4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager Page: 1 EDUCATION Master, Real Estate Development, University of Southern California, Los Angeles, California, May 1994 Bachelor of Science, Civil Engineering, University of California, Irvine, California, June 1987 Associate of Arts, Business Administration, Irvine Valley College, Irvine, California, May 1991 Associate of Science, Computer and Information Sciences, Irvine Valley College, Irvine, California, May 1990 Associate of Arts, Mathematics, Sacramento City College, Sacramento, California, June 1988 Associate of Science, Physical Sciences, American River College, Sacramento, California, January 1988 REGISTRATIONS Professional Engineer-Civil, 46868, CA TIME WITH FIRMS Parsons Corporation 21 years 8 months UMA Engineering, Inc. 3 years 1 month ASL Consulting Engineers 2 years 8 months CERTIFICATIONS Project Manager Certification, Parsons COURSEWORK/TRAINING Supervisory Training and Accident Reduction Techniques (START); Parsons, 2004 & 2006 Safety, Health, and Risk Program (SHARP); Parsons, 2004 & 2006 Leadership and Management Program; Parsons, 2006 PACE (Plan, Act, Check, Excel) Quality Management; Parsons, 2007 PROFESSIONAL AFFILIATIONS American Society of Civil Engineers EXPERIENCE PROFILE Bruce Tafoya is a principal transportation project manager / senior project manager with more than 27 years of civil engineering experience in the overall project delivery process, ranging from conceptual design/planning through actual construction and operation. He has delivered projects involving highway, public works, and land development engineering and related disciplines, including rail, traffic, drainage, geotechnical, and structural engineering. In addition to the traditional design-bid-build project delivery process, Bruce has been instrumental in the design-build project delivery process. He has represented the owner/authority or the design consultant for the design-bid-build project delivery process, as well as the owner/authority or the design-build contractor for design-build project delivery process. Bruce has represented the owner/authority within road improvement programs, both domestically and internationally. His domestic experience includes serving as a project manager and quality assurance manager for the planning and design of roadway projects for the Thomas Roads Improvement Program (TRIP) in Bakersfield, California. Bruce’s quality assurance manager role included monitoring consultant’s compliance with quality control procedures and providing documentation and responding to internal audits within the program. His international experience includes owner/authority representation within the Abu Dhabi Transportation and Roads Improvement Program (TRIP) in Abu Dhabi, United Arab Emirates. Bruce’s experience extends to transportation planning, right-of-way engineering, and design and construction management. Bruce also has experience involving environmental and planning report documents; public presentations; surveying; and civil designs involving highway, roadway, site, parking lot, toll booth facilities, storm drains, retaining walls, bridges, utility relocation; signing, channelization, traffic control, and construction phasing. He has prepared planning documents, such as project study reports, project reports, and mandatory and advisory fact sheets; and reviewed environmental documents, including technical study reports; contract documents (construction plans, specifications, and cost estimates); and right-of-way acquisition and easement documents. Additionally, Bruce has resolved construction-related issues for all the aforementioned design elements through daily interactions with designers, contractors, inspectors, owners, and those authorities having jurisdiction to approve the resolutions to the issues. He has provided engineering services during construction for major transportation projects and has been responsible for review and/or preparation of submittals and technical items in accordance with plans and specifications. Submittals for approval have included shop drawings, product data, samples, and as-builts. Submittals for information have included drawings, calculations, design of temporary works, test reports, certificates, manufacturer’s instructions, field reports, request for information, and notifications (design change notices, and field change notices). Bruce’s construction-related experiences have primarily been on design-build
Transcript
Page 1: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 1

EDUCATION

Master, Real Estate Development, University of Southern California, Los Angeles, California, May 1994

Bachelor of Science, Civil Engineering, University of California, Irvine, California, June 1987

Associate of Arts, Business Administration, Irvine Valley College, Irvine, California, May 1991

Associate of Science, Computer and Information Sciences, Irvine Valley College, Irvine, California, May 1990

Associate of Arts, Mathematics, Sacramento City College, Sacramento, California, June 1988

Associate of Science, Physical Sciences, American River College, Sacramento, California, January 1988

REGISTRATIONS

Professional Engineer-Civil, 46868, CA

TIME WITH FIRMS

Parsons Corporation 21 years 8 months

UMA Engineering, Inc. 3 years 1 month

ASL Consulting Engineers 2 years 8 months

CERTIFICATIONS

Project Manager Certification, Parsons

COURSEWORK/TRAINING

Supervisory Training and Accident Reduction Techniques (START); Parsons, 2004 & 2006

Safety, Health, and Risk Program (SHARP); Parsons, 2004 & 2006

Leadership and Management Program; Parsons, 2006

PACE (Plan, Act, Check, Excel) Quality Management; Parsons, 2007

PROFESSIONAL AFFILIATIONS

American Society of Civil Engineers

EXPERIENCE PROFILE

Bruce Tafoya is a principal transportation project manager / senior project manager with more than 27 years of civil engineering experience in the overall project delivery process, ranging from conceptual design/planning through actual construction and operation. He has delivered projects involving highway, public works, and land development engineering and related disciplines, including rail, traffic, drainage, geotechnical, and structural engineering. In addition to the traditional design-bid-build project delivery process, Bruce has been instrumental in the design-build project delivery process. He has represented the owner/authority or the design consultant for the design-bid-build project delivery process, as well as the owner/authority or the design-build contractor for design-build project delivery process.

Bruce has represented the owner/authority within road improvement programs, both domestically and internationally. His domestic experience includes serving as a project manager and quality assurance manager for the planning and design of roadway projects for the Thomas Roads Improvement Program (TRIP) in Bakersfield, California. Bruce’s quality assurance manager role included monitoring consultant’s compliance with quality control procedures and providing documentation and responding to internal audits within the program. His international experience includes owner/authority representation within the Abu Dhabi Transportation and Roads Improvement Program (TRIP) in Abu Dhabi, United Arab Emirates.

Bruce’s experience extends to transportation planning, right-of-way engineering, and design and construction management. Bruce also has experience involving environmental and planning report documents; public presentations; surveying; and civil designs involving highway, roadway, site, parking lot, toll booth facilities, storm drains, retaining walls, bridges, utility relocation; signing, channelization, traffic control, and construction phasing. He has prepared planning documents, such as project study reports, project reports, and mandatory and advisory fact sheets; and reviewed environmental documents, including technical study reports; contract documents (construction plans, specifications, and cost estimates); and right-of-way acquisition and easement documents.

Additionally, Bruce has resolved construction-related issues for all the aforementioned design elements through daily interactions with designers, contractors, inspectors, owners, and those authorities having jurisdiction to approve the resolutions to the issues. He has provided engineering services during construction for major transportation projects and has been responsible for review and/or preparation of submittals and technical items in accordance with plans and specifications. Submittals for approval have included shop drawings, product data, samples, and as-builts. Submittals for information have included drawings, calculations, design of temporary works, test reports, certificates, manufacturer’s instructions, field reports, request for information, and notifications (design change notices, and field change notices). Bruce’s construction-related experiences have primarily been on design-build

Page 2: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 2

(ASCE), Member, 2002

COMPUTER/SOFTWARE SKILLS

Adobe Acrobat Pro (Windows)

Microsoft Excel

Microsoft Outlook

Microsoft PowerPoint

Microsoft Project

Microsoft Word

HONORS AND AWARDS

National Action Council for Minorities in Engineering (NACME) Scholarship Recipient, University of California, Irvine, 1985 - 1987

projects where he has represented either the owner/authority or the design-build contractor.

Project Management

As a project manager, Bruce has been involved in the management of Parsons' projects requiring large-scale staff supervision from both Parsons' specialists and subconsultants. All other requirements of project management are part of his daily routine, including development and delivery of project plans, specifications, construction estimates, schedules, and project status reports; coordination and supervision of reviews, quality control, and document preparation; attending project, client, and public meetings; review and/or approval of employee timesheets, monthly billing statements, and management reports; and maintaining strong client relations.

Business Development Experience

Bruce has business development experience involving pre-proposal strategies, proposal team building, project planning, scope development, fee preparation, and interviewing for projects. Bruce’s business development activities have included proposal and/or event participation; frequent communication with the client and personal presence in client’s office or other suitable setting to: strengthen client relationships, better understand client’s project and proposal requirements, and gain knowledge of client-preferred specialists and subconsultants. Bruce has been involved in many proposal efforts and was recently the Highway/Roadway Design Leader for the following design-build transportation project pursuit:

TxDOT SH 183 Managed Lanes Project, Design-Build, Tarrant and Dallas Counties, TX Client: Texas Department of Transportation (TxDOT) Project Role: Highway/Roadway Design Leader Start Date, End Date: 10/2013-2/2014 Project Description: On May 29, 2014, Texas Department of Transportation (TxDOT) awarded its $850 million SH 183 Managed Lanes transportation development project to Southgate Mobility Partners Team, which includes Parsons as its lead designer. The project consists of improvements along and connecting to SH 183, SH 114, and Loop 12 from SH 121 to I-35E in Tarrant and Dallas counties. It involves constructing managed lanes, general-purpose lanes, frontage roads, ramps, and connecting roadways, along with associated drainage, structures, signing and pavement markings, lighting, landscaping, right-of-way acquisition, and utility adjustments. The TxDOT SH 183 Managed Lanes project will improve mobility throughout the highly congested Dallas-Fort Worth Metroplex.

