2017 Future Brood Document FinalABERDEEN SD 5(ABERDE
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
Planted
13Received 250
11Shipping 200
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: WYNOOCHEE R 22.0260
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 LK ABERDEEN HATCHERY 250 20.0 JUVENILE1301/2018Shipped 05/2018 LK ABERDEEN HATCHERY 200 18.0 JUVENILE1105/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 1Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalABERDEEN SD 5(ABERDE
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
1Planted 750
13Received 1,250
11Shipping 200
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: WYNOOCHEE R 22.0260
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 04/2018 LK ABERDEEN HATCHERY 1,000 EGGS EYED004/2018Received 01/2019 LK ABERDEEN HATCHERY 250 20.0 JUVENILE1301/2019Shipped 05/2019 LK ABERDEEN HATCHERY 200 18.0 JUVENILE1105/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
750 750.0 1 JUVENILE STEWART CR 22.019205/201805/2018
Page 2Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalAGATE PASS SEA PENS
COASTAL / PUGET SOUND / HOOD CANAL
SUQUAMISH TRIBE
Egg Take
27,000Planted 270,000
10,880Received 272,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: MINTER CR 15.0048
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 GORST CR REARING PND 272,000 25.0 JUVENILE10,88003/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
270,000 10.0 27,000 JUVENILE AGATE PASS SEA PENS AD06/201806/2018
Page 3Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalAGATE PASS SEA PENS
COASTAL / PUGET SOUND / HOOD CANAL
SUQUAMISH TRIBE
Egg Take
27,000Planted 270,000
10,880Received 272,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: MINTER CR 15.0048
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2019 GORST CR REARING PND 272,000 25.0 JUVENILE10,88003/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
270,000 10.0 27,000 JUVENILE AGATE PASS SEA PENS AD06/201906/2019
Page 4Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalALL SAINTS SCHOOL
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 VOIGHTS CR HATCHERY 250 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE CLARKS CR 10.002705/201805/2018
Page 5Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalBAKER LK HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
3,250Planted 65,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: BAKER R 03.0435
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
5,000 20.0 250 JUVENILE BAKER LK (WHAT) AD+PT06/201805/201855,000 20.0 2,750 JUVENILE BAKER R 03.0435 AD06/201805/20185,000 20.0 250 JUVENILE LK SHANNON (SKAG) AD+PT06/201805/2018
Page 6Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Release number to be determined by the Baker Committee and are goals.
2017 Future Brood Document FinalBAKER LK HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 240,000
4,050Planted 225,000
Received
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: BAKER R 03.0435
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 240,000
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
160,000 200.0 800 JUVENILE LK SHANNON (SKAG)06/201805/20185,000 20.0 250 JUVENILE BAKER LK (WHAT) AD+PT06/201905/201955,000 20.0 2,750 JUVENILE BAKER R 03.0435 AD06/201905/20195,000 20.0 250 JUVENILE LK SHANNON (SKAG) AD+PT06/201905/2019
Page 7Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Release number to be determined by the Baker Committee and are goals.
2017 Future Brood Document FinalBEAVER CR ACCL. POND
NORTH CENTRAL WASHINGTON
YAKAMA TRIBE
Egg Take
6,250Planted 100,000
4,478Received 103,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 WILLARD NFH 33,000 23.0 JUVENILE1,43503/2018Received 03/2018 OR- CASCADE HATCHERY 70,000 23.0 JUVENILE3,04304/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 16.0 6,250 JUVENILE WENATCHEE R 45.003006/201805/2018
Page 8Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalBEAVER CR ACCL. POND
NORTH CENTRAL WASHINGTON
YAKAMA TRIBE
Egg Take
6,250Planted 100,000
4,478Received 103,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2019 OR- CASCADE HATCHERY 70,000 23.0 JUVENILE3,04304/2019Received 03/2019 WILLARD NFH 33,000 23.0 JUVENILE1,43504/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 16.0 6,250 JUVENILE WENATCHEE R 45.003006/201905/2019
Page 9Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalBEAVER CR HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
Planted
Received
275Shipping 5,500
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type NStock: GRAYS R 25.0093
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 02/2018 WAHKIAKUM HS(CATHLAM 5,500 20.0 JUVENILE27503/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 10Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalBEAVER CR HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
Planted
0Received 8,000
275Shipping 5,500
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: GRAYS R 25.0093
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 GRAYS RIVER HATCHERY 8,000 EGGS GREEN001/2018Shipped 02/2019 WAHKIAKUM HS(CATHLAM 5,500 20.0 JUVENILE27503/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 11Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalBERNIE GOBIN HATCH
NORTH PUGET SOUND
TULALIP TRIBE
Egg Take
55,556Planted 1,000,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
750,000 18.0 41,667 JUVENILE TULALIP BAY AD+OT06/201806/201850,000 18.0 2,778 JUVENILE TULALIP BAY AD+OT06/201806/2018200,000 18.0 11,111 JUVENILE TULALIP BAY OT06/201806/2018
Page 12Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalBERNIE GOBIN HATCH
NORTH PUGET SOUND
TULALIP TRIBE
Egg Take
55,556Planted 1,000,000
0Received 1,600,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 10/2017 WALLACE R HATCHERY 1,600,000 EGGS GREEN010/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
200,000 18.0 11,111 JUVENILE TULALIP BAY OT06/201906/2019750,000 18.0 41,667 JUVENILE TULALIP BAY AD+OT06/201906/201950,000 18.0 2,778 JUVENILE TULALIP BAY AD+OT06/201906/2019
Page 13Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalBINGHAM CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
8,824Planted 150,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: LateStock: SATSOP R 22.0360
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
150,000 17.0 8,824 JUVENILE SATSOP R -EF 22.0360 AD05/201803/2018
Page 14Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalBINGHAM CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
8,824Planted 150,000
118Received 2,000
6,046Shipping 133,250
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: SATSOP R 22.0360
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 01/2018 ELMA FFA 2,000 25.0 JUVENILE8001/2018Shipped 01/2018 FRIENDS LANDING NP 26,250 22.0 JUVENILE1,19301/2018Shipped 01/2018 WESTPORT NET PENS 105,000 22.0 JUVENILE4,77301/2018Received 04/2018 ELMA FFA 2,000 17.0 JUVENILE11804/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
75,000 17.0 4,412 JUVENILE SATSOP R -EF 22.0360 AD05/201803/201875,000 17.0 4,412 JUVENILE SATSOP R -EF 22.036005/201803/2018
Page 15Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalBINGHAM CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 180,000
8,824Planted 150,000
Received
0Shipping 1,500
Total PoundsTotal #Brood Year: 2017Species: CohoRun: LateStock: SATSOP R 22.0360
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 180,000
Shipped 01/2018 LITTLEROCK ES 500 EGGS GREEN001/2018Shipped 01/2018 MARY M KNIGHT ES(ELM 250 EGGS EYED001/2018Shipped 01/2018 MONTESANO JHS HS 250 EGGS EYED001/2018Shipped 01/2018 OCEAN SHORES/CITY ES 500 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
150,000 17.0 8,824 JUVENILE SATSOP R -EF 22.0360 AD05/201903/2019
Page 16Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalBINGHAM CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 1,139,000
8,824Planted 150,000
118Received 2,000
11,048Shipping 634,550
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SATSOP R 22.0360
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 1,139,000
Shipped 01/2018 ELMA FFA 300 EGGS EYED001/2018Shipped 03/2018 ELMA FFA 1,000 500.0 JUVENILE203/2018Shipped 06/2018 SATSOP SPRINGS PONDS 500,000 100.0 JUVENILE5,00006/2018Shipped 01/2019 ELMA FFA 2,000 25.0 JUVENILE8001/2019Shipped 01/2019 FRIENDS LANDING NP 26,250 22.0 JUVENILE1,19301/2019Shipped 01/2019 WESTPORT NET PENS 105,000 22.0 JUVENILE4,77301/2019Received 04/2019 ELMA FFA 2,000 17.0 JUVENILE11804/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
75,000 17.0 4,412 JUVENILE SATSOP R -EF 22.0360 AD05/201903/201975,000 17.0 4,412 JUVENILE SATSOP R -EF 22.036005/201903/2019
Page 17Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalBOEING CR PROJECT
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
7Planted 10,000
0Received 10,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: ISSAQUAH CR 08.0178
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 ISSAQUAH HATCHERY 10,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
10,000 1,500.0 7 JUVENILE BOEING CR 08.001903/201803/2018
Page 18Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Remote Site Incubator Project.
2017 Future Brood Document FinalBROOK BAY PROJECT
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
150Planted 15,000
0Received 15,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: ISSAQUAH CR 08.0178
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 ISSAQUAH HATCHERY 15,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
15,000 100.0 150 JUVENILE LK WASHINGTON (KING)06/201806/2018
Page 19Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalBUTCHER POND
NORTH CENTRAL WASHINGTON
YAKAMA TRIBE
Egg Take
6,250Planted 100,000
4,652Received 107,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 WILLARD NFH 107,000 23.0 JUVENILE4,65203/2018Received 03/2018 OR- CASCADE HATCHERY 0 23.0 JUVENILE004/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 16.0 6,250 JUVENILE WENATCHEE R 45.003006/201805/2018
Page 20Tuesday, August 1, 2017
Memo: Mid‐Columbia Coho Restoration Project.
2017 Future Brood Document FinalBUTCHER POND
NORTH CENTRAL WASHINGTON
YAKAMA TRIBE
Egg Take
6,250Planted 100,000
4,565Received 105,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2019 WILLARD NFH 35,000 23.0 JUVENILE1,52203/2019Received 03/2019 OR- CASCADE HATCHERY 70,000 23.0 JUVENILE3,04304/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 16.0 6,250 JUVENILE WENATCHEE R 45.003006/201905/2019
Page 21Tuesday, August 1, 2017
Memo: Mid‐Columbia Coho Restoration Project.
2017 Future Brood Document FinalBUZZARD CR COOP
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
2,083Planted 25,000
1,000Received 25,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: WISHKAH R 22.0191
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 05/2017 MAYR BROTHERS REARIN 25,000 25.0 JUVENILE1,00006/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
25,000 12.0 2,083 JUVENILE CHEHALIS R 22.0190 AD04/201803/2018
Page 22Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Released into Buzzard Creek.
2017 Future Brood Document FinalBUZZARD CR COOP
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take 35,000
2,083Planted 25,000
1,000Received 25,000
0Shipping 35,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: WISHKAH R 22.0191
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 35,000
Shipped 11/2017 MAYR BROTHERS REARIN 35,000 EGGS GREEN011/2017Received 05/2018 MAYR BROTHERS REARIN 25,000 25.0 JUVENILE1,00006/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
25,000 12.0 2,083 JUVENILE CHEHALIS R 22.0190 AD04/201903/2019
Page 23Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Released into Buzzard Creek.
2017 Future Brood Document FinalBYRD CRK PROJECT
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
50Planted 25,000
0Received 25,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKOOKUMCHUCK 23.0761
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 SKOOKUMCHUCK HATCHERY 25,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
25,000 500.0 50 JUVENILE NEWAUKUM-NF T23.090902/201802/2018
Page 24Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalCAPE HORN SKYE ES
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: WASHOUGAL R 28.0159
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 WASHOUGAL HATCHERY 250 EGGS EYED003/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE WASHOUGAL R 28.015905/201805/2018
Page 25Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalCARLISLE LK PROJECT
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
2,941Planted 50,000
2,100Received 52,500
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: LateStock: SKOOKUMCHUCK 23.0761
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 SKOOKUMCHUCK HATCHERY 52,500 25.0 JUVENILE2,10001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 17.0 2,941 JUVENILE GHEER CR 23.0913 AD05/201805/2018
Page 26Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Part of Skookumchuck Mitigation Agreement.
2017 Future Brood Document FinalCARLISLE LK PROJECT
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
2,942Planted 50,000
2,100Received 52,500
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: SKOOKUMCHUCK 23.0761
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 SKOOKUMCHUCK HATCHERY 52,500 25.0 JUVENILE2,10001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
16,500 17.0 971 JUVENILE CARLISLE LK (LEWI) AD05/201803/201833,500 17.0 1,971 JUVENILE GHEER CR 23.0913 AD05/201803/2018
Page 27Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Part of Skookumchuck Mitigation Agreement.
2017 Future Brood Document FinalCARLISLE LK PROJECT
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
2,941Planted 50,000
2,100Received 52,500
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: LateStock: SKOOKUMCHUCK 23.0761
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2019 SKOOKUMCHUCK HATCHERY 52,500 25.0 JUVENILE2,10001/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 17.0 2,941 JUVENILE GHEER CR 23.0913 AD05/201905/2019
Page 28Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Part of Skookumchuck Mitigation Agreement.
2017 Future Brood Document FinalCARLISLE LK PROJECT
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
2,942Planted 50,000
2,100Received 52,500
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKOOKUMCHUCK 23.0761
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2019 SKOOKUMCHUCK HATCHERY 52,500 25.0 JUVENILE2,10001/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
16,500 17.0 971 JUVENILE CARLISLE LK (LEWI) AD05/201903/201933,500 17.0 1,971 JUVENILE GHEER CR 23.0913 AD05/201903/2019
Page 29Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Part of Skookumchuck Mitigation Agreement.
2017 Future Brood Document FinalCARNATION ES
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 250 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE HORSESHOE PD (SNOH)04/201804/2018
Page 30Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalCASTLE ROCK HS (CAST
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 75
0Received 100
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: COWLITZ R 26.0002
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 COWLITZ SALMON HATCHERY 100 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
75 500.0 0 JUVENILE DELAMETER CR 26.019204/201804/2018
Page 31Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalCEDAR SPRINGS CAMP
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
1Planted 475
0Received 500
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 500 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
475 500.0 1 JUVENILE STAR CR 07.015305/201805/2018
Page 32Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalCEDARCREST SCHL(MARY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 250 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE ALLEN CR 07.006804/201804/2018
Page 33Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalCENTRAL ES #2 (SEDRO
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKAGIT R 03.0176
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 MARBLEMOUNT HATCHERY 250 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE HANSEN CR 03.026705/201805/2018
Page 34Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalCHAIN LAKE ES(SNOHOM
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 250 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE WOODS CR 07.082604/201804/2018
Page 35Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalCHINOOK MS (LACEY)
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: LateStock: SKOOKUMCHUCK 23.0761
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 SKOOKUMCHUCK HATCHERY 250 EGGS EYED003/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE SKOOKUMCHUCK 23.076105/201805/2018
Page 36Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalCITY OF FEDERAL WAY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 VOIGHTS CR HATCHERY 250 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE HYLEBOS CR 10.000605/201805/2018
Page 37Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalCITY OF TUKWILA
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
53Planted 80,000
0Received 80,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: GREEN R NATIVE (9)
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 SOOS CREEK HATCHERY 80,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
60,000 1,500.0 40 JUVENILE RIVERTON CR 09.000303/201803/201820,000 1,500.0 13 JUVENILE SOUTHGATE CR 09?03/201803/2018
Page 38Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Some scatter planting of fry above the Remote Site Incubator will occur.
2017 Future Brood Document FinalCITY OF VANCOUVER
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: WASHOUGAL R 28.0159
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 WASHOUGAL HATCHERY 250 EGGS EYED003/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE SALMON CR 28.005905/201805/2018
Page 39Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalCLARK COUNTY PUD
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
31Planted 46,000
0Received 46,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: LEWIS R 27.0168
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 LEWIS RIVER HATCHERY 46,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
46,000 1,500.0 31 JUVENILE SALMON CR 28.005903/201803/2018
Page 40Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. McNab, Sorenson, Hoaa, Kinney, Roscoe, and Orander projects.
2017 Future Brood Document FinalCLARKS CRK HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
PUYALLUP TRIBE
Egg Take
145Planted 3,200
145Received 3,200
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 VOIGHTS CR HATCHERY 3,200 22.0 JUVENILE14502/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
3,200 22.0 145 JUVENILE DIRU CR 10.0029 AD04/201802/2018
Page 41Tuesday, August 1, 2017
Memo: To Calibrate screw trap.
2017 Future Brood Document FinalCLARKS CRK HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
PUYALLUP TRIBE
Egg Take
145Planted 3,200
145Received 3,200
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2019 VOIGHTS CR HATCHERY 3,200 22.0 JUVENILE14502/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
3,200 22.0 145 JUVENILE DIRU CR 10.0029 AD04/201902/2019
Page 42Tuesday, August 1, 2017
Memo: To Calibrate screw trap.
2017 Future Brood Document FinalCLEAR LAKE ES
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKAGIT R 03.0176
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 MARBLEMOUNT HATCHERY 250 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE CLEAR CR 03.109705/201805/2018
Page 43Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalCOLUMBIA SPRINGS COOP
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
8Planted 14,450
0Received 14,500
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: LEWIS R 27.0168
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 LEWIS RIVER HATCHERY 14,500 EGGS EYED001/2018
Page 44Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Eggs provided to approximately 50 school groups. Releases are grouped by site.
2017 Future Brood Document FinalCOLUMBIA SPRINGS COOP
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
8Planted 14,450
0Received 14,500
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: LEWIS R 27.0168
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
1,700 1,500.0 1 JUVENILE BURNT BRIDGE CR (28)04/201804/2018250 1,500.0 0 JUVENILE CAMPEN CR 28.027704/201804/2018250 1,500.0 0 JUVENILE CHELATCHIE-NF 27037304/201804/2018500 1,500.0 0 JUVENILE GIBBONS CR 28.027604/201804/2018250 1,500.0 0 JUVENILE LACAMAS CR 28.016004/201804/2018250 1,500.0 0 JUVENILE LEWIS R 27.016804/201804/2018250 1,500.0 0 JUVENILE LEWIS R TRIBS04/201804/2018250 1,500.0 0 JUVENILE MILL CR 29.016804/201804/2018500 1,500.0 0 JUVENILE MORGAN CR 28.009304/201804/2018250 1,500.0 0 JUVENILE ROCK CR 27.022204/201804/2018
9,250 1,500.0 6 JUVENILE SALMON CR 28.005904/201804/2018750 1,500.0 1 JUVENILE WASHOUGAL R 28.015904/201804/2018
Page 45Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Eggs provided to approximately 50 school groups. Releases are grouped by site.
