2016 - 1st Qtr

Date post: 03-Jan-2017
Category:
Upload: vokhue
View: 242 times
Download: 4 times
Share this document with a friend
43
4 – Outstanding - Meeting the success indicators 3 – Very Satisfactory - 90% to 99% of the success indicators 2 – Satisfactory - 80% to 89% of OFFICE PERFORMANCE COMMITMENT AND REVIEW (OPCR) Regional Office No.7 I, EXEQUIEL R. SARCAUGA of DOLE RO7 , commit to deliver and agree to be rated on the attainment of the following targets in accordance with the indicated measures for the period January to December, 2016. MAJOR FINAL OUTPUT (MFO) SUCCESS INDICATORS (Targets + Measures) ALLOTTE D BUDGET DIVISION/S ACCOUNTABLE ACTUAL ACCOMPLISHMENTS SELF- RATING VALIDATE D RATING REMARKS (for validatio n) (1) (2) (3) (4) (5) (6) (7) (8) CORE INDICATORS MFO 2: Employment Facilitation and Capacity Building Services (376,190,000.00 +SRP 1,845,000.00) Special Program for Employment of Students (SPES) (19,219) youth-beneficiaries assisted TSSD-EW, FOs 0 youth beneficiaries were assisted under SPES 80% of SPES Education Vouchers (EVs) issued within three (3) days upon receipt by ROs of terminal report with all the complete documents necessary for payment TSSD-EW, FOs, IMSD For completion 5% - 10% increase in number of SPES babies (using 2015 baseline) TSSD-EW, FOs For completion 100% of SPES babies in FY 2015 profiled and submitted to BLE by TSSD-EW, FOs For completion 1 Republic of the Philippines DEPARTMENT OF LABOR AND EMPLOYMENT Intramuros, Manila FM-DOLE-PS-01.01 Revision No. 00 Date Issued: 10 Dec AS OF MARCH 2016 RATING
Transcript

4 – Outstanding - Meeting the success indicators3 – Very Satisfactory - 90% to 99% of the success indicators2 – Satisfactory - 80% to 89% of the success indicators1 – Unsatisfactory - 79% or below the success indicators

OFFICE PERFORMANCE COMMITMENT AND REVIEW (OPCR) Regional Office No.7

I, EXEQUIEL R. SARCAUGA of DOLE RO7, commit to deliver and agree to be rated on the attainment of the following targets in accordance with the indicated measures for the period January to December, 2016.

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)CORE INDICATORSMFO 2: Employment Facilitation and Capacity Building Services (376,190,000.00 +SRP 1,845,000.00)Special Program for Employment of Students (SPES)

(19,219) youth-beneficiaries assisted TSSD-EW, FOs0 youth beneficiaries were assisted under SPES

80% of SPES Education Vouchers (EVs) issued within three (3) days upon receipt by ROs of terminal report with all the complete documents necessary for payment

TSSD-EW, FOs, IMSD

For completion

5% - 10% increase in number of SPES babies (using 2015 baseline) TSSD-EW, FOs For completion

100% of SPES babies in FY 2015 profiled and submitted to BLE by the end of December 2016 TSSD-EW, FOs For completion

Oriented the LGUs of the conduct of SPES Impact Evaluation in coordination with BLE, ILS and Innovations for Poverty Action (IPA) from January to March 2016 (for ROs-NCR, 3, 6, 7 and 11)

TSSD-EW, FOs

2 Conducted of SPES Impact on the following dates: Feb. 19,2016- Hotel Azia, Cebu CityFeb. 26,2016-Dumaguete City

70% of surveyed beneficiaries rated services as satisfactory or better (include actual figures on the number of surveyed beneficiaries)

TSSD-EW, FOs

96.75% or 149 of 154 surveyed beneficiaries rated services satisfactory or better

Utilized 100% of funds allocated for SPES TSSD-EW, FOs, IMSD For completion

1

Republic of the PhilippinesDEPARTMENT OF LABOR AND EMPLOYMENT

Intramuros, Manila

FM-DOLE-PS-01.01Revision No. 00

Date Issued: 10 Dec 2014

AS OF MARCH 2016

RATING

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)Government Internship Program (GIP) (368 ) youth-beneficiaries assisted TSSD-EW, FOs,

IMSD675 youth beneficiaries were assisted under GIP

70% of surveyed beneficiaries rated services as satisfactory or better

TSSD-EW, FOs, IMSD

100% or 550 of 550 surveyed beneficiaries rated services satisfactory or better

Monitored the employment of GIP beneficiaries after the Program (FY 2015 baseline)

TSSD-EW, FOs, IMSD

For completion

JobStart (600) youth beneficiaries provided with JobStart services TSSD-EW, FOs For Completion

70% of surveyed clients (beneficiaries and employers) rated services as satisfactory or better (2016 GAA indicator / commitment)

TSSD-EW, FOs

95% or 95 of 100 surveyed beneficiaries rated services satisfactory or better

70% placement rate TSSD-EW, FOs For completion

Utilized 100% of budget allocation for JobStart TSSD-EW, FOs, IMSD

For completion

Public Employment Service (PES) ( 120,915 ) qualified jobseekers referred for placement TSSD-EW, FOs

