+ All Categories
Home > Documents > 27 Thurloe Street - Proposed Plan€¦ · Open Space C9b Open Space C6 Marina: Docks, moorings and...

27 Thurloe Street - Proposed Plan€¦ · Open Space C9b Open Space C6 Marina: Docks, moorings and...

Date post: 22-Sep-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
5
C18 Wind and Solar Farm B38 Sustainable food farm B39 wastewater treatment plant C20 Allotments C19 Atrium A28 Social Hub C21 Green Park A 29 Electric Train A 30 Transport Hub B40 Water Taxi- vaporetto Room 1 Energy Town Exhibition Entrance Exhibition continues to Room 2 A8 University C1 Boulevard A1 Castle B1 Retail/Resi A2 Old registry building A4 Museum of Architecture D3 New bridge D1 Old bridge D2 New bridge C8 Park and tiered waterfront public space A3 Historic Building A9 Financial Centre A10 Financial Centre A11 Financial Centre C2 Park w/Arch C3 Waterfront park A17 Office Tower A12 Beer brewery A19 Mixed use C4a Linear route C5a Linear route C4b Linear route C5b Linear route A15 Ginger root industries B11 Comm/Resi B17 Retail/ commercial/ resi B18 Retail/ commercial/ resi C9a Open Space C9b Open Space C6 Marina: Docks, moorings and boats A14 Mansion resi B12 Comm/resi B13 Comm/resi B19 Comm/resi B16 Comm/resi B20 Comm/resi B14 Resi B15 Resi A13 Mansion resi C7 Square D4 Bridge Landing D5 Bridge Landing A16 Gallery C10 Public Square A18 Stadium B2 Retail/Resi B3 Retail/Resi B4 Retail/Resi B8 Office/Resi B9 Office/Resi B10 Office/Resi B5 Retail/Resi A7 Loggia Building B7 Office/Resi A6 Archaeological site B6 Office/Resi A5 Market C11 Civic Park C12 Main street C13 Eco Town Square A20 Hospital A21 Tower A22 Tower A23 A24 Community Hall C14 Productive Park A25 School A26 Recycling plant B27 Resi B28 Resi B29 Resi B30 Resi B32 Resi B33 Resi B34 Resi B35 Resi B36 Resi B37 Resi B31 Resi A27 Rail station C16 Active park C17 Play park C15 wind farm B21 MIxed use B22 MIxed use B23 MIxed use B24 MIxed use B25 MIxed use B26 MIxed use 10m Basement Ground n room 1 entrance room family workshops exit and shop room 2 27 Thurloe Street Plans
Transcript
Page 1: 27 Thurloe Street - Proposed Plan€¦ · Open Space C9b Open Space C6 Marina: Docks, moorings and boats A14 Mansion resi B12 Comm/resi B13 B19 Comm/resi B16 Comm/resi B20 Comm/resi

