Client: Cairns Regional Council

Redlynch Sport and RecreationParklands Masterplan PO Box 8187 Wynnum North QLD 4178

[email protected] 273 283

Placemaking I Landscape Architecture I Urban Design

Rounsefell DesignRounseABN: 20 164 429 056

N

SCALE 1:2500 @ A1/ 1:5000 @ A3

25 50 100 150M

REVISED MASTERPLAN - DRAFTDWG NO. 201518-MP02REVISION IDATE: 30 MARCH 2017

BASALT ST

VIEW ST

GOOMBOORA PARK

ST ANDREW’S CATHOLIC COLLEGE

AA

POWERLINK SITE

REDLYNCH CENTRAL SHOPPING CENTRE

MCDONALDS

INDOOR STADIUM(FUTSAL)

FRESFREFRESFRESFRESFREFRESFRESFRESFRESFREFRESRESESESESHWATHWATHHHWATHHHWATWHWATHH ER ER ER ER CHRCHRICHCHRCHRICHRCHRCHRICHRCHRHCHRCHRCCC TIASTIASTIASTIASTIASSTIATIATIASTIATIAANNNNNNNNNNCOLLCOLLCOLLCOLLCOLLOLLCOLLCOLCOCOLCOLCOLLCOOOLLEGEEGEEEGEEGEEGEEGEEGEGEGEGEGEGEG

STATE GOVERNMENT LAND

8

2

6

GLENOMA PARK

ARTERIAL

“BIG ISLAND”

DRAINAGE CHANNEL

fi eld 1 fi eld 2

fi eld 3 fi eld 4

existing parking 40

refer section

existing parking

22

existing shared pathway

existing footbridge

possible future substation site

substation buffer zone

substation buffer zone

exist

ing

cane

rail

and

alig

nmen

t of m

ajor

wat

er a

nd s

ewer

exist

ing

cane

rail a

nd a

lignm

ent o

f maj

or w

ater

and

sew

er

possible future substation site

future powerline easement

possible future powerline easement

possible future powerline easement

possible future powerline easement

possible future powerline easement

possible future powerline easement

possible future powerline easement

existing parking

existing child care

possible future pool by SACC

Fres

hwat

erC

reek

CARAVAN PARK

4

7

5

Freshwater

REDL

YNC

H C

ON

NEC

TION

RD

REDL

YNC

H IN

TAKE

RD

LARSEN RD

HERI

TAG

E S

ST

CYP

RUS

DR

LOM

ATIA

CL

SATIN

ASH

CL

NORFOLK CIRCUIT

PORT

ELLI

RO

AD

BYRON TCE

MICHELANGELO DR

SHALE ST

LORIDAN DR

WIN

DSO

R C

L

BANN

ING

AVE

OPA

LIN

E C

L

BRINSMEAD-KAMERUNGA RD

WESTERN

RD

CAIRNS

OBERSKY CL

VILLAGE TCE

Creek

1

21

21

21

21

21

21

21

2121

21

2222

23

23

24

24

24

20

20

20

20

20

18

18

25

25

25

25

25 25

19

19

19

19

9 9

27

29

29

29

29

32

31

31

31

10

11

33

16

15

14

13

17

12

12

12

LORIDAN DRIVE PARK (BMX jumps)

UNDERPASS

32

124

125

A

B

C

G

FE

D

H

I8

6

60

15

150

50

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

30

new site entry road with avenue tree planting - if possible (subject to fl ood study outcomes), road level and parking area within dashed area designed above Q5 fl ood level

AFLCY House complex - refer MP06 for detail

3 court shared indoor multi-use facility

AFL clubhouse/ community hub

senior AFL fi eld with lighting - 135m x 165m with 5m runoff

AFL fi eld 110m x155m with 5m runoff shared clubhouse elevated above Q100 fl ood levels - ramp access from fi eld and Portelli Road level

on-street 90 degree parking with manoeuvre space to Australian Standards - direct access from Portelli Road - refer MP05 for detail

shared clubhouse elevated above Q100 fl ood levels - ramp access from fi eld and Portelli Road level