62,051 referred qualified jobseekers (51.32%)

( 2) capability-building trainings on employment facilitation services (e.g. CGEC, LMI, Referral and Placement) and/or related trainings conducted for PESO personnelo (160) participants trained

TSSD-EW, FOs

1 Capability –Building Training conducted by TSSD-EWW last Feb.10-12,2016 at Alona Kwe Beach Resort ,Panglao Island with 85 participants trained

70% of surveyed jobseekers rated services provided as satisfactory or better

TSSD-EW, FOs, IMSD

100% or 341 of 341 surveyed beneficiaries rated services satisfactory or better( ARTA)

National Jobs Fairs (Independence Day, Labor Day)

100% of applicants registered during the conduct of Job Fairs TSSD-EW, FOs For completion

20% of qualified applicants hired-on-the-spot (HOTS) TSSD-EW, FOs For completion Assessment report on placement submitted within 30

days for local employment, and 90 days for overseas TSSD-EW, FOsFor completion

2

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)employment after the conduct of Jobs Fair

Local Jobs Fairs Annual calendar of Job Fairs (indicating date, venue, employers, and vacancies) posted at the RO website and Phil-JobNet website by 1ST Quarter

TSSD-EW, FOs21 local @ 1 overseas job fairs conducted

Calendar of Job Fairs updated quarterly TSSD-EW, FOs 22 job fairs conducted for first quarter

Labor Market Information ( 235,000) individuals reached TSSD-EW, FOs

100,829 individual reached ( 42.91% of annual target)

(2,200) institutions reached TSSD-EW, FOs

559 institutions reached ( 25.41% of annual target)

70% of surveyed individuals rated services as satisfactory or better

TSSD-EW, FOs, IMSD

96.81% or 213 of 220 surveyed beneficiaries rates services satisfactory or better

Regional Industry Consultation on Updating of JobsFit LMI Report / HRD Roadmapping 2016-2022 conducted by end of June 2016o Submission of JobsFit Regional Report / HRD

Roadmap by end of July 2016

TSSD-EW, FOs

For completion

Conducted an orientation for RDCs and ITCs on the 2016-2022 Philippine Employment Projection by end of February 2016

TSSD-EW, FOs

Conducted RTIPC Executive Board Consultation Meeting of LEP 2016-2022- Nov. 25, 2015Participated in PLEP 2016-2022 Visayas-Wide Consultative (LEP)Feb. 17-18,2016 @ Iloilo City

Developed regional employment situationer by end of March 2016 TSSD-EW, FOs

For completion

Job Displacement Monitoring System (JDMS)

Submitted to BLE monthly Job Displacement Monitoring System (JDMS) report 15 working days after the reference month

IMSD Date of SubmissionJanuary – Feb. 5,2016February- March 2,2016

3

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)

PhilJobNet and Skills Registry System (SRS)

(39) LGUs covered in 6th wave of NSRP implementationTSSD-EW, FOs

For Completion

in coordination with PESO

Quarterly Monitoring Reports on NSRP submitted to BLE within a week after the reference quarter TSSD-EW, FOs

For Completion

Regional validation exercise at the PESO level conductedo Submission of regional post-activity reports as a

result of the conduct of NSRP Regional Lessons Learned Workshop (i.e., “regional validation exercise”) by end of August 2016

TSSD-EW, FOs

For Completion

Career Guidance Advocacy Program (CGAP)

(342) Capacity-building activities conducted covering at least 50% of the total number of 2015 member-ship of Networks of Career Guidance Advocates of the Philippines (NCGAPs) in the region.

TSSD-EW, FOs

1 CGC networks covered involving 25 members

( 85) Career Guidance and Employment Coaching (CGEC) Activities conducted in at least 10% of the total number of public education and training institutions (public high schools, TESDA Training Institutions and State Universities and Colleges) in the region

TSSD-EW, FOs

39 CG advocacies conducted covering 77 S/C/U,11,612 participants;100 employment coaching conducted covering 33,931 job applicants

DOLE Integrated Livelihood and Emergency Employment Program (DILEEP)

DILP: (21,778) beneficiaries provided with livelihood assistanceo Individual: (actual accomplishments ) o Group: (actual accomplishments )

TSSD-EW, FOs, IMSD

8,230 individual beneficiaries provided with livelihood involving 96 groups undertakings

Conducted the following interventions to the 20 livelihood projects to be assisted towards transitioning to sustainable enterprise by end of December 2016 following the Sustainable Livelihood Frameworko conducted training on Business and Work

Improvement Course (BWIC) for the beneficiaries

TSSD-EW, FOs, IMSD

For Completion

4

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8) Percentage of beneficiaries provided with livelihood

formation assistance with continued employment and income after 6 months of availment.

