+ All Categories
Home > Documents > 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly...

2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly...

Date post: 26-Jul-2020
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
38
Equinox MANUAL single unit assembly instructions
Transcript
Page 1: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

INSA6000

Equinox MANUALsingle unit assembly instructions

2013 LOGO & COLOR GUIDELINES

FOILS / PMS 1&2 COLOR

GLOSS FOIL

PMS 1795 C

877 DULL FOIL

PMS 1795 C

GLOSS FOIL

877 DULL FOIL

PMS 1&2 COLOR

PMS 877 C

PMS 1795 C

PMS 877 C

PMS 1795 C

BLACK & WHITE 1 COLOR

BLACK

WHITE

Page 2: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

2 | tuuci

INSA6000

ContentsBase installation page 3

Columns and beams structure pages 12-14

End cap bracket and beauty cover pages 14-15

Trellis roof installation pages 17-18

Hard top fabric roof for square and rectangle (excluding 12’ square) pages 19-21

Hard top fabric roof for 12’ square pages 22-24

Single Bench installation pages 25-28

L-Bench installation pages 29-33

Trellis wall installation pages 33-34

Curtain installation pages 35-36

Care and Maintenance page 37

Warranty page 38

ASSEMBLY & OPERATING INSTRUCTIONS EQUINOX

GENERAL INSTRUCTIONS FOR SINGLE UNITS

Page 3: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

tuuci | 3

INSA6000

ASSEMBLY & OPERATING INSTRUCTIONS BASE OPTIONS

LEVELING BASE & END CAP INSTALLATIONS

FOR CABANAS WITH 9x9 PLATESAND LEVELING BASE OPTIONS

BASE MUST BE INSTALLED PRIOR TO ASSEMBLING THE CABANA

SEE PAGE 4

FOR CABANAS WITH IGSM AND LEVELING BASE OPTIONS

BASE MUST BE INSTALLED PRIOR TO ASSEMBLING THE CABANA

SEE PAGE 9

FOR END CAP BRACKETS - SEE PAGE 15

Leveling Base

Leveling Base

IGSM

9x9 Plate

Page 4: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

4 | tuuci

INSA6000

ASSEMBLY & OPERATING INSTRUCTIONS STEM w/9”x9” PLATE

ITEM NO DESCRIPTION QTY1 9”X9” Stainless steel base plate 4

2 Leveling base 4 2

1

Hardware and tools required [images are not to scale]

3/8-16” x 3/4” Flat socketQty: 2 pieces (per column)

Drill bits 5/8” & 1”Not included

Recommended: Chalk line reelNot included

1/2”-13 x 2” Hex tap boltwasher / lock washerQty: 4 pieces (per base)

Expansion anchorQty: 8 pieces (per base)

Recommended: HammerNot included

Recommended: Drilling GunNot included

Anchor punch 1/4”Qty: 1 piece

Counter-sunk bolt1/2” x 1-1/4”Qty: 8 pieces (per plate)

continued on next page

Page 5: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

tuuci | 5

INSA6000

INSTALLATION INSTRUCTIONS STEM w/9”x9” PLATE

EQUINOX CABANA SIZE DIM A DIM B DIM C

8’ SQUARE 92” / 233.7cm 92” / 233.7cm 130” / 330 cm

10’ SQUARE 116” / 294.6 cm 116” / 294.6 cm 164” / 416 cm

12’ SQUARE 140” / 355.6 cm 140” / 355.6 cm 198” / 503 cm

8’ X 10’ RECTANGLE 92” / 233.7 cm 116” / 294.6 cm 148” / 376 cm

8’ X12’ RECTANGLE 92” / 233.7 cm 140” / 355.6 cm 167.5” / 425 cm

10’ X 12’ RECTANGLE 116” / 294.6 cm 140” / 355.6 cm 181” / 460 cm

FIG B

9”x9” SS base plate

Step 1Once you have located the correct dimension from the table below, mark the CENTER locations for each column and their diagonal dimensions. Using the chalk line (not included), trace the line from center of each mark.

Attention: accuracy in diagonal dimensions are crucial to ensure proper aligment of cabana.

Step 2Turn 9”x9” plate over and place on the floor aligning the holes perpendicular to the chalk lines,as shown in Figure A. Using the 9”x9” plate as a template mark each hole. Reference Figure B.

