5G-PICTURE 5G Programmable Infrastructure Converging disaggregated network and compUte Resources 01.06.2017 – 30.11.2019 Anna Tzanakaki 1 & Eckhard Grass 2 1 University of Bristol, UK 2 IHP, Germany On Behalf of the 5G-PICTURE consortium
Transcript
Page 1: 5G-PICTURE€¦ · Technology • • CNIT • COSMOTE ... M8 M18 M24 Rail Use Case development Validation in the FGC Rail Infrastructure Validation in the Ashton Gate Stadium (Bristol)

5G-PICTURE 5G Programmable Infrastructure Converging

disaggregated network and compUte Resources

01.06.2017 – 30.11.2019

Anna Tzanakaki1 & Eckhard Grass2

1 University of Bristol, UK 2 IHP, Germany

On Behalf of the 5G-PICTURE consortium

Page 2: 5G-PICTURE€¦ · Technology • • CNIT • COSMOTE ... M8 M18 M24 Rail Use Case development Validation in the FGC Rail Infrastructure Validation in the Ashton Gate Stadium (Bristol)

• IHP GmbH (Coordinator)

• University of Bristol

• ADVA Optical Networking

• Airrays GmbH

• Blu Wireless Technology

• CNIT

• COSMOTE

• EURECOM

• Fundació Privada i2CAT, Internet I Innovació Digital a Catalunya

• Telecom Italia S.p.A

• Zeetta Networks

• Mellanox

• Huawei Technologies

Dusseldorf GmbH

• Technische Universität

Dresden

• Transpacket

• Paderborn University

• COMSA INSTALACIONES Y SISTEMAS INDUSTRIALES SL

• Ferrocarrils de la Generalitat de Catalunya

• University of Thessaly

Consortium Members

Universities (4x), Research Institutes (4x), SMEs (3x), Operators (3x), Industry partners (5x)

Oulu, 14.06.2017 5G-PICTURE 2

Page 3: 5G-PICTURE€¦ · Technology • • CNIT • COSMOTE ... M8 M18 M24 Rail Use Case development Validation in the FGC Rail Infrastructure Validation in the Ashton Gate Stadium (Bristol)

Main Objectives • 5G-PICTURE will design and develop an integrated, scalable and open

5G infrastructure with the aim to support operational and end-user services for both ICT and ‘vertical’ industries.

• This infrastructure will rely on a converged fronthaul and backhaul solution, integrating advanced wireless access and novel optical network domains.

• To address the limitations of current solutions 5G-PICTURE will adopt the novel concept of Disaggregated-Radio Access Networks (DA-RANs)

• allows any service to flexibly mix-and-match and use compute, storage and network resources through HW programmability

• relies on network ‘softwarisation’ to enable an open reference platform instantiating a variety of network functions

• adopts slicing and service chaining to facilitate optimised multi-tenancy operation

Oulu, 14.06.2017 5G-PICTURE 3

Page 4: 5G-PICTURE€¦ · Technology • • CNIT • COSMOTE ... M8 M18 M24 Rail Use Case development Validation in the FGC Rail Infrastructure Validation in the Ashton Gate Stadium (Bristol)

Concept

• Extensive demonstration activities to showcase ICT and vertical industry use cases

• Converged fronthaul and backhaul services in a smart city test-bed (city of Bristol, UK)

• Seamless service provisioning and mobility management in high speed railway environments - 5G railway experimental testbed (Barcelona, Spain)

• Media services supporting large venues with increased density and static-to-low mobility - stadium test-bed supporting large venues (Bristol, UK)

Large DCsInternet

Metro

Core

Metro

Mini DCs

Mid-DCs

Micro-DCs

Wireless AccessMacro-cells

SSD

RAMGPP SPP

SSD

RAMGPP

SSD

RAMGPP

SPP

SPP

• 5G-PICTURE proposes to integrate network and compute/storage resources in a common infrastructure.

• Hierarchical compute & storage structure supported by a network hierarchy

• Integrated programmable wireless technologies at the edge and a hybrid passive/active optical transport network

Oulu, 14.06.2017 5G-PICTURE 4

Page 5: 5G-PICTURE€¦ · Technology • • CNIT • COSMOTE ... M8 M18 M24 Rail Use Case development Validation in the FGC Rail Infrastructure Validation in the Ashton Gate Stadium (Bristol)

Technical Approach

• Τo address the limitations of D-RAN and C-RAN, we will develop flexible functional splits

• Adoption of the notion of DA-RAN relying on resource disaggregation

• mixing-and-matching of resources

• Development of novel technology solutions and control & management platforms

• enhanced network and compute HW and SW modularity and flexibility

• Creation and deployment of programmable network functions and intelligent orchestration schemes

