Date post: | 22-May-2018 |
Category: |
Documents |
Upload: | nguyennhan |
View: | 223 times |
Download: | 1 times |
208m
65m
82m 31m
159m
16m
234m
17m
100m
183m
134m
187m 16m
40m
38m
36m
Client: Cairns Regional Council
Redlynch Sport and RecreationParklands Masterplan PO Box 8187 Wynnum North QLD 4178
[email protected] 273 283
Placemaking I Landscape Architecture I Urban Design
Rounsefell DesignRounseABN: 20 164 429 056
N
SCALE 1:2500 @ A1/ 1:5000 @ A3
25 50 100 150M
REVISED MASTERPLAN - DRAFTDWG NO. 201518-MP02REVISION IDATE: 30 MARCH 2017
BASALT ST
VIEW ST
GOOMBOORA PARK
ST ANDREW’S CATHOLIC COLLEGE
AA
POWERLINK SITE
REDLYNCH CENTRAL SHOPPING CENTRE
MCDONALDS
INDOOR STADIUM(FUTSAL)
FRESFREFRESFRESFRESFREFRESFRESFRESFRESFREFRESRESESESESHWATHWATHHHWATHHHWATWHWATHH ER ER ER ER CHRCHRICHCHRCHRICHRCHRCHRICHRCHRHCHRCHRCCC TIASTIASTIASTIASTIASSTIATIATIASTIATIAANNNNNNNNNNCOLLCOLLCOLLCOLLCOLLOLLCOLLCOLCOCOLCOLCOLLCOOOLLEGEEGEEEGEEGEEGEEGEEGEGEGEGEGEGEG
STATE GOVERNMENT LAND
8
2
6
GLENOMA PARK
ARTERIAL
“BIG ISLAND”
DRAINAGE CHANNEL
fi eld 1 fi eld 2
fi eld 3 fi eld 4
existing parking 40
refer section
existing parking
22
existing shared pathway
existing footbridge
possible future substation site
substation buffer zone
substation buffer zone
exist
ing
cane
rail
and
alig
nmen
t of m
ajor
wat
er a
nd s
ewer
exist
ing
cane
rail a
nd a
lignm
ent o
f maj
or w
ater
and
sew
er
possible future substation site
future powerline easement
possible future powerline easement
possible future powerline easement
possible future powerline easement
possible future powerline easement
possible future powerline easement
possible future powerline easement
existing parking
existing child care
possible future pool by SACC
Fres
hwat
erC
reek
CARAVAN PARK
4
7
5
Freshwater
REDL
YNC
H C
ON
NEC
TION
RD
REDL
YNC
H IN
TAKE
RD
LARSEN RD
HERI
TAG
E S
ST
CYP
RUS
DR
LOM
ATIA
CL
SATIN
ASH
CL
NORFOLK CIRCUIT
PORT
ELLI
RO
AD
BYRON TCE
MICHELANGELO DR
SHALE ST
LORIDAN DR
WIN
DSO
R C
L
BANN
ING
AVE
OPA
LIN
E C
L
BRINSMEAD-KAMERUNGA RD
WESTERN
RD
CAIRNS
OBERSKY CL
VILLAGE TCE
Creek
1
21
21
21
21
21
21
21
2121
21
2222
23
23
24
24
24
20
20
20
20
20
18
18
25
25
25
25
25 25
19
19
19
19
9 9
27
29
29
29
29
32
31
31
31
10
11
33
16
15
14
13
17
12
12
12
LORIDAN DRIVE PARK (BMX jumps)
UNDERPASS
32
124
125
A
B
C
G
FE
D
H
I8
6
60
15
150
50
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
30
new site entry road with avenue tree planting - if possible (subject to fl ood study outcomes), road level and parking area within dashed area designed above Q5 fl ood level
AFLCY House complex - refer MP06 for detail
3 court shared indoor multi-use facility
AFL clubhouse/ community hub
senior AFL fi eld with lighting - 135m x 165m with 5m runoff
AFL fi eld 110m x155m with 5m runoff shared clubhouse elevated above Q100 fl ood levels - ramp access from fi eld and Portelli Road level
on-street 90 degree parking with manoeuvre space to Australian Standards - direct access from Portelli Road - refer MP05 for detail
shared clubhouse elevated above Q100 fl ood levels - ramp access from fi eld and Portelli Road level
2 no. rectangle fi elds with lighting - 80mx120m with 5 m runoff
junior cricket pitch between fi elds
new internal site access road and 90 degree parking at grade
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
1
17
28
28
28
125G
site boundary
direction of fl ow of watercourses/drainage lines
Freshwater Creek channel
existing extent of 1:100 year fl ood level through site
existing shared path network
new path network
new parking areas - identifying letter and approx. number of bays