2017 Future Brood Document FinalCONCORDIA LUTH SCHL
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 VOIGHTS CR HATCHERY 250 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE CLEAR CR 10.002205/201805/2018
Page 46Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalCONCRETE MS/HS(CONCR
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKAGIT R 03.0176
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 MARBLEMOUNT HATCHERY 250 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE SKAGIT R 03.017605/201805/2018
Page 47Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalCOULTER POND
NORTH CENTRAL WASHINGTON
YAKAMA TRIBE
Egg Take
0Planted 0
0Received 0
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 WILLARD NFH 0 23.0 JUVENILE004/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
0 16.0 0 JUVENILE WENATCHEE R 45.003006/201805/2018
Page 48Tuesday, August 1, 2017
Memo: Mid‐Columbia Coho Restoration Project. Pond not used in 2017, back online 2018
2017 Future Brood Document FinalCOULTER POND
NORTH CENTRAL WASHINGTON
YAKAMA TRIBE
Egg Take
3,750Planted 60,000
2,826Received 65,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2019 WILLARD NFH 65,000 23.0 JUVENILE2,82604/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
60,000 16.0 3,750 JUVENILE WENATCHEE R 45.003006/201905/2019
Page 49Tuesday, August 1, 2017
Memo: Mid‐Columbia Coho Restoration Project. Pond not used in 2017, back online 2018
2017 Future Brood Document FinalCOVENANT HS (PIER)
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: GREEN R NATIVE (9)
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 SOOS CREEK HATCHERY 250 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE BIG SOOS CR 09.007205/201805/2018
Page 50Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Former Friends of Ish school.
2017 Future Brood Document FinalCOWEEMAN JHS (KELSO)
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
1Planted 375
0Received 400
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: KALAMA R HATCH 27.0002
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 KALAMA FALLS HATCHERY 400 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
375 500.0 1 JUVENILE KALAMA R 27.000204/201804/2018
Page 51Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalCOWLITZ GAME ANGLERS
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
26Planted 40,000
0Received 40,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: COWLITZ R 26.0002
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 COWLITZ SALMON HATCHERY 40,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
10,000 1,500.0 7 JUVENILE ARKANSAS CR 26.018903/201803/201810,000 1,500.0 7 JUVENILE CAMPBELL CR 26.044303/201803/20185,000 1,500.0 3 JUVENILE COWLITZ R @ MAYFIELD03/201803/20185,000 1,500.0 3 JUVENILE COWLITZ R TRIBS03/201803/20185,000 1,500.0 3 JUVENILE HILL CR 26.042303/201803/20185,000 1,500.0 3 JUVENILE SALMON CR 26.047903/201803/2018
Page 52Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalCOWLITZ SALMON HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
80,000Planted 1,200,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type NStock: COWLITZ R 26.0002
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
1,200,000 15.0 80,000 JUVENILE COWLITZ R 26.0002 AD06/201804/2018
Page 53Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Release 5/1. Egg take for Cooperatives as late as possible.
2017 Future Brood Document FinalCOWLITZ SALMON HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
65,200Planted 978,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type NStock: COWLITZ R 26.0002
Integrated/Segregated: INTEGRATEDBrood Origin: WILD
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
978,000 15.0 65,200 JUVENILE COWLITZ R 26.0002 AD06/201804/2018
Page 54Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Release 5/1.
2017 Future Brood Document FinalCOWLITZ SALMON HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 1,734,014
80,000Planted 1,200,000
Received
10Shipping 271,600
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: COWLITZ R 26.0002
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 1,734,014
Shipped 01/2018 CASTLE ROCK HS (CAST 100 EGGS EYED001/2018Shipped 01/2018 COWLITZ GAME ANGLERS 40,000 EGGS EYED001/2018Shipped 01/2018 FRIENDS OF COWLITZ 230,000 EGGS EYED001/2018Shipped 01/2018 LONGVIEW SD 122 (LON 250 EGGS EYED001/2018Shipped 01/2018 MOSSYROCK ES(MOSSYRO 250 EGGS EYED001/2018Shipped 06/2018 KRAUS RYDERWOOD PROJ 1,000 100.0 JUVENILE1006/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
1,200,000 15.0 80,000 JUVENILE COWLITZ R 26.0002 AD06/201904/2019
Page 55Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Release 5/1. Egg take for Cooperatives as late as possible.
2017 Future Brood Document FinalCOWLITZ SALMON HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 1,259,851
65,200Planted 978,000
Received
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: COWLITZ R 26.0002
Integrated/Segregated: INTEGRATEDBrood Origin: WILD
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 1,259,851
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
978,000 15.0 65,200 JUVENILE COWLITZ R 26.0002 AD06/201904/2019
Page 56Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Release 5/1.
2017 Future Brood Document FinalCRYSTAL SPRINGS ES
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 250 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE SKYKOMISH R 07.001204/201804/2018
Page 57Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalDEEP CR 23.0957
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
60Planted 90,000
0Received 100,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKOOKUMCHUCK 23.0761
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 SKOOKUMCHUCK HATCHERY 100,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
45,000 1,500.0 30 JUVENILE GABLE CR 23.095903/201803/201845,000 1,500.0 30 JUVENILE TAPP CR 23.095803/201803/2018
Page 58Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalDEEP R NET PENS
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
36,666Planted 550,000
24,400Received 610,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type NStock: GRAYS R 25.0093
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 NORTH TOUTLE HATCHERY 225,000 25.0 JUVENILE9,00011/2017Received 11/2017 WASHOUGAL HATCHERY 385,000 25.0 JUVENILE15,40011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
200,000 15.0 13,333 JUVENILE DEEP R 25.0071 AD05/201805/201845,000 15.0 3,000 JUVENILE DEEP R 25.0071 AD05/201805/2018305,000 15.0 20,333 JUVENILE DEEP R 25.0071 AD05/201805/2018
Page 59Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalDEEP R NET PENS
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
16,667Planted 250,000
10,600Received 265,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: GRAYS R 25.0093
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2018 GRAYS RIVER HATCHERY 500,000 25.0 JUVENILE20,00011/2018Received 11/2018 WASHOUGAL HATCHERY 265,000 25.0 JUVENILE10,60011/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
405,000 15.0 27,000 JUVENILE DEEP R 25.0071 AD05/201904/201945,000 15.0 3,000 JUVENILE DEEP R 25.0071 AD05/201904/2019205,000 15.0 13,667 JUVENILE DEEP R 25.0071 AD05/201905/201945,000 15.0 3,000 JUVENILE DEEP R 25.0071 AD05/201905/2019
Page 60Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Lower Net Pens. Possible Lewis Stock.
2017 Future Brood Document FinalDOBBS CR PROJECT
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
3Planted 5,000
0Received 5,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: MINTER CR 15.0048
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 MINTER CR HATCHERY 5,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
5,000 1,500.0 3 JUVENILE DOBBS CR 13.000504/201804/2018
Page 61Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Remote Site Incubator Project.
2017 Future Brood Document FinalDOVE POND PROJECT
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
29Planted 1,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: GROVERS CR 15.0299
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
1,000 35.0 29 JUVENILE DOGFISH CR 15.0285 AD12/201712/2017
Page 62Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Project limited to 6 years beginning with BY 2008.
2017 Future Brood Document FinalDOVE POND PROJECT
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
29Planted 1,000
5Received 1,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: GROVERS CR 15.0299
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 04/2018 GROVERS CR HATCHERY 1,000 200.0 JUVENILE504/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
1,000 35.0 29 JUVENILE DOGFISH CR 15.0285 AD12/201812/2018
Page 63Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Project limited to 6 years beginning with BY 2008.
2017 Future Brood Document FinalDUNGENESS HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
29,412Planted 500,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: DUNGENESS HATCHERY
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
500,000 17.0 29,412 JUVENILE DUNGENESS R 18.0018 AD06/201805/2018
Page 64Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Fry plant into restored stream in partnership with NOSC. Yearling release on May 15th.
2017 Future Brood Document FinalDUNGENESS HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 550,000
29,422Planted 502,000
Received
0Shipping 7,500
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: DUNGENESS HATCHERY
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 550,000
Shipped 12/2017 HURD CR HATCHERY 7,500 EGGS GREEN012/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
2,000 200.0 10 JUVENILE COOPER CR 18.001706/201805/2018500,000 17.0 29,412 JUVENILE DUNGENESS R 18.0018 AD06/201905/2019
Page 65Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Fry plant into restored stream in partnership with NOSC. Yearling release on May 15th.
2017 Future Brood Document FinalDUNGENESS R AUDUBON
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: DUNGENESS HATCHERY
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 HURD CR HATCHERY 250 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE DUNGENESS R 18.001805/201805/2018
Page 66Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalEASTSIDE CATHOLIC HS
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 80
0Received 100
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: ISSAQUAH CR 08.0178
Integrated/Segregated: INTEGRATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 ISSAQUAH HATCHERY 100 EGGS EYED0
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
80 500.0 0 JUVENILE ISSAQUAH CR 08.017805/2018
Page 67Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalEDMONDS ES (EDMONDS)
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 250 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE SHELL CR 08.000904/201804/2018
Page 68Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalEDUCKET CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
MAKAH TRIBE
Egg Take
2,667Planted 40,000
2,222Received 40,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: TSOO‐YESS R 20.0015
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 MAKAH NFH ON TSOO-YESS R 40,000 18.0 JUVENILE2,22203/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
40,000 15.0 2,667 JUVENILE EDUCKET CR 20.0010 AD04/201804/2018
Page 69Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalEDUCKET CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
MAKAH TRIBE
Egg Take
2,667Planted 40,000
2,222Received 40,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: TSOO‐YESS R 20.0015
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2019 MAKAH NFH ON TSOO-YESS R 40,000 18.0 JUVENILE2,22203/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
40,000 15.0 2,667 JUVENILE EDUCKET CR 20.0010 AD04/201904/2019
Page 70Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalEIGHT CK/UPR CHEHALI
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
6,667Planted 100,000
4,200Received 105,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: LateStock: SKOOKUMCHUCK 23.0761
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 SKOOKUMCHUCK HATCHERY 105,000 25.0 JUVENILE4,20001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 15.0 6,667 JUVENILE EIGHT CR 23.1117 AD05/201804/2018
Page 71Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Part of Skookumchuck Mitigation Agreement.
2017 Future Brood Document FinalEIGHT CK/UPR CHEHALI
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
6,667Planted 100,000
4,200Received 105,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: LateStock: SKOOKUMCHUCK 23.0761
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2019 SKOOKUMCHUCK HATCHERY 105,000 25.0 JUVENILE4,20001/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 15.0 6,667 JUVENILE EIGHT CR 23.1117 AD05/201904/2019
Page 72Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Part of Skookumchuck Mitigation Agreement.
2017 Future Brood Document FinalELLIOTT BAY TRIBAL NP
NORTH PUGET SOUND
MUCKLESHOOT / SUQUAMISH
Egg Take
39,500Planted 395,000
25,000Received 500,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: GREEN R NATIVE (9)
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 KETA CREEK COMPLEX 500,000 20.0 JUVENILE25,00003/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
395,000 10.0 39,500 JUVENILE ELLIOTT BAY 10A AD06/201806/2018
Page 73Tuesday, August 1, 2017
Memo: Joint Muckleshoot/Suquamish Tribe Project.
2017 Future Brood Document FinalELLIOTT BAY TRIBAL NP
NORTH PUGET SOUND
MUCKLESHOOT / SUQUAMISH
Egg Take
39,500Planted 395,000
25,000Received 500,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: GREEN R NATIVE (9)
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2019 KETA CREEK COMPLEX 500,000 20.0 JUVENILE25,00003/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
395,000 10.0 39,500 JUVENILE ELLIOTT BAY 10A AD06/201906/2019
Page 74Tuesday, August 1, 2017
Memo: Joint Muckleshoot/Suquamish Tribe Project.
2017 Future Brood Document FinalELMA FFA
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
Planted
80Received 2,000
118Shipping 2,000
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: SATSOP R 22.0360
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 BINGHAM CR HATCHERY 2,000 25.0 JUVENILE8001/2018Shipped 04/2018 BINGHAM CR HATCHERY 2,000 17.0 JUVENILE11804/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 75Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalELMA FFA
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
6Planted 1,000
82Received 3,300
118Shipping 2,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SATSOP R 22.0360
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 BINGHAM CR HATCHERY 300 EGGS EYED001/2018Received 03/2018 BINGHAM CR HATCHERY 1,000 500.0 JUVENILE203/2018Received 01/2019 BINGHAM CR HATCHERY 2,000 25.0 JUVENILE8001/2019Shipped 04/2019 BINGHAM CR HATCHERY 2,000 17.0 JUVENILE11804/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
1,000 167.0 6 JUVENILE SATSOP R 22.0360 AD06/201806/2018
Page 76Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalENUMCLAW HS
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 VOIGHTS CR HATCHERY 250 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE BOISE CR 10.005705/201805/2018
Page 77Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalEVERETT SH AND SALMON
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
1,333Planted 20,000
800Received 20,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 WALLACE R HATCHERY 20,000 25.0 JUVENILE80002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
20,000 15.0 1,333 JUVENILE EVERETT MARINA AD06/201806/2018
Page 78Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Formally known as NWSSC‐Everett N Pens.
2017 Future Brood Document FinalEVERETT SH AND SALMON
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
1,333Planted 20,000
800Received 20,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2019 WALLACE R HATCHERY 20,000 25.0 JUVENILE80002/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
20,000 15.0 1,333 JUVENILE EVERETT MARINA AD06/201906/2019
Page 79Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Formally known as NWSSC‐Everett N Pens.
2017 Future Brood Document FinalFERNDALE HS
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
40Planted 20,000
0Received 20,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKOOKUM CR 01.0273
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 SKOOKUM CR HATCHERY 20,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
20,000 500.0 40 JUVENILE DEER CR 01.016505/201805/2018
Page 80Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalFISH FIRST RSI
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
304Planted 460,000
0Received 460,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: LEWIS R 27.0168
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 LEWIS RIVER HATCHERY 460,000 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 1,500.0 33 JUVENILE DAVIS CR 26.108504/201804/201850,000 1,500.0 33 JUVENILE HOUGHTON CR 27.031904/201804/201850,000 1,500.0 33 JUVENILE JOHNSON CR 27.032704/201804/201850,000 1,500.0 33 JUVENILE LEWIS R -NF 27.016804/201804/201850,000 1,500.0 33 JUVENILE LEWIS R TRIBS04/201804/201850,000 1,500.0 33 JUVENILE LEWIS R TRIBS04/201804/201810,000 1,500.0 7 JUVENILE LEWIS R TRIBS04/201804/201850,000 1,500.0 33 JUVENILE LEWIS R TRIBS04/201804/201850,000 1,500.0 33 JUVENILE ROBINSON CR 27.030004/201804/201850,000 1,500.0 33 JUVENILE STABLE CR (27)04/201804/2018
Page 81Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalFISH FIRST RSI
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
264Planted 400,000
0Received 400,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: LEWIS R 27.0168
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 LEWIS RIVER HATCHERY 400,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 1,500.0 33 JUVENILE BEAVER CR 26.032504/201804/201850,000 1,500.0 33 JUVENILE BITTER CR 27.036704/201804/201850,000 1,500.0 33 JUVENILE CEDAR CR 27.033904/201804/201850,000 1,500.0 33 JUVENILE CHELATCHIE-NF 27037304/201804/201850,000 1,500.0 33 JUVENILE JOHN CR 27.033504/201804/201850,000 1,500.0 33 JUVENILE LEWIS R TRIBS04/201804/201850,000 1,500.0 33 JUVENILE MALINOWSKI PD04/201804/201850,000 1,500.0 33 JUVENILE PUP CR 27.034504/201804/2018
Page 82Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalFIVE ACRE SCHOOL (SEQUIM)
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 200
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: DUNGENESS HATCHERY
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 HURD CR HATCHERY 250 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
200 500.0 0 JUVENILE DUNGENESS R 18.001805/201805/2018
Page 83Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalFORKS CREEK HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
5,882Planted 100,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: LateStock: WILLAPA R 24.0251
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 17.0 5,882 JUVENILE FORK CR 24.0356 AD05/201803/2018
Page 84Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Backfill for Naselle.
2017 Future Brood Document FinalFORKS CREEK HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
11,765Planted 200,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: WILLAPA R 24.0251
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 17.0 2,941 JUVENILE FORK CR 24.0356 AD04/201803/201875,000 17.0 4,412 JUVENILE FORK CR 24.035604/201803/201875,000 17.0 4,412 JUVENILE FORK CR 24.0356 AD04/201803/2018
Page 85Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalFORKS CREEK HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 350,000
5,882Planted 100,000
Received
0Shipping 200,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: LateStock: WILLAPA R 24.0251
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 350,000
Shipped 01/2018 PACIFIC CO ANGLERS 200,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 17.0 5,882 JUVENILE FORK CR 24.0356 AD05/201903/2019
Page 86Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Backfill for Naselle.