California Experience

Bruce has processed projects through Caltrans Districts 5, 6, 7, 8, 11, and 12; the Orange County Environmental Management Agency; the Los Angeles County Public Works Department; the California Department of Fish and Game; fire departments; various water and sewer districts; and various utility companies in cities throughout Santa Barbara, Ventura, Los Angeles, Orange, and Riverside

Page 3: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 3

counties. He plan checked roadway improvement projects for the City of Irvine and land development and roadway improvement projects for the City of Camarillo.

International Experience

Bruce’s international experience includes serving as a section highway manager for the planning and design of roadway projects for the Abu Dhabi Transportation and Roads Improvement Program (TRIP) in Abu Dhabi, United Arab Emirates; serving as project manager for the planning and design of roadway and bridge projects for Dubai’s Road & Transport Authority (RTA) in Dubai, United Arab Emirates; as well as for major infrastructure investment planning in Egypt for a private client. Bruce opened and served as the area manager for the Oman office and served as the project manager for the planning and design of the Southern Expressway, a major highway (52 km), in Muscat, Sultanate of Oman.

Page 4: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 4

EXPERIENCE SUMMARY

PARSONS CORPORATION Fresno, CA, United States March 1993 – October 2014 (21 years 8 months) Principal Transportation Project Manager / Senior Project Manager Management of planning, design, and construction for highway and roadway projects.

As a project manager, Bruce has been involved in the management of Parsons' projects requiring large-scale staff supervision from both Parsons' specialists and subconsultants. All other requirements of project management are part of his daily routine, including development and delivery of project plans, specifications, construction estimates (PS&E), schedules, and project status reports; coordination and supervision of reviews, quality control, and document preparation; attending project, client, and public meetings; review and/or approval of employee timesheets, monthly billing statements, and management reports; and maintaining strong client relations.

UMA ENGINEERING, INC. Irvine, CA, United States February 1990 – February 1993 (3 years 1 month) Project Engineer / Manager Technical supervision and management of design for highway, roadway, and parking facility projects.

Bruce was responsible for the management and technical supervision of projects that were primarily in the design stage. His staff consisted of engineers, technicians, and subconsultants dedicated to designs for highway, roadway, and parking facility projects, as well as land development projects requiring roadway and parking facilities. Bruce’s responsibilities included preparation of plans, specifications, and estimates (PS&E), as well as coordinating inter-discipline reviews, quality assurance, and client relations.

ASL CONSULTING ENGINEERS Irvine, CA, United States July 1987 – February 1990 (2 years 8 months) Assistant Project Engineer Technical engineer of design for highway, roadway, parking facility, and land development projects.

Bruce was responsible for the technical aspects of the projects, which were primarily in the design stage. His staff consisted of engineers, technicians, and subconsultants dedicated to designs for highway, roadway, and parking facility projects, as well as land development projects requiring roadway and parking facilities. Bruce’s responsibilities included preparation of plans, specifications, and cost estimates (PS&E), as well as coordinating inter-discipline reviews.

Page 5: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 5

PROJECT EXPERIENCE

PARSONS CORPORATION Fresno, CA, United States March 1993 – October 2014 (21 years 8 months) Principal Transportation Project Manager / Senior Project Manager Project: California High-Speed Train (CA HST) Construction Package 1 (CP 1), Design-Build, CHSRA Project No. HSR13-06 Project Location: Madera-Fresno Counties, CA, United States Project #: 406724 Client: California High-Speed Rail Authority (CHSRA) Project Role: Utilities Design Manager / Utilities Design Deputy Manager Start Date, End Date: 3/2014-10/2014

Project Description: The $1.023 billion CA HST CP1 project is the first significant construction contract executed on the Initial Operating Section of the high-speed rail project. The CP1 construction area is a 29-mile stretch between Avenue 17 in Madera County to East American Avenue in Fresno County. It includes 12 grade separations, 2 viaducts, 1 tunnel and a major river crossing over the San Joaquin River. This design-build project provides civil engineering and construction in preparation of the installation of the rail and systems needed for HST. This project includes all grade separations, utility modifications, drainage, grading for the rail alignment, and other street and highway modifications.

Project Responsibilities: Bruce was brought into the project as the utilities design deputy manager with primary focus on the technical utility issues related to relocation of conflicting utilities. He was “responsible charge” of Parsons’ utility design plans and specifications. Bruce was elevated to utilities design manager August 2014 with overall responsibility for the design and coordination of all utilities impacted by the project. Activities included coordination with multidisciplinary design team, drainage team, subconsultants, local and State agencies, other stakeholders, and utilities owners. He remained as “responsible charge” of Parsons’ utility design plans and specifications. Project: US Highway 101/San Benito Parkway Interchange Project Location: San Benito County, CA, United States Project #: 647479 Client: Confidential Client Project Role: Project Manager, Engineer-of-Record Start Date, End Date: 3/2011-9/2013

Project Description: This project is confidential.

Project Responsibilities: The project task order will prepare project initiation, project approval, and environmental documents (PID and PA&ED) for a proposed interchange along US Highway 101 in Santa Clara County, located approximately 2.2 miles south of SR 25 (Gilroy), and approximately 1.8 miles north of Betabel/Y Road in San Benito County. The purpose of this facility would be to provide alternative access to US Highway 101 for existing and future residents and visitors to San Benito County, via an extension of Shore Road, to be referred to as the San Benito Parkway. San

Page 6: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 6

Benito Parkway will be a principal arterial street extending from SR 25 to the limits of the interchange project, at the Santa Clara and San Benito County line. The project would include connections to northbound and southbound US Highway 101.

As project manager, Bruce manages and coordinates the effort of a large consultant team in order to deliver the transportation project, from initial planning and environmental documents (PID and PA/ED phases) through final design (PS&E phase). Another project task order will be issued for the PS&E phase. The project will require close, continuous coordination with Caltrans District 4 (Santa Clara County) and Caltrans District 5 (San Benito County), since there will be impacts to the regional transportation planning. His specific program responsibilities include collaborating with stakeholders; directing the planning, environmental, and design staff; overseeing subcontract administration and the production of deliverables; and assisting with negotiations for environmental and design subconsultant contracts. Bruce’s overall project responsibilities include day-to-day oversight and monitoring project development activities. He works in conjunction with other technical managers and engineers and discipline leads, overseeing the defined scope of work, scope management, and performance of defined projects to meet the project goals and objectives. Project: BART Oakland International Airport Connector, Design-Build Project Location: Oakland, CA, United States Project #: 647374 Client: Bay Area Rapid Transit District (BART) Project Role: Assistant to Project Manager Start Date, End Date: 4/2013-7/2013

Project Description: The $361 million Oakland International Airport Connector project will improve access to the Oakland International Airport (OAK) via an automated people mover (APM) system, using an automated guideway transit (AGT) operating system technology (OST). The APM will provide a 3.2-mile-long, pollution-free connection between the BART Coliseum Station to the passenger terminal at OAK. The AGT is primarily elevated with an underground segment near the airport and an on-grade segment along Airport Drive, and the operating system functions are on an exclusive right-of-way without on-board drivers or attendants. The project will deliver significant benefits to local and regional economies by creating immediate and long-term jobs and opportunities for local disadvantaged business enterprises. It will also reduce congestion along local access roads to the airport, thereby improving environmental conditions of airport operations.

Project Responsibilities: As an assistant to the project manager, Bruce coordinated the effort of subconsultants in order to resolve transportation facilities’ design/construction issues while under construction. He was responsible for providing bike path, emergency egress path, and drainage designs, as well as resolving inquiries pertaining to roadway and drainage due to changes in design, construction issues and methods, changed field conditions, and clarification of plans and specifications. The project required close, continuous coordination with Caltrans District 4.

Page 7: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 7

Project: Guam Islandwide Program Management Services Project Location: Tamuning, Guam Project #: 646979 Client: Government of Guam Department of Public Works (DPW) Project Role: Project Civil Design Manager Start Date, End Date: 5/2010-5/2013

Project Description: Parsons provided program and construction management, which involved assisting with planning, design, procurement, contract management, and construction management for roadway improvements, islandwide. The work included educating and training the Government of Guam, Department of Public Works (DPW) Highway Department, to perform construction inspections in accordance with federal standards and practices. Parsons also led the environmental, programming, planning, and acquisition activities during coordination with the United States Department of Defense (DOD) and the Federal Highway Administration (FHWA) for the island’s roadway improvements to support relocating and building-up of the military in the relocation of the Marines from Okinawa, Japan, to Guam.

Project Responsibilities: The project consists of safety improvements to Route 4, beginning approximately 1.5 miles south of Route 17, near Togcha River, and ending approximately 1.7 miles north of Route 4A, near Ipan Beach Park, in Talofofo, Guam. The 0.5-mile (2,600 feet) of safety improvements includes roadway reconstruction, increased roadway profile and superelevation, anti-skid surfacing, drainage facilities, and reestablishing the clear zone.