approx. extent of existing creekside vegetation (refer Opportunities & Constraints plan)
approx. width in metres of existing and proposed creek -side vegetation shown - subject to future detailed design resolution
NOTE: ALL ROAD AND PARKING LAYOUTS SUBJECT TO TRAFFIC ENGINEER’S DETAIL DESIGN CONFIRMATION
ALL INFRASTRUCTURE AND PLANTING WITHIN POWERLINE EASEMENT SUBJECT TO POWERLINK REQUIREMENTS
PARKING REQUIREMENTS BASED ON 50 BAYS PER FIELD PLUS 1 ACCESSIBLE BAY PER 50 SPACES; COMMUNITY USE BUILDINGS 1 SPACE PER 15M2 GFA
CREEK LOCATION BASED ON LIDAR INFORMATION PROVIDED BY OTHERS - DETAILED SITE SURVEY REQUIRED TO CONFIRM ACTUAL LOCATION
LEGEND
3
RICE’S GULLY
OVERFLO
W CHANNEL
26existing
amenities
28
existing Powerlink electricity pylons on centreline of 20m wide easement; long term constraint - maximum extent (total 120m width shown) of potential future 60m wide power easement subject to fi nal Powerlink design and alignment - potential additional revegetation area available depending on fi nal future easement alignment and if not required for other purposes
nature play area combined with open kickabout/ event space and shady picnic facilities
environment and outdoor education centre above Q100 fl ood level with ramp access - possible small cafe facility and toilets - pole construction required due to proximity to creek - access and parking requirements usbject to future design detail
short term rectangular fi eld location due to existing cane rail - future warm-up/ overfl ow parking area
once cane rail operations cease to south and rail no longer required then fi eld can be oriented north-south (shown in grey outline)
indicative Q5 and Q100 fl ood levels shown dashed - refer MP04 and MP06 for more detail
connected paths throughout site
minor footbridges/ culverts across drainage lines/ watercourses - widths and design as required in each location
new 3.5m shared pathway runs length of west side of creek and connects to Goomboora Park to south, Glenoma Park to east, and to wider community path network - alignment to be verifi ed on site to minimise earthworks and avoid existing signifi cant trees
new rehabilitation planting along Freshwater Creek - minimum 30m width wherever possible
continue existing Treeforce rehabilitation planting area to ‘Big Island’ - liaison required with Powerlink for planting in easement
existing Goomboora Park pathway, links to 3.5m wide shared Brinsmead path to south
existing cane rail - 1.8m high fence both sides may be required through site; long term, rail to be removed when cane no longer farmed to south; potential future rail trail opportunity
rehabilitiona planting in easement subject to Powerlink access and height requirements
existing multi-use outdoor courts
new 3.5m wide path connection between footbridge and underpass/ existing shared path on Cairns Western Arterial Road
picnic areas in key locations to future detailed design
informal 2m wide decomposed granite pathways through forest
new shared foot/cycle bridge over Freshwater Creek at Glenoma Park to provide direct link to site - provide small build-out viewing deck in centre of bridge
open pockets/ themed planting in rainforest (e.g. use endangered ecosystem species used to create small palm grove) to provide different path journey experiences; potential for educational/ botanical learning experiences
large existing Leichhardt tree - arborist to inspect with view to protect and retain as feature and build paths/road around
State Government land - future strategic drainage corridor
xxx m