Boiler Documentation By: Dhruv Garg Engineer/Boiler PS-TS, BHE L
Transcript
Page 1: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 1/90

Boiler Documentation

By:Dhruv GargEngineer/BoilerPS-TS, BHEL

Page 2: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 2/90

Boiler Manufacturing Plant

High Pressure Boilers (For 500/250/210/125 MW Ratings) inBHEL are designed And manufactured at High PressureBoiler Plant (HPBP), BHEL Trichy, Tamil Nadu.

Boiler Auxiliaries Like FD, ID, PA Fans, Air Pre-Heaters andESP are designed And manufactured At BAP Ranipet.

Coal Mills are designed and manufactured at Heavy Power Equipment Plant, R.C Puram Hyderabad.

Page 3: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 3/90

Boiler Documentation

Major documents associated with Erection of boiler:

Applicable PGMA list:

 After basic thermal design and layout of boiler is worked out,

Trichy first finalizes the applicable PGMA list vary from projectto project.

PG stands for Product Group.

Identified by a two digits number, ranging from 00 to 99.

Page 4: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 4/90

Boiler Documentation…

Each Product Group identifies a pre-defined area of boiler.

Following are some examples:

04 Steam drum.

05 Headers in circulation system.

06 Water walls of circulation system.

07 Line, links and suspensions of

circulation system.

08 Buck stays.

35 Boiler supporting structure.

36 Boiler platforms and galleries.

Page 5: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 5/90

Boiler Documentation…

Examples (cont’d…)

39 Structure behind main boiler.

48 Ducts.

50 Steam coil air pre-heater.

52 Regenerative air pre-heater.

55,56 Fans

78 ESP

80 Piping

95,96,97 Control and Instrumentations

Page 6: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 6/90

Boiler Documentation…

MA stands for Main Assemblies.

Identified by a three digits number and defines a sub-group

applicable to specific Product Group.

Following are some examples:

04-126 Steam drum.

04-146 Drum suspension.

05-137 Front water wall lower inlet header.

05-147 Rear water wall lower inlet header.

06-631 Front upper water wall panels.

06-634 Front inter water wall panels.

07-215 Side relief tubes.

07-223 Furnace hanger tubes.

08-101 Furnace upper buck stays.

Page 7: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 7/90

Boiler Documentation…

Examples (cont’d…)

08-111 Rear arch buck stays.

35-010 Support structure foundation material.

35-110 Main columns left.

35-210 Ceiling structure fabricated.

39-141 Columns ID fan inlet.

48-012 Duct-FD fan to air heater. 48-022 Duct-FD fan interconnection.

52-011 Rotor post assembly for air pre-heater.

52-041 Hot end connecting plate for air pre-heater.

Page 8: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 8/90

Boiler Documentation

The released applicable PGMA list for a boiler presents

following information:

• Major PGs applicable to the boiler.

• Main sub-assemblies applicable to that product group and

boiler.

• Estimation of design weight for every PGMA.

• Summed up estimated design weight of a PG.

• Summed up estimated weight of complete boiler.

Page 9: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 9/90

BOILER SHIPPING LIST

Page 10: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 10/90

Boiler Shipping List

Basic document giving details of style of manufacture and

dispatches for complete boiler components.

Issued for each and every PGMA with title and PGMA

number.

Identified by Boiler job number (a four digits unique

number for a boiler)

Contains a three digit number called as   “Dispatch Priority

Number” (DPN) which indicates the sequence of supply

w.r.t. erection sequence.

Nature of supply as NS-1 (main contractual supply) or NS-

2 (free of cost supply for some left out or modification area)

or NS-3, 4 etc.

Page 11: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 11/90

Boiler Shipping List…

In various columns in the shipping list sheet, it gives

following information:

• DU (Dispatchable Unit) number as three digits number 

starting from 001 for each PGMA.

• Description of DU.

The drawing number to be referred for that DU. Some

times a star mark is put in this column. It indicates that a

Project drawing should be referred for the details of thatDU.

Page 12: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 12/90

Boiler Shipping List…

• Item number in next column relates it to the respective

item number on the bill of material of related drawing.

• Next column gives the total quantities of dispatch for that

DU.

• Next column gives the weight of total numbers in Kgs.

• In right hand bottom corner, the number of sheets used for that shipping list is also indicated.

• At the bottom the summed up total weight of dispatch for 

complete PGMA is also indicated in Kgs.

• After last DU, each shipping list is marked with -"Shippinglist completed" to ensure total DUs in that shipping list.

Page 13: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 13/90

BOILER DRAWINGS

Page 14: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 14/90

Boiler Drawings

Drawings, Schemes and P&ID schemes are released for

every boiler-

• Scheme of water and steam system.

