+ All Categories
Home > Documents > 2018 Accessible Roads & Parking Locations in Downtown ... · San Marcos Pl. 2018 Accessible Roads &...

2018 Accessible Roads & Parking Locations in Downtown ... · San Marcos Pl. 2018 Accessible Roads &...

Date post: 09-Jan-2019
Category:
Upload: duongtram
View: 215 times
Download: 0 times
Share this document with a friend
2
Dakota St. California St. Boston St. Buffalo St. Chicago St. Chandler Blvd. Frye Rd. Arizona Ave. Commonwealth Ave. San Marcos Pl. 2018 Accessible Roads & Parking Locations in Downtown During The Event Road Closures (Start 2:30-4:30pm/Re-Open 9:30-10pm) Road Closures (Start 6:30pm/Re-Open approx. 7:45pm) Road Closures (Start 6:50pm/Re-Open approx. 8:00pm) Road Access Ingress & Egress Street Closures Key Parking Location Key P1 P2 Area Closed due to Construction – NO street access on Oregon St. between Chicago & Boston St. P5 S N E W P1 Parking Garage accessible from Buffalo St. & California St. P2 Parking Lot accessible from Boston St. & San Marcos Pl. P5 Parking lot accessible from Chicago St. & Oregon St. (subject to change/construction) San Marcos Place between Commonwealth & Buffalo St. will close from 7-8pm Oregon St.
Transcript

Dakota St.

California St.

Boston St.

Buffalo St.

Chicago St. Chandler Blvd.

Frye Rd.

Arizona Ave.

Comm

onwealth Ave.

San Marcos Pl.

2018 Accessible Roads & Parking Locations in Downtown During The Event

Road Closures (Start 2:30-4:30pm/Re-Open 9:30-10pm)Road Closures (Start 6:30pm/Re-Open approx. 7:45pm)Road Closures (Start 6:50pm/Re-Open approx. 8:00pm)Road Access Ingress & Egress

Street Closures Key Parking Location Key

P1

P2

Area Closed dueto Construction –NO street access onOregon St. betweenChicago & Boston St.

P5

S NE

W

P1 Parking Garage accessible from Buffalo St. & California St.P2 Parking Lot accessible from Boston St. & San Marcos Pl.P5 Parking lot accessible from Chicago St. & Oregon St. (subject to change/construction)

San Marcos Place between Commonwealth & Buffalo St. will close from 7-8pm

Oregon St.

Frye Rd.

Chicago St. Boston St.

Buffalo St.

Chandler Blvd.

Washington St.Washington St.

Colorado St.

Delaware St.

2018 Accessible Roads & Parking Locations in Downtown During The Event

Road Closures (Start 6am/Re-Open Midnight)Road Closures (Start 2:30-4:30pm/Re-Open 9:30-10pm)Road Closures (Start 6:30pm/Re-Open approx. 7:45pm)Road Closures (Start 6:50pm/Re-Open approx. 8:00pm)Road Access Ingress & Egress

S NE

W

Street Closures KeyParking Location Key

P6

P7

P8P9

P10P11

P12

P13

P14

P6 Parking Garage accessible from Chicago St. & Washington St.P7, P8, P9 & P10 Parking Lots accessible from Chicago St. & Delaware St.P11 & P12 Parking Garages accessible from Boston St. & Delaware St.P13 Parking Garage accessible Buffalo St. & Delaware St.P14 Parking Lot accessible from Chandler Blvd. & Washing St.


Recommended