  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    1/46

    Understanding the OPM 11.5.10 to R12

    Data Migration Process

    Melanie Grosser, Oracle EBS Process Manufacturing Applications Architect

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    2/46 2011 Oracle CorporationProprietary and Confidential

    The following is intended to outline our general

    product direction. It is intended for information

    purposes only, and may not be incorporated into any

    contract. It is not a commitment to deliver any

    material, code, or functionality, and should not berelied upon in making purchasing decisions.

    The development, release, and timing of any

    features or functionality described for Oracles

    products remains at the sole discretion of Oracle.

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    3/46 2011 Oracle CorporationProprietary and Confidential

    Agenda

    Migration Documents

    Support Note Migration Checklist

    OPM Migration Messages and Technical Reference

    Convergence Migration Setup UI

    Organizations

    Warehouses

    Data

    How data is migrated

    Data NOT migrated

    Migration Process Overview- User Interaction Perspective

    Pre-Migration

    In-Line (Blackout Period)

    Post-Migration

    Q & A

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    4/46

    Migration Documents

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    5/46 2011 Oracle CorporationProprietary and Confidential

    OPM 11.5.10 to 12.1 Migration DocumentsSupport note 376683.1

    These documents are available to help customers understand the

    migration process and to help guide them through the process. OPM Migration Overview and Business Needs Guide

    This document contains an overview of the OPM Migration process and the business needs thatare met by this process.

    OPM Migration Best PracticesThis document contains helpful tips to help ensure that the migration process proceeds assmoothly and as efficiently as possible.

    OPM Migration Reference GuideThis document provides information on how the 11.5.10Oracle Process Manufacturing data ismapped to the converged R12.1 Oracle Inventory model, and the User Interface and optionsavailable for the mapping of that data.

    OPM Migration ChecklistThis document lists all steps and patches needed to migrate data from Oracle ProcessManufacturing Release 11.5.10 to 12.1. in the order in which they must be applied.

    OPM Migration Messages and Technical ReferenceThis document lists the messages that can be logged during the running of the data migrationand the actions required based upon those messages. The names of the individual migrationscripts and Data Mapping tables are also available in this document.

    The Checklist and Best Practices documents are live documents and will beupdated as needed.

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    6/46 2011 Oracle CorporationProprietary and Confidential

    OPM Migration ChecklistThe Checkl is t is a l ive docum ent and wi l l be upd ated with n ewpatches/changes as needed. ALWAYS check for an updated versionpr ior to star ting a m igration run.

    All steps are mandatory except where SPECIFICALLY noted. All steps must be performed inthe order in which they are presented. DO NOT PROCEED to the next step/phase until eachstep has successfully completed (No errors/all errors resolved). All patches must beinstalled in the order specifiedPatch Merge functionality CANNOT be employed acrosssteps.

    The Checklist Steps are divided into four Phases:

    1. Preparation:These steps are performed in preparation for migration planning. The informationcontained in the referenced documents and note help to explain the overall OPM Migrationprocess and recommendations for ensuring a smooth, successful migration.

    2. Pre-Migration:These steps are performed while the system is still available for use by end-users.

    3. Blackout:These steps are performed prior to Upgrade Patch Installation The following stepsare performed after end-users are no longer allowed to log into the system, but before thesystem is taken offline to apply the R12 Upgrade drivers .

    4. Post-Migration:These steps are performed after the application of the R12 Upgrade andbefore bringing the system back up and allowing users to log on.

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    7/46 2011 Oracle CorporationProprietary and Confidential

    OPM Migration ChecklistI t is STRONGLY RECOMMENDED that the checkl is t be fi l led ou t appro priately as

    you pro gress throug h the steps.

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    8/46 2011 Oracle CorporationProprietary and Confidential

    Migration Messages and Technical ReferenceMigrat ion Messages

    This part of the document l is ts the messages that can be logged dur ing the

    runn ing of the data mig rat ion and the act ions required based upo n those

    messages.

    GMI: Process Inventory

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    9/46 2011 Oracle CorporationProprietary and Confidential

    Migration Messages Log ViewerOPM System Adm inistrat ion > View Migrat ion Log

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    10/46 2011 Oracle CorporationProprietary and Confidential

    Migration Messages and Technical ReferenceMigrat ion Fi les

    This part of the docum ent l is ts the names of the indiv idual migrat ion sc r ipts

    and the ent i t ies that are migrated by each s cr ipt .

