TYPICAL CROSS SECTION
NOT TO SCALE
Highway Boundary
Existing Ditch and Culvert System
New Highway Boundary Fencing
(min. 3m from E/W toe)
New Earthworks
Retaining Wall / Strengthened Earthworks
(Earthworks Solution 9/12)
Cycle / footpath
ALIGNMENT BASED ON DESIGN SPEED OF 50KPH
PLAN
SCALE 1:1000
LONG SECTION
SCALE: HORIZONTAL 1:1000, VERTICAL 1:250
Proposed Bridge
Drawing Number
Drawing Title
Scale at A1
Highways Agency
Alliance Document Reference Rev
Job Title
This map is reproduced from Ordnance Survey material with permission of Ordnance Survey
Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civilproceedings. Highways Agency 100030649 2015
NOTES LEGEND
TR010019 - 2.6
AS SHOWN
The Cube199 Wharfside StreetBirminghamB1 1RN
M4 JUNCTIONS 3 TO 12
SMART MOTORWAY
SIDE ROAD PLAN & PROFILE
REGULATIONS 5 (2) (o) 5 (2) (p) & 6 (2)
SHEET 8 OF 13
OLDWAY LANE
Rev # Revision DetailsRevision Date Drawn Check Review Appr'd
1. Do not scale from the drawing.
2. Ordnance Survey base mapping used.
3. New earthworks to be benched into existing (500mm
high steps).
4. Conventional earthwork slopes based on being 1:2
(vertical/horizontal) - to be confirmed by geotechnical
investigations at later stage.
5. New fence lines to be tied-in with the existing
boundary fences.
6. For details of M4 works see Mainline General
Arrangement sheets 1 - 61 in Engineering Design
Report.
7. For details of standardised earthworks solutions see
Earthworks Standard Details sheets 1 & 2.
8. Earthworks solutions to be confirmed by geotechnical
investigation at a later stage.
9. Existing carriageway, footways, kerbs and drainage
not forming part of the new works to be removed.
Such areas to be filled, topsoiled and seeded.
Order limits
Carriageway
FOR INDICATIVE DESIGN OF STRUCTURE
SEE ENGINEERING DESIGN REPORT.
PARAPET HEIGHT ABOVE STRING COURSE LEVEL TO BE 1.8M.
HEIGHT OF BRIDGE SUPERSTRUCTURE ABOVE SIDE ROAD.
LEVEL IS 4.75M.
0D
1R
16/01/15
16/02/15
1st Draft developed from PEI report
Updated
RPJ
RPJ
PW
PW
GM PW
GM
2R 17/12/14 Updated RPJ DC GMPW
3R 05/03/15 For review prior to DCO application RPJ DC GMPW
4F 20/03/15 Submitted with DCO application RPJ DC PW GM
Existing ground level
ALIGNMENT BASED ON DESIGN SPEED OF 60KPH
New Earthworks
Carriageway
TIE-IN POINT
TO EXISTING
TIE-IN POINT
TO EXISTING
TIE-IN POINT
TO EXISTING
PHASED CONSTRUCTION
REQUIRED TO KEEP WOOD LANE
OPEN TO TRAFFIC AT ALL TIMES
EXISTING RIGHT OF WAY TO BE
KEPT OPEN AT ALL TIMES
CONNECTION TO EXISTING
FOOTPATH NETWORK
PUBLIC RIGHT OF WAY TO BE
KEPT OPEN AT ALL TIMES
EXISTING PATH TO BE
ADAPTED TO SUIT
SOUTHERN
TIE-IN CH.0
NORTHERN
TIE-IN CH. 486
TYPICAL CROSS SECTION
NOT TO SCALE
PLAN
SCALE 1:1000
LONG SECTION
SCALE: HORIZONTAL 1:1000, VERTICAL 1:250
M4
TIE-IN TO EXISTING
FENCELINE
RETAINING WALL/
EARTHWORKS
SOLUTION 9/12
Proposed Bridge
Drawing Number
Drawing Title
Scale at A1
Highways Agency
Alliance Document Reference Rev
Job Title
This map is reproduced from Ordnance Survey material with permission of Ordnance Survey
Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civilproceedings. Highways Agency 100030649 2015
NOTES LEGEND
TR010019 - 2.6
AS SHOWN
The Cube199 Wharfside StreetBirminghamB1 1RN
M4 JUNCTIONS 3 TO 12
SMART MOTORWAY
SIDE ROAD PLAN & PROFILE
REGULATIONS 5 (2) (o) 5 (2) (p) & 6 (2)
SHEET 9 OF 13
WOOD LANE
Rev # Revision DetailsRevision Date Drawn Check Review Appr'd
1. Do not scale from the drawing.
2. Ordnance Survey base mapping used.
3. New earthworks to be benched into existing (500mm
high steps).