TSSD-EW, FOs, IMSD

For completion

100% of approved formation projects provided with social preparation trainings

TSSD-EW, FOs, IMSD

For completion

Submission of inventory of formation/enhancement/restoration projects/beneficiaries with complete profile

TSSD-EW, FOs, IMSD

For completion

70% of surveyed beneficiaries rated the services as satisfactory or better TSSD-EW, FOs,

IMSD

98.54 % or 338 of 343 surveyed beneficiaries rates services satisfactory or better

Utilized 100% of funds allocated for DILEEP (DILP) TSSD-EW, FOs, IMSD

For completion

DOLE Adjustment Measures Program (DOLE-AMP) K-to-12 Program – BLE

100% of affected workers who sought assistance provided services within 10 working dayso No. of beneficiaries assisted: (actual accomplishment)

TSSD-EW, FOs, IMSD

For Completion

Productivity Toolbox for MSMEs in KEGs

750 MSMEs per RBs assisted

RTWPB

74 MSMEs provided with training services2 MSMEs provided with technical assistance ( Hercules Transport Jhade Transport)175 MSMEs provided with orientations

(1) 220 MSMEs provided with training services(2) 50 MSMEs provided with technical assistance on

designing/formulation of productivity/ performance-based incentives scheme

(3) 480 MSMEs provided with orientation(s)

90% of participants who rated training services as satisfactory or better

o with at least 60% of training participants accomplished/submitted the training evaluation

RTWPB

RTWPB

91.4% or 212 of 232 surveyed beneficiaries rated services satisfactory or better

5

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)Two Tiered Wage System

Tier 1: Wage order issued in accordance with RA 6727 and NWPC guidelines, rules and regulations, as necessary

Tier 2:(1) Wage advisory issued in accordance with NWPC

guidelines, rules and regulations, as necessary(2) 5 MSMEs with productivity / performance-based

incentives scheme documented(3) 5 MSMEs with productivity / performance-based

incentives scheme awarded.

RTWPB

For Completion

MFO 3: Labor Force Welfare Services 10,623,000.00Tripartism (18) Regional/Provincial/Municipal or City TIPCs and

ITCs in Key Employment Generators (KEGs) strengthened thru:(1) Inclusivity of membership(2) Increase in membership(3) Output driven such as adoption of Resolution /

Position Papers(4) ITCs capacitated to become partners in labor

education, dispute prevention, among others

TSSD-LRS, FOs

6 activities conducted to strengthen ITCs on going –regular meetings @ GMMs

70% of surveyed members of the industry to which the RTIPC regulars are connected who rated the services as satisfactory or better TSSD-LRS, FOs

70% or 84 of 120 surveyed beneficiaries rates services satisfactory or better

Industry Self-Regulation through Voluntary Codes of Good Practices

(4) VCGPs in ITCs in KEGs enhanced:(1) Aligned with the criteria on standard VCGPs(2) 100% of VCGP Action Plans implemented TSSD-LRS, FOs

3 activities conducted to enhanced VCGPs in ITCs

Workers Organization and Development (WODP) Program

(6) training grants provided to unions and workers’ organizationso ( 100) number of union members / workers’

association members trained

TSSD-LRS, FOs, IMSD For completion

(4) individuals provided with scholarship grants( continuing)

TSSD-LRS, FOs, IMSD

(Continuing )4 individuals provided

6

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)with scholarships:BFO – Abegail Kate Varquez (Bohol Light Inc. Employee’s Union)CPFO – Robe Leunice S. Natad (Ilaw at BuklodngManggagawasa Atlas Fertilizer CorporationNOFO – Jon Michael Calimpong (ALU)TCFO – Nelvin S. Calamba (HJR International Employees Union – Tupas)

100% of applications for trainings and scholarships grants processed within one day upon receipt of complete requirements

TSSD-LRS, FOs, IMSD Training or completion

70% of surveyed beneficiaries rated the services as satisfactory or better

TSSD-LRS, FOs, IMSD For completion

Labor and Employment Education Services

10% of target establishments to be covered by LLCS in 2016 provided with labor education seminars benefitting (666) workers and employer representatives (note: absolute figures should be provided in reporting accomplishments)

TSSD-LRS, FOs

1,130 establishments provided with labor education seminars by LLCS

70% of surveyed beneficiaries rated the seminars conducted as satisfactory or better

TSSD-LRS, FOs, IMSD

100% or 341 of 341 surveyed beneficiaries rated services satisfactory or better( ARTA)

Child Labor Prevention and Elimination Program (CLPEP)

( 16) Low-Hanging (LH) barangays certified as Child Labor-Free TSSD-EW, FOs

For completion

(20) Continuing barangays upgraded to low-hanging (C-LH) barangays TSSD-EW, FOs

For completion

(9) New-Frontiers barangays upgraded to Continuing (NF-C) barangays

TSSD-EW, FOs 2- Barangays Barangay Mayabon,Zamboanguita-NOFO

7

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)Barangay Toong -CPFO

70% of surveyed beneficiaries rated the services as satisfactory or better

TSSD-EW, FOs, IMSD

100% or 341 of 341 surveyed beneficiaries rated services satisfactory or better( ARTA)

Social Amelioration Program (SAP)(in regions where applicable)