• Scheme of fuel system.

• Scheme of Air and Flue gas system.

• Scheme of piping.

• Any other applicable scheme including instrumentation.

Page 15: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 15/90

Boiler Drawings…

 A set of Project drawings are released-

• Composite foundation plan and loading data.

• General arrangement of Boiler-Elevation and Plan.

• Sectional drawings of General arrangement.

• Pressure Parts arrangement drawing.• Sectional drawings for pressure part arrangement.

• Floor Plans at various levels.

• Lay out drawings for Air and Flue gas ducting.

• General Assembly(GA) drawings for some equipment likefans, mills, air pre-heaters etc.

• Lay out of Fuel System

Page 16: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 16/90

How To Read Drawing Numbers

Drawing Number 

0-00-022-72045 Rev 00

• Size of drawing such as 0,1,2,3 or 4

• PG number for which it is applicable, such as 00, 35 or 48

etc.

• MA number three digit e.g. 020, 110, 210 etc.

• Individual distinctive drawing number in five digits.

• Revision number such as 00 or 01 etc.

Each drawing contains all dimensional details, item

numbers and complete Bill of material(BOM) applicable tothat drawing.

Page 17: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 17/90

OTHER DOCUMENTSREQUIRED FOR

ERECTION & COMMISSIONINGACTIVITIES

Page 18: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 18/90

Other Documents

• IBR approved drawings for pressure parts.

• IBR provisional certificate to invite Boiler inspector for

ground inspection of pressure part components.

• IBR data book along with form IIIC of valves, before

Hydraulic test of boiler.

• Thickness calculation sheets for pressure part

components.• Erection Welding Schedule (EWS)

• Welding Procedure Specifications (WPS) for various types

of welding joints.

• Welding, NDT and Heat treatment manuals.• Field Quality Plans(FQP) for Products / Systems e.g Boiler

structure and Pressure Parts

Page 19: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 19/90

Other Documents…

• Electrical and Control Panel arrangement drawings.

• Cable Schedules and Termination details.

• Hydraulic test procedure.

• Commissioning Procedures for specific equipments.

• Acid Cleaning procedure.

• Steam blowing procedure and scheme.

• Safety valve settings procedure.

• Operation & Maintenance Manual for specific Equipment

• Start up and Unit loading curves.

• PG Test Procedure.

Page 20: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 20/90

BOILER COLUMNS LAYOUT

Page 21: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 21/90

• Boiler center line is generally at right angle to the center line

of Steam turbine-generator-Exciter line.

• The vertical cavity formed by first four main columns of boiler

support structure (usually named S7L&R, S8L&R, S9L&R and

S10L&R) accommodates the main furnace of boiler. This

cavity referred as First Pass.

• The vertical cavity formed by rear columns (S10L&R, S11L&R

and S12L&R) Referred as Second Pass.

Boiler Columns Layout

Page 22: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 22/90

REGULAR ARRANGEMENT OF BOILER COLUMNS FOR RAMAGUNDAM 500 MW

UNIT 7 (53 NO OF COLUMNS)

Page 23: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 23/90

BOILERSTRUCTURE

DIMEMSIONAL DETAILS OF BOILER COLUMNS FOR

Page 24: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 24/90

DIMEMSIONAL DETAILS OF BOILER COLUMNS FOR

KAHALGOAN 500 MW

Page 25: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 25/90

BOILER LAYOUTS

Page 26: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 26/90

LAYOUT CATEGORY

A) LAYOUT FOR GREEN FIELD PROJECTS.

B) LAYOUT FOR EXTENSION OF EXISTING UNITS.

C) LAYOUT FOR ANY RENOVATION & MODERNIZATION

OF EXISTING UNITS

Page 27: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 27/90

TYPES OF LAYOUT

BASIC BOILER LAYOUT IS DESIGNATED BASED ON THELOCATION OF MILLS .

FOLLOWING FOUR TYPES OF LAYOUTS ARE IN USE

FRONT MILL LAYOUT

REAR MILL LAYOUT

SIDE MILL LAYOUT

VIJAYAWADA (SPECIAL) LAYOUT

FRONT MILL LAYOUT

Page 28: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 28/90

FRONT MILL LAYOUT

Page 29: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 29/90

FRONT MILL LAYOUT

REAR MILL LAYOUT (PANIPAT)

Page 30: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 30/90

REAR MILL LAYOUT (PANIPAT)