2017 Future Brood Document FinalFORKS CREEK HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 1,100,000
11,765Planted 200,000
Received
0Shipping 750,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: WILLAPA R 24.0251
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 1,100,000
Shipped 01/2018 WILLAPA BAY GILLNETR 250,000 EGGS EYED001/2018Shipped 03/2018 RFEG 10 WILLAPA BAY 500,000 EGGS EYED003/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 17.0 2,941 JUVENILE FORK CR 24.0356 AD04/201903/201975,000 17.0 4,412 JUVENILE FORK CR 24.035604/201903/201975,000 17.0 4,412 JUVENILE FORK CR 24.0356 AD04/201903/2019
Page 87Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalFRANKLIN ES(PT ANGLE
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: DUNGENESS HATCHERY
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 HURD CR HATCHERY 250 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE TUMWATER CR 18.025605/201805/2018
Page 88Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalFRIENDS LANDING NP
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
1,667Planted 25,000
1,193Received 26,250
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: SATSOP R 22.0360
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 BINGHAM CR HATCHERY 26,250 22.0 JUVENILE1,19301/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
25,000 15.0 1,667 JUVENILE QUIGG LAKE (GRAY) AD04/201804/2018
Page 89Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalFRIENDS LANDING NP
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
1,667Planted 25,000
1,193Received 26,250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SATSOP R 22.0360
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2019 BINGHAM CR HATCHERY 26,250 22.0 JUVENILE1,19301/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
25,000 15.0 1,667 JUVENILE QUIGG LAKE (GRAY) AD04/201904/2019
Page 90Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalFRIENDS OF COWLITZ
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
152Planted 230,000
0Received 230,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: COWLITZ R 26.0002
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 COWLITZ SALMON HATCHERY 230,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
80,000 1,500.0 53 JUVENILE BLUE CR 26.052703/201803/201820,000 1,500.0 13 JUVENILE COWLITZ R TRIBS03/201803/201820,000 1,500.0 13 JUVENILE COWLITZ R TRIBS03/201803/201820,000 1,500.0 13 JUVENILE COWLITZ R TRIBS03/201803/201830,000 1,500.0 20 JUVENILE COWLITZ R TRIBS03/201803/201820,000 1,500.0 13 JUVENILE JONES CR 26.053103/201803/201816,000 1,500.0 11 JUVENILE LACAMAS CR 26.046703/201803/20188,000 1,500.0 5 JUVENILE OLEQUA CR 26.042703/201803/201816,000 1,500.0 11 JUVENILE SALMON CR 26.018703/201803/2018
Page 91Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalFRIENDS OF ISH
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
31Planted 18,545
0Received 19,150
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: ISSAQUAH CR 08.0178
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 ISSAQUAH HATCHERY 19,150 EGGS EYED001/2018
Page 92Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Issaquah River Tribs include Brookside Creek and Colin Creek
2017 Future Brood Document FinalFRIENDS OF ISH
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
31Planted 18,545
0Received 19,150
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: ISSAQUAH CR 08.0178
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
725 500.0 1 JUVENILE BEAR CR 08.043505/201805/2018225 500.0 0 JUVENILE BOEING CR 08.001905/201805/2018225 500.0 0 JUVENILE CEDAR R 08.029905/201805/2018225 500.0 0 JUVENILE HALL CR (08)05/201805/2018225 500.0 0 JUVENILE HONEY CR 08.030105/201805/2018
1,900 500.0 4 JUVENILE ISSAQUAH CR 08.017805/201805/2018475 500.0 1 JUVENILE ISSAQUAH TRB 08.020305/201805/2018225 500.0 0 JUVENILE JUANITA CR 08.023005/201805/2018975 500.0 2 JUVENILE KELSEY CR-NB 08.026605/201805/2018475 500.0 1 JUVENILE KELSEY CR08.0259-R0205/201805/2018225 500.0 0 JUVENILE LEWIS CR 08.016205/201805/2018225 500.0 0 JUVENILE LK SAMMAMISH (KING)05/201805/2018
9,160 500.0 18 JUVENILE LK WASHINGTON (KING)05/201805/2018225 500.0 0 JUVENILE LTL BEAR CR 08.008005/201805/2018225 500.0 0 JUVENILE LYON CR 08.005205/201805/2018225 500.0 0 JUVENILE MACKEY CR 08.011505/201805/2018905 500.0 2 JUVENILE MCALEER CR 08.004905/201805/2018455 500.0 1 JUVENILE NORTH CR 08.007005/201805/2018225 500.0 0 JUVENILE PENNY CR 08.007705/201805/2018225 500.0 0 JUVENILE SHELL CR 08.000905/201805/2018
Page 93Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Issaquah River Tribs include Brookside Creek and Colin Creek
2017 Future Brood Document FinalFRIENDS OF ISH
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
31Planted 18,545
0Received 19,150
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: ISSAQUAH CR 08.0178
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
225 500.0 0 JUVENILE SNOQUALMIE R 07.021905/201805/2018550 500.0 1 JUVENILE SWAMP CR 08.005905/201805/2018
Page 94Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Issaquah River Tribs include Brookside Creek and Colin Creek
2017 Future Brood Document FinalFRIENDS OF ISH
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
11Planted 7,100
0Received 7,400
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: GREEN R NATIVE (9)
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 SOOS CREEK HATCHERY 7,400 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
2,150 500.0 4 JUVENILE BIG SOOS CR 09.007205/201805/20183,125 500.0 6 JUVENILE FAUNTLEROY C 09.036105/201805/2018225 500.0 0 JUVENILE FLETT CR 12.000905/201805/2018475 500.0 1 JUVENILE GREEN R 09.000105/201805/2018225 500.0 0 JUVENILE GREEN R TRIB 09.022105/201805/2018225 500.0 0 JUVENILE GREEN R TRIB 09.022605/201805/2018225 500.0 0 JUVENILE JENKINS CR 09.008705/201805/2018225 500.0 0 JUVENILE MILL CR 09.000605/201805/2018225 500.0 0 JUVENILE SOUTHGATE CR 09?05/201805/2018
Page 95Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Green River Trib McSorley Creek and United Nations Creek
2017 Future Brood Document FinalFRIENDS OF ISH
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
8Planted 4,000
0Received 4,550
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 VOIGHTS CR HATCHERY 4,550 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
4,000 500.0 8 JUVENILE HYLEBOS CR 10.000605/201805/2018
Page 96Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Multiple school groups combined.
2017 Future Brood Document FinalGARRISON HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
1,000Planted 100,000
150Received 120,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: MINTER CR 15.0048
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 MINTER CR HATCHERY 120,000 800.0 JUVENILE15002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 100.0 1,000 JUVENILE DESCHUTES R 13.0028 AD05/201805/2018
Page 97Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalGEORGE ADAMS HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
17,647Planted 300,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: GEORGE ADAMS HATCH
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
210,000 17.0 12,353 JUVENILE PURDY CR 16.0005 AD04/201804/201845,000 17.0 2,647 JUVENILE PURDY CR 16.0005 AD04/201804/201845,000 17.0 2,647 JUVENILE PURDY CR 16.000504/201804/2018
Page 98Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalGEORGE ADAMS HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
Planted
Received
17,000Shipping 425,000
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: BIG QUILCENE 17.0012
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 02/2018 PORT GAMBLE BAY PENS 425,000 25.0 JUVENILE17,00002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 99Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Adjust as necessary to realize 400,000 smolts from this transfer.
2017 Future Brood Document FinalGEORGE ADAMS HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 345,000
17,647Planted 300,000
Received
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: GEORGE ADAMS HATCH
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 345,000
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
210,000 17.0 12,353 JUVENILE PURDY CR 16.0005 AD04/201904/201945,000 17.0 2,647 JUVENILE PURDY CR 16.0005 AD04/201904/201945,000 17.0 2,647 JUVENILE PURDY CR 16.000504/201904/2019
Page 100Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalGEORGE ADAMS HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
Planted
0Received 450,000
17,000Shipping 425,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: BIG QUILCENE 17.0012
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 QUILCENE NFH 450,000 EGGS EYED011/2017Shipped 02/2019 PORT GAMBLE BAY PENS 425,000 25.0 JUVENILE17,00002/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 101Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Adjust as necessary to realize 400,000 smolts from this transfer.
2017 Future Brood Document FinalGLACIER MS
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 VOIGHTS CR HATCHERY 250 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE WHITE R 10.003105/201805/2018
Page 102Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalGOLD CR ACC PONDS
NORTH CENTRAL WASHINGTON
YAKAMA TRIBE
Egg Take
0Planted 0
0Received 0
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 WILLARD NFH 0 23.0 JUVENILE003/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
0 20.0 0 JUVENILE GOLD CR 48.010406/201806/2018
Page 103Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalGOLD CR ACC PONDS
NORTH CENTRAL WASHINGTON
YAKAMA TRIBE
Egg Take
2,500Planted 50,000
2,174Received 50,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2019 WILLARD NFH 50,000 23.0 JUVENILE2,17403/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 20.0 2,500 JUVENILE GOLD CR 48.010406/201906/2019
Page 104Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalGORST CR REARING PND
COASTAL / PUGET SOUND / HOOD CANAL
SUQUAMISH TRIBE
Egg Take
Planted
Received
10,880Shipping 272,000
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: MINTER CR 15.0048
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 03/2018 AGATE PASS SEA PENS 272,000 25.0 JUVENILE10,88003/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 105Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalGORST CR REARING PND
COASTAL / PUGET SOUND / HOOD CANAL
SUQUAMISH TRIBE
Egg Take
Planted
0Received 330,000
10,880Shipping 272,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: MINTER CR 15.0048
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 MINTER CR HATCHERY 330,000 EGGS EYED001/2018Shipped 03/2019 AGATE PASS SEA PENS 272,000 25.0 JUVENILE10,88003/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 106Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalGRAYS HARBOR COLLEGE
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
200Planted 4,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: WYNOOCHEE R 22.0260
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
4,000 20.0 200 JUVENILE ALDER CR 22.1215 AD05/201805/2018
Page 107Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Backfill will be from Lk Aberdeen if no Broodstock returns to the college. Program started with BY 2015.
2017 Future Brood Document FinalGRAYS HARBOR COLLEGE
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take 7,500
200Planted 4,000
0Received 5,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: WYNOOCHEE R 22.0260
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 7,500
Received 01/2018 LK ABERDEEN HATCHERY 5,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
4,000 20.0 200 JUVENILE ALDER CR 22.1215 AD05/201905/2019
Page 108Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Backfill will be from Lk Aberdeen if no Broodstock returns to the college. Program started with BY 2015.
2017 Future Brood Document FinalGRAYS HARBOR GILLNET
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
333Planted 100,000
0Received 100,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: WISHKAH R 22.0191
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 MAYR BROTHERS REARIN 100,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 300.0 333 JUVENILE HOQUIAM R-EF 22.013805/201805/2018
Page 109Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalGRAYS RIVER HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
10,000Planted 150,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type NStock: GRAYS R 25.0093
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
105,000 15.0 7,000 JUVENILE GRAYS R 25.0093 AD04/201804/201845,000 15.0 3,000 JUVENILE GRAYS R 25.0093 AD04/201804/2018
Page 110Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalGRAYS RIVER HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 58,000
Planted
Received
0Shipping 333,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: GRAYS R 25.0093
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 58,000
Shipped 01/2018 BEAVER CR HATCHERY 8,000 EGGS GREEN001/2018Shipped 01/2018 PETERSON PROJECT 40,000 EGGS EYED001/2018Shipped 01/2018 WASHOUGAL HATCHERY 285,000 EGGS GREEN001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 111Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalGRAYS RIVER HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 1,100,000
10,000Planted 150,000
Received
20,000Shipping 785,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: GRAYS R 25.0093
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 1,100,000
Shipped 01/2018 WASHOUGAL HATCHERY 285,000 EGGS GREEN001/2018Shipped 11/2018 DEEP R NET PENS 500,000 25.0 JUVENILE20,00011/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
105,000 15.0 7,000 JUVENILE GRAYS R 25.0093 AD04/201904/201945,000 15.0 3,000 JUVENILE GRAYS R 25.0093 AD04/201904/2019
Page 112Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalHALLS LAKE PROJECT
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
20Planted 30,000
0Received 30,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: ISSAQUAH CR 08.0178
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 ISSAQUAH HATCHERY 30,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
30,000 1,500.0 20 JUVENILE HALL LK (SNOH)03/201803/2018
Page 113Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Remote Site Incubator Project.
2017 Future Brood Document FinalHAMILTON ES(PT ANGEL
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: DUNGENESS HATCHERY
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 HURD CR HATCHERY 250 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE VALLEY CR 18.024905/201805/2018
Page 114Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalHARRIS HOME SCHOOL
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 VOIGHTS CR HATCHERY 250 EGGS EYED012/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE CARBON R 10.041305/201805/2018
Page 115Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalHARVEY CR HATCHERY
NORTH PUGET SOUND
STILLAGUAMISH TRIBE
Egg Take
3,333Planted 60,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: FallStock: FORTSON CR 05.0254
Integrated/Segregated: INTEGRATEDBrood Origin: WILD
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
60,000 18.0 3,333 JUVENILE HARVEY CR 05.0131 AD04/201805/2018
Page 116Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalHARVEY CR HATCHERY
NORTH PUGET SOUND
STILLAGUAMISH TRIBE
Egg Take 120,000
3,333Planted 60,000
Received
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: FallStock: FORTSON CR 05.0254
Integrated/Segregated: INTEGRATEDBrood Origin: WILD
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 120,000
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
60,000 18.0 3,333 JUVENILE HARVEY CR 05.0131 AD06/201905/2019
Page 117Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalHEIMBIGNER PROJECT
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
90Planted 45,000
0Received 50,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKOOKUMCHUCK 23.0761
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 SKOOKUMCHUCK HATCHERY 50,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
45,000 500.0 90 JUVENILE STEARNS CR 23.0934 UM02/201802/2018
Page 118Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalHILLTOP ES (ILWACO)
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 200
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: LateStock: NASELLE R 24.0543
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 NASELLE HATCHERY 250 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
200 500.0 0 JUVENILE BEAR R 24.068905/201805/2018
Page 119Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalHOKO FALLS HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
MAKAH TRIBE
Egg Take 105,000
4,750Planted 95,000
Received
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: HOKO R 19.0148
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 105,000
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
95,000 20.0 4,750 JUVENILE HOKO R 19.0148 AD05/201904/2019
Page 120Tuesday, August 1, 2017
Memo: No terminal harvest is currently anticipated. Initial harvest opportunities will be limited to marine areas
2017 Future Brood Document FinalHOLY ROSARY (EDMONDS
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 250 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE SHELL CR 08.000904/201804/2018
Page 121Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalHUMPTULIPS HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
6,667Planted 100,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: LateStock: HUMPTULIPS R 22.0004
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 15.0 6,667 JUVENILE STEVENS CR 22.0064 AD05/201803/2018
Page 122Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalHUMPTULIPS HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
26,667Planted 400,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: HUMPTULIPS R 22.0004
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
400,000 15.0 26,667 JUVENILE STEVENS CR 22.0064 AD05/201803/2018
Page 123Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalHUMPTULIPS HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 125,000
6,667Planted 100,000
Received
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: LateStock: HUMPTULIPS R 22.0004
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 125,000
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 15.0 6,667 JUVENILE STEVENS CR 22.0064 AD05/201903/2019
Page 124Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalHUMPTULIPS HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 450,000
26,667Planted 400,000
Received
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: HUMPTULIPS R 22.0004
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 450,000
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
400,000 15.0 26,667 JUVENILE STEVENS CR 22.0064 AD05/201903/2019
Page 125Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalHUPP SPRINGS REARING
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
8,824Planted 150,000
103Received 165,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: MINTER CR 15.0048
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 MINTER CR HATCHERY 165,000 1,600.0 JUVENILE10302/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
150,000 17.0 8,824 JUVENILE MINTER CR TR 15.005105/201905/2019
Page 126Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Loss due to predation. Shortages may be backfilled from other South Sound Coho Programs.
2017 Future Brood Document FinalHURD CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
Planted
0Received 7,500
0Shipping 2,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: DUNGENESS HATCHERY
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 DUNGENESS HATCHERY 7,500 EGGS GREEN012/2017Shipped 01/2018 DUNGENESS R AUDUBON 250 EGGS EYED001/2018Shipped 01/2018 FIVE ACRE SCHOOL (SEQUIM) 250 EGGS EYED001/2018Shipped 01/2018 FRANKLIN ES(PT ANGLE 250 EGGS EYED001/2018Shipped 01/2018 HAMILTON ES(PT ANGEL 250 EGGS EYED001/2018Shipped 01/2018 JEFFERSON ES(PT ANGE 250 EGGS EYED001/2018Shipped 01/2018 MT VIEW CHRISTIAN (SEQUIM) 250 EGGS EYED001/2018Shipped 01/2018 QUEEN OF ANGELS SCHL 250 EGGS EYED001/2018Shipped 01/2018 SALISH COAST ELEMENTARY 250 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 127Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalIMMACULATE CONC(EVER
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 250 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE SULTAN R 07.088104/201804/2018
Page 128Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalISSAQUAH HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
26,470Planted 450,000
Received
1,200Shipping 30,000
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: ISSAQUAH CR 08.0178
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 02/2018 NWSSC - LAEBUGTEN 30,000 25.0 JUVENILE1,20002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 17.0 2,941 JUVENILE ISSAQUAH CR 08.0178 AD05/201805/2018300,000 17.0 17,647 JUVENILE ISSAQUAH CR 08.0178 AD05/201805/201850,000 17.0 2,941 JUVENILE LK WASHINGTON (KING) AD05/201805/201850,000 17.0 2,941 JUVENILE SAMMAMISH R 08.0057 AD05/201805/2018
Page 129Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Sammamish Slough.