• service chaining

• slicing & multi-tenancy

mmWaveRRH

VIM VIM VIM

PON

VIM

RAM

VIM

Storage

VIM

Processing (specific)

VIM

Processing (general)

OPP

MPI

MPI

OPP

Tx

BVT/R

BVT/R

BV-WSS

BV-WSS

Fast Switch

module λ2

MUX

MUX

Fast Switch

module λ1

Fast Switch

module λΝ

MPI

BV-WSS

BV-WSS

Fast Switch

module λ2

MUX

MUX

Fast Switch

module λ1

Fast Switch

module λΝ

OPP

MPI

MPI

OPP

Tx

BVT/R

BVT/R

MPI

VIM VIM VIM VIM

NFV Orhestrator

5G-PICTURE OS

PNF(Synchronization)

PNF(Signal Processing/

massive MIMO)PNF(beam tracking)

PNF (FFT, iFFT)

VNF (vEPC)

VNF (vMME, vBBU)

VNF

VNF vCDN

VNF controller

VNF controller

SDN ControllerSlicing

Manager

Monitoring and Profiling

Operations and Support System(OSS)

a)

b) c)

d)

e)

Oulu, 14.06.2017 5G-PICTURE 5

Page 6: 5G-PICTURE€¦ · Technology • • CNIT • COSMOTE ... M8 M18 M24 Rail Use Case development Validation in the FGC Rail Infrastructure Validation in the Ashton Gate Stadium (Bristol)

Inter-project cooperation

• Relevant Working Groups WG 5G Pre-standardization WG – 5G IA •Facilitator: Olav Queseth, Ericsson

WG NetMgmgt & QoS – 5G-PPP •Facilitator: Michael Barros, TSSG Wateford

WG 5G Spectrum – 5G IA •Facilitator: Terje Tjelta, Telenor

WG 5G Architecture – 5G-PPP • Facilitator: Simone Redana, Nokia

WG Software Networks (SDN,NFV) – 5G-PPP

• Facilitators: Josep Martrat, Atos Carlos Jesús Bernardos, UC3M

Collaborations with other Phase-I & Phase II 5G PPP projects-

• 5G-XHaul, Phase I

• mmMAGIC, Phase I

• 5G-Crosshaul, Phase I

• METRO-HAUL, Phase II

• 5G-Transformer, Phase II

• Sat5G, Phase II

• … t.b.d.

WG SME – Networld2020 •Facilitator: Jacques Magen, Interinnov

WG Vision and Societal Challenges WG- 5G IA •Facilitator: Salaheddine Elayoubi, Orange

WG Security – 5G-PPP •Facilitator: J-P Wary, Orange,

Pascal Bisson, Thales

WG Trials – 5G IA •Facilitator: Didier Bourse, Nokia

Oulu, 14.06.2017 5G-PICTURE 6

Page 7: 5G-PICTURE€¦ · Technology • • CNIT • COSMOTE ... M8 M18 M24 Rail Use Case development Validation in the FGC Rail Infrastructure Validation in the Ashton Gate Stadium (Bristol)

Computing

HardwareStorage Hardware

Wireless Network

Hardware

Optical Network

Hardware

Hardware resources

Virtualization Layer

Virtual Compute Virtual Storage Virtual Wireless Virtual Optical

NFVI

VNF VNF PNFVNF

EM EM EMEM

OSS/BSS Orchestrator VNF Manager VIM Manager

WP3: Data Plane

Programmability and

Infrastructure

Components

WP5: 5G-Operating System

WP

2:

: 5

G a

nd

Ver

tica

ls S

erv

ices

, R

equ

irem

ents

an

d

Arc

hit

ectu

re

WP

6:

Dem

on

stra

tio

n o

f 5

G T

elec

om

mu

nic

ati

on

s

an

d V

erti

cal

Use

Ca

ses

WP1: Project Management

WP4: Physical

and Virtual

Programmable

functions

PNF

Memory

Oulu, 14.06.2017 5G-PICTURE 7

Work Organisation

Page 8: 5G-PICTURE€¦ · Technology • • CNIT • COSMOTE ... M8 M18 M24 Rail Use Case development Validation in the FGC Rail Infrastructure Validation in the Ashton Gate Stadium (Bristol)

Oulu, 14.06.2017 5G-PICTURE 8

Design & Requirements

Architecture Definition/RefinementTechnical Developments

5G ICT Use Case development

5G Stadium/Media Use Case development

Validation in the Bristol is Open (BIO)

Testbed

Phase 1 Phase 3M8 M18 M24

Rail Use Case development

Validation in the FGC Rail Infrastructure

Validation in the Ashton Gate

Stadium (Bristol)

Phase 2 Phase 4 M30

Timeline, Use-Cases & Validation