TYPICAL CROSS SECTION NOT TO SCALE Highway Boundary Existing Ditch and Culvert System New Highway Boundary Fencing (min. 3m from E/W toe) New Earthworks Retaining Wall / Strengthened Earthworks (Earthworks Solution 9/12) Cycle / footpath ALIGNMENT BASED ON DESIGN SPEED OF 50KPH PLAN SCALE 1:1000 LONG SECTION SCALE: HORIZONTAL 1:1000, VERTICAL 1:250 Proposed Bridge Drawing Number Drawing Title Scale at A1 Highways Agency Alliance Document Reference Rev Job Title This map is reproduced from Ordnance Survey material with permission of Ordnance Survey RQ EHKDOI RI WKH &RQWUROOHU RI +HU 0DMHVW\V 6WDWLRQHU\ 2IILFH &URZQ &RS\ULJKW Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. Highways Agency 100030649 2015 NOTES LEGEND TR010019 - 2.6 AS SHOWN The Cube 199 Wharfside Street Birmingham B1 1RN M4 JUNCTIONS 3 TO 12 SMART MOTORWAY SIDE ROAD PLAN & PROFILE REGULATIONS 5 (2) (o) 5 (2) (p) & 6 (2) SHEET 8 OF 13 OLDWAY LANE Rev # Revision Details Revision Date Drawn Check Review Appr'd 1. Do not scale from the drawing. 2. Ordnance Survey base mapping used. 3. New earthworks to be benched into existing (500mm high steps). 4. Conventional earthwork slopes based on being 1:2 (vertical/horizontal) - to be confirmed by geotechnical investigations at later stage. 5. New fence lines to be tied-in with the existing boundary fences. 6. For details of M4 works see Mainline General Arrangement sheets 1 - 61 in Engineering Design Report. 7. For details of standardised earthworks solutions see Earthworks Standard Details sheets 1 & 2. 8. Earthworks solutions to be confirmed by geotechnical investigation at a later stage. 9. Existing carriageway, footways, kerbs and drainage not forming part of the new works to be removed. Such areas to be filled, topsoiled and seeded. Order limits Carriageway FOR INDICATIVE DESIGN OF STRUCTURE SEE ENGINEERING DESIGN REPORT. PARAPET HEIGHT ABOVE STRING COURSE LEVEL TO BE 1.8M. HEIGHT OF BRIDGE SUPERSTRUCTURE ABOVE SIDE ROAD. LEVEL IS 4.75M. 0D 1R 16/01/15 16/02/15 1st Draft developed from PEI report Updated RPJ RPJ PW PW GM PW GM 2R 17/12/14 Updated RPJ DC GM PW 3R 05/03/15 For review prior to DCO application RPJ DC GM PW 4F 20/03/15 Submitted with DCO application RPJ DC PW GM Existing ground level
Transcript
  • TYPICAL CROSS SECTION

    NOT TO SCALE

    Highway Boundary

    Existing Ditch and Culvert System

    New Highway Boundary Fencing

    (min. 3m from E/W toe)

    New Earthworks

    Retaining Wall / Strengthened Earthworks

    (Earthworks Solution 9/12)

    Cycle / footpath

    ALIGNMENT BASED ON DESIGN SPEED OF 50KPH

    PLAN

    SCALE 1:1000

    LONG SECTION

    SCALE: HORIZONTAL 1:1000, VERTICAL 1:250

    Proposed Bridge

    Drawing Number

    Drawing Title

    Scale at A1

    Highways Agency

    Alliance Document Reference Rev

    Job Title

    This map is reproduced from Ordnance Survey material with permission of Ordnance Survey

    Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civilproceedings. Highways Agency 100030649 2015

    NOTES LEGEND

    TR010019 - 2.6

    AS SHOWN

    The Cube199 Wharfside StreetBirminghamB1 1RN

    M4 JUNCTIONS 3 TO 12

    SMART MOTORWAY

    SIDE ROAD PLAN & PROFILE

    REGULATIONS 5 (2) (o) 5 (2) (p) & 6 (2)

    SHEET 8 OF 13

    OLDWAY LANE

    Rev # Revision DetailsRevision Date Drawn Check Review Appr'd

    1. Do not scale from the drawing.

    2. Ordnance Survey base mapping used.

    3. New earthworks to be benched into existing (500mm

    high steps).

    4. Conventional earthwork slopes based on being 1:2

    (vertical/horizontal) - to be confirmed by geotechnical

    investigations at later stage.

