+ All Categories
Home > Documents > 6 4 5 2 3 - Scpurchasing.sc.edu/solicitations/USC FP00000193.pdf · 2021. 2. 10. · 3/8" = 1'-0"...

6 4 5 2 3 - Scpurchasing.sc.edu/solicitations/USC FP00000193.pdf · 2021. 2. 10. · 3/8" = 1'-0"...

Date post: 01-Apr-2021
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
3
P1 P2 1/2" CW 1/2" HW 1 1/2" TW 5 6 NEW LAB EXHAUST HOOD; PROVIDED BY OWNER. 2 P1 P2 1 1/2"V 3 1 1/2"S 4 5 7 NEW LAB EXHAUST HOOD; PROVIDED BY OWNER. AREA OF WORK C 1 A B 2 3 D 1 E 2 3 C 4 5 SHEET NUMBER 6 DRAWN BY: CHECKED BY: JOB NUMBER DATE: A B 4 5 D 6 E CONSTANTINE ENGINEERING ASSOCIATES, LLC 1643B Savannah Hwy, #181, Charleston, SC 29407 Phone: 843.628.7878, Fax: 843.628.7881 ASSOCIATES, LLC ENGINEERING C E R T I F I C A T E O F A U T H O R I Z A T I O N S O U T H C A R O L I N A CONSTANTINE C-04361 16540 S O U T H C A R O L I N A SEAL C H R I S T O P H E R J. C O N S T A N T I N E R E G I S T E R E D P R O F E S S I O N A L E N G I N E E R 921 ASSEMBLY STREET, COLUMBIA, SC 29208 FP00000193 USC SCHOOL OF PUBLIC HEALTH 05/07/19 19-019 PLUMBING PLANS P1.1 CJC MDF SUPPLY PLAN A1 DRAIN, WASTE AND VENT PLAN A3 BRANCH ISOLATION BALL VALVE CONNECTION TO EXISTING HOT WATER LINE, HW COLD WATER LINE, CW VENT LINE, V SANITARY DRAIN LINE, S LEGEND TEPID WATER LINE, TW DFA CLG DOWN FROM ABOVE CEILING 1. PROVIDE LABOR, EQUIPMENT AND MATERIALS TO COMPLETE THE PLUMBING WORK INDICATED ON THESE DRAWINGS AS REQUIRED BY LOCAL CODE AND ORDINANCES. 2. INCLUDE WASTE, VENT, DOMESTIC COLD & HOT WATER PIPING, AS INDICATED ON THESE DRAWINGS, AS WELL AS HOOKUP OF FIXTURES AND INSULATION OF PIPING. 3. INCLUDE ITEMS, SUCH AS FITTINGS, ETC. NOT MENTIONED BUT UNDERSTOOD TO BE NECESSARY TO COMPLETE THE PLUMBING SYSTEM. 4. SOIL, WASTE, VENT AND WATER PIPING MATERIALS MUST MEET OR EXCEED LOCAL CODES. 5. PROVIDE WATER HAMMER ARRESTERS IN ACCORDANCE WITH THE SOUTH CAROLINA PLUMBING CODE AND LOCAL ORDINANCES. 6. COMPLETE WORK IN ACCORDANCE WITH THE SOUTH CAROLINA PLUMBING CODE AND LOCAL ORDINANCES. SEE SPECIFICATIONS FOR PRODUCT AND INSTALLATION REQUIREMENTS. 7. GUARANTEE WORK UNDER THIS CONTRACT TO BE FREE FROM DEFECTIVE WORKMANSHIP, MATERIALS AND EQUIPMENT FOR ONE YEAR AFTER ACCEPTANCE OF THE BUILDING BY THE OWNER. SHOULD SUCH DEFECTS OCCUR DURING THE ONE YEAR PERIOD, REPAIR AND/OR REPLACE DEFECTIVE ITEMS AND DAMAGE RESULTING FROM THE FAILURE OF THESE ITEMS AT NO EXPENSE WHATSOEVER TO THE OWNER. GENERAL NOTES DRAWING NOTES CONNECT TO EXISTING CW/HW/TW SUPPLY IN THIS AREA. CONTRACTOR TO FIELD VERIFY EXACT LOCATION. 1 ø DIAMETER 3/8" = 1'-0" 32' 64' 16' 0 3/8" = 1'-0" 32' 64' 16' 0 PLUMBING FIXTURE SCHEDULE MARK DESCRIPTION MFR MODEL USE NOTES CW HW TEPID WASTE VENT P1 LAB SINK FISHERBRAND 06000459 1/2" 1/2" - 1 1/2" 1 1/2" INTEGRAL WITH COUNTERTOP P2 EMERGENCY EYEWASH GUARDIAN G1805 - - 1/2" - - DECK MOUNTED WITH SWING OPERATION CONNECT TO EXISTING VENT IN THIS AREA. CONTRACTOR TO FIELD VERIFY EXACT LOCATION. 2 CONNECT TO EXISTING SANITARY IN THIS AREA. CONTRACTOR TO FIELD VERIFY EXACT LOCATION. 3 INSTALL DRAIN AND VENT RISER INSIDE WALL. PATCH AND FINISH WALL TO MATCH EXISTING. 4 REMOVE LAY-IN CEILING TILES AND GRID AS NECESSARY TO INSTALL PIPING. REINSTALL GRID AND TILES; REPLACE DAMAGED TILES WITH NEW TO MATCH EXISTING. 5 PROVIDE VACUUM AND COMPRESSED AIR CONNECTIONS INSIDE HOOD. INSTALL MANUAL PRESSURE VALVES MOUNTED ON EXTERIOR WALL. 6 KEY PLAN - 5TH FLOOR A5 NO SCALE PROVIDE AND INSTALL 1.5 GALLON POLYETHYLENE CHEMICAL DILUTION TANK. 7
Transcript
Page 1: 6 4 5 2 3 - Scpurchasing.sc.edu/solicitations/USC FP00000193.pdf · 2021. 2. 10. · 3/8" = 1'-0" 016'32' 64' 3/8" = 1'-0" 016'32' 64' plumbing fixture schedule markdescription mfr