C18Wind and

Solar Farm

B38Sustainable food farm

B39wastewater treatment

plant

C20Allotments

C19Atrium

A28Social Hub

C21 Green Park

A 29Electric Train

A 30Transport

Hub

B40Water Taxi-vaporetto

Room 1Energy Town

Exhibition Entrance

Exhibition continues to Room 2

A8University

C1Boulevard

A1Castle

B1Retail/Resi

A2Old registry

building

A4Museum of

Architecture

D3New bridge

D1Old bridge

D2New bridge

C8Park and tiered

waterfront public space

A3Historic Building

A9Financial

Centre

A10Financial

CentreA11

FinancialCentre

C2Park

w/Arch

C3Waterfront

park

A17O�ceTower

A12Beer

brewery A19Mixed

useC4a

Linear route

C5aLinear route

C4bLinear route

C5bLinear route

A15Ginger rootindustries

B11Comm/Resi

B17Retail/

commercial/resi

B18Retail/

commercial/resi

C9aOpen Space

C9bOpen Space

C6Marina: Docks, moorings and

boats

A14Mansion

resi

B12Comm/resi

B13Comm/resi

B19Comm/resi

B16Comm/resi

B20Comm/resi

B14Resi

B15Resi

A13Mansion

resi

C7Square

D4Bridge

Landing

D5Bridge

Landing

A16Gallery

C10PublicSquare

A18Stadium

B2Retail/Resi

B3Retail/Resi

B4Retail/Resi

B8O�ce/Resi

B9O�ce/Resi

B10O�ce/Resi

B5Retail/Resi

A7Loggia

Building B7

O�ce/Resi

A6Archaeological site

B6O�ce/Resi

A5Market

C11CivicPark C12

Mainstreet

C13Eco Town Square

A20Hospital

A21Tower

A22Tower

A23A24

CommunityHall

C14Productive

Park

A25School

A26Recycling

plant

B27Resi

B28ResiB29

Resi

B30Resi

B32Resi

B33Resi

B34Resi

B35Resi

B36Resi

B37Resi

B31Resi

A27Rail

station

C16Activepark

C17Playpark

C15wind farm

B21MIxed

use

B22MIxed

use B23MIxed

use

B24MIxed

use

B25MIxed

use

B26MIxed

use

DRAWING NO

DRAWN BY

DRAWING TITLE

SCALE

CLIENT

PROJECT

REV DATE NATURE OF REVISION

REVISIONS

This drawing is Copyright. It should not be relied on or usedin circumstances other than those for which it was originallyprepared and for which SKE Ltd was originallycommissioned. SKE Ltd accepts no responsibility for thisdrawing to any party other than the person(s) by whom itwas commissioned.

NOTES

c

South Kensington EstatesAlfred House

23-24 Cromwell PlaceLondon

SW7 2LD

tel: 020 7761 6420

email: [email protected]

REVDATE

DRAWING NO

DRAWN BY

DRAWING TITLE

SCALE

CLIENT

PROJECT

REV DATE NATURE OF REVISION

REVISIONS

This drawing is Copyright. It should not be relied on or usedin circumstances other than those for which it was originallyprepared and for which SKE Ltd was originallycommissioned. SKE Ltd accepts no responsibility for thisdrawing to any party other than the person(s) by whom itwas commissioned.

NOTES

c

South Kensington EstatesAlfred House

23-24 Cromwell PlaceLondon

SW7 2LD

tel: 020 7761 6420

email: [email protected]

REVDATE

THS-G027

1:100@A3 V1

27 Thurloe StreetLondonSW7

Rose Darvill

13.12.2016

x x x

ske

Scale 1:100531 10m420

Basement Ground

27 Thurloe Street - Proposed Plan

room 1

entrance room

family workshops

exit and shop

room 2

27 Thurloe Street Plans

Page 2: 27 Thurloe Street - Proposed Plan€¦ · Open Space C9b Open Space C6 Marina: Docks, moorings and boats A14 Mansion resi B12 Comm/resi B13 B19 Comm/resi B16 Comm/resi B20 Comm/resi

C18Wind and

Solar Farm

B38Sustainable food farm

B39wastewater treatment

plant

C20Allotments

C19Atrium

A28Social Hub

C21 Green Park

A 29Electric Train

A 30Transport

Hub

B40Water Taxi-vaporetto

Room 1Energy Town

Exhibition Entrance

Exhibition continues to Room 2

Entrance to room 1

Plots Sold

Energy Town

Exhibition contiues through

hallway to room 2

Page 3: 27 Thurloe Street - Proposed Plan€¦ · Open Space C9b Open Space C6 Marina: Docks, moorings and boats A14 Mansion resi B12 Comm/resi B13 B19 Comm/resi B16 Comm/resi B20 Comm/resi