SAP Lien Collection and Remittance Monitoringo 100% of SAP lien due monitored as collected and

remitted (current crop year)o Analysis report on Sugar Production and Withdrawal

Lien Collection and Remittance submitted to BWSC within 15 days after end of reference month

TSSD-EW, FOs, IMSD

For completion

SAP Fund Utilizationo Monthly Cash-In Bank Register submitted to BWSC

within 15 days after the end of the reference month

TSSD-EW, FOs, IMSD

For completion

CBF Distribution Monitoringo 50% of current crop year monitored as distributedo 80% of the previous crop year monitored as

distributedo 95% of the prior crop years monitored as distributedo Report on the implementation of Cash Bonus

distribution program submitted to BWSC within 15 days after end of reference quarter

TSSD-EW, FOs, IMSD

For completion

Maternity Benefit Program Monitoringo 100% of claims filed with complete documents

processed within 10 working days from receipt of documents

o 100% of processed and approved claims ready for payment within 5 working days after processing

o Monthly report on maternity benefits submitted to BWSC within 15 working days after end of reference month

TSSD-EW, FOs, IMSD

10 maternity claims were processed and approved amouting to Php 20,000

Death Benefit Program Monitoringo 100% of claims filed with complete documents

processed within 10 working days from receipt of documents

o 100% of processed and approved claims ready for

TSSD-EW, FOs, IMSD

41 Death claims were processed and approved amouting to Php 287,000

8

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)payment within 5 working days after processing

o Monthly report on death benefits claims submitted to BWSC within 15 working days after end of reference month

70% of surveyed beneficiaries rated the services as satisfactory or better TSSD-EW, FOs,

IMSD

90.90% or 50 of 55 surveyed beneficiaries rated services satisfactory or better

Utilized 100% of funds allocated for SAP TSSD-EW, FOs, IMSD

For completion

Family Welfare Program (152) establishments reached through DOLE initiated

FWP-related services/activities

o (30,400) workers served, including those initiated by LLCOs

TSSD-EW, FOs

14 establishments served or 9.21% of the annual target( 6,212 with 200 or more workers@ 214 with less than 200 workers )-6,426 workers served

70% of surveyed beneficiaries rated the services as satisfactory or better TSSD-EW, FOs,

IMSD

94.6% or 339 of 360 surveyed beneficiaries rated services satisfactory or better

DILEEP (TUPAD) (20,380) beneficiaries assisted TSSD-EW, FOs, IMSD

364 beneficiaries assisted TCFO

DOLE Adjustment Measures Program (DOLE-AMP) – BWSC

100% of affected workers who sought assistance provided services within 10 working dayso No. of beneficiaries assisted: (actual

accomplishment)

TSSD-EW, FOs, IMSD

For completion

70% of surveyed beneficiaries rated the services as satisfactory or better

TSSD-EW, FOs, IMSD

100% or 341 of 341 surveyed beneficiaries rated services satisfactory or better( ARTA)

NRCO Reintegration Services

(70)Balik Pinay! Balik Hanapbuhay! &(42) 10K Livelihood Assistance (LDAP) ( 112) OFW returnees provided with livelihood

(formation) assistance by the end of December 2016 NRCO, IMSDFor completion

At least 10% of the beneficiaries provided with livelihood NRCO, IMSD For completion

9

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)formation assistance sustained operation after six months of availment by end of 2016

70% of surveyed beneficiaries rated the services provided as satisfactory or better NRCO, IMSD

For completion

100% of proposals under Balik Pinay! Balik Hanapbuhay! approved and starter Kits released within 15 days from completion of training NRCO, IMSD

For completion

100% of LDAP proposals approved and kits released within 45 days upon receipt of complete documents NRCO, IMSD

For completion

Utilized 100% of budget allocation for BPBH and LDAP

NRCO, IMSD

For completion

(70) Financial Awareness Seminar (FAS) and (42) Small Business Management Training (SBMT) (112) OFW returnees/families provided with FAS and

SBMT services by end of December 2016 NRCO, IMSDFor completion

70% of surveyed beneficiaries rated the services provided as satisfactory or better NRCO, IMSD

For completion

Byaheng Agri-preneur Conduct learning journey with at least 30 OFW returnees

and/ or families as participants in each region by end of December 2016. NRCO, IMSD

For completion

Sa Pinas, Ikaw ang Ma’am/Sir 100% of application forms preliminarily screened and

endorsed to NRCO Central Office within 7 days upon receipt of complete documents. NRCO, IMSD

For completion

Reintegration Network Strengthening

Published at least four (4) Quarterly Issues of Regional Reintegration Information Bulletin

NRCO, IMSD For completion

10

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)

Conducted at least one (1) group activity related to OFW return and reintegration NRCO, IMSD

For completion

Finalized and firmed up directory of Reintegration Network and the services provide NRCO, IMSD

For completion

Reporting

Submitted monthly performance report to NRCO on its (NRCO) Livelihood Programs not later than 5th day of the succeeding month. NRCO, IMSD

For completion

MFO 4: Employment Regulation Services 14,447.00Labor Laws Compliance System

(6,662) establishments covered by LLCS as reflected in the LLCS-MIS by end of November 2016(1) 100% of (variable) registered Contractors /