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    11/46 2011 Oracle CorporationProprietary and Confidential

    Migration Messages and Technical ReferenceTable Mapp ings

    This part of the do cum ent con tains the table mappin gs from OPM 11.5.10 to

    R12. The tables are l is ted by prod uct . Obsolete colum ns are denoted as such .

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    12/46

    Migration Setup Form

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    13/46

    2011 Oracle CorporationProprietary and Confidential

    Convergence Migration Setup UI:Organization Tab

    Activates On-Hand

    Material Statuslevel tracking

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    14/46

    2011 Oracle CorporationProprietary and Confidential

    Convergence Migration Setup UIOrganizat ion Migrate As Opt ions

    NewCreates a new organization with the specified Organization Name.

    Validates that an organization of the same name (not organization code)does not already exist. All inventory balances, recipes, etc are migrated tothis new organization. Requires the specification of a Template Org (anexisting org in mtl_parameters) that will be used for the setting of orgparameter values while creating this new org. The Template Org must usethe same Set of Books as the organization being migrated.

    Existing-All inventory balances, recipes, etc are migrated to this existing(in mtl_parameters) organization. This organization must be ProcessEnabled.

    InactiveWill migrate all of the related data (inventory balances, recipes,etc) and will end date the organization on the R12 side. This will prevent the

    organization from being transacted against in R12 but will allow for theviewing of historical data.

    NoneWill not migrate any existing data related the org. The organizationmust be marked as Inactive in OPM in order for this option to be chosen.

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    15/46

    2011 Oracle CorporationProprietary and Confidential

    Convergence Migration Setup UIWarehouses Tab

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    16/46

    2011 Oracle CorporationProprietary and Confidential

    11i 12

    Warehouse Mapping Considerations

    Inventory Balances at a Warehouse

    Level

    Inventory Balances at a Inventory Org

    and SubInventory Level

    Resource Costs are defined

    at the OPM Organization level

    OPM Resource Costs are defined

    at the Inventory Org level.

    All documents are defined

    at OPM Org (Plant) level

    All OPM document are defined

    at Inventory Org level

    Costing and Planning:

    Process is at Warehouse level

    Discrete is at Inventory Org level

    Costing and Planning is done at the

    Inventory Org level

    The following should be considered when deciding whether to migrate awarehouse as an inventory organization or a subinventory.

    O i ti d W h M i

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    17/46

    2011 Oracle CorporationProprietary and Confidential

    OPM Organization migrates as a new inventory organization andwarehouses remain as inventory organizations

    Interorg transfers required for production

    Organization and Warehouse MappingDefault Migrat ion

    OPMCCompany

    OPMEOrganization

    CWEWarehouse

    RMEWarehouse

    FGEWarehouse

    LELegal Entity

    CWEInventory Org

    RMEInventory Org

    FGEInventory Org

    R11iR12

    CWESubinventory

    RMESubinventory

    FGESubinventory

    OPMInventory Org

    OPMSubinventory

    OPUSLedger

    OPUOperating Unit

    New Entities

    O i ti d W h M i

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    18/46

    2011 Oracle CorporationProprietary and Confidential

    OPM Organization migrates as a new inventory organization.

    Warehouses moved as Subinventory under the new inventoryorganization.

    These warehouses must belong to the same cost warehouse.

    Organization and Warehouse MappingAlternate Example 1

    OPMCCompany

    OPME

    Organization

    CWEWarehouse

    RMEWarehouse

    FGEWarehouse

    CWE RME FGE

    R11i R12

    CWE RME FGE

    OPEInventory Org

    CWE RME FGE

    Migrate asNew

    Migrate asSubinventory

    LELegal Entity

    OPUS

    Ledger

    OPUOperating Unit

    New Entities

    O i ti d W h M i

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    19/46

    2011 Oracle CorporationProprietary and Confidential

    OPM Organization migrate to one of its warehouse inventory

    organization Warehouses with the same cost warehouse can be selectively

    moved as Subinventory to the org mapped above.

    Migrate asSubinventory

    Organization and Warehouse MappingAlternate Example 2

    OPMCCompany

    OPMEOrganization

    CWEWarehouse

    RMEWarehouse

    FGEWarehouse

    CWEInventory Org

    RME FGE

    R11i

    CWE RME FGERME

    Migrate asExist ing

    R12

    LELegal Entity

    OPUSLedger

    OPUOperating Unit

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    20/46

    Data - What is and isnt migrated?

