Page 1: 5S - Becoming a Visual Factory
Page 2: 5S - Becoming a Visual Factory

  It is a factory that is;   Self Explaining   Self Ordering   Self Regulating   Self Improving

5's Overview Kickoff 2

http://forums.vwvortex.com

Page 3: 5S - Becoming a Visual Factory

5's Overview Kickoff 3

http://forums.vwvortex.com

Page 4: 5S - Becoming a Visual Factory

5's Overview Kickoff 4

Page 5: 5S - Becoming a Visual Factory

  They are the foundation for an effective Lean Manufacturing System

“The 5S’s are the foundation – or workplace “pillars” – upon which we establish flow production, visual control, standard operations, and other JIT building blocks.” Hiroyuk Hirano

5's Overview Kickoff 5

Page 6: 5S - Becoming a Visual Factory

  What are the Benefits to me?

 They improve Workplace Safety  They improve Job Satisfaction  They remove Obstacles and Frustrations  They improve Communication flow

5's Overview Kickoff 6

Page 7: 5S - Becoming a Visual Factory

  What are the benefits to the company? •  Reduced changeover time = improved

productivity •  Reduced defects = improved quality •  Reduced waste = reduced cost •  Reduced delays = improved delivery •  Reduced injuries = improved safety •  Reduced breakdowns = improved flow •  Reduced complaints = improved morale

...…Company Growth

5's Overview Kickoff 7

Page 8: 5S - Becoming a Visual Factory

5's Overview Kickoff 8

Page 9: 5S - Becoming a Visual Factory

  Separate the necessary from the necessary and get rid of what you don’t need.

5's Overview Kickoff 9

Page 10: 5S - Becoming a Visual Factory

5's Overview Kickoff 10

SORT

Page 11: 5S - Becoming a Visual Factory

  Typical Activities include   Throw out the things you don’t need.   Deal with the cause of dirt and leaks   Housecleaning.   Treat defects and breakage   Inspect covers and troughs to prevent leakage and

scatter.   Clean the grounds.   Organize the warehouse/store.   Eliminate grime and burrs.   Eliminate oil pans.

5's Overview Kickoff 11

Page 12: 5S - Becoming a Visual Factory

  Everything in its place and a place for everything!

  Establish a neat layout so you can always get just as much of what you need when you need it.

5's Overview Kickoff 12

Page 13: 5S - Becoming a Visual Factory

  Typical Activities include   Everything has a clearly designated place   Thirty second storage and retrieval   Filing standards   Zoning and placement marks   Eliminate lids and locks.   FIFO (First In First Out)   Straight lines and right angles.   Functional placement of times.

5's Overview Kickoff 13

Page 14: 5S - Becoming a Visual Factory

5's Overview Kickoff 14

www.leaninnovations.ca

Not so good!

Good!

Page 15: 5S - Becoming a Visual Factory

  Is a daily activity, clean as you go.   Keep everything clean.

  Inside / Outside / On top / Below

  Focus on mess prevention instead of mess cleanup.   Look for ways to contain messes.   Use vacuums not hoses for cleanup

  Cleaning as a form of inspection.

5's Overview Kickoff 15

Page 16: 5S - Becoming a Visual Factory

5's Overview Kickoff 16

Page 17: 5S - Becoming a Visual Factory

  Typical Activities include   Individual responsibility   Make cleaning and inspection easier   Sparkling clean campaigns   Everybody is a janitor   Perform cleaning inspections and correct minor

problems.   Clean even the places most people do not notice.

5's Overview Kickoff 17

Page 18: 5S - Becoming a Visual Factory

  Develop process that define the “best method” for things to be done.

  Use agreed upon visual standards.   Document changes and share with others

5's Overview Kickoff 18

Page 19: 5S - Becoming a Visual Factory

5's Overview Kickoff 19

Page 20: 5S - Becoming a Visual Factory

  Typical Activities include   Okay marks   Danger zones   Color coding   Warning colors   Fire extinguisher signs   Mistake proofing   Wire/cord/hose management

5's Overview Kickoff 20

Page 21: 5S - Becoming a Visual Factory

  Sustain or discipline is a process of repetition and practice.

  Keeps the first 4S’s from losing ground.   Paves the way for other kaizen efforts.