4. Conventional earthwork slopes based on being 1:2
(vertical/horizontal) - to be confirmed by geotechnical
investigations at later stage.
5. New fence lines to be tied-in with the existing
boundary fences.
6. For details of M4 works see Mainline General
Arrangement sheets 1 - 61 in Engineering Design
Report.
7. For details of standardised earthworks solutions see
Earthworks Standard Details sheets 1 & 2.
8. Earthworks solutions to be confirmed by geotechnical
investigation at a later stage.
9. Existing carriageway, footways, kerbs and drainage
not forming part of the new works to be removed.
Such areas to be filled, topsoiled and seeded.
Order limits
Retaining Wall / Strengthened Earthworks
(Earthworks Solution 9/12)
Cycle / footpath
New Highway Boundary Fencing (min.
3m from E/W toe)
FOR INDICATIVE DESIGN OF STRUCTURE
SEE ENGINEERING DESIGN REPORT.
PARAPET HEIGHT ABOVE STRING COURSE LEVEL TO BE 1.8m.
0D
1R
2R
29/08/14
28/10/14
17/12/14
Draft
Updated
Updated
RPJ
RPJ
RPJ
DC
PW
DC
GM
PW
PW
PW
GM
3R 05/03/15 For review prior to DCO application RPJ DC PW GM
4F 20/03/15 Submitted with DCO application RPJ DC PW GM
Existing ground level
Drawing Number
Drawing Title
Scale at A1
Highways Agency
Alliance Document Reference Rev
Job Title
This map is reproduced from Ordnance Survey material with permission of Ordnance Survey
Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civilproceedings. Highways Agency 100030649 2015
NOTES LEGEND
TR010019 - 2.6
AS SHOWN
The Cube199 Wharfside StreetBirminghamB1 1RN
M4 JUNCTIONS 3 TO 12
SMART MOTORWAY
SIDE ROAD PLAN & PROFILE
REGULATIONS 5 (2) (o) 5 (2) (p) & 6 (2)
SHEET 10 OF 13
DATCHET ROAD
514451-MUH-SR-ZZ-DR-GA-300608 4F
Rev # Revision DetailsRevision Date Drawn Check Review Appr'd
Order limits
New Highway Boundary Fencing
New Earthworks
Carriageway
TYPICAL CROSS SECTION
NOT TO SCALE
ALIGNMENT BASED ON DESIGN SPEED OF 70KPH
PLAN
SCALE 1:1000
LONG SECTION
SCALE: HORIZONTAL 1:1000, VERTICAL 1:250
PRIVATE
ACCESS
THE
MYRKE
NORTHERN
TIE-IN
CH.60
M
4
M
4
TIE-IN TO EXISTING
FENCELINE
Proposed Bridge
LE
VE
L=
34
.8
44
M
CH
AIN
AG
E=
24
6.5
23
M
1. Do not scale from the drawing.
2. Ordnance Survey base mapping used.
3. New earthworks to be benched into existing (500mm
high steps).
4. Conventional earthwork slopes based on being 1:2
(vertical/horizontal) - to be confirmed by geotechnical
investigations at later stage.
5. New fence lines to be tied-in with the existing
boundary fences.
6. For details of M4 works see Mainline General
Arrangement sheets 1 - 61 in Engineering Design
Report.
7. For details of standardised earthworks solutions see
Earthworks Standard Details sheets 1 & 2.
8. Earthworks solutions to be confirmed by geotechnical
investigation at a later stage.
9. Existing carriageway, footways, kerbs and drainage
not forming part of the new works to be removed.
Such areas to be filled, topsoiled and seeded.