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    21/46

    2011 Oracle CorporationProprietary and Confidential

    OPM Data MigrationOrder of Migrat ion Dependenc ies

    Inventory Types

    OPM Category Sets

    Actions

    Grades

    Organizations/

    Warehouse/

    Locations

    Transaction Types

    Reason Codes

    Lot Status

    Update Existing OPM Items

    in DiscreteCommon Upgrade Scripts

    Item Creation/ Migration

    Lot Create Migration

    Lot Conversions

    Inventory Balances

    New Product Development

    Migration

    Process Execution

    MigrationProcess Quality Migration

    Costing Migration Regulatory MigrationPlanning Migration

    Logistics Migration

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    22/46

    2011 Oracle CorporationProprietary and Confidential

    Open Batch and FPO Migration Process

    Pre-Migration Completed batches are closed.

    Batches and FPOs in Pending or WIP status are snapshotted copied tomigration tables with the current state (material transactions, resourcetransactions, steps, etc) reflected.

    WIP batches are unreleased (set back to Pending) and all open batches andFPOs are cancelled.

    Post-Migration Renames old version of the batch, appends M

    Creates new batches (with the same batch number) from the snapshot data.

    Pending transactions are re-created as reservations If the batch had been in WIP status prior to migration, the batch is

    released.

    Completed transactions are re-created as allocations

    Only documents in a Pending or WIP status can be included in thesnapshot. Batches that are not included in the snapshot (re-

    created) cannot be transacted in R12.

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    23/46

    2011 Oracle CorporationProprietary and Confidential

    OPM Financials

    Moving from MAC to SLA

    OPM MAC module will be obsoleted.

    OPM Event model will be mapped to SLA event model.

    Account Titles will be replaced with Journal Line Types in

    SLA.

    Account Mapping functionality will be replaced withAccounting Definition Rules (ADRs) in SLA. (NOTE:If your

    company maintains a large number of accounting mapping

    rules, it may be advantageous to manually define ADRs as

    opposed to using the default migration.)

    Test Subledger will be replaced with TABTest Accounting

    Methods Builder.

    Subledger code will be retained to use as extract program in

    SLA.

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    24/46

    2011 Oracle CorporationProprietary and Confidential

    Other Product Migrations Common Transformation

    Updates columns in NPD, GME and GMP tables with the appropriate values for Org ID, InvItem ID, Lot Number, and units of measure

    OPM Quality Migrates specifications, samples, and stability studies to the appropriate organizations andsubinventories

    Process Execution Migrates GME profiles and WIP entities

    Open Batch/FPO Migration

    OPM Logistics

    Migrates move orders for Order Management Updates PO shipment line with uoms and secondary quantities

    Updates Receiving tables with uoms and secondary quantities

    OPM Costing Migration of resource details, cost component details, standard ledgers, actual cost ledgers,

    adjustment details, burden details, item costs, lot costs, lot cost item setups, lot costadjustments, lot costing material transactions, lot costing burdens

    If multiple companies are migrated to the same Legal Entity then the scripts copy existing

    costs appropriately Migration of account mappings and GMF entities to SLA

    Regulatory Management Migration of Regulatory Items to INV

    Migration of Regulatory Standalone Formulas to GMD with a validity rule for Regulatory Use

    Update of Dispatch History records with the appropriate org id and item id.

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    25/46

    2011 Oracle CorporationProprietary and Confidential

    Data NOT migratedData is st i l l viewable in R12 from read-only versions

    of the old forms

    Historic Transactions - data in ic_tran_pnd and ic_tran_cmp

    Planning Setups OPM Warehouse, Production, & Transfer Rules not migrated as they do

    not directly map to ASCP Sourcing Rules

    Item Lead-times from MRP

    Old lots that no longer have inventory nor are they associated toany documents (batches, quality samples, etc.)

    Lot genealogy

    Inactive items that are not associated to a document such as abatch or formula.A new patch has been created to allow customersto migrate/update items and attributes that were not

    migrated/updated as part of the inline migration for a givenorganization (Patch 10405668).

    Discrete organization/item data is not touched during migration

    http://bugpriority.oraclecorp.com/pls/bugpriority/BUGPRI.ECMS_ADHOC.SHOW_BUG?P_BUG_NUMBER=10405668&P_URL_FROM=Ohttp://bugpriority.oraclecorp.com/pls/bugpriority/BUGPRI.ECMS_ADHOC.SHOW_BUG?P_BUG_NUMBER=10405668&P_URL_FROM=O
  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    26/46

    Migration Process- User Interaction Perspective

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    27/46

    2011 Oracle CorporationProprietary and Confidential

    Migration Process- User Interaction

    PerspectivePre-Migration

    Map the Company, Organization, Warehouse, Items,

    and Quality data using the Convergence Migration

    Setup user interface.