    5. New fence lines to be tied-in with the existing

    boundary fences.

    6. For details of M4 works see Mainline General

    Arrangement sheets 1 - 61 in Engineering Design

    Report.

    7. For details of standardised earthworks solutions see

    Earthworks Standard Details sheets 1 & 2.

    8. Earthworks solutions to be confirmed by geotechnical

    investigation at a later stage.

    9. Existing carriageway, footways, kerbs and drainage

    not forming part of the new works to be removed.

    Such areas to be filled, topsoiled and seeded.

    Order limits

    Carriageway

    FOR INDICATIVE DESIGN OF STRUCTURE

    SEE ENGINEERING DESIGN REPORT.

    PARAPET HEIGHT ABOVE STRING COURSE LEVEL TO BE 1.8M.

    HEIGHT OF BRIDGE SUPERSTRUCTURE ABOVE SIDE ROAD.

    LEVEL IS 4.75M.

    0D

    1R

    16/01/15

    16/02/15

    1st Draft developed from PEI report

    Updated

    RPJ

    RPJ

    PW

    PW

    GM PW

    GM

    2R 17/12/14 Updated RPJ DC GMPW

    3R 05/03/15 For review prior to DCO application RPJ DC GMPW

    4F 20/03/15 Submitted with DCO application RPJ DC PW GM

    Existing ground level

  • ALIGNMENT BASED ON DESIGN SPEED OF 60KPH

    New Earthworks

    Carriageway

    TIE-IN POINT

    TO EXISTING

    TIE-IN POINT

    TO EXISTING

    TIE-IN POINT

    TO EXISTING

    PHASED CONSTRUCTION

    REQUIRED TO KEEP WOOD LANE

    OPEN TO TRAFFIC AT ALL TIMES

    EXISTING RIGHT OF WAY TO BE

    KEPT OPEN AT ALL TIMES

    CONNECTION TO EXISTING

    FOOTPATH NETWORK

    PUBLIC RIGHT OF WAY TO BE

    KEPT OPEN AT ALL TIMES

    EXISTING PATH TO BE

    ADAPTED TO SUIT

    SOUTHERN

    TIE-IN CH.0

    NORTHERN

    TIE-IN CH. 486

    TYPICAL CROSS SECTION

    NOT TO SCALE

    PLAN

    SCALE 1:1000

    LONG SECTION

    SCALE: HORIZONTAL 1:1000, VERTICAL 1:250

    M4

    TIE-IN TO EXISTING

    FENCELINE

    RETAINING WALL/

    EARTHWORKS

    SOLUTION 9/12

    Proposed Bridge

    Drawing Number

    Drawing Title

    Scale at A1

    Highways Agency

    Alliance Document Reference Rev

    Job Title

    This map is reproduced from Ordnance Survey material with permission of Ordnance Survey

    Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civilproceedings. Highways Agency 100030649 2015

    NOTES LEGEND

    TR010019 - 2.6

    AS SHOWN

    The Cube199 Wharfside StreetBirminghamB1 1RN

    M4 JUNCTIONS 3 TO 12

    SMART MOTORWAY

    SIDE ROAD PLAN & PROFILE

    REGULATIONS 5 (2) (o) 5 (2) (p) & 6 (2)

    SHEET 9 OF 13

    WOOD LANE

    Rev # Revision DetailsRevision Date Drawn Check Review Appr'd

    1. Do not scale from the drawing.

    2. Ordnance Survey base mapping used.

    3. New earthworks to be benched into existing (500mm

    high steps).

    4. Conventional earthwork slopes based on being 1:2

    (vertical/horizontal) - to be confirmed by geotechnical

    investigations at later stage.

    5. New fence lines to be tied-in with the existing

    boundary fences.

    6. For details of M4 works see Mainline General

    Arrangement sheets 1 - 61 in Engineering Design

    Report.

    7. For details of standardised earthworks solutions see

    Earthworks Standard Details sheets 1 & 2.

    8. Earthworks solutions to be confirmed by geotechnical

    investigation at a later stage.

    9. Existing carriageway, footways, kerbs and drainage

    not forming part of the new works to be removed.

    Such areas to be filled, topsoiled and seeded.

    Order limits

    Retaining Wall / Strengthened Earthworks

    (Earthworks Solution 9/12)

    Cycle / footpath

    New Highway Boundary Fencing (min.

