WELCOMESWELCOMES
ON THE OCCASION OF BOILER LIGHT UP OF UNIT #1ON THE OCCASION OF BOILER LIGHT UP OF UNIT #1
DEVELOPED BY:- DEVELOPED BY:- B. ADHIKARY, B. ADHIKARY, EE (IE)EE (IE)
Flue Gas Duct
ID FanID Fan
CHIMNEY
ELECTROSTATIC
PRECIPITATOR
BOILEBOILERR
FD Fan
OIL TAN
K
WATER TANK
OIL LINEOIL LINE
WATER WATER LINELINE
AIR LINEAIR LINE
BOILER LIGHT UP UNIT #1 BOILER LIGHT UP UNIT #1 2X250 MW, TPP, CSEB, KORBA 2X250 MW, TPP, CSEB, KORBA
(E)(E)
BOILER LIGHT UP UNIT #1 BOILER LIGHT UP UNIT #1 2X250 MW, TPP, CSEB, KORBA 2X250 MW, TPP, CSEB, KORBA
(E)(E)
DM DM PUMPPUMP
OIL OIL PUMPPUMPCOMPRESSCOMPRESS
OROR
WIND BOX
WINDBOX
SA SA
Coal/Oil Burner
Coal/A
ir M
ixtu
reA
tom
ized
O
il
Internal Combustion BoilerCorner Fired (Tangential)
Fuel Firing System
water walls
water walls
wate
r walls
FURNACEFIRE BALL
wate
r walls
Drum
From HPT To IPT
W/W Platen
To Boiler Drum
Drum
To HPT
From HPT To IPT
To Boiler Drum
ECO
RH
RH
Pre
pare
d b
y:-
B. A
dh
ikary
, EE (IE
), K
E
LTSH
Inte
rnal
Com
bu
stio
n
Boile
r
APH-A
BFP
Oil Guns
Coal Burner
ESP
To atmosphere through chimney
FD Fan Flue gas exit
ID Fan
Wind Box
FSH
FSH
Hot SA
Cold SA
PLTSH
PLTSH
APH
PlSH
PlSH
RH
RHR
H
RH
FSH
FSH
Eco
PSH
147Kg/cm2
5400
C
Generator Transforme
r
Generator
Turbine
Boiler
Coal Bunkers
Primary Air Fans
Coal Mills
Raw Coal Fdr
Ch
imn
ey
Flue Gas Duct
Induced Draft Fan
Coal Conveyer
Coal Bunker
CSEB Crusher House
400/220 KV
Switch Yard
400/220 KV15.75
KV
Condenser
Boiler Feed Pump
2x250MW, Thermal Power Project CSEB, Korba (E) Prepared by:
B Adhikary (I.E.)
2x250MW, Thermal Power Project CSEB, Korba (E) Prepared by:
B Adhikary (I.E.)
Coal Handling Plant
Forced Draft Fan
BoilerDrum
3000 rpm
210MW
Plant LayoutPlant LayoutPlant LayoutPlant Layout
ESPESP
AH
Cold PA Hot PA