    Prepare Costing Data for migration Run Actual SubLedger Update

    Execute GL Export

    Execute Journal Import

    Run the Pre-Migration Validation script for all products

    and correct all errors

    Optionally migrate all organizations and items.

    Associate Forecast Sets to Forecasts

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    28/46

    2011 Oracle CorporationProprietary and Confidential

    Migration Process- User Interaction

    PerspectiveIn-l ine (B lacko ut Period )

    Review, act upon, and dispose of information inOracle ASCP interface tables

    Review, act upon, and dispose of information in theOPM MRP interface

    Process Batches for migration Complete or cancel all pending transfers and Internal

    Sales Orders

    Backorder or ship OPM Order Fulfillment sales orders

    that are pick confirmed or staged prior to migration Run Preliminary Inventory Close Process

    RUN GMF Data validationCorrect all errors

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    29/46

    2011 Oracle CorporationProprietary and Confidential

    Migration Process- User Interaction

    PerspectivePost -Migrat ion Steps

    Run OPM Data Transformation

    Run OPM Financials Data Transformation

    Migrate OPM Regulatory data

    Recreate Open Batches Migrate OPM Edit Text to attachments

    Update items attributes for MRP/MPS and Lead times

    for migrated items for ASCP planning

    Run Planning Manager Run script to update additional existing org/item

    definitions (Optional)

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    30/46

    2011 Oracle CorporationProprietary and Confidential

    Q U E S T I O N SA N S W E R S

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    31/46

    2011 Oracle CorporationProprietary and Confidential

    Appendix

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    32/46

    2011 Oracle CorporationProprietary and Confidential

    OPM Inventory Data MigrationPre-Migration Phase

    OPM Inventory Discrete InventoryOrganizations (Optional) Organizations

    Warehouses (Optional) Organizations and/or Subinventories

    Locations (Optional) Stock Locators

    Items (Optional) Master Items and Organization Items

    .

    OPM I D Mi i

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    33/46

    2011 Oracle CorporationProprietary and Confidential

    OPM Inventory Data MigrationIn-Line Phase

    OPM Inventory Discrete InventoryReason Codes Transaction Reasons

    Organizations Organizations

    Warehouses Organizations and/or Subinventories

    Locations Stock Locators

    Items Master Items and Organization Items

    Action Codes Action Codes

    Grades Grades

    Lot Statuses Material StatusesInventory Types Item Types

    Lots/Sublots (lot_id) Organization specific Parent Lots/Lots (no idreference key element is lot_number)

    Lot Specific Conversions Lot Specific ConversionsInventory Balances Inventory Balances

    .

    OPM R l t D t Mi ti

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    34/46

    2011 Oracle CorporationProprietary and Confidential

    OPM Regulatory Data MigrationPost-Migrat ion Phase

    OPM Regulatory Discrete InventoryRegulatory Items Master Items and Organization Items

    Standalone Regulatory Formulas Formulas and Recipes

    Master Item Associations Item Relationships

    Hazard Classifications PO Hazard ClassesUN Numbers PO UN Numbers

    Item Version Item RevisionsPrimary CAS Number CAS Number

    .

    OPM Pl i D t Mi ti

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    35/46

    2011 Oracle CorporationProprietary and Confidential

    OPM Planning Data MigrationIn -L ine Phase

    OPM Planning ASCPForecasts Forecasts

    .

    OPM C T f ti

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    36/46

    2011 Oracle CorporationProprietary and Confidential

    OPM Common TransformationsIn-Line Phase

    Updates columns in GMD-New Product Development

    (Formulas, Recipes, Validity Rules, etc), GME Process

    Execution (Batches, Batch Resources, etc) and GMD-Quality

    (Specifications, Validity Rules, Samples, etc.) tables.

    OPM Inventory Discrete InventoryOrganization ID Org ID

    Item ID Inventory Item ID

    Lot ID Lot Number

    UM Code (4 Character) UOM Code (3 Character)

    .

    OPM GMD NPD D t Mi ti

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    37/46

    2011 Oracle CorporationProprietary and Confidential

    OPM GMD-NPD Data MigrationIn-Line Phase

    OPM GMD-NPD 11i OPM GMD-NPD 12.1

    New Product Development Profiles Options New Product Development Parameters

    Recipe Owner/Master Org Recipe Types (General/Site/Master)

    .