Bruce was responsible for the overall civil design management and technical advisor, which included re-scoping the design safety improvement elements to meet environmental constraints. He managed and provided technical guidance for the preparation of the final design (PS&E phase). The design for the project was primarily based on the American Association of State Highway and Transportation Officials’ publication, “A Policy on Geometric Design of Highways and Streets, 6th Edition.” Project: Passenger Rail Service Extension to Monterey County Project Location: Monterey County, CA, United States Project #: 645188 Client: Transportation Agency for Monterey County (TAMC) Project Role: Technical Design Reviewer Start Date, End Date: 8/2010-2/2011

Project Description: Parsons provided the conceptual design, advanced preliminary engineering, cost estimates, and environmental studies for an extension of passenger rail service to relieve congestion for commuters traveling between Monterey County, from its existing terminus in Gilroy, and the San Francisco Bay Area. The project will construct a layover facility and additional commuter parking in Salinas, a new station in Castroville, and a new station in Pajaro/Watsonville, to serve northern Monterey County and southern Santa Cruz County. The service will be operated by the Capitol Corridor Joint Powers Agency as an extension of passenger rail service between Sacramento-Oakland-San Jose to Salinas. The project will additionally accommodate the relocation of intercity

Page 8: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 8

Greyhound bus service and will construct a Monterey-Salinas Transit local bus transfer facility at the Salinas Intermodal Transportation Center. In developing the adopted building program, wide-range of station siting and value-engineering alternatives were conceptually rendered and evaluated. The project was coordinated with the UPRR, the Peninsula Corridor Joint Powers Board, the Capitol Corridor Joint Powers Authority, Caltrans, the Santa Clara Valley Transportation Authority, the city of Salinas, the Redevelopment Agency of Monterey County, Monterey-Salinas Transit, the city of Watsonville, the Santa Cruz County Regional Transportation Commission, and the Santa Cruz Metropolitan Transit District. The project deliverables included a project study report (PSR); advanced preliminary engineering plans, specifications, and estimates; and state and federal environmental documentation.

Project Responsibilities: As a technical design reviewer for the project manager, Bruce performed a technical review of the site development for the proposed Salinas Commuter Rail Station and Layover Facility and roadway improvements for State Route 183 (SR 183 - Market Street & North Main Street). The proposed SR 183 improvements are necessary to provide access to parking, station, and maintenance facilities and include two new city streets configured to form a "T" intersection to the north of SR 183 (Market Street), with right turns in and out only; modify Lincoln Avenue/SR 183 (Market Street) intersection, from a "T" configuration to a four-legged configuration, by extending Lincoln Avenue to the north, into the site; reconstruct SR 183 (Market Street) raised median islands and curb returns, between Stone Street and North Main Street; and modify traffic signals at Lincoln Avenue/SR 183 (Market Street) intersection and at SR 183 (Market Street/North Main Street)/Salinas Street intersection, so as to improve traffic operations along SR 183. Additionally, he was responsible for confirming fact sheet items and preparing the encroachment permit for SR 183 improvements which is under Caltrans District 5’s jurisdiction. Project: Thomas Roads Improvement Program (TRIP) Program Management Project Location: Bakersfield, CA, United States Project #: 646593 Client: City of Bakersfield Project Role: Corridor Manager Start Date, End Date: 1/2008-6/2010

Project Description: The project involved providing program management services for a consultant team augmenting the City of Bakersfield staff in collaboration with the County of Kern; the California Department of Transportation (Caltrans), District 6; the Kern Council of Governments; and the Federal Highway Administration (FHWA). The project work included planning, environmental clearance, design, and construction of 14 projects totaling 85 miles in transportation improvements along the metropolitan Bakersfield highway network. The program's cost was estimated at more than $1.25 billion.

Project Responsibilities: As corridor manager, Bruce coordinated the effort of large consultant teams who oversee the delivery of four simultaneous transportation projects, from initial planning and

Page 9: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 9

environmental documents (PID and PA/ED phases) through final design (PS&E phase), and the construction. The four transportation projects, Centennial Corridor, Crosstown Freeway (So. Centennial Corridor), Oak Street and 24th Street Interchange, and 24th Street Widening, required close, continuous coordination with Caltrans District 6, as the impacted transportation facilities include SR 58, SR 99, and SR 178. His specific program responsibilities included collaborating with stakeholders; assisting with implementing the delivery strategies through construction, negotiating, awarding, and administering contracts; reviewing and approving proposals, contracts, and subcontracts; directing the planning, environmental, and design staff; overseeing subcontract administration and the production of deliverables; and assisting with negotiations for environmental and design consultant contracts. As the program management consulting quality manager, Bruce was responsible for implementing the quality assurance program to verify the design consultant’s compliance to the design quality plan and ensuring all applicable city, county, Caltrans, and regulatory requirements were met. He also performed or assigned monthly or “as-needed” audits of the design consultant’s compliance with the design quality plan. Bruce’s overall project responsibilities included day-to-day oversight and monitoring project development activities. He worked in conjunction with other corridor and project managers and engineers and discipline leads, overseeing the defined scope of work, scope management, and performance of defined projects to meet the program goals and objectives. Project: The Lagoons Master Plan and Design Project Location: Dubai, United Arab Emirates Project #: 350346 Client: Sama Dubai Project Role: Project Manager Start Date, End Date: 4/2007-12/2007

Project Description: The Lagoons, a unique mixed use development, is part of the Dubai Creek master plan which includes the master planned communities of Old Town, and Wellness Center, as well as the existing wilderness preserve. The Lagoons project is envisioned as a major mixed-use commercial and residential development with recreational and cultural centers consisting of 7 man-made islands, known as the “Pearls”, connected by waterways, roads and bridges. Parsons scope is primarily to design the infrastructure, roads, marinas, waterways, and bridges. The overall construction value for the project will be over $30B+, but Parsons’ portion is only the infrastructure which should be about 5 to 10% of that value. The key features of the infrastructure are:

• Area = 645 HA (1,600 Acres) • Water = 197 Ha (490 Acres) • Revetments Quay Walls = 52,000 m (32 miles) • Marinas = 8 (1,300 Berths • Bridges = 26 (Vehicle and Pedestrian) • Buildings = 95M Square Feet (General Floor Area)

It is estimated that the finished project will accommodate about 125,000 residents, 105,000 workers, and over 70,000 visitors. The Business Pearl is a major development in itself and is one of the

Page 10: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 10

largest and most critical elements of The Lagoons project. The key features of the Business Pearl are:

• 2,765 Apartments • 1,741,480 Square Feet of Retail • 15,608,630 Square Feet of Commercial Office • 4,442 Hotel Rooms • 340 Students Private School

The Business Pearl will account for a majority of the total traffic generated by The Lagoons; therefore, significant efforts are being put into solving the transportation issues intrinsic to the Business Pearl and the distribution of utilities coming onto the island and feeding the various buildings. This very dense development program will be constructed on approximately 111 acres with many of the buildings being over 50 stories in height. The island development will require a seven-level 30,000 space parking structure and commercial vehicle docking zones within a podium structure on the man-made island. The Lagoons is located at the basin of Dubai Creek and will only be accessible via four bridges.

Project Responsibilities: Bruce was responsible for planning and producing the report related to the traffic impact assessment, structural loading criteria, and validation of parking requirements; the planning and review of the conceptual drawings for the roadway network, parking, and infrastructure; and review of the detailed geometric design of the major roadways and ramping systems. He also coordinated among the client, master plan architect, landscape architects, contractor, and various design disciplines.

Bruce worked directly with a subconsultant specialist to address the original plans for the parking structure within the podium which called for very steep ramps that could not adequately accommodate the number of projected vehicle trips for the proposed number of parking spaces.

Of the many challenges addressed was the need to provide express ramps to all parking levels of the podium directly from three of the four bridges. This was required because the levels of peak hour traffic were so high that the planned surface street system could not accommodate all the projected vehicle trips. Working together with the subconsultant specialist, a plan was conceived that provided a flat floor one-way ring road around a central core that can be entered from down ramps on its outside and can be exited to up ramps on its inside. The express up and down ramps were designed so that they would stack in the same volume of space thereby maximizing the amount of flat floor space that would be available for parking. Five secondary ramp systems were also developed that would allow floor-floor access from the surface level through the lowest level. These secondary ramps were proposed as double circular helixes with access to an outer ring road system.

The island is elliptical in shape and as such the parking bays were recommended to be designed in a radial pattern that follows the circumference of the island's shape between the podium’s inner ring road and the edge of the parking structure. Inside the inner ring road the parking bays were recommended to be parallel to the shorter axis of the island and allowed for sloping floor ramps to serve the lowest levels of parking between levels P5 and P7. A 9 meter by 18 meter column grid system was chosen outside of building footprints

Page 11: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 11

to allow for clear span parking and enhanced vehicle circulation and visibility.

Also, recommendations were provided with respect to traffic access that resulted in enhanced access for commercial vehicle traffic to and from the local road system surrounding the island and a traffic management plan that would preclude cut-through traffic from an adjacent island. Project: R777 Creek Crossings Design Project Location: Dubai, United Arab Emirates Project #: 646689 Client: Dubai Municipality Project Role: Project Manager Start Date, End Date: 8/2006-12/2007

Project Description: The Sixth Crossing Corridor, R777/3, located south of the new Business Bay Bridge (Ras Al Khor Corridor), entailed constructing the major arterial along Sheikh Rashid Road with interchanges at Riyadh Street, Ras Al Khor Road, Opera House Island, Dubai Festival City/The Lagoons, Nadd Al Hamar Road, Emirates Road, and Al Awir Road. A multi-span bridge was proposed to connect Ras Al Khor Crossing Corridor with Nadd Al Hamar Road and provide full navigation clearance for commercial and recreational vessels. The Seventh Crossing Corridor, R777/4, is located just east of the Maktoum Bridge and replaces the Floating Bridge, which was an interim solution to the traffic issues. The Seventh Crossing will included constructing new access roads to improve operations on the roads accessing the Maktoum Bridge and increasing travel speeds on both sides of Dubai Creek. The improvements consisted of constructing a new roadway corridor beginning at Oud Metha Road, running adjacent to Sheikh Rashid Hospital Compound, with a new signalized intersection at Riyadh Street and through the Dubai Creek Park to the new bridge crossing over Dubai Creek and landing at the Road 9 and Baniyas Road intersection. The construction costs of the Sixth and Seventh Crossing Corridors were approximately $1.2 billion and $260 million, respectively.