Subcontractors(2) 100% of (125) Philippine Registered Domestic Ships

assessed by end of June 2016(3) 100% of (10) POEA registered recruitment and

manning agencies(4) 100% of (208) ongoing construction projects / sites

with approved CSHP are assessed(5) 100% of In-House OSH Assessment conducted and

submitted by accredited OSH Practitioner

TSSD-LRS, FOs

TSSD-LRS, FOs

1,130 establishments covered(1.) 8 registered

Contractors’/subcontractors

(2.) For completion(3.) For completion(4).365 construction projects/site with approved CSHPFor completion(5.)For completion

100% of establishments with expired COCs monitored submission of compliance report TSSD-LRS, FOs For completion

73% Compliance Rate achievedTSSD-LRS, FOs

LS -35%GLS-44.5%

100% of establishments with deficiencies provided assistance leading to compliance

TSSD-LRS, FOs 95.39% or 1,078 of 1,130 establishments with deficiencies provided

11

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)assistance leading to compliance

100% of assessments conducted synced into the System (LLCS-MIS) within 72 hours after the conduct of assessment TSSD-LRS, FOs

100% or 1,130 or 1,130of assessments conducted synced into the System (LLCS-MIS)

100% of (2,702) 2015-assessed establishments with deficiencies with status report submitted by end of June 2016

TSSD-LRS, FOsFor completion

OSH Investigation(1) 100% of incidents/ reports acted upon within 24

hours upon receipt of information of: imminent danger/ dangerous occurrence/disabling injury/plain view

(2) Work Stoppage Orders Issued within 24 hours to 100% of establishments where disabling injury occurred/imminent danger exists

TSSD-LRS, FOs

100% of incidents/reports acted upon within 24 hours upon receipt of information of imminent danger/dangerous occurrence/disabling injury/plain view6 Work Stoppage Orders Issued

Incentivizing Compliance Program (ICP)(1) ICP 1ST Level (TCCLS and CLFE) TSSD-LRS, FOs For completiono (4) establishments issued with TCCLSo (4 ) establishments issued with CLFE(2) ICP 2ND Level (Secretary’s Award)o At least 2 ICP 1st level establishments

endorsed/nominated for the Secretary’s Award (2) destinations/ zones recommended as Labor Laws

Compliant Zone TSSD-LRS, FOsFor completion

Reporting Requirements:Monthly online detailed reports submitted to BWC every 5TH day after the end of the reference month; Monthly Detailed Reporting Forms:(1) Types of assistance rendered to establishments

assessed(2) Domestic Ships(3) Accreditation of Safety Practitioners(4) Construction Safety and Health Program

TSSD-LRS, FOs

(1.)For completion(2.)For Completion(3.)Jan.- Feb. 4,2016 Feb- March 11,2016(4.)For completion

12

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)(5) SpeED(6) DO 18-A(7) ICP(8) Cooperatives Engaged in Contracting /

Subcontracting

(5.) March- April 4,2016(6.) For completion(7.) For completion(8.) For completion

Compliance with 13th Month Pay Report to be submitted not later than 25th of January of the following year TSSD-LRS, FOs For Completion

Utilized 100% of budget allocation for LLCS For CompletionDispute Resolution

Single Entry Approach (SEnA)o 77% of the total request handled settled within 30 days

from date of filingo 100% of the total request handled disposed within 30

dayso 70% of surveyed clients rated services as satisfactory

or bettero Submitted to NCMB the monthly SEnA Database

every 27TH of the month:(1) Statistical Summary of SEnA RFAs(2) Report Listing of SEnA RFAs(3) Cumulative Report of SEnA RFAs

TSSD-LRS, FOs, MALSU

o 67.13% settlement rate as of March 2016 or (290/432)

o 82.41% disposition rate as of March 2016 or (356/ 432)

o 100% or 341 of 341 surveyed beneficiaries rated services satisfactory or better

(1.) For completion(2.) For completion(3.) For completion

SpeED Cases: Labor Standards and Arbitration Caseso 100% of handled med-arbitration cases disposed

within the prescribed period pursuant to D.O. 40-03o 100% of Labor Standards cases handled disposed

within 50 days reckoned from the date of the 1st Mandatory Conference

o implementation rates of:(1) certification election cases; and

TSSD-LRS, FOs, MALSU

TSSD-LRS, FOs,

o 6.8% disposition rate as of March 2016 or 194/2,841

o 50% or 2 of 4 handled med-arbitration cases disposed

o For completion(2) labor standards cases (*baseline : 2015) MALSU For completion

Efficient Service Delivery/Other Employment Regulation Services

100% of applications for permits, licenses, registration, certificates, and clearances with complete requirements processed within the PCT: TSSDs, FOs, IMSD

Completed

13

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)o Alien Employment Permit (AEP) – within 3 working

days upon filing of application TSSDs, FOs, IMSD

595 applications approved within 3 working days upon filing of application

o Private Employment Agency’s (PEA) license – within 10 days upon filing of application TSSDs, FOs, IMSD