2017 Future Brood Document FinalISSAQUAH HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 390,000
Planted
Received
20Shipping 354,250
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: ISSAQUAH CR 08.0178
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 390,000
Shipped 01/2018 BOEING CR PROJECT 10,000 EGGS EYED001/2018Shipped 01/2018 BROOK BAY PROJECT 15,000 EGGS EYED001/2018Shipped 01/2018 EASTSIDE CATHOLIC HS 100 EGGS EYED001/2018Shipped 01/2018 FRIENDS OF ISH 19,150 EGGS EYED001/2018Shipped 01/2018 HALLS LAKE PROJECT 30,000 EGGS EYED001/2018Shipped 01/2018 JOHN SIMS PROJECT-COOP 8,000 EGGS EYED001/2018Shipped 01/2018 JORDAN PROJECT -RSI 5,000 EGGS EYED001/2018Shipped 01/2018 MCALEER CR PROJECT 70,000 EGGS EYED001/2018Shipped 01/2018 NWSSC - LAEBUGTEN 80,000 EGGS EYED001/2018Shipped 01/2018 ROGER URBANIAK PROJECT 107,000 EGGS EYED001/2018Shipped 04/2018 LIVELY ENV. CTR 10,000 500.0 JUVENILE2004/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 130Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalISSAQUAH HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 575,000
26,470Planted 450,000
Received
1,200Shipping 30,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: ISSAQUAH CR 08.0178
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 575,000
Shipped 02/2019 NWSSC - LAEBUGTEN 30,000 25.0 JUVENILE1,20002/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 17.0 2,941 JUVENILE ISSAQUAH CR 08.0178 AD05/201905/2019400,000 17.0 23,529 JUVENILE ISSAQUAH CR 08.0178 AD05/201905/2019
Page 131Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Sammamish Slough.
2017 Future Brood Document FinalJEFFERSON ES(PT ANGE
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: DUNGENESS HATCHERY
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 HURD CR HATCHERY 250 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE DUNGENESS R 18.001805/201805/2018
Page 132Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalJOHN SIMS PROJECT‐COOP
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
6Planted 8,000
0Received 8,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: ISSAQUAH CR 08.0178
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 ISSAQUAH HATCHERY 8,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
4,000 1,500.0 3 JUVENILE LYON CR 08.005203/201803/20184,000 1,500.0 3 JUVENILE MCALEER CR 08.004903/201803/2018
Page 133Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Remote Site Incubator Project.
2017 Future Brood Document FinalJOHNSON CR PROJECT ‐RSI
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
33Planted 50,000
0Received 50,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: NASELLE R 24.0543
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 NASELLE HATCHERY 50,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 1,500.0 33 JUVENILE JOHNSON CR 24.058104/201804/2018
Page 134Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Remote Site Incubator Project. May come from local stocks via broodstocking.
2017 Future Brood Document FinalJORDAN PROJECT ‐RSI
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
3Planted 5,000
0Received 5,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: ISSAQUAH CR 08.0178
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 ISSAQUAH HATCHERY 5,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
5,000 1,500.0 3 JUVENILE UNNAMED CR 08.006003/201803/2018
Page 135Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Remote Site Incubator Project.
2017 Future Brood Document FinalKALAMA CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
NISQUALLY TRIBE
Egg Take
23,529Planted 400,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: KALAMA CR 11.0017
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
355,000 17.0 20,882 JUVENILE KALAMA CR 11.0017 AD04/201804/201845,000 17.0 2,647 JUVENILE KALAMA CR 11.0017 AD04/201804/2018
Page 136Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalKALAMA CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
NISQUALLY TRIBE
Egg Take 470,000
23,529Planted 400,000
Received
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: KALAMA CR 11.0017
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 470,000
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
355,000 17.0 20,882 JUVENILE KALAMA CR 11.0017 AD04/201904/201945,000 17.0 2,647 JUVENILE KALAMA CR 11.0017 AD04/201904/2019
Page 137Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalKALAMA FALLS HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
35,294Planted 600,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type NStock: KALAMA R HATCH 27.0002
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
45,000 17.0 2,647 JUVENILE KALAMA R 27.0002 AD05/201804/2018555,000 17.0 32,647 JUVENILE KALAMA R 27.0002 AD05/201804/2018
Page 138Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. On station release.
2017 Future Brood Document FinalKALAMA FALLS HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 550,000
17,647Planted 300,000
Received
0Shipping 400
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: KALAMA R HATCH 27.0002
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 550,000
Shipped 11/2017 COWEEMAN JHS (KELSO) 400 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
45,000 17.0 2,647 JUVENILE KALAMA R 27.0002 AD05/201904/2019255,000 17.0 15,000 JUVENILE KALAMA R 27.0002 AD05/201904/2019
Page 139Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. On station release.
2017 Future Brood Document FinalKETA CREEK COMPLEX
NORTH PUGET SOUND
MUCKLESHOOT TRIBE
Egg Take
33,333Planted 500,000
7,500Received 600,000
25,000Shipping 500,000
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: GREEN R NATIVE (9)
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 08/2017 SOOS CREEK HATCHERY 600,000 80.0 JUVENILE7,50008/2017Shipped 03/2018 ELLIOTT BAY TRIBAL NP 500,000 20.0 JUVENILE25,00003/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
500,000 15.0 33,333 JUVENILE CRISP CR 09.0113 AD05/201805/2018
Page 140Tuesday, August 1, 2017
Memo: Crisp Creek Rearing Pond. Currently funded for only 600,000 fish.
2017 Future Brood Document FinalKETA CREEK COMPLEX
NORTH PUGET SOUND
MUCKLESHOOT TRIBE
Egg Take 550,000
33,333Planted 500,000
7,500Received 600,000
25,000Shipping 500,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: GREEN R NATIVE (9)
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 550,000
Received 08/2018 SOOS CREEK HATCHERY 600,000 80.0 JUVENILE7,50008/2018Shipped 03/2019 ELLIOTT BAY TRIBAL NP 500,000 20.0 JUVENILE25,00003/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
500,000 15.0 33,333 JUVENILE CRISP CR 09.0113 AD05/201905/2019
Page 141Tuesday, August 1, 2017
Memo: Crisp Creek Rearing Pond. Currently funded for only 600,000 fish.
2017 Future Brood Document FinalKLICKITAT HATCHERY (YKFP)
SOUTHWEST WASHINGTON / LOWER COL
YAKAMA TRIBE
Egg Take
66,667Planted 1,000,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type NStock: LEWIS R 27.0168
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
955,000 15.0 63,667 JUVENILE KLICKITAT R 30.0002 AD06/201804/201845,000 15.0 3,000 JUVENILE KLICKITAT R 30.0002 AD06/201804/2018
Page 142Tuesday, August 1, 2017
Memo: On station plant, release at 15‐17 fpp.
2017 Future Brood Document FinalKLICKITAT HATCHERY (YKFP)
SOUTHWEST WASHINGTON / LOWER COL
YAKAMA TRIBE
Egg Take
66,667Planted 1,000,000
0Received 1,300,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: LEWIS R 27.0168
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 WASHOUGAL HATCHERY 1,300,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
955,000 15.0 63,667 JUVENILE KLICKITAT R 30.0002 AD06/201904/201945,000 15.0 3,000 JUVENILE KLICKITAT R 30.0002 AD06/201904/2019
Page 143Tuesday, August 1, 2017
Memo: On station plant, release at 15‐17 fpp.
2017 Future Brood Document FinalKRAUS RYDERWOOD PROJ
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
10Planted 1,000
10Received 1,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: COWLITZ R 26.0002
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 06/2018 COWLITZ SALMON HATCHERY 1,000 100.0 JUVENILE1006/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
1,000 100.0 10 JUVENILE CAMPBELL CR 26.0443 AD06/201806/2018
Page 144Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalLEAVENWORTH HATCHERY
NORTH CENTRAL WASHINGTON
U.S. FISH AND WILDLIFE SERVICE
Egg Take
17,500Planted 280,000
Received
11,400Shipping 285,000
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 02/2018 OR- CASCADE HATCHERY 285,000 25.0 JUVENILE11,40002/2018Shipped 03/2018 WILLARD NFH 0 25.0 JUVENILE004/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
280,000 16.0 17,500 JUVENILE ICICLE CR 45.047404/201802/2018
Page 145Tuesday, August 1, 2017
Memo: Annually 250 Frozen beheaded eviscerated carcasses are put into the Upper Nason Creek.
2017 Future Brood Document FinalLEAVENWORTH HATCHERY
NORTH CENTRAL WASHINGTON
U.S. FISH AND WILDLIFE SERVICE
Egg Take
34,063Planted 545,000
0Received 600,000
9,200Shipping 230,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 OR- CASCADE HATCHERY 600,000 EGGS EYED001/2018Shipped 02/2019 OR- CASCADE HATCHERY 195,000 25.0 JUVENILE7,80002/2019Shipped 02/2019 WILLARD NFH 35,000 25.0 JUVENILE1,40002/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
545,000 16.0 34,063 JUVENILE ICICLE CR 45.047404/201902/2019
Page 146Tuesday, August 1, 2017
Memo: Annually 250 Frozen beheaded eviscerated carcasses are put into the Upper Nason Creek.
2017 Future Brood Document FinalLEWIS CO. CONS. DIST.
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
100Planted 50,000
0Received 50,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: LateStock: SKOOKUMCHUCK 23.0761
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 SKOOKUMCHUCK HATCHERY 50,000 EGGS EYED003/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
25,000 500.0 50 JUVENILE COAL CR 23.087703/201803/201825,000 500.0 50 JUVENILE LINCOLN CR 23.073303/201803/2018
Page 147Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Remote Incubator Site.
2017 Future Brood Document FinalLEWIS RIVER HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
56,251Planted 900,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type NStock: LEWIS R 27.0168
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
75,000 16.0 4,688 JUVENILE LEWIS R 27.016805/201804/2018750,000 16.0 46,875 JUVENILE LEWIS R 27.0168 AD05/201804/201875,000 16.0 4,688 JUVENILE LEWIS R 27.0168 AD05/201804/2018
Page 148Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalLEWIS RIVER HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
68,751Planted 1,100,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type SStock: LEWIS RIVER HATCHERY
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
75,000 16.0 4,688 JUVENILE LEWIS R 27.0168 AD05/201804/201875,000 16.0 4,688 JUVENILE LEWIS R 27.016805/201804/2018950,000 16.0 59,375 JUVENILE LEWIS R 27.0168 AD05/201804/2018
Page 149Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalLEWIS RIVER HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 5,216,000
Planted
Received
0Shipping 4,958,500
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: LEWIS R 27.0168
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 5,216,000
Shipped 11/2017 WASHOUGAL HATCHERY 1,423,000 EGGS GREEN012/2017Shipped 11/2017 WASHOUGAL HATCHERY 3,000,000 EGGS GREEN012/2017Shipped 01/2018 CLARK COUNTY PUD 46,000 EGGS EYED001/2018Shipped 01/2018 COLUMBIA SPRINGS COOP 14,500 EGGS EYED001/2018Shipped 01/2018 RIDGEFIELD HS(RIDGEF 10,000 EGGS EYED001/2018Shipped 01/2018 STEVE SYVERSON PROJ 5,000 EGGS EYED001/2018Shipped 02/2018 FISH FIRST RSI 460,000 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 150Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. The 3 million is for Washougal as backfill if Washougal stock in not available.
2017 Future Brood Document FinalLEWIS RIVER HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 1,400,000
56,251Planted 900,000
Received
0Shipping 400,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: LEWIS R 27.0168
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 1,400,000
Shipped 01/2018 FISH FIRST RSI 400,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
75,000 16.0 4,688 JUVENILE LEWIS R 27.0168 AD05/201904/201975,000 16.0 4,688 JUVENILE LEWIS R 27.016805/201904/2019750,000 16.0 46,875 JUVENILE LEWIS R 27.0168 AD05/201904/2019
Page 151Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalLEWIS RIVER HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
68,751Planted 1,100,000
0Received 1,325,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type SStock: LEWIS RIVER HATCHERY
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 SPEELYAI HATCHERY 1,325,000 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
75,000 16.0 4,688 JUVENILE LEWIS R 27.0168 AD05/201904/201975,000 16.0 4,688 JUVENILE LEWIS R 27.016805/201904/2019950,000 16.0 59,375 JUVENILE LEWIS R 27.0168 AD05/201904/2019
Page 152Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalLINCOLN ES(HOQUIAM)
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
1Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: WISHKAH R 22.0191
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 MAYR BROTHERS REARIN 250 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 250.0 1 JUVENILE HOQUIAM R 22.013703/201803/2018
Page 153Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalLITTLEROCK ES
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
1Planted 400
0Received 500
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: LateStock: SATSOP R 22.0360
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 BINGHAM CR HATCHERY 500 EGGS GREEN001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
400 500.0 1 JUVENILE BEAVER CR 23.066705/201805/2018
Page 154Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalLIVELY ENV. CTR
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
50Planted 10,000
20Received 10,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: ISSAQUAH CR 08.0178
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 04/2018 ISSAQUAH HATCHERY 10,000 500.0 JUVENILE2004/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
10,000 200.0 50 JUVENILE NICKEL CR 08.0077A06/201806/2018
Page 155Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalLK ABERDEEN HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
2,000Planted 30,000
11Received 200
13Shipping 250
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: WYNOOCHEE R 22.0260
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 01/2018 ABERDEEN SD 5(ABERDE 250 20.0 JUVENILE1301/2018Received 05/2018 ABERDEEN SD 5(ABERDE 200 18.0 JUVENILE1105/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
30,000 15.0 2,000 JUVENILE VAN WINKLE C 22.0240 AD05/201803/2018
Page 156Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Transfer to Grays Harbor CC only if not broodstock retruns to the college.
2017 Future Brood Document FinalLK ABERDEEN HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 50,000
2,000Planted 30,000
11Received 200
13Shipping 6,250
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: WYNOOCHEE R 22.0260
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 50,000
Shipped 01/2018 GRAYS HARBOR COLLEGE 5,000 EGGS EYED001/2018Shipped 04/2018 ABERDEEN SD 5(ABERDE 1,000 EGGS EYED004/2018Shipped 01/2019 ABERDEEN SD 5(ABERDE 250 20.0 JUVENILE1301/2019Received 05/2019 ABERDEEN SD 5(ABERDE 200 18.0 JUVENILE1105/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
30,000 15.0 2,000 JUVENILE VAN WINKLE C 22.0240 AD05/201903/2019
Page 157Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Transfer to Grays Harbor CC only if not broodstock retruns to the college.
2017 Future Brood Document FinalLONGVIEW SD 122 (LON
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: COWLITZ R 26.0002
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 COWLITZ SALMON HATCHERY 250 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE COAL CR 25.034004/201804/2018
Page 158Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalLOWER ELWHA HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
LOWER ELWHA KLALLAM TRIBE
Egg Take
26,564Planted 425,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: ELWHA R 18.0272
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
75,000 16.0 4,688 JUVENILE ELWHA R 18.0272 AD04/201803/201875,000 16.0 4,688 JUVENILE ELWHA R 18.027204/201803/2018275,000 16.0 17,188 JUVENILE ELWHA R 18.0272 AD04/201803/2018
Page 159Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalLOWER ELWHA HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
LOWER ELWHA KLALLAM TRIBE
Egg Take 475,000
27,709Planted 425,000
Received
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: ELWHA R 18.0272
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 475,000
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
75,000 16.0 4,688 JUVENILE ELWHA R 18.027204/201903/201975,000 16.0 4,688 JUVENILE ELWHA R 18.0272 AD04/201903/2019275,000 15.0 18,333 JUVENILE ELWHA R 18.0272 AD04/201903/2019
Page 160Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalLUMMI SEA PONDS
NORTH PUGET SOUND
LUMMI TRIBE
Egg Take
66,666Planted 1,000,000
25,000Received 1,000,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: LUMMI STOCK
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 04/2018 SKOOKUM CR HATCHERY 1,000,000 40.0 JUVENILE25,00004/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
950,000 15.0 63,333 JUVENILE NOOKSACK R+LUMMI BAY AD06/201806/201850,000 15.0 3,333 JUVENILE NOOKSACK R+LUMMI BAY AD06/201806/2018
Page 161Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalLUMMI SEA PONDS
NORTH PUGET SOUND
LUMMI TRIBE
Egg Take 1,400,000
66,666Planted 1,000,000
25,000Received 1,000,000
0Shipping 1,200,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: LUMMI STOCK
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 1,400,000
Shipped 12/2017 SKOOKUM CR HATCHERY 1,200,000 EGGS EYED012/2017Received 04/2019 SKOOKUM CR HATCHERY 1,000,000 40.0 JUVENILE25,00004/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
950,000 15.0 63,333 JUVENILE NOOKSACK R+LUMMI BAY AD06/201906/201950,000 15.0 3,333 JUVENILE NOOKSACK R+LUMMI BAY AD06/201906/2019
Page 162Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalLYNDEN CHRISTIAN
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
100Planted 50,000
0Received 50,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKOOKUM CR 01.0273
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 SKOOKUM CR HATCHERY 50,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 500.0 100 JUVENILE FISHTRAP CR 01.021005/201805/2018
Page 163Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalMAKAH NFH ON TSOO‐YESS R
COASTAL / PUGET SOUND / HOOD CANAL
U.S. FISH AND WILDLIFE SERVICE
Egg Take
11,112Planted 200,000
Received
2,222Shipping 40,000
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: TSOO‐YESS R 20.0015
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 03/2018 EDUCKET CR HATCHERY 40,000 18.0 JUVENILE2,22203/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
55,000 18.0 3,056 JUVENILE TSOO-YESS R 20.0015 AD05/201805/2018145,000 18.0 8,056 JUVENILE TSOO-YESS R 20.0015 AD05/201805/2018
Page 164Tuesday, August 1, 2017
Memo: Release about May 15 at 15‐20 fpp. Excess to program will be stocked on station as fry.
