+ All Categories
Home > Documents > 5S Project

5S Project

Date post: 26-Jan-2017
Category:
Upload: isaiah-villalon
View: 29 times
Download: 2 times
Share this document with a friend
13
5S Project ISAIAH VILLALON BUSM 390R
Transcript
Page 1: 5S Project

5S ProjectISAIAH VILLALONBUSM 390R

Page 2: 5S Project

Activity

Page 3: 5S Project

Current Situation:

We currently spending about $1248 a year on Labor Cost alone in regular cleaning of the Recycling Center

There is a lot of unnecessary equipment and materials in the area.

No segregation of recycling materials

Page 4: 5S Project

Before Pictures

Page 5: 5S Project
Page 6: 5S Project
Page 7: 5S Project
Page 8: 5S Project
Page 9: 5S Project

After Pictures:

Page 10: 5S Project
Page 11: 5S Project
Page 12: 5S Project
Page 13: 5S Project

New Situation:

Organized materials in proper location Removed equipment and other unnecessary materials Savings of $624 a year for Labor Cost Segregation of Recycling Materials with appropriate signs


Recommended