P1

P2

1/2" CW

1/2" HW

1

1/2" TW

5

6

NEW LAB EXHAUST HOOD;

PROVIDED BY OWNER.

2

P1

P2

1 1/2"V

3

1 1/2"S

4

5

7

NEW LAB EXHAUST HOOD;

PROVIDED BY OWNER.

AREA OF

WORK

C

1

A

B

2 3

D

1

E

2 3

C

4 5

SHEET NUMBER

6

DRAWN BY:CHECKED BY:

JOB NUMBERDATE:

A

B

4 5

D

6

E

CO

NS

TA

NT

IN

E

EN

GIN

EE

RIN

G

AS

SO

CIA

TE

S, L

LC

16

43

B S

av

an

na

h H

wy

, #

18

1, C

ha

rle

sto

n, S

C 2

94

07

Ph

on

e: 8

43

.6

28

.7

87

8, F

ax

: 8

43

.6

28

.7

88

1

ASSOCIATES, LLCENGINEERING

C E R T I F I CA T E O F AU T HOR I ZAT I ON

SOUTH CAROL I NA

CONSTANTINE

C-04361

16540

SOUTH CAROL I NA

SEAL

CHR I S T O P H E R J . C ON S T ANT I NEREG

ISTE

RED

PROFES S I ONALENGINEER

921

ASS

EM

BL

Y S

TR

EE

T, C

OL

UM

BIA

, SC

292

08FP

0000

0193

USC

SC

HO

OL

OF

PUB

LIC

HE

AL

TH

05/07/19

19-019

PLU

MB

ING

PL

AN

S

P1.1

CJCMDF

SUPPLY PLANA1

DRAIN, WASTE AND VENT PLANA3

BRANCH ISOLATION BALL VALVE

CONNECTION TO EXISTING

HOT WATER LINE, HW

COLD WATER LINE, CW

VENT LINE, V

SANITARY DRAIN LINE, S

LEGEND

TEPID WATER LINE, TW

DFA

CLG

DOWN FROM ABOVE

CEILING

1. PROVIDE LABOR, EQUIPMENT AND MATERIALS TO COMPLETE THE

PLUMBING WORK INDICATED ON THESE DRAWINGS AS REQUIRED BY

LOCAL CODE AND ORDINANCES.