A8University

C1Boulevard

A1Castle

B1Retail/Resi

A2Old registry

building

A4Museum of

Architecture

D3New bridge

D1Old bridge

D2New bridge

C8Park and tiered

waterfront public space

A3Historic Building

A9Financial

Centre

A10Financial

CentreA11

FinancialCentre

C2Park

w/Arch

C3Waterfront

park

A17O�ceTower

A12Beer

brewery A19Mixed

useC4a

Linear route

C5aLinear route

C4bLinear route

C5bLinear route

A15Ginger rootindustries

B11Comm/Resi

B17Retail/

commercial/resi

B18Retail/

commercial/resi

C9aOpen Space

C9bOpen Space

C6Marina: Docks, moorings and

boats

A14Mansion

resi

B12Comm/resi

B13Comm/resi

B19Comm/resi

B16Comm/resi

B20Comm/resi

B14Resi

B15Resi

A13Mansion

resi

C7Square

D4Bridge

Landing

D5Bridge

Landing

A16Gallery

C10PublicSquare

A18Stadium

B2Retail/Resi

B3Retail/Resi

B4Retail/Resi

B8O�ce/Resi

B9O�ce/Resi

B10O�ce/Resi

B5Retail/Resi

A7Loggia

Building B7

O�ce/Resi

A6Archaeological site

B6O�ce/Resi

A5Market

C11CivicPark C12

Mainstreet

C13Eco Town Square

A20Hospital

A21Tower

A22Tower

A23A24

CommunityHall

C14Productive

Park

A25School

A26Recycling

plant

B27Resi

B28ResiB29

Resi

B30Resi

B32Resi

B33Resi

B34Resi

B35Resi

B36Resi

B37Resi

B31Resi

A27Rail

station

C16Activepark

C17Playpark

C15wind farm

B21MIxed

use

B22MIxed

use B23MIxed

use

B24MIxed

use

B25MIxed

use

B26MIxed

use

Entrance to room 2

Plots Sold

Page 4: 27 Thurloe Street - Proposed Plan€¦ · Open Space C9b Open Space C6 Marina: Docks, moorings and boats A14 Mansion resi B12 Comm/resi B13 B19 Comm/resi B16 Comm/resi B20 Comm/resi

Old Town

Crumble Hill

Cake a Diem

Churning District

Central Baking District

New Town

Treacle-Tech Hub

Home-craft Honeycomb

Eco Town

A8University

C1Boulevard

A1Castle

B1Retail/Resi

A2Old registry

building

A4Museum of

Architecture

D3New bridge

D1Old bridge

D2New bridge

C8Park and tiered

waterfront public space

A3Historic Building

A9Financial

Centre

A10Financial

CentreA11

FinancialCentre

C2Park

w/Arch

C3Waterfront

park

A17O�ceTower

A12Beer

brewery A19Mixed

useC4a

Linear route

C5aLinear route

C4bLinear route

C5bLinear route

A15Ginger rootindustries

B11Comm/Resi

B17Retail/

commercial/resi

B18Retail/

commercial/resi

C9aOpen Space

C9bOpen Space

C6Marina: Docks, moorings and

boats

A14Mansion

resi

B12Comm/resi

B13Comm/resi

B19Comm/resi

B16Comm/resi

B20Comm/resi

B14Resi

B15Resi

A13Mansion

resi

C7Square

D4Bridge

Landing

D5Bridge

Landing

A16Gallery

C10PublicSquare

A18Stadium

B2Retail/Resi

B3Retail/Resi

B4Retail/Resi

B8O�ce/Resi

B9O�ce/Resi

B10O�ce/Resi

B5Retail/Resi

A7Loggia

Building B7

O�ce/Resi

A6Archaeological site

B6O�ce/Resi

A5Market

C11CivicPark C12

Mainstreet

C13Eco Town Square

A20Hospital

A21Tower

A22Tower

A23A24

CommunityHall

C14Productive

Park

A25School

A26Recycling

plant

B27Resi

B28ResiB29

Resi

B30Resi

B32Resi

B33Resi

B34Resi

B35Resi

B36Resi

B37Resi

B31Resi

A27Rail

station

C16Activepark

C17Playpark

C15wind farm

B21MIxed

use

B22MIxed

use B23MIxed

use

B24MIxed

use

B25MIxed

use

B26MIxed

use

Page 5: 27 Thurloe Street - Proposed Plan€¦ · Open Space C9b Open Space C6 Marina: Docks, moorings and boats A14 Mansion resi B12 Comm/resi B13 B19 Comm/resi B16 Comm/resi B20 Comm/resi

Level ChangesRoom 1

Colours are for diagramatic purposes only.

Bases will be white.

Level ChangesRoom 2


Recommended