+ All Categories
Home > Documents >  · 2017-06-06 · (c) RCC Bridge No. 411 on Sopa Jhargaon Road (Physical = 1%) (5)PERFORMANCE...

 · 2017-06-06 · (c) RCC Bridge No. 411 on Sopa Jhargaon Road (Physical = 1%) (5)PERFORMANCE...

Date post: 16-May-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
5
Transcript
Page 1:  · 2017-06-06 · (c) RCC Bridge No. 411 on Sopa Jhargaon Road (Physical = 1%) (5)PERFORMANCE BASED MAINTENANCE CONTRACT The PWD (Road) Deptt. has taken up 114 roads which included
Page 2:  · 2017-06-06 · (c) RCC Bridge No. 411 on Sopa Jhargaon Road (Physical = 1%) (5)PERFORMANCE BASED MAINTENANCE CONTRACT The PWD (Road) Deptt. has taken up 114 roads which included
Page 3:  · 2017-06-06 · (c) RCC Bridge No. 411 on Sopa Jhargaon Road (Physical = 1%) (5)PERFORMANCE BASED MAINTENANCE CONTRACT The PWD (Road) Deptt. has taken up 114 roads which included
Page 4:  · 2017-06-06 · (c) RCC Bridge No. 411 on Sopa Jhargaon Road (Physical = 1%) (5)PERFORMANCE BASED MAINTENANCE CONTRACT The PWD (Road) Deptt. has taken up 114 roads which included
Page 5:  · 2017-06-06 · (c) RCC Bridge No. 411 on Sopa Jhargaon Road (Physical = 1%) (5)PERFORMANCE BASED MAINTENANCE CONTRACT The PWD (Road) Deptt. has taken up 114 roads which included

Recommended