Project Responsibilities: Bruce was responsible for the overall management, which included the planning and design of various subcontracts. He managed and coordinated preparation of the Preliminary Study and follow-on studies related to the subcontracts, as well as the design staff for submission of the subcontracts. Bruce prepared the construction phasing and schedules for the various subcontracts and coordinated among the client, agencies, service authorities, and various design disciplines. The planning and design for the project was primarily based on the American Association of State Highway and Transportation Officials’ publication, “A Policy on Geometric Design of Highways and Streets, 2001.” Project: Ministry of Transport (MOT) Project in Egypt Project Location: Egypt Project #: 646761 Client: Abu Dhabi National Holding, LLC (for the Egyptian Ministry of Transport) Project Role: Task Manager, Road & Highway Operations Start Date, End Date: 12/2006–3/2007

Page 12: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 12

Project Description: Developments throughout the transportation sector will integrate rail, road, maritime and air transport to achieve the plan of keeping Egypt at the top of business and trade across the country. The development of such a system will also establish safer, convenient and efficient means of transportation.

The project entailed conducting a due-diligence study to evaluate the engineering and financial aspects of upgrading and/or providing new transportation infrastructure (road and highway systems, rolling stock and rail route systems, and port facilities) throughout Egypt. rolling stock and rail route infrastructure between Qena and Safaga to meet a new demand for phosphate rock and phosphoric acid.

Project Responsibilities: Conducted site investigations to determine existing conditions of track and facilities. Recommended actions for track rehabilitation included ballast cleaning, track surfacing and lining, spot tie replacement, and earthwork. Also recommended new facilities, including a train control system, siding replacement, and maintenance shops and rolling stock, including locomotives, hopper cars, and tank cars. Project: Jewel of the Nile Project Location: Cairo, Egypt Project #: 350336 Client: Dubai International Limited Project Role: Task Manager, Road & Highway Operations Start Date, End Date: 12/2006–3/2007

Project Description: Developments throughout the transportation sector will integrate rail, road, maritime and air transport to achieve the plan of keeping Egypt at the top of business and trade across the country. The development of such a system will also establish safer, convenient and efficient means of transportation.

The project entailed conducting a due-diligence study to evaluate the engineering and financial aspects of upgrading and/or providing new transportation infrastructure (road and highway systems, rolling stock and rail route systems, and port facilities) throughout Egypt. rolling stock and rail route infrastructure between Qena and Safaga to meet a new demand for phosphate rock and phosphoric acid.

Project Responsibilities: Conducted site investigations to determine existing conditions of track and facilities. Recommended actions for track rehabilitation included ballast cleaning, track surfacing and lining, spot tie replacement, and earthwork. Also recommended new facilities, including a train control system, siding replacement, and maintenance shops and rolling stock, including locomotives, hopper cars, and tank cars. Project: R659 Comprehensive Improvement of Interchanges at Sheikh Zayed Road – R659/10: Dubai Marina Interchange (Interchange 5) Project Location: Dubai, United Arab Emirates Project #: 643992 Client: Dubai Municipality Project Role: Project Manager Start Date, End Date: 10/2005-5/2007

Project Description: Parsons was selected to design

Page 13: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 13

comprehensive improvements to the Sheikh Zayed Road expressway to alleviate congestion and provide for increased traffic volumes from the new developments along the major freeway corridor. Parsons’ work on this improvement project began in 1999 at the preliminary study stage, and the program included upgrading 29 km of Sheikh Zayed Road starting from Trade Center Interchange to Interchange 6. The work included improving all seven preexisting interchanges and constructing six new interchanges.

Project Responsibilities: The Dubai Marina Interchange, or Interchange 5, project involved removing the existing grade-separated roundabout and providing a new free-flow interchange along Sheikh Zayed Road near Dubai Marina. A Variation Order was introduced halfway into the construction schedule, which required planning, design, construction coordination, and implementation. The Variation Order construction contract value was $11 million, thereby bringing the total construction contract value to $83 million. The work included the removal of existing roadways and bridge, widening and reconstruction of roadways, new asphalt works, asphalt overlay, bridge structures and ramps, retaining walls, drainage, lighting, signing, pavement marking and striping, utility relocation and protection, and traffic staging.

Bruce was responsible for planning and design of the Variation Order and construction coordination for the overall project. He performed coordination among the client, resident engineer, contractor, and various design disciplines. The planning and design for the project was primarily based on the American Association of State Highway and Transportation Officials’ publication, “A Policy on Geometric Design of Highways and Streets, 2001.” Project: Garden Grove Freeway (SR 22) HOV Lane Project Location: Orange County, CA, United States Project #: 645195 Client: Orange County Transportation Authority (OCTA) Project Role: Civil Project Manager Start Date, End Date: 4/2002-10/2005

Project Description: The program management contract involved managing cost, schedule, design, and construction activities for the $550 million design-build widening of SR 22 in Orange County, California. The project was a 13-mile-long freeway that connected five major freeways and included the reconfiguration of interchanges and 54 new bridges or bridge widenings, as well as more than 12.5 miles of retaining walls. The Orange County Transportation Authority was the funding agency, and Caltrans was the ultimate owner and operator. The project design and construction was scheduled and completed in an aggressive 810 days. Expedition was used for the project's controls program, and Primavera P3 was used for the scheduling program.

Project Responsibilities: As the assistant program manager for Phase 1, Bruce was responsible for preparation of the Project Management Plan; design-build procurement documents, including the statement of qualifications, Industry Review Package, and request for proposals; and procuring a design-build contractor.

As the civil project manager for Phase 2, Bruce provided oversight for the design of the project to ensure all applicable Caltrans, federal,

Page 14: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 14

and regulatory requirements were followed; all established project management policies and procedures were followed; and the design was consistent with the approved design documents and contract. Project: Muscat Expressway Project Location: Muscat, Oman Project #: 644778 Client: Muscat Municipality Project Role: Area Project Manager Start Date, End Date: 8/2001-4/2002

Project Description: Recognizing the need for a second corridor in the Muscat Capital Area, Muscat Municipality in August 2001 selected Parsons to design and supervise the construction of the 54-kilometer-long Muscat Expressway (previously known as the Southern Expressway). In addition to alleviating traffic congestion along the existing corridor, the new expressway provides access to previously inaccessible areas, complementing the economic growth of the region by opening up new areas for development served by an efficient transportation network. By reducing congestion across the capital area, the project provides socioeconomic and environmental benefits, as it reduces travel times and distances.

Project Responsibilities: The project involved alignment selection and the preparation of planning and design documents. The expressway's alignment started at the Al Qurum Roundabout and extended 52 km west along the foot of the mountains south of Muscat City, then north to the proposed Al Batinah Highway with a temporary at-grade connection to the Al Naseem Roundabout on the Sultan Qaboos Highway. The project included 15 interchanges, several wadi crossings, 44 bridges, and approximately 20 km of cross roads through desert and mountainous terrain. The planning and design for the new Southern Expressway was based on the American Association of State Highway and Transportation Officials’ 1994 publication, “A Policy on Geometric Design of Highways and Streets.”

As the area project manager, Bruce reviewed and analyzed the planned alignment completed by another firm and discovered several design speed related flaws, lack of adequate right of way, as well as the planned horizontal alignment’s close proximity to the only existing main corridor to access Muscat, Sultan Qaboos Highway. Based on these findings and recommendation to re-plan the project alignment, the Muscat Municipality directed Parsons to implement an alignment selection process and report in order to re-establish and document a proper project alignment. In addition to recommending a horizontal alignment, the report covered interchange configurations and design elements, including typical sections, vertical alignments, number of lanes, right-of-way widths, drainage, utilities, pavement markings, signage, lighting, and bridge type selection. Further, he recommended the newly proposed alignment be elevated when crossing a wadi (dried up riverbed, during sudden downpours have lead to flash floods resulting in the flooding of Sultan Qaboos Highway and have been highly dangerous to the residents of Muscat), so as to form a dam in order to control the flash flooding that occurs and protect Sultan Qaboos Highway, as well as the residents of Muscat.

Page 15: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 15

Bruce, as project manager, managed and coordinated the alignment selection report, procured subcontracts, prepared project schedule and invoices, and coordinated among the client, agencies, service authorities, and various design disciplines. During this same time period, Bruce served as the area manager for Parsons’ transportation business unit and established Parsons’ initial transportation office in Muscat. His duties included selecting an office building and procuring all office elements and services necessary to have an operational business, including the hiring of design staff for the design phase. Project: Abu Dhabi TRIP Contract 982, Bridge and Tunnel Interchange At MIP-76 (Musaffah) Project Location: Abu Dhabi, United Arab Emirates Project #: 642453 Client: Abu Dhabi Municipality Project Role: Highway Section Manager Start Date, End Date: 6/2001-9/2001

Project Description: The contract objective entailed construction of a bridge and tunnel interchange at MIP-76 on the Abu Dhabi/Al Ain Truck route in Mussafah. The project scope included removal of existing roadway, widening and reconstruction of roadways, new asphalt works, asphalt overlay, bridge structures and ramps, retaining walls, tunnel structure, underpass structure, lift stations, stormwater reservoir, drainage, lighting, signing, pavement marking and striping, utility relocation and protection, and traffic staging.

