    7 Reasons

    Why GridInvestment Fail

  • 8/17/2019 7 Reason Why Grid Investment Fail

    2/12

    ⊡7 Reasons Why GridInvestment Fail

  • 8/17/2019 7 Reason Why Grid Investment Fail

    3/12

    PitFall : Vendor/ Integrator businesscase analysis

    Utility often rely on vendors or system integrator to provinvestment business system. Since these organization financial interest in moving project forward, a conflict-ofin inherent in this practice.

    Recommendation : ngage third parties who has no finterest in the project to provide an unbiased financial evof the smart grid project

    1

  • 8/17/2019 7 Reason Why Grid Investment Fail

    4/12

    PitFall : Absence o ris! analysis

    !hange in wholesase power cost structure, uncertaincostumer demand response participation, and many othecan result in considerable uncertainty over estimated resmart grid invesment.

    Recommendation : Smart grid business case analysisinclude ris" analysis associated with uncertain parametassumption,applied in the analysis. Scenario analysis help impact of uncertainty while value-at-ris" analysis ptraditional financial ris" analysis.

    "

  • 8/17/2019 7 Reason Why Grid Investment Fail

    5/12

    PitFall : Failure to #uantiy uni#ueutility and costumer characteristic

    #usiness case analysis often apply industry average parand estimaters that poorly represent actual utility characS$R! e%perience show that average cost& benefit parametpoor job of reflecting actual utility cost and benefit. #est

    re'uires an objective evaluation of the business casavailable utility data.Recommendation  : ma"e sure that the business case e%plicity 'uantifies these benefits for your utility rathrelying on estimates from other utilities.

    $

  • 8/17/2019 7 Reason Why Grid Investment Fail

    6/12

    PitFall : %ub&ective system integrator/'rime contractor selection(

    %electing a system integrator/ 'rime contractoa''roving subcontractor based on name recogsales re'resentative) relationshi' or other sconsideration is dangerous(

    Recommendation  : don*t automatically assume +big name, 'rime contactor or subcontractodeliver all 'roduct and service -ithout com'li.he smart grid is relatively ne- a'lication area th+sha!e out, non 'erorming com'anies both larsmall( hec! many reerence(

    0

  • 8/17/2019 7 Reason Why Grid Investment Fail

    7/12

    PitFall : %ot-are 'erormance ailure(

    Smart grid depend on software& () performance. (f your capability have not been successfully applied by several li"e your, proceed at you own ris". Software is notoriously to implement and modify for different application.

    Recommendation  : ma"e sure that you tal" with softwarvendor whose application are semilar to yours to ensurdelivery and acceptable capabilities.

  • 8/17/2019 7 Reason Why Grid Investment Fail

    8/12

    Inade#uate 'ost2A3I im'lementationstrategies(

    *any smart grid business plans rely heavily on post-+*( from costumer engagement& demand response, + anowever, program development and implementation planidentified and scheduled to limit implementation delays.

    Recommendation : ma"e sure that post-+mi benefappropriately considered with program developmeimplementation plans clearly identified and scheduled implementation delays.

    4

  • 8/17/2019 7 Reason Why Grid Investment Fail

    9/12

    Insu5cient utility due diligence(

    )his last category is a catchall that capture all those thiutilities should consider including elements from some ofitem above. )here are li"ely to be option that are not offefavored proposal that should be considered.

    Recommendation : each utility should retain an independent evaluation firm for its due deligence or develohouse team of smart grid project participant from the application areas who have responsiblility for assessievaluating.

    7

  • 8/17/2019 7 Reason Why Grid Investment Fail

    10/12

    /US)(01?

  • 8/17/2019 7 Reason Why Grid Investment Fail

    11/12

    “THANK YOU

  • 8/17/2019 7 Reason Why Grid Investment Fail

    12/12

    SlidesCarnival ic

    )his means that y● Resize the● !hange fi● !hange li

    (sn2t that nice3 :4

    %amples:


Recommended