mines we have contracted and have under evaluation.
Join with us. There are 2 ways to participate. Contact us to find out how!
Thank you!
For More Information, Contact Us:
Tel: US Voip : 1-518-312-4243 (rings in Lima, Peru)
Email: [email protected]
27