2. INCLUDE WASTE, VENT, DOMESTIC COLD & HOT WATER PIPING, AS

INDICATED ON THESE DRAWINGS, AS WELL AS HOOKUP OF FIXTURES

AND INSULATION OF PIPING.

3. INCLUDE ITEMS, SUCH AS FITTINGS, ETC. NOT MENTIONED BUT

UNDERSTOOD TO BE NECESSARY TO COMPLETE THE PLUMBING

SYSTEM.

4. SOIL, WASTE, VENT AND WATER PIPING MATERIALS MUST MEET OR

EXCEED LOCAL CODES.

5. PROVIDE WATER HAMMER ARRESTERS IN ACCORDANCE WITH THE

SOUTH CAROLINA PLUMBING CODE AND LOCAL ORDINANCES.

6. COMPLETE WORK IN ACCORDANCE WITH THE SOUTH CAROLINA

PLUMBING CODE AND LOCAL ORDINANCES. SEE SPECIFICATIONS

FOR PRODUCT AND INSTALLATION REQUIREMENTS.

7. GUARANTEE WORK UNDER THIS CONTRACT TO BE FREE FROM

DEFECTIVE WORKMANSHIP, MATERIALS AND EQUIPMENT FOR ONE

YEAR AFTER ACCEPTANCE OF THE BUILDING BY THE OWNER.

SHOULD SUCH DEFECTS OCCUR DURING THE ONE YEAR PERIOD,

REPAIR AND/OR REPLACE DEFECTIVE ITEMS AND DAMAGE

RESULTING FROM THE FAILURE OF THESE ITEMS AT NO EXPENSE

WHATSOEVER TO THE OWNER.

GENERAL NOTES

DRAWING NOTESCONNECT TO EXISTING CW/HW/TW SUPPLY IN THIS AREA.

CONTRACTOR TO FIELD VERIFY EXACT LOCATION.

1

ø DIAMETER

3/8" = 1'-0" 32' 64'16'0 3/8" = 1'-0" 32' 64'16'0

PLUMBING FIXTURE SCHEDULE

MARK DESCRIPTION MFR MODEL

USE

NOTES

CW HW TEPID WASTE VENT

P1 LAB SINK FISHERBRAND 06000459 1/2" 1/2" - 1 1/2" 1 1/2" INTEGRAL WITH COUNTERTOP

P2 EMERGENCY EYEWASH GUARDIAN G1805 - - 1/2" - - DECK MOUNTED WITH SWING OPERATION

CONNECT TO EXISTING VENT IN THIS AREA.

CONTRACTOR TO FIELD VERIFY EXACT LOCATION.

2

CONNECT TO EXISTING SANITARY IN THIS AREA.

CONTRACTOR TO FIELD VERIFY EXACT LOCATION.

3

INSTALL DRAIN AND VENT RISER INSIDE WALL. PATCH AND FINISH

WALL TO MATCH EXISTING.

4

REMOVE LAY-IN CEILING TILES AND GRID AS NECESSARY TO INSTALL

PIPING. REINSTALL GRID AND TILES; REPLACE DAMAGED TILES WITH

NEW TO MATCH EXISTING.

5

PROVIDE VACUUM AND COMPRESSED AIR CONNECTIONS INSIDE

HOOD. INSTALL MANUAL PRESSURE VALVES MOUNTED ON EXTERIOR

WALL.

6

KEY PLAN - 5TH FLOORA5NO SCALE

PROVIDE AND INSTALL 1.5 GALLON POLYETHYLENE CHEMICAL

DILUTION TANK.