Project Responsibilities: Bruce was responsible for preparation of plans and specifications preparation for a bridge and tunnel interchange at MIP-76 on the Abu Dhabi-Al Ain truck route in Mussafah. Project: Abu Dhabi Al Abyad Island I/D, Contract 2017, Design Project Location: Abu Dhabi, United Arab Emirates Project #: 644388 Client: Abu Dhabi Municipality Project Role: Highway Section Manager Start Date, End Date: 8/2001-9/2001

Project Description: The project involved the removal of existing roadway, widening, and reconstruction of roadways, new asphalt works, asphalt overlay, ramps, box culvert and retaining walls, drainage, lighting, signing, pavement marking and striping, utility relocation and protection, and traffic staging.

Project Responsibilities: Bruce as highway section manager, was responsible for development of PS&Es to construct an interchange on Abu Dhabi-Tarif Road Highway at the Abu Al Abyad junction. Project: Abu Dhabi TRIP, Program Support Project Location: Abu Dhabi, United Arab Emirates Project #: 667012 Client: Abu Dhabi Municipality Project Role: Highway Section Manager Start Date, End Date: 11/2000-6/2001

Project Description: Parsons has been in charge of the

Page 16: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 16

Transportation and Roads Improvement Program (TRIP) since its inception in the late 1970s. TRIP involves the planning, design, and construction of an entire urban roadway network in the City of Abu Dhabi. As Program Manager, Parsons is responsible for all TRIP design and construction supervision activities, including the administration of more than 100 separate construction contracts (since inception), which typically include water, wastewater, stormwater, electrical and telephone relocations, and roads and bridges. The roadway work includes at-grade and grade-separated intersections, parking areas, service reservations, utility relocations and protection, drainage, and lighting and traffic signal systems.

Project Responsibilities: The work included the removal of existing roadway, widening and reconstruction of roadways, asphalt overlay, new asphalt works, bridge structures and ramps, demolition of an existing bridge, reconfiguration of existing intersections and parking areas, drainage, lighting, traffic signals, signing, pavement marking and striping, utility relocation and protection, traffic staging, fountains and associated plant rooms and water tanks, landscaping, retaining walls, a tunnel structure, lift station, and stormwater reservoir. The Abu Dhabi TRIP projects were designed in accordance to the Abu Dhabi Municipality’s Roadway Design Manual, published in 1998, which was primarily based on the American Association of State Highway and Transportation Officials’ 1994 publication, “A Policy on Geometric Design of Highways and Street.”

Bruce was responsible for preparation of planning and design documents for various projects ranging from roadway widening to interchanges. He prepared plans and specifications for the bridge interchange at IP-111 at the junction of Cross Road “G” and Eastern Ring Road; the widening of East Road between IP-43A and IP-145, which included beautification and landscaping of the median and widening improvements to the existing bridge structure at IP-47A; and the Umm Al Nar Bridge and Tunnel Interchange at the intersection of Abu Dhabi/Al Ain Roads and Abu Dhabi/Shahama Roads. Project: Abu Dhabi TRIP Contract 2015A, New Corniche Road, Land Reclamation and Road Works (Stage 1) Project Location: Abu Dhabi, United Arab Emirates Project #: 644198 Client: Abu Dhabi Municipality Project Role: Highway Section Manager Start Date, End Date: 1/2001-1/2001

Project Description: As part of the Abu Dhabi TRIP, the objective of this contract was the completion of the remaining dredging, land reclamation, road and bridge construction required for the construction of the New Corniche Road East (Stage 1) and to prepare for the construction of the New Corniche Road East (Stage 2), along with extensive landscaping and beautification works between the old Corniche Road alignment and the newly created waterfront promenade. The associated landscaping and beautification works included 3 tunnels; 7 pedestrian underpasses; 60 water features including, a 130-meter-high jet marine fountain; 600,000 sq. m of soft landscaping; fresh water lake (9,000 sq. m area); 100 sun shelters; 25 children play areas; and relocation and

Page 17: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 17

protection of various utilities.

Project Responsibilities: The New Corniche Road East (Stage 1) involved dredging material from designated borrow areas, fill placement in reclamation areas, sea walls and railings, new roadways, new intersections, a pedestrian underpass, parking areas, drainage, lighting, traffic signals, signing, pavement marking and striping, and traffic staging.

Bruce was responsible for preparing the plans and specifications for the dredging, land reclamation, sea wall layout, and roadway and their related design elements for the New Corniche Road East (Stage 1). Project: San Joaquin Hills Transportation Corridor, Toll Road Construction Services Project Location: Costa Mesa, CA, United States Project #: 660322 Client: California Corridor Constructors Project Role: Project Engineer Start Date, End Date: 1/1995-12/2000

Project Description: The project involved the final design and preparation of plans, specifications, and cost estimates for a new $1.1 billion, 19-mile, six-lane toll road extending from I-5 to the vicinity of the I-405, Route 55 interchange in Orange County, which included 11 interchanges, 76 bridges and wildlife crossings, environmental mitigation, and landscaping. The six-lane, divided road extended State Route 73 from Interstate Route 5 at San Juan Capistrano to John Wayne Airport . Parsons was responsible for all design efforts associated with the major design-build contract, which included highway design, design of cross streets and collector distributor roads, traffic signalization, design of multiple bridge structures, maintenance of traffic plans, drainage facilities, and related improvements. The project required the mapping and appraisal of more than 125 individual parcels prior to the start of construction. More than 300 environmental mitigation measures were incorporated into the project.

Project Responsibilities: Bruce served as liaison between field coordinators and the contractor's staff for construction issues pertaining to all design sections of the San Joaquin Hills Transportation Corridor (SR 73). He was responsible for resolving inquiries pertaining to highway-related disciplines due to changes in design, construction issues and methods, changed field conditions, and clarification of plans and specifications. Project: SR 111 Indio Project Study Report/Plans, Specifications, and Estimates Project Location: Indio, CA, United States Project #: 660506 Client: Riverside County Transportation Commission (RCTC) Project Role: Senior Project Engineer Start Date, End Date: 1/1998-12/2000

Project Description: This project included horizontal and vertical alignments, hydrology, hydraulics, storm drains, signing, striping, traffic staging, and landscape and hardscape features. Coordination among Caltrans District 8, the County of Riverside, and City of Indio

Page 18: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 18

was required for permit processing. The Riverside County Transportation Commission administered the design contract, which required the plans, specifications, and estimates to be prepared in accordance to Caltrans’ metric standards. The City of Indio administered the construction contract.

Project Responsibilities: Bruce was responsible for the highway widening and roadway and plaza area improvements. He prepared the PS&E for widening SR 111 and adjoining city streets. Project: Abu Dhabi TRIP Contract 981, Bridge and Tunnel Interchange At MIP-3 (Musaffah) Project Location: Abu Dhabi, United Arab Emirates Project #: 642452 Client: Abu Dhabi Municipality Project Role: Highway Section Manager Start Date, End Date: 11/2000-12/2000

Project Description: The contract objective entailed construction of a bridge and tunnel interchange at MIP-3 on the Abu Dhabi/Al Ain Truck route in Mussafah. The project scope included removal of existing roadway, widening and reconstruction of roadways, new asphalt works, asphalt overlay, bridge structures and ramps, retaining walls, tunnel structure, underpass structure, lift stations, stormwater reservoir, drainage, lighting, signing, pavement marking and striping, utility relocation and protection, and traffic staging.

Project Responsibilities: Bruce was responsible for preparation of plans and specifications preparation for a bridge and tunnel interchange at MIP-3 on the Abu Dhabi-Al Ain truck route in Mussafah. Project: Abu Dhabi Interchange, Abu Dhabi-Al Ain Road, Contract 996, Design Project Location: Abu Dhabi, United Arab Emirates Project #: 643946 Client: Abu Dhabi Municipality Project Role: Highway Section Manager Start Date, End Date: 9/2000-11/2000

Project Description: The project involved removal of existing roadway, widening and reconstruction of roadways, new asphalt works, asphalt overlay, bridge structures and ramps, retaining walls, an irrigation reservoir, drainage, lighting, signing, pavement marking and striping, utility relocation and protection, and traffic staging.

Project Responsibilities: Bruce was responsible for preparation of plans and specifications for a bridge interchange on Abu Dhabi-Al Ain Road at MIP-39D. Project: Abu Dhabi Interchange, Abu Dhabi-Al Ain Road, Contract 994, Design Project Location: Abu Dhabi, United Arab Emirates Project #: 643945 Client: Abu Dhabi Municipality Project Role: Highway Section Manager Start Date, End Date: 9/2000-9/2000

Project Description: The project involved removal of existing

Page 19: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 19

roadway, widening and reconstruction of roadways, new asphalt works, asphalt overlay, bridge structures and ramps, retaining walls, an irrigation reservoir, drainage, lighting, signing, pavement marking and striping, utility relocation and protection, and traffic staging.