DIM B

DIM A

DIM C

FIG A

continued on next page

Page 6: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

6 | tuuci

INSA6000

INSTALLATION INSTRUCTIONS STEM w/9”x 9” PLATE

anchor spike

Step 5:Clean holes from debris and place anchors in each hole making sure anchor is below the surface. Use the anchor spike to set the anchors in place.

Step 4:Use a 1” diameter drill bit and drill 1-1/2” deep for the 4 inner holes.

Step 3:Use a 5/8” diameter drill bit and drill 2-1/4” deep for the 8 parameter holes.

continued on next page

Page 7: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

tuuci | 7

INSA6000

INSTALLATION INSTRUCTIONS STEM w/9”x9” PLATE

1/2”x1-1/4” counter-sunk bolt

9”x9” base plate

anchors

9”x9” base plate

ss oval washer

9”x9” base plate

ss 1/2”-13x2” hex tap bolt

leveling bolt

security base stem

security base stem

Step 7:Place the security base stem on the 9”x9” base plate and insert the 4 hex bolts 1/2” into the 9”x9” base plate through the oval washers.

Step 8:Using the level tool (not included), adjust security base stem with the leveling bolts.

Step 6:Install 9”x9” base plate by using 1/2” x 1-1/4” counter sunk bolt and tighten securely.

continued on next page

Page 8: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

8 | tuuci

INSA6000

INSTALLATION INSTRUCTIONS STEM w/9”x9” PLATE

beauty cover

column

Step 9:Install columns as illustrated.

orient stem through hole with column through hole mount

3/8-16” x 3/4” flat-head socket cap screw

security leveling base

Page 9: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

tuuci | 9

INSA6000

INSTALLATION INSTRUCTIONS STEM w/IGSM BASE

continued on next page

DIM B

DIM A

DIM C

FIG A

31.5” (80cm)

27.6” (70cm)

31.5” (80cm)

EQUINOX CABANA SIZE DIM A DIM B DIM C

8’ SQUARE 92” / 233.7cm 92” / 233.7cm 130” / 330 cm

10’ SQUARE 116” / 294.6 cm 116” / 294.6 cm 164” / 416 cm

12’ SQUARE 140” / 355.6 cm 140” / 355.6 cm 198” / 503 cm

8’ X 10’ RECTANGLE 92” / 233.7 cm 116” / 294.6 cm 148” / 376 cm

8’ X12’ RECTANGLE 92” / 233.7 cm 140” / 355.6 cm 167.5” / 425 cm

10’ X 12’ RECTANGLE 116” / 294.6 cm 140” / 355.6 cm 181” / 460 cm

Step 1Once you have located the correct dimension from the table below, mark the CENTER locations for each column and their diagonal dimensions. Using the chalk line (not included), trace the line from center of each mark.

Attention: accuracy in diagonal dimensions are crucial to ensure proper aligment of cabana.

Step 2Design concrete slab with dimensions of 31.5” (80cm) x 27.6” (70cm) for each center marked from step 1.

Page 10: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

10 | tuuci

INSA6000

ASSEMBLY & OPERATING INSTRUCTIONS STEM w/IGSM BASE

90 degree

Step 3After pouring concrete, insert in-ground base (IGSM) into the center of the concrete slab.Make sure the top of the in-ground is flush and leveled with the top of the concrete.

Step 4Place the leveling base on the IGSM and mount with 1/2 inch bolts.Adjust leviling base with the leveling bolts.

Leveling BaseLeveling Bolts

IGSM

continued on next page

Page 11: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

tuuci | 11

INSA6000

INSTALLATION INSTRUCTIONS STEM w/IGSM BASE

beauty cover

column

Step 5:Install columns as illustrated.

orient stem through hole with column through hole mount

3/8-16” x 3/4” flat-head socket cap screw

security leveling base

Page 12: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

12 | tuuci

INSA6000

ASSEMBLY & OPERATING INSTRUCTIONS COLUMNS & BEAMS FRAME STRUCTURE

C4

B4

B1

B2B3

C1

C2

C3

Note: columns and beams are labeled as followed“B” - indicates Beam“C” - indicates Column

Page 13: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

tuuci | 13

INSA6000

ASSEMBLY & OPERATING INSTRUCTIONS COLUMNS & BEAMS FRAME STRUCTURE

Step 1Attach/connect column (C1), beam (B1), and column (C2) on the floor laying horizontally.