7

AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
517
AutoCAD SHX Text
466 SF
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
517
AutoCAD SHX Text
466 SF
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
DN
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
UP
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
UP
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
DN
Page 2: 6 4 5 2 3 - Scpurchasing.sc.edu/solicitations/USC FP00000193.pdf · 2021. 2. 10. · 3/8" = 1'-0" 016'32' 64' 3/8" = 1'-0" 016'32' 64' plumbing fixture schedule markdescription mfr

1

VD

6" E

A

TWO 2.5" RD EA

TERMINATE 12" BELOW

CEILING WITH MANUAL

DAMPER. SEE NOTE

10" EA

2

6" E

A

2.5" RD EA

TERMINATE 12" BELOW CEILING

WITH MANUAL DAMPER. SEE

NOTE

2

TWO ARGON GAS TANKS.

SHOWN FOR REFERENCE

ONLY; BY OWNER.

3

TWO ARGON GAS TANKS.

SHOWN FOR REFERENCE

ONLY; BY OWNER.

500 CFM500 CFM

40 CFM

53 CFM

53 CFM

40 CFM

326 CFM

3

4

424 CFM

424 CFM

10" RD EA

LAB EXHAUST HOOD

CASEWORK

LAB SINK

(INTEGRAL TO

COUNTER)

EYE WASH

(BY PLUMBER)

ALUMINUM COLLAR AT

CEILING PENETRATION

DECK WATER FAUCET

NOTE

3

MASS

SPECTROMETER

(PROVIDED BY

OTHERS)

LAB TABLE

(PROVIDED BY

OTHERS)

ARGON GAS

TANKS

(PROVIDED BY

OTHERS)

TWO 2.5" RD EA DUCT

BELOW CEILING WITH

VOLUME DAMPER

ALUMINUM COLLAR AT

CEILING PENETRATION

AREA OF

WORK

C

1

A

B

2 3

D

1

E

2 3

C

4 5

SHEET NUMBER

6

DRAWN BY:CHECKED BY:

JOB NUMBERDATE:

A

B

4 5

D

6

E

CO

NS

TA

NT

IN

E

EN

GIN

EE

RIN

G

AS

SO

CIA

TE

S, L

LC

16

43

B S

av

an

na

h H

wy

, #

18

1, C

ha

rle

sto

n, S

C 2

94

07

Ph

on

e: 8

43

.6

28

.7

87

8, F

ax

: 8

43

.6

28

.7

88

1

ASSOCIATES, LLCENGINEERING

C E R T I F I CA T E O F AU T HOR I ZAT I ON

SOUTH CAROL I NA

CONSTANTINE

C-04361

16540

SOUTH CAROL I NA

SEAL

CHR I S T O P H E R J . C ON S T ANT I NEREG

ISTE

RED

PROFES S I ONALENGINEER

921

ASS

EM

BL

Y S

TR

EE

T, C

OL

UM

BIA

, SC

292

08FP

0000

0193

USC

SC

HO

OL

OF

PUB

LIC

HE

AL

TH

05/07/19

19-019

ME

CH

AN

ICA

L P

LA

N

M1.1

CJCMDF

MECHANICAL PLAN

MANUAL VOLUME DAMPERVD

LEGEND

CEILING SUPPLY DIFFUSER, EXISTING

CEILING EXHAUST GRILLE, EXISTING

SUPPLY AIR

EXHAUST AIR

SA

EA

GENERAL NOTES

DRAWING NOTESINSTALL 10" Ø EXHAUST DUCT UP FROM NEW LAB HOOD (FURNISHED BY OTHERS AND

INSTALLED BY CONTRACTOR) TO EXISTING 30"X12" EA DUCT ABOVE CEILING. PROVIDE

MANUAL BALANCING DAMPER ABOVE CEILING.

1

CONNECTION TO EXISTING

1. PROVIDE LABOR, MATERIALS AND EQUIPMENT TO COMPLETE THE HVAC WORK

INDICATED ON THE DRAWINGS AND AS REQUIRED BY LOCAL CODES AND

ORDINANCES.

