Enhancing passenger experience through design and planning Focus One:
Transcript
Page 1: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

Enhancing passenger experience through design

and planning

Focus One:

Page 2: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

SCOPE OF OPTIMISATION OF LIGHT FITINGS & AIR CONDITIONING

• Lighting of Metro stations are generally overdesigned and fittings at many locations are kept in switched off condition and this results into passengers’ discomfort and dissatisfaction.

• To address the issue RVNL has taken few measures.

Page 3: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

• RVNL is using 3D Lighting Software (DIALUX EVO – 5.2 latest model) to finalise the position, angle, location of the fittings for desired lux level.

• RVNL is selecting the colour of wall, roof, floor, granite etc to have largest possible light reflection factor through this software.

Page 4: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

• LED Lights are being provided in Metro stations.• All the LED fitting shall be with intelligence so

that dimming can be done whenever or wherever required. All the required fittings shall be occupancy sensored.

• SOFTWARE (DACCS-HKGSG) is being used for AC tonnage calculation which takes into account of thickness of floor, roof even the presence of main beam, cross beam, pillar etc under the roof to have real time heat load to AC.

• REVIT Architectural Software

Page 5: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

3D Model for lighting software (Dialux EVO- 5.2) used for Joka Metro Corridor: optimization of angle, numbers and selection of material

Page 6: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

Incorporation of real wall mural being simulated to consider real time reflection factor at a station

Page 7: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

Positioning and angling of individual light fittings is decided by using this software - at Joka station

Page 8: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

Traction Sub Station/Auxiliary sub station Lighting design has been made after incorporating the equipments in the proposed layout in the said software

Page 9: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

Passage for passengers and selection of the building material and color is also simulated and decided using this software.

Page 10: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

Optimizing planning and project management

Focus Two:

Page 11: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

Project ???

Means of converting Vision to Reality Temporary, Unique, Predefined Goal, Face Risks,

Budget and Resources, Quality. Has got Project life cycle.

Page 12: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

Metro Project Management- not an easy task....

Page 13: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

Project Triangle tells us how to implement and what to monitor

Time

Scope Cost

Quality

Fast Track Project

Implementation

Page 14: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016
Page 15: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016
Page 16: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

Typical Problem in Project Management andTeam Work

This can happen without effectiveproject management/Team Work

Page 17: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

What is needed in Team Work ?

Page 18: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

18

Page 19: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

Never implement a project unless all major resources are available.

Page 20: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

Motivation to the complete team.

तू रख हौसला वो मंजर भी आएगा, प्यासे के पास चलकर समंदर भी आएगा,

थक हार के ना रूकना ऐ मंजिजल के मुसाफि"र, मंजि#ल भी मिमलेगी मिमलने का म#ा भी आएगा II

Page 21: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

New approaches and latest technology to help build in challenging environments

Focus Three:

Page 22: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

An Engineering challenge was confronted due to the presence of seven EHV and 13 HV overhead lines in the approach of Joka Depot

Page 23: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

132 KV Cable termination on narrow base tower erected on Canal itself.

Conventional (Optimal) Gantry System requiring acquisition of Land

JOKA MODEL

Page 24: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

This model resulted into a saving of Rs 50 Cr.

Page 25: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

• Existing system of 33 KV/11 KV/750 v DC replaced by 33 KV/750 V DC for removing requirement Receiving Sub station (RSS) with a cost saving of Rs 300 Cr for 62 Kms planned.

• Existing system of steel third rail is replaced with Aluminum third rail for energy saving by reducing resistive loss.

POWER SYSTEM

Page 26: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

Adoption of new technologies for Metro Rail Built

Focus Four:

Page 27: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

Design of Earth mat

IS 2309 not applicableIEC 62305 applicable

All the Metro Stations have been provided with the Lightning Protection as per IS:2309-1989, which is not only old but does not provide adequate safety. RVNL shall be first one to implement safety as per IEC:62305.

Page 28: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

The empirical formula as IEEE Standard-80 & IS 2309 is applicable only when the earth mat is symmetrical which is not possible in a typical elevated Metro station.

Earth Mat designed for Joka Metro Station as per IEEE Standard-80, simulated by using E-TAP Software.

Page 29: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

RVNL is perhaps the only Metro Builder in India who has used E-TAP Software for calculations of Step Voltage, Touch Voltage and Grid Voltage for earth mat. Our design does not use abnormally thick concrete slab to compensate the inadequacy in using the standard formula which have a limitation. Our design is not only technically correct, it is the most economical and optimal design.

Page 30: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

Others

Page 31: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

Remote Eye Monitoring System in RVNL is one such initiative.

Page 32: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016
Page 33: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

Block Section wise details

• Joka – Thakurpukur• Thakurpukur– Sakherbazar• Sakherbazar– Behala Chowrasta• Behala Chowrasta– Behala Bazar• Behala Bazar—Taratala

STEP 1

Drawing Management System

Page 34: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

STEP - 2

Detailed information of each & every activity

Page 35: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

STEP - 3

Detail drawing

Page 36: 5th metro rail summit at shangri la, cp, new delhi on 11.03.2016

THANK YOU