REAR MILL LAYOUT

Page 31: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 31/90

REAR MILL LAYOUT

SIDE MILL LAYOUT

Page 32: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 32/90

SIDE MILL LAYOUT

VIJAYAWADA MILL LAYOUT

Page 33: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 33/90

VIJAYAWADA MILL LAYOUT

VIJAYAWADA MILL LAYOUT

Page 34: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 34/90

VIJAYAWADA MILL LAYOUT

Page 35: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 35/90

AIR & FLUE GAS PATH OF

BOILER

Page 36: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 36/90

SCHEME OF FLUE GAS PATH

FURNACE 1ST

PASS

AIR PRE-

HEATER 

ESPID FANCHIMNEY

BACK PASS

OR 2 ND

PASS

Page 37: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 37/90

SCHEME OF SECONDARY AIR PATH

FORCED

DRAFT

(FD) FAN

SECONDARY

AIR PRE-

HEATER 

TO FURNACE

THROUGH

WINDBOX

HOT

SECONDARY

AIR 

Page 38: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 38/90

SCHEME OF PRIMARY AIR PATH

PRIMARYAIR(PA)

FAN

PRIMARY AIR

PRE-HEATER 

MILLS

FURNACE

TEMPERING (COLD)AIR HOT PRIMARY AIR  

MIXED PRIMARY AIR 

FEEDER

PULVERISED COALWITH AIR 

RAW

COAL

Page 39: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 39/90

FLOW DIAGRAM OF AIR & FLUE GASPATH

FLUE GAS TO ESP

FD FAN PA FAN

AIR HEATER 

HOT SEC. AIR TO WIND BOX HOT PA TO MILLS

FLUE GAS FROM ECONOMISER 

Page 40: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 40/90

DUCTS

DUCTS & DAMPERS

DUCTS

Page 41: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 41/90

Duct is a closed path for the flow of cold air , hot airand gases from one point to another point in asystem . This can be of any shape like Circular ,Elbow, Straight , Square, Rectangular or some other shape.

There are eleven duct systems in Boiler :

1 . Cold air duct - FD fan to air heater.

- PA fan to air heater.

2 . Tempering Air system .

DUCTS

HOT AIR DUCTS :

HOT AIR DUCTS

Page 42: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 42/90

* Hot air To Wind box

* Hot air To Bus duct

* Hot air to Mills

GAS DUCTS :

* Gas To Economizer

* Gas To Boiler Outlet

* Gas To Electro statics precipitator

* Gas To ID Fan

* Gas To Chimney

HOT AIR DUCTS

GAS DUCTS

Page 43: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 43/90

COLD AIR DUCT FROM

FD FAN TO SECONDARY

AIR HEATER

Page 44: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 44/90

HOT SECONDARY AIR

DUCT FROM SAPH TO

FURNACE WINDBOX

Page 45: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 45/90

TEMPERING AIR DUCTING (COLD PA)

Page 46: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 46/90

Hot Primary Air duct from

PAPH to Mills &

Tempering Air Duct to Mills

FLUE GAS DUCT FROM

Page 47: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 47/90

FLUE GAS DUCT FROM

ECONOMISER TO AIR PRE-

HEATER 

Page 48: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 48/90

AIR PRE- HEATERS TO

BOILER OUTLET FLANGE (BOF)

Page 49: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 49/90

BOF TO AIR HEATERS

FLUE GAS DUCT FROM BOF

TO ESP PASS

Page 50: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 50/90

FLUE GAS

DUCT FROM

ESP to ID FAN

Page 51: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 51/90

FLUE GAS DUCTFROM ID FAN TO

CHIMNEY

Raichur -7, 210 MW – Top View

Page 52: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 52/90

Duct Modules

Page 53: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 53/90

Straight ductCircular to

Rectangular ductTransition duct Y duct

T ductBend ductElbow duct

3D VIEW OF TUBULARFLUE

GAS

Page 54: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 54/90

3D VIEW OF TUBULAR AIRPREHEATERS WITH

DUCTS

FLUE

GAS IN

COLD

 AIR IN

HOT AIR

OUT

GAS

OUT

 AH-I

 AH-II

 AH-III

ELBOW DUCT

TRANSITION

DUCT

Page 55: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 55/90

SUPPORTS & RESTRAINTS OFDUCTS

Anatomy of a simple straight duct

Page 56: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 56/90

STIFFENER 

DUCT

PLATE

FLANGE

CORNER

 ANGLE

DUCT WITH

INTERNAL

TRUSS

Anatomy of a simple straight duct

Page 57: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 57/90

RESTRAINT

STRUT TUBE WELD

GUSSET

BASE PLATE

WITH (BEARING)