2. FABRICATE AND INSTALL DUCTWORK IN ACCORDANCE WITH SMACNA STANDARDS.

3. INSTALL AND CONNECT THE HVAC SYSTEM IN STRICT ACCORDANCE WITH LOCAL

CODES, ORDINANCES AND THE LATEST EDITION OF THE SOUTH CAROLINA BUILDING

CODE.

4. ADJUST CONTROLS AND EQUIPMENT FOR PROPER OPERATION. LUBRICATE AND

CLEAN EQUIPMENT PRIOR TO ACCEPTANCE OF BUILDING BY OWNER.

5. COORDINATE WORK WITH THE ELECTRICAL INSTALLER.

6. GUARANTEE WORK INSTALLED UNDER THE CONTRACT TO BE FREE FROM DEFECTIVE

WORKMANSHIP AND MATERIALS, USUAL WEAR EXPECTED. SHOULD SUCH DEFECTS

DEVELOP WITHIN A PERIOD OF ONE YEAR AFTER ACCEPTANCE OF THE BUILDING BY

THE OWNER, REPAIR AND/OR REPLACE DEFECTIVE ITEMS AND DAMAGE, RESULTING

FROM FAILURE OF THESE ITEMS, AT NO EXPENSE WHATSOEVER TO THE OWNER.

RD

PROVIDE 2.5" Ø INSTRUMENT EXHAUST DUCT 12" BELOW CEILING. FINAL CONNECTION

AND FLEXIBLE HOSE TO EQUIPMENT TO BE PROVIDED BY OTHERS.

2

A43/8" = 1'-0" 32' 64'16'0

CONTRACTOR TO PROVIDE CUSTOM LAB HOOD SURFACE AND CASEWORK WITH

LOWER CABINETS AND SINK W/ EYEWASH. DIMENSIONS ARE APPROXIMATELY 88"

WIDE X 36" DEEP. FIELD VERIFY DIMENSIONS.

3

ELEVATION - LAB HOODD4

NO SCALE

D4

M1.1

ELEVATION - MASS SPECTROMETERD1

NO SCALE

M1.1

D1

ROUND

REMOVE LAY-IN CEILING TILES AND GRID AS NECESSARY TO INSTALL PIPING.

REINSTALL GRID AND TILES; REPLACE DAMAGED TILES WITH NEW TO MATCH

EXISTING.

4

KEY PLANA5NO SCALE

AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
517
AutoCAD SHX Text
466 SF
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
DN
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
UP
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
UP
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
DN
Page 3: 6 4 5 2 3 - Scpurchasing.sc.edu/solicitations/USC FP00000193.pdf · 2021. 2. 10. · 3/8" = 1'-0" 016'32' 64' 3/8" = 1'-0" 016'32' 64' plumbing fixture schedule markdescription mfr

EXISTING

PANEL "PLN5H"

TO REMAIN

c

c

PLN5H-20,22

PLN5H-21,23

c

c

NEW FUME HOOD

MASS SPECTROMETER

PLN5H-17

1

1

1

1

1

1

1

1

1

1

1

111

PLN5H-25,27

PLN5H-24,26

PLN5H-29

PLN5H-31

PLN5H-28

PLN5H-30

PLN5H-32

PLN5H-33PLN5H-35

PLN5H-34

MASS SPECTROMETER

1

c

AREA OF

WORK

C

1

A

B

2 3

D

1

E

2 3

C

4 5

SHEET NUMBER

6

DRAWN BY:CHECKED BY:

JOB NUMBERDATE:

A

B

4 5

D

6

E

CO

NS

TA

NT

IN

E

EN

GIN

EE

RIN

G

AS

SO

CIA

TE

S, L

LC

16

43

B S

av

an

na

h H

wy

, #

18

1, C

ha

rle

sto

n, S

C 2

94

07

Ph

on

e: 8

43

.6

28

.7

87

8, F

ax

: 8

43

.6

28

.7

88

1

ASSOCIATES, LLCENGINEERING

C E R T I F I CA T E O F AU T HOR I ZAT I ON

SOUTH CAROL I NA

CONSTANTINE

C-04361

16540

SOUTH CAROL I NA

SEAL

CHR I S T O P H E R J . C ON S T ANT I NEREG

ISTE

RED

PROFES S I ONALENGINEER

921

ASS

EM

BL

Y S

TR

EE

T, C

OL

UM

BIA

, SC

292

08FP

0000

0193

USC

SC

HO

OL

OF

PUB

LIC

HE

AL

TH

05/07/19

19-019

EL

EC

TR

ICA

L P

LA

N -

POW

ER

E1.1

CJCJCM

GENERAL NOTES

LEGEND

HOMERUN OF CIRCUIT TO PANEL -

CIRCUIT NUMBERS INDICATED.

A-1,3

DRAWING NOTESEXISTING TO REMAIN.1

1. FURNISH ALL MATERIALS AND LABOR NECESSARY TO PROVIDE COMPLETE AND PROPERLY OPERATING ELECTRICAL

SYSTEMS. FURNISH ALL MATERIALS AND LABOR NECESSARY TO DEMONSTRATE TO THE OWNER AND TO THE

ENGINEER THAT ALL SYSTEMS ARE OPERATING PROPERLY AND AS SPECIFIED. WARRANTY ALL WORK AND ALL

MATERIALS, EQUIPMENT AND DEVICES FOR A PERIOD OF ONE YEAR AFTER OWNER'S ACCEPTANCE.

2. ENSURE THAT ALL WORK CONFORMS TO THE LATEST EDITION OF:

2.1. ANSI/NFPA 70 (NATIONAL ELECTRICAL CODE)

2.2. NECA STANDARD OF INSTALLATION

2.3. SOUTH CAROLINA BUILDING CODE

2.4. NFPA 101 (LIFE SAFETY CODE)

2.5. ALL FEDERAL, STATE AND LOCAL CODES AND ORDINANCES

2.6. LOCAL UTILITY COMPANY REGULATIONS

3. ALL MATERIALS, EQUIPMENT AND DEVICES AS A MINIMUM SHALL MEET THE REQUIREMENTS OF U.L. (WHERE U.L.

STANDARDS ARE ESTABLISHED FOR THOSE ITEMS) AND THE REQUIREMENTS OF THE NFPA 70. ALL ITEMS SHALL BE

CLASSIFIED BY U.L. AS SUITABLE FOR THE PURPOSE USED.

4. COORDINATE LOCATION OF ELECTRICAL DEVICES AND ELECTRICAL WORK WITH OTHER TRADES TO AVOID CONFLICTS

AND INTERFERENCES. NUMBERS ADJACENT TO DEVICES ARE NOMINAL MOUNTING HEIGHTS.

5. PROVIDE ALL THE INTERCONNECTING POWER WIRING AND CONDUIT, CONTROL WIRING (RATED 120 VOLTS (NOMINAL))

AND CONDUIT, AND THE ELECTRICAL POWER CIRCUITS FOR ALL EQUIPMENT PROVIDED BY OTHER TRADES.

6. PROVIDE MINIMUM SIZE OF #12 CONDUCTOR FOR 20A POWER CIRCUITS LESS THAN 75'-0" IN LENGTH. OTHERWISE,

PROVIDE MINIMUM CONDUCTOR SIZE OF #10. INSTALL ALL WIRING IN CONDUIT UNLESS NOTED OTHERWISE.

7. SUPPORT ALL CONDUIT ABOVE CEILING FROM BUILDING STRUCTURAL MEMBERS OR CONCRETE DECKING, NOT FROM

CEILING GRID OR GRID HANGER WIRES.

8. WHERE CONDUIT PENETRATES FIRE RATED BARRIERS (WALLS, FLOORS AND CEILINGS), SEAL THE OPENING AROUND

THE CONDUIT TO MAINTAIN THE FIRE RATING OF THE BARRIER WITH U.L. LISTED FIRE STOPPING MATERIAL.