0D
1R
2R
29/08/14
28/10/14
17/12/14
Draft
Updated
Updated
RPJ
RPJ
RPJ
DC
PW
DC
GM
PW
PW
PW
GM
3R 05/03/15 For review prior to DCO application RPJ DC PW GM
Existing ground level
4F 20/03/15 Submitted with DCO application RPJ DC PW GM
Drawing Number
Drawing Title
Scale at A1
Highways Agency
Alliance Document Reference Rev
Job Title
This map is reproduced from Ordnance Survey material with permission of Ordnance Survey
Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civilproceedings. Highways Agency 100030649 2015
NOTES LEGEND
TR010019 - 2.6
AS SHOWN
The Cube199 Wharfside StreetBirminghamB1 1RN
M4 JUNCTIONS 3 TO 12
SMART MOTORWAY
SIDE ROAD PLAN & PROFILE
REGULATIONS 5 (2) (o) 5 (2) (p) & 6 (2)
SHEET 11 OF 13
RECREATION GROUND ROAD
514451-MUH-SR-ZZ-DR-GA-300609 4F
Rev # Revision DetailsRevision Date Drawn Check Review Appr'd
M4
TYPICAL CROSS SECTION
NOT TO SCALE
MOTOCROSS AREA
TIE-IN POINT
TO EXISTING
EXISTING PASSING BAY TO
BE RECONSTRUCTED
ALIGNMENT BASED ON DESIGN SPEED OF 50KPH
M
4
M
4
LONG SECTION
SCALE: HORIZONTAL 1:1000, VERTICAL 1:250
PLAN
SCALE 1:1000
1. Do not scale from the drawing.
2. Ordnance Survey base mapping used.
3. New earthworks to be benched into existing (500mm
high steps).
4. Conventional earthwork slopes based on being 1:2
(vertical/horizontal) - to be confirmed by geotechnical
investigations at later stage.
5. New fence lines to be tied-in with the existing
boundary fences.
6. For details of M4 works see Mainline General
Arrangement sheets 1 - 61 in Engineering Design
Report.
7. For details of standardised earthworks solutions see
Earthworks Standard Details sheets 1 & 2.
8. Earthworks solutions to be confirmed by geotechnical
investigation at a later stage.
9. Existing carriageway, footways, kerbs and drainage
not forming part of the new works to be removed.
Such areas to be filled, topsoiled and seeded.
Order limits
Retaining Wall / Strengthened Earthworks
(Earthworks Solution 9/12)
Cycle / footpath
New Earthworks
Carriageway
Proposed Bridge
0D
1R
2R
29/08/14
28/10/14
17/12/14
Draft
Updated
Updated
RPJ
RPJ
RPJ
DC
PW
DC
GM
PW
PW
PW
GM
3R 05/03/15 For review prior to DCO application RPJ DC PW GM
4F 20/03/15 Submitted with DCO application RPJ DC PW GM
Existing ground level
M4
TYPICAL CROSS SECTION
NOT TO SCALE
TIE-IN POINT
TO EXISTING
TIE-IN POINT
TO EXISTING
TIE-IN POINT
TO EXISTING
ACCESS TRACK TO BE
KEPT OPEN AT ALL TIMES
EXISTING ACCESS ROAD TO BE
KEPT OPEN AT ALL TIMES
EXISTING JUNCTION
TO BE MODIFIED
ALIGNMENT BASED ON DESIGN SPEED OF 60KPH
RE
AD
IN
G
PLAN
SCALE 1:1000
LONG SECTION
SCALE: HORIZONTAL 1:1000, VERTICAL 1:250
RIDING
COURT
JUNCTION
TIE INTO
EXISTING
CH.110
FIELD
ACCESS
ACCESS
TRACK
ACCESS TO PROPOSED AGGREGATE EXTRACTION SITE TO
BE FORMED OFF RIDING COURT ROAD BY OTHERS. DETAILS
AND LOCATION OF JUNCTION TO BE CONFIRMED.
Drawing Number
Drawing Title
Scale at A1
Highways Agency
Alliance Document Reference Rev
Job Title
This map is reproduced from Ordnance Survey material with permission of Ordnance Survey
Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civilproceedings. Highways Agency 100030649 2015
NOTES LEGEND
TR010019 - 2.6
AS SHOWN
The Cube199 Wharfside StreetBirminghamB1 1RN
M4 JUNCTIONS 3 TO 12
SMART MOTORWAY
SIDE ROAD PLAN & PROFILE
REGULATIONS 5 (2) (o) 5 (2) (p) & 6 (2)
SHEET 12 OF 13
RIDING COURT ROAD
514451-MUH-SR-ZZ-DR-GA-300610
4F
Rev # Revision DetailsRevision Date Drawn Check Review Appr'd
1. Do not scale from the drawing.
2. Ordnance Survey base mapping used.
3. New earthworks to be benched into existing (500mm
high steps).