SUPPORT

CORNER ANGLE PLATE

Page 58: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 58/90

HOT SECONDARY AIR DUCT

FLOW METER 

EXPANSION JT

SUPPORT

TOP SUPPORT WITH

HANGER AND LUG PLATE

Page 59: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 59/90

HANGER AND LUG PLATE

RESTRAINT SUPPORT

Page 60: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 60/90

DUCT WITH BOTTOM SUPPORT

Page 61: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 61/90

SUPPORT

FLANGE WITH

FITUP HOLES

Page 62: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 62/90

I-BEAM

SUPPORT

TOP PLATE

BEARING PLATE

BASE PLATE

BOTTOM SUPPORT WITH BASE PLATE

 AND BEARING PLATE

BOTTOM SUPPORT WITH STOPPERS

Page 63: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 63/90

TOP PLATE

BEARING PLATE

BASE PLATE

WITH STOPPER 

Page 64: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 64/90

EXPANSION JOINTS

EXPANSION JOINTS

Page 65: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 65/90

• Takes care of Axial & Lateral Expansion in Ducts.• Also Takes care of slight misalignment between two

duct pieces.

• Used in Hot Air Ducts, Flue Gas Ducts, Ductsconnecting with wind box, furnace and BoilerAuxiliaries.

• Expansion Joints always work in compression mode

rather than in tension mode

Page 66: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 66/90

EXPANSION JOINT

ASSEMBLED IN DUCT

CL of support C L of support

Expansion Movement in Duct

Page 67: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 67/90

AIR PRE- 

HEATER 

Lateral movement to Toggle

Axial movement

Axial movement

Movement

of duct

Movement

of A.H.

pp pp

TYPES OF EXPANSION JOINTS

Page 68: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 68/90

1 Metallic Expansion Joints (MEJ)

2 Non- Metallic Expansion Joints (NMEJ)

METALLIC EXPANSION JOINT

Page 69: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 69/90

NON-METALLIC EXPANSION JOINT(Circular Shape)

Page 70: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 70/90

ELASTOMER COATEDOUTER LAYER (silitex)PTFE SEALINGLAYER 

GLASS FABRICSUPPORT LAYER 

Page 71: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 71/90

DUCT S.S WIREMESH

FABRIC DETAILS FOR N.M.E.J

GLASS FABRIC

CAVITY

PILLOW

BOLSTER 

Page 72: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 72/90

GATES

GUILLOTINE GATES

Page 73: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 73/90

Guillotine gates are used in

boilers for isolation of anyduct, system or equipment byrestricting the flow of air orflue gas during running ofboiler.

Gates are 100 % leak tight infull close condition.

100% Leak tightness for Gates

The seal air is admitted inside the

Page 74: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 74/90

The seal air is admitted inside theseal air chamber with a pressure of

125 mm WC more than the systempressure.

BLOWER TESTING TUBE

PLENUM DUCT

FLOW

P1 P2P3

P2>P1&P3

Page 75: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 75/90

DAMPERS

DAMPERS

Page 76: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 76/90

Dampers are used in the ducts to control flow of air or

flue gas in the Boiler system.

Types of Dampers used in the Power Plants:

1. Louver Damper2. Bi-plane Damper

3. Flap Damper

LOUVER DAMPER

Page 77: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 77/90

This damper is used in two way ducts and provides onlysingle plane sealing in the system.

This damper is only 95 % leak tight in full close

condition.

BI-PLANE DAMPER

Page 78: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 78/90

This damper is also used in two way ducts and providesdouble plane sealing in the system.

This is considered as 99 % leak tight in full close

condition.

Used in Secondary Air Damper etc.

BIPLANE DAMPERS

Page 79: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 79/90

FLAP DAMPER

Page 80: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 80/90

This damper is used in three way ducts.

This damper is 100 % leak tight in full close conditionand can replace Gates due to easy operation.

Used in Economizer Bypass ducts, mill hot air ducts etc.

FLAP DAMPER 

Page 81: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 81/90

CASING

BLADE

SEAL AIR FAN

ACTUATOR 

GEAR BOX

Page 82: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 82/90

FLAP DAMPER WORKING

Page 83: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 83/90

Page 84: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 84/90

Page 85: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 85/90

Page 86: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 86/90

Page 87: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 87/90

DUCT

FLAP WITH

TOGGLE

LEVER

FLOW IN

ACTUATOR

Page 88: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 88/90

Page 89: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 89/90

Page 90: 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

7/23/2019 3.Boiler documentation, Air & Flue Gas path, Ducts,EJ,Gates & Dampers(1.5 hrs).pdf

http://slidepdf.com/reader/full/3boiler-documentation-air-flue-gas-path-ductsejgates-dampers15-hrspdf 90/90


Recommended