5's Overview Kickoff 21

Page 22: 5S - Becoming a Visual Factory

5's Overview Kickoff 22

Page 23: 5S - Becoming a Visual Factory

  Typical Activities include   One minute 5S   Pick-up practice   Practice dealing with emergencies   Individual responsibility and accountability   5S manuals   Communication and feedback   Seeing is believing

5's Overview Kickoff 23

Page 24: 5S - Becoming a Visual Factory
Page 25: 5S - Becoming a Visual Factory

  SEPARATE THE NECESSARY FROM THE UN-NECESSARY

  SORT ITEMS ACCORDING TO   NOT NEEDED NOW   NOT NEEDED IN 15

MINUTES   NOT NEEDED IN 1 HOUR   NOT NEEDED THIS

MORNING   NOT NEEDED THIS SHIFT   NOT NEEDED TODAY (24

HOURS)

5's Overview Kickoff 25

Page 26: 5S - Becoming a Visual Factory

  RED TAG   DO NOT

NEED   REMOVE

FROM AREA   AUCTION   THROW

AWAY

  YELLOW TAG   NOT SURE

YET   DATE IT TO

DETERMINE USE

5's Overview Kickoff 26

Page 27: 5S - Becoming a Visual Factory

  RED TAG ITEMS   RETURN TO STORE   AUCTION AREA   SCRAP BIN   REPAIR AREA   ZONE RETRIEVAL AREA

  WHAT DO I DO WITH IT AFTER I HAVE TAGGED IT?

5's Overview Kickoff 27

Page 28: 5S - Becoming a Visual Factory

  YELLOW / GREEN (MUST HAVE A HOME)

  STORE BASED ON FREQUENCY OF USE   STORE BASED ON SEQUENCE USED   REDUCE NUMBER OF TOOLS / FIXTURES

NEEDED   CARTS MOVABLE ITEMS NEED FLOOR

LOCATIONS IDENTIFIED   USE COLOR CODING TO DISTINGUISH

OWNERSHIP   STORE FOR RETRIEVAL CONVIENCE

5's Overview Kickoff 28

Page 29: 5S - Becoming a Visual Factory

WHEN SETTING UP STORAGE KEEP THESE IN MIND

  ONE STEP RULE   KEEP ITEMS AS CLOSE AS POSSIBLE TO REDUCE WALK / MOVEMENT

  45 DEGREE RULE   MINIMIZE TWISTING

  IF MORE THAN A FEW POUNDS PUT OUTSIDE OF REACH TO ALLOW FOR ERGONOMIC ADJUSTMENT PRIOR TO LIFT

  STRIKE ZONE   STORE ABOVE THE KNEE   BELOW THE CHEST

  HIGHER THE POUNDS – CLOSER TO KNUCKLES   LOCATE HEAVY ITEMS TO ELIMINIATE LIFTING MOVEMENTS.

(REDUCE BENDING, STOOPING, UN-NECESSARY ARM MOVEMENTS)

5's Overview Kickoff 29

Page 30: 5S - Becoming a Visual Factory

  Each area needs to develop checklists to evaluate the effectiveness of your 5’s activity.

  Checklists need to identify   Identify the Who, What, Where, When

  Use visual standards where items are critical.

5's Overview Kickoff 30

Page 31: 5S - Becoming a Visual Factory

5's Overview Kickoff 31

5’s Levels of Excellence

Page 32: 5S - Becoming a Visual Factory

  Develop Autonomous Maintenance Checklists for Equipment   Look at Daily Needs   Weekly Needs   Yearly Needs   Assign Responsibility

  Plan for a Daily 5’s Sweep   3 MINUTES where everyone participates.

  This includes everyone from the top to bottom of the organization.

  It occurs regardless of where you are at that moment!

5's Overview Kickoff 32

Page 33: 5S - Becoming a Visual Factory

5's Overview Kickoff 33

Page 34: 5S - Becoming a Visual Factory

  Look for ways to improve   Reward areas for their efforts   Management walkthroughs of areas   Have areas evaluate their level of excellence   Look for customer impressions / feedback at

post in the area.

5's Overview Kickoff 34

Page 35: 5S - Becoming a Visual Factory

  MANAGEMENT   Provide time for 5’s improvement activities

  3 Minute Daily Clean

  Walk through the area once per week with a focus on 5’s   Recognize Behaviors

  Practice pick-up behaviors   Encourage new methods by sharing your ideas!

5's Overview Kickoff 35

Page 36: 5S - Becoming a Visual Factory

  ZONE LEADERS   Do self evaluation as a baseline   Organize Red Tag Events   Develop area checklists   Develop cleaning checklist and responsibilities   Develop autonomous maintenance schedules

5's Overview Kickoff 36

Page 37: 5S - Becoming a Visual Factory

  LEAN FOCAL   Provide training to Zone Leaders and other

employees as needed.   Provide the needed tools to the Zone Leaders

  Red Tag Forms   Evaluation Sheet   Samples of Checklists

  Provide 5’s Visibility on Plan and Activities   Help Where Needed

5's Overview Kickoff 37

Page 38: 5S - Becoming a Visual Factory

  The 5S’s Five Keys to a Total Quality Environment, Takashi Osada, Asian Productivity Organization 1991

  5 Pillars of the Visual Workplace, Hiroyuki Hirano, Productivity Press 1995

  Seminar, “Visual Factory Management”, Saddle Island Institute

  Seminar, “5’s Workshop Leaders Guide”. The Boeing Company

  www.magnatag.com