Project Responsibilities: Bruce was responsible for preparation of plans and specifications for a bridge interchange on Abu Dhabi-Al Ain Road at MIP-3A. Project: Ocean Boulevard/Terminal Island Freeway Interchange Project Location: Long Beach, CA, United States Project #: 641023 Client: Port of Long Beach (POLB) Project Role: Senior Project Engineer Start Date, End Date: 4/1999-8/2000

Project Description: The Parsons team provided engineering services necessary to produce complete and usable Ocean Boulevard/Terminal Island freeway interchange final design plans. The project limits were Los Angeles County, in the cities of Long Beach and Los Angeles, on SR 47, from Navy Way Overhead to 0.8 kilometers east of the Terminal Island Freeway. The structures consisted of two grade separations and more than 3,100 meters of retaining walls. The project accommodated an expected increase in through traffic and traffic. The project accommodated an expected increase in through traffic and traffic generated by planned development on Terminal Island. The total value of the interchange improvements was approximately $45 million. Specific project elements included project management, technical guidance for the overall project, including several subconsultants, evaluation, and assessment of multiple alternatives, roadway and bridge design concepts, conceptual and preliminary designs for right-of-way delineations, signing and striping, drainage, and construction staging concepts.

Project Responsibilities: Bruce was responsible for preparation of the Project Study Report, Project Report, and Mandatory and Advisory Fact Sheets. He also proposed the concept to deliver a two phase design and construction process in order to make an adjacent port facility available for a prospective tenant. Phase 1 was to deliver the design (PS&E) for the construction of all utility relocations necessary to service the port facility for the prospective tenant. Phase 2 was to deliver the design (PS&E) for the construction of the interchange and remaining infrastructure works. The concept was successfully implemented during the design and construction phases. Project: Overland Bridge Project Study Report (PSR) Project Location: Los Angeles, CA, United States Project #: 643574 Client: Los Angeles County Department of Transportation Project Role: Project Manager Start Date, End Date: 11/1999-7/2000

Project Description: The Los Angeles Department of Transportation (LADOT), in cooperation with the California Department of Transportation (Caltrans), proposed adding one northbound through lane on the existing Overland Avenue Bridge

Page 20: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 20

overcrossing at the I-10 Santa Monica Freeway. The northbound through lane was proposed between the National Boulevard/National Place and National Boulevard/I-10 westbound ramps. The project was needed to accommodate existing through traffic generated by the Fox Studios expansion development.

Project Responsibilities: Bruce provided project management oversight. He was responsible for the preparation of the Project Study Report and Mandatory and Advisory Fact Sheets. Project: Equilon Effluent Data Statistics System (EDSS) Refinery Mitigations Project Location: Wilmington, CA, United States Project #: 642351 Client: Equilon Enterprise LLC Project Role: Senior Project Engineer Start Date, End Date: 8/1998-7/2000

Project Description: The Parsons team provided engineering services necessary to identify facility impacts, produce a mitigation plan, and provide an estimated cost to maintain Equilon’s Los Angeles Refinery’s operations due to the proposed Pacific Coast Highway (PCH) grade separation project. Caltrans District 7, as the lead agency, in conjunction with the City of Los Angeles as the lead designer, proposed grade separating PCH with the Alameda Corridor railroad tracks.

Project Responsibilities: Bruce was the senior project engineer responsible for identify refinery and associated facility impacts, produce a mitigation plan, and provide an estimated cost to maintain Equilon’s Los Angeles Refinery mitigation plan for PCH’s (SR 1) grade separation project during the planning phase. Project: 17th Street Plans, Specifications, and Estimates Project Location: Costa Mesa, CA, United States Project #: 655428 Client: City of Costa Mesa Project Role: Quality Assurance Engineer Start Date, End Date: 1/1999-12/1999

Project Description: The project involved widening 17th Street, within the right-of-way, where it crosses Newport Boulevard.

Project Responsibilities: Bruce was responsible for the legal descriptions and plates associated with the required right-of-way acquisition to widen 17th Street. Project: Milpas Street/SR 101 Roundabout Interchange, Phase 2 Project Location: Santa Barbara, CA, United States Project #: 641806 Client: City of Santa Barbara Project Role: Senior Project Engineer Start Date, End Date: 1/1998-12/1999

Project Description: The City of Santa Barbara, the lead agency, in conjunction with the Santa Barbara Counties Associated Governments and Caltrans, District 5, proposed improvements to the five-legged, at-grade intersection along Milpas Street at SR 101. The improvements required the at-grade intersection be reconfigured to a

Page 21: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 21

roundabout and reconfiguration of the northbound SR 101 off-ramp to properly enter the proposed roundabout at Milpas Street. The City of Santa Barbara administered the design contract; the Santa Barbara Counties Associated Governments administered the construction contract; and Caltrans, District 5, served as the oversight agency for all aspects within the state right-of-way.

Project Responsibilities: Bruce was responsible for the realignment and he prepared the project plan, profile, and superelevation diagram for the northbound SR 101 off-ramp. He also prepared Mandatory and Advisory Fact Sheets in accordance to Caltrans’ standards. Project: Anaheim Street Grade Separation Project Location: Long Beach, CA, United States Project #: 669626 Client: Port of Long Beach (POLB) Project Role: Project Engineer Start Date, End Date: 3/1993-3/1999

Project Description: The Port of Long Beach, the lead agency, in conjunction with the City of Los Angeles and Caltrans District 7, proposed to grade separate Anaheim Street with the existing Southern Pacific (SP) railroad tracks, with much of the project residing within the city of Los Angeles. The project was approved through the City of Los Angeles’ “B” Permit process and included close coordination with the City of Los Angeles’ Bureau of Engineering; Department of Transportation; Bureau of Street Lighting; Department of Water and Power; the City of Long Beach; SP Transportation Company; Union Pacific Railroad; and more than 25 utility companies, including the City of Los Angeles’ Department of Water and Power for overhead distribution, temporary street lighting, and fuel; Southern California Edison Company for overhead transmission and distribution; and Southern California Gas Company for high-pressure transmission and distribution. The project required permitting with Caltrans, District 7, for improvements under the Terminal Island Freeway (State Route 103). Permits were also required from the POLB and cities of Los Angeles and Long Beach.

Project Responsibilities: Bruce was responsible for the design phase of the Project Concept Report and Caltrans Project Study Report/Project Report, as well as initial PS&Es for the SP overpass. His specific tasks included utilities design and construction phasing and overall coordination of utility companies' designs and agency permit processing. Bruce served as liaison between the construction manager and utility companies’ design and construction staff for construction issues pertaining to all design disciplines on this complex construction phasing project. He was also responsible for resolving the construction manager’s and contractor's inquiries pertaining to utility construction issues and scheduling. Bruce resolved other civil-related disciplines due to changes in design, construction issues methods, and changed field conditions and provided clarification of plans and specifications. Project: Palmdale Multimodal Transportation Center Project Location: Palmdale, CA, United States Project #: 642099

Page 22: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 22

Client: City of Palmdale Project Role: Senior Project Engineer Start Date, End Date: 1/1998-12/1998

Project Description: The project involved preparing a feasibility study for the Palmdale Multimodal Transportation Center Facility.

Project Responsibilities: Bruce was responsible for the roadway planning element, which included establishing preliminary roadway alignments and plans, quantities, and cost estimates. Project: US Route 395/North McCarran Interchange, Freeway Design Task 2 Project Location: Las Vegas, NV, United States Project #: 642274 Client: Nevada Department of Transportation (NDOT) Project Role: Quality Assurance Engineer Start Date, End Date: 1/1998-12/1998

Project Description: The project involved highway and roadway improvements, including right-of-way acquisition, at the US Route 395/North McCarran Boulevard Interchange.

Project Responsibilities: Bruce provided quality assurance review of the project plans and right-of-way maps. Project: Earthquake Retrofit Nos. 119, 129, 718 and 719 Project Location: Orange County, CA, United States Project #: 660797 Client: California Department of Transportation (Caltrans) Project Role: Inspection Engineer Start Date, End Date: 1/1997-12/1997

Project Description: The project involved construction management and engineering, inspection, and contract administration services for statewide seismic retrofit construction projects, including the Santa Monica Viaduct (Hoover to Oak and Freeway 110 Southbound Distributor) and Route 5 (Valley View to Hoover). The Santa Monica Viaduct seismic retrofit (EA 07-119174) involved the construction of various link beams, pipe seat extenders, hinge diaphragm bolsters, in-fill walls, and abutment catcher blocks; modifying existing cable restrainers; and column casing. The Route 5 seismic retrofit (EA 07-123804) consisted of nine bridges with various retrofit constructions, including in-fill walls, abutment catcher blocks, shear keys, footing overlay, adding steel piles, and column casing.

Project Responsibilities: Bruce served as bridge representative for the construction project encompassing the seismic retrofit of eight bridges on Route 5. His responsibilities included documentation of construction activities, enforcement of plans and specifications requirements, resolution of contract change orders and design conflicts, and progress pay estimates. Project: San Joaquin Hills Transportation Corridor, Toll Road, Phase 2, Design Project Location: Costa Mesa, CA, United States Project #: 660139 Client: California Corridor Constructors Project Role: Project Engineer

Page 23: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 23

Start Date, End Date: 4/1993-10/1997

Project Description: The project involved the final design and preparation of plans, specifications, and cost estimates for a new $1.1 billion, 19-mile, six-lane toll road extending from I-5 to the vicinity of the I-405/Route 55 interchange in Orange County, which included 11 interchanges; 76 bridges and wildlife crossings; environmental mitigation; and landscaping. This six-lane, divided road extended SR 73 from Route 5 at San Juan Capistrano to John Wayne Airport. Parsons was responsible for all design efforts associated with the major design-build contract, which included highway design, design of cross streets and collector distributor roads, traffic signalization, design of multiple bridge structures, maintenance of traffic plans, drainage facilities, and related improvements. The project required the mapping and appraisal of more than 125 individual parcels prior to the start of construction. More than 300 environmental mitigation measures were incorporated into the project.