    OPM GMD Q lit D t Mi ti

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    38/46

    2011 Oracle CorporationProprietary and Confidential

    OPM GMD-Quality Data MigrationIn-Line Phase

    OPM GMD-Quality 11i Discrete Inventory/OPM GMD-Quality 12.1

    OPM GMD-Quality Profiles Options OPM GMD-Quality Parameters

    Stability Studies Organization Specific Stability Studies

    Quality Actions Action Codes

    Grades Grades

    .

    OPM P E ti D t Mi ti

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    39/46

    2011 Oracle CorporationProprietary and Confidential

    OPM Process Execution Data MigrationIn-Line Phase

    OPM GMD-Quality 11i Discrete Inventory/OPM GMD-Quality 12.1

    OPM Process Profiles Options OPM Process Parameters

    .

    OPM Process Execution Data Migration

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    40/46

    2011 Oracle CorporationProprietary and Confidential

    OPM Process Execution Data MigrationPre-Migration Phase

    OPM GMD-Quality 11i Discrete Inventory/OPM GMD-Quality 12.1

    Open Batches Batch Snapshot

    .

    OPM Process Execution Data Migration

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    41/46

    2011 Oracle CorporationProprietary and Confidential

    OPM Process Execution Data MigrationPost-Migrat ion Phase

    OPM Process Execution 11i Discrete Inventory/OPM ProcessExecution

    Snapshot of Open Batches Renames Old Batches, Recreates OpenBatches

    Specifications, Samples, Results againstbatches

    Specifications, Samples, Results updatedbased upon new batches/ids.

    Quality Actions Action Codes

    Grades Grades

    .

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    42/46

    2011 Oracle CorporationProprietary and Confidential

    OPM Financials Data Migration

    In-Line Phase

    Data is m igrated to the appropriate LE/Organizat ion

    Cost Types

    Fiscal Policies

    Lot Cost Type

    GMF Data Transformation (update of ids, uoms etc) Expense Allocation Basis

    Expense Allocation Codes Expense Allocation Expenses Expense Allocation Inputs Burden Priorities Cost Calendar Assignments Material Cost Components Event Fiscal Policies Fiscal Policies Item Cost Component Details Cost Warehouses Costing Items

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    43/46

    2011 Oracle CorporationProprietary and Confidential

    OPM Financials Data MigrationPost-Migrat ion Phase

    Data is m igrated to th e app rop r iate LE/Organizat ion

    Burden Percentages Item Cost Component Details Resource Details Actual Cost Adjustments Item Cost Component Details Burden Details Item Costs Lot Costs Lot Costed Items Lot Cost Burdens Lot Cost Adjustments Material Lot Cost Transactions Standard Cost Ledgers Actual Cost Ledgers Account Mappings to SLA Account Derivation Rules (May wish to manually create

    ADRs) Period Balances

    Source Warehouses Actual Cost control data Rollup Control Records Cost Update control data Subledger control data

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    44/46

    2011 Oracle CorporationProprietary and Confidential

    OPM Financials MAC to SLA

    MAC Seed Data SLA Seed DataEvents, Sub-Events SLA Event Entities, SLA Event Entity Classes,

    SLA Event TypesSources SLA Process CategoriesAccount Titles Journal Line Types (JLT) as well as TAB

    definitions.Sub-Event Account Title Templates Application Accounting Definitions (AAD)Account Unit Mappings & Account Mappings

    (per account title) Account Derivation Rules (ADR) (per JLT)Account Selection Priorities Will be used to derive the sequencing of ADR

    conditions for migration.New ADR definitions will have to explicitly

    set up the sequencing of the conditions tomimic the priority

    Test Mapping Test Transaction Account Builder (TAB)function

    The following seed data entities in OPM MAC will be migrated to SLA seed data as shown.

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    45/46

    2011 Oracle CorporationProprietary and Confidential

    OPM Costing Data MigrationOrder of Migrat ion Dependencies

  • 5/27/2018 6-11Understanding the OPM 11.5.10 to R12 Data Migration

    46/46

    Inventory Migration

    Action CodesCategory

    Sets

    Inventory

    TypesLot Status

    Inventory

    Balance

    Item Categories

    Lot

    Conversions

    Org/Whse/

    Locations

    Item & Lot

    Migration

    Calls

    Grades

    Item Upgrade

    Process to Discrete

    Transfer

    Calls


Recommended