    3m from E/W toe)

    FOR INDICATIVE DESIGN OF STRUCTURE

    SEE ENGINEERING DESIGN REPORT.

    PARAPET HEIGHT ABOVE STRING COURSE LEVEL TO BE 1.8m.

    0D

    1R

    2R

    29/08/14

    28/10/14

    17/12/14

    Draft

    Updated

    Updated

    RPJ

    RPJ

    RPJ

    DC

    PW

    DC

    GM

    PW

    PW

    PW

    GM

    3R 05/03/15 For review prior to DCO application RPJ DC PW GM

    4F 20/03/15 Submitted with DCO application RPJ DC PW GM

    Existing ground level

  • Drawing Number

    Drawing Title

    Scale at A1

    Highways Agency

    Alliance Document Reference Rev

    Job Title

    This map is reproduced from Ordnance Survey material with permission of Ordnance Survey

    Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civilproceedings. Highways Agency 100030649 2015

    NOTES LEGEND

    TR010019 - 2.6

    AS SHOWN

    The Cube199 Wharfside StreetBirminghamB1 1RN

    M4 JUNCTIONS 3 TO 12

    SMART MOTORWAY

    SIDE ROAD PLAN & PROFILE

    REGULATIONS 5 (2) (o) 5 (2) (p) & 6 (2)

    SHEET 10 OF 13

    DATCHET ROAD

    514451-MUH-SR-ZZ-DR-GA-300608 4F

    Rev # Revision DetailsRevision Date Drawn Check Review Appr'd

    Order limits

    New Highway Boundary Fencing

    New Earthworks

    Carriageway

    TYPICAL CROSS SECTION

    NOT TO SCALE

    ALIGNMENT BASED ON DESIGN SPEED OF 70KPH

    PLAN

    SCALE 1:1000

    LONG SECTION

    SCALE: HORIZONTAL 1:1000, VERTICAL 1:250

    PRIVATE

    ACCESS

    THE

    MYRKE

    NORTHERN

    TIE-IN

    CH.60

    M

    4

    M

    4

    TIE-IN TO EXISTING

    FENCELINE

    Proposed Bridge

    LE

    VE

    L=

    34

    .8

    44

    M

    CH

    AIN

    AG

    E=

    24

    6.5

    23

    M

    1. Do not scale from the drawing.

    2. Ordnance Survey base mapping used.

    3. New earthworks to be benched into existing (500mm

    high steps).

    4. Conventional earthwork slopes based on being 1:2

    (vertical/horizontal) - to be confirmed by geotechnical

    investigations at later stage.

    5. New fence lines to be tied-in with the existing

    boundary fences.

    6. For details of M4 works see Mainline General

    Arrangement sheets 1 - 61 in Engineering Design

    Report.

    7. For details of standardised earthworks solutions see

    Earthworks Standard Details sheets 1 & 2.

    8. Earthworks solutions to be confirmed by geotechnical

    investigation at a later stage.

    9. Existing carriageway, footways, kerbs and drainage

    not forming part of the new works to be removed.

    Such areas to be filled, topsoiled and seeded.

    0D

    1R

    2R

    29/08/14

    28/10/14

    17/12/14

    Draft

    Updated

    Updated

    RPJ

    RPJ

    RPJ

    DC

    PW

    DC

    GM

    PW

    PW

    PW

    GM

    3R 05/03/15 For review prior to DCO application RPJ DC PW GM

    Existing ground level

    4F 20/03/15 Submitted with DCO application RPJ DC PW GM

  • Drawing Number

    Drawing Title

    Scale at A1

    Highways Agency

    Alliance Document Reference Rev

    Job Title

    This map is reproduced from Ordnance Survey material with permission of Ordnance Survey

    Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civilproceedings. Highways Agency 100030649 2015

    NOTES LEGEND

    TR010019 - 2.6

    AS SHOWN

    The Cube199 Wharfside StreetBirminghamB1 1RN

    M4 JUNCTIONS 3 TO 12

    SMART MOTORWAY

    SIDE ROAD PLAN & PROFILE

    REGULATIONS 5 (2) (o) 5 (2) (p) & 6 (2)

    SHEET 11 OF 13

    RECREATION GROUND ROAD

    514451-MUH-SR-ZZ-DR-GA-300609 4F

    Rev # Revision DetailsRevision Date Drawn Check Review Appr'd

    M4

    TYPICAL CROSS SECTION

    NOT TO SCALE

    MOTOCROSS AREA

    TIE-IN POINT

    TO EXISTING

    EXISTING PASSING BAY TO

    BE RECONSTRUCTED

    ALIGNMENT BASED ON DESIGN SPEED OF 50KPH

    M

    4

    M

    4

    LONG SECTION

    SCALE: HORIZONTAL 1:1000, VERTICAL 1:250

    PLAN

    SCALE 1:1000

    1. Do not scale from the drawing.

    2. Ordnance Survey base mapping used.

    3. New earthworks to be benched into existing (500mm

    high steps).