Project Responsibilities: Bruce prepared highway plans for the new toll road. Caltrans, District 12, provided oversight of the design-build project in accordance to its design standards. Other agencies’ design approvals included the County of Orange; cities of San Juan Capistrano, Mission Viejo, Laguna Niguel, Alisio Viejo, Newport Beach, and Irvine; the Orange County Fire Authority; and various water districts and utility companies throughout Orange County. He designed more than 450,000 sq. ft. of retaining walls and supervised design engineers on highway work, including horizontal and vertical alignments, grading, and drainage. Bruce performed quality assurance tasks on check prints and calculations and assisted the manager of utilities design with overall coordination of subconsultants' and utility agencies' designs and processed Caltrans' Encroachment Permits. He also prepared and processed an “Exception Request to Utility Relocation” through Caltrans’ Office of Project Planning and Design and District Office of Right of Way. Project: Santa Barbara Engineering Services Project Location: Santa Barbara, CA, United States Project #: 660627 Client: City of Santa Barbara Project Role: Project Engineer Start Date, End Date: 1/1996-12/1996

Project Description: The city of Santa Barbara was declared a federal disaster area as a result of the devastating January and March 1995 storms. Under this declaration, the city was eligible to seek disaster recovery funding assistance from the Federal Emergency Management Agency, through the State Office of Emergency Services, and the Federal Highway Administration, through the California Department of Transportation, for a feasibility study and cost estimate to repair Mountain Drive from El Cielito Road to approximately two miles east of the city limits. The feasibility study addressed pavement replacement and/or reconstruction, culvert replacement and inlet and outlet repairs, stabilization of slide areas, erosion control, retaining wall construction, and potential right-of-way encroachment. The study addressed limits and the magnitude of repairs and improvements and provided additional measures

Page 24: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 24

above and beyond the pre-existing storm damage repair to mitigate severe damage from future storms.

Project Responsibilities: Bruce performed site reconnaissance and prepared the preliminary design, feasibility study, and cost estimate.

Page 25: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 25

PROJECT EXPERIENCE

UMA ENGINEERING, INC. Irvine, CA, United States February 1990 – February 1993 (3 years 1 month) Project Engineer / Manager Project: State Route 55 Widening Location: Orange County, CA, United States Client: Orange County Transportation Agency (OCTA) / Caltrans, District 12 Project Role: Project Engineer Start Date, End Date: 1990-1993

Project Description: The project involved widening State Route 55 from 17th Street to State Route 22. Caltrans, District 12, performed oversight of design and construction, and the OCTA administered the design and construction contracts.

Project Responsibilities: Bruce prepared the preliminary on-site and off-site hydrology and hydraulic reports, preliminary drainage maps, and cost estimates. Project: State Route 60 Westbound Off-Ramp Widening and Azusa Avenue Rehabilitation Location: Industry, CA, United States Client: City of Industry Project Role: Project Manager Start Date, End Date: 1990-1993

Project Description: The project involved widening State Route 60 westbound off-ramp, replacing the Azusa Avenue roadway section with concrete pavement, and traffic control. The work included horizontal and vertical alignments, hydrology, hydraulics, drainage, signing, striping, street lighting, overhead sign structure, traffic control, and right-of-way documents. Coordination was required for the Construction Scheduling Permit of State Route 60 westbound off-ramp with Caltrans, District 7; County of Los Angeles; and City of Industry.

Project Responsibilities: Bruce prepared the plans, specifications, and cost estimates. Project: Passing Lane Study Location: San Diego and San Bernardino Counties, CA, United States Client: Caltrans, District 11 Project Role: Project Engineer Start Date, End Date: 1990-1993

Project Description: The project involved passing lane locations along eight, two-lane highways within Caltrans’ District 11 jurisdiction. The work included data collection, model input and output data analyses, mapping physical constraints, and determining and prioritizing passing lane opportunities and turnouts. Preliminary Study Reports were prepared for State Routes 76, 78, 79, 94, 98, 111, 115, and U.S. Highway 95.

Page 26: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 26

Project Responsibilities: Bruce prepared the Preliminary Study Reports. Project: Lake Forest Drive Intersections Location: Lake Forest, CA, United States Client: Orange County Environmental Management Agency (OCEMA) Project Role: Project Manager Start Date, End Date: 1990-1993

Project Description: The project involved widening streets at four major intersections along Lake Forest Drive. The Lake Forest Drive intersection cross streets were Rockfield Boulevard, Muirlands Avenue, Jeronimo Road, and Trabuco Road. The work included horizontal and vertical alignments, storm drain, drainage, retaining walls, off-site improvements for the adjacent properties, signing, striping, utility relocation, street lighting, traffic control, right-of-way and construction easement documents, and plates. Right-of-way acquisitions and construction easements were required from more than 50 parcels. The project required permitting with Caltrans, District 12, and coordination with the design of the Interstate 5/Interstate 405 interchange improvement project. OCEMA administered the design and construction contracts.

Project Responsibilities: Bruce prepared the plans, specifications, and cost estimates. Project: Foothill Transportation Corridor (State Route 241) Location: Orange County, CA, United States Client: Transportation Corridor Agency (TCA) / Caltrans, District 12 Project Role: Project Engineer Start Date, End Date: 1990-1993

Project Description: The project involved construction of the Avenida de las Banderas interchange and a section (one-mile) of the Foothill Transportation Corridor (State Route 241). The project work included horizontal and vertical alignments, signing, and striping. The plans, specifications, and cost estimate were prepared in accordance with Caltrans’ District 12 design standards. Caltrans provided oversight of the design and TCA administered the design and construction contract.

Project Responsibilities: Bruce prepared the plans, specifications, and cost estimates. Project: Gale Avenue Widening Location: Industry, CA, United States Client: City of Industry Project Role: Project Manager Start Date, End Date: 1990-1993

Project Description: The project involved street widening, which included horizontal and vertical alignments, hydrology, hydraulics, drainage, signing, striping, utility relocation, street lighting, traffic control, right-of-way documents, and plates. The project required permitting with Caltrans, District 7, and coordination with the City of Industry. The City administered the design and construction contracts.

Page 27: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 27

Project Responsibilities: Bruce prepared the plans, specifications, and cost estimates. Project: Chet Holifield Parking Facilities Location: Laguna Niguel, CA, United States Client: Orange County Environmental Management Agency (OCEMA) Project Role: Project Engineer Start Date, End Date: 1990-1993

Project Description: The project involved the reconfiguration of parking facilities due to the realignment of Alicia Parkway. The work included planter reconstruction, asphalt and concrete construction, utility and parking lot light relocation, striping, and asphalt rehabilitation. The project required permitting with the federal government’s General Service Agency. OCEMA administered the design and construction contracts.

Project Responsibilities: Bruce prepared concept and construction plans and the specifications, and cost estimates. Project: Sand Canyon Avenue Bike Trail Location: Irvine, CA, United States Client: City of Irvine Project Role: Project Manager Start Date, End Date: 1990-1993

Project Description: The project involved construction of a bike trail and bridge widening. The project work, which required permitting with the California Department of Fish and Game, included horizontal and vertical alignments, bridge construction, signing, striping, utility relocation, street lighting, traffic control, and construction management.

Project Responsibilities: Bruce prepared concept and construction plans and the specifications, and cost estimates. Project: South Coast Plaza Parking Lot Location: Costa Mesa, CA, United States Client: Segerstrom Development Company Project Role: Project Manager Start Date, End Date: 1990-1993

Project Description: The project involved parking lot improvements. The project work, which required permitting with the City of Costa Mesa, included reconstruction of the parking lot and drainage facilities due to street widening.

Project Responsibilities: Bruce prepared the plans and cost estimates. Project: Chino Town Center Location: Chino, CA, United States Client: Private Developer Project Role: Project Engineer Start Date, End Date: 1990-1993

Project Description: The project involved development of a commercial site. The project work, which required permitting with the City of Chino, included site layout, grading, drainage, street

Page 28: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 28

improvements, utility hook-ups, striping, and traffic control.

Project Responsibilities: Bruce prepared the plans and cost estimates. Project: Town Center Parking Lot Location: Costa Mesa, CA, United States Client: Segerstrom Development Company Project Role: Project Engineer Start Date, End Date: 1990-1993

Project Description: The project involved a parking lot reconfiguration. The work, which required permitting with the City of Costa Mesa, included planter reconstruction, asphalt and concrete construction, utility and parking lot light relocation and toll facilities, and asphalt rehabilitation.

Project Responsibilities: Bruce prepared the plans and cost estimates. Project: Mesa North Shopping Center Location: Costa Mesa, CA, United States Client: Segerstrom Development Company Project Role: Project Manager Start Date, End Date: 1990-1993

Project Description: The project involved ascertaining parking lot layout alternatives and required coordination with the City of Costa Mesa.

Project Responsibilities: Bruce prepared the plans and cost estimates. Project: Pico/Los Molinos Storm Drain Location: San Clemente, CA, United States Client: City of San Clemente Project Role: Project Engineer Start Date, End Date: 1990-1993

Project Description: The project involved installing storm drain systems, and the project work included horizontal and vertical alignments, hydrology, hydraulics, and resurfacing at the intersection.