C2

C3

B2

B1

C2

C1

Step 2Attach/connect beam (B2), and col-umn (C3) on the floor. Move sub-assemblies upright, and fasten to column C2.

continued on next page

Page 14: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

14 | tuuci

INSA6000

ASSEMBLY & OPERATING INSTRUCTIONS COLUMNS & BEAMS FRAME STRUCTURE

C4

B3

B4

C1

C4

C3

Step 3Attach/Connect column (C4) to beam (B3) on the floor, move upright and fasten to column (C3).

Step 4Attach/Connect beam (B4) to column (C1) and (C4).

Page 15: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

tuuci | 15

INSA6000

ASSEMBLY & OPERATING INSTRUCTIONS END CAP BRACKET AND BEAUTY COVER

column end cap bracket and beauty cover installation

Install beauty cover before mounting end cap bracket

Once cabana is stationed in its desired location mount end cap brackets.

Page 16: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

16 | tuuci

INSA6000

ASSEMBLY & OPERATING INSTRUCTIONS TRELLIS ROOF INSTALLATION

Page 17: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

tuuci | 17

INSA6000

Step 1Remove pre-installed 1/4”-20 cap screws from beams (B2) and (B4).

Step 2Install each trellis roof as illustrated. Use previously removed 1/4”-20 x 3/4” cap screws.

B4

B2

1/4”-20 cap screws(typical)

TRELLIS ROOF INSTALLATION

Page 18: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

18 | tuuci

INSA6000

ASSEMBLY & OPERATING INSTRUCTIONSHARD TOP FABRIC ROOF FOR SQUARE AND RECTANGLE

(EXCLUDING 12’ SQUARE)

3 Panelssee page 20

5 Panelssee page 22

ASSEMBLY & OPERATING INSTRUCTIONS HARD TOP FABRIC ROOF 12’ SQUARE

Page 19: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

tuuci | 19

INSA6000

Step 1Remove pre-installed 1/4”-20 cap screws from beams (B2) and (B4).

Step 2Place rear and center trellis roof panel on cabana. Secure previously removed 1/4”-20 cap screws. Snap in place top panel trim extrusion.

B4

B2

1/4-20 cap screws(typical)

top panel trim

rear

center

3 TOTAL PANELS TO INSTALL

continued on next page

HARD TOP FABRIC ROOF FOR SQUARE AND RECTANGLE (EXCLUDING 12’ SQUARE)

Page 20: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

20 | tuuci

INSA6000

3 TOTAL PANELS TO INSTALL

HARD TOP FABRIC ROOF FOR SQUARE AND RECTANGLE (EXCLUDING 12’ SQUARE)

Step 3Place front trellis roof panel on cabana. Fasten ¼”-20 cap screws. Snap in place panel trim extrusion (top part) including front and back.

back trim extrusion

roof panel

front trimextrusion

Page 21: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

tuuci | 21

INSA6000

HARD TOP FABRIC ROOF INSTALLATIONS FOR 12’ SQUARE

Step 1Remove pre-installed 1/4”-20 cap screws from beams (B2) and (B4).

Step 2Place rear and adjacent trellis roof panels on cabana. Fasten previously removed 1/4”-20 x 1-1/2” cap screws. Snap in place panel trim extrusion (top part).

B4

B2

1/4”-20 cap screws(typical)

continued on next page

5 TOTAL PANELS TO INSTALL

Page 22: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

22 | tuuci

INSA6000

HARD TOP FABRIC ROOF INSTALLATIONS FOR 12’ SQUARE

5 TOTAL PANELS TO INSTALL

Step 3Place center roof panel and snap in place trim extrusion.

Step 4Place trellis roof panel and fasten previously removed 1/4”-20 x 1-1/2” cap screws. Snap in place panel trim extrusion (top part).

1/4”-20 cap screws(typical)

continued on next page

Page 23: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

tuuci | 23

INSA6000

HARD TOP FABRIC ROOF INSTALLATIONS FOR 12’ SQUARE

5 TOTAL PANELS TO INSTALL

Step 5Place final trellis roof panel and fasten previously removed 1/4”-20 x 1-1/2” cap screws.