1 (TCFO) Application processed within 10days upon filling of application

o Job Fair Clearance / Permit – within 5 working days upon filing of application TSSDs, FOs, IMSD

22 job fairs clearance/permit were processed and approved within 5working days

o Authority to Recruit – within 2 days upon filing of application TSSDs, FOs, IMSD

No Application

o Mechanical and Electrical Plans and Applications – within 15 days after receipt of complete requirements Permit to operate issued within 5 days upon

receipt of proof of payment of fees Certificate of electrical inspection issued within 5

days upon receipt of proof of payment of fees

TSSDs, FOs, IMSD

Not Applicable

o Construction Safety and Health Program – Simplified - within 5 days Comprehensive - within 5 days

TSSDs, FOs, IMSDFor completion

o Safety Practitioner’s Accreditation Processed within 15 days upon receipt of

complete documents Issued certificates of accreditation to 100% of

approved application within 5 days from the date of interview

TSSDs, FOs, IMSD

4 applications processed within the prescribed period

o DO-18-A Processed and approved/denied 100% of

applications for registration of contractors/ subcontractors within 3 days upon receipt of complete documents

Issued certificates of registration to 100% of approved applications upon payment of fees

TSSDs, FOs, IMSD

TSSDs, FOs, IMSD

Processed and approved /denied 100% or 8 applications for registration ofcontractors /subconstructors within 3days upon receipt of complete documentsIssued certificates or registration to 100% of

14

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)approved applications upon payment of fees.

o Working Child Permit Processed within eight (8) hours upon receipt of

paymentTSSDs, FOs, IMSD

No application

NON-CORE INDICATORS

SUPPORT TO OPERATIONSCommunication Program

Submitted a copy of approved Communication Program to LCO for January to December 2016 by 31 March 2016

IMSD, FOs, TSSDs Date submission:Feb 26,2016

Submitted to LCO at least three (3) good news at the end of the month IMSD, FOs, TSSDs 21 goodnews submitted

Developed/ disseminated at least four (4) press releases every month - one (1) for national media and three (3) for regional media

v IMSD, FOs, TSSDs36 press releases submitted

Attended to 100% of requests for TV appearance/radio guesting IMSD, FOs, TSSDs 100% accommodation

for TV/Radio guesting Conducted press briefings at least once a month

IMSD, FOs, TSSDs3 press briefing conducted

At least 2 AVPs on success stories of programs submitted to the LCO/Program Manager not later than May 31, 2016 for the 1st semester and October 31, 2016 for the 2nd semester

IMSD, FOs, TSSDs For completion

Statistical Performance Reporting System

Submitted online monthly Statistical Performance Reporting System not later than 5TH day following the reference month

IMSD, FOs, TSSDs For completion

Validated the monthly performance report of Field Offices not later than the 7TH day following the reference month

IMSD, FOs, TSSDs Date of Submission:January – Feb 2- emailed/JRS feb.4February – March 3- emailed/march 7,2016 via JRSMarch- April 2 emailed via JRS April 5,2016

Gender and Development (GAD)

At least 5% of total budget utilized for GAD activities TSSD-EW,IMSD For Completion

15

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8) Submitted to BWSC the 2018 GAD Plan and Budget

(GPB) by end of October 2016TSSD-EW,IMSD For Completion

Submitted to PS GAD 2016 1ST Semester Accomplishment Report on or before 10 July 2016

TSSD-EW,IMSD For Completion

Submitted to PS the 2016 GAD Annual Report not later than 5 January 2017

TSSD-EW,IMSD For Completion

Implementation of Quality Management System (QMS) aligned with International Organization for Standardization (ISO) standards or continuing ISO certification of Process/es and system/s

Sustained and/or expanded ISO Certification and submitted reports to FMS not later than the 15th day of the month after the reference quarter on the following:On Sustaining ISO Certification: Complied 100% with the internal and external/

surveillance audits findings and recommendations based on set timelines

On Expanding ISO Certification: Enrolled/documented additional work processes; or Included additional units/field offices/branches in the

coverage of QMS

IMSD,TSSDs,

MALSU,FOs

For completion

Citizens Charter/Anti-Red Tape Act (ARTA)

Achieved at least 85% client satisfaction rate on Quality of Services and Quality of Facilities

MALSU,IMSD 100% or 341 of 341 surveyed beneficiaries rated services satisfactory or better( ARTA)

Acted upon 100% of client satisfaction feedback / complaints / recommendations within 5 working days upon receipt

MALSU,IMSD No complaints

GENERAL ADMINISTRATION AND SUPPORT SERVICES (GASS) 9,097,000.00Integrity Development Program

Submitted to the LS not earlier than the 1st day or later than the 5th day of the month after the end of the reference quarter, completely and correctly filled-up prescribed forms on the latest status of complaints and cases (administrative, civil and criminal), against the officials and employees of the office filed or pending

MALSU,IMSD For completion

16

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)before the DOLE offices, regular courts and other quasi-judicial bodies