2017 Future Brood Document FinalMAKAH NFH ON TSOO‐YESS R
COASTAL / PUGET SOUND / HOOD CANAL
U.S. FISH AND WILDLIFE SERVICE
Egg Take 450,000
11,112Planted 200,000
Received
2,222Shipping 40,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: TSOO‐YESS R 20.0015
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 450,000
Shipped 03/2019 EDUCKET CR HATCHERY 40,000 18.0 JUVENILE2,22203/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
55,000 18.0 3,056 JUVENILE TSOO-YESS R 20.0015 AD05/201905/2019145,000 18.0 8,056 JUVENILE TSOO-YESS R 20.0015 AD05/201905/2019
Page 165Tuesday, August 1, 2017
Memo: Release about May 15 at 15‐20 fpp. Excess to program will be stocked on station as fry.
2017 Future Brood Document FinalMALTBY ES (SNOHOMISH
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 250 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE WALLACE R 07.094004/201804/2018
Page 166Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalMAPLEWOOD ES(PUYALLU
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 VOIGHTS CR HATCHERY 250 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE CLARKS CR 10.002705/201805/2018
Page 167Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalMARBLEMOUNT HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
14,706Planted 250,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: SKAGIT R 03.0176
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
160,000 17.0 9,412 JUVENILE CASCADE R 03.1411 AD05/201805/201845,000 17.0 2,647 JUVENILE CASCADE R 03.1411 AD05/201805/201845,000 17.0 2,647 JUVENILE CASCADE R 03.141105/201805/2018
Page 168Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalMARBLEMOUNT HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 335,000
14,706Planted 250,000
Received
0Shipping 1,250
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKAGIT R 03.0176
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 335,000
Shipped 02/2018 CENTRAL ES #2 (SEDRO 250 EGGS EYED002/2018Shipped 02/2018 CLEAR LAKE ES 250 EGGS EYED002/2018Shipped 02/2018 CONCRETE MS/HS(CONCR 250 EGGS EYED002/2018Shipped 02/2018 SKAGIT FISH ENHANC GRP 500 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
160,000 17.0 9,412 JUVENILE CASCADE R 03.1411 AD05/201905/201945,000 17.0 2,647 JUVENILE CASCADE R 03.1411 AD05/201905/201945,000 17.0 2,647 JUVENILE CASCADE R 03.141105/201905/2019
Page 169Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalMARBLEMOUNT HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
Planted
0Received 1,700,000
0Shipping 1,650,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 10/2017 WALLACE R HATCHERY 1,700,000 EGGS GREEN010/2017Shipped 01/2018 SKOOKUMCHUCK HATCHERY 1,650,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 170Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Maintained on pathogen‐free water.
2017 Future Brood Document FinalMARINE TECH CENTR
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
909Planted 10,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: WASHINGTON ‐ GENERAL
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
10,000 11.0 909 JUVENILE SEAHURST CO PARK 09 AD06/201806/2018
Page 171Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Local stock released on‐station.
2017 Future Brood Document FinalMARINE TECH CENTR
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take 10,000
909Planted 10,000
Received
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: WASHINGTON ‐ GENERAL
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 10,000
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
10,000 11.0 909 JUVENILE SEAHURST CO PARK 09 AD06/201906/2019
Page 172Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Local stock released on‐station.
2017 Future Brood Document FinalMARINE TECH CENTR
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
Planted
0Received 5,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: GREEN R NATIVE (9)
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 SOOS CREEK HATCHERY 5,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 173Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Backfill if eggtake not met.
2017 Future Brood Document FinalMARY M KNIGHT ES(ELM
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: LateStock: SATSOP R 22.0360
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 BINGHAM CR HATCHERY 250 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE DECKER CR 22.044504/201804/2018
Page 174Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalMAYR BROTHERS REARIN
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
17,647Planted 300,000
Received
1,000Shipping 25,000
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: WISHKAH R 22.0191
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 05/2017 BUZZARD CR COOP 25,000 25.0 JUVENILE1,00006/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
300,000 17.0 17,647 JUVENILE WISHKAH R 22.0191 AD05/201803/2018
Page 175Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalMAYR BROTHERS REARIN
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take 601,000
17,647Planted 300,000
0Received 35,000
1,000Shipping 125,250
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: WISHKAH R 22.0191
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 601,000
Received 11/2017 BUZZARD CR COOP 35,000 EGGS GREEN011/2017Shipped 12/2017 GRAYS HARBOR GILLNET 100,000 EGGS EYED001/2018Shipped 01/2018 LINCOLN ES(HOQUIAM) 250 EGGS EYED001/2018Shipped 05/2018 BUZZARD CR COOP 25,000 25.0 JUVENILE1,00006/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
300,000 17.0 17,647 JUVENILE WISHKAH R 22.0191 AD05/201903/2019
Page 176Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalMCALEER CR PROJECT
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
47Planted 70,000
0Received 70,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: ISSAQUAH CR 08.0178
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 ISSAQUAH HATCHERY 70,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
70,000 1,500.0 47 JUVENILE MCALEER CR 08.004903/201803/2018
Page 177Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Remote Site Incubator Project.
2017 Future Brood Document FinalMEEKER MS (TACOMA)
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
7Planted 10,000
0Received 10,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 VOIGHTS CR HATCHERY 10,000 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
10,000 1,500.0 7 JUVENILE PUGET CREEK04/201804/2018
Page 178Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Unfed fry release into Puget Creek WRIA 10.
2017 Future Brood Document FinalMINTER CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
35,539Planted 500,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: MINTER CR 15.0048
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
250,000 17.0 14,706 JUVENILE MINTER CR 15.0048 AD06/201805/2018205,000 12.0 17,083 JUVENILE MINTER CR 15.0048 AD07/201807/201845,000 12.0 3,750 JUVENILE MINTER CR 15.0048 AD07/201807/2018
Page 179Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Loss due to predation. Shortages may be backfilled from other South Sound Coho Programs.
2017 Future Brood Document FinalMINTER CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 1,430,000
35,539Planted 500,000
Received
253Shipping 735,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: MINTER CR 15.0048
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 1,430,000
Shipped 01/2018 DOBBS CR PROJECT 5,000 EGGS EYED001/2018Shipped 01/2018 GORST CR REARING PND 330,000 0.0 EGGS EYED001/2018Shipped 01/2018 OLALLA ES (OLALLA) 50,000 EGGS EYED001/2018Shipped 01/2018 OLYMPIA SALMON CLUB 50,000 EGGS EYED001/2018Shipped 01/2018 PORT ORCHARD ROTARY 15,000 EGGS EYED001/2018Shipped 02/2018 GARRISON HATCHERY 120,000 800.0 JUVENILE15002/2018Shipped 02/2018 HUPP SPRINGS REARING 165,000 1,600.0 JUVENILE10302/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
250,000 17.0 14,706 JUVENILE MINTER CR 15.0048 AD06/201905/2019205,000 12.0 17,083 JUVENILE MINTER CR 15.0048 AD07/201907/201945,000 12.0 3,750 JUVENILE MINTER CR 15.0048 AD07/201907/2019
Page 180Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Loss due to predation. Shortages may be backfilled from other South Sound Coho Programs.
2017 Future Brood Document FinalMONROE ES(EVERETT)
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 WALLACE R HATCHERY 250 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE SULTAN R 07.088105/201805/2018
Page 181Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. James Monroe ES
2017 Future Brood Document FinalMONTESANO JHS HS
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: LateStock: SATSOP R 22.0360
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 BINGHAM CR HATCHERY 250 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE SYLVIA CR 22.026104/201804/2018
Page 182Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalMOSSYROCK ES(MOSSYRO
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: COWLITZ R 26.0002
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 COWLITZ SALMON HATCHERY 250 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE COWLITZ R 26.000204/201804/2018
Page 183Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalMT PILCHUCK ES(LK ST
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 250 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE CATHERINE CR 07.014804/201804/2018
Page 184Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalMT VIEW CHRISTIAN (SEQUIM)
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: DUNGENESS HATCHERY
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 HURD CR HATCHERY 250 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE HURD CR 18.002805/201805/2018
Page 185Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalNAPAVINE JHS HS
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
1Planted 370
0Received 375
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: LateStock: SKOOKUMCHUCK 23.0761
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 SKOOKUMCHUCK HATCHERY 375 EGGS EYED003/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
370 500.0 1 JUVENILE ALLEN CR 23.088306/201806/2018
Page 186Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalNASELLE HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
11,765Planted 200,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: LateStock: NASELLE R 24.0543
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
200,000 17.0 11,765 JUVENILE NASELLE R 24.0543 AD04/201803/2018
Page 187Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Forks Creek Hatchery is backup egg source in short years.
2017 Future Brood Document FinalNASELLE HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
70,588Planted 1,200,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: NASELLE R 24.0543
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
1,200,000 17.0 70,588 JUVENILE NASELLE R 24.0543 AD05/201803/2018
Page 188Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalNASELLE HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 425,000
11,765Planted 200,000
Received
0Shipping 200,250
Total PoundsTotal #Brood Year: 2017Species: CohoRun: LateStock: NASELLE R 24.0543
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 425,000
Shipped 01/2018 HILLTOP ES (ILWACO) 250 EGGS EYED001/2018Shipped 01/2018 RFEG 10 WILLAPA BAY 200,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
200,000 17.0 11,765 JUVENILE NASELLE R 24.0543 AD04/201903/2019
Page 189Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Forks Creek Hatchery is backup egg source in short years.
2017 Future Brood Document FinalNASELLE HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 1,660,000
70,588Planted 1,200,000
3,333Received 200,000
1,250Shipping 450,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: NASELLE R 24.0543
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 1,660,000
Shipped 06/2017 NEMAH HATCHERY 200,000 160.0 JUVENILE1,25006/2017Received 11/2017 NEMAH HATCHERY 200,000 60.0 JUVENILE3,33311/2017Shipped 01/2018 JOHNSON CR PROJECT -RSI 50,000 EGGS EYED001/2018Shipped 01/2018 RFEG 10 WILLAPA BAY 200,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
1,200,000 17.0 70,588 JUVENILE NASELLE R 24.0543 AD05/201903/2019
Page 190Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalNASELLE HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
Planted
3,333Received 200,000
1,250Shipping 200,000
Total PoundsTotal #Brood Year: 2018Species: CohoRun: NAStock: NASELLE R 24.0543
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 06/2018 NEMAH HATCHERY 200,000 160.0 JUVENILE1,25006/2018Received 11/2018 NEMAH HATCHERY 200,000 60.0 JUVENILE3,33311/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 191Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalNATURE BRIDGE ONP
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
0Planted 75
0Received 100
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SOL DUC R 20.0096
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 SOLDUC HATCHERY 100 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
75 750.0 0 JUVENILE SOL DUC R 20.009605/201804/2018
Page 192Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Released at the Sol Duc Hatchery Boat Launch.
2017 Future Brood Document FinalNELSON PROJECT
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
27Planted 40,000
0Received 40,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKOOKUM CR 01.0273
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 SKOOKUM CR HATCHERY 40,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
40,000 1,500.0 27 JUVENILE DEER CR 01.016504/201804/2018
Page 193Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. RSI projects on Deer & Silver Creeks (Nooksack basin).
2017 Future Brood Document FinalNEMAH HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
Planted
1,250Received 200,000
3,333Shipping 200,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: NASELLE R 24.0543
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 06/2017 NASELLE HATCHERY 200,000 160.0 JUVENILE1,25006/2017Shipped 11/2017 NASELLE HATCHERY 200,000 60.0 JUVENILE3,33311/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 194Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalNEMAH HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
Planted
1,250Received 200,000
3,333Shipping 200,000
Total PoundsTotal #Brood Year: 2018Species: CohoRun: NAStock: NASELLE R 24.0543
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 06/2018 NASELLE HATCHERY 200,000 160.0 JUVENILE1,25006/2018Shipped 11/2018 NASELLE HATCHERY 200,000 60.0 JUVENILE3,33311/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 195Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalNORTH TOUTLE HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
Planted
Received
9,000Shipping 225,000
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type NStock: GRAYS R 25.0093
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 11/2017 DEEP R NET PENS 225,000 25.0 JUVENILE9,00011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 196Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalNORTH TOUTLE HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
10,000Planted 150,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type SStock: TOUTLE R 26.0227
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
105,000 15.0 7,000 JUVENILE GREEN R 26.0323 AD05/201805/201845,000 15.0 3,000 JUVENILE GREEN R 26.0323 AD05/201805/2018
Page 197Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalNORTH TOUTLE HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 200,000
10,000Planted 150,000
Received
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type SStock: TOUTLE R 26.0227
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 200,000
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
105,000 15.0 7,000 JUVENILE GREEN R 26.0323 AD05/201905/201945,000 15.0 3,000 JUVENILE GREEN R 26.0323 AD05/201905/2019
Page 198Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalNWSSC ‐ EAGLE CREEK
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
3,600Planted 54,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
54,000 15.0 3,600 JUVENILE EAGLE CR 07.1416 AD04/201804/2018
Page 199Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Formally Seattle Poggie Club.
2017 Future Brood Document FinalNWSSC ‐ EAGLE CREEK
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
3,600Planted 54,000
0Received 60,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 60,000 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
54,000 15.0 3,600 JUVENILE EAGLE CR 07.1416 AD04/201904/2019
Page 200Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Formally Seattle Poggie Club.
2017 Future Brood Document FinalNWSSC ‐ LAEBUGTEN
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
2,500Planted 25,000
1,200Received 30,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: ISSAQUAH CR 08.0178
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 ISSAQUAH HATCHERY 30,000 25.0 JUVENILE1,20002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
25,000 10.0 2,500 JUVENILE EDMONDS NET PENS AD05/201805/2018
Page 201Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalNWSSC ‐ LAEBUGTEN
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
240Planted 80,000
0Received 80,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: ISSAQUAH CR 08.0178
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 ISSAQUAH HATCHERY 80,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
55,000 500.0 110 JUVENILE NORTH CR 08.007004/201804/201815,000 500.0 30 JUVENILE SWAMP CR 08.005904/201804/201810,000 100.0 100 JUVENILE NORTH CR 08.007006/201806/2018
Page 202Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalNWSSC ‐ LAEBUGTEN
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
2,500Planted 25,000
1,200Received 30,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: ISSAQUAH CR 08.0178
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2019 ISSAQUAH HATCHERY 30,000 25.0 JUVENILE1,20002/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
25,000 10.0 2,500 JUVENILE EDMONDS NET PENS AD05/201905/2019
Page 203Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalOCEAN SHORES/CITY ES
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
1Planted 475
0Received 500
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: LateStock: SATSOP R 22.0360
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 BINGHAM CR HATCHERY 500 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
475 500.0 1 JUVENILE DAMON CR 22.003304/201804/2018
Page 204Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalOLALLA ES (OLALLA)
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
34Planted 50,000
0Received 50,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: MINTER CR 15.0048
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 MINTER CR HATCHERY 50,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
25,000 1,500.0 17 JUVENILE BURLEY CR 15.005602/201802/201825,000 1,500.0 17 JUVENILE OLALLA CR 15.010702/201802/2018
Page 205Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Unfed fry release.
2017 Future Brood Document FinalOLYMPIA SALMON CLUB
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
33Planted 50,000
0Received 50,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: MINTER CR 15.0048
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 MINTER CR HATCHERY 50,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 1,500.0 33 JUVENILE WOODARD CR 13.001203/201803/2018
Page 206Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Remote Site Incubator Project.
2017 Future Brood Document FinalOLYMPIC ES (CHEHALIS
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
1Planted 370
0Received 375
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: LateStock: SKOOKUMCHUCK 23.0761
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 SKOOKUMCHUCK HATCHERY 375 EGGS EYED003/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
370 500.0 1 JUVENILE NEWAUKUM R 23.088206/201806/2018
Page 207Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalORTING COOP
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
313Planted 50,000
0Received 50,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 VOIGHTS CR HATCHERY 50,000 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 160.0 313 JUVENILE BRADLEY CR 10.047706/201806/2018
Page 208Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalORTING SD (ORTING)
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 200
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 VOIGHTS CR HATCHERY 250 EGGS EYED012/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
200 500.0 0 JUVENILE VOIGHT CR 10.041404/201804/2018
Page 209Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalPACIFIC CO ANGLERS
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
132Planted 200,000
0Received 200,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: LateStock: WILLAPA R 24.0251
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 FORKS CREEK HATCHERY 200,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 1,500.0 33 JUVENILE MILL CR 24.032201/201801/201850,000 1,500.0 33 JUVENILE STRINGER CR 24.033901/201801/201850,000 1,500.0 33 JUVENILE WALKER CR 24.036901/201801/201850,000 1,500.0 33 JUVENILE WILLAPA R 24.025101/201801/2018
Page 210Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Remote Site Incubator Project.