Step 6Snap in place trim extrusions in three places.

back trim extrusion

front trim extrusion

Page 24: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

24 | tuuci

INSA6000

ASSEMBLY & OPERATING INSTRUCTIONS SINGLE BENCH INSTALLATION

Page 25: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

tuuci | 25

INSA6000

left

be

nc

h

back bench

rig

ht

be

nc

h

Step 1Remove bottom bracket from bench beams before dropping blades through column slot.

Step 2Once beams are installed, install bottom bracket and fasten to beam. Repeat process on other ends

continued on next page

SINGLE BENCH INSTALLATION

Page 26: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

26 | tuuci

INSA6000

SINGLE BENCH INSTALLATION

Step 3Install angle brackets on lower beams.

Step 4Install inner bench beams and legs.Secure with 3/8”-16 hex cap screws.

continued on next page

Page 27: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

tuuci | 27

INSA6000

SINGLE BENCH INSTALLATION

Step 5Install bench support panels(no fastener required).

Step 6Mount cushions

continued on next page

Page 28: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

28 | tuuci

INSA6000

ASSEMBLY & OPERATING INSTRUCTIONS RIGHT & LEFT L - BENCH INSTALLATIONS

Page 29: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

tuuci | 29

INSA6000

Step 1Remove bottom bracket from bench beams before dropping blades through column slot.

Step 2Once beams are installed, install bottom bracket and fasten to beam. Repeat process on other ends

le

ft L

left L bench right L bench

ri

gh

t L

continued on next page

RIGHT & LEFT L - BENCH INSTALLATIONS

Page 30: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

30 | tuuci

INSA6000

RIGHT & LEFT L - BENCH INSTALLATIONS

1/4”-20 cap screws(typical)

Step 4Install inner bench beams and legs.Secure with 3/8”-16 hex cap screws.

Step 3Install angle brackets on all lower beams.

Step 5Install support beams using boltsthrough bottom slot.continued on next page

Page 31: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

tuuci | 31

INSA6000

RIGHT & LEFT L - BENCH INSTALLATIONS

Step 7Install bench support panels(no fastener required).

Step 6If necessary use bed post levelerto level bench to floor

Step 8Mount cushions

Page 32: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

32 | tuuci

INSA6000

ASSEMBLY & OPERATING INSTRUCTIONS TRELLIS WALLS INSTALLATION

trellis walls w/ bench

trellis walls

Page 33: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

tuuci | 33

INSA6000

1/4”-20 Allen KeyFlat Head

(typical)

Install trellis walls using 1/4”-20 Allen Key Flat Heads.

TRELLIS WALLS INSTALLATION

trellis walls

trellis walls w/ bench

Page 34: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

34 | tuuci

INSA6000

ASSEMBLY & OPERATING INSTRUCTIONS CURTAIN INSTALLATION

Page 35: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

tuuci | 35

INSA6000

Step 3:Slide-up curtain bar onto other side bracket per detailed view and lock-in with pin.

Step 4:Attach curtains to column withturn buttons

Step 2:Insert curtain bar into column bracketon one side.

Step 1:Mount curtain on curtain bar.

curtain bar

bracket

locking pin

CURTAIN INSTALLATION

Page 36: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

36 | tuuci

INSA6000

ASSEMBLY & OPERATING INSTRUCTIONS CARE & MAINTENANCE

TUUCI frames are constructed from durable, marine-grade, weather resistant materials including: fiberglass,

armor-wall aluminum, Dura-TEAK composites, Aluma-TEAK aluminum and sustainable hardwood. All fasten-

ers (nuts, bolts, pulleys, cam cleats, etc.) are marine-grade stainless steel and will withstand the most corrosive

environments. Proper care and maintenance is important to extend the serviceable life of all TUUCI products.

We recommend the following:

• Fresh water rinses once a week

• Weekly inspection of your TUUCI product is recommended. Loose screws should be tightened and any

broken com ponents replaced immediately to avoid further damage to your product.

• Prior to opening, ensure that the shade product is properly secured to an adequate shade anchor.

• When opening a TUUCI parasol, separate each rib 6 inches from the center post, before raising the hub.

Do not force hub if it does not rise easily.

• When closing the parasol, pull the fabric out from between the struts to avoid pinching or damaging the

TUFF-SKIN canopy membrane.

• TUUCI recommends that all collapsible shade equipment be closed in wind conditions which exceed 25 MPH.