    4. Conventional earthwork slopes based on being 1:2

    (vertical/horizontal) - to be confirmed by geotechnical

    investigations at later stage.

    5. New fence lines to be tied-in with the existing

    boundary fences.

    6. For details of M4 works see Mainline General

    Arrangement sheets 1 - 61 in Engineering Design

    Report.

    7. For details of standardised earthworks solutions see

    Earthworks Standard Details sheets 1 & 2.

    8. Earthworks solutions to be confirmed by geotechnical

    investigation at a later stage.

    9. Existing carriageway, footways, kerbs and drainage

    not forming part of the new works to be removed.

    Such areas to be filled, topsoiled and seeded.

    Order limits

    Retaining Wall / Strengthened Earthworks

    (Earthworks Solution 9/12)

    Cycle / footpath

    New Earthworks

    Carriageway

    Proposed Bridge

    0D

    1R

    2R

    29/08/14

    28/10/14

    17/12/14

    Draft

    Updated

    Updated

    RPJ

    RPJ

    RPJ

    DC

    PW

    DC

    GM

    PW

    PW

    PW

    GM

    3R 05/03/15 For review prior to DCO application RPJ DC PW GM

    4F 20/03/15 Submitted with DCO application RPJ DC PW GM

    Existing ground level

  • M4

    TYPICAL CROSS SECTION

    NOT TO SCALE

    TIE-IN POINT

    TO EXISTING

    TIE-IN POINT

    TO EXISTING

    TIE-IN POINT

    TO EXISTING

    ACCESS TRACK TO BE

    KEPT OPEN AT ALL TIMES

    EXISTING ACCESS ROAD TO BE

    KEPT OPEN AT ALL TIMES

    EXISTING JUNCTION

    TO BE MODIFIED

    ALIGNMENT BASED ON DESIGN SPEED OF 60KPH

    RE

    AD

    IN

    G

    PLAN

    SCALE 1:1000

    LONG SECTION

    SCALE: HORIZONTAL 1:1000, VERTICAL 1:250

    RIDING

    COURT

    JUNCTION

    TIE INTO

    EXISTING

    CH.110

    FIELD

    ACCESS

    ACCESS

    TRACK

    ACCESS TO PROPOSED AGGREGATE EXTRACTION SITE TO

    BE FORMED OFF RIDING COURT ROAD BY OTHERS. DETAILS

    AND LOCATION OF JUNCTION TO BE CONFIRMED.

    Drawing Number

    Drawing Title

    Scale at A1

    Highways Agency

    Alliance Document Reference Rev

    Job Title

    This map is reproduced from Ordnance Survey material with permission of Ordnance Survey

    Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civilproceedings. Highways Agency 100030649 2015

    NOTES LEGEND

    TR010019 - 2.6

    AS SHOWN

    The Cube199 Wharfside StreetBirminghamB1 1RN

    M4 JUNCTIONS 3 TO 12

    SMART MOTORWAY

    SIDE ROAD PLAN & PROFILE

    REGULATIONS 5 (2) (o) 5 (2) (p) & 6 (2)

    SHEET 12 OF 13

    RIDING COURT ROAD

    514451-MUH-SR-ZZ-DR-GA-300610

    4F

    Rev # Revision DetailsRevision Date Drawn Check Review Appr'd

    1. Do not scale from the drawing.

    2. Ordnance Survey base mapping used.

    3. New earthworks to be benched into existing (500mm

    high steps).

    4. Conventional earthwork slopes based on being 1:2

    (vertical/horizontal) - to be confirmed by geotechnical

    investigations at later stage.

    5. New fence lines to be tied-in with the existing

    boundary fences.

    6. For details of M4 works see Mainline General

    Arrangement sheets 1 - 61 in Engineering Design

    Report.

    7. For details of standardised earthworks solutions see

    Earthworks Standard Details sheets 1 & 2.

    8. Earthworks solutions to be confirmed by geotechnical

    investigation at a later stage.