9. PROVIDE TYPEWRITTEN DIRECTORY FOR PANEL TO INCLUDE ALL EXISTING AND NEW CIRCUITS. DIRECTORY SHALL

IDENTIFY PANELBOARD AND INDICATE EACH CIRCUIT NUMBER, DESCRIPTION AND LOCATION.

125V, 20A DUPLEX RECEPTACLE AT 18" ABOVE

FINISHED FLOOR UNLESS OTHERWISE NOTED

125V, 20A QUADRAPLEX RECEPTACLE AT 18" ABOVE

FINISHED FLOOR UNLESS OTHERWISE NOTED

250V, 20A SINGLE RECEPTACLE

EXISTING COMMUNICATIONS OUTLET

PANELBOARD, EXISTING

"c" INDICATES 42" AFF MOUNTING HEIGHT

POWER PLANA1

3/8" = 1'-0" 32' 64'16'0

KEY PLANA5NO SCALE

ELECTRICAL PANEL "PLN5H" SCHEDULE (EXISTING)

VOLTS/PHASE/WIRE: PANEL SIZE & TYPE: MAIN SIZE & TYPE: CABINET: MIN SCC: FED FROM: NOTES:

120-208/3/4 225A 100A MLO FLUSH 10 KAIC

NO TRIP AREA SERVED A B C A B C AREA SERVED TRIP NO

1 20 RECEPT - VENT TEACH LAB 200 1000 RECEPT- VENT TEACH LAB 20 2

3 20 RECEPT - VENT TEACH LAB 200 X SPARE 20 4

5 20 RECEPT - VENT TEACH LAB 200 400 RECEPT- VENT TEACH LAB 20 6

7 20 RECEPT - VENT TEACH LAB 1000 1000 RECEPT- VENT TEACH LAB 20 8

9 20 SPARE X X SPARE 20 10

11 20 RECEPT - VENT TEACH LAB 400 1000 RECEPT- VENT TEACH LAB 20 12

13 20 RECEPT - VENT TEACH LAB 400 1000 SPARE 20 14

15 20 RECEPT - VENT TEACH LAB 1000 200 RECEPT- VENT TEACH LAB 20 16

17 20 FUME HOOD** 70 400 RECEPT- VENT TEACH LAB 20 18

19 20 RECEPT - VENT TEACH LAB 500 1100

MASS SPECTROMETER** 20*

20

21

20* MASS SPECTROMETER**

1100 1100 22

23 1100 950

FORE VACUUM PUMP** 15*

24

25

15* FORE VACUUM PUMP**

950 950 26

27 950 X SPECTROMETER COMPUTER** 15* 28

29 15* SPECTROMETER COMPUTER** X X SPECTROMETER MONITOR** 15* 30

31 15* SPECTROMETER MONITOR** X 100 DATA ACQUISITION UNIT** 15* 32

33 15* DATA ACQUISITION UNIT** 100 100 TOF POWER SUPPLY** 15* 34

35 15* TOF POWER SUPPLY** 100 X SPARE 20 36

37 20 SPARE X X SPARE 20 38

39 20 SPARE X X SPARE 20 40

41 20 SPARE X X SPARE 20 42

TOTAL CONNECTED LOAD = 17570 VA TOTAL DEMAND = 17570 VA TOTAL DEMAND = 49 AMPS

ALL BREAKERS ARE EXISTING TO REMAIN UNLESS DENOTED OTHERWISE. BREAKERS DENOTED BY A * ARE NEW.

ALL CIRCUITS ARE EXISTING TO REMAIN UNLESS DENOTED OTHERWISE. CIRCUITS DENOTED BY A ** ARE NEW.

EXISTING LOADS ARE BASED ON PHRC BUILDING DRAWINGS DATED "11 JUNE 2004".

AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
517
AutoCAD SHX Text
466 SF
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
DN
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
UP
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
UP
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
D.S.
AutoCAD SHX Text
DN

Recommended