• Clean above ground parasol bases regularly to maintain appearance. To clean, gently wash with soap and

water using a nonabrasive cloth or pad.

• Check three bolts in base plate regularly to ensure that they remain fully tightened. Inspect weekly if parasol

bases are moved on a regular basis.

• Do not roll Aluma-crete (Aluminum Shell, Concrete Filled) bases on their side as damage to shell

or finish can occur.

• Do not use on stairways or over distances which exceed 50 feet, as damage to welded wheel tray may occur.

• Canopy should be cleaned regularly and can be cleaned without being removed from the frame. Hose down

and clean with a mild soap and lukewarm water (no more than 100° F.) using a soft bristle brush. Rinse thor

oughly to remove soap. Allow fabric to air dry. TUUCI Parts can be purchased at [email protected].

• Do not use a pressure washer to clean canopes.

Page 37: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

tuuci | 37

INSA6000

ASSEMBLY & OPERATING INSTRUCTIONS WARRANTY

warranty: parasol / cabana / lounge / shade anchor

Product TUUCI constructs its shade structures with the finest marine-grade ma¬terials available. We test our products in extreme weather environ-ments to ensure stability, durability and years of worry-free service. In addi-tion, TUUCI personnel carefully follow specific quality control procedures and inspect each product to ensure freedom from any type of manufactur-ing defect. Our goal is to produce shade platforms that will exceed your ex¬pectations and provide a shade experience like no other in the world. The warranty protection listed below covers manufacturing defects only. Although all TUUCI marine-grade shade equipment is rigorously tested to withstand incredible forces of nature, TUUCI does not recommend or war¬ranty the deployment or use of any collapsible shade equipment in wind conditions which exceed 25 MPH (45 MPH for the MAX F-1). TUUCI will only warranty products which are properly secured to an adequate base or anchoring system. Furthermore, TUUCI will not cover any dam-age to a shade or base device which occurs as a result of contact with the ground or any other foreign object including damage which occurs as a result of sud¬den and severe weather events or other extreme acts of na-ture. In general, TUUCI recommends that all collapsible shade products be securely closed when not in use. TUUCI can recommend specific base weight and anchoring systems for specific parasol styles, shapes and sizes, however, TUUCI will only warrant the safe, sensible and reasonable operation of our shade structures within the recommended deployment guidelines. Please contact TUUCI directly if requesting shade devices and anchoring systems which can be warranted in sustained wind conditions which exceed 25 MPH. The following specific time periods and limitations apply to the product indicated:

15 Year Warranty OCEAN MASTER™, OCEAN MASTER and PLANTATION MAX™ (Classic, Can¬tilever and F-1) center mast, cantilever mast, top and bottom hubs and stainless steel hardware only. If warrantable damage occurs to the hubs, center pole or stainless steel hardware, TUUCI will replace or repair any item listed in this category at its discretion. Superficial damage, includ-ing any type of scratches or abrasions caused from contact with the mov-ing components of the frame itself or canopy during normal operation are not eligible for warranty coverage unless the damage compromises the struc¬tural integrity of the frame.

5 Year Warranty OCEAN MASTER™, OCEAN MASTER and PLANTATION MAX™ (Classic, Can¬tilever and F-1), STINGRAY SHADE SCULPTURE, connecting brackets, stain¬less steel fasteners, optional hardware (pulleys, auto-loc lifts, pis-tons and crank systems), aluminum canopy ribs, and struts. If warrantable damage occurs to the hubs, center pole or stainless steel hardware, TUUCI will re¬place or repair any item listed in this category at its discretion. Su-perficial damage, including any type of scratches or abrasions caused from contact with the moving components of the frame itself or canopy during normal operation are not eligible for warranty coverage unless the dam-age com¬promises the structural integrity of the frame. TUUCI CABANA and LOUNGE structures, including all tubing, joints/hubs, and fasteners. If warrantable damage occurs to the structure, TUUCI will replace or repair any item listed in this category at its discretion. Please re-move fabric canopy tops to any TUUCI CABANA or LOUNGE products for winds exceeding 35 MPH, except where product is specifically engineered and warranted for higher wind loads according to TUUCI’s engineering and usage guide. Level “C” fabric (SUNBRELLA® 9.25 oz. and other TUUCI Tuff Skin marine-grade fabric fabric). If any fabric (SUNBRELLA® or other TUUCI Tuff Skin) Level “C” fabric is rendered unserviceable by loss of color or strength caused by UV degradation, mildew, rot or atmospheric chemicals, TUUCI will replace or repair the fabric at its discretion. Labor charges will apply to the cutting and sewing of any fabric replaced under warranty.