Submitted 100% of SALN to HRDS not later than 15 April 2016

IMSD For completion

Strategic Performance Management System`

Submitted to PS the 2016 OPCR within 10 days from receipt of the approved 2016 Core (for ROs) and Non-Core (all agencies) indicators for endorsement to the Secretary thru the Cluster Head

IMSD Date submission:Submitted via email last march 4,2016 Via JRS March 7,2016

Submitted to PS 2016 annual OPCR accomplishments with self-ratings not later than 5 January 2017

IMSD For completion

Submitted to PS through the PS DPX Homepage 2016 quarterly OPCR accomplishments with cumulative data within 5 days after the reference quarter

IMSD First Quarter: April 4,2016

Submitted to HRDS summary of IPCR ratings within 30 calendar days upon receipt of approved OPCR ratings (covers accomplishment in the previous year)

IMSD For completion

Financial Management Funds Utilization

17

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)Utilized the allotted funds to wit:

1st quarter: 16 %2nd quarter: 26 %3rd quarter: 21 %4th quarter: 21%

*Obligation Rate = Obligation Allotment *16% is allocated for cost-efficiency/saving measures

IMSDFor completion

Utilized the allotted funds to wit:1st quarter: 20 %2nd quarter: 30 %3rd quarter: 25 %4th quarter: 25 %

*Obligation Rate = Obligation Allotment

IMSD For completion

Utilized 100% of the Notice of Cash Allocation (NCA)

*Disbursement Rate = NCA Utilized NCA Received

IMSD For completion

Contributed to cost-saving/efficiency measures by at least 4 % per quarter on the following MOOE items with quarterly report submitted to FMS not later than the 15TH day of the month after the reference quarter:(1) Traveling Expenses(2) Communication Expenses(3) Repairs and Maintenance Expenses(4) Transportation and Delivery Expenses(5) Supplies and Materials Expenses(6) Utility Expenses

Submitted the following Budget Preparation (BP) Forms to FMS 5th day prior to the schedule of submission to DBM:

1.BP Form C- Summary of RDC inputs and

IMSD

IMSD

For completion

For completion

1. For completion

18

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)recommendations on Agency New and Expanded Program and Projects2.BP Form D- Report of CSO’s inputs on Ongoing and New Spending Projects and Activities3.BP Form 100- Statement of Revenues4. BP Form 100-A-Statement of Revenues and Expenditures –Special Account in the General fund( if applicable)5.BP- Form 100-B-Statement of Other Receipts/ Expenditures ( if Applicable)6.BP Form 100-C-Statement of Donations and Grants ( if applicable)7.BP Form 200- Comparison of Appropriations and Obligations8.BP Form 201- Summary of Obligations and Proposed Programs /Projects9.BP Form 201-A-obligations for Personnel Services (PS)10. BP Form 201 A-1 –Multi-year requirements for FY 2017 TIER 2 Proposals- Obligations for PS11. BP Form 201 B-Obligations for Maintenance and Other Operating Expenses ( MOOE)12.BP Form 201 B-1 –Multi-year Requirements for FY 2017 TIER 2 Proposals –MOOE13. BP Form 201 C-Obligations for financial Expenses (FINEX)14.BP Form 201-C1- Multi- year Requirements for FY 2017 TIER 2 Proposals –FINEX15.BP Form 201- D- Obligations for Capital Outlays (CO)16. BP Form 201 D- 1- Multi- year Requirements for FY 2017 TIER 2 Proposals- CO17.BP Form 201-E- Program Expenditure Plan18. BP Form 201-F- Climate Change Expenditure19. BP Form 202-Profile and Requirements of Locally –Funded Projects20. BP Forms 300- Proposed Special Provisions ( if applicable)

IMSD

2. For completion

3. Feb. 3,2016

4. For completion

5. For completion

6. For completion

7. For completion

8.February 2016

9. February 2016

10. For completion

11. February 2016

12.For Completion

13.Not Applicable

14. Not Applicable

15. February 2016

16.For completion

17. For completion

18. For completion

19.For completion

20 Not Applicable

19

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)

Funds Accountability Submitted the monthly Statement of Appropriations,

Allotment, Obligations, and Balances (SAAOB) report to FMS using the FAR no. 1 template not later than the 10th day after the reference month

IMSD April 5,2016

Submitted monthly flash performance monitoring report on obligation and disbursement rates, by appropriations source and allotment class to FMS not later than the 7th day after the reference month

IMSD April 5,2016

Submitted monthly report of actual income to FMS not later than the 5th day of the month following the reference month

IMSD Jan.- Feb.4,2016Feb. – March 6,2016March- April 5,2016

Financial Accountability of Selected Accounts

Submitted quarterly report on the status of the following accounts to IAS not later than the 15th day of the month following the reference quarter:(1) Due from LGUs(2) Due from NGOs/POs(3) Due from NGAs(4) Due from GOCCs

