2020 Improvements to Borden Elementary & Borden Junior-Senior High School Borden Junior-Senior High School SHIREMAN CONSTRUCTION MANAGEMENT ALLEN RITZ I C HELL T E C S I H R A T C M 319 BANK STREET,NEWALBANY,IN 47150 PHONE 812-945-2324 WWW.MICHELLALLENRITZ.COM C S OMMUNITY CHOOLS December 12,2019
Transcript
Page 1: 2020 Improvements to Borden Elementary & MICHELL ALLEN ...westclarkschools.com/wccs/wp-content/uploads/sites/... · 2020 Improvements to Borden Elementary & Borden Junior-Senior High

2020 Improvements to

Borden Elementary &

Borden Junior-Senior High School

Borden Junior-Senior High School

SHIREMANCONSTRUCTION MANAGEMENT

A L L E N

R I T Z

ICHELL

T E C SIHRA TC

M

319 BANK STREET, NEW ALBANY, IN 47150

PHONE 812-945-2324

WWW.MICHELLALLENRITZ.COM

C SOMMUNITY CHOOLS

December 12, 2019

Page 2: 2020 Improvements to Borden Elementary & MICHELL ALLEN ...westclarkschools.com/wccs/wp-content/uploads/sites/... · 2020 Improvements to Borden Elementary & Borden Junior-Senior High

Location of highschool gymnasium RTU’s

Location of elementaryschool condenser unit.

All foam coated roofing systemsto be recoated or replaced asrequired for new warranty

A L L E N

R I T Z

ICHELL

T E C SIHRA TC

M

319 BANK STREET, NEW ALBANY, IN 47150

PHONE 812-945-2324

WWW.MICHELLALLENRITZ.COM

Exterior Work Highlights

Complete replacement of approximately12,000 sq.ft. of existing foam roofing system.New system will have 20 year total system warranty.

Removal and replacement of approximately71,000 sq.ft. of existing roof system top coat and1” +/- existing foam. New system will have 20 yeartotal system warranty.

Installation of proper roof curbs at all equipment.

Installation of elementary school condenser unitfor air conditioning.

Installation of junior-senior high school roof topunits for air conditioning.

Bo

rd

en E

lem

en

tary,

Jun

ior-

Se

nio

r H

igh S

ch

oo

lD

ecem

ber

12

,20

19

Page 3: 2020 Improvements to Borden Elementary & MICHELL ALLEN ...westclarkschools.com/wccs/wp-content/uploads/sites/... · 2020 Improvements to Borden Elementary & Borden Junior-Senior High

Accessible entrance viaelevator. -Controls limittravel to high school lobby

New secured storefrontinfill with riot glazing.Remote camera and controlfor accessible entrance

New secured storefrontinfill with riot glazing.Remote camera and controlfor accessible entrance

Student access to GroupPresentation via innerstair

Junior-Senior High School Highlights

Reconfiguration of entry stairs and lobby to providea secured access route for visitors. New storefrontframing system with riot glazing will be used to createthe welcome center zone and doors will be controlledelectronically by office staff.

Relocation of office entry for new student receptionarea inside “safe” zone.

Modification to elevator control to allow those withaccessible need access to lobby level only.

Installation of duct work in gymnasium for new airconditioning system.

Replacement of building boilers with new moreefficient systems.

Replacement of HVAC equipment and addition ofoccupancy sensors as budget allows.

Upgrade of building HVAC control system.

Replacement of building water softener.

New student receptioncounter

A L L E N

R I T Z

ICHELL

T E C SIHRA TC

M

Bo

rd

en E

lem

en

tary,

Jun

ior-

Se

nio

r H

igh S

ch

oo

l

319 BANK STREET, NEW ALBANY, IN 47150

PHONE 812-945-2324

WWW.MICHELLALLENRITZ.COM

Decem

ber

12

,20

19

Page 4: 2020 Improvements to Borden Elementary & MICHELL ALLEN ...westclarkschools.com/wccs/wp-content/uploads/sites/... · 2020 Improvements to Borden Elementary & Borden Junior-Senior High

New secured storefrontinfill with riot glazing.Remote camera and controlfor accessible entrance

A L L E N

R I T Z

ICHELL

T E C SIHRA TC

M

319 BANK STREET, NEW ALBANY, IN 47150

PHONE 812-945-2324

WWW.MICHELLALLENRITZ.COM

Elementary High School Highlights

Reconfiguration of entry and lobby to provide asecured access route for visitors. New storefrontframing system with riot glazing will be used to createthe welcome center zone and doors will be controlledelectronically by office staff.

Relocation of office entry for new student receptionarea inside “safe” zone.

Installation of duct work in gymnasium for new airconditioning system.

Replacement of building boilers with new moreefficient systems.

Replacement of HVAC equipment and addition ofoccupancy sensors as budget allows.

Upgrade of building HVAC control system.

Replacement of building water softener.

New student receptioncounter

Bo

rd

en E

lem

en

tary,

Jun

ior-

Se

nio

r H

igh S

ch

oo

lD

ecem

ber

12

,20

19


Recommended