3 Year Warranty BAY MASTER and VINEYARD (Classic, fiber-Flex, ultra-Flex and Cantile-ver umbrellas), BAY MASTER MAX and MISTRAL hardwood umbrellas, includ¬ing the center pole, side mast, hub system, fasteners and canopy ribs. If warrantable damage occurs to the hubs, center pole, struts or stain-less steel hardware, TUUCI will replace or repair any item listed in this category at its own discretion. Superficial damage, including any type of scratches or abrasions caused from contact with the moving components of the frame itself or canopy during normal operation are not eligible for war¬ranty coverage unless the damage compromises the structural integ-rity of the frame. Level “A” and “B” fabric (SUNBRELLA® 8 oz. and other TUUCI Tuff Skin furniture-grade fabric fabric). If any fabric (SUNBRELLA® or other TU¬UCI Tuff Skin) Level “A” or “B” fabric is rendered unserviceable by loss of color or strength caused by UV degradation, mildew, rot or atmospheric chemicals, TUUCI will replace or repair the fabric at its discretion. Labor charges will apply to the cutting and sewing of any fabric replaced un¬der warranty.

1 Year Warranty Powder coat finish of aluminum frames (umbrellas or cabanas) and bases including TUUCI’s exclu¬sive ALUMA-TEAK finish. If any TUUCI applied fin-ish flakes, bubbles, peels, or loses color within one (1) year from the date of purchase, TUUCI will re¬place or repair any paint finish damage at its own discretion.

The limited warranties outlined above cover only manufacturer defects, not damage caused by the product striking the ground or other object. The redeemable value of all warranties provided herewith shall be pro-rated over the life of the specific limited warranty itself. In all cases, the war¬ranty claimant shall be responsible for all shipping and/or freight charges incurred by claimant or TUUCI as a result of a warranty claim. War-ranty covers only parts and the labor to manufacture the parts for non-fabric claims. Labor for installation of parts covered under TUUCI Warranty is not included. Fabric warranties shall never include the cost of labor and any as¬sociated fabrication costs. All warranty claims must be submitted with an original proof of purchase dated from the dealer of origin, a de-scription of damaged product, including how the damage occurred, along with photos of the damaged product. The foregoing warranties may not be assigned and are available only to the original purchaser of TUUCI prod-ucts. TUUCI reserves at its sole discretion the right to repair, replace, or re-design any product that is returned as a result of a warranty claim.

ALWAYS BUY FROM AN AUTHORIZED TUUCI DEALER TUUCI proudly sells its products through a carefully selected network of Authorized Dealers. If you purchase through one of our Authorized Deal-er partners, you can be sure you are receiving the latest innovation and un¬compromising quality you can expect from TUUCI. Beware of those who claim to be authorized dealers but are not in fact part of our Autho-rized Dealers network. Only purchases from a TUUCI Authorized Dealer will be supported by our warranty program.

Page 38: 2013 LOGO & COLOR GUIDELINES PMS 1&2 COLOR ......INSA6000 Equinox MANUAL single unit assembly instructions 2013 LOGO & COLOR GUIDELINES FOILS / PMS 1&2 COLOR GLOSS FOIL PMS 1795 C

INSA6000

caution: may cause sudden relaxation

global mission control2900 NW 35th Street, Miami, FL 33142 USA / 305.634.5116

[email protected]

europe shade postNedervonder 17, 5061 JP Oisterwijk, The Netherlands / +31.13.522.0471

[email protected]

asia shade postLevel 24, 138 Market Street

CapitaGreen, Singapore 048946 / [email protected]

www.tuuci.com

2013 LOGO & COLOR GUIDELINES

FOILS / PMS 1&2 COLOR

GLOSS FOIL

PMS 1795 C

877 DULL FOIL

PMS 1795 C

GLOSS FOIL

877 DULL FOIL

PMS 1&2 COLOR

PMS 877 C

PMS 1795 C

PMS 877 C

PMS 1795 C

BLACK & WHITE 1 COLOR

BLACK

WHITE

2/1/17

INSA6000


Recommended