IMSD For completion

Liquidated/settled cash advances within the prescribed IMSD For completion

20

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)

period and submitted the following accounts to IAS every 15th day of the month following the reference quarter:(1) Due from Officers and Employees(2) Advances to Officers and Employees(3) Advances for Operating Expenses (if applicable)(4) Advances to Special Disbursing Officers (if

applicable)(5) Advances for Payroll IMSD

Submitted quarterly Report of Collections/ Settlement of Loan Receivables (Account 126) by at least 50% to IAS including the requests for write-off with complete documentation submitted to IAS every 15th day of the month following the reference quarter

IMSD For completion

Compliance to COA Observations

Submitted quarterly Report of Actions Taken on 100% Compliance to COA Recommendations to IAS every 5th day of the month following the reference quarter (March, June, September and December)

IMSD For completion

Submitted quarterly reports to IAS every 5th day of the month following the reference quarter(1) 100% Settlement of Suspensions within the

prescribed period (within 90 days)(2) Appeal on Notices of Disallowance submitted to

COA within the prescribed period (within 6 months)

IMSD For completion

HRD Interventions Recruitment and Selection Issued appointments to 80% of vacant positions as of

31 August 2016 by end of November 2016 and submitted to HRDS report on filling-up of vacancies on 09 December 2016 with Certification on validation/invalidation of appointments by CSC

IMSD For completion

Complied 100% with recruitment and selection process and documentary requirements as provided in the ESPS (for appointments processed at the ROs, Bureaus, and Services and for those referred to the HRDS for appointment by the Secretary)

IMSD For completion

Capacity Building of Staff Trained/provided training opportunities to 80% of staff

by end of the year and submitted report to HRDS on the IMSD For completion

21

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)trainings (grouped into: prescribed and optional trainings) attended by staff within 7th day of the month following the reference quarter

Submitted to HRDS monitoring/progress report on the interventions provided to Management Succession Program (MSP) beneficiaries end of May and November 2016

IMSD For completion

Green Our DOLE Program (GODP)

100% accomplishment of GODP Plan 2016 containing activities that contribute to cost efficiency

IMSD February 5,2016

Transparency Seal Compliance

100% compliance with Transparency Seal requirements in accordance with 2016 General Appropriations Act (GAA), IATF Memorandum Circular 2015-1, and other Joint Circulars and Memorandum Circulars that may be issued by agencies in authority:

IMSD For completion

General Appropriations Act 2016(1) Agency’s mandates and functions, names of its

officials with their position and designation, and contact information

IMSD For completion

(2) Approved budgets and corresponding targets immediately upon approval of 2016 GAA

IMSD For completion

(3) Realignment made pursuant to the general and special provisions in GAA 2016

IMSD For completion

(4) Annual Procurement plan/s and contracts awarded with the winning supplier, contractor or consultant

IMSD For completion

(5) Major programs and projects categorized in accordance with the five key results areas under E.O. No. 43, s. 2011 and their target beneficiaries

IMSD For completion

(6) Status of implementation, evaluation and/or assessment reports of said programs or projects

IMSD For completion

(7) Budget and Financial Accountability Reports, pursuant to COA and DBM J.C. No. 2014-1 dated July 1, 2014

IMSD For completion

(8) Annual Reports on the status of income authorized by law to be retained and/or used and be deposited outside of the National Treasury, which shall include

IMSD For completion

22

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)

the legal basis for its retention and/or use, the beginning balance, income collected and its sources, expenditures, and ending balance for the preceding fiscal year

IATF MC 2015-1 dated 12 August 2015

(9) System of Ranking Delivery Units and IndividualsIMSD For completion

(10) Quality Management System Certified by international certifying body or Agency Operations Manual

IMSD For completion

Additional Transparency Seal(11) Status of Cases (if applicable), as required under

Administrative Order No. 340, s. 2013:a) Pending Casesb) Released Decisionc) Cases with Entry Judgment

IMSD For completion

(12) Net Worth of Officials, as required under CSC Republic Act No. 6713

IMSD For completion

(13) COA Annual Audit Report IMSD For completion

Property, Plant and Equipment Monitoring

Submitted to AS the Report on Actual Physical Count of Property, Plant and Equipment (RPCPPE) for CY 2016 in soft copy (excel spreadsheet file) to [email protected] after completion of physical stock taking and the accomplished printed copy of the RPCPPE not later than last working day of February

IMSD

Total Overall Rating:

Final Average Rating:

Adjectival Rating:

23

MAJOR FINAL OUTPUT

(MFO)SUCCESS INDICATORS

(Targets + Measures)ALLOTTEDBUDGET

DIVISION/SACCOUNTABLE

ACTUAL ACCOMPLISHMENTS

SELF-RATING

VALIDATED RATING

REMARKS(for validation)

(1) (2) (3) (4) (5) (6) (7) (8)

24

25

Endorsed by: Validated by: Recommended by:

EXEQUIEL R.SARCAUGA,CESO IV

Date

March 4,

2016

REBECCA C. CHATOUNDERSECRETARY

Date Date

CIRIACO A.LAGUNDAZ III,CESO IIUNDERSECRETARY

Date

Regional Director Chairperson-DOLE PMT DOLE Validation Team Cluster Head

Approved by:COMMENTS/OBSERVATIONS:

ROSALINDA DIMAPILIS-BALDOZ Secretary Date


Recommended