4. Conventional earthwork slopes based on being 1:2
(vertical/horizontal) - to be confirmed by geotechnical
investigations at later stage.
5. New fence lines to be tied-in with the existing
boundary fences.
6. For details of M4 works see Mainline General
Arrangement sheets 1 - 61 in Engineering Design
Report.
7. For details of standardised earthworks solutions see
Earthworks Standard Details sheets 1 & 2.
8. Earthworks solutions to be confirmed by geotechnical
investigation at a later stage.
9. Existing carriageway, footways, kerbs and drainage
not forming part of the new works to be removed.
Such areas to be filled, topsoiled and seeded.
Order limits
Retaining Wall / Strengthened Earthworks
(Earthworks Solution 9/12)
Cycle / footpath
New Earthworks
Carriageway
New Highway Boundary Fencing (min.
3m from E/W toe)
Proposed Bridge
FOR INDICATIVE DESIGN OF STRUCTURE
SEE ENGINEERING DESIGN REPORT.
PARAPET HEIGHT ABOVE STRING COURSE LEVEL TO BE 1m.
0D
1R
2R
29/08/14
28/10/14
17/12/14
Draft
Updated
Updated
RPJ
RPJ
RPJ
DC
PW
DC
GM
PW
PW
PW
GM
3R 05/03/15 For review prior to DCO application RPJ DC PW GM
Existing ground level
4F 20/03/15 Submitted with DCO application RPJ DC PW GM
PLAN
SCALE 1:1000
M4
M
4
ALIGNMENT BASED ON DESIGN SPEED OF 50KPH
TIE-IN POINT
TO EXISTING
ACCESS TO EXISTING PATH
TO BE MAINTAINED AT ALL
TIMES
Level Datum
=20.000m (A.O.D.)
TYPICAL CROSS SECTION
NOT TO SCALE
LONG SECTION
SCALE: HORIZONTAL 1:1000, VERTICAL 1:250
RE
AD
IN
G
TIE INTO
EXISTING
CH.135
TIE INTO
EXISTING
CH.273
M4
Drawing Number
Drawing Title
Scale at A1
Highways Agency
Alliance Document Reference Rev
Job Title
This map is reproduced from Ordnance Survey material with permission of Ordnance Survey
Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civilproceedings. Highways Agency 100030649 2015
NOTES LEGEND
TR010019 - 2.6
AS SHOWN
The Cube199 Wharfside StreetBirminghamB1 1RN
M4 JUNCTIONS 3 TO 12
SMART MOTORWAY
SIDE ROAD PLAN & PROFILE
REGULATIONS 5 (2) (o) 5 (2) (p) & 6 (2)
SHEET 13 OF 13
OLD SLADE LANE
Rev # Revision DetailsRevision Date Drawn Check Review Appr'd
1. Do not scale from the drawing.
2. Ordnance Survey base mapping used.
3. New earthworks to be benched into existing (500mm
high steps).
4. Conventional earthwork slopes based on being 1:2
(vertical/horizontal) - to be confirmed by geotechnical
investigations at later stage.
5. New fence lines to be tied-in with the existing
boundary fences.
6. For details of M4 works see Mainline General
Arrangement sheets 1 - 61 in Engineering Design
Report.
7. For details of standardised earthworks solutions see
Earthworks Standard Details sheets 1 & 2.
8. Earthworks solutions to be confirmed by geotechnical
investigation at a later stage.
9. Existing carriageway, footways, kerbs and drainage
not forming part of the new works to be removed.
Such areas to be filled, topsoiled and seeded.
Carriageway
Proposed Bridge
Order limits
0D
1R
2R
29/08/14
28/10/14
17/12/14
Draft
Updated
Updated
RPJ
RPJ
RPJ
DC
PW
DC
GM
PW
PW
PW
GM
3R 05/03/15 For review prior to DCO application RPJ DC PW GM
4F 20/03/15 Submitted with DCO application RPJ DC PW GM
Existing ground level
514451-MUH-SR-ZZ-DR-GA-300606_Rev.4R - Oldway Lane514451-MUH-SR-ZZ-DR-GA-300607_Rev.4F - Wood Lane514451-MUH-SR-ZZ-DR-GA-300608_Rev.4F - Datchet Road514451-MUH-SR-ZZ-DR-GA-300609_Rev.4F - Recreation Ground514451-MUH-SR-ZZ-DR-GA-300610_Rev.4F - Riding Court Road514451-MUH-SR-ZZ-DR-GA-300611_Rev.4F - Old Slade Lane