2017 Future Brood Document FinalPANTHER LK ES (FEDE
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 175
0Received 200
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 VOIGHTS CR HATCHERY 200 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
175 500.0 0 JUVENILE HYLEBOS CR 10.000605/201805/2018
Page 211Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalPARK PLACE MS
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 250 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE SKYKOMISH R 07.001205/201805/2018
Page 212Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalPEDERSEN PROJECT
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
30Planted 45,000
0Received 50,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKOOKUMCHUCK 23.0761
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 SKOOKUMCHUCK HATCHERY 50,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
45,000 1,500.0 30 JUVENILE NEWAUKUM R-NF23.088704/201804/2018
Page 213Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalPESHASTIN INCUBATION
NORTH CENTRAL WASHINGTON
YAKAMA TRIBE
Egg Take 720,000
Planted
Received
0Shipping 1,100,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 720,000
Shipped 12/2017 OR- CASCADE HATCHERY 400,000 EGGS EYED001/2018Shipped 12/2017 WILLARD NFH 700,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 214Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalPETERSON PROJECT
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
195Planted 39,000
0Received 40,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: GRAYS R 25.0093
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 GRAYS RIVER HATCHERY 40,000 0.0 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
39,000 200.0 195 JUVENILE COLUMBIA R - GENERAL AD05/201804/2018
Page 215Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Release Lower Columbia River.
2017 Future Brood Document FinalPORT GAMBLE BAY PENS
COASTAL / PUGET SOUND / HOOD CANAL
INTERAGENCY PROJECTS
Egg Take
26,667Planted 400,000
17,000Received 425,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: BIG QUILCENE 17.0012
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 GEORGE ADAMS HATCHERY 425,000 25.0 JUVENILE17,00002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
355,000 15.0 23,667 JUVENILE PORT GAMBLE BAY PENS AD06/201806/201845,000 15.0 3,000 JUVENILE PORT GAMBLE BAY PENS AD06/201806/2018
Page 216Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalPORT GAMBLE BAY PENS
COASTAL / PUGET SOUND / HOOD CANAL
INTERAGENCY PROJECTS
Egg Take
26,667Planted 400,000
17,000Received 425,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: BIG QUILCENE 17.0012
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2019 GEORGE ADAMS HATCHERY 425,000 25.0 JUVENILE17,00002/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
355,000 15.0 23,667 JUVENILE PORT GAMBLE BAY PENS AD06/201906/201945,000 15.0 3,000 JUVENILE PORT GAMBLE BAY PENS AD06/201906/2019
Page 217Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalPORT ORCHARD ROTARY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
10Planted 15,000
0Received 15,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: MINTER CR 15.0048
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 MINTER CR HATCHERY 15,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
15,000 1,500.0 10 JUVENILE BEAVER CR 15.019203/201803/2018
Page 218Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalPUYALLUP HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
17,647Planted 300,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
250,000 17.0 14,706 JUVENILE CLARKS CR 10.0027 AD04/201804/201850,000 17.0 2,941 JUVENILE CLARKS CR 10.0027 AD04/201804/2018
Page 219Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalPUYALLUP HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
17,647Planted 300,000
2,200Received 330,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 05/2018 VOIGHTS CR HATCHERY 330,000 150.0 JUVENILE2,20006/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 17.0 2,941 JUVENILE CLARKS CR 10.0027 AD04/201904/2019250,000 17.0 14,706 JUVENILE CLARKS CR 10.0027 AD04/201904/2019
Page 220Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalPUYALLUP HS(PUYALLUP
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 VOIGHTS CR HATCHERY 250 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE CLARKS CR 10.002702/201802/2018
Page 221Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalPUYALLUP TRIBAL HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
PUYALLUP TRIBE
Egg Take
5,556Planted 100,000
3,333Received 100,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 VOIGHTS CR HATCHERY 100,000 30.0 JUVENILE3,33302/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 18.0 5,556 JUVENILE RUSHINGWATER 10.0625 AD05/201805/2018
Page 222Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalPUYALLUP TRIBAL HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
PUYALLUP TRIBE
Egg Take
5,556Planted 100,000
3,333Received 100,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2019 VOIGHTS CR HATCHERY 100,000 30.0 JUVENILE3,33302/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 18.0 5,556 JUVENILE RUSHINGWATER 10.0625 AD05/201905/2019
Page 223Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalQUEEN OF ANGELS SCHL
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: DUNGENESS HATCHERY
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 HURD CR HATCHERY 250 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE VALLEY CR 18.024905/201805/2018
Page 224Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalQUILCENE BAY SEA PEN
COASTAL / PUGET SOUND / HOOD CANAL
INTERAGENCY PROJECTS
Egg Take
10,000Planted 150,000
8,000Received 200,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: BIG QUILCENE 17.0012
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 QUILCENE NFH 200,000 25.0 JUVENILE8,00003/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
110,000 15.0 7,333 JUVENILE QUILCENE BAY SEAPENS AD05/201805/201840,000 15.0 2,667 JUVENILE QUILCENE BAY SEAPENS AD05/201805/2018
Page 225Tuesday, August 1, 2017
Memo: Skokomish Tribe, WDFW and NFH.
2017 Future Brood Document FinalQUILCENE BAY SEA PEN
COASTAL / PUGET SOUND / HOOD CANAL
INTERAGENCY PROJECTS
Egg Take
10,000Planted 150,000
8,000Received 200,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: BIG QUILCENE 17.0012
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2019 QUILCENE NFH 200,000 25.0 JUVENILE8,00003/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
40,000 15.0 2,667 JUVENILE QUILCENE BAY SEAPENS AD05/201905/2019110,000 15.0 7,333 JUVENILE QUILCENE BAY SEAPENS AD05/201905/2019
Page 226Tuesday, August 1, 2017
Memo: Skokomish Tribe, WDFW and NFH.
2017 Future Brood Document FinalQUILCENE NFH
COASTAL / PUGET SOUND / HOOD CANAL
U.S. FISH AND WILDLIFE SERVICE
Egg Take
22,556Planted 406,000
Received
8,000Shipping 200,000
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: BIG QUILCENE 17.0012
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 03/2018 QUILCENE BAY SEA PEN 200,000 25.0 JUVENILE8,00003/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
75,000 18.0 4,167 JUVENILE BIG QUILCENE 17.001205/201805/201875,000 18.0 4,167 JUVENILE BIG QUILCENE 17.0012 AD05/201805/2018256,000 18.0 14,222 JUVENILE BIG QUILCENE 17.0012 AD05/201805/2018
Page 227Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalQUILCENE NFH
COASTAL / PUGET SOUND / HOOD CANAL
U.S. FISH AND WILDLIFE SERVICE
Egg Take 1,300,000
22,556Planted 406,000
Received
8,000Shipping 650,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: BIG QUILCENE 17.0012
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 1,300,000
Shipped 11/2017 GEORGE ADAMS HATCHERY 450,000 EGGS EYED011/2017Shipped 03/2019 QUILCENE BAY SEA PEN 200,000 25.0 JUVENILE8,00003/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
256,000 18.0 14,222 JUVENILE BIG QUILCENE 17.0012 AD05/201905/201975,000 18.0 4,167 JUVENILE BIG QUILCENE 17.0012 AD05/201905/201975,000 18.0 4,167 JUVENILE BIG QUILCENE 17.001205/201905/2019
Page 228Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalQUINAULT NFH ‐COOK C
COASTAL / PUGET SOUND / HOOD CANAL
U.S. FISH AND WILDLIFE SERVICE
Egg Take
44,000Planted 660,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: COOK CR 21.0429
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
580,000 15.0 38,667 JUVENILE COOK CR 21.0429 AD05/201805/201880,000 15.0 5,333 JUVENILE COOK CR 21.0429 AD05/201805/2018
Page 229Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalQUINAULT NFH ‐COOK C
COASTAL / PUGET SOUND / HOOD CANAL
U.S. FISH AND WILDLIFE SERVICE
Egg Take 700,000
44,000Planted 660,000
Received
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: COOK CR 21.0429
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 700,000
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
580,000 15.0 38,667 JUVENILE COOK CR 21.0429 AD05/201905/201980,000 15.0 5,333 JUVENILE COOK CR 21.0429 AD05/201905/2019
Page 230Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalRFEG 10 WILLAPA BAY
COASTAL / PUGET SOUND / HOOD CANAL
WILLAPA BAY REGIONAL ENHANCEMENT GROUP
Egg Take
133Planted 200,000
0Received 200,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: LateStock: NASELLE R 24.0543
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 NASELLE HATCHERY 200,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
200,000 1,500.0 133 JUVENILE NASELLE R TR 24.066202/201802/2018
Page 231Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalRFEG 10 WILLAPA BAY
COASTAL / PUGET SOUND / HOOD CANAL
WILLAPA BAY REGIONAL ENHANCEMENT GROUP
Egg Take
313Planted 470,000
0Received 500,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: WILLAPA R 24.0251
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 FORKS CREEK HATCHERY 500,000 EGGS EYED003/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
200,000 1,500.0 133 JUVENILE MILL CR 24.032204/201804/2018270,000 1,500.0 180 JUVENILE NORTH R 24.003404/201804/2018
Page 232Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalRFEG 10 WILLAPA BAY
COASTAL / PUGET SOUND / HOOD CANAL
WILLAPA BAY REGIONAL ENHANCEMENT GROUP
Egg Take
133Planted 200,000
0Received 200,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: NASELLE R 24.0543
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 NASELLE HATCHERY 200,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
200,000 1,500.0 133 JUVENILE NASELLE R TR 24.066202/201802/2018
Page 233Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalRFEG 8 NORTH COAST
COASTAL / PUGET SOUND / HOOD CANAL
NORTH COAST REGIONAL ENHANCEMENT GROUP
Egg Take 12,500
8Planted 12,500
Received
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: BOGACHIEL R 20.0162
Integrated/Segregated:Brood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 12,500
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
12,500 1,500.0 8 JUVENILE BOGACHIEL R TRIBS03/201803/2018
Page 234Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Borde Springs Project. No more than 5 pair, brood‐stocked from the Bogachiel. Backfill from Sol Duc if needed.
2017 Future Brood Document FinalRIDGEFIELD HS(RIDGEF
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
7Planted 10,000
0Received 10,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: LEWIS R 27.0168
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 LEWIS RIVER HATCHERY 10,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
10,000 1,500.0 7 JUVENILE GEE CR 27.016801/201801/2018
Page 235Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalRIVERVIEW ES (SNOHOM
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
1Planted 475
0Received 500
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 500 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
475 500.0 1 JUVENILE MOSHER CR 07.009604/201804/2018
Page 236Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalROGER URBANIAK PROJECT
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
70Planted 107,000
0Received 107,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: ISSAQUAH CR 08.0178
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 ISSAQUAH HATCHERY 107,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
7,000 1,500.0 5 JUVENILE COAL CR 08.026803/201803/20182,000 1,500.0 1 JUVENILE FORBES CR 08.024203/201803/201860,000 1,500.0 40 JUVENILE JUANITA CR 08.023003/201803/201827,000 1,500.0 18 JUVENILE KELSEY CR08.0259-R0203/201803/20182,000 1,500.0 1 JUVENILE LK WASHINGTON (KING)03/201803/20183,000 1,500.0 2 JUVENILE MAY CR 08.028203/201803/20182,000 1,500.0 1 JUVENILE SAMMAMISH TR 08.010403/201803/20182,000 1,500.0 1 JUVENILE UNNAMED CR 08.025203/201803/20182,000 1,500.0 1 JUVENILE UNNAMED CR 08.027503/201803/2018
Page 237Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. This project is part of the former 10 million salmon and Medina RSI. Unnamed Creeks are Medina and Cozy Cove.
2017 Future Brood Document FinalROHLFINGS POND
NORTH CENTRAL WASHINGTON
YAKAMA TRIBE
Egg Take
6,250Planted 100,000
4,652Received 107,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 OR- CASCADE HATCHERY 0 23.0 JUVENILE004/2018Received 03/2018 WILLARD NFH 107,000 23.0 JUVENILE4,65204/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 16.0 6,250 JUVENILE WENATCHEE R 45.003006/201805/2018
Page 238Tuesday, August 1, 2017
Memo: Mid‐Columbia Coho Restoration Project.
2017 Future Brood Document FinalROHLFINGS POND
NORTH CENTRAL WASHINGTON
YAKAMA TRIBE
Egg Take
6,250Planted 100,000
4,565Received 105,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2019 OR- CASCADE HATCHERY 70,000 23.0 JUVENILE3,04304/2019Received 03/2019 WILLARD NFH 35,000 23.0 JUVENILE1,52204/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 16.0 6,250 JUVENILE WENATCHEE R 45.003006/201905/2019
Page 239Tuesday, August 1, 2017
Memo: Mid‐Columbia Coho Restoration Project.
2017 Future Brood Document FinalSALISH COAST ELEMENTARY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: DUNGENESS HATCHERY
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 HURD CR HATCHERY 250 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE CHIMACUM CR 17.020305/201805/2017
Page 240Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSALISH MS
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: LateStock: SKOOKUMCHUCK 23.0761
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 SKOOKUMCHUCK HATCHERY 250 EGGS EYED003/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE SKOOKUMCHUCK 23.076105/201805/2018
Page 241Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSALMON R FISH CULTUR
COASTAL / PUGET SOUND / HOOD CANAL
QUINAULT DEPARTMENT OF NATURAL RESOURCES
Egg Take
43,333Planted 650,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: SALMON R 21.0139
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
500,000 15.0 33,333 JUVENILE SALMON R 21.0139 AD04/201804/201875,000 15.0 5,000 JUVENILE SALMON R 21.013904/201804/201875,000 15.0 5,000 JUVENILE SALMON R 21.0139 AD04/201804/2018
Page 242Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalSALMON R FISH CULTUR
COASTAL / PUGET SOUND / HOOD CANAL
QUINAULT DEPARTMENT OF NATURAL RESOURCES
Egg Take 800,000
43,333Planted 650,000
Received
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SALMON R 21.0139
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 800,000
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
75,000 15.0 5,000 JUVENILE SALMON R 21.013904/201904/2019500,000 15.0 33,333 JUVENILE SALMON R 21.0139 AD04/201904/201975,000 15.0 5,000 JUVENILE SALMON R 21.0139 AD04/201904/2019
Page 243Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalSATSOP SPRINGS PONDS
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
26,471Planted 450,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: SATSOP R 22.0360
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
450,000 17.0 26,471 JUVENILE SATSOP R 22.0360 AD05/201803/2018
Page 244Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Excess coho can be planted in the either Duck Lake or Vance Crk Ponds once viral samples are negative and Co‐manager approval is met.
2017 Future Brood Document FinalSATSOP SPRINGS PONDS
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
26,471Planted 450,000
5,000Received 500,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SATSOP R 22.0360
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 06/2018 BINGHAM CR HATCHERY 500,000 100.0 JUVENILE5,00006/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
450,000 17.0 26,471 JUVENILE SATSOP R 22.0360 AD05/201903/2019
Page 245Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Excess coho can be planted in the either Duck Lake or Vance Crk Ponds once viral samples are negative and Co‐manager approval is met.
2017 Future Brood Document FinalSEATTLE AQUARIUM
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
Planted
40Received 1,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: GREEN R NATIVE (9)
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 SOOS CREEK HATCHERY 1,000 25.0 JUVENILE4002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 246Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Fish are for display only, no release.
2017 Future Brood Document FinalSEATTLE AQUARIUM
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
Planted
40Received 1,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: GREEN R NATIVE (9)
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2019 SOOS CREEK HATCHERY 1,000 25.0 JUVENILE4002/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 247Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Fish are for display only, no release.
2017 Future Brood Document FinalSEATTLE HILL ES(EVER
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 250 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE FRENCH CR 07.018404/201804/2018
Page 248Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Release into Ghost Horse Creek, trib to French Creek.
2017 Future Brood Document FinalSHINING MTAIN ES(SPA
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 VOIGHTS CR HATCHERY 250 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE CLARKS CR 10.002705/201805/2018
Page 249Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSILVER FIRS ES (EVER
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
1Planted 475
0Received 500
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 500 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
475 500.0 1 JUVENILE SULTAN R 07.088104/201804/2018
Page 250Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSILVER LK ES(EVERETT
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
1Planted 475
0Received 500
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 500 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
475 500.0 1 JUVENILE SNOHOMISH R 07.001204/201804/2018
Page 251Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSKAGIT FISH ENHANC GRP
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
1Planted 475
0Received 500
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKAGIT R 03.0176
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 MARBLEMOUNT HATCHERY 500 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
475 500.0 1 JUVENILE SKAGIT R TRIBS05/201805/2018
Page 252Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Trumpeter Creek.