Project Responsibilities: Bruce prepared the plans and cost estimates. Project: Firehall No. 19 Sewer Improvements Location: Orange County, CA, United States Client: County of Orange Project Role: Project Engineer Start Date, End Date: 1990-1993

Project Description: The project involved installing a sewer line, and the project work included replacing a septic tank and seepage pit with a domestic sewer line and horizontal and vertical alignments.

Project Responsibilities: Bruce prepared the plans and cost estimates. Project: Santa Ana Stadium Site Revisions Location: Santa Ana, CA, United States

Page 29: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 29

Client: City of Santa Ana Project Role: Project Engineer Start Date, End Date: 1990-1993

Project Description: The project involved revising grades and drainage around the stadium.

Project Responsibilities: Bruce prepared the plans and cost estimates. Project: Darby Storm Drain Location: Los Angeles County, CA, United States Client: County of Los Angeles Project Role: Project Engineer Start Date, End Date: 1990-1993

Project Description: The project involved installing storm drain systems, and the project work included horizontal and vertical alignments, hydrology, hydraulics, and resurfacing at two intersections.

Project Responsibilities: Bruce prepared the plans and cost estimates.

Page 30: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 30

PROJECT EXPERIENCE

ASL CONSULTING ENGINEERS Irvine, CA, United States July 1987 – February 1990 (2 years 8 months) Assistant Project Engineer Project: Alton Parkway and Interstate 5 Northbound On-Ramp Widening Location: Irvine, CA, United States Client: City of Irvine / Caltrans, District 12 Project Role: Assistant Project Engineer Start Date, End Date: 1987-1990

Project Description: The project involved widening Alton Parkway and the Interstate 5 northbound on-ramp. The work included horizontal and vertical alignments, hydrology, hydraulics, storm drain, signing, striping, utility relocation, overhead sign structure, street lighting, traffic control, and right-of-way documents and plates. Due to construction of the Interstate 5 widening project, coordination between Caltrans, District 12; City of Irvine; Irvine Ranch Water District; The Irvine Company; and various utility companies was required for permit processing and construction scheduling.

Project Responsibilities: Bruce prepared the plans, specifications, and cost estimates. Project: Garden Grove Civic Center Improvements Location: Garden Grove, CA, United States Client: City of Garden Grove Project Role: Assistant Project Engineer Start Date, End Date: 1987-1990

Project Description: The project involved street improvements, and the project work included major street widening, realignment, reconstruction, pavement rehabilitation, parking lot restoration, grading, storm drain, decorative crosswalks and sidewalk landings, median and landscape improvements, street lighting, retaining walls, utility relocation, signing, striping, right-of-way acquisition, construction phasing, and traffic control.

Project Responsibilities: Bruce prepared the plans, specifications, and cost estimates. Project: MacArthur Boulevard Widening Location: Irvine, CA, United States Client: City of Irvine Project Role: Design Engineer Start Date, End Date: 1987-1990

Project Description: The project involved MacArthur Boulevard widening, which was the major access road to the Orange County (John Wayne) Airport. The project work included widening the Interstate 405 overcrossing, signing, striping, and preliminary right-of-way requirements. Coordination was required with the Orange County Transportation Authority; Caltrans, District 12; County of Orange; City of Irvine; and City of Newport Beach.

Page 31: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 31

Project Responsibilities: Bruce prepared the plans, specifications, and cost estimates. Project: Downtown Streetscape Location: Manhattan Beach, CA, United States Client: City of Manhattan Beach Project Role: Design Engineer Start Date, End Date: 1987-1990

Project Description: The project involved street improvements, and the project work included street widening, reconstruction, pavement rehabilitation, parking stall reconfiguration, grading, storm drain, decorative crosswalks and sidewalk landings, street lighting, utility relocation, signing, striping, construction phasing, and traffic control.

Project Responsibilities: Bruce prepared the plans, cost estimates, and "as-built" plans. Project: Pacific Coast Highway (State Route 1), Phase II Location: Newport Beach, CA, United States Client: City of Newport Beach Project Role: Design Engineer Start Date, End Date: 1987-1990

Project Description: The project involved a major street widening (1.6 miles) and reconstruction of the eastbound travel lanes (3.6 miles). The project work included horizontal and vertical alignments, drainage, mechanically stabilized earth wall design, signing, striping, utility relocation, street lighting, and traffic control. Permitting was required with Caltrans, District 12, and coordination with the City of Newport Beach.

Project Responsibilities: Bruce prepared the plans and cost estimates. Project: Pariso Drive/Montanoso Drive Sewer Manhole Location: Mission Viejo, CA, United States Client: Orange County Sanitation District Project Role: Assistant Project Engineer Start Date, End Date: 1987-1990

Project Description: The project involved installing a sewer line, and the project work included horizontal and vertical alignments and traffic control.

Project Responsibilities: Bruce prepared the plans for the sewer line. Project: Irvine Regional Park Sewer Study and Featherly Regional Park Sewer Study Location: Orange County, CA, United States Client: Orange County Sanitation District Project Role: Assistant Project Engineer Start Date, End Date: 1987-1990

Project Description: The project entailed determining problems with the existing on-site sewer system, providing alternatives for on-site and off-site sewer systems, cost estimates for each alternative, and recommending an alternative for each park.

Page 32: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 32

Project Responsibilities: Bruce prepared the preliminary and final study reports. Project: Whites Canyon Roadway Design Location: Los Angeles County, CA, United States Client: County of Los Angeles Project Role: Assistant Project Engineer Start Date, End Date: 1987-1990

Project Description: The project involved construction of a new roadway, and the project work included checking horizontal alignment of the roadway and bridge, grading for bridge construction phasing, and drainage near bridge abutment.

Project Responsibilities: Bruce prepared the plans for the new roadway. Project: Jamboree Road Widening Location: Newport Beach, CA, United States Client: City of Newport Beach Project Role: Assistant Project Engineer Start Date, End Date: 1987-1990

Project Description: The project involved a street widening, and the project work included horizontal and vertical alignments, drainage, hydraulics, storm drain, energy dissipaters, grading for canyon, signing, striping, utility relocation, street lighting, traffic control, and right-of-way and utility easement documents and plates.

Project Responsibilities: Bruce prepared the plans, specifications, and cost estimates. Project: Mariner's Mile Storm Drain and Riverside Storm Drain Location: Newport Beach, CA, United States Client: City of Newport Beach Project Role: Design Engineer Start Date, End Date: 1987-1990

Project Description: The project involved installing storm drain systems, and the project work included horizontal and vertical alignments, hydraulics, and traffic control.

Project Responsibilities: Bruce prepared the plans and cost estimates. Project: Marriott Residence Inn (Main at MacArthur) and Marriott Residence Inn (Redhill at Gillette) Location: Irvine, CA, United States Client: Marriott Development Company Project Role: Design Engineer Start Date, End Date: 1987-1990

Project Description: The project involved construction of a Marriott Residence Inn in two separate locations. The project work included site layout, grading, street improvements, utility hook-ups, striping, and traffic control.

Project Responsibilities: Bruce prepared the plans, specifications, and cost estimates.

Page 33: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 33

Project: Thousand Oaks Financial Plaza Location: Thousand Oaks, CA, United States Client: Private Developer Project Role: Design Engineer Start Date, End Date: 1987-1990

Project Description: The project involved construction of a 26-acre master-planned business and professional complex. The project work included site layout, grading, drainage, and street improvements.

Project Responsibilities: Bruce prepared the plans for the business and professional complex. Project: Senior Inn Location: Thousand Oaks, CA, United States Client: Private Developer Project Role: Design Engineer Start Date, End Date: 1987-1990

Project Description: The project involved construction of a 150-room commercial senior hotel. The project work included site layout, grading, drainage, and street improvements.

Project Responsibilities: Bruce prepared the plans for the commercial senior hotel. Project: AM/PM Mini Market Location: Los Angeles, CA, United States Client: Private Developer Project Role: Design Engineer Start Date, End Date: 1987-1990

Project Description: The project involved construction of a mini-market, and the project work included site layout, grading, drainage, and street improvements, and striping.

Project Responsibilities: Bruce prepared the plans and cost estimates. Project: Bent Avenue/Boardwalk Avenue Location: San Marcos, CA, United States Client: City of San Marcos Project Role: Design Engineer Start Date, End Date: 1987-1990

Project Description: The project involved conducting a hydrology study, which included horizontal and vertical alignments of storm drain and waterlines, hydraulics, utility relocation, and traffic control.

Project Responsibilities: Bruce prepared the hydrology map and plans. Project: Del Obispo Storm Drain Location: San Juan Capistrano, CA, United States Client: City of San Juan Capistrano Project Role: Design Engineer Start Date, End Date: 1987-1990

Project Description: The project involved installing storm drain systems, and the project work included horizontal and vertical alignments, hydrology, hydraulics, and traffic control.

Page 34: 2014-11-28b BAT_TAFOYA_Bruce_Updated_Resume

4698 W. Stuart Avenue BRUCE ANTHONY TAFOYA Fresno, California 93722 CA Professional Engineer, Civil No. 46868 (626) 278-3378 Principal Transportation Project Manager [email protected] / Senior Project Manager

Page: 34

Project Responsibilities: Bruce prepared the plans and cost estimates.