2 no. rectangle fi elds with lighting - 80mx120m with 5 m runoff

junior cricket pitch between fi elds

new internal site access road and 90 degree parking at grade

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

1

17

28

28

28

125G

site boundary

direction of fl ow of watercourses/drainage lines

Freshwater Creek channel

existing extent of 1:100 year fl ood level through site

existing shared path network

new path network

new parking areas - identifying letter and approx. number of bays

approx. extent of existing creekside vegetation (refer Opportunities & Constraints plan)

approx. width in metres of existing and proposed creek -side vegetation shown - subject to future detailed design resolution

NOTE: ALL ROAD AND PARKING LAYOUTS SUBJECT TO TRAFFIC ENGINEER’S DETAIL DESIGN CONFIRMATION

ALL INFRASTRUCTURE AND PLANTING WITHIN POWERLINE EASEMENT SUBJECT TO POWERLINK REQUIREMENTS

PARKING REQUIREMENTS BASED ON 50 BAYS PER FIELD PLUS 1 ACCESSIBLE BAY PER 50 SPACES; COMMUNITY USE BUILDINGS 1 SPACE PER 15M2 GFA

CREEK LOCATION BASED ON LIDAR INFORMATION PROVIDED BY OTHERS - DETAILED SITE SURVEY REQUIRED TO CONFIRM ACTUAL LOCATION

LEGEND

3

RICE’S GULLY

OVERFLO

W CHANNEL

26existing

amenities

28

existing Powerlink electricity pylons on centreline of 20m wide easement; long term constraint - maximum extent (total 120m width shown) of potential future 60m wide power easement subject to fi nal Powerlink design and alignment - potential additional revegetation area available depending on fi nal future easement alignment and if not required for other purposes

nature play area combined with open kickabout/ event space and shady picnic facilities

environment and outdoor education centre above Q100 fl ood level with ramp access - possible small cafe facility and toilets - pole construction required due to proximity to creek - access and parking requirements usbject to future design detail

short term rectangular fi eld location due to existing cane rail - future warm-up/ overfl ow parking area

once cane rail operations cease to south and rail no longer required then fi eld can be oriented north-south (shown in grey outline)

indicative Q5 and Q100 fl ood levels shown dashed - refer MP04 and MP06 for more detail

connected paths throughout site

minor footbridges/ culverts across drainage lines/ watercourses - widths and design as required in each location

new 3.5m shared pathway runs length of west side of creek and connects to Goomboora Park to south, Glenoma Park to east, and to wider community path network - alignment to be verifi ed on site to minimise earthworks and avoid existing signifi cant trees

new rehabilitation planting along Freshwater Creek - minimum 30m width wherever possible

continue existing Treeforce rehabilitation planting area to ‘Big Island’ - liaison required with Powerlink for planting in easement

existing Goomboora Park pathway, links to 3.5m wide shared Brinsmead path to south

existing cane rail - 1.8m high fence both sides may be required through site; long term, rail to be removed when cane no longer farmed to south; potential future rail trail opportunity

rehabilitiona planting in easement subject to Powerlink access and height requirements

existing multi-use outdoor courts

new 3.5m wide path connection between footbridge and underpass/ existing shared path on Cairns Western Arterial Road

picnic areas in key locations to future detailed design

informal 2m wide decomposed granite pathways through forest

new shared foot/cycle bridge over Freshwater Creek at Glenoma Park to provide direct link to site - provide small build-out viewing deck in centre of bridge

open pockets/ themed planting in rainforest (e.g. use endangered ecosystem species used to create small palm grove) to provide different path journey experiences; potential for educational/ botanical learning experiences

large existing Leichhardt tree - arborist to inspect with view to protect and retain as feature and build paths/road around

State Government land - future strategic drainage corridor