2017 Future Brood Document FinalSKOOKUM CR HATCHERY
NORTH PUGET SOUND
LUMMI TRIBE
Egg Take
66,666Planted 1,000,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: SKOOKUM CR 01.0273
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
950,000 15.0 63,333 JUVENILE SKOOKUM CR 01.0273 AD06/201805/201850,000 15.0 3,333 JUVENILE SKOOKUM CR 01.0273 AD06/201805/2018
Page 253Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalSKOOKUM CR HATCHERY
NORTH PUGET SOUND
LUMMI TRIBE
Egg Take
Planted
Received
25,000Shipping 1,000,000
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: LUMMI STOCK
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 04/2018 LUMMI SEA PONDS 1,000,000 40.0 JUVENILE25,00004/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 254Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalSKOOKUM CR HATCHERY
NORTH PUGET SOUND
LUMMI TRIBE
Egg Take 1,600,000
66,666Planted 1,000,000
Received
0Shipping 125,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKOOKUM CR 01.0273
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 1,600,000
Shipped 12/2017 FERNDALE HS 20,000 EGGS EYED001/2018Shipped 12/2017 LYNDEN CHRISTIAN 50,000 EGGS EYED001/2018Shipped 12/2017 NELSON PROJECT 40,000 EGGS EYED001/2018Shipped 12/2017 TOAD CREEK PROJECT 15,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
950,000 15.0 63,333 JUVENILE SKOOKUM CR 01.0273 AD06/201905/201950,000 15.0 3,333 JUVENILE SKOOKUM CR 01.0273 AD06/201905/2019
Page 255Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalSKOOKUM CR HATCHERY
NORTH PUGET SOUND
LUMMI TRIBE
Egg Take
Planted
0Received 1,200,000
25,000Shipping 1,000,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: LUMMI STOCK
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 LUMMI SEA PONDS 1,200,000 EGGS EYED012/2017Shipped 04/2019 LUMMI SEA PONDS 1,000,000 40.0 JUVENILE25,00004/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 256Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalSKOOKUMCHUCK HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
2,941Planted 50,000
Received
6,300Shipping 157,500
Total PoundsTotal #Brood Year: 2016Species: CohoRun: LateStock: SKOOKUMCHUCK 23.0761
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 01/2018 CARLISLE LK PROJECT 52,500 25.0 JUVENILE2,10001/2018Shipped 01/2018 EIGHT CK/UPR CHEHALI 105,000 25.0 JUVENILE4,20001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 17.0 2,941 JUVENILE SKOOKUMCHUCK 23.0761 AD05/201804/2018
Page 257Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSKOOKUMCHUCK HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
Planted
Received
60,800Shipping 1,520,000
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 01/2018 SOUTH SOUND NET PENS 810,000 25.0 JUVENILE32,40002/2018Shipped 01/2018 SQUAXIN ISLAND PENS 710,000 25.0 JUVENILE28,40002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 258Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Squaxin Island transfer has 80K AD+LV.
2017 Future Brood Document FinalSKOOKUMCHUCK HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
2,941Planted 50,000
Received
2,100Shipping 52,500
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: SKOOKUMCHUCK 23.0761
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 01/2018 CARLISLE LK PROJECT 52,500 25.0 JUVENILE2,10001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 17.0 2,941 JUVENILE SKOOKUMCHUCK 23.0761 AD05/201804/2018
Page 259Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSKOOKUMCHUCK HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 301,500
2,941Planted 50,000
Received
6,300Shipping 208,750
Total PoundsTotal #Brood Year: 2017Species: CohoRun: LateStock: SKOOKUMCHUCK 23.0761
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 301,500
Shipped 03/2018 CHINOOK MS (LACEY) 250 EGGS EYED003/2018Shipped 03/2018 LEWIS CO. CONS. DIST. 50,000 EGGS EYED003/2018Shipped 03/2018 NAPAVINE JHS HS 375 EGGS EYED003/2018Shipped 03/2018 OLYMPIC ES (CHEHALIS 375 EGGS EYED003/2018Shipped 03/2018 SALISH MS 250 EGGS EYED003/2018Shipped 01/2019 CARLISLE LK PROJECT 52,500 25.0 JUVENILE2,10001/2019Shipped 01/2019 EIGHT CK/UPR CHEHALI 105,000 25.0 JUVENILE4,20001/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 17.0 2,941 JUVENILE SKOOKUMCHUCK 23.0761 AD05/201904/2019
Page 260Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSKOOKUMCHUCK HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
Planted
0Received 1,650,000
60,800Shipping 1,520,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 MARBLEMOUNT HATCHERY 1,650,000 EGGS EYED001/2018Shipped 01/2019 SOUTH SOUND NET PENS 810,000 25.0 JUVENILE32,40002/2019Shipped 01/2019 SQUAXIN ISLAND PENS 710,000 25.0 JUVENILE28,40002/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 261Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Squaxin Island transfer has 80K AD+LV.
2017 Future Brood Document FinalSKOOKUMCHUCK HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 500,000
2,941Planted 50,000
Received
2,100Shipping 277,500
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKOOKUMCHUCK 23.0761
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 500,000
Shipped 01/2018 BYRD CRK PROJECT 25,000 EGGS EYED001/2018Shipped 01/2018 DEEP CR 23.0957 100,000 EGGS EYED001/2018Shipped 01/2018 HEIMBIGNER PROJECT 50,000 EGGS EYED001/2018Shipped 01/2018 PEDERSEN PROJECT 50,000 EGGS EYED001/2018Shipped 01/2019 CARLISLE LK PROJECT 52,500 25.0 JUVENILE2,10001/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 17.0 2,941 JUVENILE SKOOKUMCHUCK 23.0761 AD05/201904/2019
Page 262Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSKYLINE ES (EVERETT)
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 250 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE CATHERINE CR 07.014804/201804/2018
Page 263Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSNOHOMISH SPORTSMEN
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
24Planted 24,000
24Received 24,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 WALLACE R HATCHERY 24,000 1,000.0 JUVENILE2403/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
12,000 1,000.0 12 JUVENILE PILCHUCK R 07.012503/201803/201812,000 1,000.0 12 JUVENILE SNOHOMISH R 07.001203/201803/2018
Page 264Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSOLDUC HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
33,333Planted 500,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: SOL DUC R 20.0096
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
200,000 15.0 13,333 JUVENILE SOL DUC R 20.0096 AD04/201704/2018150,000 15.0 10,000 JUVENILE SOL DUC R 20.0096 AD04/201804/201875,000 15.0 5,000 JUVENILE SOL DUC R 20.0096 AD04/201804/201875,000 15.0 5,000 JUVENILE SOL DUC R 20.009604/201804/2018
Page 265Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Tribe sponsors 200k.
2017 Future Brood Document FinalSOLDUC HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
6,667Planted 100,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: SummerStock: SOL DUC R 20.0096
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 15.0 6,667 JUVENILE SOL DUC R 20.0096 AD04/201804/2018
Page 266Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSOLDUC HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 540,000
33,333Planted 500,000
Received
0Shipping 100
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SOL DUC R 20.0096
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 540,000
Shipped 01/2018 NATURE BRIDGE ONP 100 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
75,000 15.0 5,000 JUVENILE SOL DUC R 20.009604/201904/2019200,000 15.0 13,333 JUVENILE SOL DUC R 20.0096 AD04/201904/2019150,000 15.0 10,000 JUVENILE SOL DUC R 20.0096 AD04/201904/201975,000 15.0 5,000 JUVENILE SOL DUC R 20.0096 AD04/201904/2019
Page 267Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Tribe sponsors 200k.
2017 Future Brood Document FinalSOLDUC HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 118,000
6,667Planted 100,000
Received
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: SummerStock: SOL DUC R 20.0096
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 118,000
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 15.0 6,667 JUVENILE SOL DUC R 20.0096 AD04/201904/2019
Page 268Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSOOS CREEK HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
35,294Planted 600,000
Received
8,740Shipping 631,000
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: GREEN R NATIVE (9)
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 08/2017 KETA CREEK COMPLEX 600,000 80.0 JUVENILE7,50008/2017Shipped 02/2018 SEATTLE AQUARIUM 1,000 25.0 JUVENILE4002/2018Shipped 02/2018 TU - DES MOINES 30,000 25.0 JUVENILE1,20002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
510,000 17.0 30,000 JUVENILE BIG SOOS CR 09.0072 AD04/201804/201845,000 17.0 2,647 JUVENILE BIG SOOS CR 09.0072 AD04/201804/201845,000 17.0 2,647 JUVENILE BIG SOOS CR 09.007204/201804/2018
Page 269Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Keta Creek Complex is operated by the Muckleshoot Tribe. 600K in production at Keta contingent on external funding. 300K at Soos contingent on external funding.
2017 Future Brood Document FinalSOOS CREEK HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 220,000
Planted
Received
0Shipping 212,900
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: GREEN R NATIVE (9)
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 220,000
Shipped 12/2017 CITY OF TUKWILA 80,000 EGGS EYED001/2018Shipped 12/2017 COVENANT HS (PIER) 250 EGGS EYED001/2018Shipped 12/2017 FRIENDS OF ISH 7,400 EGGS EYED001/2018Shipped 12/2017 MARINE TECH CENTR 5,000 EGGS EYED001/2018Shipped 12/2017 SOUTHWOOD ES(ENUMCLA 250 EGGS EYED001/2018Shipped 12/2017 TU - DES MOINES 120,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 270Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSOOS CREEK HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 1,705,000
35,294Planted 600,000
Received
8,802Shipping 662,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: GREEN R NATIVE (9)
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 1,705,000
Shipped 03/2018 WORDAN PROJECT 1,000 500.0 JUVENILE203/2018Shipped 04/2018 VASHON SPORTSMEN 30,000 500.0 JUVENILE6004/2018Shipped 08/2018 KETA CREEK COMPLEX 600,000 80.0 JUVENILE7,50008/2018Shipped 02/2019 SEATTLE AQUARIUM 1,000 25.0 JUVENILE4002/2019Shipped 02/2019 TU - DES MOINES 30,000 25.0 JUVENILE1,20002/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
510,000 17.0 30,000 JUVENILE BIG SOOS CR 09.0072 AD04/201904/201945,000 17.0 2,647 JUVENILE BIG SOOS CR 09.0072 AD04/201904/201945,000 17.0 2,647 JUVENILE BIG SOOS CR 09.007204/201904/2019
Page 271Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Keta Creek Complex is operated by the Muckleshoot Tribe. 600K in production at Keta contingent on external funding. 300K at Soos contingent on external funding.
2017 Future Brood Document FinalSOUTH SOUND NET PENS
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
91,667Planted 1,100,000
44,600Received 1,115,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 SKOOKUMCHUCK HATCHERY 810,000 25.0 JUVENILE32,40002/2018Received 01/2018 WALLACE R HATCHERY 305,000 25.0 JUVENILE12,20002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
1,050,000 12.0 87,500 JUVENILE PEALE PASS @ SS PENS AD06/201805/201850,000 12.0 4,167 JUVENILE PEALE PASS @ SS PENS AD06/201805/2018
Page 272Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSOUTH SOUND NET PENS
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
91,667Planted 1,100,000
44,600Received 1,115,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2019 SKOOKUMCHUCK HATCHERY 810,000 25.0 JUVENILE32,40002/2019Received 01/2019 WALLACE R HATCHERY 305,000 25.0 JUVENILE12,20002/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
50,000 12.0 4,167 JUVENILE PEALE PASS @ SS PENS AD06/201905/20191,050,000 12.0 87,500 JUVENILE PEALE PASS @ SS PENS AD06/201905/2019
Page 273Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSOUTH WHIDBEY ES(LAN
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 200
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 250 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
200 500.0 0 JUVENILE MAXWELTON CR 06.002904/201804/2018
Page 274Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSOUTHWOOD ES(ENUMCLA
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: GREEN R NATIVE (9)
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 SOOS CREEK HATCHERY 250 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE GREEN R 09.000105/201805/2018
Page 275Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Former Friends of Ish School.
2017 Future Brood Document FinalSPEELYAI HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 1,850,000
Planted
Received
0Shipping 1,775,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type SStock: LEWIS RIVER HATCHERY
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 1,850,000
Shipped 10/2017 WASHOUGAL HATCHERY 450,000 EGGS GREEN010/2017Shipped 11/2017 LEWIS RIVER HATCHERY 1,325,000 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 276Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSPRING VALLEY SCHOOL
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 VOIGHTS CR HATCHERY 250 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE HYLEBOS CR 10.000605/201805/2018
Page 277Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSQUAXIN ISLAND PENS
COASTAL / PUGET SOUND / HOOD CANAL
INTERAGENCY PROJECTS
Egg Take
58,333Planted 700,000
28,400Received 710,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 SKOOKUMCHUCK HATCHERY 710,000 25.0 JUVENILE28,40002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
625,000 12.0 52,083 JUVENILE PEALE PASS @ SI PENS AD06/201804/201875,000 12.0 6,250 JUVENILE PEALE PASS @ SI PENS AD07/201806/2018
Page 278Tuesday, August 1, 2017
Memo: Release 10‐12 fpp.
2017 Future Brood Document FinalSQUAXIN ISLAND PENS
COASTAL / PUGET SOUND / HOOD CANAL
INTERAGENCY PROJECTS
Egg Take
58,333Planted 700,000
28,400Received 710,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2019 SKOOKUMCHUCK HATCHERY 710,000 25.0 JUVENILE28,40002/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
625,000 12.0 52,083 JUVENILE PEALE PASS @ SI PENS AD06/201904/201975,000 12.0 6,250 JUVENILE PEALE PASS @ SI PENS AD07/201906/2019
Page 279Tuesday, August 1, 2017
Memo: Release 10‐12 fpp.
2017 Future Brood Document FinalST CHARLES BORROMEO
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 VOIGHTS CR HATCHERY 250 EGGS EYED012/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE PUGET CREEK05/201805/2018
Page 280Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSTADIUM HS (TACOMA)
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 VOIGHTS CR HATCHERY 250 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE SWAN CR 10.002305/201805/2018
Page 281Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSTEVE SYVERSON PROJ
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
3Planted 5,000
0Received 5,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: LEWIS R 27.0168
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 LEWIS RIVER HATCHERY 5,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
5,000 1,500.0 3 JUVENILE SALMON CR 28.005903/201803/2018
Page 282Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSULTAN ES (SULTAN)
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 250 0.0 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE WAGLEYS CR 07.093904/201804/2018
Page 283Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalSULTAN HS (SULTAN)
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
20Planted 10,000
0Received 10,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 WALLACE R HATCHERY 10,000 EGGS EYED011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
2,500 500.0 5 JUVENILE SKYKOMISH TRB 7.006505/201805/20185,000 500.0 10 JUVENILE WINTERS CR 07.088205/201805/20182,500 500.0 5 JUVENILE WOODS CR 07.088405/201805/2018
Page 284Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Released into Groeneveld Cr (WRIA 07). Formally Sky Valley Schools.
2017 Future Brood Document FinalSURPRISE LAKE PROJ
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
7Planted 10,000
0Received 10,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 VOIGHTS CR HATCHERY 10,000 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
10,000 1,500.0 7 JUVENILE HYLEBOS CR 10.000603/201803/2018
Page 285Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Remote Site Incubator Project.
2017 Future Brood Document FinalTACOMA COMMUNITY COLLEGE
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 VOIGHTS CR HATCHERY 250 EGGS EYED012/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE PUGET CREEK05/201805/2018
Page 286Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalTOAD CREEK PROJECT
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
10Planted 15,000
0Received 15,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKOOKUM CR 01.0273
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 SKOOKUM CR HATCHERY 15,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
15,000 1,500.0 10 JUVENILE TOAD CR 01.056004/201804/2018
Page 287Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Remote Site Incubator Project.
2017 Future Brood Document FinalTU ‐ DES MOINES
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
2,000Planted 30,000
1,200Received 30,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: GREEN R NATIVE (9)
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 SOOS CREEK HATCHERY 30,000 25.0 JUVENILE1,20002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
30,000 15.0 2,000 JUVENILE DES MOINES NET PENS AD06/201806/2018
Page 288Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalTU ‐ DES MOINES
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
80Planted 120,000
0Received 120,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: GREEN R NATIVE (9)
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 SOOS CREEK HATCHERY 120,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
54,000 1,500.0 36 JUVENILE DES MOINES C 09.037701/201801/201833,000 1,500.0 22 JUVENILE MILLER CR 09.037101/201801/201833,000 1,500.0 22 JUVENILE WALKER CR 09.037201/201801/2018
Page 289Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Remote Site Incubator Project.
2017 Future Brood Document FinalTU ‐ DES MOINES
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
2,000Planted 30,000
1,200Received 30,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: GREEN R NATIVE (9)
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2019 SOOS CREEK HATCHERY 30,000 25.0 JUVENILE1,20002/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
30,000 15.0 2,000 JUVENILE DES MOINES NET PENS AD06/201906/2019
Page 290Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalTWISP ACCLIMATION PD
NORTH CENTRAL WASHINGTON
YAKAMA TRIBE
Egg Take
0Planted 0
0Received 0
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 WILLARD NFH 0 25.0 JUVENILE004/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
0 25.0 0 JUVENILE TWISP R 48.037406/201805/2018
Page 291Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalTWISP ACCLIMATION PD
NORTH CENTRAL WASHINGTON
YAKAMA TRIBE
Egg Take
3,600Planted 90,000
3,600Received 90,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2019 WILLARD NFH 90,000 25.0 JUVENILE3,60004/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
90,000 25.0 3,600 JUVENILE TWISP R 48.037406/201905/2019
Page 292Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalVASHON SPORTSMEN
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
60Planted 30,000
60Received 30,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: GREEN R NATIVE (9)
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 04/2018 SOOS CREEK HATCHERY 30,000 500.0 JUVENILE6004/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
15,000 500.0 30 JUVENILE JUDD CR 15.012904/201804/201815,000 500.0 30 JUVENILE SHINGLE MILL 15.013004/201804/2018
Page 293Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalVOIGHTS CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
45,882Planted 780,000
Received
3,478Shipping 103,200
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 02/2018 CLARKS CRK HATCHERY 3,200 22.0 JUVENILE14502/2018Shipped 02/2018 PUYALLUP TRIBAL HATCHERY 100,000 30.0 JUVENILE3,33302/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
690,000 17.0 40,588 JUVENILE VOIGHT CR 10.0414 AD04/201804/201845,000 17.0 2,647 JUVENILE VOIGHT CR 10.0414 AD04/201804/201845,000 17.0 2,647 JUVENILE VOIGHT CR 10.041404/201804/2018
Page 294Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Volitional Release.