    9. Existing carriageway, footways, kerbs and drainage

    not forming part of the new works to be removed.

    Such areas to be filled, topsoiled and seeded.

    Order limits

    Retaining Wall / Strengthened Earthworks

    (Earthworks Solution 9/12)

    Cycle / footpath

    New Earthworks

    Carriageway

    New Highway Boundary Fencing (min.

    3m from E/W toe)

    Proposed Bridge

    FOR INDICATIVE DESIGN OF STRUCTURE

    SEE ENGINEERING DESIGN REPORT.

    PARAPET HEIGHT ABOVE STRING COURSE LEVEL TO BE 1m.

    0D

    1R

    2R

    29/08/14

    28/10/14

    17/12/14

    Draft

    Updated

    Updated

    RPJ

    RPJ

    RPJ

    DC

    PW

    DC

    GM

    PW

    PW

    PW

    GM

    3R 05/03/15 For review prior to DCO application RPJ DC PW GM

    Existing ground level

    4F 20/03/15 Submitted with DCO application RPJ DC PW GM

  • PLAN

    SCALE 1:1000

    M4

    M

    4

    ALIGNMENT BASED ON DESIGN SPEED OF 50KPH

    TIE-IN POINT

    TO EXISTING

    ACCESS TO EXISTING PATH

    TO BE MAINTAINED AT ALL

    TIMES

    Level Datum

    =20.000m (A.O.D.)

    TYPICAL CROSS SECTION

    NOT TO SCALE

    LONG SECTION

    SCALE: HORIZONTAL 1:1000, VERTICAL 1:250

    RE

    AD

    IN

    G

    TIE INTO

    EXISTING

    CH.135

    TIE INTO

    EXISTING

    CH.273

    M4

    Drawing Number

    Drawing Title

    Scale at A1

    Highways Agency

    Alliance Document Reference Rev

    Job Title

    This map is reproduced from Ordnance Survey material with permission of Ordnance Survey

    Unauthorized reproduction infringes Crown Copyright and may lead to prosecution or civilproceedings. Highways Agency 100030649 2015

    NOTES LEGEND

    TR010019 - 2.6

    AS SHOWN

    The Cube199 Wharfside StreetBirminghamB1 1RN

    M4 JUNCTIONS 3 TO 12

    SMART MOTORWAY

    SIDE ROAD PLAN & PROFILE

    REGULATIONS 5 (2) (o) 5 (2) (p) & 6 (2)

    SHEET 13 OF 13

    OLD SLADE LANE

    Rev # Revision DetailsRevision Date Drawn Check Review Appr'd

    1. Do not scale from the drawing.

    2. Ordnance Survey base mapping used.

    3. New earthworks to be benched into existing (500mm

    high steps).

    4. Conventional earthwork slopes based on being 1:2

    (vertical/horizontal) - to be confirmed by geotechnical

    investigations at later stage.

    5. New fence lines to be tied-in with the existing

    boundary fences.

    6. For details of M4 works see Mainline General

    Arrangement sheets 1 - 61 in Engineering Design

    Report.

    7. For details of standardised earthworks solutions see

    Earthworks Standard Details sheets 1 & 2.

    8. Earthworks solutions to be confirmed by geotechnical

    investigation at a later stage.

    9. Existing carriageway, footways, kerbs and drainage

    not forming part of the new works to be removed.

    Such areas to be filled, topsoiled and seeded.

    Carriageway

    Proposed Bridge

    Order limits

    0D

    1R

    2R

    29/08/14

    28/10/14

    17/12/14

    Draft

    Updated

    Updated

    RPJ

    RPJ

    RPJ

    DC

    PW

    DC

    GM

    PW

    PW

    PW

    GM

    3R 05/03/15 For review prior to DCO application RPJ DC PW GM

    4F 20/03/15 Submitted with DCO application RPJ DC PW GM

    Existing ground level

    514451-MUH-SR-ZZ-DR-GA-300606_Rev.4R - Oldway Lane514451-MUH-SR-ZZ-DR-GA-300607_Rev.4F - Wood Lane514451-MUH-SR-ZZ-DR-GA-300608_Rev.4F - Datchet Road514451-MUH-SR-ZZ-DR-GA-300609_Rev.4F - Recreation Ground514451-MUH-SR-ZZ-DR-GA-300610_Rev.4F - Riding Court Road514451-MUH-SR-ZZ-DR-GA-300611_Rev.4F - Old Slade Lane