2017 Future Brood Document FinalVOIGHTS CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 1,435,450
45,882Planted 780,000
Received
3,753Shipping 511,700
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 1,435,450
Shipped 12/2017 HARRIS HOME SCHOOL 250 EGGS EYED012/2017Shipped 12/2017 ORTING SD (ORTING) 250 EGGS EYED012/2017Shipped 12/2017 ST CHARLES BORROMEO 250 EGGS EYED012/2017Shipped 12/2017 TACOMA COMMUNITY COLLEGE 250 EGGS EYED012/2017Shipped 02/2018 ALL SAINTS SCHOOL 250 EGGS EYED002/2018Shipped 02/2018 CITY OF FEDERAL WAY 250 EGGS EYED002/2018Shipped 02/2018 CONCORDIA LUTH SCHL 250 EGGS EYED002/2018Shipped 02/2018 ENUMCLAW HS 250 EGGS EYED002/2018Shipped 02/2018 FRIENDS OF ISH 4,550 0.0 EGGS EYED002/2018Shipped 02/2018 GLACIER MS 250 EGGS EYED002/2018Shipped 02/2018 MAPLEWOOD ES(PUYALLU 250 EGGS EYED002/2018Shipped 02/2018 MEEKER MS (TACOMA) 10,000 EGGS EYED002/2018Shipped 02/2018 ORTING COOP 50,000 EGGS EYED002/2018Shipped 02/2018 PANTHER LK ES (FEDE 200 EGGS EYED002/2018Shipped 02/2018 PUYALLUP HS(PUYALLUP 250 EGGS EYED002/2018Shipped 02/2018 SHINING MTAIN ES(SPA 250 EGGS EYED002/2018Shipped 02/2018 SPRING VALLEY SCHOOL 250 EGGS EYED002/2018
Page 295Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Volitional Release.
2017 Future Brood Document FinalVOIGHTS CR HATCHERY
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 1,435,450
45,882Planted 780,000
Received
3,753Shipping 511,700
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
Shipped 02/2018 STADIUM HS (TACOMA) 250 EGGS EYED002/2018Shipped 02/2018 SURPRISE LAKE PROJ 10,000 EGGS EYED002/2018Shipped 02/2018 WILKESON ES(WILKESON 250 EGGS EYED002/2018Shipped 03/2018 PUYALLUP HATCHERY 330,000 1,200.0 JUVENILE27504/2018Shipped 02/2019 CLARKS CRK HATCHERY 3,200 22.0 JUVENILE14502/2019Shipped 02/2019 PUYALLUP TRIBAL HATCHERY 100,000 30.0 JUVENILE3,33302/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
690,000 17.0 40,588 JUVENILE VOIGHT CR 10.0414 AD04/201904/201945,000 17.0 2,647 JUVENILE VOIGHT CR 10.0414 AD04/201904/201945,000 17.0 2,647 JUVENILE VOIGHT CR 10.041404/201904/2019
Page 296Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Volitional Release.
2017 Future Brood Document FinalWAHKIAKUM HS(CATHLAM
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
313Planted 5,000
275Received 5,500
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type NStock: GRAYS R 25.0093
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 BEAVER CR HATCHERY 5,500 20.0 JUVENILE27503/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
5,000 16.0 313 JUVENILE BIRNIE CR 25.0281 AD04/201804/2018
Page 297Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalWAHKIAKUM HS(CATHLAM
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
313Planted 5,000
275Received 5,500
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: GRAYS R 25.0093
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2019 BEAVER CR HATCHERY 5,500 20.0 JUVENILE27503/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
5,000 16.0 313 JUVENILE BIRNIE CR 25.0281 AD04/201904/2019
Page 298Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalWALLACE R HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
8,823Planted 150,000
Received
13,000Shipping 325,000
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 01/2018 SOUTH SOUND NET PENS 305,000 25.0 JUVENILE12,20002/2018Shipped 02/2018 EVERETT SH AND SALMON 20,000 25.0 JUVENILE80002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
60,000 17.0 3,529 JUVENILE SKYKOMISH R 07.0012 AD05/201805/201845,000 17.0 2,647 JUVENILE SKYKOMISH R 07.0012 AD05/201805/201845,000 17.0 2,647 JUVENILE SKYKOMISH R 07.001205/201805/2018
Page 299Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalWALLACE R HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 4,500,000
8,823Planted 150,000
Received
13,024Shipping 3,724,250
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 4,500,000
Shipped 10/2017 BERNIE GOBIN HATCH 1,600,000 EGGS GREEN010/2017Shipped 10/2017 MARBLEMOUNT HATCHERY 1,700,000 EGGS GREEN010/2017Shipped 11/2017 CARNATION ES 250 EGGS EYED011/2017Shipped 11/2017 CEDAR SPRINGS CAMP 500 EGGS EYED011/2017Shipped 11/2017 CEDARCREST SCHL(MARY 250 EGGS EYED011/2017Shipped 11/2017 CHAIN LAKE ES(SNOHOM 250 EGGS EYED011/2017Shipped 11/2017 CRYSTAL SPRINGS ES 250 EGGS EYED011/2017Shipped 11/2017 EDMONDS ES (EDMONDS) 250 EGGS EYED011/2017Shipped 11/2017 HOLY ROSARY (EDMONDS 250 EGGS EYED011/2017Shipped 11/2017 MALTBY ES (SNOHOMISH 250 EGGS EYED011/2017Shipped 11/2017 NWSSC - EAGLE CREEK 60,000 EGGS EYED011/2017Shipped 11/2017 PARK PLACE MS 250 EGGS EYED011/2017Shipped 11/2017 RIVERVIEW ES (SNOHOM 500 EGGS EYED011/2017Shipped 11/2017 SEATTLE HILL ES(EVER 250 EGGS EYED011/2017Shipped 11/2017 SILVER FIRS ES (EVER 500 EGGS EYED011/2017Shipped 11/2017 SILVER LK ES(EVERETT 500 EGGS EYED011/2017Shipped 11/2017 SKYLINE ES (EVERETT) 250 EGGS EYED011/2017
Page 300Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalWALLACE R HATCHERY
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 4,500,000
8,823Planted 150,000
Received
13,024Shipping 3,724,250
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SKYKOMISH R 07.0012
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
Shipped 11/2017 SOUTH WHIDBEY ES(LAN 250 EGGS EYED011/2017Shipped 11/2017 SULTAN ES (SULTAN) 250 EGGS EYED011/2017Shipped 11/2017 SULTAN HS (SULTAN) 10,000 EGGS EYED011/2017Shipped 01/2018 MONROE ES(EVERETT) 250 EGGS EYED001/2018Shipped 03/2018 SNOHOMISH SPORTSMEN 24,000 1,000.0 JUVENILE2403/2018Shipped 01/2019 SOUTH SOUND NET PENS 305,000 25.0 JUVENILE12,20002/2019Shipped 02/2019 EVERETT SH AND SALMON 20,000 25.0 JUVENILE80002/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
60,000 17.0 3,529 JUVENILE SKYKOMISH R 07.0012 AD05/201905/201945,000 17.0 2,647 JUVENILE SKYKOMISH R 07.0012 AD05/201905/201945,000 17.0 2,647 JUVENILE SKYKOMISH R 07.001205/201905/2019
Page 301Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalWASHOUGAL HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
Planted
Received
15,400Shipping 385,000
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type NStock: GRAYS R 25.0093
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 11/2017 DEEP R NET PENS 385,000 25.0 JUVENILE15,40011/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 302Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalWASHOUGAL HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
125,000Planted 2,500,000
Received
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type NStock: WASHOUGAL HATCHERY
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
2,430,000 20.0 121,500 JUVENILE KLICKITAT R 30.0002 AD04/201804/201870,000 20.0 3,500 JUVENILE KLICKITAT R 30.0002 AD04/201804/2018
Page 303Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Remaining Klickitat River production planted at RM 18. Will be Lewis Stock if Washougal Stock in not available.
2017 Future Brood Document FinalWASHOUGAL HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
10,000Planted 150,000
Received
1Shipping 250
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type NStock: WASHOUGAL R 28.0159
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 03/2017 CITY OF VANCOUVER 250 500.0 JUVENILE103/2017
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
105,000 15.0 7,000 JUVENILE WASHOUGAL R 28.0159 AD06/201805/201845,000 15.0 3,000 JUVENILE WASHOUGAL R 28.0159 AD06/201805/2018
Page 304Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalWASHOUGAL HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
Planted
0Received 285,000
15,400Shipping 385,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: GRAYS R 25.0093
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 GRAYS RIVER HATCHERY 285,000 EGGS GREEN001/2018Shipped 11/2018 DEEP R NET PENS 385,000 25.0 JUVENILE15,40011/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 305Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalWASHOUGAL HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take
Planted
0Received 4,423,000
0Shipping 1,300,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: LEWIS R 27.0168
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 11/2017 LEWIS RIVER HATCHERY 3,000,000 EGGS GREEN012/2017Received 11/2017 LEWIS RIVER HATCHERY 1,423,000 EGGS GREEN012/2017Shipped 01/2018 KLICKITAT HATCHERY (YKFP) 1,300,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 306Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. The 3 million will backfill if Washougal stock is not available for releases.
2017 Future Brood Document FinalWASHOUGAL HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 3,000,000
125,000Planted 2,500,000
Received
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: WASHOUGAL HATCHERY
Integrated/Segregated: SEGREGATEDBrood Origin: HATCHERY
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 3,000,000
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
2,430,000 20.0 121,500 JUVENILE KLICKITAT R 30.0002 AD04/201904/201970,000 20.0 3,500 JUVENILE KLICKITAT R 30.0002 AD04/201904/2019
Page 307Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Remaining Klickitat River production planted at RM 18. Will be Lewis Stock if Washougal Stock in not available.
2017 Future Brood Document FinalWASHOUGAL HATCHERY
SOUTHWEST WASHINGTON / LOWER COL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE
Egg Take 200,500
10,000Planted 150,000
Received
0Shipping 500
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type NStock: WASHOUGAL R 28.0159
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 200,500
Shipped 03/2018 CAPE HORN SKYE ES 250 EGGS EYED003/2018Shipped 03/2018 CITY OF VANCOUVER 250 EGGS EYED003/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
105,000 15.0 7,000 JUVENILE WASHOUGAL R 28.0159 AD06/201905/201945,000 15.0 3,000 JUVENILE WASHOUGAL R 28.0159 AD06/201905/2019
Page 308Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalWESTPORT NET PENS
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
8,333Planted 100,000
4,773Received 105,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: NAStock: SATSOP R 22.0360
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 BINGHAM CR HATCHERY 105,000 22.0 JUVENILE4,77301/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 12.0 8,333 JUVENILE WESTPORT BOAT BASIN AD05/201804/2018
Page 309Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Port of Grays Harbor Cooperative.
2017 Future Brood Document FinalWESTPORT NET PENS
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
8,333Planted 100,000
4,773Received 105,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: SATSOP R 22.0360
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2019 BINGHAM CR HATCHERY 105,000 22.0 JUVENILE4,77301/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
100,000 12.0 8,333 JUVENILE WESTPORT BOAT BASIN AD05/201904/2019
Page 310Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding. Port of Grays Harbor Cooperative.
2017 Future Brood Document FinalWILKESON ES(WILKESON
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ EDUCATIONAL COOPS
Egg Take
0Planted 225
0Received 250
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: PUYALLUP R 10.0021
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 02/2018 VOIGHTS CR HATCHERY 250 EGGS EYED002/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
225 500.0 0 JUVENILE WILKESON CR 10.043205/201805/2018
Page 311Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalWILLAPA BAY GILLNETR
COASTAL / PUGET SOUND / HOOD CANAL
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
167Planted 250,000
0Received 250,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: WILLAPA R 24.0251
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 01/2018 FORKS CREEK HATCHERY 250,000 EGGS EYED001/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
250,000 1,500.0 167 JUVENILE OXBOW CR 24.034402/201802/2018
Page 312Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.
2017 Future Brood Document FinalWILLARD NFH
SOUTHWEST WASHINGTON / LOWER COL
U.S. FISH AND WILDLIFE SERVICE
Egg Take
Planted
Received
12,565Shipping 289,000
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Shipped 03/2018 BEAVER CR ACCL. POND 33,000 23.0 JUVENILE1,43503/2018Shipped 03/2018 BUTCHER POND 107,000 23.0 JUVENILE4,65203/2018Shipped 03/2018 GOLD CR ACC PONDS 0 23.0 JUVENILE003/2018Shipped 03/2018 WOLF CR ACC PONDS 42,000 23.0 JUVENILE1,82603/2018Shipped 03/2018 COULTER POND 0 23.0 JUVENILE004/2018Shipped 03/2018 LEAVENWORTH HATCHERY 0 25.0 JUVENILE004/2018Shipped 03/2018 ROHLFINGS POND 107,000 23.0 JUVENILE4,65204/2018Shipped 03/2018 TWISP ACCLIMATION PD 0 25.0 JUVENILE004/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 313Tuesday, August 1, 2017
Memo: Shipped to Mid‐Columbia Coho Restoration Project. Wenatchee/Methow Acclimation Sites.
2017 Future Brood Document FinalWILLARD NFH
SOUTHWEST WASHINGTON / LOWER COL
U.S. FISH AND WILDLIFE SERVICE
Egg Take
Planted
0Received 1,050,000
19,835Shipping 471,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 12/2017 PESHASTIN INCUBATION 700,000 EGGS EYED001/2018Received 12/2017 WINTHROP NFH 350,000 EGGS EYED001/2018Shipped 02/2019 LEAVENWORTH HATCHERY 35,000 25.0 JUVENILE1,40004/2019Shipped 03/2019 BUTCHER POND 33,000 23.0 JUVENILE1,43503/2019Shipped 03/2019 GOLD CR ACC PONDS 50,000 23.0 JUVENILE2,17403/2019Shipped 03/2019 WOLF CR ACC PONDS 70,000 23.0 JUVENILE3,04303/2019Shipped 03/2019 BEAVER CR ACCL. POND 33,000 23.0 JUVENILE1,43504/2019Shipped 03/2019 COULTER POND 65,000 23.0 JUVENILE2,82604/2019Shipped 03/2019 ROHLFINGS POND 35,000 23.0 JUVENILE1,52204/2019Shipped 03/2019 TWISP ACCLIMATION PD 90,000 25.0 JUVENILE3,60004/2019Shipped 03/2019 WINTHROP NFH 60,000 25.0 JUVENILE2,40004/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
Page 314Tuesday, August 1, 2017
Memo: Shipped to Mid‐Columbia Coho Restoration Project. Wenatchee/Methow Acclimation Sites.
2017 Future Brood Document FinalWINTHROP NFH
NORTH CENTRAL WASHINGTON
U.S. FISH AND WILDLIFE SERVICE
Egg Take
20,667Planted 310,000
2,304Received 53,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 OR- CASCADE HATCHERY 53,000 23.0 JUVENILE2,30404/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
310,000 15.0 20,667 JUVENILE WINTHROP NFH06/201805/2018
Page 315Tuesday, August 1, 2017
Memo: 300 frozen beheaded eviscerated carcasses planted into Spring Creek, and Middle and Upper Methow River.
2017 Future Brood Document FinalWINTHROP NFH
NORTH CENTRAL WASHINGTON
U.S. FISH AND WILDLIFE SERVICE
Egg Take 350,000
4,000Planted 60,000
2,400Received 60,000
0Shipping 350,000
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal 350,000
Shipped 12/2017 WILLARD NFH 350,000 EGGS EYED001/2018Received 03/2019 WILLARD NFH 60,000 25.0 JUVENILE2,40004/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
60,000 15.0 4,000 JUVENILE WINTHROP NFH06/201905/2019
Page 316Tuesday, August 1, 2017
Memo: 300 frozen beheaded eviscerated carcasses planted into Spring Creek, and Middle and Upper Methow River.
2017 Future Brood Document FinalWOLF CR ACC PONDS
NORTH CENTRAL WASHINGTON
YAKAMA TRIBE
Egg Take
2,100Planted 42,000
1,826Received 42,000
Shipping
Total PoundsTotal #Brood Year: 2016Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 WILLARD NFH 42,000 23.0 JUVENILE1,82603/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
42,000 20.0 2,100 JUVENILE WOLF CR 48.105906/201806/2018
Page 317Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalWOLF CR ACC PONDS
NORTH CENTRAL WASHINGTON
YAKAMA TRIBE
Egg Take
3,500Planted 70,000
3,043Received 70,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: Type SStock: COLUMBIA R ‐MID
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2019 WILLARD NFH 70,000 23.0 JUVENILE3,04303/2019
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
70,000 20.0 3,500 JUVENILE WOLF CR 48.105906/201906/2019
Page 318Tuesday, August 1, 2017
Memo:
2017 Future Brood Document FinalWORDAN PROJECT
NORTH PUGET SOUND
WASHINGTON DEPARTMENT OF FISH AND WILDLIFE ‐ ENHANCEMENT COOPS
Egg Take
2Planted 1,000
2Received 1,000
Shipping
Total PoundsTotal #Brood Year: 2017Species: CohoRun: NAStock: GREEN R NATIVE (9)
Integrated/Segregated: INTEGRATEDBrood Origin: MIXED
End DateStart Date Life StageTotal PoundsFPPNumberFacilityShipped or Received
Estimated Transfer Data
Estimated Brood DataEgg Take Goal
Received 03/2018 SOOS CREEK HATCHERY 1,000 500.0 JUVENILE203/2018
Estimated Release DataNum Release FPP Total Pounds Life Stage Release Site Mark Type TaggedStart Date End Date
1,000 500.0 2 JUVENILE LTL SOOS CR 09.009203/201803/2018
Page 319Tuesday, August 1, 2017
Memo: Program implementation is dependent on legal authority and funding.